February 15, 2022

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000352/2021401 AND 05000353/2021401

Dear Mr. Rhoades:

On January 21, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2 and discussed the results of this inspection with Mr. Frank Sturniolo, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000352 and 05000353

License Numbers:

NPF-39 and NPF-85

Report Numbers:

05000352/2021401 and 05000353/2021401

Enterprise Identifier: I-2021-401-0099

Licensee:

Constellation Energy Generation, LLC

Facility:

Limerick Generating Station, Units 1 and 2

Location:

Limerick, PA

Inspection Dates:

November 29, 2021 to January 21, 2022

Inspectors:

D. Caron, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

J. Rey, Security Specialist

Approved By:

Daniel L. Schroeder, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Limerick Generating Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

On February 1, 2022, the license for Limerick Generating Station, Units 1 and 2 was transferred to Constellation Energy Generation, LLC (Constellation) as documented in license amendments (ML22021B660). While some or all of the inspection documented in this report was performed while the licensee was referred to as Exelon Generation Company, LLC, this report will refer to the licensee as Constellation throughout.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, e)
  • Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 9 Requirements (02.09 a, b, 02.10, 02.11 a - e, 02.13 a)
  • Tier III: 4 Requirements (02.14, 02.15 a - c)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.05 a, b, c, d, 02.06 a, b)
  • Tier III: 5 Requirements (02.10, 02.11 a, 02.12 a, b, 02.13 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revisions 23 and 24 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changes continue to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) July 1, 2020 through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On December 2, 2021, the inspectors presented a security inspection debrief to Mr. Frank Sturniolo, Site Vice President, and other members of the licensee staff.
  • On January 21, 2022, the inspectors presented the security baseline inspection results to Mr. Frank Sturniolo, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

04376806

04382141

04393794

04400200

04401297

04418898

04436358

04453245

Procedures

SY-AA-101-112

Exelon Security Search Processes

Revision 37

SY-AA-101-112-

1004

Protected Area Search Processes

Revision 4

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

Revision 2

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 33

SY-AA-101-118

Control of Badges

Revision 10

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-124

Operation of The Security Control Centers

Revision 15

SY-AA-101-132

Security Assessment and Response to Unusual Activities

Revision 34

SY-LG-101-112

Limerick Generating Station Search Processes

Revision 9

SY-LG-101-115

Operations of Active Vehicle Barriers and Gates

Revision 10

SY-LG-101-119

Control of Receiving Warehouse at Limerick Generating

Station

Revision 11

SY-LG-101-124

Duties and Responsibilities of Security Control Centers and

Security Supervision at Limerick Generating Station

Revision 14

SY-LG-1016

Limerick Watch Standing Practices

Revision 14

SY-LG-1039

Visitor Authorization

Revision 10

71130.04

Procedures

SI-500

Security Light Surveillance and Calibration

Revision 16

SI-851

Early Warning System (EWS) and Unattended Pathway

Performance Determination Test

Revision 1

SI-955

Observation and Inspection of Security Barriers

Revision 022

SY-AA-101-122

Testing Security Equipment

Revision 23

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-101-122-

101

Performance of Perimeter Intrusion Detection/Camera

System Tests

Revision 30

SY-AA-101-122-

2

Performance of Early Warning Detection System Tests

Revision 00

71130.07

Corrective Action

04374991

263398

04400010

04393115

04436358

04376806

04393794

04400200

04401297

04436358

04376806

04418898

04408675

04440700

04422944

04382141

04454693

04416309

04408675

Corrective Action

Documents

Resulting from

Inspection

04464261

04464322

04464325

04464329

04464343

Miscellaneous

Approved Firearms Courses of Fire

Procedures

SY-AA-1036

Avon Protective Respirator

Revision 1

SY-AA-150-1008

Firearm Training Simulator (FATS)

Revision 1

SY-AA-150-101

Exelon Nuclear Security Training

Revision 2

SY-AA-150-105

Exelon Nuclear Security Physical Fitness Test, Development

and Conduct

Revision 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-152

Tactical Course Development Approval and Conduct

Revision 7

Self-Assessments NOSA-LIM-20-02

Security Programs Audit Report

01/21/20

NOSA-LIM-21-01

Security Programs Audit Report

01/19/21

71130.09

Miscellaneous

Limerick Generation Station Physical Security Plan, Training

and Qualification Plan, Safeguards Contingency Plan, and

Independent Spent Fuel Storage Installation Security

Program

Revision 23

Limerick Generation Station Physical Security Plan, Training

and Qualification Plan, Safeguards Contingency Plan, and

Independent Spent Fuel Storage Installation Security

Program

Revision 24

71151

Procedures

SI-034

Protected Area Security Performance Indicator Instruction

Revision 13

SY-AA-150-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 11