ML101590390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 Facility:
{{#Wiki_filter:Appendix D                                                 Scenario Outline                                   Form ES-D-1 Facility:               Turkey Point                         Scenario No.:           1 1     Op Test No.:     2007-301 Examiners:                                                             Candidates:                                         US RD RO BOP Initial Conditions:       Mode 1, 1 75% Power, MOL, MDL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return to 100% power following a turbine valve test.
Turkey Point Scenario No.: 1 Op Test No.: 2007-301 Examiners:
Turnover:                 Equipment OOS:DOS: 3B EDG due to failed fuel pump (OOS (DOS 22 days; next 0-OSP-023.3 AU    1 &
Candidates:
Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS (005 4 hrs; ETR 24 hrs; both trains verified operable);
US RO BOP Initial Conditions:
3B CSP due to failed 1ST -low- low discharge pressure (OOS (DOS 12 hr; ETR 36 hr)
Mode 1, 75% Power, MOL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return to 100% power following a turbine valve test. Turnover:
Perform 3C ICWP isolation valve cycling test per step 7.1.3 of 3-0SP-019.3.
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3-OSP-01 9.3. Steps 7.1.1 && 7.1.2 for 3A and 3B ICWP are not scheduled for this shift.
3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Perform 3C ICWP isolation valve cycling test per step 7.1.3 of 3-0SP-019.3.
Known tube leak in 3A S/G SIG (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate.
Steps 7.1.1 & 7.1.2 for 3A and 3B ICWP are not scheduled for this shift. Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
Event                               Type*
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) SRO/BOP 3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 step 7.1.3. 2 (I) RO/BOP Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = T per 3-0NOP-059.8. (TS,I) SRO 3 See event 4a PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator TFS1ML3L = T below 0-7/4. 4 (C) BOP Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.
Event Type*                                     Event Description No.
TS are TFE2Z52S = T evaluated for loss of the A SSGFWP. (C, TS) SRO 4a (R) SRO/BOP Automatic runback fails due to PT-3-1604 failure and requires manual action (I) RO to reduce power < 60 % to avoid reactor trip on s/g 10-10 level. The crew responds per 3-0NOP-089.
I 1                         (N) SRO/BOP                                                               3-OSP-019.3 step 7.1.3.
5 TYFACN3 = 0.1 (M) ALL Once reactor power stabilized
3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 2                         (I) RO/BOP       Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = = T per 3-0NOP-059.8.
< 60% power, a 3C SG feed break occurs TFW98M=T inside containment.
TSI SRO (TS,I) 3                         See event 4a     PT-3-1 604 fails low. The crew responds per 3-ARP-097.CR for annunciator PT-3-1604 TFS1ML3LT TFS1ML3L   =T     below             0-7/4.
A manual reactor trip is required before any SG level TCF1D09M = F drops < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is TFL2XASE = T performed.
D-7/4.
The MOV-3-1409 breaker trips & FCV-3-498 fails to close leaving TFL2XBSE = T an uncontrolled feed path to 3C SG if 3A SGFP started. 6 (C) ALL C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC = can not be reset. B AFWP is OOS. A AFWP starts, but runs out of steam 6300.0 pressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 TCF5MTC = T steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.  
4                         (C) BOP                                                           3-ONOP-004.4. TS are Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.
.. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: _1_ Page _1_ of _1_ Event
TFE2Z52S = = T evaluated for loss of the A SSGFWP.
(C TS) SRO (C,
4a                         (R) SRO/BOP                                         PT-3-1 604 failure and requires manual action Automatic runback fails due to PT-3-1604 to reduce power < 60 %                                  b-b level. The crew
                                                                        % to avoid reactor trip on s/g 10-10 I RO (I) RD 3-ONOP-089.
responds per 3-0NOP-089.
TVFACN3O.1 TYFACN3   = 0.1                                                       < 60% power, a 3C SG feed break occurs 5                          (M) ALL          Once reactor power stabilized <
TFW98M=T                           inside containment. A manual reactor trip is required before any SG level TCF1009M =
TCF1D09M   = F                     drops < < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is TFL2XASE = = T MOV-3-1 409 breaker trips &
performed. The MOV-3-1409                       & FCV-3-498 fails to close leaving TFL2XBSE = = T an uncontrolled feed path to 3C SG if 3A SGFP started.
6                         (C) ALL           C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC =
                        =                      can not be reset. B AFWP is OOS.
DOS. A AFWP starts, but runs out of steam eaoo.o 6300.0                           pressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 2 TCF5MTC == TT TCF5MTC                            steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed && bleed since all SGs << 32% narrow range with adverse containment conditions.
(R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty,                                       (M)ajor (l)nstrument, (C)omponent, (M)aJor 1
1
 
AppendixDD Appendix                                           OperatorActions Operator       Actions                                         Form FormES-D-2 ES-D-2 Op-TestNo.:
Op-Test   No.: 2007-301 2007-301            ScenarioNo.:
Scenario     No.:_1_ 1          EventNo.:
Event       No.:_1_               Page 1              Page_1_
j_ofof_1_j_
EventDescription:
Event
 
== Description:==
30 ICWP 3C  CWPdischarge dischargeisolation isolationvalve valvecycling cyclingtest testperper3-0SP-019.3 3-OSP-01 9.3 step step 7.1.3.
7.1.3.
=
Time Time  J  Position Position  J    Directs BOP Applicants Actions Applicant's      Actions or  or Behavior Behavior US US        Directs    BOP to to have have NSONSO cyclecycle 3C30 ICWP CWP discharge discharge isolation isolation valve, valve, 3                            50-332 per 50-332      per 3-0SP-019.3, 3-OSP-019.3, sectionsection 7.1. 7.1.
Directs BOP Directs      BOP start start 3B 3B ICWP ICWP && sid  s/d 3C3C ICWP ICWP per per 3-0P-019 3-OP-Ol 9 section section 5.3.
5.3.
BOP BOP        Obtains copies Obtains      copies ofof 3-0SP-019.3, 3-OSP-019.3, section section 7.1  7.1 && 3-0P-019, 3-OP-019, section section 5.3.
5.3.
Perform    s  actions  as Performs actions as follows:  follow  s:
1.
: 1.        Starts 3B Starts    3B ICWP ICWP && stops stops 3C 3C ICWPICWP per per 3-0P-019 3-OP-019 section section 5.3 5.3 a.
: a.      Verifies NSO Verifies  NSO understands understands ICWPs    ICWPs to  to be be started/stopped started/stopped
: b.      Directs NSO Directs    NSO verify oil in 3B ICWP    ICWP sightglass sightglass &  & 3B 3B ICWP ICWP discha dischargerge  valve    open
: c.      Starts 3B ICWP & checks VPA ammeter>          ammeter> zero
: d.      Directs NSO locally check 3B ICWP visible packing                packing leakoff leakoff
: e.      Stops 30 3C  ICWP      & checks              ammeter VPA ammet          er ==zero
: f.      Directs NSO NSO locally do    do post-st post-stopop check 2.
: 2.        Has Has RO record 30      3C ICWP ICWP as  as inoper inoperable.
able.
3.
: 3.        Directs Directs NSONSO perform perform stepssteps 7.1.3.3 7.1.3.3 thru thru 7.1.3.6 7.1.3.6 NOTE NOTE:: NSO  NSO has has signof signoff f proced procedure  ure copycopy inin field field and and will will perform perform steps steps 7.1.3.3 7.1.3.3 thru thru 7.1.3.6 7.1.3.6 and and will will notify notify BOP BOP when  when these these steps steps are are done.
done.
4.4.      Starts Starts 30 3C ICWP ICWP per  per 3-OP-0 3-0P-019        section 5.3 19 section      5.3 toto verify verify operab operability.
ility.
a.
: a. Verifie Verifiess NSO NSO unders understands tands ICWPs ICWPs to  to be be started started/stopped
                                                                                                                /stopped b.b. Directs Directs NSO NSO verify verify oil oil inin 30 3C ICWP ICWP sightgl sightglass        3C ICWP ass && 30    ICWP discha  rge valve discharge    valve open open c.c. Starts Starts 303C ICWP ICWP && checks checks VPA  VPA ammet ammeter>          zero er> zero d.d. Directs Directs NSO NSO locally locallycheck check 30    3C ICWP ICWPvisiblevisible packin packing  leakoff g leakoff 5.5.      Has Has RO  RO record record 30 3C ICWP ICWPas  asback backininservice service.  .
6.6.      Since Sincethisthisisisthe thelast lastIOWP ICWPdischa discharge      valvetotobe rge valve          becycled cycled,  stops
                                                                                                                    , stops 3B    or 30  ICWP      per 3B or 3C ICWP per 3-0P-019  3-OP-0            section5.3.
19 section        5.3.
a.a. Stops Stops3B  3Boror303CICWPICWP&&checks  checksVPA  VPAammetammeter  er =zero zero b.b. Directs DirectsNSONSOlocally locallydo dopost-st post-stop    check op check RO RO      Record Records s 30  3CICWP ICWPOOS  OOSand  andreturn returntotoservice servicewhenwhenadviseadvised  byBOP.
d by  BOP.
11
 
Appendix DD Appendix                                        OperatorActions Operator      Actions                                        Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301          Scenario No.:
Scenario      No.: _1_ 1      Event Event No.:No.: _2_ 2            Page Page _1_ 1 ofof_2_2 Event
 
== Description:==
 
Event  


== Description:==
== Description:==
Power range Power      range NI NI channel channel N-42 N-42 upper upper detector detector fails fails high.
high. The The crew crew responds per responds        per 3-0NOP-059.8.
3-ONOP-059.8.
Time
[_Time    Position Position                                  ApplicanVs Actions Applicant's      Actions or  or Behavior Behavior RO RO        Recognizes // reports Recognizes          reports PRNI PRNI channel channel N-42 N-42 upper upper detector detector failed failed high.
high.
                            *. annunciator B-2/2, annunciator        B-2/2, 3/6, 3/6, 5/5, 5/5, 6/1, 6/1, 6/3, 6/3, 6/4,  9/2 && G-5/1, 6/4, 9/2      G-511, 5/2 5/2
                            *. N-42 power N-42    power range range channel channel indication indication on on console console fails fails high high
                            *. N-42 axial N-42    axial flux flux indication indication on  on console console fails fails high high
                            *. N-42 upper N-42    upper detector detector indication indication on  on NIS NIS racks racks fails fails high high NOTE: There NOTE:      There are are no no immediate actions actions for for this this failure failure N-42 N-42 US                                      3-ONOP-059.8 Directs response per 3-0NOP-059.8 RO!
RO/      Performs subsequent actions of 3-0NOP-059.8    3-ONOP-059.8 as directed by US:
BOP        1. Places dropped rod mode switch for N-42 in BYPASS.
: 2. Places right rod stop bypass switch to bypass N-42.
: 3. Transfers upper section comparator defeat switch to N-42.
: 4. Transfers lower section comparator defeat switch to N-42.
: 5. Transfers right power mismatch bypass switch to bypass N-42.
6.
: 6. Transfers comparator channel defeat        defeat switch switch to N-42.
N-42.
7.
: 7. Pulls Pulls instrument instrument powerpower fuses from N-42      N-42 drawer drawer BB US US      Evaluates Evaluates impactimpact per per TS TS 3.3.1.
3.3.1. Table Table 3.3-13.3-1 units units 2, 2, 5, 5, 66 &1
                                                                                                        & 17  apply.
7 apply.
Actions Actions 22 (6hr),
(6hr), 77 (lhr)
(1 hr)& & 1313 (6hr)
(6hr) all all in in effect.
effect.
Conducts Conducts crew  crew brief brief regarding regarding effects effects of  of N-42 N-42 failure failure and and of of tripping tripping bistables bistables as  as directed directed in in 3-ONOP-059 3-0NOP-059.8      .8 BOP BOP      Obtains Obtains keys, keys, opens opens doordoor toto and and trips trips following following bistables bistables inin protection protection channel channel II,II, rack rack 11:
11:
                            .*  BS-3-422B1 BS-3-422B1 (OPiT  (OPilT trip) trip)
                            .*  BS-3-422B2 BS-3-422B2 (OPIiT (OPilT rod rod stop) stop)
                          .It  BS-3-422C1 BS-3-422C1 (OTtT  (OTilT trip) trip)
                          .*    BS-3-422C2 BS-3-422C2 (OThT  (OTilT rod rod stop) stop)
Closes Closes protection protection rackrack door doorwhen when done.done.
22


3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 step 7.1.3. = Time Position Applicant's Actions or Behavior US Directs BOP to have NSO cycle 3C ICWP discharge isolation valve, 3-50-332 per 3-0SP-019.3, section 7.1. Directs BOP start 3B ICWP & sid 3C ICWP per 3-0P-019 section 5.3. BOP Obtains copies of 3-0SP-019.3, section 7.1 & 3-0P-019, section 5.3. Performs actions as follows: 1. Starts 3B ICWP & stops 3C ICWP per 3-0P-019 section 5.3 a. Verifies NSO understands ICWPs to be started/stopped
AppendixDD Appendix                                      OperatorActions Operator      Actions                                 Form Form ES-D-2 ES-D-2 Op-TestNo.:
: b. Directs NSO verify oil in 3B ICWP sightglass
Op-Test    No.: 2007-301 2007-30 1       Scenario No.:
& 3B ICWP discharge valve open c. Starts 3B ICWP & checks VPA ammeter> zero d. Directs NSO locally check 3B ICWP visible packing leakoff e. Stops 3C ICWP & checks VPA ammeter = zero f. Directs NSO locally do post-stop check 2. Has RO record 3C ICWP as inoperable.
Scenario    No.: _1_
: 3. Directs NSO perform steps 7.1.3.3 thru 7.1.3.6 NOTE: NSO has signoff procedure copy in field and will perform steps 7.1.3.3 thru 7.1.3.6 and will notify BOP when these steps are done. 4. Starts 3C ICWP per 3-0P-019 section 5.3 to verify operability.
1       EventNo.:
: a. Verifies NSO understands ICWPs to be started/stopped
Event    No.: _2_2            Page.....L Page    2 ofof_2_
: b. Directs NSO verify oil in 3C ICWP sightglass
2 Event
& 3C ICWP discharge valve open c. Starts 3C ICWP & checks VPA ammeter> zero d. Directs NSO locally check 3C ICWP visible packing leakoff 5. Has RO record 3C ICWP as back in service. 6. Since this is the last ICWP discharge valve to be cycled, stops 3B or 3C ICWP per 3-0P-019 section 5.3. a. Stops 3B or 3C ICWP & checks VPA ammeter = zero b. Directs NSO locally do post-stop check RO Records 3C ICWP OOS and return to service when advised by BOP. 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: _2_ Page _1_ of _2_ Event


== Description:==
== Description:==


Power range NI channel N-42 upper detector fails high. The crew responds per 3-0NOP-059.8.
Event  
Time Position Applicant's Actions or Behavior RO Recognizes
/ reports PRNI channel N-42 upper detector failed high.
* annunciator B-2/2, 3/6, 5/5, 6/1, 6/3, 6/4, 9/2 & G-5/1, 5/2
* N-42 power range channel indication on console fails high
* N-42 axial flux indication on console fails high
* N-42 upper detector indication on NIS racks fails high NOTE: There are no immediate actions for this failure N-42 US Directs response per 3-0NOP-059.8 RO/ Performs subsequent actions of 3-0NOP-059.8 as directed by US: BOP 1. Places dropped rod mode switch for N-42 in BYPASS. 2. Places right rod stop bypass switch to bypass N-42. 3. Transfers upper section comparator defeat switch to N-42. 4. Transfers lower section comparator defeat switch to N-42. 5. Transfers right power mismatch bypass switch to bypass N-42. 6. Transfers comparator channel defeat switch to N-42. 7. Pulls instrument power fuses from N-42 drawer B US Evaluates impact per TS 3.3.1. Table 3.3-1 units 2, 5, 6 & 17 apply. Actions 2 (6hr), 7 (1 hr)& 13 (6hr) all in effect. Conducts crew brief regarding effects of N-42 failure and of tripping bistables as directed in 3-0NOP-059.8 BOP Obtains keys, opens door to and trips following bistables in protection channel II, rack 11:
* BS-3-422B1 (OPilT trip)
* BS-3-422B2 (OPilT rod stop) It BS-3-422C1 (OTilT trip)
* BS-3-422C2 (OTilT rod stop) Closes protection rack door when done. 2 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: _2_ Page .....L of _2_ Event


== Description:==
== Description:==
Power range Power  range NINI channel channel N-42N-42 u[2[2er upperdetector detectorfails fails high.
high. The The crew crew responds  per 3-0NOP-059.8.
res[2onds [2er  3-ONOP-059.8.
Time
    ,.... Position Dosition                              Applicants Actions Applicant's    Actions oror Behavior Behavior RD RO        Monitors bistable Monitors    bistable status status lights lights and and annunciator annunciator panels panels forfor expected expected indications  while  bistables    being indications while bistables being tripped.tripped.
US US        1. Directs notification
: 1. Directs  notification ofof I&e l&C
: 2. Directs
: 2. Directs STA STA monitor monitor QPTR QPTR perper 3-0SP-059.1 3-OSP-059.100(reactor (reactor power power approx. 75%)
approx. 75%)
: 3. Directs
: 3. Directs wee WCC generate generate clearance clearance for for tripped tripped bistables bistables 33


Power range NI channel N-42 u[2[2er detector fails high. The crew res[2onds
Appendix DD Appendix                                      OperatorActions Operator     Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.:
[2er 3-0NOP-059.8. , .... Dosition Applicant's Actions or Behavior RO Monitors bistable status lights and annunciator panels for expected indications while bistables being tripped. US 1. Directs notification of I&e 2. Directs STA monitor QPTR per 3-0SP-059.1 0 (reactor power approx. 75%) 3. Directs wee generate clearance for tripped bistables 3
Op-Test No.:   2007-30 1 2007-301           Scenario No.:
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: --l. Page _1_ of_1_ Event
Scenario     No.: _1_ 1                  No.: --l. Page Page _1_
Event Event No.:                    j of_1_
of ..i.
Event


== Description:==
== Description:==


PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator D-7/4. Time Position Applicant's Actions or Behavior BOP Acknowledges alarm D-7/4. Perform actions of 3-ARP-097.CR for annunciator D-7/4. 1. Recognizes/reports CV-3-2011 open and PT-3-1604 failed. 2. Determines no other automatic actions have occurred.
Event
: 3. Determines reactor power increased due to CV-3-2011 failure but still < 100% 4. Determines SGFP suction pressure>
260 psig. 5. When directed by US, closes CV-3-2011.
: 6. Directs NSO verify CV-3-1900 closed. 7. Determines 2 HDPs running as required since turbine load> 450 MWe RO Reads 3-ARP-097.CR for annunciator D-7/4 Observes decrease in Tavg & increase in reactor power due to CV-3-2011 failure US Directs closure of CV-3-2011 once it has been determined that SGFP suction pressure>
260 psig Determines effects of PT-3-1604 failure (e.g, no turbine runback on loss of SGFP). Conducts crew brief regarding effects of PT 1604 failure. Directs WCC have I&C investigate
/ fix PT-3-1604 failure. If QPTR directed in event 2, then allows power> 75% 4 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: 4/4a Page _1_ of 2 Event


== Description:==
== Description:==
PT-3-1 604 fails PT-3-1604      fails low.
low. The The crew crew responds responds per  per 3-ARP-097.CR 3-ARP-097.CR for  for annunciator D-7/4.
annunciator      D-7/4.
Time Time        Position Position                                Applicants Actions Applicant's      Actions or or Behavior Behavior BOP BOP            Acknowledges alarm Acknowledges        alarm D-7/4.
D-7/4.
Perform actions Perform    actions of of 3-ARP-097.CR 3-ARP-097.CR for    for annunciator annunciator D-7/4.
D-7/4.
1.1. Recognizes/reports CV-3-2011 Recognizes/reports          CV-3-201 1 openopen andand PT-3-1604 PT-3-1 604 failed.
failed.
2.
: 2. Determines no Determines          other automatic no other    automatic actions actions have have occurred.
occurred.
: 3. Determines reactor Determines      reactor power increased due to CV-3-2011  CV-3-201 1 failure failure but still but still << 100%
100%
: 4. Determines SGFP suction pressure>  pressure > 260 psig.
: 5. When directed by US, closes CV-3-2011. CV-3-201 1.
: 6.                              CV-3-1 900 closed.
Directs NSO verify CV-3-1900
: 7. Determines 2 HDPs running as required since turbine load>
450 MWe RO          Reads 3-ARP-097.C 3-ARP-097.CR      R for annunciator D-7/4 Observes decrease in Tavg &            & increase in reactor power due to CV-3-2011 failure US US        Directs Directs closure of CV-3-201 CV-3-20111 once once itit has has been been determined determined thatthat SGFP SGFP suction suction pressure>
pressure> 260  260 psig psig Determines Determines effects        of PT-3-1 effects of  PT-3-1604    failure (e.g, 604 failure    (e.g, no no turbine turbine runback runback on  on loss loss of of SGFP).
SGFP).
Conducts Conducts crewcrew brief brief regarding regarding effects effects of of PT-3-1 PT-3-1604    failure.
604 failure.
Directs Directs WCC WCC have        I&C investigate have l&C      investigate // fix fix PT-3-1604 PT-3-1604 failure.
failure.
IfIf QPTR QPTR directed directed in in event event 2,2, then then allows allows power>
power> 75%
75%
44


Loss of 3C 4kV bus. 3B SGFP is lost. Automatic run back fails due to PT-3-1604 failure and requires manual action to reduce power < 60 % to avoid reactor trip on S/9 10-10 level. The crew responds per 3-0NOP-089 and 3-0NOP-004.4.
AppendixDD Appendix                                                OperatorActions Operator      Actions                                        Form Form ES-D-2 ES-D-2 Op-TestNo.:
TS are evaluated for loss of the A SSGFWP . .,.., I II I It:: Position Applicant's Actions or Behavior BOP Recognizes/reports loss of 3B SGFP US BOP
Op-Test         No.:   2007-301 2007-301             Scenario No.:
* Annunciator D-6/2 (B SGFP low flow)
Scenario       No.: _1_1          Event No.:
* Annunciators C-5/1 thru 5/3 (SG steam> feed flow)
Event    No.: 4/4a 4/4a       Page Page_1_1 of   of2 2 Event
* Annunciators D-6/1 thru 6/3 (SG level deviations)
* 3B SGFP breaker open indication with ammeter = 0
* Indicated feedwater flow < steam flow for all SGs
* Slowly dropping level in all SGs Notices absence of runback and takes 3B SGFP control switch to trip. Recognizes/reports failure of turbine to runback. Directs performance of immediate actions per 3-0NOP-089 including manual turbine runback to < 60% turbine load or as needed to reduce steam flow < available feedwater flow. Verifies automatic actions per 3-0NOP-089:
: 1. Manually reduces turbine load 2. Performs fast load reduction to < 60% turbine load or as needed to reduce steam flow < available feedwater flow. 3. Verifies condenser steam dumps open as necessary based on Tavg-Tref mismatch.
: 4. Verifies main FW regulating valves throttle as necessary to return SG level to program (60%). RO Verifies automatic actions per 3-0NOP-089:
: 1. Verifies auto rod insertion in response to turbine load reduction to reduce Tavg/Tref mismatch 2. Verifies PZR level & pressure control: a. Charging pump speed changes to maintain PZR level b. PZR heaters / normal spray function as needed to maintain PZR pressure approx 2235 psig 5 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: 4/4a Page _2_ of _2_ Event


== Description:==
== Description:==


Loss of 3C 4kV bus. 3B SGFP is lost. Automatic runback fails due to PT-3-1604 failure and reguires manual action to reduce 120wer < 60 % to avoid reactor tril2 on s/g 10-10 level. The crew resl20nds l2er 3-0NOP-089 and 3-0NOP-004.4.
Event       
TS are evaluated for loss of the A SSGFWP. Time Position Applicant's Actions or Behavior US Directs subsequent actions per 3-0NOP-089.
 
BOP Performs remainder of subsequent actions per 3-0NOP-089.
== Description:==
Loss of Loss     of 3C 3C 4kV 4kV bus.
bus. 3B3B SGFP SGFP isis lost.
lost. Automatic Automatic run        back fails runback    fails due due toto PT-3-1 604 failure PT-3-1604          failure and and requires requires manual manual action action to  to reduce power << 60 reduce    power        60 % %
to  avoid    reactor  trip to avoid reactor trip on S/9  on        b-b s/g 10-10 level. The level. The crew crew responds responds per  per 3-0NOP-3-ONOP-089 and 089    and 3-0NOP-004.4.
3-ONOP-004.4. TS      TS are are evaluated evaluated for for loss loss ofof the the AA SSGFWP SSGFWP..
Time_J            Position I II I It::      Position                                  Applicants Actions Applicant's      Actions or or Behavior Behavior BOP BOP          Recognizes/reports loss Recognizes/reports            loss of of 3B 3B SGFP SGFP
                                          **    Annunciator D-6/2 Annunciator        D-6/2 (B(B SGFP SGFP low  low flow) flow)
                                          *. Annunciators C-5/1 Annunciators        0-5/1 thru thru 5/3 5/3 (SG (SG steam>
steam > feed feed flow) flow)
                                          *. Annunciators D-6/1  D-6/1 thru 6/3 6/3 (SG (SG level level deviations)
                                          **    3B SGFP breaker open indication  indication with ammeter            =0
                                          *. Indicated feedwater flow <        < steam flow for all SGs
                                          *. Slowly dropping level in all SGs Notices absence absence of runback and takes 3B SGFP control switch to                        to trip. Recognizes/reports Recognizes/reports failure of turbine to runback.
US US          Directs performance of immediate actions per 3-ONOP-089            3-0NOP-089 including manual turbine runback to << 60% turbine load or as needed to reduce steam flow << available feedwater flow.
Verifies automatic automatic actions actions per per 3-ONOP-089 3-0NOP-089::
BOP BOP 1.
: 1. Manually Manually reduces reduces turbine turbine load load 2.
: 2. Performs Performs fast fast load load reduction reduction to to << 60%
60% turbine turbine load      or as load or    as needed needed to  to reduce reduce steam steam flow flow << available available feedwater feedwater flow.flow.
3.
: 3. Verifies Verifies condenser condenser steam steam dumps dumps openopen as  as necessary necessary based based on on Tavg-Tref      mismatch.
Tavg-Tref mismatch.
4.
: 4. Verifies Verifies main main FW FW regulating regulating valves valves throttle throttle as  as necessary necessary to  to return return SG SG level level to to program program (60%).
(60%).
RO RO        Verifies Verifies automatic automatic actions actions per per 3-ONOP-089 3-0NOP-089:      :
1.1. Verifies Verifies autoauto rod rod insertion insertion inin response response to    to turbine turbine load load reduction reduction toto reduce reduce Tavg/Tref Tavg/Tref mismatch mismatch 2.2. Verifies Verifies PZR PZR level level && pressure pressure control:
control:
a.a. Charging Charging pump pump speed speed changes changes toto maintain maintain PZR PZR level level b.b. PZR PZR heaters heatersI /normal normalspraysprayfunction function as  asneeded neededtoto maintain maintain PZR PZR pressure pressureapprox approx22352235 psig psig 55
 
Appendix DD Appendix                                      Operator Actions Operator      Actions                                          Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:  2007-301 2007-301            Scenario No.:
Scenario      No.: _1_1        Event Event No.:No.: 4/4a 4/4a    Page Page _2_  2 of  of _2_
2 Event
 
== Description:==
 
Event
 
== Description:==
Loss of Loss    of 3C 30 4kV 4kV bus.
bus. 3B3B SGFP SGFP is  is lost.
lost. Automatic Automatic runback runback fails fails due due to to PT-3-1 604 failure PT-3-1604       failure and and reguires requires manual manual action action to     reduce 120wer to reduce    power << 60  60 %%
to avoid to avoid reactor reactor tril2 trip on on s/g   b-b level.
s/q 10-10   level. The The crew crew resl20nds responds l2er per 3-0NOP-3-ONOP-089 and 089     and 3-0NOP-004.4.
3-ONOP-004.4. TS      TS are are evaluated evaluated for  for loss loss ofof the the AA SSGFWP.
SSGFWP.
Time__[
Time       Position Position                               ApplicanVs Actions Applicant's     Actions or or Behavior Behavior US US          Directs subsequent Directs   subsequent actions actions perper 3-0NOP-089.
3-ONOP-089.
BOP BOP         Performs remainder Performs     remainder of  of subsequent subsequent actionsactions per per 3-0NOP-089.
3-ONOP-089.
: 1. Verifies SG levels and pressures stabilized
: 1. Verifies SG levels and pressures stabilized
: 2. Verifies steam dumps closed. 3. Marks control room charts with date/time/cause of runback Performs remainder of subsequent actions per 3-0NOP-089.
: 2. Verifies steam dumps closed.
RO 1. Verifies Tavg matches Tref 2. Verifies PZR level & pressure stabilized.
: 3. Marks control room charts with date/time/cause date/time/cause of runback Performs remainder of subsequent actions per 3-0NOP-089.            3-ON OP-089.
: 3. Marks control room charts with date/time/cause of runback BOP Determines loss of 3B SGFP due to loss of 3C 4kV bus US Directs actions per 3-0NOP-004.4 BOP Performs actions as directed by US per 3-0NOP-004.4:
RO         1. Verifies Tavg matches Tref
: 1. Stabilizes plant following manual turbine run back 2. Determines 3A & 3B 4kV buses both energized
: 2. Verifies PZR level & pressure stabilized.
: 3. Determines 3C 4kV bus lockout tripped NOTE: Attempts made to reset lockout will be unsuccessful.
: 3. Marks control room charts with date/time/cause date/time/cause of runback BOP         Determines loss of 3B SGFP due to loss of 30                  3C 4kV bus US         Directs actions per 3-ONOP-004 3-0NOP-004.4        .4 BOP         Performs actions as directed by US per 3-ONOP-004      3-0NOP-004.4:      .4:
: 4. Directs FS/NSO locally investigate 3C 4kV bus US Directs WCC have Electrical maint. investigate 3C 4kV bus lockout. Determines no further actions per 3-0NOP-004.4 can be performed until 3C 4kV bus lockout reset. Directs SM to review 0-ADM-011 to see if ERT should be activated.
1.
Directs System & DCS 0-ADM-115 notification about runback. Directs Chemistry notification to sample RCS (15% power change) Determines TS 3.7.1.6 Action a. (30 days) applies for A SSGFWP (if time permits this evaluation).
: 1. Stabilizes plant following manual turbine runback            run back 2.
Conducts crew brief regarding effects of loss of 3C 4kV bus. 6 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: Pagelof_4_
: 2. Determines Determines 3A   3A && 3B3B 4kV 4kV buses buses both both energized energized
: 3. Determines
: 3. Determines 3C  3C 4kV 4kV busbus lockout lockout tripped NOTE: Attempts Attempts mademade to  to reset lockout lockout will    be unsuccessful will be   unsuccessful..
: 4. Directs
: 4. Directs FS/NSO FS/NSO locally locally investigate investigate 3C  3C 4kV 4kV busbus us US         Directs Directs WCC WCC have have Electrical Electrical maint.
maint. investigate investigate 30  3C 4kV 4kV bus bus lockout.
lockout.
Determines Determines no    no further further actions actions perper 3-ONOP-004 3-0NOP-004.4          can be
                                                                                              .4 can   be performed performed until   3C 4kV until 30  4kV busbus lockout lockout reset.
reset.
Directs Directs SMSM to to review review 0-ADM-01 0-ADM-0111 to    to see see ifif ERT ERT should should be be activated.
activated.
Directs Directs System System && DOS DCS 0-ADM-115 0-ADM-115 notification notification about about runback.
runback.
Directs Directs Ohemistry Chemistry notification notification to to sample sample ROSRCS (15% (15% power power change) change)
Determines Determines TS   TS 3.7.1.6 3.7.1.6 Action Action a. a. (30 (30 days) days) applies applies forfor AA SSGFWP SSGFWP (if (iftime time permits    this evaluation).
permits this   evaluation).
Conducts Conducts crew crew brief brief regarding regarding effects effects ofof loss loss ofof 30 3C 4kV4kV bus.
bus.
66
 
Appendix DD Appendix                                            OperatorActions Operator      Actions                                              Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test      No.:    2007-301 2007-301              Scenario No.:
Scenario    No.: _1_  1                  No.: ~
Event No.:
Event            .....        Pagelof_4_
Page .1... of 4 Event
 
== Description:==
 
Event   
 
== Description:==
Once reactor Once      reactor [:2ower power stabilized stabilized << 60%        power, aa 3C 60% [:2ower,          30 SG SG feedfeed break break occurs      inside  containment.
occurs inside containment. AA manual        manual reactor reactor tri[:2 trip isis reguired required beforebefore ani any SG level SG    level dro[:2s drops << 10%
10% since since thethe automatic automatic reactor reactor tri[:2 trip isis failed.
failed. 3-EOP-3-EOP-E-0 isis [:2erformed.
E-O        performed. The  The MOV-3-1409 MOV-3-1 409 breaker            trips &
breaker tri[:2s      & FCV-3-498 FCV-3-498 fails  fails to to close leaving close    leaving an  an uncontrolled uncontrolled feed  feed [:2ath path to to 3C 30 SGSG ifif 3A3A SGFP SGFP started started..
  .....Time      Position lillie      Position                                  Applicants Actions Applicant's        Actions or or Behavior Behavior BOP BOP          Recognizes and Recognizes          and reports reports dropping dropping 3C    3C SGSG levels levels and  and feedwater feedwater flows flows
                                        *. Annunciators C-5/1 Annunciators      0-5/1 thruthru 5/3 5/3 (SG (SG steam>
steam > feed  feed flow)flow)
                                        *. Annunciators D-6/1 Annunciators      D-611 thruthru 6/3 6/3 (SG (SG level level deviations) deviations)
                                        *. Indicated feedwater Indicated    feedwater flow  flow << steam steam flow flow for for all all SGs SGs
                                        *. Slowly dropping level Slowly                  level in in all all SGs SGs Recommends manual rx Recommends                        rx trip before any SG level drops < 10% NR.
US US        Determines a loss of FW flow is occurring and directs RO to Critical Critical      manually trip the reactor before any SG level drops <                                  < 10% NR.
Directs crew perform 3-EOP-E-0 immediate actions &                              & foldout page.
RD RO        Performs immediate actions of 3-EOP-E-0:
: 1.      Verifies reactor trip
                                        . Rod bottom lights on &        & RPIs RPls at zero
                                      .*    Rx trip && bypass bkrs open
                                      .*    Neutron Neutron flux decreasing decreasing 2.
: 2.      Determines Determines SI  SI eventually eventually actuates actuates on  on SG SG pressure pressure txP>100 LlP>1 00 psi psi BOP BOP        Performs Performs immediate immediate actions actions of  of 3-EOP-E-0:
3-EOP-E-0:
1.
: 1.      Verifies Verifies turbine turbine tripped tripped
                                      .
* Turbine Turbine stop stop valves valves closed closed
                                      .*    Closes Closes MSRMSR mainmain steam steam stop stop MOVs MOVs
                                      .*    Mid Mid &&East East GCBs GCBs open open 2.2. Verifies Verifies power power to to emergency emergency 4kV    4kV buses buses 3.3. Determines Determines both both 3A3A &&3B  3B 4kV 4kV buses buses energized energized with    with 3D 3D 4kV 4kV bus energized bus    energized from from 3B  3B 4kV 4kV bus bus RD RO        Trips Trips RCPs  RCPs ififsubcooling subcooling << 25[65]&deg;F 25[65]OF per per 3-EOP-E-0 3-EOP-E-0 foldout    foldout page.
page.
77
 
Appendix 0D Appendix                                   Operator Actions Operator       Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test No.:   2007-301 2007-301           Scenario No.:
Scenario  No.: _1_   1          Event No.:
Event   No.: _5_ 5        Page -2 Page        2 of_4_
of 4 Event
 
== Description:==
 
Event
Event
== Description:==
Once reactor Once    reactor power power stabilized stabilized << 60%  60% power, power, aa 3C30 SGSG feed feed break break occurs inside occurs    inside containment.
containment. A    A manual manual reactor reactor trip trip is is required      before any required before      any SG level SG  level drops drops << 10%
10% since since the    automatic reactor the automatic      reactor trip trip is is failed.
failed. 3-EOP-3-EOP-E-0 is E-O  is performed.
performed. The MOV-3-1409 MOV-3-1 409 breakerbreaker trips trips & & FCV-3-498 FCV-3..498 fails to leaving an close leaving    an uncontrolled uncontrolled feed path    path to 3C 30 SGSG ifif 3A 3A SGFP SGFP started.
Time e      Position Position  j                          Applicants Actions or Behavior Applicant's                    Behavior BOP        Performs 3-EOP-E-0 foldout page actions when directed by US                        US
: 1.      Isolates AFW to 3C (faulted) SG
: 2.      Opens ADVs on 3A & 3B SG          SG to stabilize RCS hot leg temp.
US        Directs BOP verify prompt actions per 3-EOP-E-0 Attachment 3.
Directs RO continue performance of 3-EOP-E-0 subsequent actions.
BOP        Verifies prompt actions per 3-EOP-E-0 Attachment 3:
: 1.      Determines 3A, 3B, 3C,    30, 3D & 3H 480V LCs      LOs energized
: 2.      Determines status of MSIVs  MSIV5 (still open) and closes them if any MS isolation signal actuated (should not be).
: 3.      Verifies FW isolation:
: a. Determines FCV-3-498 not closed. Attempts unsuccessfully        unsuccessfully to close valve using controller. Determines other 2 main FW regulating valves closed.
: b. Determines all main FW regulating bypass valves closed.
: c. Closes MOV-3-1 MOV-3-1407  407 & 1408.
1408. Determines MOV-3-1  MOV-3-1409  409 has no power. Directs NSO to locally close valve.
: d. Determines A SSGFWP not available & BB SSGFWP              SSGFWP off.
: 4. Verifies at least 2 ICWPs running, POV-3-4882 & 4883 closed with lOW ICW headers tied together.
: 5. Verifies 33 CCWHXs in service, 3A & 3B CCWPs running, COW                      CCW headers headers tied together &      & MOV-3-626 MOV-3-626 open. open.
: 6. Determines Determines 22 ECCs ECCs &  & all all 33 ECFs running.
7.
: 7. Determines Determines allall 44 HHSIPs HHSIPs &    & 22 RHRPs running
: 8. Determines RCS pressure> 1600          1600 psig (no(no HHSI HHSI flow) 9.
: 9. Shuts  down both Shuts down    both unitunit 44 HHSIPs HHSIPs 10.
: 10. Determines Determines allall containment isolation isolation phase phase A valvesvalves closed.
closed.
88
Appendix DD Appendix                                      OperatorActions Operator      Actions                                            Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:  2007-301 2007-301            Scenario No.:
Scenario      No.:    11                  No.: ~
Event No.:
Event              5        Page -..2..
Page        3 ofof ~ 4 Event
== Description:==
Event
== Description:==
Once reactor Once    reactor power power stabilized stabilized << 60% 60% power, power, aa 3C  3C SG SG feedfeed break break occurs inside occurs      inside containment.
containment. AA manual manual reactor reactor trip trip isis required required before before any any SG level SG    level drops drops << 10%
10% since since thethe automatic automatic reactor reactor trip trip isis failed.
failed. 3-EOP-3-EOP-E-O      performed. The E-0 isis performed.        The MOV-3-1409 MOV-3-1 409 breaker breaker trips trips && FCV-3-498 FCV-3-498 fails  fails to to close    leaving    an  uncontrolled close leaving an uncontrolled feed          feed path path toto 3C 30 SG SG ifif 3A3A SGFP SGFP started.
started.
Time Time      Position Position                                Applicants Actions Applicant's      Actions or or Behavior Behavior BOP BOP        Continues prompt Continues        prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 AttachmentAttachment 3:    3:
1 1. Determines
: 11.      Determines all  all SI SI valves valves in in proper proper injection injection alignment alignment
: 12. Resets
: 12. Resets SI  SI && containment containment isolation isolation phase phase A. A.
: 13. IfIf RCPs
: 13.        RCPs running, running, opens MOV-3-1417 MOV-3-1417 &      & 1418 1418 then then resets/starts resets/starts all available all  available NCCs.
: 14. Determines containment pressure remained < 20 psig.
: 15. Determines containment ventilation isolated and control room ventilation in proper emergency recirculation alignment.
: 16. Directs NSO place PAHMS in service per 3-0P-094.                3-OP-094.
: 17. Verifies 3A & both U4 EDGs running (3B EDG is OOS).
: 18. Determines 3A, 3B & 3D 4kV buses still energized.
: 19. Notifies US that prompt action verification complete.
RO        Performs subsequent actions of 3-EOP-E-O as directed:
1.
: 1.      Determines no AFWPs will be running.
: a. A AFWP slowly losing steam supply as 30                      3C SG depressurizes through the        the FW FW break break into into containment.
: b. BAFWPOOS
: b. BAFWP OOS c.
: c. C  C AFWP AFWP started, started, increased increased speedspeed but but then then mechanically mechanically tripped. Directs Directs NSO NSO investigate investigate C      AFWP and C AFWP          and attempt attempt toto reset reset trip trip (3-ONOP-07 (3-0NOP-075          Att. 44 may 5 Att. may be be used used for  for guidance).
guidance).
2.
: 2. Determines Determines AFW  AFW valvevalve alignment alignment proper proper 3.
: 3. Recognizeslr Recognizes/reports eports SGs  SGs levels levels & & AFW AFW flow flow 4.
: 4. Determines Determines RCP  RCP thermal thermal barrier barrier alarms alarms off.off.
5.
: 5. Determines Determines RCS  RCS temptemp dropping dropping due due toto feed feed break.
break. Limits Limits AFW AFW flow flow toto 345
                                            =345 gpmgpm ifif directed directed to to reduce reduce cooldown.
cooldown.
6.
: 6. Determines Determines PZR  PZR PORVs, PORVs, normalnormal spray, spray, auxaux spray spray && excess excess letdown letdown isolation isolation valves valves closed.
closed.
7.7. Stops      RCPs ifif running Stops RCPs          running && triptrip criteria criteria met met 8.8. Determines Determines 3C    3C SGSG faulted.
faulted.
99
Appendix DD Appendix                                  Operator Actions Operator  Actions                                      Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:  2007-301 2007-301          Scenario No.:
Scenario  No.: _1_
1                No.: _5_
Event No.:
Event          5        Page~of_4_
Page 4 of 4 Event


== Description:==
== Description:==


Once reactor [:2ower stabilized
Event
< 60% [:2ower , a 3C SG feed break occurs inside containment.
A manual reactor tri[:2 is reguired before ani SG level dro[:2s < 10% since the automatic reactor tri[:2 is failed. 3-EOP-E-O is [:2erformed.
The MOV-3-1409 breaker tri[:2s & FCV-3-498 fails to close leaving an uncontrolled feed [:2ath to 3C SG if 3A SGFP started . ..... , lillie Position Applicant's Actions or Behavior BOP Recognizes and reports dropping 3C SG levels and feedwater flows
* Annunciators C-5/1 thru 5/3 (SG steam> feed flow)
* Annunciators D-6/1 thru 6/3 (SG level deviations)
* Indicated feedwater flow < steam flow for all SGs
* Slowly dropping level in all SGs Recommends manual rx trip before any SG level drops < 10% NR. US Determines a loss of FW flow is occurring and directs RO to Critical manually trip the reactor before any SG level drops < 10% NR. Directs crew perform 3-EOP-E-0 immediate actions & foldout page. RO Performs immediate actions of 3-EOP-E-0:
: 1. Verifies reactor trip
* Rod bottom lights on & RPls at zero
* Rx trip & bypass bkrs open
* Neutron flux decreasing
: 2. Determines SI eventually actuates on SG pressure LlP>1 00 psi BOP Performs immediate actions of 3-EOP-E-0:
: 1. Verifies turbine tripped
* Turbine stop valves closed
* Closes MSR main steam stop MOVs
* Mid & East GCBs open 2. Verifies power to emergency 4kV buses 3. Determines both 3A & 3B 4kV buses energized with 3D 4kV bus energized from 3B 4kV bus RO Trips RCPs if subcooling
< 25[65]OF per 3-EOP-E-0 foldout page. 7 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: _5_ Page -2 of_4_ Event


== Description:==
== Description:==
Once reactor Once    reactor l20wer power stabilized stabilized << 60%  power, aa 3C 60% l2ower,      30 SG SG feed feed break break occurs inside occurs    inside containment.
containment. AA manual manual reactor reactor tril2 trip isis reguired      before an~
required before      any SG level SG  level drol2s drops << 10%  since the 10% since  the automatic automatic reactor reactor tril2 trip is is failed.
failed. 3-EOP-3-EOP-E-0 is E-O  is l2erformed.
performed. The The MOV-3-1409 MOV-3-1 409 breaker breaker tril2s trips && FCV-3-498 FCV-3-498 fails fails to to close leaving close  leavinq anan uncontrolled uncontrolled feed feed l2ath path to to 3C 30 SGSG ifif 3A3A SGFP SGFP started.
started.
Time      Position Position                            Applicants Actions or Applicant's            or Behavior Behavior US        1.
: 1. If all SG levels <
If                < 6[32]% and AFW flow <      < 345 gpm at 3-EOP-E-O step 8, directs transition to 3-EOP-FR-H.1.
3-EOP-FR-H.1.
: 2. Determines 3C SG faulted
: 3. Directs STA monitor CSFSTs (red path on Heat Sink CSF)
: 4.                              3-EOP-FR.H.1 Directs transition to 3-EOP-FR.H.1 10 10


Once reactor power stabilized
Appendix D Appendix D                                  Operator Actions Operator  Actions                                     Form Form ES-D-2 ES-D-2 Op-Test No.:
< 60% power, a 3C SG feed break occurs inside containment.
Op-Test No.:   2007-30 1 2007-301           Scenario    No.: _ 1_
A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. E-O is performed.
Scenario No.:     1                   No.: _6 Event No.:
The MOV-3-1409 breaker trips & FCV-3-498 fails to close leaving an uncontrolled feed path to 3C SG if 3A SGFP started. e Position Applicant's Actions or Behavior BOP Performs 3-EOP-E-0 foldout page actions when directed by US 1. Isolates AFW to 3C (faulted)
Event            6_    Page _1_
SG 2. Opens ADVs on 3A & 3B SG to stabilize RCS hot leg temp. US Directs BOP verify prompt actions per 3-EOP-E-0 Attachment
Page     1 of of --2...
: 3. Directs RO continue performance of 3-EOP-E-0 subsequent actions. BOP Verifies prompt actions per 3-EOP-E-0 Attachment 3: 1. Determines 3A, 3B, 3C, 3D & 3H 480V LCs energized
2 Event
: 2. Determines status of MSIVs (still open) and closes them if any MS isolation signal actuated (should not be). 3. Verifies FW isolation:
: a. Determines FCV-3-498 not closed. Attempts unsuccessfully to close valve using controller.
Determines other 2 main FW regulating valves closed. b. Determines all main FW regulating bypass valves closed. c. Closes MOV-3-1407
& 1408. Determines MOV-3-1409 has no power. Directs NSO to locally close valve. d. Determines A SSGFWP not available & B SSGFWP off. 4. Verifies at least 2 ICWPs running, POV-3-4882
& 4883 closed with ICW headers tied together.
: 5. Verifies 3 CCWHXs in service, 3A & 3B CCWPs running, CCW headers tied together & MOV-3-626 open. 6. Determines 2 ECCs & all 3 ECFs running. 7. Determines all 4 HHSIPs & 2 RHRPs running 8. Determines RCS pressure>
1600 psig (no HHSI flow) 9. Shuts down both unit 4 HHSIPs 10. Determines all containment isolation phase A valves closed. 8 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 1 Event No.: Page -..2.. of Event


== Description:==
== Description:==


Once reactor power stabilized
< 60% power, a 3C SG feed break occurs inside containment.
A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. E-O is performed.
The MOV-3-1409 breaker trips & FCV-3-498 fails to close leaving an uncontrolled feed path to 3C SG if 3A SGFP started. Time Position Applicant's Actions or Behavior BOP Continues prompt action verification per 3-EOP-E-0 Attachment 3: 11. Determines all SI valves in proper injection alignment
: 12. Resets SI & containment isolation phase A. 13. If RCPs running, opens MOV-3-1417
& 1418 then resets/starts all available NCCs. 14. Determines containment pressure remained < 20 psig. 15. Determines containment ventilation isolated and control room ventilation in proper emergency recirculation alignment.
: 16. Directs NSO place PAHMS in service per 3-0P-094.
: 17. Verifies 3A & both U4 EDGs running (3B EDG is OOS). 18. Determines 3A, 3B & 3D 4kV buses still energized.
: 19. Notifies US that prompt action verification complete.
RO Performs subsequent actions of 3-EOP-E-O as directed:
: 1. Determines no AFWPs will be running. a. A AFWP slowly losing steam supply as 3C SG depressurizes through the FW break into containment.
: b. BAFWP OOS c. C AFWP started, increased speed but then mechanically tripped. Directs NSO investigate C AFWP and attempt to reset trip (3-0NOP-075 Att. 4 may be used for guidance).
: 2. Determines AFW valve alignment proper 3. Recognizes/reports SGs levels & AFW flow 4. Determines RCP thermal barrier alarms off. 5. Determines RCS temp dropping due to feed break. Limits AFW flow to =345 gpm if directed to reduce cooldown.
: 6. Determines PZR PORVs, normal spray, aux spray
& excess letdown isolation valves closed. 7. Stops RCPs if running & trip criteria met 8. Determines 3C SG faulted. 9 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _1_ Event No.: _5_
Event
Event


== Description:==
== Description:==
CC AFWP AFWP tril2s trips on on oversl2eed overspeed I2rematurely prematurely at  at 6300  RPM (from 6300 RPM      (from setul2}.
setup). TheThe trip can tril2 can not not be  reset. BB AFWP be reset. AFWP is  is OOS.
OOS. A  A AFWP AFWP starts, starts, but but runs runs out out ofof steam I2ressure steam    pressure from from the the 3C 3C feed feed line line fault.
fault. Efforts Efforts to to realign realign A A AFWP AFWP to    to train 22 steam train    steam are are I2revented prevented by by AFSS-3-007 AFSS-3-007 stuck closed. SSGFW    SSGFW can not be used due to loss of 3C 4kV bus and a dead batte!y          battery on B  B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow <                          < 345 qpm and gl2m    and is eventually eventually reguired required toto initiate feed &  & bleed since since all  SGs <<
all SGs narrow range 32% narrow      range with adverse adverse containment containment conditions.
Time      Position                              Applicants Actions or Behavior Applicant's US            Directs response per 3-EOP-FR-H.1.
Performs actions per 3-EOP-FR-H.1 as directed by US:
RCO            1. Determines RCS pressure> intact SG pressure
: 2. Determines RCS Tavg >350&deg;F BOP            Performs actions per 3-EOP-FR-H.1 as directed by US:
: 1. Per step 2 Caution, informs US that all SG narrow range level << 32%
US            Since all narrow range SG levels << 32%, directs immediate transition to steps 11-19 of 3-EOP-FR-H.1.
Critical        Directs initiation of feed &    & bleed per steps 11-19 of 3-EOP-FR-H.1.
RO            Performs actions of 3-EOP-FR-H.1 as directed by US:
1.
: 1. Determines SI & containment isolation phase A already initiated Critical        2. Stops all running RCPs
: 3. Determines 2 HHSIPs HHSIPs running & SI valves in proper injection alignment
: 4. Determines PORV block MOVs open and energized Critical        5.
: 5. Opens bothboth PORVs PORVs for adequate adequate RCS bleed  bleed path.
path.
6.
: 6. Determines Determines CV-3-2803 CV-3-2803 open (IA to containment) containment) 7.
: 7. Determines Determines SI  SI &
                                                    & containment isolation isolation phase A already already reset.
8.
: 8. Determines Determines both      unit 33 HHSIPs both unit                running &
HHSIPs running        & both both unit unit 44 HHSIPs HHSIPs already already stopped    and in stopped and    in standby.
standby.
11 11


Once reactor l20wer stabilized
Appendix DD Appendix                                        OperatorActions Operator      Actions                                     Form Form ES-D-2 ES-D-2 Op-Test No.:
< 60% l2ower, a 3C SG feed break occurs inside containment.
Op-Test  No.: 2007-301 2007-301        Scenario No.:
A manual reactor tril2 is reguired before SG level drol2s < 10% since the automatic reactor tril2 is failed. 3-EOP-E-O is l2erformed.
Scenario       No.:   11      Event No.:
The MOV-3-1409 breaker tril2s & FCV-3-498 fails to close leaving an uncontrolled feed l2ath to 3C SG if 3A SGFP started. Time Position Applicant's Actions or Behavior US 1. If all SG levels < 6[32]% and AFW flow < 345 gpm at 3-EOP-E-O step 8, directs transition to 3-EOP-FR-H.1.
Event    No.: _6_  6            Page--L Page      2 of of--L 2
: 2. Determines 3C SG faulted 3. Directs STA monitor CSFSTs (red path on Heat Sink CSF) 4. Directs transition to 3-EOP-FR.H.1 10 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _ 1_ Event No.: _6 _ Page _1_ of --2... Event
Event


== Description:==
== Description:==


C AFWP tril2s on oversl2eed I2rematurely at 6300 RPM (from setul2}. The tril2 can not be reset. B AFWP is OOS. A AFWP starts, but runs out of steam I2ressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 steam are I2revented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead batte!y on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gl2m and is eventually reguired to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.
Event  
Time Position Applicant's Actions or Behavior US Directs response per 3-EOP-FR-H.1.
Performs actions per 3-EOP-FR-H.1 as directed by US: RCO 1. Determines RCS pressure>
intact SG pressure 2. Determines RCS Tavg >350&deg;F BOP Performs actions per 3-EOP-FR-H.1 as directed by US: 1. Per step 2 Caution, informs US that all SG narrow range level < 32% US Since all narrow range SG levels < 32%, directs immediate transition to steps 11-19 of 3-EOP-FR-H.1.
Critical Directs initiation of feed & bleed per steps 11-19 of 3-EOP-FR-H.1. RO Performs actions of 3-EOP-FR-H.1 as directed by US: 1. Determines SI & containment isolation phase A already initiated Critical 2. Stops all running RCPs 3. Determines 2 HHSIPs running & SI valves in proper injection alignment
: 4. Determines PORV block MOVs open and energized Critical 5. Opens both PORVs for adequate RCS bleed path. 6. Determines CV-3-2803 open (IA to containment)
: 7. Determines SI & containment isolation phase A already reset. 8. Determines both unit 3 HHSIPs running & both unit 4 HHSIPs already stopped and in standby. 11 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 1 Event No.: _6_ Page --L of --L Event


== Description:==
== Description:==
CC AFWP AFWP tril2Strips on on oversl2eed overspeed I2rematurely prematurely at    at 6300 6300 RPMRPM (from (from setul2).
setup).
The  trip can    not  be  reset.
The tril2 can not be reset. BB AFWP    AFWP isis OOS.
OOS. AA AFWPAFWP starts, starts, but but runs runs out of out  of steam steam I2ressure pressure fromfrom the the 3C 3C feed feed line line fault.
fault. Efforts Efforts to to realign realign AA AFWP to AFWP          train 22 steam to train      steam are are I2revented prevented by  by AFSS-3-007 AFSS-3-007 stuck  stuck closed.
closed.
SSGFW can SSGFW        can not not be be used used due due toto loss loss of of 3C 3C 4kV4kV bus bus and and aa dead dead battery battery on BB SSGFWP.
on      SSGFWP. The      The crew crew transitions transitions toto 3-EOP-FR-H.1 3-EOP-FR-H.1 when    when AFW AFW flow flow
                        <<345    gpm and 345 gl2m      and isis eventually    required to eventually reguired      to initiate  feed &
initiate feed    & bleed bleed since since all all SGs << 32%
SGs        32% narrow narrow range range with with adverse adverse containment containment conditions.
conditions.
Time Time      Position Position                                  Applicants Actions Applicant's    Actions or or Behavior Behavior BOP BOP        Performs actions Performs      actions of of 3-EOP-FR-H.1 3-EOP-FR-H.1 as    as directed directed by  by US:
US:
11 . Reverifies
                            . Reverifies SI  SI && phase phase A  A equipment equipment actuated actuated using using 3-EOP-E-0 3-EOP-E-0 Attachment 33 (performed Attachment            (performed withwith same same results results as in as  in event event 5).
5).
: 2. Determines status of Determines                    placing PAHMS of placing    PAHMS in    in service (directed (directed NSONSO to do this in event 5). Completes PAHMS alignment in control room 3-OP-094 if NSO reports field actions complete.
per 3-0P-094 US        Determines RCS heat removal adequate.
TERMINATING TERMINATING CUE Scenario terminated when feed & bleed alignment complete (3-CUE EOP-FR-H.1 step 22).
12 12


C AFWP tril2S on oversl2eed I2rematurely at 6300 RPM (from setul2). The tril2 can not be reset. B AFWP is OOS. A AFWP starts , but runs out of steam I2ressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 steam are I2revented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gl2m and is eventually reguired to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.
Appendix 0D Appendix                                                                Scenario Outline Scenario          Outline                                                Form Form ES-O-1 ES-D-1 Facility:
Time Position Applicant's Actions or Behavior BOP Performs actions of 3-EOP-FR-H.1 as directed by US: 1 . Reverifies SI & phase A equipment actuated using 3-EOP-E-0 Attachment 3 (performed with same results as in event 5). 2. Determines status of placing PAHMS in service (directed NSO to do this in event 5). Completes PAHMS alignment in control room per 3-0P-094 if NSO reports field actions complete.
Facility:                  Turkey Point Turkey      Point                                Scenario No.:
US Determines RCS heat removal adequate.
Scenario        No.:              11      Op    Test No.:
TERMINATING Scenario terminated when feed & bleed alignment complete (3-CUE EOP-FR-H.1 step 22). 12 Appendix 0 Scenario Outline Form ES-O-1 Facility:
Op Test      No.:        2007-301 2007-30 1 Examiners:
Turkey Point Scenario No.: 1 Op Test No.: 2007-301 Examiners:
Examiners:                                                                              Candidates:
Candidates:
Candidates:                                                              US US RO RO BOP BOP Initial Conditions:
US RO BOP Initial Conditions:
Initial  Conditions:        Mode 1, Mode    1, 75%
Mode 1, 75% Power, MOL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for retum to 100% power following a turbine valve test. Tumover: Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next performance of O-OSP-023.3 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs); 3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Perform 3C ICWP isolation valve cycling test per step 7.1.3 of 3-0SP-019.3.
75% Power, Power, MOL, MOL, Awaiting Awaiting permission permission from from plant plant management management to      to increase increase powerpower back back to 100%.
Steps 7.1.1 & 7.1.2 for 3A and 3B ICWP were completed by the offgoing shift. Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
to  100%. 3-GOP-301 3-GOP-301 inin use  use complete complete through through stepstep 5.96 5.96 for for retum return to to 100%
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) SRO/BOP 3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 step 7.1.3. 2 (I) RO/BOP Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = T per 3-0NOP-059.8. (TS,I) SRO 3 See event 4a PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator TFS1ML3L = T below 0-7/4. 4 (C) BOP Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.
100% power power following following aa turbine valve turbine    valve test.
TS are TFE2Z52S = T evaluated for loss of the A SSGFWP. (C, TS) SRO 4a (R) SRO/BOP Automatic runback fails due to PT-3-1604 failure and requires manual action (I) RO to reduce power < 60 % to avoid reactor trip on slg 10-10 level. The crew responds per 3-0NOP-089.
test.
5 TVFACN3 = 0.1 (M) ALL Once reactor power stabilized  
Turnover:
< 60% power, a 3C SG feed break occurs TFW98M=T inside containment.
Tumover:                      Equipment OOS:
A manual reactor trip is required before any SG level TCF1D09M = F drops < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is TFL2XASE =T performed.
Equipment        OOS: 3B      EDG due 3B EDG      due to to failed failed fuel fuel pump pump (OOS (OOS 22 days; days; next next performance performance of      of O-OSP-0-OSP-023.3 in 023.3    in 44 hrs);
The MOV-3-1409 breaker trips & FCV-3-498 fails to close leaving TFL2XBSE = T an uncontrolled feed path to 3C SG if 3A SGFP started. 6 (C) ALL C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC = can not be reset. B AFWP is OOS. A AFWP starts, but runs out of steam 6300.0 pressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 TCF5MTC = T steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions. (N)ormal, (R)eactlvity, (I)nstrument, (C)omponent, (M)aJor 1 TP-2007-301 Scenario #1 Event Description Turkey Point 2007-301 Scenario #1 Event 1 -3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 step 7.1.3 Event 2 -Power range NI channel N-42 upper detector fails high. The crew responds per 3-ONOP-059.8.
hrs); BB AFW AFW PumpPump due  due to    bearing failure to bearing    failure (OOS (OOS 44 hrs; hrs; ETR ETR 24 24 hrs);
Event 3 -PT-3-1604 fails low. The crew responds per 3-ARP-097.CR for annunciator 0-7/4. Event 4 -Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.
hrs); 3B3B CSP CSP due  due to to failed 1ST failed  1ST -low
TS are evaluated for loss of the A SSGFWP. Event 4a -Automatic run back fails due to PT 1604 failure and requires manual action to reduce power < 60 % to avoid reactor trip on slg 10-10 level. The crew responds per 3-0NOP-089. Event 5 -Once reactor power stabilized  
                                            - low discharge discharge pressure pressure (OOS (OOS 12  12 hr; hr; ETR ETR 36 36 hr) hr)
< 60% power, a 3C SG feed break occurs inside containment.
Perform 3C Perform          ICWP isolation 3C ICWP        isolation valve valve cycling cycling test test per perstep      7.1.3 of step 7.1.3      of 3-0SP-019.3.
A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is performed.
3-OSP-019.3. Steps    Steps 7.1.1 7.1.1 && 7.1.2 7.1.2 for 3A andand 3B ICWPICWP were completed completed by      by the offgoing offgoing shift.
The MOV-3-1409 breaker trips & FCV-3-498 fails to close leaving an uncontrolled feed path to 3C SG if 3A SGFP started. Event 6 -C AFWP trips on overs peed prematurely at 6300 RPM (from setup). The trip can not be reset. B AFWP is OOS. A AFWP starts, but runs out of steam pressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since all SGs < 32% narrow range with adverse containment conditions.
Known tube Known     tube leak leak inin 3A 3A S/G S/G (2 (2 gpd) gpd) - unchanged unchanged for    for last last week.
2 TP-2007-301 Scenario #1 Event Description Scenario XXIII NRC 1 Simulator Operating Instructions Setup IC-16 (75% MOL) Place simulator in run Trigger lesson steps: SETUP -AUTO REACTOR TRIP FAIL (actuates TFL2XASE = T, TFL2XBSE = T, TFL2XASE = F when IML2CRXT & TFL2XBSE = F when IML2CRXT)
week. Chemistry Chemistry samples samples are  are being being taken per taken  per 3-0NOP-071.2, 3-ONOP-071 .2, Attachment Attachment 1.      1. The The current current sample, sample, just completed completed indicates indicates no  no significant change in leak rate. MOV-3-1403 remains open at management direction                              direction due due to small stability of tube leak size and stability                 leak rate.
SETUP -3B EDG OOS (actuates TA05LRSB = OFF (0) & TA05B20P = RACKOUT (3)) SETUP -B AFWP OOS (actuates TAFK244 = 0.0, TAFK002 = 0.0, TAFF01B = 0.0, TCF5MTB = T) SETUP -3A SG 2 GPO LEAK (actuates TVHHSGA = 0.0000013)
rate.
SETUP -3B CSP OOS (actuates TAM1DPOB = RACKOUT (3) & TCM1D41 M = FALSE) SETUP -C AFWP OVERSPEED TRIP (actuates TAFXSRPC =6300.0, TCF5MTC = Twhen F50SlAFC EO 6290) Start 3A ICWP and stop 3B ICWP. (Leave 3A & 3C ICWP running).
Event Event                                     Type*
Start train A chilled water and secure train B chilled water (CR HVAC panel). Acknowledge annunciators F-9/2 & F-9/5 (3B EDG) and place simulator in freeze. Place clearance info tags on 3B EDG normal start switch, B AFWP T& T valve control switch & 3B CSP control switch. Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X. Provide shift turnover checklists and 3-0NOP-071.2 Att 1. Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3). Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator I/F. Event 1 -3C ICWP discharge isolation valve test Initiated from shift turnover immediately after shift turnover.
Event Type*                                                        Event Description No.
The crew will start 38 ICWP & stop 3C ICWP per 3-0P-019 section 5.3, then NSO begins performing 3-0SP-019.3 step 7.1.3. Respond as NSO if directed to perform pre-start checks for 3B ICWP & post-shutdown checks for 3C ICWP. Report all conditions normal. Step 7.1.3.1 -Done by securing 3C ICWP. Step 7.1.3.2 -Call as NSO and request RO log 3C ICWP inoperable.
No.
Step 7.1.3.3 -Trigger lesson step EVENT 1 -REMOVE 3AD05 CLOSE CKT FUSES (actuates TFK2G05A = T) 3 TP-2007-301 Scenario #1 Event Description Step 7.1.3.4 -Trigger lesson step EVENT 1 -CLOSE 3-50-332 (actuates TAKB332 = 0.0 on 60 sec ramp), then trigger lesson step EVENT 1 -OPEN 3-50-332 (actuates TAKB332 = 1.0 on 60 sec ramp). Step 7.1.3.5 -Trigger lesson step EVENT 1 -INSTALL 3AD05 CLOSE CKT FUSES (actuates TFK2G05A = F). Step 7.1.3.6 -NSO field verification of lights on 3AD05. Step 7.1.3.7 -Respond as NSO when directed to do pre-start checks on 3C ICWP and report pump ready. Respond as NSO when directed to do post-start checks and report pump running normally.
1 1                        (N)SRO/BO (N)  SRO/BOP     P      3C ICWP discharge isolation valve cycling test per 3-0SP-019.3            3-OSP-019.3 step 7.1.3.
Step 7.1.3.9 -Respond as NSO when directed to perform post-shutdown checks on ICWP just shutdown.
22                        (I) RO/BOP               Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = T TFN1P2AH      T (TSI)SRO                per 3-0NOP-059.8.
Report pump shutdown satisfactorily.
(TS,I)   SRO 33                        See See event 4a             PT-3-1 604 fails low. The crew responds per 3-ARP-097.C PT-3-1604                                                        3-ARP-097.CR       R for annunciator TFS1 ML3L = T TFS1ML3L     T below                   D-7/4.
Event 2 -PRNI N-42 upper detetctor fails high Once 3-0SP-019.3 step 7.1.3 complete, trigger lesson step EVENT 2 -PRNI N-42 UPPER DET FAILS HIGH (actuates TFN1 P2AH = T). This actuates annunciators 8-2/2, 3/6, 5/5, 6/1, 6/3, 6/4, 9/2 The crew responds per 3-0NOP-059.8 and takes PRNI N-42 out of service per steps 5.1.1.1 thru 5.1.1.7. Step 5. 1. 1. 1 actuates 8-8/4. Step 5.1.1.2 clears 8-6/3. Step 5.1.1.3 clears 8-2/2. Step 5. 1. 1.6 clears 8-6/4. Step 5.1.1.7.a  
0-7/4.
-Respond as AOM/I&C if asked whether or not to pull instrument fuses. Reply that fuses should be pulled. All annunciators clear except 8-6/1, 6/5 & 8/4. Step 5.1.1.7.c  
44                          (C) BOP                 Loss of 303C 4kV bus. The crew responds per 3-ONOP-004          3-0NOP-004.4.     .4. TS are TFE2z525 TFE2Z52S == TT                              evaluated for loss of the A SSGFWP.
-Tripping bistables actuates 8-3/5, 3/6 & ref/ash for 8-5/5. Step 5.1.1.8 -Respond as WCC/I&C when called regarding N-42 failure. Step 5.1.1.9 -Respond as Rx Engineering I STA when directed to perform a QPTR Step 5.1.1.10 -Not applicable.
(C (C, TS) SRO 4a 4a                          (R) SRO/BOP             Automatic runback fails due to PT-3-1        PT-3-1604 604 failure and requires manual action (I                     to reduce power << 60 % to avoid reactor trip on                       slg b-b on s/g    10-10 level. The crew (I) RO responds per 3-ONOP-089 3-0NOP-089..
Step 5.1.1.11 -Respond as WCC if directed to generate ECO for tripped bistables.
55      TVFACN3O.1 TVFACN3 = 0.1       (M) ALL                 Once reactor power stabilized << 60% power, aa 3C SG feed break occurs TFW98M TFW98M=T  = T                             inside containment. A manual      manual reactor trip is      is required before any     any SGSG level level TCF1009M=F TCF1D09M = F                               drops drops << 10%
Event 3 -PT-3-1604 fails low After PRNI N-42 taken out of service, trigger lesson step EVENT 3 -PT-3-1604 FAILS LOW (actuates TFS1 ML3L = T). PT-3-1604 failure cause CV-3-2011 to automatically open and it is failed that way to prevent closure from the console control switch. The crew responds per 3-ARP-097.CR for annunciator 0-7/4. Respond as NSO if directed to verify CV-3-1900 closed. Click on FEEDWATER PRESS FW HEATERS & RHTR & HTR DRAIN CV-3-1900 position (see far right side of mimic). Crew should determine SGFP suction pressure>
10% sincesince the the automatic automatic reactor trip   trip is is failed. 3-EOP-E-0 3-EOP-E-0 is     is TFL2XAS TFL2XASE ==T T                             performed. The    The MOV-3-1 MOV-3-1409   409 breaker breaker trips trips && FCV-3-498 fails to      to close close leaving leaving TFL2xBsE=T TFL2XBSE = T an an uncontrolled uncontrolled feed path     path to to 303C SGSG ifif 3A 3A SGFP SGFP started.
260 psig with 2 HOPs running so fast load reduction is not required.
started.
4 TP-2007-301 Scenario #1 Event Description Event 4 -Loss of 3C 4kV bus The plant is stabilized following CV-3-2011 failure open, trigger lesson step EVENT 4 -LOSS OF 3C 4KV BUS (actuates TFE2Z52S = T). This causes a loss of 38 SGFP. The crew may take the 38 SGFP control switch to STOP which ordinarily would open the breaker and initiate automatic turbine runback. Since the PT-3-1604 failure in event 3 also defeats the automatic loss of SGFP turbine runback, the crew must manually run back power to < 60% per 3-0NOP-OS9.
66                          (C)
The crew should also respond per 3-0NOP-004.4 due to loss of the 3C 4kV bus. TS are evaluated for the loss of the A SSGFWP. Respond if called as NSO to investigate 3C 4kV bus. After 1-3 min, report that the lockout relay has actuated and the bus enclosure smells of overheated insulation.
(C) ALL ALL                CC AFWP AFWP tripstrips onon overspeed overspeed prematurely prematurely at   at 6300 6300 RPM RPM (from (from setup).
If directed to reset 3C 4kV bus lockout relay, report that the lockout will not reset. Respond if called as WCC/Electrical to investigate 3C 4kV bus lockout. Do not fix this malfunction before the end of the scenario.
setup). The The trip trip TAFXSRPC TAFXSRPC =
Respond if called as System & Duty Call Supervisor per O-ADM-115.
                        =                              can can not not be     reset. BB AFWP be reset.        AFWP is  is OOS.
Respond if called as SM to review O-ADM-011 regarding need for an ERT. Respond if called as Chemistry about RCS sampling following a > 15% power change. Respond as NSO if directed to cross-tie E MCCs per 3-0P-007 sect 7.1. No further action required during this scenario.
OOS. A   A AFWP AFWP starts, starts, but but runs runs outout ofof steam steam 6300.0 6300.0                                  pressure pressure fromfrom thethe 303C feed    line fault.
Event 5 -3C SG main feed line failures After the plant is stabilized  
feed line   fault. Efforts Efforts to to realign realign A A AFWP AFWP to    to train train 22 TcF5MTC=T TCF5MTC = T                               steam steam areare prevented prevented by    by AFSS-3-007 AFSS-3-007 stuck  stuck closed.
< 60% power, at lead examiner direction, trigger lesson step EVENT 5 -3C FW LINE FAIL (actuates TVFACN3 = 0.1, TFVV98M = T & TCF1D09M = F). A main feed break occurs on 3C feed line inside containment.
closed. SSGFW SSGFW can    can not not bebe used used due  to loss due to   loss ofof 303C 4kV 4kV bus    and aa dead bus and               battery on dead battery       on BB SSGFWP.
A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. 3-EOP-E-O is performed.
SSGFWP. The     The crew crew transitions transitions to to 3-EOP-FR-H 3-EOP-FR-H.1    .1 when when AFW AFW flowflow << 345 345 gpm gpm andand is is eventually eventually required required to to initiate   feed && bleed initiate feed        bleed since since all all SGs SGs << 32% 32% narrow narrow range range withwith adverse adverse containment containment conditions.
The MOV-3-1409 breaker trips & FCV-3-49S fails to close. This creates a feed path to the faulted 3C SG should feed be restored.
conditions.
5 TP-2007-301 Scenario #1 Event Description Events 6 -Loss of AFW I Heat sink Entered upon completion of 3-EOP-E-O steps 1-4. C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip can not be reset. B AFWP is OOS. A AFWP starts, but runs out of steam pressure from the feed line fault on 3C feed line. Efforts to realign A AFWP to train 2 steam is prevented by AFSS-3-007 being stuck closed. SSGFW can not be used due to a dead battery on B SSGFWP (A SSGFWP not available due to loss of 3C 4kV bus). The crew transitions to 3-EOP-FR-H.
(N)ormal, (N)ormal, (R)eactivity, (R)eactlvity, (l)nstrument, (I)nstrument, (C)omponen (C)omponent,      t, (M)ajor (M)aJor 11
1 when AFW flow < 345 gpm and is eventually required to initiate feed & bleed since SG levels are < 32% narrow range with adverse containment conditions.
 
If asked as NSO to locally reset C AFWP overspeed trip (3-0NOP-075 Attachment 4), respond that the C AFWP overspeed trip can not be reset. If asked as NSO to align train 2 steam to the A AFWP by opening AFSS-3-007, report that AFSS-3-007 will not open. Request mechanical maintenance assistance.
TP-2007-301 Scenario TP-2007-301       Scenario #1 #1 Event Event Description Description Turkey Point Turkey      Point 2007-301 2007-301 Scenario Scenario #1  #1 Event 11 --30 Event            ICWP discharge 3C ICWP       discharge isolation isolation valve valve cycling cycling test   per 3-0SP-019.3 test per  3-OSP-019.3 step step 7.1.3 7.1.3 Event 22 - Power Event       - Power range range NI NI channel channel N-42 N-42 upper upper detector detector fails fails high.
Respond as WCC/Mechanical Maintenance if asked to troubleshoot/fix C AFWP mechanical trip and AFSS-3-007.
high. The The crew crew responds responds per per 3-3-
Respond as NSO if asked to locally close MOV-3-1409 or 3-20-333.
ONOP-059.8.
Delay local closure of these valves until after feed & bleed initiated then trigger lesson step EVENT 6 -LOCALLY CLOSE MOV-3-1409 (actuates TFFVV09C = T) and report when complete.
ONOP-059.8.
3A SGFP should not be started since an uncontrollable feed path exists to 3C SG. With level < [33%J wide range, feed flow must be limited to 100 gpm to the faulted SG (3-EOP-FR-H.
Event 33 - PT-3-1604 Event      -  PT-3-1604 fails fails low.
1 step 4 caution 2). Respond as NSO when directed to place PAHMS in service on unit 3. After 8-12 minutes, trigger lesson step EVENT 6 -PLACE U3 PAHMS IN SERVICE (actuates TAC2V02A = 1.0, TAC2V02B = 1.0, TAAAV21 = 1.0, TAAAV22 = 1.0 & TACA005 = 0.0). Report when complete.
low. The The crew crew responds responds per per 3-ARP-097.CR 3-ARP-097.CR for     annunciator 0-7/4.
6 I NRC-I ... '"
for annunciator  D-714.
1>O l OPERATIONS SHIFT TURNOVER REPORT :t ..s;, .. "Olear 1.'\0 ONCOMING CREW ASSIGNMENTS Shift Mgr: Inside SNPO: Field Supv.: Outside SNPO: Admin RCO: ANPO: Unit 3 Unit 4 Unit Supv.: Unit Supv.: RCO: RCO: NPO: NPO: Plant Status Unit 3 Unit 4 Mode: 1 Mode: 1 Power: 75 Power: 100 MWe: 557 MWe: 759 Gross Leakrate:
Event 44 - Loss Event      - Loss ofof 3C   4kV bus.
0.03 Gross Leakrate:
30 4kV     bus. The The crew crew responds responds per      3-ONOP-004.4. TS per 3-0NOP-004.4.       TS are are evaluated evaluated for for loss loss of the of  the AA SSGFWP.
0.04 RCS Boron Cone: 825 RCS Boron Cone: 600 Operational Concerns:.i<  
SSGFWP.
.**... .' .. ..f!: APWP OOS (bearing failure; OOS 4 hr; ETR 24 hr) 3B EDG OOS (fuel pump failed; OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed IST -low discharge pressure; OOS 12 hr; ETR 36 hr) Train A is protected 2 gpd tube leak in 3A S/G -unchanged for past week (Chemistry sampling per 3-0NOP-071.2, Attachment 1.) U3 Anticipated LCO Actions: Current: B APWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.S.1.1.b.l Actions b & d (0-OSP-023.3 Att 1 & 9 every S hr; 3/4-0SP-023.1 start of other EDGs not req'd; 3-0P-023 sect 7.7 due next shift ifOOS > 72 hr; repair in 14 days) 3B CSP-TS 3.6.2.1 Action a (Pix in 72 hr) Anticipated:
Event 4a Event   4a - Automatic run
None Train A is protected.
              -              runback back fails due to PT PT-3-1  604 failure and requires manual action to 1604 reduce reduce    power   <
OLRM is green (CDP = 2.06E-6; LERP = 9.2SE-S).
                  < 60 %        avoid reactor
U4 Anticipated LCO Actions: Current: B APWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.S.1. i .b.l Actions b & d (0-OSP-023.3 Att 1 & 9 every S hr; 3/4-0SP-023.1 start of other EDGs not req' d; fix in 14 days) Anticipated:
                          % to avoid   reactor trip on slgs/g 10-10 b-b level.
None Train A is protected.
level. The crew crew responds responds per per 3-0NOP-3-ONOP-089.
OLRM is green (CDP = 2.00E-6; LERP = 9.2SE-S).
Event 55 - Once Event      - Once reactor power stabilized <<60%      60% power, a 3C   30 SG feed break occurs inside containment. A containment.      A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is performed. The MOV-3-1409 automatic                                                                        MOV-3-1 409 breaker trips & FCV-FCV 3-498   fails to close leaving an uncontrolled feed path to 3C 3-498 fails                                                              30 SG if 3A SGFP started.
Results of Offgoing Focus Area: See :\0 s\Common\0900 g p Unit 3 Status Reactor Operator Mode: 1 RCS Leakrate Accumulator Ref Levels Power: 75 Gross: 0.03 gpm A 6615 MWe: 557 Unidentified 0.02 gpm B 6640 Tavg: 567 Charging Pps: 0.01 gpm C 6625 RCS Pressure:
Event 66 - C Event     - C AFWP AFWP tripstrips on overs overspeed peed prematurely at 6300 RPM (from setup). The trip can not be reset.
2235 RCS Boron Cone: 825 ,.Abbd'r.ll1al.Ahli
be  reset. B B AFWP AFWP is  is OOS. A AFWP starts, but runs out of steam pressure from the 3C             30 feed line fault. Efforts fault. Efforts toto  realign   A AFWP     to train 2 steam   are prevented by AFSS-3-007 stuck closed.
! '.' \ \ ".1
SSGFW SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions transitions to 3-EOP-FR-H 3-EOP-FR-H.1    .1 when AFW flow << 345 gpm and is eventually required to initiate feed & bleed since all SGs <
*. " It:; '. ';'.,::;.'!:,!'
initiate                                      < 32% narrow range with adverse containment conditions.
** '::!!( *. \.,;  
22
*..***
 
TP-2007-301 Scenario TP-2007-301     Scenario #1      Event Description
                                                              #1 Event       Description Scenario XXIII NRC Scenario                    NRC 1I Simulator Operating Simulator     Operating Instructions Instructions Setup 10-16 (75%
IC-16   (75% MOL)MOL)
Place simulator Place    simulator in    run in run Trigger lesson steps:
SETUP - AUTO REACTOR TRIP FAIL (actuates
            -                                      (actuates TFL2XASE TFL2XASE == T,  T, TFL2XBSE TFL2XBSE == T,T, TFL2XASE TFL2XASE == FF when when IML2CRXT && TFL2XBSE == FF when IML2CRXT)
IML2CRXT                          ML2CRXT)
SETUP - 3B EDG
            -      EDG OOS DOS (actuates (actuates TA05LRSB TAQ5LRSB == OFF OFF (0)
(0) && TA05B20P TAQ5B2OP == RACKOUT RACKOUT (3)) (3))
SETUP - B AFWP OOS
            -              DOS (actuates TAFK244 == 0.0, TAFK002 TAFKOO2 == 0.0, TAFF01B TAFF01 B == 0.0, TCF5MTB     == T)
SETUP - 3A SG 2 GPO
            -              GPD LEAK (actuates TVHHSGA = 0.0000013)
SETUP - 3B CSP OOS (actuates
            -                    (actuates TAM1DPOB TAM1 DPOB == RACKOUT RACKOUT (3)    (3) & TCM1 D41 M
                                                                          & TCM1D41   M == FALSE)
FALSE)
SETUP - C AFWP OVERSPEED
            -              OVERSPEED TRIP (actuates (actuates TAFXSRPC =6300.0, TCF5MTC == Twhen       T when F50SlAFC F50SAFC EQ 6290)
EO Start 3A ICWP and stop 3B ICWP. (Leave 3A & 3C                 30 ICWP running). Start train A chilled water and secure train B chilled water (CR HVAC panel).
Acknowledge annunciators F-9/2 Acknowledge                          F-912 & F-9/5 (3B EDG) and place simulator in freeze.
Place clearance info tags on 3B EDG normal start switch, B AFWP T&                           T&T  T valve control switch & 3B CSP control switch.
Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X.
3-ONOP-071 .2 Att 1.
Provide shift turnover checklists and 3-0NOP-071.2 Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3).
Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator I/F.
Event I1 - 3C ICWP discharge isolation valve test Initiated from shift turnover immediately after shift turnover.
The crew will start 3B    38 ICWP &    & stop 3C ICWP per 3-OP-019  3-0P-019 section 5.3, then NSO begins performing 3-OSP-019.3 3-0SP-019.3 step 7.1.3.
Respond Respond as    as NSO NSO ifif directed directed to perform perform pre-start checks checks for 3B  3B ICWP ICWP &       post-shutdown
                                                                                                & post-shutdow      n checks for 30        ICWP. Report 3C ICWP. Report       all conditions   normal.
Step 7.1.3.1 Step   7.1.3.1 - Done
                  -  Done byby securing 30  3C ICWP.
ICWP.
Step Step 7.1.3.2 7.1.3.2 - Call
                  -      as NSO Call as NSO andand request RD RO loglog 3C3C ICWP ICWP inoperable.
inoperable.
Step Step 7.1.3.3 7.1.3.3 - Trigger
                  -  Trigger lesson lesson step step EVENT EVENT I1 - REMOVE 3AD05
                                                            -                3AD05 CLOSE CLOSE CKT    CKT FUSES FUSES (actuates (actuates TFK2GO5A TFK2G05A == T)T) 33
 
TP-2007-301 Scenario TP-2007-301       Scenario #1  #1 Event Event Description Description Step 7.1.3.4 Step    7.1.3.4 - Trigger
                      -  Trigger lesson lesson step step EVENT EVENT 1I - CLOSE
                                                                    - CLOSE 3-50-332 3-50-332 (actuates (actuates TAKB332 TAKB332 == 0.00.0 on on 60 60 ramp),  then      trigger    lesson  step sec ramp), then trigger lesson step EVENT 1I - OPEN sec                                                EVENT        - OPEN 3-50-332 3-50-332 (actuates (actuates TAKB332       1.0 on TAKB332 == 1.0    on 60 60 sec ramp).
sec  ramp).
Step 7.1.3.5 Step    7.1.3.5 - Trigger
                      -   Trigger lesson lesson step    EVENT 1I - INSTALL step EVENT           - INSTALL 3AD05 3AD05 CLOSECLOSE CKT    CKT FUSES FUSES (actuates TFK2G05A (actuates  TFK2GO5A == F). F).
Step 7.1.3.6 Step    7.1.3.6 - NSO
                      -  NSO field field verification verification of    lights on of lights   on 3AD05.
3AD05.
Step    7.1.3.7 - Respond Step 7.1.3.7         -   Respond as   as NSO NSO when when directed directed to  to do do pre-start pre-start checks checks on    on 3C 3C ICWP ICWP and  and report pump report    pump ready.
ready. Respond Respond as        NSO when as NSO     when directed directed to to do post-start     checks     and do post-start checks and report    report pump running pump      running normally.
normally.
Step 7.1.3.9 Step     7.1.3.9 - Respond
                      -  Respond as  as NSO NSO whenwhen directed directed to   to perform perform post-shutdown post-shutdown checks    checks on on ICWP     just   shutdown.
ICWP just shutdown. Report pump    Report  pump shutdown shutdown satisfactorily.
satisfactorily.
Event 2 - PRNI N-42
                  -            N-42 upper upper detetctor fails high 3-OSP-019.3 step 7.1.3 complete, trigger lesson step EVENT 2 - PRNI N-42 Once 3-0SP-019.3                                                                                          -
UPPER DET FAILS HIGH (actuates                            P2AH =
(actuates TFN1 P2AH       T).
                                                                  = T).
This actuates annunciators 8-2/2,          B-2/2, 3/6, 5/5, 6/1, 6/3, 6/4, 9/2 The crew responds per 3-0NOP-059.8   3-ONOP-059. 8 and takes PRNI N-42 out of service per steps 5.1.1.1 thruthru5.1.1.7.
5.1.1.7.
Step 5. 5.1.1.1
: 1. 1. 1 actuates 8-8/4. B-8/4.
Step 5.1.1.2 clears 8-6/3.     B-6/3.
Step 5.1.1.3 clears 8-2/2.     B-2/2.
Step 5. 5.1.1.6
: 1. 1.6 clears 8-6/4.B-6/4.
Step 5.1.1       .7.a - Respond as AOM/I&C if asked whether or not to pull instrument fuses.
5.1.1.7.a      -
Reply that fuses should be pulled. All annunciators clear except 8-6/1,                      B-6/1, 6/5 & 8/4.
Step 5.1.1       .7.c - Tripping bistabies 5.1.1.7.c bistables actuates B-3/5,8-3/5, 3/6 &   & reflash ref/ash for B-5/5.
8-5/5.
Step 5.1.1.8 - Respond as WCC/I&C
                    -                    WCC/l&C when called regarding N-42 failure.
Step 5.1.1.9 5.1.1.9 - Respond as Rx Engineering Engineering I STA when directed    directed to perform aa QPTR Step 5.1.1.10 - Not applicable.
Step 5.1.1.11 Step    5.1.1.11 - Respond Respond as   as WOO WCC ifif directed directed to generate generate ECO ECO for tripped tripped bistables.
Event 33 - PT-3-1 Event          -
PT-3-1604   604 fails low  low After     PRNI After PRNI N-42    N-42 takentaken outout of of service, service, trigger trigger lesson lesson step step EVENT EVENT 3-    3 - PT-3-1604 PT-3-1604 FAILS LOW FAILS        LOW (actuates (actuates TFS1 TFS1 ML3L ML3L = T).
T).
PT  PT-3-16041604 failure cause  cause CV-3-20 CV-3-2011   11 to to automatically automatically open  open and and itit is is failed that that way way to to prevent prevent closure closure from from thethe console console control control switch.
switch. The  The crew crew responds responds per   per 3-ARP-097.
3-ARP-097.CR      CR for  annunciator for annunciator 0-7/4. D-7/4.
Respond Respond as    as NSO NSO ifif directed directed to to verify verify CV-3-1 CV-3-1900         closed. Click 900 closed.      Click on     Schema~
on Schema>
FEEDWATE FEEDWATER         R HEATING HEATING~HIGH    >HIGH PRESS PRESS FW   FW HEATERS HEATERS && RHTR RHTR && HTR   HTR DRAINDRAIN TANKS>r TANKS~report      eport CV-3-1 CV-3-1900900 position position (see (see farfar right right side side of of mimic).
mimic).
Crew should Crew      should determine determine SGFP  SGFP suction suction pressure pressure>         260 psig
                                                                        > 260   psig with with 22 HDP5 HOPs running running so  so fast fast load load reduction reduction isis not  not required.
required.
44
 
TP-2007-301 Scenario TP-2007-301       Scenario #1    Event Description
                                                                #1 Event     Description Event 44-- Loss Event            Loss of   of 3C3C 4kV4kV bus bus The plant The  plant is is stabilized stabilized following following CV-3-2011 CV-3-2011 failure failure open, open, trigger trigger lesson     step EVENT lesson step    EVENT 4  LOSS    OF    3C  4KV    BUS 4 - LOSS OF 3C 4KV BUS (actuates TFE2Z52S == T).
  -                                    (actuates TFE2Z52S      T).
This causes This causes aa loss loss of of 383B SGFP.
SGFP. The The crew crew may may take      the 38 take the   38 SGFP SGFP control control switch switch to to STOP which STOP    which ordinarily ordinarily would would openopen thethe breaker breaker and and initiate initiate automatic      turbine  runback.
automatic turbine runback.
Since the Since   the PT-3-1604 PT-3-1604 failure failure inin event event 33 also also defeats defeats the       automatic loss the automatic      loss ofof SGFP SGFP turbine turbine runback, the runback,    the crew crew must must manually manually run run back back power power to  to << 60%
60% per 3-ONOP-089. The crew per 3-0NOP-OS9.       The   crew should  also    respond should also respond per      per 3-0NOP-004.4 3-ONOP-004.4 due     due to    loss of to loss       the 3C of the   3C 4kV 4kV bus.
bus. TSTS are are evaluated for evaluated     for the the loss loss ofof the the AA SSGFWP.
SSGFWP.
Respond ifif called Respond        called as as NSO NSO to     investigate 3C to investigate    3C 4kV 4kV bus.
bus. After After 1-3 1-3 min, mm, report report that that the the lockout relay   has   actuated lockout relay has actuated and the bus and   the bus enclosure enclosure smells smells of of overheated overheated insulation.
insulation, IfIf directed to reset directed      reset 3C      4kV bus 3C 4kV           lockout relay, bus lockout     relay, report report that that the the lockout will will not not reset.
reset.
Respond if called as WCC/Electrical WCC/Electrical to investigate 3C 4kV bus lockout.          lockout. Do not fix this malfunction before the end of the scenario.
malfunction Respond if called as System & Duty Call Supervisor per O-ADM-115.
Respond                                                                        O-ADM-1 15.
Respond if called as SM to review O-ADM-011     O-ADM-O1 I regarding need for an ERT.
Respond if called as Chemistry about RCS sampling following a                           a>> 15% power change.
Respond as NSO if directed to cross-tie E MCCs             MCC5 per 3-OP-007 3-0P-007 sect 7.1. No further action required during this scenario.
Event 55 - 3C SG main feed line failures After the plant is stabilized <60%        < 60% power, at lead examiner direction, trigger lesson step  EVENT      5  - 3C  FW step EVENT 5 - 3C FW LINE FAIL    LINE    FAIL (actuates   TVFACN3 ==0.1, (actuates TVFACNS            TFVV98M ==TT && TOF1 0.1, TFVV98M              DO9M =F).
TCF1D09M     F). A main main feed break break occurs on 3C feed line inside containment. A manual                  manual reactor trip is required before before any any SGSG level level drops << 10%  10% since since thethe automatic automatic reactor trip is    is failed. 3 EOP-E-0 EOP-E-O is performed.
performed. The MOV-3-1409 breaker          breaker trips && FCV-3-498 FCV-3-49S fails to close. This creates a feed path path toto the faulted 3C  3C SG SG should should feed be   be restored.
restored.
55
 
TP-2007-301 Scenario TP-2007-301       Scenario#1#1 Event EventDescription Description Events 66 - Loss Events                Loss of ofAFWAFWII Heat  Heat sink sink Entered upon Entered        upon completion completion of     of3-EOP-E-O 3-EOP-E-O steps  steps 1-4.
1-4.
C  AFWP      trips  on  oversp    eed C AFWP trips on overspeed prematurely at     premat  urely    at6300 6300RPM RPM(from (from setup).
setup). TheThe trip trip can can not notbebe reset. BB AFWP reset.        AFWPisis OOS. OOS. AA AFWPAFWP starts, starts, butbutrunsruns out outof ofsteam steampressure pressure from from the    feed the feed line fault line    fault onon 3C3C feed feedline.
line. Efforts Efforts to to realign realign AA AFWP AFWP toto train train 22 steam steam isisprevented preventedby    by AFSS-3-007being AFSS-3-007           being stuck stuck closed.
closed. SSGFW SSGFWcan      can notnotbebe used used due due toto aa dead deadbattery battery on on BB SSGFWP (A SSGFWP           (A SSGFWP SSGFWP not    not available available due due to  to loss loss of 3C 4kV bus). The crew transitions to of3C    4kV    bus). The  crew    transitions    to 3-EOP     -FR-H     .
3-EOP-FR-H. 1 when AFW I when    AFWflow  flow << 345 345 gpmgpm and  and isis eventually eventuallyrequired required to  to initiate initiate feed feed &&
bleed since bleed     since SG SG levels levels areare <<32%      narrowrange 32% narrow         range withwith adverse adverse containment con tainment conditions.
conditions.
IfIf asked asked as as NSO NSO to     locally reset to locally    reset CC AFWP AFWP overspeed overspeed trip  trip (3-0NOP-075 (3-ONOP-075 Attachment Attachment 4),   4),
respon    d  that  the  C  AFWP respond that the C AFWP overspeed trip   oversp  eed    trip can can not not be be reset.
reset.
asked as IfIf asked   as NSO NSO to  to align align train train 22 steam steam to  to the the AA AFWP AFWP by  by opening opening AFSS-3-007, AFSS-3-007, report report that  AFSS-that AFSS-3-007  3-007 willwill not not open.
open. Request Request mechanical mechanical maintenance maintenance assistance.
assistance.
Respond as Respond             WCC/Mechanical Maintenance as WCC/Mechanical             Maintenance ifif asked  asked to troubleshoot/fix troubleshootlfix C    C AFWP AFWP mechanical trip mechanical         trip and and AFSS-3-007.
AFSS-3-007.
Respond as Respond        as NSO NSO if asked to locally close MOV-3-1409   MOV-3-1 409 or 3-20-333. 3-20-333. Delay local closure  closure of   these   valves of these valves          until after   feed & bleed initiated
                                              &            initiated then trigger lesson step EVENT           EVENT 66 -    -
LOCALLY CLOSE LOCALLY           CLOSE MOV-3-1409 MOV-3-1409 (actuates TFFVV09C TFFvv09C == T) and report when complete. complete.
3A SGFP 3A    SGFP should should not be started since an uncontrollable uncontrollable feed path exists to 3C SG.                SG. With With level       [33%]
level < [33%J
        <            wide   range,     feed   flow   must   be   limited to 100 gpm to the faulted SG            SG (3-(3-EOP-F EOP-FR-H. R-H. 1 1 step 4 caution 2).
Respo Respond   nd as NSO when directe    directed d to place PAHM  PAHMS     S in service on unit 3. After 8-12 minute minutes,   s, trigger trigger lesson step EVEN      EVENT T 66 - PLAC
                                                          - PLACE             PAHMS E U3 PAHM            IN SERV S IN   SERVICE ICE (actuates (actuates TAC2V02A = 1.0, TAC2V02B =1.0, TAC2VO2A      = 1.0, TAC2VO2B    =      TAAAV21 ==1.0, 1.0, TAAAV21      1.0, TAAAV22 TAAAV22 == 1.0      TACA005 ==0.0).
                                                                              &TACAOO5 1.0 &                      Report when 0.0). Report compl complete. ete.
66
 
I       NRC-I NRC-i t,,~...~~~..          '"
O 1> l OPERATIONS SHIFT OPERATIONS                          SHIFTTURNOVERTURNOVER REPORT           REPORT
:t
          ..s;,           ~..
              "Olear 1.'\0 ONCOMING CREW ONCOMING                CREWASSIGNMENTS ASSIGNMENTS Shift Mgr:
Shift Mgr:                                                                                            Inside InsideSNPO:
SNPO:
FieldSupv.:
Field     Supv.:                                                                                     Outside OutsideSNPO:
SNPO:
AdminRCO:
Admin         RCO:                                                                                   ANPO:
ANPO:
Unit 33 Unit                                                                                        Unit Unit 44 UnitSupv.:
Unit     Supv.:                                                                                     Unit UnitSupv.:
Supv.:
RCO:
RCO:                                                                                                 RCO:
RCO:
NPO:
NPO:                                                                                                 NPO:
NPO:
Plant Status Plant      Status Unit 33 Unit                                                                                        Unit Unit 44 Mode:
Mode:                                              11                                                Mode:                                   1 Mode:
Power:
Power:                                             75 75                                                 Power:                                100 Power:                                 100 MWe:                                             557 557 MWe:                                                                                                  MWe:
MWe:                                   759 759 Gross Leakrate:
Gross      Leakrate:                            0.03 0.03                                                 Gross Gross Leakrate:
Leakrate:                      0.04 0.04 RCS      Boron RCS Boron Cone:     Conc:                        825 825                                                 RCS Boron Cone:                       600 Conc:                    600 Operational Concerns:.i<
Operational                  Concerns: .**.. .' ..     ..f!:     I 3  AFWP
.~ .~ APWP OOS (bearing OOS          (bearing failure; failure; OOS 4 hr; ETR 24 hr) 3B EDG 3B    EDG OOS  OOS (fuel    (fuel pump     failed; OOS 2 days; next 0-OSP-023.3 pump failed;                                O-OSP-023.3 in 4 hr) 3B    CSP      OOS          (failed 3B CSP OOS (failed IST -low discharge 1ST      low    discha  rge pressu    re; OOS 12 hr; ETR 36 hr) pressure; Train      A  is Train A is protected protect      ed 22 gpd gpd tube tube leak leak in  in 3A 3A S/G S/G - unchan unchangedged for past week (Chem            istry sampli (Chemistry     sampling         3-0NOP-071.2, ng per 3-ONO                  Attachment     1.)
P-07 1.2, Attach    ment 1.)
U3      Antici      pated U3 Anticipated LCO Actions:     LCO    Action    s:
Curren Current:   t:
BB AFWP APWP - TS        -
TS 3.7.1.2 3.7.1.2 Action Action 33 (trains (trains verifie verifiedd operab operable le just just before before turnov turnover;    30 days er; 30   days toto repair) repair) 3B    EDG            -TS 3B EDG - TS 3.S.1.1.b.l   3.8.1.1  .b.1 Action Actions s bb && dd (0-OSP   -023.3 Att (0-OSP-023.3      Att 11 && 99 every every 8S hr; hr; 3/4-OS 3/4-0SP-023.1      start of P-023.1 start     of other other EDGs  not    reqd;    3-OP-0  23    sect 7.7 EDGs not req'd; 3-0P-023 sect 7.7 due next shift due  next  shift if OOS >> 72 ifOOS       72 hr; hr; repair repair in in 14 14 days) days) 3B3B CSP CSP- TS    -
TS 3.6.2.1 3.6.2.1 Action Action aa (Fix (Pix inin 72 72 hr) hr)
Anticip Anticipated: ated: None        None Train      A Train A isis protect  protected. ed. OLRM OLRM isis green green (CDF (CDP ==2.06E-2.06E-6;   LERP ==9.28E-6; LERF        9.2SE-S).
8).
U4    Anticip          ated U4 Anticipated LCO Actions:     LCO  Action      s:
Curren Current:   t:
BBAFWPAPWP -TS        -
TS 3.7.1.2 3.7.1.2Action Action 33 (trains (trains verifie  d operab verified operablele just justbefore beforeturnov turnover;    30 days er; 30   days toto repair) repair) 3B      EDG 3B EDG - TS 3.8.1.1-TS    3.S.1. i.b.1
                                                  .b.l Action Actions s bb && dd(0-OSP    -023.3 Att (0-OSP-023.3       Att 11&& 99every every8Shr;hr; 3/4-OS 3/4-0SP-023.1      startof P-023.1 start     ofother other EDGs   not   reqd;   fix in 14 EDGs not req' d; fix in 14 days)    days)
Anticip Anticipated:ated: None        None Train TrainAAisisprotect  protected. ed. OLRM OLRMisisgreen  green(CDF (CDP==2.OOE 2.00E-6;   LERP =9.28E-
                                                                                        -6; LERF        9.2SE-S).
8).
Result      s  of    Offgoi Results of Offgoing Focus Area:   ng Focus      Area:
See g:\Ops\Common\0900
  ~. See g :\0p s\Common\0900
 
Unit 3         3 Stat  Status       us
  !~-~
Reac tor Oper              Operator Mode:                             1I                                    RCS Leakrate Power:                                                                                                                                    Accumulator Accum                      Ref Levels 75               Gross:                                                   0.03 gpm MWe:                                                                                                                                      A                         6615 557               Unidentified Tavg:                           567               Chargi ng Pps:
0.02 gpm 0.01 gpmgpmj
(                B                          6640 C                         6625 RCS Pressure:                   2235 RCS Boron Cone:Conc:            825
        ,.Abbd Ahnnr  'r.ll1al.Ahliunciai m1 Annnn            ~rs::V!;.,:;,!\',i;t~.,:~j(J;<.
bitnrc                              ! '.' \ \ ".1 ,?;!,.:!~ *."It:; '. ';'.,::;.'!:,!' * '::!!(  *. \.,; .!!~i,;,r[T;t*;: *..*****.J~~).;;!!I':\ !!:,l.!'!.**.f!~&#xa5;~r!>!;
Annunciator:
Annunciator:
F 9/2 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
Annunc  iator:      F 9/2 - 3B EDG OOS Actions::
3-0P-023 sect 7.7 due next shift. Annunciator:
Comp Actions         O-OSP-023 O-OSP-   023.3.3 Att 11 & 9 due in 4 hours. 3/4-0SP 3!4-OSP-023.  -023.11 not required required.. 3-0P-0 3-OPO23 sect 7.7 due next shift.
F 9/5 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
Annunciator:
3-0P-023 sect 7.7 due next shift. Annunciator:
Annunc  iator:      F 9/5 - 3B EDG OOS Actions::
Comp Actions: Annunciator:
Comp Actions         O-OSP-023.3 O-OSP-   023.3 Att 11 & 9 due in 4 hours. 3/4-0SP   3/4-OSP-023.  -023.11 not requiredrequired.. 3-0P-0 3-OP-023 sect 7.7 due next shift.
Comp Actions: Annunciator:
Annunciator:
Comp Actions: Annunciator:
Annunc  iator:
Comp Actions: Annunciator: Comp Actions: Annunciator:
Comp Actions Actions::
Comp Actions: Annunciator:
Annunciator:
Comp Actions: Annunciator:
Annunc  iator:
Comp Actions: Current Tech Spec Action Statements: (Does Not Include "For Trackin2 Only Items" T.S.A.S / Component:
Comp Actions Actions::
3.7.1.2 Action 3/ B AFWP Reason: Bearing failed Entry Date: XX/Xx/XX (Previous shift) T.S.A.S / Component:
Annunciator:
3.8.1.1 Actions b & d / 3B EDG Reason: Fuel pump failed Entry Date: XX/XX/XX (2 days ago) T.S.A.S / Component:
Annunc  iator:
3.6.2.1 Action a / 3B CSP Reason: Failed 1ST -low discharge pressure Entry Date: XX/Xx/XX (Yesterday)
Comp Actions Actions::
Annunciator:
Annunc  iator:
Comp Actions Actions::
Annunciator:
Annunc  iator:
.!~-
Comp Actions Actions::
Annunciator:
Annunc  iator:
Comp Actions Actions::
Annunciator:
Annunc iator:
Actions::
Comp Actions Annunciator:
Annunc  iator:
Actions::
Comp Actions Current Curre  nt Tech Spec Action Statem ents: (Does          (Does Not Include "For                   For Track  Trackiin2  ng Only Items"   Items T.S.A.S / Component:
T.S.A.S                      3.7.1.2 Action 3/ 3 / B AFWP Reason:
Reason:                       Bearing failed Bearing Entry Date:                   XX/XX/XX XX/Xx     JXX (Previous shift)
T.S.A.S / Component:
T.S.A.S / Component:
3.4.3 Action a / 3B PZR backup heaters Reason: 14 day due to 3B EDG OOS Entry Date: Xx/Xx/XX (2 days ago) T.S.A.S / Component:
T.S.A.S                      3.8.1.1 Actions Actions b & d / 3B EDG Reason:
3.5.2 Action f / 3B HHSIP Reason: 14 day due to 3B EDG OOS Entry Date: Xx/XX/XX (2 days ago) T.S.A.S / Component:
Reason:                       Fuel pump failed Entry Date:                   XX/XX/XX (2 days ago)
Reason: 'j Entry Date:
T.S.A.S / Component:
Unit 3 Status Changes to Risk S!gnificant Equipment:
T.S.A.S                      3.6.2.1 Action a / 3B CSP Reason:
B AFWP OOS (Bearing replacement) 3B EDG OOS (Fuel pump repair) 3B CSP OOS (Failed 1ST -low discharge pressure)
Reason:                       Failed 1ST - low discharg dischargee pressur pressuree Entry Date:                   XX/XX/XX XX/Xx      IXX (Yester (Yesterday) day)
Unit 3 Risk is GREEN. Main contributor is B AFWP. Upcoming Reactivity Management Activities:
T.S.A.S / Component:
Dilute to maintain 75% power until management permission received to complete increasing power back to 100%. Upcoming Major POD Activities:
T.S.A.S                      3,4.3 Action a / 3B PZR backup heaters
Return to 100% power if/when management permission received to increase power back to 100%. Upcoming ECOs to Hang and lor Release: None ""'-Evolutions or Compensatory Actions in Progress:  
 
-In process of returning power back to 100% from turbine valve test. Currently on hold at 75% awaiting management permission to continue power increase.
====3.4.3 Reason====
3-GOP-301 in use completed through step 5.97. -After shift turnover, perform 3C ICWP isolation valve cycling test per step 7.1.3 of 3-0SP-019.3 (steps 7.1.1 & 7.1.2 for 3A and 3B ICWP are not scheduled for this shift). -Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
Reason:                      14 day due to 3B EDG OOS Entry Date:                  XXIXX/XX Xx/Xx    !XX (2 days ago)
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains energized at management direction due to small size and stability of tube leak rate. OSP-023.3 Att 1 & 9 for 3B EDG OOS due in 4 hrs. 3-0SP-023.1 not required since 3B EDG OOS due to support system failure. 3-0P-023 sect 7.7 due next shift to allow 3B EDG OOS > 72 hr. General Information, Remarks, and Operator Work Around Status: See evolutions
T.S.A.S / Component:
& compensatory actions listed above. Train A is protected.
T.S.A.S                      3.5.2 Action ff// 3B HHSIP Reason:
Appendix D . Scenario Outline Form ES-D-1 Facility:
Reason:                      14 day due to 3B EDG OOS Entry Date:                  XX!XX/XX (2 days ago)
Turkey Point Scenario No.: 2 Op Test No.: 2007-301 Examiners:
Xx/XX T.S.A.S / Component:
.. Candidates:
T.S.A.S Reason:
US RO BOP Initial Conditions:
Reason:
Mode 1, 50% Power, MOL. Power on hold at 50% following inadvertent trip of 3B SGFP while investigation in progress.
'j  Entry Date:
Turnover:
 
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
Unit 33 Status Unit              Status ChangestotoRisk Changes              RiskS!gnificant SignificantEquipment:
3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW pump (vibration increase last shift). Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
Equipment:
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) SRO/BOP Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4. 2 (I) BOP/RO First stage impulse pressure channel PT-3-446 fails low. The crew responds TFS1MABL=T (TS,I) SRO per 3-0NOP-028 to stop inward rod movement by taking rod control to manual and then 3-0NOP-049.1.
B  AFWP      OOS      (Bearing B AFWP OOS (Bearing replacement)    replace  ment) 3BEDG 3B    EDGOOS  OOS(Fuel (Fuelpump pumprepair) repair) 3B  CSPOOS 3BCSP        QOS(Failed (Failed1ST  1ST-low lowdischarge dischargepressure) pressure)
3 (C) ALL 120VAC power panel 3P09 normal inverter fails. The auto swap to the CVT TFE6X06F = T also fails leaving 3P09 deenergized.
Unit  3  Risk  is  GREEN.
The crew responds per 3-0NOP-003.9.
Unit 3 Risk is GREEN. Main          Maincontributor contributorisisBBAFWP.AFWP.
TCE6DI1C =T 3P09 is swapped over to the spare inverter per 3-0NOP-003.9 Attachment
Upcoming Reactivity Upcoming          ReactivityManagement ManagementActivities:
: 1. 4 TFCMM2A4 =T (M) ALL The 3A steam generator tube leak grows to 2 gpm. R-3-19 fails to respond. TVHHSGA= (I) SRO/BOP The crew responds per 3-0NOP-071.2 0.002 (TS) SRO 4a (R) ALL A load reduction from 50% power is initiated and performed per 3-0NOP-071.2 5 TVHHSGA= (M) ALL The 3A steam generator tube leak grows from 2 gpm into a rupture. The 0.4 (cont'd from reactor is tripped and 3-EOP-E-0 performed.
Activities:
MOV-3-1433 fails to close TFSW33C=T event 4) requiring manual isolation of MSIVs. 6 (C) ALL When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup TFQ5A20A = T transformer locks out. 3A EDG starts but the output breaker does not automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG output breaker TAQ5LRSB =T is manually closed and the crew transitions back to 3-EOP-E-3.
Dilute toto maintain Dilute        maintain 75%  75% power power until until management management permission permission received received toto complete complete increasing increasing power power back back toto 100%.
Only 3A & 3D TFP1S38S = T 4kV bus are now available from 3A EDG. 3-EOP-E-3 is performed to cooldown and depressurize the RCS to stop primary-secondary leak flow. .. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2 Event No.: _1_ Page _1_ of _1_ Event
100%.
Upcoming Major Upcoming          Major POD POD Activities:
Activities:
Return to Return    to 100%
100% powerpower if/when if/when management management permission permission received received to to increase increase power power back back toto 100%.
100%.
Upcoming ECOs Upcoming          EGOs to  to Hang Hang and and lor br Release:
Release:
None None Evolut Evolutionsions or  or Compe      nsatory Action Compensatory            Actions  s in Progre Progress:  ss:
      - InIn proces    s  of  returning    power    back  to 100%
process of returning power back to 100% from turbine        from    turbine valve valve test.
test. Currently Currently on on hold hold at at 75%
75% awaiting awaiting manag managementement permission permission to    to continue continue power power increase.
increase. 3-GOP-301 3-GOP-301 in      in use use completed completed through through stepstep 5.97.
5.97.
      - After After shift shift turnover, turnover, perform perform 3C  3C ICWP ICWP isolation isolation valve valve cycling cycling test test per per step step 7.1.3 7.1.3 of of 3-OSP-01 3-0SP-019.3      (steps 7.1.1 9.3 (steps  7.1.1 &  & 7.1.2 7.1.2 for for 3A  and 3A and 3B    3B ICWP ICWP are are not not schedu scheduled led for for this this shift).
shift).
    -   Known Known tube
      - 071.2,        tube leak leak inin 3A 3A S/GS/G (2(2 gpd) gpd) - unchan unchanged ged forfor last last week.
week. Chemistry Chemistry sample samples    are being s are  being taken taken per per 3-ONOP-3-0NOP-Attachment      1.
071.2, Attachment 1. The current The    current sample, sample, justjust completed completed indicates indicates no no significant significant change change in in leak leak rate.
rate. MOV-3-1 MOV-3-1403 remains                                                                                                                                               403 remains energized energized at  at manag    ement direction management         direction duedue to to small small size size and and stability stability of of tube tube leak leak rate.
rate.
OSP-023.3 0-OSP-023.3 Att      Att 11 && 99 for for 3B 3B EDG EDG OOSOOS due  due inin 44 hrs.
hrs. 3-OSP-023.1 3-0SP-023.1 not  not required required since since 3B 3B EDG EDG QOS OOS duedue toto support support system      failure. 3-OP-023      sect  7.7  due system failure. 3-0P-023 sect 7.7 due next shift to    next  shift  to allow allow 3B 3B EDG EDG QOS OOS >> 72 72 hr.
hr.
Genera General  l Inform      ation, Remar Information,        Remarks, ks, and and Operat Operator  or Work Work ArounAround d Status:
Status:
See    evolutions      &  compe    nsatory    actions See evolutions & compensatory actions listed above.       listed  above.
Train Train AA isis protected.
protected.
 
Appendix D                                                . Scenario Outline                                Form ES-D-1 Facility:              Turkey Point                          Scenario No.:        2   Op Test No.:      2007-301 Examiners:                                                            candidates:
                                                                    .. Candidates:                                      US RO BOP Initial Conditions:      Mode 1, 1 50% Power, MOL. Power on hold at 50% following inadvertent trip of 3B SGFP while investigation in progress.
Turnover:                Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1        1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low - low discharge pressure (OOS 12 hr; ETR 36 hr)
Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-0053-OP-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW pump (vibration increase last shift).
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
Event                                Type*
Event Type*                                      Event Description No.
1 1                        (N) SRO/BOP                                                            3-OP-005 section 7.4.
Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 2                        (I) BOP/RO        First stage impulse pressure channel PT-3-446 fails low. The crew responds TFS1MASL=T TFS1MABL=T        (T5 I) SRO (TS,I)                3-ONOP-028 to stop inward rod movement by taking rod control to per 3-0NOP-028 3-ONOP-049.1.
manual and then 3-0NOP-049.1.
3                        (C) ALL            1 2OVAC power panel 3P09 normal inverter fails. The auto swap to the CVT 120VAC TFE6X06F = T 3-ONOP-003.9.
also fails leaving 3P09 deenergized. The crew responds per 3-0NOP-003.9.
TCE6DI1C =T 3-ONOP-003.9 Attachment 1.
3P09 is swapped over to the spare inverter per 3-0NOP-003.9 4      TFCMM2A4=T TFCMM2A4    =T (M)ALL (M)  ALL          The 3A steam generator tube leak grows to 2 gpm. R-3-19 fails to respond.
TVHHSGA =
TVHHSGA=        (I) SRO/BOP                                  3-ONOP-071 .2 The crew responds per 3-0NOP-071.2 0.002 (TS) SRO 4a                        (R) ALL            A load reduction from 50% power is initiated and performed per 3-0NOP-3-ONOP-071.2 5        TVHHSGA =
TVHHSGA=        (M) ALL            The 3A steam generator tube leak grows from 2 gpm into a rupture. The 0.4          (contd from (cont'd            reactor is tripped and 3-EOP-E-0 performed. MOV-3-1433 fails to close TFSW33C=T        event 4)          requiring manual isolation of MSIVs.
6                        (C) ALL            When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup transformer locks out. 3A EDG starts but the output breaker does not TFQ5A2OA =
TFQ5A20A  = T close and 3-EOP-ECA-0.0 is entered. 3A EDG output breaker automatically close, TAQ5LRSB =T is manually closed and the crew transitions back to 3-EOP-E-3. Only 3A & 3D TFP1S38S = T
                      -                        4kV bus are now available from 3A EDG.EDO. 3-EOP-E-3 is performed to cooldown and depressurize the RCS to stop primary-secondary leak flow.
(N)ormal, (R)eactlvlty, (R)eactivity, (I)nstrument, (l)nstrument, (C)omponent, (M)aJor (M)ajor 1
1
 
Appendix DD Appendix                                      Operator Actions Operator      Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.: 2007-301 2007-301          Scenario No.:
Scenario      No.: 22            Event Event No.:
No.: _1_1            Page _1_
Page    1 of of _1_
I Event
 
== Description:==
 
Event
 
== Description:==
Swap 3D Swap    3D 4kV 4kV busbus power power supply supply to to 3A 3A 4kV 4kV busbus per per 3-0P-005 3-OP-005 section section 7.4.
Time Time  [  Position Position Directs BOPBOP to Applicants Actions Applicant's to transfer Actions oror Behavior Behavior US US      Directs                transfer 3D 3D 4kV 4kV bus bus supply supply from from 3B 3B 4kV 4kV bus bus to to 3A 3A 4kV 4kV bus per bus    per 3-0P-005 3-OP-005 sectionsection 7.4.
7.4.
Directs BOP Directs    BOP start start 3A 3A ICWP ICWP && sid  s/d 3C 30 ICWP ICWP per per 3-0P-019 3-OP-019 section section 5.3.
5.3.
BOP BOP      Obtains copies of 3-0P-005, Obtains                    3-OP-005, section 7.4 & 3-0P-019,3-OP-019, section 5.3.
Performs actions Performs        actions asas follows:
follows:
: 1.      Starts 3A ICWP  CWP & stops 3C      30 ICWP per  per 3-0P-019 3-OP-019 section 5.3
: a.      Verifies NSO understands ICWPs to be started/stopped  started/stopped
: b.      Directs NSO verify oil in 3A ICWP sightglass & 3A ICWP discharge valve open
: c.      Starts 3A ICWP & checks for amperage on VPA ammeter
: d.      Directs NSO locally check 3A ICWP visible packing leakoff
: e.      Stops 3C 30 ICWP & checks zero amperage on VPA ammeter
: f.      Directs NSO locally do post-stop check
: 2.      Opens 3AB19 and then 3AD06 NOTE: 3C CCWP & 3C ICWP are OOS while 3D 4kV bus is deenergized TS 3.7.2 - 77 day action statement & TS 3.7.3 - 30 day action statement.
3.
: 3.      Closes Closes 3ADO13AD01 and and then then 3AA17 3AA 17 4.
: 4.      Directs Directs NSO NSO to locally locally check 3D  3D 4kV 4kV bus voltage 3744-4576 3744-4576 volts volts on  on cubicle 3AD08.
3AD08.
5.
: 5.      Starts Starts 30  3C ICWP ICWP per per 3-OP-019 3-0P-019 section section 5.35.3 to to verify verify operability.
operability.
a.
: a.      Verifies Verifies NSO NSO understands understands ICWPsICWPs to  to be be started/stopp started/stopped ed b.
: b.      Directs Directs NSONSO verify verify oil oil in in 30 3C ICWP ICWP sightglass sightglass && 303C ICWP ICWP discharge discharge valvevalve open open c.c. Starts Starts 303C ICWP ICWP && checks checks forfor amperage amperage on    on VPA VPA ammeter ammeter d.
: d.      Directs Directs NSONSO locally locally check check 3C 3C ICWP ICWP visible visible packing packing leakoff leakoff 6.
: 6.      At At SM  SM direction, direction, stops stops 30 3C ICWP ICWP perper 3-OP-019 3-0P-019 section section 5.3.
5.3.
a.
: a.      Stops Stops 3C 3C ICWP ICWP && checks checks zero zero amperage amperage on    on VPA VPA ammeter ammeter b.b. Directs Directs NSONSO locally locally do do post-stop post-stop check check RO RO      Assists Assists BOPBOP as  as directed directed by by US.
US.
I1
 
Appendix DD Appendix                                        OperatorActions Operator        Actions                                      Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301          Scenario No.:
Scenario    No.: -2...
2        Event Event No.: No.: _2_ 2          Page Page _1_ 1 of of_2_ 2 Event
 
== Description:==
 
Event
 
== Description:==
First stage First  stage iml2ulse impulse I2ressure pressure channelchannel PT-3-446 PT-3-446 fails fails low.
low. The The crew crew responds l2er resl20nds    per 3-0NOP-028 3-ONOP-028 to            stop inward to stOI2    inward rodrod movement movement by  by taking rod taking  rod control to control      manual and to manual            then 3-0NOP-049.1.
and then      3-ONOP-049.1.
Time Time    Position Position                                Applicants Actions Applicant's        Actions or  or Behavior Behavior BOP BOP        Recognizes/reports ch Recognizes/reports          ch III Ill first first stage stage impulse impulse pressure pressure PT-3-446 PT-3-446 failed failed low.
low.
                            *. annunciators C-6/1, annunciators      0-6/1, 6/2, 6/2, 6/3 6/3 (due (due toto change change in in SG SC level level program program setpoint  from setpoint from 60%  60% to  to 50%)
50%)
                            *. 0-7/1, 7/2, 7/3 steam line C-7/1,                          line hi flow & C-8/30-8/3 stm dump due to failure
                            *. P1-3-446 indication PI-3-446    indication on VPA fails low
                            *. Control rods inserting in automatic RO RO        Recognizes/reports control rods inserting in automatic Recognizes/reports When PT-3-446 failure recognized, performs immediate action of 3-ONOP-028 for continuous insertion of an RCC control bank: Places rod control in MANUAL and verifies rods stop moving.
US      Directs response per 3-ON              OP-028 3-0NOP-028 RO        Performs subsequent actions of 3-ONOP-028        3-0NOP-028 as directed by US:
: 1. IfIf directed, withdraws control rods to restore Tavg =Tref 1.
2.
: 2. Determines Determines rods rods above above RIL  RIL from VPA    VPA recorder (or  (or PCB PCB section section VII VII figure 3).
3).
: 3. Determines
: 3. Determines PRNIPRNI N-44N-44 did        not fail did not    fail 4.
: 4. After After PT-3-447 PT-3-447 selected selected for  for 1 1st stage st stage pressure pressure control, control, places places rods rods back in back    in auto auto 5.
: 5. Determines Determines TM-408 TM-408 medianmedian Tavg  Tavg selector selector not not failed failed BOP BOP      Performs Performs subsequent subsequent actions actions of  of 3-ONOP-028 3-0NOP-028 as      as directed directed byby US:
US:
1.1. IfIf directed, directed, reduces reduces turbine turbine load load to to restore  Tavg ==Tref restore Tavg        Tref
: 2. Selects
: 2.      Selects Channel Channel Select Select First First Stage Stage Control Control toto ch ch IV IV (PT-3-447)
(PT-3-447)
US US      Directs Directs WOOWCC notify notify I&C I&C ofof PT-3-446 PT-3-446 failure.failure.
Directs Directs response response per per 3-ONOP-049 3-0NOP-049.1        .1 22
 
Appendix DD Appendix                                      Operator Actions Operator      Actions                                        Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:  2007-30 1 2007-301            Scenario No.:
Scenario    No.: 22          Event Event No.:
No.: _2_  2            Page-Lof_2_
Page 2 of 2 Event
 
== Description:==
 
Event
 
== Description:==
First stage First  stage impulse impulse pressure pressure channel channel PT      446 fails PT-3-446      fails low.
low. The The crew crew responds per responds      per 3-0NOP-028 3-ONOP-028 to      to stop stop inward inward rod  rod movement by movement        by taking taking rod rod control to control    to manual manual andand then then 3-0NOP-049.1.
3-ONOP-049.1.
_Time Time    Position Position                                Applicants Actions Applicant's      Actions or  or Behavior Behavior BOP BOP        Performs actions Performs      actions ofof 3-0NOP-049.1 3-ONOP-049.1 as        as directed directed by  by US:
US:
1.
: 1.      Determine PT-3-446 Determine    PT-3-446 failedfailed by by comparison comparison to      to PT-3-447, PT-3-447, PT-3-1604 PT-3-1 604 and expected and  expected value based based on  on turbine load. load.
: 2.                PT-.3-447 selected for 11 Verifies PT-3-447                        sstt stage impulse impulse pressure pressure control
: 3.      Verifies PT-3-447 reading normally US        Evaluates impact per TS:
3.3.1. Table 3.3-1 units 12 &17b apply. Actions 6 (6hr) & 7 (1hr)                (lhr) in effect.
3.3.2. Table 3.3-2 units 1f      if & 4d. Action 15 (6hr) applies.
Conducts crew brief regarding effects of PT                    446 failure and of tripping PT-3-446 bistables as directed in 3-0NOP-049.1 3-ONOP-049.1 Attachment 4 BOP        Continues performing actions of 3-ONOP-049    3-0NOP-049.1        .i as directed by US:
Obtains keys, opens door to and trips following bistables in protection              protection channel III, rack 16:  16:
                            .*    BS-3-446-i BS-3-446-1 (Turbine (Turbine powerpower >10%
                                                                        >10% input input toto P-7)
P-7)
                            .*    BS-3-446-2 BS-3-446-2 (70%(70% turbturb load load limit limit runback run back permissive) permissive)
                            .*    BS-3-474 BS-3-474 (SG(SG A  A hi hi steam steam flow) flow)
                            .*    BS-3-484 BS-3-484 (SG(SG BB hi hi steam steam flow) flow)
                            **    BS-3-494 BS-3-494 (SG(SG C  C hi hi steam steam flow) flow)
Closes Closes protection protection rack rack door door whenwhen done.
done.
Places Places SteamSteam Dump Dump to  to Condenser Condenser Mode  Mode switchswitch in in MANUAL MANUAL RO RO      Monitors Monitors bistable bistable status status lights lights and and annunciator annunciator panels  panels forfor expected expected indications indications while while bistables bistables being being tripped.
tripped.
US US        1.1. Directs Directs NSO NSO bypass bypass power power 11 on on AMSAC AMSAC per      per Attachment Attachment 55 2.2. Directs Directs notification notification ofof l&C I&C 3.3. Directs Directs WCC WCC generate generate clearance clearance for  for tripped tripped bistables bistables 33
 
Appendix DD Appendix                                        OperatorActions Operator        Actions                                          Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301              Scenario No.:
Scenario      No.: .L    2          Event    No.: ~
Event No.:      3        Page Page _1_1 of_3_
of 3 Event
 
== Description:==
 
Event  


== Description:==
== Description:==
12OVAC Qower 120VAC        power Qanel panel 3P09 3P09 normalnormal inverter inverter fails.
fails. The The auto auto swaQ swap toto the the CVT also CVT    also fails fails leaving leaving 3P093P09 deenergized.
deenergized. The    The crew responds per 3-crew    resQonds    Qer  3-ONOP-003.9. 3P09 ONOP-003.9.          3P09 isis swaQQed swapped over    over to to the the sQare spare inverter inverter Qer per 3-3-
ONOP-003.9          Attachment ONOP-003.9 Attachment 1.                  1.
Time Time        Position Position                                    Applicants Actions Applicant's          Actions or or Behavior Behavior BOP BOP          Recognizes 1/ reports Recognizes            reports loss loss ofof 3P09 3P09 120VAC 120VAC vital vital inst inst bus bus
                                  *. Annunciator F-1/2 Annunciator          F-1/2
                                *. Loss of Loss    of all all ch ch IV IV instrumentation instrumentation (yellow(yellow labels) labels)
                                *. Loss of Loss    of controller controller for  for BB SG SG FRV FRV RO        Recognizes 1I reports loss of 3P09 120VAC              120VAC vital inst bus
                                *. Annunciators B-6/5    B-615 &    & B-7/1 8-7/1
                                *. Loss of all ch IV instrumentation instrumentation (yellow labels)
                                  *. Loss of controllers for PZR pressure, level &                    & spray valves
                                *. Letdown isolation Determines a reactor trip has not occurred US        Directs performance of 3-ONOP-003      3-0NOP-003.9      .9 Determines unit operating in                in mode 11 Directs Directs FS/NSO FS/NSO to    to restore restore power power to to 3P09 3P09 per      Attachment 11 && RO per Attachment              RO restore PZR          pressure PZR pressure and        and level level control control per per Attachment 4.      4.
RO RO        Performs Performs actionsactions of  of 3-ONOP-003 3-0NOP-003.9            as directed
                                                                                .9 as  directed by  by US:
US:
1.
: 1. Places Places rods rods in in MANUAL MANUAL 2.
: 2.      Reduces Reduces charging charging flow    flow toto minimum minimum reqd req'd for for seal seal injection injection using using aa charging charging pump  pump in    in manual manual speed speed control control 3.
: 3.      Determines Determines PORVs  PORVs closed  closed 4.4. Maintains Maintains Tavg,Tavg, rx  rx power, power, PZR        pressure &&PZR PZR pressure          PZR level level inin normal normal control control bands bands BOP BOP        Performs Performs actionsactions of  of 3-ONOP-003 3-0NOP-003.9            as directed
                                                                                .9 as  directed by  by US:
US:
1.1. Determines Determines steam  steam dump  dump to  to condenser condenser mode  mode already already inin MAN MAN 2.2. Determines Determines 3B    3B SGSG inin auto auto lockup.
lockup. Increases Increases 3B    3B SG SG blowdown blowdown flow    as necessary flow as    necessaryto      to control control 3B 3B SG SG level.
level.
3.3. Maintains Maintains SG  SG levels levels inin normal normal control control band band 44


Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4. Time Position Applicant's Actions or Behavior US Directs BOP to transfer 3D 4kV bus supply from 3B 4kV bus to 3A 4kV bus per 3-0P-005 section 7.4. Directs BOP start 3A ICWP & sid 3C ICWP per 3-0P-019 section 5.3. BOP Obtains copies of 3-0P-005, section 7.4 & 3-0P-019, section 5.3. Performs actions as follows: 1. Starts 3A ICWP & stops 3C ICWP per 3-0P-019 section 5.3 a. Verifies NSO understands ICWPs to be started/stopped
Appendix DD Appendix                                        OperatorActions Operator      Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
: b. Directs NSO verify oil in 3A ICWP sightglass
Op-Test No.:     2007-301 2007-301          Scenario No.:
& 3A ICWP discharge valve open c. Starts 3A ICWP & checks for amperage on VPA ammeter d. Directs NSO locally check 3A ICWP visible packing leakoff e. Stops 3C ICWP & checks zero amperage on VPA ammeter f. Directs NSO locally do post-stop check 2. Opens 3AB19 and then 3AD06 NOTE: 3C CCWP & 3C ICWP are OOS while 3D 4kV bus is deenergized TS 3.7.2 -7 day action statement
Scenario      No.: 22            Event Event No.:No.: ~  3        Page-l.,
& TS 3.7.3 -30 day action statement.
Page 2 of    of~ 3 Event
: 3. Closes 3AD01 and then 3AA 17 4. Directs NSO to locally check 3D 4kV bus voltage 3744-4576 volts on cubicle 3AD08. 5. Starts 3C ICWP per 3-0P-019 section 5.3 to verify operability.
: a. Verifies NSO understands ICWPs to be started/stopped
: b. Directs NSO verify oil in 3C ICWP sightglass
& 3C ICWP discharge valve open c. Starts 3C ICWP & checks for amperage on VPA ammeter d. Directs NSO locally check 3C ICWP visible packing leakoff 6. At SM direction, stops 3C ICWP per 3-0P-019 section 5.3. a. Stops 3C ICWP & checks zero amperage on VPA ammeter b. Directs NSO locally do post-stop check RO Assists BOP as directed by US. 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: -2... Event No.: _2_ Page _1_ of _2_ Event


== Description:==
== Description:==


First stage iml2ulse I2ressure channel PT-3-446 fails low. The crew resl20nds l2er 3-0NOP-028 to stOI2 inward rod movement by taking rod control to manual and then 3-0NOP-049.1.
Time Position Applicant's Actions or Behavior BOP Recognizes/reports ch III first stage impulse pressure PT-3-446 failed low.
* annunciators C-6/1, 6/2, 6/3 (due to change in SG level program setpoint from 60% to 50%)
* C-7/1, 7/2, 7/3 steam line hi flow & C-8/3 stm dump due to failure
* PI-3-446 indication on VPA fails low
* Control rods inserting in automatic RO Recognizes/reports control rods inserting in automatic When PT-3-446 failure recognized, performs immediate action of 3-ONOP-028 for continuous insertion of an RCC control bank: Places rod control in MANUAL and verifies rods stop moving. US Directs response per 3-0NOP-028 RO Performs subsequent actions of 3-0NOP-028 as directed by US: 1. If directed, withdraws control rods to restore Tavg = Tref 2. Determines rods above RIL from VPA recorder (or PCB section VII figure 3). 3. Determines PRNI N-44 did not fail 4. After PT-3-447 selected for 1 st stage pressure control, places rods back in auto 5. Determines TM-408 median Tavg selector not failed BOP Performs subsequent actions of 3-0NOP-028 as directed by US: 1. If directed, reduces turbine load to restore Tavg = Tref 2. Selects Channel Select First Stage Control to ch IV (PT-3-447)
US Directs WCC notify I&C of PT-3-446 failure. Directs response per 3-0NOP-049.1 2
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2 Event No.: _2_ Page-Lof_2_
Event
Event


== Description:==
== Description:==
120 VAC power 120VAC      power panelpanel 3P09 3P09 normal normal inverter inverter fails.
fails. The The auto auto swap swap toto the the CVT also CVT    also fails fails leaving    3P09 deenergized.
leaving 3P09        deenergized. The    The crew crew responds responds per 3-per  3-ONOP-003.9. 3P09 ONOP-003.9.          3P09 isis swapped swapped over  over toto the the spare spare inverter inverter per per 3-3-
ONOP-003.9        Attachment ONOP-003.9 Attachment 1.              1.
II. Time Time        Position Position                                  ApplicanVs Actions Applicant's      Actions or  or Behavior Behavior RO RO        Performs 3-0NOP-003.9 Performs      3-ONOP-003.9 AttachmentAttachment 44 when  when directed directed byby US:
US:
1.
: 1. Determines PORVs Determines        PORVs closed closed 2.
: 2. Directs FS/NSO Directs    FS/NSO go    go to    rack 46 to rack  46 && press/hold press/hold in  in relay relay LC459CX LC459CX 3.
: 3. Manually operate Manually      operate PZR PZR heaters heaters to to return return pressure pressure to to normal.
normal.
: 4. Restores letdown Restores      letdown
: a. Determines B CCW    COW header flow normal.
: b. Determines letdown orifice isolation valves closed
: c. Opens CV-3-204 then opens LCV-3-460
: d. Manually controls PCV-3-145 to control letdown pressure
: e. Opens letdown orifice isolation valve(s) for desired flow us US        Briefs crew on effects of loss of 3P09 using Enclosure 1.
Evaluates TS impact: 3.8.3.1.j  3.B.3.1.j applies. Action c. (2hrto  (2hr to reenergize; 24 hrhr  to  reenergize      from    inverter).
BOP BOP        Coordinates Coordinates with FS/NSO  FS/NSO to    to restore 3P09 3P09 per  per 3-ONOP-003 3-0NOP-003.9    .9 Att 1.1.
1.
: 1. Informs Informs FS/NSO FS/NSO that that DSDS inverter inverter not not currently currently in in use use 2.
: 2. When informed informed that 3P09  3P09 about about to to be be reenergized, reenergized, turns turns off off both both groups groups of  of PZR PZR backup backup heaters heaters 3.
: 3. Observes Observes components components reenergizing reenergizing as  as 3P09/3P24 3P09/3P24 breakers breakers closed closed in  in 4.
: 4. Relays Relays notification notification from from F5/NSO FS/NSO that  that all all 3P09/3P24 3P09/3P24 breakers breakers closed closed in in NOTE:
NOTE: Auto/Manua Auto/Manual      l controllers controllers should should notnot bebe returned returned to to AUTO AUTO until  vital  power    completely until vital power completely restored. restored. When When powerpower isis restored restored toto an an Auto/Manua Auto/Manual      l station, station, the the AUTO AUTO light light will will turn turn onon for for approx.
approx. 1515 sec sec after which after  which the the MANUAL MANUAL light  light turns turns onon indicating indicating that that manual manual control control isis now nowavailable.
available.
55


First stage impulse pressure channel PT 446 fails low. The crew responds per 3-0NOP-028 to stop inward rod movement by taking rod control to manual and then 3-0NOP-049.1.
AppendixDD Appendix                                      OperatorActions Operator    Actions                                   Form FormES-D-2 ES-D-2 Op-TestNo.:
Time Position Applicant's Actions or Behavior BOP Performs actions of 3-0NOP-049.1 as directed by US: 1. Determine PT-3-446 failed by comparison to PT-3-447, PT-3-1604 and expected value based on turbine load. 2. Verifies PT-3-447 selected for 1 st stage impulse pressure control 3. Verifies PT-3-447 reading normally US Evaluates impact per TS: 3.3.1. Table 3.3-1 units 12 &17b apply. Actions 6 (6hr) & 7 (1hr) in effect. 3.3.2. Table 3.3-2 units 1f & 4d. Action 15 (6hr) applies. Conducts crew brief regarding effects of PT 446 failure and of tripping bistables as directed in 3-0NOP-049.1 Attachment 4 BOP Continues performing actions of 3-0NOP-049.1 as directed by US: Obtains keys, opens door to and trips following bistables in protection channel III, rack 16:
Op-Test No.:     2007-301 2007-301            Scenario No.:
* BS-3-446-1 (Turbine power >10% input to P-7)
Scenario      No.:L 2        Event EventNo.:No.:-L 3        Page23 of_3_
* BS-3-446-2 (70% turb load limit run back permissive)
Page       of 3 Event
* BS-3-474 (SG A hi steam flow)
* BS-3-484 (SG B hi steam flow)
* BS-3-494 (SG C hi steam flow) Closes protection rack door when done. Places Steam Dump to Condenser Mode switch in MANUAL RO Monitors bistable status lights and annunciator panels for expected indications while bistables being tripped. US 1. Directs NSO bypass power 1 on AMSAC per Attachment 5 2. Directs notification of I&C 3. Directs WCC generate clearance for tripped bistables 3
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: .L Event No.: Page _1_ of_3_ Event


== Description:==
== Description:==


120VAC Qower Qanel 3P09 normal inverter fails. The auto swaQ to the CVT also fails leaving 3P09 deenergized.
Event  
The crew resQonds Qer 3-ONOP-003.9.
3P09 is swaQQed over to the sQare inverter Qer 3-ONOP-003.9 Attachment
: 1. Time Position Applicant's Actions or Behavior BOP Recognizes 1 reports loss of 3P09 120VAC vital inst bus
* Annunciator F-1/2
* Loss of all ch IV instrumentation (yellow labels)
* Loss of controller for B SG FRV RO Recognizes 1 reports loss of 3P09 120VAC vital inst bus
* Annunciators B-6/5 & B-7/1
* Loss of all ch IV instrumentation (yellow labels)
* Loss of controllers for PZR pressure, level & spray valves
* Letdown isolation Determines a reactor trip has not occurred US Directs performance of 3-0NOP-003.9 Determines unit operating in mode 1 Directs FS/NSO to restore power to 3P09 per Attachment 1 & RO restore PZR pressure and level control per Attachment
: 4. RO Performs actions of 3-0NOP-003.9 as directed by US: 1. Places rods in MANUAL 2. Reduces charging flow to minimum req'd for seal injection using a charging pump in manual speed control 3. Determines PORVs closed 4. Maintains Tavg, rx power, PZR pressure & PZR level in normal control bands BOP Performs actions of 3-0NOP-003.9 as directed by US: 1. Determines steam dump to condenser mode already in MAN 2. Determines 3B SG in auto lockup. Increases 3B SG blowdown flow as necessary to control 3B SG level. 3. Maintains SG levels in normal control band 4 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2 Event No.: Page-l., of Event


== Description:==
== Description:==
12OVAC Qower 120VAC      powerQanelpanel 3P09 3P09 normal normal inverter inverterfails.
fails. The The auto auto swaQ swaptotothethe CVT also CVT    also fails fails leaving    3P09 deenergized.
leaving 3P09    deenergized. The The crew crew responds Qer resQonds    per3                          ONOP-003.9. 3P09 ONOP-003.9.          3P09 isis swaQQed swapped over overtoto the the sQare spare inverter inverterQerper3-3-
ONOP-003.9        Attachment ONOP-003.9 Attachment 1.          1.
Timee r_Tim        Position Position    J                          Applicants Actions Applicant's  Actions or or Behavior Behavior RO RO          Restores auto Restores      auto controls controls on on Encl End 11 as as 3P09 3P09 breakers breakers are  are closed closed in:
in:
1.
: 1. Restores auto Restores      auto PZR PZR pressure pressure control control perper Att Att 44 section section 22 a.
: a. Directs NSO Directs    NSO release release LC459CX LC459CX b.
: b. Restore charging Restore    charging pumps, pumps, PZRPZR heaters heaters && spray spray valves valves toto auto control auto    control
: 2. Determines annunciators Determines      annunciators indicate indicate correctly correctly for plant plant conditions conditions
: 3. Returns rods to auto once PRNI N-44      N-44 reenergized reenergized BOP BOP          Restores auto controls on Ene!
Restores                          End 11 as 3P09 breakers breakers are closed in:  in:
: 1. Returns 3B SG level control to automatic Returns                                automatic
: a. Manually control FCV-3-488 to return SG level to            to 60+/-5%
60+/-5%
and match feed flow ==steam flow
: b. Places 3B SG level control in auto 2.
: 2. Places Places steam dump  dump to conden condenser    mode selecto ser mode      selector    to RESET r to RESET and and  then  to AUTO to AUTO 3.
: 3. Determines Determines annunc        iators indicate annunciators    indicate correctly correctly for for plant plant conditions conditions 66


120VAC power panel 3P09 normal inverter fails. The auto swap to the CVT also fails leaving 3P09 deenergized.
AppendixDD Appendix                                          OperatorActions Operator      Actions                                        Form FormES-D-2ES-D-2 Op-TestNo.:
The crew responds per 3-ONOP-003.9.
Op-Test    No.:   2007-301 2007-301              Scenario No.:
3P09 is swapped over to the spare inverter per 3-ONOP-003.9 Attachment
Scenario      No.:-.&#xa3;..
: 1. II. Time Position Applicant's Actions or Behavior RO Performs 3-0NOP-003.9 Attachment 4 when directed by US: 1. Determines PORVs closed 2. Directs FS/NSO go to rack 46 & press/hold in relay LC459CX 3. Manually operate PZR heaters to return pressure to normal. 4. Restores letdown a. Determines B CCW header flow normal. b. Determines letdown orifice isolation valves closed c. Opens CV-3-204 then opens LCV-3-460
2          EventNo.:
: d. Manually controls PCV-3-145 to control letdown pressure e. Opens letdown orifice isolation valve(s) for desired flow US Briefs crew on effects of loss of 3P09 using Enclosure
Event    No.:--L          Page 4        Page_1_..j...ofof_1_
: 1. Evaluates TS impact: 3.B.3.1.j applies. Action c. (2hr to reenergize; 24 hr to reenergize from inverter).
                                                                                                                          .J...
BOP Coordinates with FS/NSO to restore 3P09 per 3-0NOP-003.9 Att 1. 1. Informs FS/NSO that DS inverter not currently in use 2. When informed that 3P09 about to be reenergized, turns off both groups of PZR backup heaters 3. Observes components reenergizing as 3P09/3P24 breakers closed in 4. Relays notification from FS/NSO that all 3P09/3P24 breakers closed in NOTE: Auto/Manual controllers should not be returned to AUTO until vital power completely restored.
Event
When power is restored to an Auto/Manual station, the AUTO light will turn on for approx. 15 sec after which the MANUAL light turns on indicating that manual control is now available.
5 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: L Event No.: -L Page 2 of_3_ Event


== Description:==
== Description:==


120VAC Qower Qanel 3P09 normal inverter fails. The auto swaQ to the CVT also fails leaving 3P09 deenergized.
Event  
The crew resQonds Qer 3-ONOP-003.9.
3P09 is swaQQed over to the sQare inverter Qer 3-ONOP-003.9 Attachment
: 1. Time Position Applicant's Actions or Behavior RO Restores auto controls on Encl 1 as 3P09 breakers are closed in: 1. Restores auto PZR pressure control per Att 4 section 2 a. Directs NSO release LC459CX b. Restore charging pumps, PZR heaters & spray valves to auto control 2. Determines annunciators indicate correctly for plant conditions
: 3. Returns rods to auto once PRNI N-44 reenergized BOP Restores auto controls on Ene! 1 as 3P09 breakers are closed in: 1. Returns 3B SG level control to automatic
: a. Manually control FCV-3-488 to return SG level to 60+/-5% and match feed flow = steam flow b. Places 3B SG level control in auto 2. Places steam dump to condenser mode selector to RESET and then to AUTO 3. Determines annunciators indicate correctly for plant conditions 6
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: -.&#xa3;.. Event No.: --L Page _1_ of _1_ Event


== Description:==
== Description:==
The 3A The    3Asteam steamgenerator generatortube tube leak      growstoto 22 QI;~m.
leakgrows              gpm. R-3-19 R-3-1 9fails failstoto respond. The res(2ond.      The crew crewres(2onds responds (2er  per3-0NOP-071.2.
3-ONOP-071 .2.
I  Time Ti...,,,
        ,~
Position Position                                  Applicants Actions Applicant's      Actions or  or Behavior Behavior BOP BOP          Recognizes/reports increase Recognizes/reports            increase inin 3A 3A SGSG tube tube leak leak rate rate
                                      *. Annunciator H-1/4 Annunciator        H-1/4 (PRMS (PRMS hihi radiation) radiation)
                                    *.      R-3-15 SJAE R-3-15    SJAE effluent effluent PRMS PRMS rising/alarming rising/alarming
                                    *.      SJAE SPING SJAE    SPING RAD-3-6417 RAD-3-6417 rising/alarming rising/alarming (see  (see ERDADS)
ERDADS)
NOTE: R-3-19 NOTE:        R-3-19 is is failed failed as as isis RO RO          Recognizes/reports increase Recognizes/reports            increase in  in 3A 3A SGSG tube tube leak leak rate rate
                                    *. Annunciator H-1/4 Annunciator      H-1/4 (PRMS hi      hi radiation) radiation)
                                    *. Slight increase increase in charging charging flow to maintain maintain PZR level  level
                                    *. Chg/letdn flow mismatch Chg/letdn            mismatch approx.
approx. 2 gpm (see ERDADS)  ERDADS) us US        Directs perform        ance of 3-0NOP-071.2 performance          3-ONOP-071 .2 Directs Chemi      stry notific Chemistry              ation to sample SGs & main steam notification                                    steam lines lines forfor activity per 0-NCA0-NCAP-1  P-10404 Directs Directs HP  HP notific  ation to notification    to take take rad rad reading readings      on mn s on  mn stm stm && blowd blowdown  own BOP BOP        Perform Performs    s actions actions of of 3-ONO 3-0NOP-071.2 P-071 .2 as  as directe directed    by US:
d by  US:
1.
: 1. Determ Determines ines R-3-1 R-3-15  5 alarm alarm valid valid (>(> alarm alarm setpoin setpointt && operab operable)  le) 2.
: 2. Perform Performs    s notific  ations as notifications      as directe directed    by US.
d by    US.
RO RO        Perform Performs    s actions actions of of 3-ONO 3-0NOP-071.2 P-071 .2 as  as directe directed    by US:
d by  US:
1.1. Determ Determines ines PZR PZR level level stable stable 2.2. Determ Determines ines chargin charging  g pump pump suction suction remain remains    aligned to s aligned    to VCT VCT 3.3. Determ Determinesines SG SG tube tube leak leak rate rate 22 gpm gpm using using VCTVCT level level trend, trend, RC5 RCS leakleak rate rate calcula    tion and/or calculation      and/orSJAE/
SJAE/R-3-15        activity R-3-1 5 activity vs. vs. SGSG tube    leakag  e  curves    (PCB tube leakage curves (PCB section        section 55figures figures 14/15) 14/15)
US US        Determ Determines ines unit unitshould should be  be inin mode mode 33inin 33hr  hr Ensure Ensures    s load loaddispatc dispatcherher notified notifiedof  ofload loaddecrea decrease.se.
77


The 3A steam generator tube leak grows to 2 R-3-19 fails to res(2ond.
Appendix D                                     Operattor Opera    or Action Actionss                                  Form ES-D-2 Op-Test No.:   2007-301 01              Scenarrio Scena    io No.: 2           Event No.: 4a           Page _1 1 of L2 Event
The crew res(2onds (2er 3-0NOP-071.2.
I Ti...,,, Position Applicant's Actions or Behavior BOP Recognizes/reports increase in 3A SG tube leak rate
* Annunciator H-1/4 (PRMS hi radiation)
* R-3-15 SJAE effluent PRMS rising/alarming
* SJAE SPING RAD-3-6417 rising/alarming (see ERDADS) NOTE: R-3-19 is failed as is RO Recognizes/reports increase in 3A SG tube leak rate
* Annunciator H-1/4 (PRMS hi radiation)
* Slight increase in charging flow to maintain PZR level
* Chg/letdn flow mismatch approx. 2 gpm (see ERDADS) US Directs performance of 3-0NOP-071.2 Directs Chemistry notification to sample SGs & main steam lines for activity per 0-NCAP-1 04 Directs HP notification to take rad readings on mn stm & blowdown BOP Performs actions of 3-0NOP-071.2 as directed by US: 1. Determines R-3-15 alarm valid (> alarm setpoint & operable)
: 2. Performs notifications as directed by US. RO Performs actions of 3-0NOP-071.2 as directed by US: 1. Determines PZR level stable 2. Determines charging pump suction remains aligned to VCT 3. Determines SG tube leak rate 2 gpm using VCT level trend, RCS leak rate calculation and/or SJAE/R-3-15 activity vs. SG tube leakage curves (PCB section 5 figures 14/15) US Determines unit should be in mode 3 in 3 hr Ensures load dispatcher notified of load decrease.
7 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2 Event No.: 4a Page _1 of L Event


== Description:==
== Description:==
A load reductreductiionon from 50% power is initiate d and perform  performed per 3-ONOP-071  -071.2 .2..
Time      Position                                  Applicant's Applic  ants Actions or Behavior US        Conducts crew brief per 3-0NO        3-ONOP-071 P-071 .2.2 foldout page:
                                  *. Specifies load reduct  reductiion on rate
                                *. Target power level = offline
                                *. Specifies tube leak rate and affected slg        s/g
                                *. Covers action actionss required after unit is offline
                              *.      Specif ies method of reactivity control includi  including ng boration amount & rate
                              *.      Covers E-O E-0 transition criteria
                            *.        Solicits crew questi questioonsns & input Notifie Notifiess SM to review EPlan, 0-ADM        0-ADM-115-115 and make required notifica notificationstions inlcudi inlcuding  verifying ng verifyin  g NRC Resident notifica notification tion BOP        When directed per 3-0NO      3-ONOP-071 P-071 .2:
                                                                        .2:
: 1.      Notifie Notifies load dispat dispatc cher her of load reduct reductiionon when directed by US
: 2.      Makes plant page annou    announ  nceme cemen  ntt regarding load reduct reductiion on
: 3. When leaking slg      s/g identifi identified, ed, closes & deenedeenerrgizes gizes affected slgs/g AFW steam supply MOV per Att 2 (may be done by RO depen dependding    ing on when this action directed)
When directed, initiates boration per 3-0NO          3-ONOP-071P-071 .2:
                                                                                              .2:
RO
: 1. Places Rx MIU        M/U Select Selecto orr Switch to BORATE
: 2. Places Rx MIU      M/U Control Switch to START
: 3. Sets FC-3-1 FC-3-1 13A1 3A pot setting =  = 8.0
: 4. Sets BA Totalizer to amount directed (powe            (powerr reduct reductiionon to 25%
at 85 gal per 10% =          = 213 gal.)
: 5. Returns CVCS mlu          rn/u to auto when boration compl  comple  te ete BOP        Reduc Reduces      es turbine load per 3-0NO3-ONOP-1  P-100 00 at rate directed by US.
8
Appendi Appen dixx DD                                    Operator Opera        Actions tor Action  s                                        Form Form ES-D-    2 ES-D-2 Op-Test Op-Te      No.:
st No.:    2007-301 2007-3 01            Scenario Scena          No.: L 2 rio No.:                Event No.:
Event      No.: 4a 4a        Page-Page ..&#xa3; 2 ofofL 2 Event Descri Event  Descripti  on:
ption:    AA fast fast load load reduct reduction      from 50%
ion from      50% power power isis initiate initiatedd and and perform performed  ed per ONO    P-1 ONOP -100. 00.                                                                              per 3-3-
Time Time        Position Positio  n                                Applican Applic      Vs Action ant's  Actions  s oror Behav Behavior ior RO RO          NOTE:
NOTE        Extent to
: Extent      to which which 3-0NO 3-ONOP-0  P-071 71.2
                                                                                  .2 action actions  s perfor  med depen performed      depend d on  point when on point    when SGTR SGTR inserte inserted  d When directe When      directed      per 3-0NO d per    3-ONOP-0 P-071 71.2
                                                                            .2::
1.
: 1. Verifies Verifie      load reduct s load    reduction ion rate rate && auto auto rod rod inserti insertionon mainta maintaini ining ng Tavg T avg-Tref  per expec T ref per    expected    value as ted value      as discus discussedsed in in crew crew brief brief NOTE:: Rods NOTE        Rods << RIL  RIL not not expec expectedted atat this this power power levellevel 2.
: 2. Checks Check        PZR level s PZR      level followi followingng progra program. m. IfIf not increa  ses chargi increases            ng charging and/or places flow and/or        places anan additio additionanall letdow letdown  n orifice orifice in service servi  ce
: 3. Dete  rmin Determ ines    es NRHX NRHX CCW flow alread    alreadyy increa increased sed (from setup) setup)
: 4. Energizes Energ    izes PZR backu backup      heaters.
p heater  s.
: 5. Verifiess conde Verifie      condense nserr steam dumpsdumps operat operating ing proper properlyly
: 6. Plac  es  stati Places station    on service service load loadss on U3 SUT
: 7. Veri  fiess blowdo Verifie      blowdow  wnn isolate isolatedd from leaking leaking s/g
: 8. Dire    cts NSO align aux steam from U4 per Atta Directs                                                        Attachchmment ent 6
: 9. Dete Determ rmin  es ines turbi    ne load << 570M turbine            570MW  W & verif verifieiess non-non-ru  nning runn  ing SGF SGFP  P recir recirc c valv valvee open 10.
: 10. Dete Determrmin    es only ines    only one one HDPHDP &  & SGF SGFP  P runn runnin ingg 111.
: 1. Veri  fiess both Verifie    both HDPHDPs  s stop stoppepedd << 300 300 MW  MWe  e 12.
: 12. Stop Stops  s 11 cond    ensa conde nsate  te pum pump  p << 275 275 MW MWe  e 13.
: 13. Open Opens  s SGF SGFP  P recir recircc valv valves es onon runn runnin ingg SGF SGFP  P << 200 200 MWMWe  e 14.
: 14. Open      s  turbi Opens turbine    ne drain drain valv valveses << 150 150 MWMWe  e 99
Appendi Appen dixx0D                                                Operato Opera    torrAction Actions s                                          Form FormES-D-    2 ES-D-2 Op-Tes Op-Te  sttNo.:
No.:    2007-30 2007-3  01 1                Scenar Scena      riQio No.:
No.:.L    2          Event Event No.:
No.:~    5          Page-.1Q..
Page        10 of of~  3 Event Descri Event  Descripti on: The ption:    The 3A  3Asteamsteam genera generattor  ortube tube leak leak grows grows fromfrom 22 g[2m gpm into into aa rU[2ture  . The reac    tor                                                                                          rupture. The reacto      r isis tri[2[2ed tripped and    and 3-EOP 3-EOP-E-  -E-00 [2erfor performed med.. MOV-3 MOV-3-1    -1433 433  fails  to  close requiring        manuall isolatio                                                                  fails  to  clos e reguiri    ng manua                isolation  n ofof MSIVs MSIVs..
Time Time        Position Positio  n                                            Applican Applic        ts Action ant's    Actions s oror Behav Behavior  ior RO RO              Recogn Recog            izes // reports nizes          reports falling falling PZRPZR levels levels andand rising rising chargi charging ng flows flows us US              Determin Determ        ines es anan increa increas  see inin SG SG tubetube leak leak rate rate isis occurr occurringing and directs respon respons                                                                          and directs                          per 3-0NO see per      3-ONOP-0  P-071 71.2.2 foldou foldoutt page page RO RO              Respon Respo        ndsds perper 3-0NO 3-ONOP-0  P-071  71.2.2 to to droppi dropping  ng PZR PZR level:
level:
rrd 3  j 1.
: 1. StartsStarts 3 chargi    charging  ng pump pump and  and establ establis ishes hes maxim maximum  um flow rate  rate
: 2. Isolate
: 2.        Isolates        letdown s letdow          flow n flow 3.
: 3.        Determin Determ        ineses PZRPZR level still droppidropping ng
: 4.        Recommends Recom        mends reacto  reactorr trip due to inabilit inabilityy to mainta maintain  in PZR level US            Directs Direct      s RO to manu    manuall  allyy trip the reacto reactorr per 3-0NO 3-ONOP-0  P-071 71 .2
                                                                                                                                    .2 due due Critical Critica                inability to inabili        ty  to    maintaiin mainta      n PZR level.level.
Directs crew perform Directs                  perform immed immediat  iatee actio action nss of 3-EOP 3-EOP-E-    -E-0.
0.
RO            Performs Perfor      ms imm  immed  ediat iatee acti actiononss of 3-EO 3-EOP    -E-0:
P-E-  0:
1.
: 1. Veri  Verifiefiess reac reacto torr trip
                                        .*      Rod bottobottom  m light lights s on on &    RPls at
                                                                                    & RPls    at zero zero
* Rx Rx trip trip && bypbypassass bkrs bkrs ope open n
                                        .      Neut Neutro  ronn flux flux dec decrea reassing ing 2.
: 2.      Act Actuatuatees  s SISI && phaphase se AA due due PZR PZR level level not not main mainta    ined taine      <12%
d <12%
BOP BOP            Perfo Perforrms    ms imm immed  ediat iatee actio action  nss of of 3-EO 3-EOP    -E-0:
P-E-  0:
1.1.      Veri Verifiefiess turbi turbine ne tripp tripped ed
* Turb Turbin  inee stop stop valvvalveses clos closeded
                                      .*    Atte Attemp mpts  ts closi closing ng MSR MSR main main stea steam    stop MOV m stop      MOVs  s..
Cri ticall Critica                          Rec Recog  ognnizes izes MOV  MOV-3  14
                                                                                  -143333 fail failed ed to to clos close e &&closcloses es MSIMSIVsVs
                                      .      Mid
* Mid && Eas      East  t GOB GCBs  s open open 2.2. Veri  Verifiefiess powpower  er toto eme emerg rgeency ncy 4kV 4kV busbuses es
                                      .*    Dete Determ  rmin    es both ines    both 3A 3A&& 3B 3B 4kV4kVbus buses    energi es ene    rgizzed ed
* Dete Determ  rmin    es 3D ines    3D 4kV4kVbus busene energi rgizzed    from 3B ed from        3B4kV4kVbus  bus 10 10


A load reduction from 50% power is initiated and performed per 3-ONOP-071.2.
Appendix 0D                                Operattor Opera    or Action Actions                               Form ES-D- 2 Op-Te st No.:   2007-301         Scenarrio Scena    io No.: _2_ 2      Event No.: _5_ 5    Page 2 of_3_
Time Position Applicant's Actions or Behavior US Conducts crew brief per 3-0NOP-071.2 foldout page:
of 3 Event
* Specifies load reduction rate
* Target power level = offline
* Specifies tube leak rate and affected slg
* Covers actions required after unit is offline
* Specifies method of reactivity control including boration amount & rate
* Covers E-O transition criteria
* Solicits crew questions
& input Notifies SM to review EPlan, 0-ADM-115 and make required notifications inlcuding verifying NRC Resident notification BOP When directed per 3-0NOP-071.2:
RO 1. Notifies load dispatcher of load reduction when directed by US 2. Makes plant page announcement regarding load reduction
: 3. When leaking slg identified, closes & deenergizes affected slg AFW steam supply MOV per Att 2 (may be done by RO depending on when this action directed)
When directed, initiates boration per 3-0NOP-071.2:
: 1. Places Rx MIU Selector Switch to BORATE 2. Places Rx MIU Control Switch to START 3. Sets FC-3-113A pot setting = 8.0 4. Sets BA Totalizer to amount directed (power reduction to 25% at 85 gal per 10% = 213 gal.) 5. Returns CVCS mlu to auto when boration complete BOP Reduces turbine load per 3-0NOP-1 00 at rate directed by US. 8 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: L Event No.: 4a Page-..&#xa3; of L Event


== Description:==
== Description:==
The 3A steam generator      tor tube leak grows from 2 gpm into a rupture.
reactorr is tripped and 3-EOP-E-0 performed. MOV-3 The reacto                                                  MOV-3-1  433 fails to
                                                                                          -1433 close requiring manual isolation of MSIVs  MSIVs..
Time        Position                            Applic ant's ants Actions or Behavior US        Directs BOP verify prompt action actionss per 3-EOP-E-0 Attachment 3.
Directs RO contin ue with perforperform  ance of 3-EOP-E-0 subse mance                  subseqquent uent actions.
BOP        Verifies prompt action Verifie            actionss per 3-EOP-E-0 Attach ment 3:
: 1. Determ ines 3A, 3B, 3C,    30, 3D & 3H 480V LCs energi energiz  ed zed
: 2. Determ ines MSIVs all closed
: 3. Verifies FW isolation:
Verifie
: a. Places running SGFP switch in STOP      STOP..
: b. Determ ines all main FW regula  regulatting ing & bypas bypasss valves closed.
: c. Closes FW isolation valves.
: d. Determ ines both SSGF  SSGFW  WPs Ps off.
: 4. Verifies 3A & 3B ICWP Verifie              CWPss running, POV-3 -4882 & 4883 closed with ICW 10W heade headerrss tied together.
: 5. Verifies 3 CCWH Xs in service, 3A & 3B CCWP5          s running, CCW headerrss tied together & MOV-3 heade                        MOV-3-626-626 open.
: 6. Determ ines 2 ECCs & all 3 ECFs running.
: 7. Determines all 4 HHSIP s & 2 RHRP s running
: 8. Check s for HHSI flow if RCS pressure < 1600 psig
: 9. Shuts down both unit 4 HHSIP s
: 10. Determ ines all contai contain  ment isolation phase A valves closed.
nment
: 11. Determ ines all SI valves in proper injection alignm alignment
: 12. Resets SI & contaicontain  ment isolation phase A.
nment
: 13. If RCPs running, opens MOV-3  MOV-3-1417
                                                                    -1417 & 1418 then resets resets//starts starts all available NCCs.
: 14. Determ ines contai contain  ment pressure remained <
nment                        < 20 psig.
: 15. Determ ines contai contain  ment ventilation isolated and control room nment ventilation in proper emerg emergeency ncy recirculation alignm ent.
11


A fast load reduction from 50% power is initiated and performed per 3-ONOP-100.
Appendix0D Appendix                                        OperatorActions Actions                                      Form Operator                                                        FormES-D-2 ES-D-2 Op-TestNo.:
Time Position Applicant's Actions or Behavior RO NOTE: Extent to which 3-0NOP-071.2 actions performed depend on point when SGTR inserted When directed per 3-0NOP-071.2:
No.:     2007-301            ScenarioNo.:  No.:_2_  2 Op-Test         2007-301           Scenario                            EventNo.:
: 1. Verifies load reduction rate & auto rod insertion maintaining T avg-T ref per expected value as discussed in crew brief NOTE: Rods < RIL not expected at this power level 2. Checks PZR level following program. If not increases charging flow and/or places an additional letdown orifice in service 3. Determines NRHX CCW flow already increased (from setup) 4. Energizes PZR backup heaters. 5. Verifies condenser steam dumps operating properly 6. Places station service loads on U3 SUT 7. Verifies blowdown isolated from leaking s/g 8. Directs NSO align aux steam from U4 per Attachment 6 9. Determines turbine load < 570MW & verifies non-running SGFP recirc valve open 10. Determines only one HDP & SGFP running 11. Verifies both HDPs stopped < 300 MWe 12. Stops 1 condensate pump < 275 MWe 13. Opens SGFP recirc valves on running SGFP < 200 MWe 14. Opens turbine drain valves < 150 MWe 9 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 ScenariQ No.: .L Event No.: Page -.1Q.. of Event
Event     No.:_5_        Page~ of ~
Page     ......
EventDescription:
Event  


== Description:==
== Description:==
The3A The    3Asteam steamgenerator generatortube  tubeleakleakgrows growsfromfrom22gpm gpminto intoaarupture.
rupture.
Thereactor The    reactorisistripped trippedand  and3-EOP-E-0 3-EOP-E-0performed.
performed. MOV-3-1433 MOV-3-1 433fails    failstoto closerequiring close    requiring manual manualisolation isolationof  MSIVs.
of MSIVs.
Time Time        Position Position                                    ApplicanVs Actions Applicant's      Actions or or Behavior Behavior BOP BOP            Continues prompt Continues        prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3:3:
: 16. Directs
: 16. Directs NSONSO place place PAHMS PAHMS inin service service perper 3-0P-094.
3-OP-094.
: 17. Verifies
: 17. Verifies 3A 3A && both both U4 U4 EDGs EDGs running running (3B(3B EDG EDG isis OOS).
OCS).
: 18. Determines
: 18. Determines 3A,    3A, 3B3B && 3D 3D 4kV 4kV buses buses still still energized.
energized.
: 19. Notifies
: 19. Notifies US US that that prompt prompt action action verification verification complete.
complete.
RO RO          Performs foldout Performs      foldout page page actions actions ofof 3-EOP-E-0 3-EOP-E-0 as    as directed:
directed:
1.
: 1.            RCPs ifif RCS Trips RCPs          RCS subcooling subcooling << 25&deg;F25&deg;F with HHSIP HHSIP running running and  and SII flowpath S  flowpath verified verified
: 2. Identifies 3A SG level increasing Identifies                        increasing in an uncontrolled uncontrolled ri ica Critical manner >6% and isolates manner                      isolates all FW flow to 3A SG Performs subsequent Performs      subsequent actions of 3-EOP-E-0  3-EOP-E-0 as directed directed
: 1. Determ Determinesines 2 AFWPAFWPss (A & C) runnin  running.g.
: 2. Determ Determinesines AFW valve alignm    alignmentent proper 3.
: 3. Determ Determinesines at at least least 3A 3A SGSG level level>    6%. Contro
                                                                                > 6%. Controls    AFW flow ls AFW      flow to to intact  SGs intact SGs (3B &(3B  & 3C) 3C) to to mainta maintain  levels 15-50%
in levels    15-50%
4.
: 4. Determ    ines annunc Determines                  iators A-1/1, annunciators              1/2 && 1/3 A-1 /1,1/2      1/3 all all off.
off.
5.
: 5. Determ    ines Tc Determines        Tc stable.
stable.
6.
: 6. Determ    ines PORV Determines        PORVs,  s, norma normal    spray, aux l spray,    aux spray spray && excess excess letdow letdown  n isolatio n isolation valves valves closed closed 7.7. Trips Trips RCPs RCPs ifif RCS RCS subcoo      ling << 25&deg;F subcooling        25&deg;F with with HHSIP HHSIP runnin running    and g and SI SI flowpa flowpathth verifie verifiedd 8.8. Determ      ines no Determines        no SGs SGs depres depressurized surized or  or depres depressurizing surizing 9.9. Determ Determinesines SG  SG tube tube rupture ruptured      (R-3-15 d (R-3-1        alarm && 3A 5 alarm          3ASG SG level) level)
US US        Based Basedon    on SG SGtubetube rupture rupture:  :
1.1. Directs DirectsSTA STAmonito monitor r CSFST CSFSTs      (red path s (red    pathon  on Heat HeatSink SinkCSF)
CSF) 2.2. Directs Directstransiti transitionon to to3-EOP 3-EOP-E-3.
                                                                          -E-3.
1212


The 3A steam generator tube leak grows from 2 g[2m into a rU[2ture.
AppendixDD Appendix                                        OperatorActions Operator      Actions                                      Form FormES-D-2 ES-D-2 Op-TestNo.:
The reactor is tri[2[2ed and 3-EOP-E-0
Op-Test  No.:    2007-301 2007-301              Scenario No.:
[2erformed.
Scenario      No.: _2_ 2                  No.: _6_
MOV-3-1433 fails to close reguiring manual isolation of MSIVs. Time Position Applicant's Actions or Behavior RO Recognizes  
Event No.:
/ reports falling PZR levels and rising charging flows US Determines an increase in SG tube leak rate is occurring and directs response per 3-0NOP-071.2 foldout page RO Responds per 3-0NOP-071.2 to dropping PZR level: 1. Starts 3 rd charging pump and establishes maximum flow rate 2. Isolates letdown flow 3. Determines PZR level still dropping 4. Recommends reactor trip due to inability to maintain PZR level US Directs RO to manually trip the reactor per 3-0NOP-071.2 due Critical to inability to maintain PZR level. Directs crew perform immediate actions of 3-EOP-E-0.
Event              6    Page_1_of~
RO Performs immediate actions of 3-EOP-E-0:
Page 1 of 4 Event
: 1. Verifies reactor trip
 
* Rod bottom lights on & RPls at zero
== Description:==
* Rx trip & bypass bkrs open
 
* Neutron flux decreasing
Event
: 2. Actuates SI & phase A due PZR level not maintained
 
<12% BOP Performs immediate actions of 3-EOP-E-0:
== Description:==
: 1. Verifies turbine tripped
When When transition transition isis made made from from 3-EOP-E-0 3-EOP-E-0 to    to 3-EOP-E-3, 3-EOP-E-3, the  the startu(2 startup transformer transformer locks  locks out.
* Turbine stop valves closed
out. 3A 3A EDG EDG starts starts but but the the out(2ut output breaker breakerdoesdoes notnot automatically close, automatically        close, and and 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.
* Attempts closing MSR main steam stop MOVs. Critical Recognizes MOV-3-1433 failed to close & closes MSIVs
entered. 3A  3A EDG EDG out(2ut output breaker isis manually breaker        manually closed closed andand the the crew crew transitions transitions backback toto 3-EOP-E-3.
* Mid & East GCBs open 2. Verifies power to emergency 4kV buses
3-EOP-E-3.
* Determines both 3A & 3B 4kV buses energized
Only 3A Only    3A && 3D3D 4kV 4kV bus bus are are now now available available from from 3A 3A EDG.
* Determines 3D 4kV bus energized from 3B 4kV bus 10 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _2_ Event No.: _5_ Page of_3_ Event
EDG. 3-EOP-E-3 3-EOP-E-3 isis performed to (2erformed      to cooldown cooldown and and de(2ressurize depressurize the  the RCS RCS to to stO(2 stop (2rimarv-primary-secondary leak secondary        leak flow.
flow.
Time Time       Position Position                                   Applicants Actions Applicant's     Actions or or Behavior Behavior BOP BOP            Recognizes/reports LOOP Recognizes/reports           LOOP causing causing loss loss ofof all all AC AC power:
power:
                                  *. 3A 4kV 3A  4kV bus bus deenergized.
deenergized. 3A    3A EDG EDG did did not not start start..
                                  *. 3B 4kV 3B  4kV bus bus deenergized.
deenergized. 3B    3B EDG EDG OOS OOS..
US US         Determines loss of all AC power exists and directs performance of 3-EOP-ECA-O.O performance              3-EOP-ECA-O.O beginning with step 33
: 1.     Determines reactor & turbine already tripped per 3-EOP-E-0
: 2.     Determines RCS Tavg >350&deg;F RCO RCO          Performs actions per 3-EOP-ECA 3-EOP-ECA-0.0  -0.0 as directed by US:
1.
: 1.     Determines PORVs closed, letdown &               & excess letdown isolated
: 2. Determines SI reset BOP BOP           Performs Performs actions per    per 3-EOP-ECA 3-EOP-ECA-0.0  -0.0 as as directed directed by by US:
US:
1.
: 1. Determines Determines 22 AFWPs AFWPs running running 2.
: 2. Increases Increases AFWAFW flowflow to to 345 345 gpm gpm to to intact intact SGs SGs 3.
: 3. Verifies Verifies 4kV 4kV bus bus stripping stripping using using Attachments Attachments 11 && 2. 2.
4.
: 4. Determines Determines 3A  3A && 3B 3B 4kV 4kV buses buses both both deenergized deenergized with  with lockout lockout relays relays reset reset 5.5. Determines Determines 3A   3A EDG EDG lockout lockout reset reset && 3B 3B EDG EDG OOS OOS 6.6. Determines Determines 3A  3A EDG EDG running, running, 3A 3A 4kV 4kV bus bus stripped stripped && SI SI reset reset Critical Critical 7.7. Manually Manually closes closes 3AA20 3AA20 and and energiz energizes  es 3A3A4kV4kV bus bus BOP BOP          Determines Determines 3D     3D 4kV 4kV bus bus energized energized fromfrom 3A 3A4kV 4kV busbus 13 13
 
AppendixDD                                        OperatorActions Actions                                          Form Appendix                                           Operator                                                       FormES-D-2 ES-D-2 Op-TestNo.:
Op-Test No.: 2007-301 2007-301            ScenarioNo.:
Scenario     No.:_2_ 2        EventNo.:
Event     No.:_6_ 6            Page20f_4_
Page   ...... of 4 EventDescription:
Event  


== Description:==
== Description:==
When Whentransition transitionisismademadefromfrom3-EOP-E-0 3-EOP-E-0 toto3-EOP-E-3, 3-EOP-E-3, the    thestartul2 startup transfo transformerrmerlockslocksout.
out. 3A 3AEDG EDGstarts starts but butthe theoutl2ut outputbreaker breakerdoes  does notnot automaticallyclose, automaticalll::      close, and and 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.entered. 3A  3A EDG OUtl2ut EDG      output breakerisis manualll::
breaker          manuallyclosedclosed andand thethe crew crewtransitions transitions backbacktoto 3-EOP-E-3.
3-EOP-E-3.
Only 3A Onll::  3A && 3D3D 4kV4kV bus bus are are now now available available from from 3A EDG. 3-EOP-E-3 3A  EDG. 3-EOP-E-3 isis performed toto cooldown l2erformed          cooldown and  and del2ressurize depressurize the    the RCS RCS to  to stOI2 stop I2rimarv-primary-second    ary  leak secondary leak flow. flow.
i._Time Time      Position Position                                    Applicants Actions Applicant's      Actions or or Behavior Behavior RCO/BOP RCO/BOP          Restarts ECCS Restarts        ECCS loads loads on on 3A  3A EDG EDG as as directed directed by  by US:
US:
Critical                  Energizes 3A, Critical              **  Energizes        3A, 3C3C && 3H  3H 480V 480V LC  LC
                                    *. 3A &
3A    & either either U4U4 HHSIP, HHSIP, 3A  3A RHRP RHRP
                                    **  3A &
3A    & 3C 3C CCWPs, CCWPs, 3A & 3C ICWPs        ICWPs
                                    **  3B & 3C ECCs, 3B & 3C ECFs            ECFs US US          Directs monitoring Directs    monitoring of CSFs for implementation.
implementation.
Directs transition Directs      transition to and performance performance of 3-EOP-E-3.
3-EOP-E-3.
Defers performance Defers    performance of 3-ONO  3-0NOP-004.3P-004.3 since there is no source    source of of power and stoppin stopping g pri-sec leak is higher priorit  priorityy Determ Determines  ines from 3-ONO          P-071.2 (event 3-0NOP-071.2            (event 4) 4) that that 3A 3A SG SG is  is rupture ruptured.d.
RO RO          Perform Performs    s actions actions of of 3-EOP 3-EOP-E-3 -E-3 asas directe directed  by US:
d by    US:
1.
: 1. Determ Determinesines RCPs RCPs not not runnin running g BOP BOP          Perform Performs    s actions actions of of 3-EOP 3-EOP-E-3 -E-3 as as directe directed d byby US:
US:
11 . Adjust Adjusts  s 3A 3A SG SG steam steam dumpdump to  to atmosp atmosphere        setpoint here setpoin          to 1060 t to  1060 psig psig and and determ    ines CV                                            determines              1606 closed CV-3-1606        closed 2.2. Determ Determinesines 3A3A SGSG level level>      6% and
                                                                        > 6%    and FW FW flow flow toto 3A 3A SGSG isolate isolatedd 3.3. Determ Determinesines AFWS AFWSS  S train train 11from from 3C 3C SG SG && train train 22from from 3B 3B SG SG Critica Criticall    4.4. Verifie Verifies s MOV-    3-1 403 closed MOV-3-1403          closed && deener deenergized gized (may (maybe  be perform performed  ed previo    usly ininevent previously            event4a)4a) 5.5. Determ Determinesines CV    6275A closed CV-3-6275A          closed 6.6. Verifie Verifiess aux auxsteam steamsupplie supplied      from U4 d from    U4directe directedd perper3-ONO 3-0NOP-071.2 P-071 .2 7.7. Determ Determinesines 3A3AMS)V MSIV&&MOV-  MOV-3-1427/1426/1425 3-1 427/1 426/1 425 already alreadyclosedclosed 8.8. Determ Determinesines nonos/gs s/g'sfaulted faulted 9.9. Contro Controlsls AFWAFWflowflowtotointact intactSGsSGstotomainta maintainin NRNRlevel level15-50%
15-50%
14 14


The 3A steam generator tube leak grows from 2 gpm into a rupture. The reactor is tripped and 3-EOP-E-0 performed.
AppendixDD Appendix                                              OperatorActions Operator      Actions                                       Form FormES-D-2 ES-D-2 Op-TestNo.:
MOV-3-1433 fails to close requiring manual isolation of MSIVs. Time Position Applicant's Actions or Behavior US Directs BOP verify prompt actions per 3-EOP-E-0 Attachment
Op-Test     No.: 2007-301 2007-30 1            ScenarioNo.:
: 3. Directs RO continue with performance of 3-EOP-E-0 subsequent actions. BOP Verifies prompt actions per 3-EOP-E-0 Attachment 3: 1. Determines 3A, 3B, 3C, 3D & 3H 480V LCs energized
Scenario       No.:_2_   2        EventNo.:
: 2. Determines MSIVs all closed 3. Verifies FW isolation:
Event     No.:_ 6_6          Page~of_4 Page 3 of _4 EventDescription:
: a. Places running SGFP switch in STOP. b. Determines all main FW regulating
Event    
& bypass valves closed. c. Closes FW isolation valves. d. Determines both SSGFWPs off. 4. Verifies 3A & 3B ICWPs running, POV-3-4882
& 4883 closed with ICW headers tied together.
: 5. Verifies 3 CCWHXs in service, 3A & 3B CCWPs running, CCW headers tied together & MOV-3-626 open. 6. Determines 2 ECCs & all 3 ECFs running. 7. Determines all 4 HHSIPs & 2 RHRPs running 8. Checks for HHSI flow if RCS pressure < 1600 psig 9. Shuts down both unit 4 HHSIPs 10. Determines all containment isolation phase A valves closed. 11. Determines all SI valves in proper injection alignment
: 12. Resets SI & containment isolation phase A. 13. If RCPs running, opens MOV-3-1417
& 1418 then resets/starts all available NCCs. 14. Determines containment pressure remained < 20 psig. 15. Determines containment ventilation isolated and control room ventilation in proper emergency recirculation alignment.
11 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _2_ Event No.: _5_ Page of Event


== Description:==
== Description:==
When When transition transition isis made madefrom from 3-EOP-E-0 3-EOP-E-0toto 3-EOP-E-3, 3-EOP-E-3, the thestartuQ startup transfo    rmer  locks transformer locks out. 3A    out. 3A EDG EDG starts starts but butthe the outQut outputbreaker breakerdoes does notnot automaticallyclose, automatically          close, andand 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.entered. 3A3A EDG EDG outQut output breaker isis manually breaker          manuallyclosed  closed and and the the crew crewtransitions transitions back back toto 3-EOP-E-3.
3-EOP-E-3.
Only Only 3A  3A &    3D 4kV
                                        & 3D    4kV busbus areare now now available available from from 3A3A EDG.
EDG. 3-EOP-E-3 3-EOP-E-3 isis performed to Qerformed        to cooldown cooldown and  and deQressurize depressurize the  the RCS RCS toto stop I2rimarv-stOI2  primary-secondary leak seconda!y        leak flow flow..
  .....Time    Position lillie    Position                                      Applicants Actions Applicant's      Actions or or Behavior Behavior RO RO          Continues performance Continues        performance of      of 3-EOP-E-3 3-EOP-E-3 actions actions asas directed directed byby US:
US:
1.1. Determines power Determines        power to  to one one PORVPORV block block MOVMOV available, available, PORVs PORVs closed &
closed    & both both PORV PORV block block MOVs MOVs openopen 2.
: 2. Verifies SI Verifies    SI & & phase phase A      reset A reset
: 3. Determines RCS Determines        RCS pressure>
pressure > 250 psig &      & stops 3A RHRPRHRP BOP BOP          Continues performing Continues        performing actions of 3-EOP-E-3 3-EOP-E-3 as directed directed by by US:
US:
1.
: 1. Determines CV-3-2803 Determines        CV-3-2803 open &        & IA pressure>
pressure > 95 psig 2.
: 2. Determines no offsite power availab Determines                                available le to 3A1B/D 3A/B/D 4kV buses due    due to to lockout U3 SUT lockout
: 3.      Determ Determinesines 3A SG pressure>
pressure > 500 psig US US          Determ Determines  ines require required    d CET CET temper temperatureature for cooldo cooldown      based on wn based      on 3A3A SG SG pressu pressure  re per per 3-EOP      -E-3 step 3-EOP-E-3        step I11a    table.
Ia table.
BOP BOP        Fully Fully opens opens 3B  3B && 3C 3C steam steam dumpsdumps to  to atmosp atmosphere.
here.
Critica Criticall RO RO        Contin Continues  ues perform performance  ance of of 3-EOP 3-EOP-E-3        actions as
                                                                              -E-3 actions      as directe directedd byby US:
US:
11    Starts Starts 3A3A or or 3C 3C chargin charging  g pump, pump, stops stops RCS RCS makeu makeup,    takes p, takes runnin running g chargin charging  g pump pump speed speed to  to maxim maximum  um &&adjusts adjusts HVC-3 HVC-3-121
                                                                                                                        -121 for for proper proper sealseal injectio  n flow.
injection    flow.
2.2. Opens Opens LCV-3        -1 I SB &&directs LCV-3-115B            directs NSONSO locally locallyclose close MOV-MOV-3-115C 3-1 1 SC 3.3. Inform Informs s USUS when when CET CET temper temperature ature <<value value from from step step I11laatable table 4.4. Determ      ines RCS Determines        RCS CET CET subcoo subcooling ling >>50&deg;F50&deg;F BOP BOP        Contin Continues  ues perform performance  ance of of3-EOP 3-EOP-E-3      actionsas
                                                                                  -E-3 actions      as directe directed    byUS:
d by    US:
I.1 . Closes Closes3B    3B&&3C  3CSG SGsteam steamdump  dumpto  toatmosp atmosphere      whenCET here when        CET temper    ature <<value temperature              valuefrom fromstep stepha 11atable table 2.2. Determ      ines 3A Determines        3ASG  SGpressu pressure re stable/
stable/increasing.
increasing.
15 15
Appendi Appen    dixxDD                                        Operato Opera    torrAction Actions s                                      Form Form ES-D-ES-D2-2 Op-Tes Op-Te      st tNo.:
No.: 2007-3 2007-30101          Scenar Scena    rio  No.: _ 2_
io No.:      2    Event    No.: _6_6 EventNo.:                      Page Page ~of_  4 of 4_  4 EventDescri Event      Descripti  on: When ption:    When transit transition ion isis made made fromfrom 3-EOP 3-EOP-E-
                                                                                -E-O0 toto 3-EOP 3-EOP-E--E-3, 3, the the startu(2 transfor  merlocks                                                                  startup transfo  rmer    locks out.
out. 3A 3A EDG EDG starts starts but but the the out(2ut output breake      rrdoes automati autom        callyclose, close, and bre ake      doe s not not atically            and 3-EOP 3-EOP-EC-ECA- A-0.
0.00 isis entere entered d.. 3A 3A EDG      out(2ut breakerrisis manua                                                            EDG    outp  ut breake          manually      closed and lly closed    and the the crew crew transit transition ionss back Only 3A                                                                back to  to 3-EOP 3-EOP-E--E-3. 3.
Only    3A & & 3D 3D 4kV 4kV busbus are are now now availab availablele from from 3A 3A EDG.
EDG. 3-EOP 3-EO      -E-33 isis P-E-performed (2erfor  med to to cooldo cooldow  wnn and and de(2re depressssurize urize thethe RCS RCS to to sto(2 stop (2rimar primary-v-sec  ond secondaCi  ary leak leak flow flow.
Time 111110:;      Position Positio n                                  Applican Applic      ts Action ant's  Actions s or or Behav    ior Behavior US US          Depress Depre      urizes ssurize      RCS to s RCS      to stop stop primar primary-s y-secoeconndary dary leak leak per per 3-EOP 3-EOP-E--E-33
: 1. Dete  rmin
: 1. Determines      es norma normall spray spray not not availab available le Critical Critica        2. Opens
: 2. Opens one  one PORV PORV.. Close Closes s PORV PORV when when RCS RCS press pressu  ure re << SG SG pressu press    re with ure  with PZRPZR level>
level> 17%
17% OR OR PZRPZR level>
level > 71%
71% OR  OR  RCS RCS GET subco CET    subcoo    ling <30&deg;F oling  <30&deg;F.. Determ Determin ineses RCS RCS pressu pressure increa        sing increasing 3.
: 3. Determin Determ      es ines SI termin terminatiation on criteria criteria met. Stops Stops 3A &  & U4 HHSIP HHSIPs. s.
TERMINATI TERMIN    ON ATION    SI termin terminat    ed after ated    after stopp stoppin  ing g prima primaryry-sec
                                                                                      -secondondar CUE                                                                          aryy leak.
1616
Appendix Appen      dix DD                                                            Scenario Scena            Outline rio Outline                                                Form Form ES-D-1 ES-D-i Facility:
Facility:                    Turkey Point Turkey      Point                                Scenario Scenari        No.:
o No.:              22      Op  Test No.:
op Test    No.:          2007-30 2007-301  1 Examiners:
Examin      ers:                                                                              Candidates:
Candida    tes:                                                    US US RO RO BOP BOP Initial Conditio Initial  Conditions:  ns:        Mode 1, Mode      1, 50%
50% Power, Power, MOL, MOL, Turnover:
Turnove    r:                    Equipment Equipm      ent OOS:
OOS: 3B  3B EDG EDG due due toto failed failed fuel fuel pump pump (OOS(DOS 22 days; days; next next perform performance ance ofof O-OSP-023.3 in 023.3    in 44 hrs);
hrs); BB AFW AFW PumpPump due                                                                            0-DSP-due to bearing bearing failure failure (OOS (DOS 44 hrs; hrs; ETR ETR 2424 hrs);
hrs);  3B 3B  CSP CSP  due failed  1ST failed 1ST -low    low dischar discharge      pressure                                                                          due to to ge pressur          (DOS 12 e (OOS      12 hr; hr; ETR ETR 3636 hr) hr)
Need to Need      to swap swap 3D  3D 4kV4kV bus bus power power supply supply to  to 3A 3A 4kV 4kV bus bus per per 3-0P-00 3-OP-005  5 section 7.4 after shift turnoverr to turnove        to support support upcomi upcoming      emergent mainten ng emerge            maintenanceance on 3A 3A CCW CCW pump.
pump.
Known tube Known      tube leakleak in in 3A3A S/G SIG (2 (2 gpd) gpd) - unchan unchanged for last week. Chemis Chemistrytry sample samples areare being being taken per per 3-0NOP 3-ONOP-071  -071.2,.2, Attachm Attachment ent 1. 1. The current current sample, sample, just comple signifi                                                                                          completedted indicate indicat  s no es  no cant significant change in        in leak rate.
rate. MOV                                                                                MOV-3-11403  403 remains remains open at managemanagementment directio directionn due to small size and stability size          stability of tube leak rate.
Event                                          Type*
Event Type*                                                        Event Descrip Descriptiontion No.
11                                  SRO/BOP (N) SRO/BO        P      Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-00                3-DP-005    5 section 7.4.
2                              (I) BOP/RO BOP/RO              First stage impulse impulse pressur pressuree channell PT-3-44 PT-3-4466 fails low. The crew respond  respondss TFS1MAB TFS1MABL  l ==TT      (TS,I) SRO              per 3-0NOP 3-ONOP-028  -028 to stop inward rod movem ent by taking rod control            control to manual and then 3-0NOP manual                    3-ONOP-049. -049.1.1.
3                                (C) ALL                  1 2OVAC power panel 3P09 normal 120VAC TFE6X06F =T                                                                              normal inverter inverter fails. The auto swap to the CVT TCE6DllC =T                                    also fails leaving 3P09 deenerg  deenergized.
ized. The crew respond respondss per 3-0NOP 3-ONOP-003.
                                                                                                                                                            -003.9.
9.
3P09 is swapp swappe  edd over to the spare inverter inverter per 3-0NOP 3-DNOP-003.-003.9  9 Attachm Attachmentent 1.
4        TFCMM2A4 TFCMM2A4 =T  = T (M) ALL                  The 3A steam generat  generator  or tube leak grows to 2 gpm. R-3-19  R-3-1 9 fails to respond respond..
TVHHSGA TVHHSGA =  =            SRO/BOP (I) SRO/BO        P      The crew respond respondss per 3-0NOP3-ONOP-071  -071.2.2 0.002 (TS) SRO 4a                                (R) ALL                  A fast load reducti reductio  onn from 50% power is initiate initiatedd and performed per 3-ONO  3-0NOP 100                                                                                                    P--
5        TVHHSGA==
TVHHSGA              (M) ALL                  The 3A steam genera  generattor  or tube leak grows from 22 gpm into aa rupture 0.4 0.4            (contd (cont'd from                                                                                                  rupture.. The reactor is tripped and 3-EOP    3-EOP--E-0 E-0 performed. MOV-  MOV    1433 fails to close 3-1433 TFSW33C ==T    T      event 4)                requiri requirin ngg manua manuall isolatio isolation n of of MSIVs MSIVs..
66                              (C) ALL                  When transiti transitio onn is made from 3-EOP  3-EOP--E-0 E-0 to 3-EOP 3-EOP--E-3, E-3, the the startup startup transfo transforrmermer locks out. 3A EDG starts but the output breake          breakerr does does not TF05A20A ==TT TFQ5A20A                                                                                                                                  not TA05lRSB =T                                    automa automatically tically close, and  and 3-EOP 3-EOP--ECA-ECA-0.0.00 is entered entered.. 3A EDG output breake  breaker r TFP1S38S =T                                    is manua manuallly ly closed and the crew transiti  transitioons ns back to 3-EOP 3-EOP--E-3.E-3. Only 3A &  & 3D 3D 4kV 4kV bus are now    now availab availabllee from 3A EDG. 3-EOP  3-EOP--E-3E-3 is is performed to cooldo cooldow  wnn and and depres depress  surize urize the RCS to stop primar  primaryy-seco
                                                                                                                                    -second ndary ary leak leak flow.
(N)orm (N)orma al,l, (R)eac      ..
tivity, (R)eact    lvlty, (l)nstru (I)nstrum  ment, ent, (C)om (C)omp  ponent onent,, (M)ajo (M)aJor r 11
TP-2007-TP-20      301 Scena 07-301    Scenario rio #2#2 Event Event Descri Descripti  ption on Turkey Turke        Point 2007-3 y Point        2007-301      Scenario 01 Scena          #2 rio #2 Event 11 - Swap Event            Swap 3D  3D 4kV4kV bus bus power power supply supply to  to 3A 3A 4kV 4kV bus bus per per 3-0P-0 3-OP-005    05 section section 7.4. 7.4.
Event 22 - First Event            First stage stage impuls impulse    pressure e pressu      channel re chann PT-3-446 el PT-3-4      46 fails fails low.
low. The The crew crew respon responds  ds perper 3  ONO  P-02 ONOP -0288 to      to stop stop inward inward rodrod movem movemen  entt byby taking taking rodrod contro cont  rol l  to to  manua man  uall and and  then then  3-0NO 3-ON      P-OP-049.
049.1.1.
Event 33-- 120VA Event            12OVAC      power panel C power      panel 3P093P09 norma normall inverte inverterr fails.
fails. The The autoauto swap swap to  to the the CVT CVT alsoalso fails leaving 3P09 leaving    3P09 deene deenergiz    ed.. The rgized    The crew crew respon                                                                            fails responds      per 3-0NO ds per    3-ONOP-0 P-003  03.9.9. . 3P09 3P09    is is swapp swap    ed ped  over  to spare  inve    rter spare inverte r per    per 3-0NO 3-ONOP-0 P-003  03.9  Attachm
                                                .9 Attach over    to the the ent 1.
ment      1.
Event 44 - The Event            The 3A3A steam steam genera generator    tube leak tor tube    leak grows grows to  to 22 gpm.
gpm. R-3-19 R-3-19 fails fails to to respon respond. d. The The crew responds respon  ds per  per 3-0NO 3-ONOP-0      71 P-071 .2..2.                                                                                          crew Event 4a - A fast load Event                        load reduct reduction    from 50%
ion from    50% power power is initiate initiatedd and and perfor performedmed per 3-0NO  3-ONOP-1 P-100 00..
Event 55 - The Event        -  The 3A steam genera  generator tor tube leak growsgrows from 2 gpm into a rupture tripp ed and and 3-EOP3-EOP-E-                                                                              rupture.. The reactoreactorr is tripped                        -E-00 perform performed  ed.. MOV-3 MOV-3-1      433 fails to close requiri
                                                              -1433                        requ    iring ng  manua MSIVs..
MSIVs man    uall  isolatio isola    n of tion Event 6 - When Event          When transit transition        made from 3-EOP ion is made            3-EOP-E-
                                                                      -E-0 0 to 3-EOP 3-EOP-E- -E-3, 3, the startup startup transfo transform  rmerer locks locks out.
out. 3A  EDG        start EDG startss but the output    output breake breakerr does not autom  automati aticall cally  y close, close  , and    3-EOP 3-EO      -ECA-P-EC      0.0 A-0. 0 isis enter ed.
entered. 3A  3A EDG output output breake breakerr is manua manually      closed and the crew transit lly closed                            trans    ionss back to 3-EOP ition                3-EO      -E-P-E-
: 3. Only
: 3. Only 3A 3A &    & 3D 4kV bus are now availab    availablele from 3A EDG. EDG. 3-EOP 3-EOP-E-    -E-3 3 is perfor performedmed to cooldo cooldow  wnn and depres and  depressu        rize the RCS to stop primar surize                          primary-s    econndary y-seco      dary leak flow flow..
22


The 3A steam generator tube leak grows from 2 gpm into a rupture. The reactor is tripped and 3-EOP-E-0 performed.
TP-2007-301 Scena  Scenarrioio #2 Event Description Scenario XXII      XXIIII NRC 2 Simula Simul    tor Opera ator  Operattinging Instru Instruc  tions ctions Setup IC-2 (50% MOL)
MOV-3-1433 fails to close requiring manual isolation of MSIVs. Time Position Applicant's Actions or Behavior BOP Continues prompt action verification per 3-EOP-E-0 Attachment 3: 16. Directs NSO place PAHMS in service per 3-0P-094.
Place simulator in run.
: 17. Verifies 3A & both U4 EDGs running (3B EDG is OOS). 18. Determines 3A, 3B & 3D 4kV buses still energized.
Trigger lesson steps:
: 19. Notifies US that prompt action verification complete.
SETU P - 3B EDG OOS (actuate (actuatess TAQ5LR TAQ5LRSB  SB == OFF (0) & & TAQ5B TAQ5B2OP        RACKOUT 20P = RACKO          (3))
RO Performs foldout page actions of 3-EOP-E-0 as directed:
UT (3>>
Critical 1. Trips RCPs if RCS subcooling
SETU P - B AFWP OOS
< 25&deg;F with HHSIP running and S I flowpath verified 2. Identifies 3A SG level increasing in an uncontrolled manner >6% and isolates all FW flow to 3A SG Performs subsequent actions of 3-EOP-E-0 as directed 1. Determines 2 AFWPs (A & C) running. 2. Determines AFW valve alignment proper 3. Determines at least 3A SG level> 6%. Controls AFW flow to intact SGs (3B & 3C) to maintain levels 15-50% 4. Determines annunciators A-1 /1,1/2 & 1/3 all off. 5. Determines Tc stable. 6. Determines PORVs, normal spray, aux spray
            -              QOS (actuate (actuatess TAFK24 TAFK2444 =        TAFKO022 =
& excess letdown isolation valves closed 7. Trips RCPs if RCS subcooling
                                                          = 0.0, TAFK00      = 0.0, TAFF01 TAFF01B  B== 0.0, TCF5MTB =  = T)
< 25&deg;F with HHSIP running and SI flowpath verified 8. Determines no SGs depressurized or depressurizing
SETU P - 3A SG 2 GPO GPD LEAK (actuate(actuatesTVH    HSGA s TVHHS  GA =O.00
: 9. Determines SG tube ruptured (R-3-15 alarm & 3A SG level) US Based on SG tube rupture: 1. Directs STA monitor CSFSTs (red path on Heat Sink CSF) 2. Directs transition to 3-EOP-E-3.
                                                                    = 0.00000 0001313))
12 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _2_ Event No.: _6_
SETU P - 3B CSP OOS
Event
            -              005 (actuate (actuatess TAM1D TAM1 DPOBPOB =  RACKOUT
                                                            = RACKO              TCM1 D41 UT (3) & TCM1D      41 M = FALSE)
FALSE)
SETU P - 3P09 AUTO SWAP TO CVT FAIL FAlL (actuate (actuatess TFE6X0 TFE6XO6F  6F =
                                                                                          = T)
SETU P - R-3-1
            -  R-3-1 99 FAIL AS IS (actuate(actuatess TFCMM TFCMM2A4 2A4 == T)
SETU P - MOV-3-1
            -        3-143 4333 FAIL AS IS (actuate (actuatess TFSVV33C =    =T)
T)
SETU P - 3A EDG BKR AUTO CLOSE FAIL (actuate (actuatess TFQ5A TFQ5A2OA  20A == T then = = F when IMQ5A2 IMQ5A200)0C)
Selectt chann Selec                Ill as the 11 channeell III            sstt stage turbin turbine  e impulse press pressu    re contro ure    controlling      channeell on VPA.
lling chann Start train A chilled water and secure train B chilled water (CR HVAC panel)panel)..
Acknowledg Ackno    wledge  e any alarm alarmss (B-2/2, B-2/3, B-213, 0-6/2 D-612 & E-2/5 normal for 50% power            power;; F-9/2 F-912 & F- F 9/5 due to 3B EDG OOS) and place simulator in freeze                  freeze..
Place cleara clearan  nce ce info tags on 3B EDG normall start switch, B AFWP T&T valve control switch & 3B CSP control switch.
Remov Remo    vee AFW train 2 orang orange    e tag from B AFWP tacho      tachom      eter just below ann. panel X.
meter Provide shift turnover check  checkllists ists and 3-0NO 3-ONOP-071P-071 .2  .2 Att 1.
Selectt 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 Selec (RVL). Set ERDADS on VPA to Tavg/Tavg/T    ref (TAV) and at the RCO desk to ENVRN (ED3)
Tref                                                                (ED3)..
Fill in blend blende  err & shutd shutdoown wn boron addition placar    placard  dss at conso consollee blend blendeerr station. Data Jor each IC may be found in the ECC & Shutd                                                                                  for Shutdoown wn Guide Guidellines ines Book in the simulator IIF.        I/F.
3
 
TP-200 TP-20      7-301 Scena 07-301      Scenar    io#2 rio    #2Event EventDescri Descripti ptionon Event Even      t 11-S      wap 3D
                  - Swap        3D 4kV  4kV busbus to  to 3A3A4kV 4kV bus Initiate bus Initiat  eddby  bycrew crewper pershiftshiftturno turnoveverrusing using3-0P- 3-OP-0    00505sect sect 7.4.
7.4.
Crewmust Crew      muststart start3A 3A ICWP ICWPand  andsecur secure      3C ICWP e 3C      ICWPper    per3-0P-3-OP-0 019 ..
19..
Respon Respo    ndd ifif direct directed ed as as NSONSO toto perfor perform      pre-sta m pre-st      artrt check checks  s for for 3A 3A ICWP ICWP and and post-post-shu tdo  wn shutdown check    checks    for 3C s for    30 ICWP ICWP.. Repor Reportt allall condit conditi    ions ons norma normall..
Respon Respo    ndd ifif direct directed ed toto locally locally verify verify voltag voltage  e onon 3D 3D 4kV 4kV bus.
bus. Click Click onon Sche Schema ma~M  *MAAIN IN PO  WE    R    DlS POWER DISTRI8UTlO    TR  lBU  TION  N  4KV && 480V
                                            ~4KV        480V AC~3AC*3D      D 4KV4KV    8US~
BUS  Repo
                                                                                              >R      rtt voltag epor          e  indica voltage indicat      ted on 3D on  3D busbus mimic mimic..                                                                                                        ed As SM, As    SM, direct direct crewcrew to to leave leave 3A  3A && 383B ICWP ICWPs    s inin servic service  e Respon Respo    ndd ifif direct directeded asas NSONSO to to perfor perform      pre-sta m pre-st        rt check art    checks  s for for 3C 30 ICWP ICWP and and post-post-shutdo shutd  ownwn check checks    for  30 s for 3C ICWP  ICWP.. Repor Reportt allall condit conditiions  ons norma normall..
Eventt 2 - PT Even                PT--3-44 3-446        (chann 6 (chan              Ill 11 el III nel        st stage impu st stage Fol  lowing impullse  se pres pressu surere)) fails fails low Follow    ing trans transferfer of 3D 4kV of 3D 4kV bus to 3A 4kV bus,              bus, trigge triggerr lesson lesson step EVEN EVENT    T 22 - PT-PT-3-446 FAILS 3-446    FAILS LOW  LOW (actuate (actuatess TFS1M    ABL =T).
TFS1 MABL Cre  w Crew willwill respo respond  nd per 3-0NO 3-ONOP-02B  P-028 and take rod contro mo                                                                              controll to manu manual al to stop inwar inward  d rod rod vem    ent.
movement. Then      The  n  the                respond crew will respo      nd to the instru instrum  ment ent fai/ure failure per 3-0NO 3-ONOP-049P-049.. 1.1.
Responnd Respo      d if direct directeded as NSONSO to reset reset AMAMSA SAC trou  troubl    e. Aft ble. After      min, trig er 1-3 mm,    trigge gerr less lesson      step EV EN  T EVENT 2 - BY      BYPAPASS AM          SAC PO                                                                            on step AMSA              WER I1 (actu POWE            (actuate ate TCL TCL4P14P1 BA == T then TCL TCL4P1 4P1 BB == TT after after 30 30 sec sec and TCL  4RSTT == TT after                                                                                                              and TCL4RS            after an an addi tionaall 30 sec). Res addition              Reset etss ann annun  uncciator iator D-70-716. Repor
                                                                                        /6. Rep  ortt whe when    compl n com        ete.
plete.
Res Respoponnd  d if dire  cted direct  ed as WC  wee  C to init  iate PW initiate  PWO  O and and not  notify  I&C.. Als ify l&C    Also  respo o resp    nd as    wee as WC dire cted    to directed to gener gen  erat atee aa clea    rannce ce for bist ond              C ifif cleara                    able bistab    les s trip trippepedd for PT- PT 446    failure 3-446 fail  ure .
Ann Annun uncciator iator 0-8    /3 alar C-BI3    alarm mss whewhen n PT-PT-3-3-4446 46 fails fai/s..
Ann  unc Annunciatoriatorss 0-6    /1, 6/2 C-611,    612 && 6/3    alar 613 alarm m unt  il ch until  ch IV IV l 1st stag stage    impuls e imp  ulsee pre press ssuure    select re sele        ed for cted    for con trol control. .
Ann Annununcciator iatorss C-7    /1, 7/2, C-711,    712, 7/3713 alar m due alarm    due toto trip trippin pingg bistbistab ableles.
s.
44
 
TP-2007-TP-20    07-301 301 Scena Scenar      io#2 rio    #2 Event Event Descri Descripti  ption  on Event Even      t 33-L- Loss ossof3  of 3P09PO9 After crew After      crew briefbrieffor for PT                                          PT-3-4    44646 failure failure,, at  at lead lead exam examin    iner er direct directio  ion,  n, trigge trigger    r lesson lesson step EVENTT 33 - LOSS EVEN                LOSS OF    OF 3D  3D INV/3 INV/3P                                                                                                            step P09 09 (actuate (actuates      TCE6DI1 s TCE6D      I1CC ==T). T)
Thi s  dee This deene    ner  gizes 3D rgizes      3D inverte inverter.r. Since Since the  the auto auto transf transfer  er to to CVT CVTwas      was fai/edfailedat    at setup, setup, 120V  120V vitalinstru vital  instrum      ent  pan ment panel 3P09  el  3P09 isis deene deenerrgizedgized.. The  The crew crew respo resp        nds ond    s per per   3-0NO 3-O    NO    P-003        .
P-003. 9 and 9  and reenerg reene        izes 3P09 rgizes      3P09 from from the  the OSDS inverte inverter.r.
Respon Respo    ndd asas FS/NS FS/NSO    O when when direct directed        to check ed to      check out    out 3P09 3P09 && 3D        3D inverte inverter.r. After  After 1-3  1-3 min, report 3P09 report      3P09 deene deenerrgized gized with  with no                                                                                                    mm, no other other unusuunusua    all condit conditiions  ons      and and    3D 3D    invert inv        er    DC      input breake                                                                                                                              erte    r  DC      input break    err CB1 CBI trippe tripped  d..
Respon Respo      ndd asas WCCWOO ifif direct directed  ed to to have have Electr Electriical cal check check out    out 3P09 3P09 for    for reene reenerg    rgizat ization.
ion. AfterAfter 8-1 8-122 min, mm, report report 3P09 3P09 okay  okay to  to reene reenerg      ize from rgize    from OS    DS invert inverte  er. r.
When direct When        directed ed asas FS/NS FS/NSO to        to reene reenerg      ize 3P09 rgize      3P09 from  from OS  DS invert inverte    er,r, wait wait 1-3  1-3 minmm then triggerr the trigge      the follow following      lesson                                                                                                            then ing lesso              steps per n steps        per 3-0NO 3-ONOP-003  P-OO39      .9 Att.
Att    . 1:
1:
Step 1:
Step      1: EVEN  EVENT 33 - OPEN      OPEN 3D      3D INVER INVERTER    TER CB6 CB6 (actuate (actuates    s TCEDI4 TCEDI4C    C ::: F)F)
Step 2a:
Step    2a: EVEN EVENT 33 - OPEN      OPEN ALL 3P09        3P09 BREA  BREAKERS KERS (actuate (actuates    s TCE621 TCE6217      7S:::
S = T) T)
Step 2b: EVEN Step              EVENT 3 - OPEN        OPEN ALL 3P24        3P24 BREA  BREAKERS TCM2DX KERS (actuate (actuates    s TCC2D TCC2DL      LM3 M3 F,:::  F, TCC2D TCC2DLLM    M :::= F, F,
TCM2D      3M = F, X3M:::    F, TCC2D TCC2DL    E = F, LE:::  F, TCC2D TCC2DP    PEE == F, TCF1D TCF1DA    A3M:::
F, TCN14 TCN14O                                                                          3M = F,  F, TCK724 TCK7240      07:::
7 = F,F, TCCMP TCCMP2      248:::
48 =
F,              9M=F,, TCN14 09M=F        TcN14I0      M=F&Tc 10M:::F    &TCN1  N14411M::
1IM=F)  :F)
Step 5a: EVEN Step              EVENT 3 - 3P09A      3P09A SWIT  SWITC    CH H TO ALTE  ALTER RNAT NATE      E (actuate (actuatess TAE6X3 TAE6X34 :::= ALTER  ALTERN    NATE)
ATE)
Ste Step p 6: Call as NSO          NSO &      & reque requesstt RO take both          both group groupss of PZR backu            backup      p heate hea    tersrs to to OFF.
OFF.
Ste Step p  7:      EVENT 3 EVEN          3-C      LOSE
                                            - CLOS            3P09 MAIN E 3P09        MAINII3    /13/o2 IO2 (actuate (actuatess TCE6D TCE6DS    S4C4C= ::: T, T, TCF TCF1D  1DA A2M:::
2M= T after 5 sec & TCH19O          2M ::: T after 1100 sec) 1902M                                                                                                            T Step 8:
Step            EVENT 3 EVEN      T 3 - CLOS CL  OSE OTHE  OTHER 3P09    3P09 BREA BREAKERS    KERS (actuate  (actuatess TCE TCE6D  6DP P2C:::
2C = T, T, TCE TCE6D 6DP  3C =::: T after 5 sec, TCE P3C                          TCE6D 6DP  4C =::: T after 10 P4C                10 sec, TCM  TCM2D    2D9 95M:::
5M      T    after 15 15 sec, sec, TCE TCE6D 6DP  5C P5C ::: T after 20 sec, TCE
                                        =                        TCE6D 6DP  6C =::: T after P6C          after 25 sec, TCE  TCE6D  6DP  P7C 7C ::: T after 30  30 sec, TCC TCCMDMDR    E T after 35 sec, TCE RE:::                        TCE6D 6DP  8C T after P8C:::      after 40 40 sec, TCN TCN191  191  1M:::
1 M  = TT after 45 sec,  sec, TCN TCN191
                        =TT  after  50 sec, TCC TCCMD MDR    E3 == TT after 55 RE3                                                                                                  19122M  M 55 sec, TCB TCB2M 2M9  915 I5  =::: T after after 6060  sec, sec,    TCE6D TCE  6D5  58C    ::: T T after after 65 sec, sec, TCD TCD2M 2MC    CL    T  after CCL = after 70                                                                                        8C
                                                    =            70 sec, sec, TCE TCE6D  6DP  9C =::: T after P9C          after 7575 sec, sec, TCM TCM2D  2D99TM TCE TCE6D6D556C6C ::: TT after                                                                                      TM =::: TT after after 8080 sec sec &  &
after 85 85 sec) sec)
Ste Step p 9:9:      EV EVEN ENTT 33 CLOS- CLOSE        E 3P23P24  4 BR BREA EAKE KERS RS (actu(actuate atess TCCTCC2D 2DLLM3 M3 ::: F, F, TCC TCC2D  2DLLM M =::: FF after after 55 sec, sec, TCM TCM2D 2DX    3M = FF after X3M:::        after 10 10 sec, sec, TCC TCC2D  2DLLE:::
E = FF after after 15 15 sec,sec, TCCTCC2D  2DP PE:::
E      F  after 20
                                                                                                                                          = F after    20 sec, sec, TCF  1 DA3M TCF1D          =  F A3M ::: F after after 25 25 sec, sec, TCK TCK724 724007:::
7 = FF after after 30 30 sec, sec, TCCTCCMP  MP2248:::
48 FF after  after 35 35 sec, sec, TCN  14O9M TCN140    9M =::: FF after after 40 40 sec, sec, TCN TCN141141O0M:::
M = FF after after 45 45 secsec && TCNTCN141 141  11M M =::: FF after after 50 50  sec) sec)
Ste Step p 10:
10: EV  EVENENTT 33 - 3Y0    3Y07B  7B SW  SWIT ITC  CHH TO TO BA BACK CK    UP UP      OS DS        INVER INV    ER    TER TER        (actuate (actu    ates s TAE TAE6X2 6X244 :::
ALT ALTERERN  ATE)
NATE)
Ste Step p 12:
12: CallCall as as NS NSO O and  and rep      ort Att.1 report    Att.1 com compl  pletete.
e.
Res Respo ponnd d asas NS NSO  O ifif dire directcted  ed toto dep depre ressss andand holdhold relarelay y LC LC45 4599X    X to to allo alloww rest restor  oraation tion of    of letd letdowownn andand PZR        pre  ssu PZR press urelle    re/leve  vell con    troll.. Afte contro        After  r 1-3 1-3 mm,min, trigtrigge ger    r  lesson less    on      step step      EVEN EVE      NT  T  3-PRE PRES  SSS II HOL HOLD  D LC LC45 4599CXCX (actu                                                                                                                3  -
atess T0H (actuate          24599C TCH245            T). Wh c =::: T). When  en diredirect cted  ed to to    releas rele          e  LC459 trig  gerr less    on step                                                                                                        ase      LC    459    CX, 0X, trigge      lesson      step EV  EVEN ENTT 33 - RE -  RELE LEA  ASESE LC  LC45  4599CXCX (actu (actuate atess TCH TCH24524599C  C == F). F).
Ann Annun  uncciator iator F-1 F-112/2 rem remai ainsns in  in due due to  to fail  ure of failure    of3D  3D invinverte erter.r. Ann Annun    uncciator iator B-7/  8-711  1 willwill rem remai  ainn on on until until PRN      I  N-4  4 PRNI N-44 rod stop  rod    stop byp  bypas asss swi    tch isis take switch            taken n toto rese reset. t.
55
 
TP-200 TP-  2007-3 7-30101 Sce Scenario #2 Eve      Event Des Description Ev Even ent 4/4414aa - 3A SG 2 gpm tube lea Once Once the  the pro k
proces cesss of  of 3P3P09 restoration has begun les les  son  step EV ste    EVENT 4 - 3A SG 2G                                                    (crew brief complete), trigger 2GP PM M TU  TU    BE BE    LEA LEAK    K (act (actuate uatess TVH TVHHSG Crew sho Cre      should see see incincrearease se in R-3R-3-15 & SJA HSGA == 0.00 0.002) 2)
ONOP                                                            SJA    E  SP SP  IN ING  G  rea  din din  gs gs  and    res ON    OP-07
                -071.21.2. An Annunnunciator H-1/4 ala                                                                      pon  d peperr 3-alarms rms soo soo  n  aft afte err lea  k  rat rate  e  inc inc 19 fail 19   failure ure ententere d at setup, act                                                                    rea rea se.
se. Du Duee to the R                                                    action ions trig triggergered  ed by R-3-19 hig h radiati perforformed manua    nually lly//lo loccal  ly.. The                                                          iati on on  ala rm mumust be ally    The crew should init        init  iate iate    a  fas 100 100 to rem  remove the unit from                                                                  t  loa  d  red  uct ion  per 3-03-ONONOP- P-from servic vicee..
Respond as NS Re                    NSO ifif ask ed to check unit 3 con denser air inle con den                inleakakaagege.. Re port 0 scfm.
Respond as Ch Re                  Chemistry wh      when en dire direct cteed d to sample SG s and MS line                  liness per 0-NCA After Aft      15-20 min er 15-        mm, ide idenntif tifyy elevated act                                                                        CAP-1P-1 04.
actiivit vityy in the 3A SG.
Respo nd as HP wh Re                        when  en dire directcteedd to perfor  formm rad readings on MS & blo wd ow 10- 15 min mm, report radiation slightl            htlyy>                                                                  n line lines. Aft After
                                                            > backgroun d on 3A MS line. HP direct dire    cteed d to survey Tur    Turbi binne e De ck aro und SJA E effl ma  y als  o  be efflue uen  ntt & rope off con tam ina ted areas.
Respond as NS O wh            when  en dire directcteedd to realig  lign n aux steam to Un          Uniitt 4 per 3-0
: 3. AftAfter er 2-4 minmm, trigger lesson step EVENT                                                                  3-ONONOP-0 P-071.71 .22 Att.
Att.
TAFF07 FO75 =
4  -
                                                                                  - AL  IGN      AU  X  STE ST  EA AMM  FR FRO OMM U4 (act FO2 =
                = 0.0, TAFF02    = 1.0 after 60 sec
                                                        & TAFFOO (actuates F007 = 0.0 after 120 sec)    sec).. Report wh Annun An    nunciator 0-4  D-4/6/6 will will alarm during this                                                          wh  en  com  ple  te.
this proproces cess.
Re spond as NSO wh            when dire  direct cteedd to loc locaally lly check CV      1150  5000 && byp bypassass valve 3-20-014.
After Aft    er 1-3 min mm, report both val        valves clo closed sed.
Re spond as Sys      Syste  m wh tem    when notified that Un          Uniitt 3 is to be rem oved from servic e.
Re spond as SM wh          when notified to refe      referr to 0-EPIP-201 01 & 0-ADM
                                                                                                                -1
                                                                                                                -1115.
5.
Event 5 - 3A SGTR I Reactor tri trip  p I Safety injection At evaluator dir      direction after 5-10% po            pow    weerr reduction (in any cas              casee before reaching 25% po    pow weer) r),, trigger lesson step EVENT 5 0.4)..
0.4)                                                                      - 3A SG TUBE RUPTURE (actuate s TVHHSG HSGA A==
The crew should recognize the inc increa rease in tube leakage to >> chargi Perr 3-0 Pe      3-ONONOP-0 P-071.
71.2, the crew should                                                                rgin ngg pump cap capacity.
uld trip the reactor and enter 3-E steam stop MO      MOV-3 V-3-1-14433 33 fai                                                                      OP  -E- 0. MS  R main faillur uree to close requir      uireess  ma  nua nua    ll level < 12% requir                                                                                clo sur  e  of  all MSIVs. PZR uireess manua  nuall safety inje inject    ion ctio  n..
Respond as NSO when dir                direect  edd to place PAHMS in servic cte minut min  utees,s, trigger lesson step EVENT                                                      vice on unit 3. After 8-12 5 - PLACE U3 PAHMS IN SE SERV RVICE TAC2VO 2V02A =  = 1.0, TAC2VO 2V02B 28 = 1.0,                                                                                  (actuatess 1.0, TAAAV21 =    = 1.0, 1.0, TAAAV22 == 1.0    1.0 & TAC comple te.                                                                                TACAOO  A005 == 0.0). Report wh en 66
 
TP-2007-3      01 Scenario #2 Event Description 7 -301 Ev Even entt 6 - Lo-  Loss  ss of offoffsit site power I 3A EDG auto Imme Imm      dia edi    tely ate  ly after entry into                                                          start fails o 3-EOP-E-3, trigger lesson ste LO CKOUT I LO        LOOP (act  (actuate p EVENT 6 - U3 SUT    -
uates TFP1S31S3S 8SS = T)
A spurio riouus    lock s loc      outt on the unit 3 SUT combin kou failure ure (from setup) and 38 EO                                    bined with  with 3A EO  EDG output breaker auto clo fail                                        EDG OOS (also from setup) cau                                                                closese AC power. 3-EOP-ECA-O.O is ent                                                                causes a momentary              ry loss of al/  all ered and the 3A EO          EDG output breaker is manua closed clo  sed afte afterr whwhiich ch the crew retu  return                                                                            nua lly lly rnss to 3-EOP-E-3 to complete res ponse pon    se to the SGTR.
Re spond as NSO if dire          direct  edd to check the condition of the cte 3A EO EDG running unl                                                                          3A EOEDG. Aft  After 1-3 min    mm, report unload oaded, oth erw ise nothing unusua ma nual out put bre aker clo                                                          l. If ask  ed    to mo nitor 3A EO        EDG afte  afterr closursure, report EO    EDG running sat        satiisfa sfaccto toririly ly..
Re spond as Sys      Syste    m//SA tem  SAC  O if ask ed about U3 SUT loc bein bei ngg dis pat ched to check out the tran                                        lock  outt.. Re kou      Rep porortt that per sonnel are transf sfo orm rme err (sw itch yard still available).
Re spond as U4 RO wh            when dire direct cteedd to perform 3-E OP-E-0 Att 11 to U3 RWRWST ST.. Aft After er 1-3 minmm, trigger lesson step EVENT                                              align U4 HH    HHSIPSIPs to RWST (act RW        (actuate uates TAMH1V 6
6-  - AL  IGN    U4    HH HH    SIP    TO  U3 H1 V41 41 == 1.0, TAM TAMH1V H1V46 46 == 1.0 afte afterr 11 min mm dela delayy,, TAM TAMH1VH1V37 37 = 0.0 afte afterr 2 min TAMH48 TAM  H485656 =        afterr 3 min
                = 0.0 afte                                                                                                      mm dela delayy,,
mm dela delayy).
                                            ). Rep Re  ortt wh por    when complete.
Re spond as NSO wh            when diredirect  edd to loc cte        locaally lly verify pha se A val        valves MO V-3-1 closed clo sed (in the U3 Pipe & Va            Vallveve Ro                                                                    -1441717 & 1418 Roo omm). After 1-3 min
                                                              ). Aft              mm  , trig  ger  les CLOSE MOV-3-1 CL                      -1441717 & 1418 (act                                                            son    ste  p  EV  ENT 6 -    -
(actuates TFKV417C =      = T & TFK TFKV418C =
when com wh        complete.                                                                                    afterr 11 min
                                                                                                    = T afte      mm dela        Rep
                                                                                                                                ). Re delayy).      ortt por Re spond as NSO wh            when dire direct cte edd to loclocaally lly clo closese LC  LCV-3 V-3-11-115C 5C.. Aft After les son step EVENT 6 - LOCALLY                                                                              er 1-3 min  mm, trig ger
                                      -          LLY CLOSE LCV-3-1                -1115C SC    (act uate when com wh      compleplete.                                                                                  s  TFB  VC6  2 = T). Re Reppor ortt When dire Wh        direct cte ed d as FS/NSO to deenergize MO 3 min                                                                    V-3-1  -14403 03 by opening bkr 400            4D01-2 1-28, afte mm, trig ger les son step EV ENT 6  6-- DEENERGIZE MOV-3                                                          afterr 1-Re port wh  when com ple te. If dire                                                          V-3  -14
                                                                                                    -14  03 03(  actu (actates uate TC s  F5M TCF    B28 5MB 28 =F)
                                                                                                                                            = F)..
directcteedd to verify MO V-3-1          -14403 03 clo closed that this is the case.                                                                             sed, afte afterr 1-3 min  mm, report If dire directcte edd to align auxiliary steam supply from or afte afterr 2-4 min                                                          U4,, eith er report that this is alre U4                                                alread mm, trigger lesson step EVENT 44-                                                                                adyy don e TAFF07
                                                                            -  AL  IGN    AU    X  STE ST  EA AM M    FRO FR    OM M U4 (actuates FO75 == 0.0, TAFFO2 F02 =  = 1.0 afte afterr 60 sec & TAFFOO F007 =  = 0.0 afte afterr 120 sec) sec).. ReRep  ort An Annnununc cia iato torr 0-4 D-4/6 will  will alarm during this pro                                          por  t  wh wh    en    com    plete.
procescess.
If asked as NSO to loc          locaally lly verify MO V-3-1      -14 425    closed 25 clo      sed, afte afterr 1-3 minmm, report that this is the case.
The crew may try to reenergize 38 4kV bus using 3-0            3-ONONOP-0P-004. 04.33.. Since 38 OOS and the U3 SUT is locked                                                                                            3B EO EDG is out, such attempts will          will be unsuccess      essful ful..
7
 
NR C-2 OP OPE    ER  RAT ATI  IOONS  NS SH    SHIFT IFT TU  TURN    RNOV  OVER    ER RE        PO REP      ORT RT ONCO ON    COMI  MIN  NG G CRCREW EW AS  ASSIG Shift Mgr:                                                                                        SIGN  NM MENENTS  TS Field Supv.:                                                                                              Inside SNPO:
Admin RCO:                                                                                                Outside SNPO:
ANPO:
Unit Un    it 33 Unit Supv.:                                                                                                                          Un Unit  it 44 RCO:                                                                                                      Unit Supv.:
NPO:                                                                                                      RCO:
NPO:
Plan Pla  ntt Sta Stat  tusus Unit 33 Un Mode:                                                                                                                                Un Unit 44 1
Power:                                                                                                    Mode:
50                                                                                                          1 MWe:                                                                                                      Power:
348                                                                                                        100 Gross Leakrate:                                                                                          MWe:
0.03                                                                                                        759 RCS Boron Conc:                                                                                            Gross Leakrate:
907                                                                                                        0.04 RCS Boron Conc:
600 Operational Concerns:
3 AF AFWP  WP OOS (bearin    aring    failur g fail  uree;; OOS 4 hr; ETR 24 hr) 3B 3B ED EDG  G OO OOS  S (fue (fuell pump fail  faileded;; OOS 2 days; next 0-OSP-3B CSP 3B   CSP OOS (fai    (failed                                                          SP-02 023 3.3.3 in 4 hr) 1ST -lo led IST          loww disc dischahar rge ge  pre  ssu Tra re;  OO  S  12  hr;    ETR 36 hr)
Trainin A A is protecttected ed..
Swap Sw  ap 3D3D 4kV bus power supply to 3A 4kV bus per 3-O        3-0 P-005 sectio ma maint inteenanannce ce on 3A CCWP (vi                                                                        tionn 7.4 to support possib      sibllee emergent  ent (vib brarati tioon n increase las  last t shif shi  t).
ft).
22 gpd gpd tube lea        k leak in 3A S/G - unchanged for past we Po Pow weerr on hold at 50% follow wee ekk (Chemistry sampli        plinngg per per 3-O 3-0 NOP-0 foIl ing    . inadverte      rten ntt 3B P-077l.21.2,, Attachment    nt 1.)
1.)
3B SGFP  FP    .
trip  wh wh    ile' ile  investiga. tion in progress.
U3 Anticipated LC        LeO  o  Ac    tio  ns:
Cu Currre rennt:t:
BB AF AFWP WP - TS  TS 3.7.1.2
                                  .1.2 Ac Acttio ionn 33 (trainsins verifieifiedd operab rablele jus justt bef 3B 3B EDG -T      - TSS  3.8  .l.1 before ore tur turn  ove nov  er;r; 30 30 day dayss toto rep repair air))
                                  .l.1.b.1
                                        .b.1 Ac  Acttioionnss bb & dd (0-(0-OOS SP-P-0023 23..3 EDGs                                                                  Att 3 Att      1 1  &  99 eve eve  ry ry  8 8  hr; hr;  3/4 3/4 -0S
                                                                                                                                    -O    P-0  23.
Gs not not reqreq 'd; 3-O d;    3-0 P-023 23 secsectt 7.7 SP  -02 3.1 1  starrtt of sta      of oth other er 3B                                                                    7.7 due due nex nextt shi shifftt if ifOOO OSS  >  72 72  hr;  rep 3B CS CSPP - TS 3.6 TS 3.6..2.12.1 Ac Acttioionn aa (Fi(Fix x in
                                                                                                                    >      hr;  rep  air air  in in  14 14  day day  s) s)
Anticipated: No                                                  in 72 72 hr) hr)
Nonene Train A is protected.. OLRM OLRM is      is green (CDF = 2.0        2.06E 6E--6; 6* LE LERF U4                                                                                          RF = 9.2  9.28E8E--8) 8.
U4 Anticipated LCO Actions:
Cu Currre rennt:t:
B B AFAFWP  WP - TS  TS 3.7 3.7.1.2
                                  .1.2 Ac Acttio ionn 33 (tra (trains ins ver verifie ifiedd ope operab rable lejus justt bef 3B 3B ED  EDG G -T- TS 3.8.1.1 S  3.8                                                                      before ore tur turn novoveer;r; 30 30 day dayss to to rep repair air)
                                .1.1.b.1
                                        .b.1 Ac  Acttioion nss bb & & dd (0-(0-OOSSP-P-0023 23..3                                                            )
Att 3 Att    I1  &
                                                                                                        &  9 9  eve eve  ry ry  88  hr; hr;    3/4 3/4  -0S
                                                                                                                                  -O  P-0  23.
ED EDGs Gs not not req    d; req'd; fix  fix in in 14 14 day days)
SP  -02  3.1 1 star sta  rtt of ofoth other er Anticipated: No                                                          s)
Nonene Train A is protected. OLRM is green (CDF              2.OOE-6; LERF Results of Offgomg Focus Ar
                                                                        =
                                                                                                  =  9.28E-8).
ea:
See g:\Ops\Common\0900
 
Uniitt 33 St Un            Statu atus  s
    .'-                                                                                                Reac Re      actor tor OpOpe  era rator tor Mode:
Mod        e:
Powe                                              1I                                              RCS Lea RCS    Leakr Pow        er:r:                                    50                                                      kraatete                                Acc 50                        Gross Gro    ss::                                                            Accumumulaulator tor Ref Ref Lev  elss Level MWe:e:
MW                                                                                                                          0.03 gpm 0.03    gpm 348 348                          Unden Uni    identi  fiedd tifie AA                  661 66155 Tavg:
Tav    g:                                                                                                                  0.02 gpm 0.02    gpm 559 559                          Charg Cha        ing rgin    Pps::
g Pps BB                664 66400 RC RCS Pre S    Pressu ssure: re:                  223                                                                        0.01 gpm 0.01    gpm              CC 22355                                                                                                                  662 66255 RC    S RCS Boron Con Bo    ron    Conc:                  907 e:              907 Ab AI____.
          .rnn()riux,ma  iiiu  l AIi Anhtin nunciaf ciatororss::        '  .      .  :
                                                                                              .':;,,< ',i) ':: '.': 'i!, ,!I :';
                                                                              ....                                                    ,*. t<:~;,.l!, !., .>t~,;i:;.
Annunci Ann      unciato atorr::            FF 9/2 9/2 - 3B 3B EDG EDG OOS    OOS
                                                                                  )
                                                                                                                                                                          \i:::!i,".:;'7 * ' ..';:!?\*C:
Compp Acti Com            Action ons: s:        O-OSP-0 SP-023 O-O          23.3.3 Att Aft 11 && 99 due    due in in 44 hou hours.
rs. 3/4-Ann      unc    iato  r:                                                                            3/4-OS 0SPP-0 23..11 not
                                                                                                                      -023      not requ require iredd.. 3-0P Annunciator:                        FF 9/5 9/5 - 3B 3B EDGEDG OOS  OOS                                                                        3-OP-0
                                                                                                                                                        -023 23 sect sect 7.7 7.7 due due nex next shif shift.t.
Compp Acti Com            Actionons: s:        O-OSP-0 SP-023 O-O              .3  Att 23.3 Att 11 && 99 due        due in in 44 hou hours.
rs. 3/4-Ann    unc    iato                                                                                  3/4-OS 0SPP-0 23..11 not
                                                                                                                      -023      not requ require iredd.. 3-0P Annunciatorr::                                                                                                                              3-OP-0
                                                                                                                                                        -023 23 sect sect 7.7 7.7 due due nex next shif shift.
Compp Acti Com            Action ons: s:
Ann    unc Annunciiato      atorr::
Compp Acti Com            Actionons: s:
Ann Annunci unciato  atorr::
Compp Acti Com            Actionons: s:
Annunci Ann      unciato  atorr::
Compp Acti Com            Action ons:s:
Ann    unc Annunciator:    iato  r:
Compp Acti Com          Action      s:
..~
ons:
Ann Annunci unciato  atorr::
Compp Acti Com          Action  ons:s:
Annunci Ann    unciato  atorr::
Com    p Comp Actiion Act    ons:s:
Ann    unc Annunciator:  iato  r:
Com Compp Act    Actiion ons:s:
Cu Curre  rrent    nt Te Tec  ch h SpSpe ecc AcActtioion n Statements:                s: (D(Do  oes es Not Includ T.S T.S.A.S.AS // Com  Compon ludee F "Fo  orr Tra Tracki ckingng On Onlyly Ite Itemmss" ponent:
ent:        3.7.1.2 Action 1.2 Action 33//BB AF          AFW  WPP Rea  son Reason::                                      Bearing ring fail faile edd Ent Entrryy Dat Date    e::                        XX Xx//XXXx//XX XX (Previo      viou  uss shif shift)t)
T.S  .A.S T.S .AS / Com  /  Compon  ponent:            3.8. 1.1 ent:                  Act 3.8.1.1 Actiion    ons s bb & & dd //3B  3B ED  EDGG Rea Reasonson::                                  Fue Fuell pum pumpp fail faile edd Ent Entrryy Dat Date    e::                        XX XX//XXXX//XX XX (2  (2 day days    s ago ago))
T.S  .A.S T.S .AS / Com  /  Compon  ponent:          3.6. 2.1 ent:                  Act 3.6.2.1 Action  ion aa // 3B  3B CSP  CSP Rea Reasonson::                                  Fai Failled ed 1ST 1ST - low  low discdischar  harggee pre  ssu pres  re sure Ent Entrryy Dat Date    e::                        XX XX//XXXX//XX XX (Ye  (Yester sterday day)  )
T.S .A.S T.S.A.S / Com  /  Compon  ponent:            3.4.
ent:        3.4.33 Act Actiion on aa // 3B 3B PZR  PZR bac back  kup up hea heatters Rea Reason son:  :                                  14                                                          ers 14 day day due due to  to 3B3B ED  EDG  G OO OOS  S Ent Entrryy Dat Date    e::                        XX XX/XX/XxIXX/XX (2  (2 day days  s ago ago))
T.S T.S.A.S
        .AS / Com/    Compon  ponent:          3.5.
ent:        3.5.22 Act  ion Action f /3Bf/  3B HH    HHS  SIPIP Rea Reason son::                                  14 14 day day due due to to 3B 3B ED EDG  G OO OOS  S Ent Entrryy Dat Date  e::                          XX XX/IXX XX//XX XX (2  (2 day days  s ago ago) )
T.S T.S..A.S      /
A.S / Com    Compon  ponent:ent:
Rea Reason son: :
IEnt  ryy Dat Entr      Date  e::
 
Chang Cha  ngees s toto Ris Riskk Sig Signifi nifican Uniitt 3 St Un                Statu atus  s cantt Equ Equipm  ipmentent::
BB AFW AFWP DOSS (Be P OO        (Bearin aringg rep replace lacemen ment)  t) 3B EDG 3B  EDG OO  DOSS (Fu(Fuelel pum pumpp repa repair) ir) 3B CSP 3B    CSP OO  DOSS (Fa (Failed iled 1ST 1ST -lolow dischar w disc    hargege pres pressu  re))
sure Unitt 33 Risk Uni        Risk isis GR GREEN EEN.. Mai  Main  contribu n con  tributotorr isis BB AFW AFWP  P..
Upcomi Upc    omn9_ing Rea Reactiv ctivity ity Man Manag ageemmeent    Activiti nt Act    ivities:
es:
Dilute Dilu      to  mai te to maintai ntain 50%
50% pow power er unti untill 3B 3B SGF SG  FPP  inadvert inad  vertent    trip cau ent trip return retu  rn 3B3B SGF SGFP  P toto serv service and                                                    causese eva evaluat luateded and and manmanageagement perm and com commen  mence ce powpower er incr increas eased ed to 100                                        permisissio sionn received to 100%.
Upcom Upc  oming Maj  Major    POD Act or POD      Activiti ivities:
es:
Return to Ret        to 100 100% pow  power er if/w if/when hen man management perm      permis    sion issio  n received to com  commen mence power incr    increas ease.
Upcom ing ECO    ECOs  s to Hang and lor      br RelReleaeasse:e:
None
/"~~
Evolu Evo      tio luti  ns or Com ons        Comp  penenssatato ry Act ory  Actioion  ns s in Progre  gress:
ss:
      - Awa
      -  Awaiti    ng perm iting  permis    sionn to restart 3B SGF issio                        SGFP  P and com inadver                                                              commence power incr        increas ease to 100%.
verttent ent trip of 3B SGF  SGFP  P while inve investi  gati                                                    %. Power on hol  hold d at 50% foll folloowi winng stig  atioon      progre n in prog    ressss..                                                                    g
      - Afte
      -    Afterr shift turnover, swap 3D 4kV bus power sup support possible emergent                                            sup ply ply  to  3A    4kV  bus  per 3-O 3-0 P-0 P-005 sec nt maintenance on 3A CC                                                            section tion 7.4 after shift turnover to
      - Known tube tube leak in 3A S/G (2 gpd)                                  CCW  W pump (vibratio  rationn incr increas ease last shift).
                                                                - unchanged for last week. Che              Chemis 071.2, Att Attaach chm menentt 1. The cur                                                                mistry try samples are being taken per currren entt sam sample,ple, just completed ind            icat                                                  3-0 NO P-3-O remains ene  energiz rgized at managemen                                                    indi catees s  no sign sign  ific ificaant nt change in leak rate. MOV-3-140 mentt direction due to sma              ll small size and stab                                                          -14033 OSP-023.3 Att 11 && 9 for 3B ED EDG G DO OOS due in 4 hrs. 3-O stability ility of tub tubee leak rate.
system fail failuure                                                              3-0  SP-SP-023.1 not req  requ uire iredd since to 3B ED re.. 3-O  P-023 sec 3-0 P-0        sectt 7.7 due nex  nextt shift to allow                                                        EDGG DO OOS  S due to sup suppor portt w 3B ED  EDGG DOOOS >> 72 72 hr.
General eral Information  tion,, Remarks, and Op          Ope era  torr Work rato          rk Around Status      tus:
See evoluti  lutioons ns & & compensato  satoryry actions listedd abo    abo  ve.
ve.
Trainin A is proprottect ecteed.
d.
 
Appendix D                                                    Scenario Outline                                    Form ES-D-1 Facility:                Turkey Point                          Scenario No.:
Scenario                33    Op Test No.:      2007-301 Examiners:
Examiners:                                                              Candidates:
Candidates:                                          US US RO RO BOP Initial Conditions:
Initial                    Mode 1, 75% Power, MOL,  MDL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return  retum to 100%
100% power following a turbine valve test.
Turnover:                  Equipment OOS:005: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att      AU 11 &
                                                                                                                            & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS  (005 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low - low discharge pressure (OOS (DOS 12 12 hr; ETR 36 hr) 3-OSP-055.1 section 7.1 immediately after shift Perform monthly surveillance on 3A ECC per 3-0SP-055.1 turnover. 1ST and remote valve position verification not required.
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate.
Event                                  Type*
Event Type*                                        Event Description No.
11                        (N) BOP          3A ECC monthly surveillance performed per 3-0SP-055.1 3-OSP-055.1 section 7.1. 3A TFKV9O5AT TFKV905A  =T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS. DOS.
(N,TS) SRO 22                          (I) SRO/RO        TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8ci-1 =
TFL1T8CH  = T                      ONOP-028 and takes rods to manual to stop continuous inward rod movement.
3                          (C) RO/BOP          Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF &        & 3D TFE3D37A = = T                      NCC OOS.DOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)
TFE3D38T=T TFE3D38T  =T          /          service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.
4      TAFcPxA1=1o.o TAKPXA1=10.0        (C) SRO/BOP      3A11 Intake screen high Llp.
3A                                                  3-ONOP-Ol 1. 3A
: p. Crew responds per 3-0NOP-011.        3A11 CWP is TAKPXA2 == 4.0                        secured.
4a                          (R) ALL          3A2 Intake screen high p.                                3-ONOP-100 to 60% for Llp. Fast load reduction per 3-0NOP-100 TAKPxA2=1.o TAKPXA2 = 1.0                        the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure.
5      TAHUVBSB=22 (M) ALL            3B RCP high vibration. The crew responds per 3-ONOP-041 38                                                  3-0NOP-041.1..1. Once TAHUVBMB=6 vibration reaches the trip setpoint, the crew manually trips the reactor and TAHUVBMB= 6                          .
immediate actions of 3-EOP-E-0 are performed.
6                          (M) ALL          When 3B RCP is tripped, 3B    38 4kV bus is lost and a large break LOCA occurs.
TF2Z51S TFE2Z51S =T=T      (cont'd from (contd            An automatic SI occurs but train A sequencer fails. Train A ECCS equipment event 5)          must be manually started. The crew completes 3-EOP-E-0 and transitions to TVHHCLB == 00.11 TFQ634AF =T  T    (C) ALL            applicable FRPs followed by 3-EOP-E-1.
6a                                            Once CSFSTs are monitored for implementation, if containment pressure is        is still above 20 psig, the crew immediately immediately transitions to 3-EOP-FR-Z.1 ifif no higher red or orange pathpath exists.
6b                          (C) SRO/RO        3-EOP-E-1 is  is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=1 TFM1D3AT=T                            running, transition is made to 3-EOP-ECA-1.1. Measures are taken to minimize the loss of RWST inventory.
(R)eactlvlty, (I)nstrument, (C)omponent, (M)ajor (N)ormal, (R)eactivity,                                        (M)aJor Ii; 11
 
Appendix DD Appendix                                 Operator Actions Operator   Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.: 2007-301 2007-30 1      Scenario No.:
Scenario   No.: ~3        Event No.:
Event    No.: _1_1          Page _1_
Page    1 of of _1_
1 Event


== Description:==
== Description:==


When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startu(2 transformer locks out. 3A EDG starts but the out(2ut breaker does not automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG out(2ut breaker is manually closed and the crew transitions back to 3-EOP-E-3.
Only 3A & 3D 4kV bus are now available from 3A EDG. 3-EOP-E-3 is (2erformed to cooldown and de(2ressurize the RCS to stO(2 (2rimarv-secondary leak flow. Time Position Applicant's Actions or Behavior BOP Recognizes/reports LOOP causing loss of all AC power:
* 3A 4kV bus deenergized.
3A EDG did not start .
* 3B 4kV bus deenergized.
3B EDG OOS . US Determines loss of all AC power exists and directs performance of 3-EOP-ECA-O.O beginning with step 3 1. Determines reactor & turbine already tripped per 3-EOP-E-0
: 2. Determines RCS Tavg >350&deg;F RCO Performs actions per 3-EOP-ECA-0.0 as directed by US: 1. Determines PORVs closed, letdown & excess letdown isolated 2. Determines SI reset BOP Performs actions per 3-EOP-ECA-0.0 as directed by US: 1. Determines 2 AFWPs running 2. Increases AFW flow to 345 gpm to intact SGs 3. Verifies 4kV bus stripping using Attachments 1 & 2. 4. Determines 3A & 3B 4kV buses both deenergized with lockout relays reset 5. Determines 3A EDG lockout reset & 3B EDG OOS 6. Determines 3A EDG running, 3A 4kV bus stripped & SI reset Critical 7. Manually closes 3AA20 and energizes 3A 4kV bus BOP Determines 3D 4kV bus energized from 3A 4kV bus 13 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _2_ Event No.: _6_ Page20f_4_
Event
Event


== Description:==
== Description:==
3A  ECC monthly 3A EGG  monthly surveillance surveillance performed performed per  per 3-0SP-055.1 3-OSP-055.1 section section 7.1.
7.1.
3A  ECC inlet 3A EGG        valve GV-3-2905 inlet valve  OV-3-2905 fails fails to to open open andand 3A 3A EGG ECC isis declared declared DOS.
OOS.
Time Time    Position Position                          Applicants Actions or Applicant's              or Behavior Behavior US US      Obtains SM Obtains  SM permission permission and and directs directs BOPBOP to to perform perform 3A3A EGG ECC monthly monthly operability test per 3-0SP-055.1 3-OSP-055.1 section 7.1 beginningbeginning at step 7.1.6.
7.1.6.
BOP BOP      Obtains copy Obtains        of 3-0SP-055.1 copy of  3-OSP-055.1 section section 7.1.7.1. Performs Performs actions actions as as follows follows beginning at step 7.1.6:
: 1.      Places 3A EGGECC switch to STOP
: 2.                      CV-3-2905, GV-3-2814 Determines GV-3-2905,        CV-3-2814 & GV-3-2908 CV-3-2908 all closed.
: 3.      Determines steps 7.1.10, 11 &      & 13 n/a since 1ST &    & remote position verification not required.
: 4.                  ECC & records start time on Att. 11 Starts 3A EGG
: 5.      Directs NSO perform steps 7.1.14 & 15 to measure current
: 6.                                CV-3-2905 did not open Recognizes & reports GV-3-2905
: 7.      Stops 3A EGGECC fan & records time on Att.1 NOTE: May leave switch in STOP rather than return to AUTO since 3A .
ECC OOS with CV-3-2905 GV-3-2905 failed closed
: 8.      Determines CV-3-2814 GV-3-2814 open & CV-3-2908 GV-3-2908 closed
: 9.      Determines COW GGW flow on Fl-3-1      470 is zero & records on Att. 11 FI-3-1470 10.
: 10.      Notifies US US 3A EGO EGG failed test due to CV-3-2905 GV-3-2905 failure to open US US      Notifies Notifies SM  3A EGO SM 3A    EGG DOS OOS Directs Directs WOO    have Mechanical WGG have      Mechanical investigate/fi investigate/fix  x OV-3-2905.
GV-3-2905.
Determines Determines TS TS 3.6.2.2 3.6.2.2 action a. applies action a. applies (72(72 hr) hr)
May directs May  directs WCO WGG place    3A EGO place 3A  EGG under under EGO EGO 11


When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startul2 transformer locks out. 3A EDG starts but the outl2ut breaker does not automaticalll::
AppendixDD Appendix                                    OperatorActions Operator      Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
close, and 3-EOP-ECA-0.0 is entered. 3A EDG OUtl2ut breaker is manualll::
Op-Test No.:   2007-30 1 2007-301         Scenario No.:
closed and the crew transitions back to 3-EOP-E-3.
Scenario   No.: ~ 3        Event No.:
Onll:: 3A & 3D 4kV bus are now available from 3A EDG. 3-EOP-E-3 is l2erformed to cooldown and del2ressurize the RCS to stOI2 I2rimarv-secondary leak flow. i. Time Position Applicant's Actions or Behavior RCO/BOP Restarts ECCS loads on 3A EDG as directed by US: Critical
Event    No.: 22                Page_1_
* Energizes 3A, 3C & 3H 480V LC
Page 1 of      of 11 Event
* 3A & either U4 HHSIP, 3A RHRP
* 3A & 3C CCWPs, 3A & 3C ICWPs
* 3B & 3C ECCs, 3B & 3C ECFs US Directs monitoring of CSFs for implementation.
Directs transition to and performance of 3-EOP-E-3.
Defers performance of 3-0NOP-004.3 since there is no source of power and stopping pri-sec leak is higher priority Determines from 3-0NOP-071.2 (event 4) that 3A SG is ruptured.
RO Performs actions of 3-EOP-E-3 as directed by US: 1. Determines RCPs not running BOP Performs actions of 3-EOP-E-3 as directed by US: 1 . Adjusts 3A SG steam dump to atmosphere setpoint to 1060 psig and determines CV-3-1606 closed 2. Determines 3A SG level> 6% and FW flow to 3A SG isolated 3. Determines AFWSS train 1 from 3C SG & train 2 from 3B SG Critical 4. Verifies MOV-3-1403 closed & deenergized (may be performed previously in event 4a) 5. Determines CV-3-6275A closed 6. Verifies aux steam supplied from U4 directed per 3-0NOP-071.2
: 7. Determines 3A MSIV & MOV-3-1427/1426/1425 already closed 8. Determines no s/g's faulted 9. Controls AFW flow to intact SGs to maintain NR level 15-50% 14 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _2_ Event No.: _ 6_
_ Event


== Description:==
== Description:==


When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startuQ transformer locks out. 3A EDG starts but the outQut breaker does not automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG outQut breaker is manually closed and the crew transitions back to 3-EOP-E-3.
Only 3A & 3D 4kV bus are now available from 3A EDG. 3-EOP-E-3 is Qerformed to cooldown and deQressurize the RCS to stOI2 I2rimarv-seconda!y leak flow . ..... , lillie Position Applicant's Actions or Behavior RO Continues performance of 3-EOP-E-3 actions as directed by US: 1. Determines power to one PORV block MOV available, PORVs closed & both PORV block MOVs open 2. Verifies SI & phase A reset 3. Determines RCS pressure>
250 psig & stops 3A RHRP BOP Continues performing actions of 3-EOP-E-3 as directed by US: 1. Determines CV-3-2803 open & IA pressure>
95 psig 2. Determines no offsite power available to 3A1B/D 4kV buses due to U3 SUT lockout 3. Determines 3A SG pressure>
500 psig US Determines required CET temperature for cooldown based on 3A SG pressure per 3-EOP-E-3 step 11a table. BOP Fully opens 3B & 3C steam dumps to atmosphere.
Critical RO Continues performance of 3-EOP-E-3 actions as directed by US: 1 Starts 3A or 3C charging pump, stops RCS makeup, takes running charging pump speed to maximum & adjusts HVC-3-121 for proper seal injection flow. 2. Opens LCV-3-115B
& directs NSO locally close MOV-3-115C
: 3. Informs US when CET temperature
< value from step 11 a table 4. Determines RCS CET subcooling
> 50&deg;F BOP Continues performance of 3-EOP-E-3 actions as directed by US: 1 . Closes 3B & 3C SG steam dump to atmosphere when CET temperature
< value from step 11a table 2. Determines 3A SG pressure stable/increasing.
15 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _ 2_ Event No.: _6 _
Event
Event


== Description:==
== Description:==
TM-3-408C (Tavg TM-3-408C              input toto rod (Tavg inl2ut        rod control}
control) fails fails high.
high. Crew    responds l2er Crew resl20nds          per 3-3-
ONOP-028 and ONOP-028      and takes takes rods rods to  to manual manual to to stOI2 stop continuous continuous inward inward rod rod movement.
movement.
Time I Time    Position Position                              Applicants Actions Applicant's      Actions or  or Behavior Behavior RORO      Recognizes/reports control Recognizes/reports      control rods rods inserting inserting inin automatic automatic Performs immediate Performs    immediate action action of of 3-0NOP-028 3-ONOP-028 for      for continuous continuous insertion insertion of  of an RCC an  RCC control control bank:
bank: Places Places rod rod control control in in MANUAL MANUAL and  and verifies rods verifies      rods stop moving.
stop  moving.
US US        Directs response per 3-0NOP-028 Directs                    3-ONOP-028 RO RO        Performs subsequent actions of 3-0NOP-028 3-ONOP-028 as directed by US:          US:
: 1. If directed, withdraws control rods to restore Tavg Tref            =
: 2. Determines rods above RIL from VPA recorder (or PCB section VII figure 3).
: 3. Determines PRNI N-44 did not fail
: 4. Determines RCS Tavg Tl-3-412D,TI-3-412D, 422D & 432D not failed BOP BOP        Performs subsequent actions of 3-ONOP-028 3-0NOP-028 as directed by US:
1.
: 1. IfIf directed, directed, reduces turbine load to restore Tavg          Tavg ==Tref 2.
: 2. Determines Determines PT-3-446 PT-3-446 &    & 447 447 did did not not fail US US      Directs Directs WCC WCC notify notify I&C I&C of of rod rod control control failure.
failure.
Directs Directs WCC WCC hang hang caution caution tagtag onon rod rod control control selector selector to to leave leave switch switch inin MANUAL MANUAL Performs Performs applicable applicable actions actions of  of 3-ONOP-049 3-0NOP-049.1    .1 ifif TM-3-408 TM-3-408 failure failure suspected suspected 1.1. Determines Determines RCS RCS Tavg Tavg Tl-3-412D, TI-3-412D, 422D 422D && 432D 432D not not failed failed 2.2. Determines Determines no  no control control switches switches require require transfer transfer 3.3. Evaluates Evaluates no no impact impact per perTS  TS 4.4. Determines Determines no  no bistable bistable switches switches require require tripping tripping per perAttAtt 4,4, no no AMSAC-rela AMSAC-related  ted channels channels failed failed and and PT-3-446/44 PT-3-446/447      did not 7 did    notfail fail 5.5. Conducts Conducts crewcrew brief briefregarding regarding effects effects ofofrodrod control control failure failure 22


When transition is made from 3-EOP-E-O to 3-EOP-E-3, the startu(2 transformer locks out. 3A EDG starts but the out(2ut breaker does not automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG out(2ut breaker is manually closed and the crew transitions back to 3-EOP-E-3.
Appendix 0D Appendix                                      OperatorActions Operator      Actions                                     Form Form ES-D-2 ES-D-2 Op-Test No.:
Only 3A & 3D 4kV bus are now available from 3A EDG. 3-EOP-E-3 is (2erformed to cooldown and de(2ressurize the RCS to sto(2 (2rimarv-secondaCi leak flow . ..,.. Position Applicant's Actions or Behavior 111110:; US Depressurizes RCS to stop primary-secondary leak per 3-EOP-E-3
Op-Test  No.:   2007-301 2007-301         Scenario No.:
: 1. Determines normal spray not available Critical 2. Opens one PORV. Closes PORV when RCS pressure < SG pressure with PZR level> 17% OR PZR level> 71% OR RCS CET subcooling
Scenario     No.: 3       Event No.:
<30&deg;F. Determines RCS pressure increasing
Event     No.: _3_  3           Page_1 Page _1 of   of _ 2_
: 3. Determines SI termination criteria met. Stops 3A & U4 HHSIPs. TERMINATION SI terminated after stopping primary-secondary leak. CUE 16 Appendix D Scenario Outline Form ES-D-1 Facility:
2 Event
Turkey Point Scenario No.: 2 Op Test No.: 2007-301 Examiners:
 
Candidates:
== Description:==
US RO BOP Initial Conditions:
 
Mode 1, 50% Power, MOL, Turnover:
Event  
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next performance of O-OSP-023.3 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs); 3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4 after shift turnover to support upcoming emergent maintenance on 3A CCW pump. Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) SRO/BOP Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4. 2 (I) BOP/RO First stage impulse pressure channel PT-3-446 fails low. The crew responds TFS1MABl = T (TS,I) SRO per 3-0NOP-028 to stop inward rod movement by taking rod control to manual and then 3-0NOP-049.1.
3 (C) ALL 120VAC power panel 3P09 normal inverter fails. The auto swap to the CVT TFE6X06F = T also fails leaving 3P09 deenergized.
The crew responds per 3-0NOP-003.9.
TCE6DllC =T 3P09 is swapped over to the spare inverter per 3-0NOP-003.9 Attachment
: 1. 4 TFCMM2A4 =T (M) ALL The 3A steam generator tube leak grows to 2 gpm. R-3-19 fails to respond. TVHHSGA= (I) SRO/BOP The crew responds per 3-0NOP-071.2 0.002 (TS) SRO 4a (R) ALL A fast load reduction from 50% power is initiated and performed per 3-0NOP-100 5 TVHHSGA= (M) ALL The 3A steam generator tube leak grows from 2 gpm into a rupture. The 0.4 (cont'd from reactor is tripped and 3-EOP-E-0 performed.
MOV-3-1433 fails to close TFSW33C =T event 4) requiring manual isolation of MSIVs. 6 (C) ALL When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup transformer locks out. 3A EDG starts but the output breaker does not TF05A20A = T automatically close, and 3-EOP-ECA-0.0 is entered.
3A EDG output breaker TA05lRSB = T is manually closed and the crew transitions back to 3-EOP-E-3.
Only 3A & 3D TFP1S38S = T 4kV bus are now available from 3A EDG. 3-EOP-E-3 is performed to cooldown and depressurize the RCS to stop primary-secondary leak flow. .. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 TP-2007-301 Scenario #2 Event Description Turkey Point 2007-301 Scenario #2 Event 1 -Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4. Event 2 -First stage impulse pressure channel PT-3-446 fails low. The crew responds per 3-ONOP-028 to stop inward rod movement by taking rod control to manual and then 3-0NOP-049.1. Event 3 -120VAC power panel 3P09 normal inverter fails. The auto swap to the CVT also fails leaving 3P09 deenergized.
The crew responds per 3-0NOP-003.9.
3P09 is swapped over to the spare inverter per 3-0NOP-003.9 Attachment
: 1. Event 4 -The 3A steam generator tube leak grows to 2 gpm. R-3-19 fails to respond. The crew responds per 3-0NOP-071.2.
Event 4a -A fast load reduction from 50% power is initiated and performed per 3-0NOP-100.
Event 5 -The 3A steam generator tube leak grows from 2 gpm into a rupture. The reactor is tripped and 3-EOP-E-0 performed.
MOV-3-1433 fails to close requiring manual isolation of MSIVs. Event 6 -When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup transformer locks out. 3A EDG starts but the output breaker does not automatically close, and 3-EOP-ECA-0.0 is entered. 3A EDG output breaker is manually closed and the crew transitions back to 3-EOP-E-3. Only 3A & 3D 4kV bus are now available from 3A EDG. 3-EOP-E-3 is performed to cooldown and depressurize the RCS to stop primary-secondary leak flow. 2 TP-2007-301 Scenario #2 Event Description Scenario XXIII NRC 2 Simulator Operating Instructions Setup IC-2 (50% MOL) Place simulator in run. Trigger lesson steps: SETUP -3B EDG OOS (actuates TAQ5LRSB = OFF (0) & TAQ5B20P = RACKOUT (3>> SETUP -B AFWP OOS (actuates TAFK244 = 0.0, TAFK002 = 0.0, TAFF01 B = 0.0, TCF5MTB = T) SETUP -3A SG 2 GPO LEAK (actuates TVHHSGA = 0.0000013)
SETUP -3B CSP OOS (actuates TAM1DPOB = RACKOUT (3) & TCM1D41 M = FALSE) SETUP -3P09 AUTO SWAP TO CVT FAIL (actuates TFE6X06F = T) SETUP -R-3-19 FAIL AS IS (actuates TFCMM2A4 = T) SETUP -MOV-3-1433 FAIL AS IS (actuates TFSVV33C = T) SETUP -3A EDG BKR AUTO CLOSE FAIL (actuates TFQ5A20A = T then = F when IMQ5A20C)
Select channel III as the 1 st stage turbine impulse pressure controlling channel on VPA. Start train A chilled water and secure train B chilled water (CR HVAC panel). Acknowledge any alarms (B-2/2, B-2/3, 0-6/2 & E-2/5 normal for 50% power; F-9/2 & F-9/5 due to 3B EDG OOS) and place simulator in freeze. Place clearance info tags on 3B EDG normal start switch, B AFWP T&T valve control switch & 3B CSP control switch. Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X. Provide shift turnover checklists and 3-0NOP-071.2 Att 1. Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3). Fill in blender & shutdown boron addition placards at console blender station. Data Jor each IC may be found in the ECC & Shutdown Guidelines Book in the simulator IIF. 3 TP-2007-301 Scenario #2 Event Description Event 1 -Swap 3D 4kV bus to 3A 4kV bus Initiated by crew per shift turnover using 3-0P-005 sect 7.4. Crew must start 3A ICWP and secure 3C ICWP per 3-0P-019 .. Respond if directed as NSO to perform pre-start checks for 3A ICWP and shutdown checks for 3C ICWP. Report all conditions normal. Respond if directed to locally verify voltage on 3D 4kV bus. Click on POWER
& 480V 4KV voltage indicated on 3D bus mimic. As SM, direct crew to leave 3A & 38 ICWPs in service Respond if directed as NSO to perform pre-start checks for 3C ICWP and shutdown checks for 3C ICWP. Report all conditions normal. Event 2 -PT 446 (channel III 1 st stage impulse pressure) fails low Following transfer of 3D 4kV bus to 3A 4kV bus, trigger lesson step EVENT 2 -PT-3-446 FAILS LOW (actuates TFS1MABL = T). Crew will respond per 3-0NOP-02B and take rod control to manual to stop inward rod movement.
Then the crew will respond to the instrument fai/ure per 3-0NOP-049.
: 1. Respond if directed as NSO to reset AMSAC trouble. After 1-3 min, trigger lesson step EVENT 2 -BYPASS AMSAC POWER 1 (actuate TCL4P1BA = T then TCL4P1BB = T after 30 sec and TCL4RST = T after an additional 30 sec). Resets annunciator 0-716. Report when complete.
Respond if directed as wee to initiate PWO and notify I&C. Also respond as wee if directed to generate a clearance for bistables tripped for PT 446 failure. Annunciator C-BI3 alarms when PT-3-446 fai/s. Annunciators C-611, 612 & 613 alarm until ch IV 1 st stage impulse pressure selected for control. Annunciators C-711, 712, 713 alarm due to tripping bistables.
4 TP-2007-301 Scenario #2 Event Description Event 3 -Loss of 3P09 After crew brief for PT-3-446 failure, at lead examiner direction, trigger lesson step EVENT 3 -LOSS OF 3D INV/3P09 (actuates TCE6DI1C = T). This deenergizes 3D inverter.
Since the auto transfer to CVT was fai/ed at setup, 120V vital instrument panel 3P09 is deenergized.
The crew responds per 3-0NOP-003.
9 and reenergizes 3P09 from the OS inverter.
Respond as FS/NSO when directed to check out 3P09 & 3D inverter.
After 1-3 min, report 3P09 deenergized with no other unusual conditions and 3D inverter DC input breaker CB1 tripped. Respond as WCC if directed to have Electrical check out 3P09 for reenergization.
After 8-12 min, report 3P09 okay to reenergize from OS inverter.
When directed as FS/NSO to reenergize 3P09 from OS inverter, wait 1-3 min then trigger the following lesson steps per 3-0NOP-003.9 Att. 1: Step 1: EVENT 3 -OPEN 3D INVERTER CB6 (actuates TCEDI4C ::: F) Step 2a: EVENT 3 -OPEN ALL 3P09 BREAKERS (actuates TCE6217S:::
T) Step 2b: EVENT 3 -OPEN ALL 3P24 BREAKERS (actuates TCC2DLM3 ::: F, TCC2DLM ::: F, TCM2DX3M:::
F, TCC2DLE:::
F, TCC2DPE = F, TCF1DA3M:::
F, TCK72407:::
F, TCCMP248:::
F, TCN1409M=F, TCN1410M:::F&TCN1411M:::F)
Step 5a: EVENT 3 -3P09A SWITCH TO ALTERNATE (actuates TAE6X34 ::: ALTERNATE)
Step 6: Call as NSO & request RO take both groups of PZR backup heaters to OFF. Step 7: EVENT 3 -CLOSE 3P09 MAIN/13/o2 (actuates TCE6DS4C ::: T, TCF1DA2M:::
T after 5 sec & TCH 1902M ::: T after 1 0 sec) Step 8: EVENT 3 -CLOSE OTHER 3P09 BREAKERS (actuates TCE6DP2C:::
T, TCE6DP3C ::: T after 5 sec, TCE6DP4C ::: T after 10 sec, TCM2D95M:::
T after 15 sec, TCE6DP5C ::: T after 20 sec, TCE6DP6C ::: T after 25 sec, TCE6DP7C ::: T after 30 sec, TCCMDRE:::
T after 35 sec, TCE6DP8C:::
T after 40 sec, TCN1911M:::
T after 45 sec, TCN1912M = T after 50 sec, TCCMDRE3 = T after 55 sec, TCB2M915 ::: T after 60 sec, TCE6D58C ::: T after 65 sec, TCD2MCCL = T after 70 sec, TCE6DP9C ::: T after 75 sec, TCM2D9TM ::: T after 80 sec & TCE6D56C ::: T after 85 sec) Step 9: EVENT 3 -CLOSE 3P24 BREAKERS (actuates TCC2DLM3 ::: F, TCC2DLM ::: F after 5 sec, TCM2DX3M:::
F after 10 sec, TCC2DLE:::
F after 15 sec, TCC2DPE:::
F after 20 sec, TCF1DA3M ::: F after 25 sec, TCK72407:::
F after 30 sec, TCCMP248:::
F after 35 sec, TCN1409M ::: F after 40 sec, TCN1410M:::
F after 45 sec & TCN1411 M ::: F after 50 sec) Step 10: EVENT 3 -3Y07B SWITCH TO BACKUP OS INVERTER (actuates TAE6X24 ::: ALTERNATE)
Step 12: Call as NSO and report Att.1 complete.
Respond as NSO if directed to depress and hold relay LC459X to allow restoration of letdown and PZR pressurellevel control. After 1-3 min, trigger lesson step EVENT 3-PRESS I HOLD LC459CX (actuates TCH2459C ::: T). When directed to release LC459CX, trigger lesson step EVENT 3 -RELEASE LC459CX (actuates TCH2459C = F). Annunciator F-112 remains in due to failure of 3D inverter.
Annunciator 8-711 will remain on until PRNI N-44 rod stop bypass switch is taken to reset. 5 TP-2007-301 Scenario #2 Event Description Event 4/4a -3A SG 2 gpm tube leak Once the process of 3P09 restoration has begun (crew brief complete), trigger lesson step EVENT 4 -3A SG 2GPM TUBE LEAK (actuates TVHHSGA = 0.002) Crew should see increase in R-3-15 & SJAE SPING readings and respond per 3-ONOP-071.2.
Annunciator H-1/4 alarms soon after leak rate increase.
Due to the R-3-19 failure entered at setup, actions triggered by R-3-19 high radiation alarm must be performed manually/locally.
The crew should initiate a fast load reduction per 3-0NOP-100 to remove the unit from service. Respond as NSO if asked to check unit 3 condenser air inleakage.
Report 0 scfm. Respond as Chemistry when directed to sample SGs and MS lines per 0-NCAP-1 04. After 15-20 min, identify elevated activity in the 3A SG. Respond as HP when directed to perform rad readings on MS & blowdown lines. After 10-15 min, report radiation slightly>
background on 3A MS line. HP may also be directed to survey Turbine Deck around SJAE effluent & rope off contaminated areas. Respond as NSO when directed to realign aux steam to Unit 4 per 3-0NOP-071.2 Att. 3. After 2-4 min, trigger lesson step EVENT 4 -ALIGN AUX STEAM FROM U4 (actuates TAFF075 = 0.0, TAFF02 = 1.0 after 60 sec & TAFF007 = 0.0 after 120 sec). Report when complete.
Annunciator 0-4/6 will alarm during this process. Respond as NSO when directed to locally check CV-3-1500
& bypass valve 3-20-014.
After 1-3 min, report both valves closed. Respond as System when notified that Unit 3 is to be removed from service. Respond as SM when notified to refer to 0-EPIP-201 01 & 0-ADM-115.
Event 5 -3A SGTR I Reactor trip I Safety injection At evaluator direction after 5-10% power reduction (in any case before reaching 25% power), trigger lesson step EVENT 5 -3A SG TUBE RUPTURE (actuates TVHHSGA = 0.4). The crew should recognize the increase in tube leakage to > charging pump capacity.
Per 3-0NOP-071.2, the crew should trip the reactor and enter 3-EOP-E-0.
MSR main steam stop MOV-3-1433 failure to close requires manual closure of all MSIVs. PZR level < 12% requires manual safety injection.
Respond as NSO when directed to place PAHMS in service on unit 3. After 8-12 minutes, trigger lesson step EVENT 5 -PLACE U3 PAHMS IN SERVICE (actuates TAC2V02A = 1.0, TAC2V028 = 1.0, TAAAV21 = 1.0, TAAAV22 = 1.0 & TACA005 = 0.0). Report when complete.
6 TP-2007 -301 Scenario #2 Event Description Event 6 -Loss of offsite power I 3A EDG auto start fails Immediately after entry into 3-EOP-E-3, trigger lesson step EVENT 6 -U3 SUT LOCKOUT I LOOP (actuates TFP1S38S = T) A spurious lockout on the unit 3 SUT combined with 3A EOG output breaker auto close failure (from setup) and 38 EOG OOS (also from setup) causes a momentary loss of al/ AC power. 3-EOP-ECA-O.O is entered and the 3A EOG output breaker is manually closed after which the crew returns to 3-EOP-E-3 to complete response to the SGTR. Respond as NSO if directed to check the condition of the 3A EOG. After 1-3 min, report 3A EOG running unloaded, otherwise nothing unusual. If asked to monitor 3A EOG after manual output breaker closure, report EOG running satisfactorily.
Respond as System/SAO if asked about U3 SUT lockout. Report that personnel are being dispatched to check out the transformer (switchyard still available).
Respond as U4 RO when directed to perform 3-EOP-E-0 Att 1 to align U4 HHSIPs to U3 RWST. After 1-3 min, trigger lesson step EVENT 6 -ALIGN U4 HHSIP TO U3 RWST (actuates TAMH1V41 = 1.0, TAMH1V46 = 1.0 after 1 min delay, TAMH1V37 = 0.0 after 2 min delay, TAMH4856 = 0.0 after 3 min delay). Report when complete.
Respond as NSO when directed to locally verify phase A valves MOV-3-1417
& 1418 closed (in the U3 Pipe & Valve Room). After 1-3 min, trigger lesson step EVENT 6 -CLOSE MOV-3-1417
& 1418 (actuates TFKV417C = T & TFKV418C = T after 1 min delay). Report when complete.
Respond as NSO when directed to locally close LCV-3-115C.
After 1-3 min, trigger lesson step EVENT 6 -LOCALLY CLOSE LCV-3-11SC (actuates TFBVC62 = T). Report when complete.
When directed as FS/NSO to deenergize MOV-3-1403 by opening bkr 4001-28, after 1-3 min, trigger lesson step EVENT 6 -DEENERGIZE MOV-3-1403 (actuates TCF5MB28 = F). Report when complete.
If directed to verify MOV-3-1403 closed, after 1-3 min, report that this is the case. If directed to align auxiliary steam supply from U4, either report that this is already done or after 2-4 min, trigger lesson step EVENT 4 -ALIGN AUX STEAM FROM U4 (actuates TAFF075 = 0.0, TAFF02 = 1.0 after 60 sec & TAFF007 = 0.0 after 120 sec). Report when complete.
Annunciator 0-4/6 will alarm during this process. If asked as NSO to locally verify MOV-3-1425 closed, after 1-3 min, report that this is the case. The crew may try to reenergize 38 4kV bus using 3-0NOP-004.3.
Since 38 EOG is OOS and the U3 SUT is locked out, such attempts will be unsuccessful.
7 OPERATIONS SHIFT TURNOVER REPORT ONCOMING CREW ASSIGNMENTS Unit 3 Plant Status Unit 3 AFWP OOS (bearing failure; OOS 4 hr; ETR 24 hr) 3B EDG OOS (fuel pump failed; OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed IST -low discharge pressure; OOS 12 hr; ETR 36 hr) Train A is protected.
Unit 4 Unit 4 NRC-2 Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4 to support possible emergent maintenance on 3A CCWP (vibration increase last shift). 2 gpd tube leak in 3A S/G -unchanged for past week (Chemistry sampling per 3-0NOP-07l.2, Attachment 1.) Power on hold at 50% foIl . inadvertent 3B SGFP . while' . U3 Leo Current: U4 B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8.l.1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req'd; 3-0P-023 sect 7.7 due next shift ifOOS > 72 hr; repair in 14 days) 3B CSP -TS 3.6.2.1 Action a (Fix in 72 hr) None . OLRM is = 2.06E-6* LERF = 9.28E-8 Current: B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8.1.1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req'd; fix in 14 days) None Unit 3 Status .'-Reactor Operator Mode: 1 RCS Leakrate Accumulator Ref Levels Power: 50 Gross: 0.03 gpm A 6615 MWe: 348 Unidentified 0.02 gpm B 6640 Tavg: 559 Charging Pps: 0.01 gpm C 6625 RCS Pressure:
2235 RCS Boron Cone: 907 Abn()r,mal AIihtinciafors:
' . . : .':;,,< ',i)'::'.':'i!,,!I:'; , *.
!.,
\i:::!i,".:;'7
**' .. ';:!?\*C:
.... ) Annunciator:
F 9/2 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
3-0P-023 sect 7.7 due next shift. Annunciator:
F 9/5 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
3-0P-023 sect7.7 due next shift. Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
.. Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Current Tech Spec Action Statements: (Does Not Include "For Tracking Only Items" T.S.AS / Component:
3.7.1.2 Action 3/ B AFWP Reason: Bearing failed Entry Date: Xx/Xx/XX (Previous shift) T.S.AS / Component:
3.8.1.1 Actions b & d /3B EDG Reason: Fuel pump failed Entry Date: XX/XX/XX (2 days ago) T.S.AS / Component:
3.6.2.1 Action a / 3B CSP Reason: Failed 1ST -low discharge pressure Entry Date: XX/XX/XX (Yesterday)
T.S.A.S / Component:
3.4.3 Action a / 3B PZR backup heaters Reason: 14 day due to 3B EDG OOS Entry Date: XX/Xx/XX (2 days ago) T.S.AS / Component:
3.5.2 Action f /3B HHSIP Reason: 14 day due to 3B EDG OOS Entry Date: XX/XX/XX (2 days ago) T.S.A.S / Component:
Reason: I Entry Date:
Unit 3 Status Changes to Risk Significant Equipment: " B AFWP OOS (Bearing replacement) 3B EDG OOS (Fuel pump repair) 3B CSP OOS (Failed 1ST -low discharge pressure)
Unit 3 Risk is GREEN. Main contributor is B AFWP. Upcomin9_
Reactivity Management Activities:
Dilute to maintain 50% power until 3B SGFP inadvertent trip cause evaluated and management permission received to return 3B SGFP to service and commence power increased to 100%. Upcoming Major POD Activities:
Return to 100% power if/when management permission received to commence power increase.
Upcoming ECOs to Hang and lor Release: None Evolutions or Compensatory Actions in Progress:
-Awaiting permission to restart 3B SGFP and commence power increase to 100%. Power on hold at 50% following inadvertent trip of 3B SGFP while investigation in progress.
-After shift turnover, swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW pump (vibration increase last shift). -Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains energized at management direction due to small size and stability of tube leak rate. OSP-023.3 Att 1 & 9 for 3B EDG OOS due in 4 hrs. 3-0SP-023.1 not required since to 3B EDG OOS due to support system failure. 3-0P-023 sect 7.7 due next shift to allow 3B EDG OOS > 72 hr. General Information, Remarks, and Operator Work Around Status: See evolutions
& compensatory actions listed above. Train A is protected.
Appendix D Scenario Outline Form ES-D-1 Facility:
Turkey Point Scenario No.: 3 Op Test No.: 2007-301 Examiners:
Candidates:
US RO BOP Initial Conditions:
Mode 1, 75% Power, MOL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return to 100% power following a turbine valve test. Turnover:
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Perform monthly surveillance on 3A ECC per 3-0SP-055.1 section 7.1 immediately after shift turnover.
1ST and remote valve position verification not required.
Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) BOP 3A ECC monthly surveillance performed per 3-0SP-055.1 section 7.1. 3A TFKV905A = T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS. (N,TS) SRO 2 (I) SRO/RO TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8CH = T ONOP-028 and takes rods to manual to stop continuous inward rod movement.
3 (C) RO/BOP Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF & 3D TFE3D37A = T (C,TS) SRO NCC OOS. Requires starting another charging pump or securing the in TFE3D38T = T service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4. 4 TAKPXA1=10.0 (C) SRO/BOP 3A 1 Intake screen high Llp. Crew responds per 3-0NOP-011.
3A 1 CWP is TAKPXA2 = 4.0 secured. 4a (R) ALL 3A2 Intake screen high Llp. Fast load reduction per 3-0NOP-100 to 60% for TAKPXA2 = 1.0 the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure. 5 TAHUVBSB=22 (M) ALL 3B RCP high vibration.
The crew responds per 3-0NOP-041.1.
Once TAHUVBMB=
6 vibration reaches the trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-0 are performed.
6 (M) ALL When 3B RCP is tripped, 38 4kV bus is lost and a large break LOCA occurs. TFE2Z51S = T (cont'd from An automatic SI occurs but train A sequencer fails. Train A ECCS equipment TVHHCLB = 0.1 event 5) must be manually started. The crew completes 3-EOP-E-0 and transitions to TFQ634AF =T (C) ALL applicable FRPs followed by 3-EOP-E-1.
6a Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists. 6b (C) SRO/RO 3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=T running, transition is made to 3-EOP-ECA-1.1.
Measures are taken to minimize the loss of RWST inventory.
.. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor Ii; 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: _1_ Page _1_ of _1_ Event


== Description:==
== Description:==
Loss of Loss    of 3H    480V LC.
3H 4BOV      LC. Also Also takes takes 3C 30 charging charging l2uml2, pump, 3B3B ECC, ECC, 3B 3B ECF ECF
                        && 3D 3D NCC NCC OOS.
OOS. Reguires Requires starting starting another another charging        l2uml2  or securing charging pump or securing the in the  in service service 60 60 gl2m gpm orifice.
orifice. The The crew crew resl20nds responds l2erper 3-ARP-097.CR 3-ARP-097.CR for annunciators      F-9!6,  A-5/4, for annunciators F-9/6, A-5/4, 1-9/3      1-9/3 or or 1-9/4.
1-9/4.
Time Time    Position Position                                Applicants Actions Applicant's      Actions oror Behavior Behavior BOP BOP        Recognizes/reports annunciator Recognizes/reports          annunciator F-9/6, F-916, X-2/6 X-2/6 &  & X-5/1.
X-5/1.
Recognizes/reports both Recognizes/reports          both 3H3H 4BOV 480V LC  LC feeder feeder breakers breakers open open indicating indicating loss of power loss      power to that LC. LO.
RO        Recognizes/reports annunciator 1-9/3, 1-9/4, Recognizes/reports                                    1-9/4, J-7/1 & J-B/1 J-8/1 (later A-5/4) 3-ARP-097.CR for annunciator F-9/6 Directs actions from 3-ARP-097.CR Recognizes/reports loss of 3C Recognizes/reports                    30 charging pump, 3B ECC, 3B ECF, 3D NOC NCC      and  3D  480V 4BOV    MCC.
BOP        Performs actions per 3-ARP-097.CR 3-ARP-097.CR for annunciator F-9/6
: 1. Determines 3H 480V    4BOV LC auto bus transfer failed
: 2. Determines 30    3C & 3D 480V 4BOV LC both energized US      Directs WOO WCC have Electrical investigate loss of 3H 480V            4BOV LC BOP      Directs 3-ONOP-041 3-0NOP-041.6      .6 entry from 3-ARP-097.C 3-ARP-097.CR      R for annunciator A-9/3 US US      Directs Directs response per    per 3-ONOP-041 3-0NOP-041.6      .6 RO      Performs Performs actions actions perper 3-ONOP-041 3-0NOP-041.6      .6 as as directed directed by by US:
US:
1.
: 1. Starts Starts standby standby (3B)
(3B) charging charging pumppump US US      Evaluates Evaluates TS    TS 3.8.3.1 3.B.3.1.a.a or    as applicable or bb as  applicable (c  (c from from U4 U4 point point of of view) view)
On  U3 - Action On U3    - Action a. a. applies applies (8 (B hr) hr)
On On U4 U4 - Table
                                      -  Table 3.8-2 3.B-2 7272 hr hr action action since since 4A2/4B2 4A2/4B2 battery battery chargers chargers not not required required by  by 3.8.2.1.c 3.B.2.1.c or or dd Evaluates Evaluates TS    TS 3.6.2.2.b 3.6.2.2.b as as applicable applicable requiring requiring plant        hr shutdown plant 11 hr shutdown since only since    only 11 EOC ECC left left operable operable Conducts Conducts crew  crew brief brief regarding regarding effects effects ofof loss loss ofof 3H 3H 480V 4BOV LO LC && 3D 3D 480V 4BOV MOO      and  requirement MCC and requirement to          to commence commence actionaction to to shutdown shutdown plant.
plant.
33


3A EGG monthly surveillance performed per 3-0SP-055.1 section 7.1. 3A EGG inlet valve GV-3-2905 fails to open and 3A EGG is declared OOS. Time Position Applicant's Actions or Behavior US Obtains SM permission and directs BOP to perform 3A EGG monthly operability test per 3-0SP-055.1 section 7.1 beginning at step 7.1.6. BOP Obtains copy of 3-0SP-055.1 section 7.1. Performs actions as follows beginning at step 7.1.6: 1. Places 3A EGG switch to STOP 2. Determines GV-3-2905, GV-3-2814
AppendixDD Appendix                                          OperatorActions Operator        Actions                                        Form FormES-D-2 ES-D-2 Op-Test No.:
& GV-3-2908 all closed. 3. Determines steps 7.1.10, 11 & 13 n/a since 1ST & remote position verification not required.
Op-Test    No.:     2007-301 2007-301            Scenario No.:
: 4. Starts 3A EGG & records start time on Att. 1 5. Directs NSO perform steps 7.1.14 & 15 to measure current 6. Recognizes
Scenario    No.: ~    3                 No.:..+/-.
& reports GV-3-2905 did not open 7. Stops 3A EGG fan & records time on Att.1 NOTE: May leave switch in STOP rather than return to AUTO since 3A . ECC OOS with GV-3-2905 failed closed 8. Determines GV-3-2814 open & GV-3-2908 closed 9. Determines GGW flow on FI-3-1470 is zero & records on Att. 1 10. Notifies US 3A EGG failed test due to GV-3-2905 failure to open US Notifies SM 3A EGG OOS Directs WGG have Mechanical investigate/fix GV-3-2905.
Event No.:
Determines TS 3.6.2.2 action a. applies (72 hr) May directs WGG place 3A EGG under EGO 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: 2 Page_1_ of 1 Event
Event           4        Page Page_1_1 of   of_1_1 Event


== Description:==
== Description:==


TM-3-408C (Tavg inl2ut to rod control} fails high. Crew resl20nds l2er 3-ONOP-028 and takes rods to manual to stOI2 continuous inward rod movement.
Event  
I Time Position Applicant's Actions or Behavior RO Recognizes/reports control rods inserting in automatic Performs immediate action of 3-0NOP-028 for continuous insertion of an RCC control bank: Places rod control in MANUAL and verifies rods stop moving. US Directs response per 3-0NOP-028 RO Performs subsequent actions of 3-0NOP-028 as directed by US: 1. If directed, withdraws control rods to restore Tavg = Tref 2. Determines rods above RIL from VPA recorder (or PCB section VII figure 3). 3. Determines PRNI N-44 did not fail 4. Determines RCS Tavg TI-3-412D, 422D & 432D not failed BOP Performs subsequent actions of 3-0NOP-028 as directed by US: 1. If directed, reduces turbine load to restore Tavg = Tref 2. Determines PT-3-446 & 447 did not fail US Directs WCC notify I&C of rod control failure. Directs WCC hang caution tag on rod control selector to leave switch in MANUAL Performs applicable actions of 3-0NOP-049.1 if TM-3-408 failure suspected
: 1. Determines RCS Tavg TI-3-412D, 422D & 432D not failed 2. Determines no control switches require transfer 3. Evaluates no impact per TS 4. Determines no bistable switches require tripping per Att 4, no AMSAC-related channels failed and PT-3-446/447 did not fail 5. Conducts crew brief regarding effects of rod control failure 2 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: _3_ Page_1 _ of _ 2_ Event


== Description:==
== Description:==
3A1 3A      Intake screen 1 Intake      screen high high 1\p.
tip. Crew Crew responds responds per  per3-0NOP-011.
3-ONOP-Ol 1. 3A        1 3A1 CWP isis secured CWP          secured..
Time_J lillie      Position Position                                Applicants Actions Applicant's      Actions or  or Behavior Behavior BOP BOP            Recognizes/reports rising Recognizes/reports            rising 1\p tp onon 3A 3A11 CWP CWP Reports annunciator Reports      annunciator 1-3/3 1-3/3 when when itit alarms alarms US US          Directs performance Directs    performance of    of 3-0NOP-011 3-ONOP-Ol 1 BOP BOP          Performs actions Performs      actions of of 3-0NOP-011 3-ONOP-Ol 1 as    as directed directed by  by US:
US:
1.
: 1. Verifies 22 screen Verifies      screen wash wash pumps pumps running running
: 2. Directs NSO Directs    NSO monitor monitor & reportreport screen wash pump    pump basket basket strainers 1\p strainers    tp
: 3. Directs NSO verify all traveling screens operating in high gear                  gear
                                    & all rotating
: 4. Directs NSO to monitor & report presence of traveling screen                  screen waterfall, debris carryover, screen wash water pressure (> 60                      60 psig)and nozzle spray over entire screen psig)'and NOTE: If a waterfall is reported or 3A1          3A 1 traveling screen Ap        f1p pegged pegged high, crew should skip ICW/CCW && IC                ICWITPCW W/TPC W checks and go          go toto step 7 to check for conditions to stop aa CWP.
: 5. Directs Directs NSOs NSOs report:
a.
: a. ICWICW flows flows toto CCWHXs CCWHXs &      & basket basket strainer strainer ps 1\p's b.
: b. ICWICW flows flows toto TPCWHXs TPCWHXs &      & basket basket strainer strainer ips1\p's US US        Determines Determines 3A1  3A 1 traveling traveling screen screen &#xa3;p 1\p still still well well above above normal normal Loops Loops between between steps steps 11 && 77 until until 3A1 3A 1 traveling traveling screen screen waterfall waterfall height    reported height reported>    > 2.5 2.5 ftft When When 3A1  3A 1 traveling traveling screen screen waterfall waterfall reported reported>      2.5 ft,
                                                                                                > 2.5    ft, directs directs shutdown shutdown of  of 3A1 3A1 CWP CWP BOP BOP        Continues Continues performing performing actions actions of of 3-ONOP-Ol 3-0NOP-011          as directed I as  directed by  by US:
US:
6.6. Stops Stops 3A13A 1CWP CWP when  when directed directed by by USUS inin response response to  to report report ofof waterfall waterfall>  > 2.5 2.5 ftft 7.7. Determines Determines ICWP  ICWP secured secured inin 3A1 3A 1intake intakewellwell US US        Directs Directs FS/WCC FS/wCC coordinate coordinate performance performanceof    ofAtt.
Att. 11toto clean clean 3A13A 1 intake intakewell.
well. Notifies Notifiesplant plantmanagement management.    .
44


Loss of 3H 4BOV LC. Also takes 3C charging l2uml2, 3B ECC, 3B ECF & 3D NCC OOS. Reguires starting another charging l2uml2 or securing the in service 60 gl2m orifice. The crew resl20nds l2er 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4. Time Position Applicant's Actions or Behavior BOP Recognizes/reports annunciator F-9/6, X-2/6 & X-5/1. Recognizes/reports both 3H 4BOV LC feeder breakers open indicating loss of power to that LC. RO Recognizes/reports annunciator 1-9/3, 1-9/4, J-7/1 & J-B/1 (later A-5/4) Directs actions from 3-ARP-097.CR for annunciator F-9/6 Recognizes/reports loss of 3C charging pump, 3B ECC, 3B ECF, 3D NCC and 3D 4BOV MCC. BOP Performs actions per 3-ARP-097.CR for annunciator F-9/6 1. Determines 3H 4BOV LC auto bus transfer failed 2. Determines 3C & 3D 4BOV LC both energized US Directs WCC have Electrical investigate loss of 3H 4BOV LC BOP Directs 3-0NOP-041.6 entry from 3-ARP-097.CR for annunciator A-9/3 US Directs response per 3-0NOP-041.6 RO Performs actions per 3-0NOP-041.6 as directed by US: 1. Starts standby (3B) charging pump US Evaluates TS 3.B.3.1.a or b as applicable (c from U4 point of view) On U3 -Action a. applies (B hr) On U4 -Table 3.B-2 72 hr action since 4A2/4B2 battery chargers not required by 3.B.2.1.c or d Evaluates TS 3.6.2.2.b as applicable requiring plant 1 hr shutdown since only 1 ECC left operable Conducts crew brief regarding effects of loss of 3H 4BOV LC & 3D 4BOV MCC and requirement to commence action to shutdown plant. 3 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: ..+/-. Page _1_ of _1_ Event
AppendixDD Appendix                                            OperatorActions Operator        Actions                                       Form FormES-D-2 ES-D-2 Op-TestNo.:
Op-Test No.:     2007-301 2007-301                Scenario No.:
Scenario        No.:~    3          EventNo.:
Event     No.:~          Page~
Page 4a            j.. of of_2_
Event


== Description:==
== Description:==


3A 1 Intake screen high 1\p. Crew responds per 3-0NOP-011.
Event  
3A 1 CWP is secured . ..,.... lillie Position Applicant's Actions or Behavior BOP Recognizes/reports rising 1\p on 3A 1 CWP Reports annunciator 1-3/3 when it alarms US Directs performance of 3-0NOP-011 BOP Performs actions of 3-0NOP-011 as directed by US: 1. Verifies 2 screen wash pumps running 2. Directs NSO monitor & report screen wash pump basket strainers 1\p 3. Directs NSO verify all traveling screens operating in high gear & all rotating 4. Directs NSO to monitor & report presence of traveling screen waterfall, debris carryover, screen wash water pressure (> 60 psig)'and nozzle spray over entire screen NOTE: If a waterfall is reported or 3A 1 traveling screen f1p pegged high, crew should skip ICW/CCW & ICWITPCW checks and go to step 7 to check for conditions to stop a CWP. 5. Directs NSOs report: a. ICW flows to CCWHXs & basket strainer 1\p's b. ICW flows to TPCWHXs & basket strainer 1\p's US Determines 3A 1 traveling screen 1\p still well above normal Loops between steps 1 & 7 until 3A 1 traveling screen waterfall height reported>
2.5 ft When 3A 1 traveling screen waterfall reported>
2.5 ft, directs shutdown of 3A1 CWP BOP Continues performing actions of 3-0NOP-011 as directed by US: 6. Stops 3A 1 CWP when directed by US in response to report of waterfall>
2.5 ft 7. Determines ICWP secured in 3A 1 intake well US Directs FS/wCC coordinate performance of Att. 1 to clean 3A 1 intake well. Notifies plant management.
4 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: Page of _2_ Event


== Description:==
== Description:==
3A2 intake 3A2    intake screen screen high        p. Fast high Llp. Fastloadload reduction reduction per per3-0NOP-1 3-ONOP-100    00 toto 60% for 60%    forthe  the purpose purpose of        securing 3A2 ofsecuring        3A2 CWP.
CWP. Manual Manual rodrod control control must must be used be    used due  due to to rod rod control control Tavg Tavg failure.
failure.
Time Time        Position Position                                      Applicants Actions Applicant's        Actions or  or Behavior Behavior BOP BOP            Recognizes II reports Recognizes              reports rising rising 3A23A2 traveling traveling screen screen Llp tp US US            Determines that Determines            that conditions conditions will will soon soon require require securing securing 3A23A2 CWP CWP and and directsdirects performance performance of        of aa fast fast load load reduction reduction per per 3-0NOP-1 3-ONOP-1 00    00 to <60%
to  <60% to    to allow allow shutdown shutdown of        the 22 of the  dnd CWP.
cwp.
Contacts FS/wCC Contacts          FSIWCC and    and determines determines 3A      3A11 intake intake well well cleaning cleaning not not compl complete so  ete  so 3A3A11 CWPCWP can  can notnot bebe started.
started.
Conducts crew brief Conducts                  brief per 3-0NOP-100 3-ONOP-100 Attachment Attachment 3:  3:
                                    *. Provides reason (2 gpm tube leak requiring Provides                                              requiring plant sid) sld)
                                    *. Target power level Target                        =
                                                                        = offline
                                    *. Specifies load reduction Specifies              reduction rate
                                    *. Specifies boration Specifies      boration amoun amountt & rate
                                  .*    Covers plant contro  controll parame parameters          contingency ters & contin    gency actions
                                  .*      Covers E-0  E-O transit    ion criteria transition    criteria
                                  .*      Review Reviews    s reqd req'd actions actions from from 3-ONO 3-0NOP-071.2 P-071 .2
                                .*      Solicit Solicits s crew crew questio questions  ns && input input Ensure Ensures      s load load dispatc dispatcher her notified notified of of load load decrea decrease.
se.
RO RO        When When directe  directed, d, initiate initiates s boratio boration      per 3-ONO n per    3-0NOP-100:
P-1 00:
1.1. Sets  Sets BABA Totaliz Totalizer er to to amoun amount      directed t directe  d 2.2. Sets  Sets FC-3-1 FC-3-113A  1 3A pot      setting =8.0 pot setting          8.0 3.3. PlacesPlaces Rx Rx MIUM/U Selecto Selector  r Switch Switch to  to BORATE BORATE 4.4. Places Places Rx Rx MIUM/U Control Control Switch Switch to  to STAR START  T BOP BOP        When When directe  directed d per per3-ONO        P-100:
3-0NOP-100:
1.1. Notifies Notifies load loaddispatc dispatcherher ofofloadload reducti reduction    when directe on when    directedd bybyUSUS 2.2. Makes  Makesplantplantpage pageannoun announcement cement regard regarding  loadreducti ing load    reduction on 55


3A2 intake screen high Llp. Fast load reduction per 3-0NOP-1 00 to 60% for the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure. Time Position Applicant's Actions or Behavior BOP Recognizes I reports rising 3A2 traveling screen Llp US Determines that conditions will soon require securing 3A2 CWP and directs performance of a fast load reduction per 3-0NOP-1 00 to <60% to allow shutdown of the 2 nd CWP. Contacts FS/wCC and determines 3A 1 intake well cleaning not complete so 3A 1 CWP can not be started. Conducts crew brief per 3-0NOP-100 Attachment 3:
AppendixDD Appendix                                        OperatorActions Operator      Actions                                         Form FormES-D-2 ES-D-2 Op-TestNo.:
* Provides reason (2 gpm tube leak requiring plant sid)
Op-Test No.:     2007-301 2007-301             Scenario No.:
* Target power level = offline
Scenario     No.: ~  3            Event No.:
* Specifies load reduction rate
Event     No.: 4a 4a      Page.&#xa3; Page    2 ofof--1.2 Event
* Specifies boration amount & rate
* Covers plant control parameters
& contingency actions
* Covers E-O transition criteria
* Reviews req'd actions from 3-0NOP-071.2
* Solicits crew questions
& input Ensures load dispatcher notified of load decrease.
RO When directed, initiates boration per 3-0NOP-100:
: 1. Sets BA Totalizer to amount directed 2. Sets FC-3-113A pot setting = 8.0 3. Places Rx M/U Selector Switch to BORATE 4. Places Rx M/U Control Switch to START BOP When directed per 3-0NOP-100:
: 1. Notifies load dispatcher of load reduction when directed by US 2. Makes plant page announcement regarding load reduction 5
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: 4a Page .&#xa3; of --1. Event


== Description:==
== Description:==


3A2 intake screen high b.12. Fast load reduction l2er 3-0NOP-1 00 to 60% for the I2Ur120Se of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure. I Time Position Applicant's Actions or Behavior RO When directed, continues fast load reduction per 3-0NOP-100:
Event
: 1. Checks for Tavg reduction from boration 2. Sets FC-3-113A for BA flow rate as directed BOP Reduces turbine load per 3-0NOP-100 at rate directed by US. RO When directed, continues fast load reduction per 3-0NOP-100:
 
== Description:==
3A2 intake 3A2    intake screen screen high high b.12.
: p. Fast Fast load load reduction reduction l2er per 3-0NOP-1 3-ONOP-100  00 to to 60%    for  the  purpose of 60% for the I2Ur120Se         ofsecuring securing 3A2  3A2 CWP.
CWP. Manual Manual rod rod control control must must be used be   used duedue toto rod rod control control Tavg Tavg failure.
failure.
I Time Time        Position Position                                  Applicants Actions Applicant's       Actions or  or Behavior Behavior RD RO           When directed, When      directed, continues continues fast fast load load reduction reduction per  per 3-0NOP-100:
3-DNOP-100:
1.
: 1.       Checks for Checks    for Tavg Tavg reduction reduction from  from boration boration 2.
: 2.       Sets FC-3-113A Sets  FC-3-1 1 3A for for BA BA flow flow rate rate asas directed directed BDP BOP           Reduces turbine Reduces       turbine load load per per 3-0NOP-100 3-ONDP-100 at        at rate rate directed directed byby US.
US.
RD RO         When directed, continues fast load reduction per 3-0NOP-100:
When                                                                    3-ONOP-100:
: 1. Manually inserts rods in response to turbine load reduction.
: 1. Manually inserts rods in response to turbine load reduction.
NOTE: Rods < RIL not expected at this power level US Per 3-0NOP-100, notifies SM to review 0-EPIP-20101  
NOTE: Rods << RIL not expected at this power level US US        Per 3-DNOP-100 Per   3-0NOP-100,, notifies SM to review 0-EPIP-2010      0-EPIP-20101           O-ADM-1 & 0-ADM-1 15 and ensure required notifications made 115 RD RO         When directed directed per 3-DNDP-1 3-0NOP-1 00 1.
& O-ADM-115 and ensure required notifications made RO When directed per 3-0NOP-1 00 1. Checks PZR level following program. If not increases charging flow and/or places an additional letdown orifice in service 2. Determines NRHX CCW flow already increased (from setup) 3. Verifies load reduction rate & manual rod control maintaining Tavg-T ref per expected value as discussed in crew brief 4. Energizes PZR backup heaters. 5. Determines turbine load < 570MW & verifies non-running SGFP recirc valve open 6. When directed by US (<:: 60% power), secures boration:
: 1. Checks Checks PZR PZR level level following program. IfIf not     not increases increases charging charging flow flow and/or and/or places places an an additional additional letdown letdown orifice orifice in in service service 2.
: a. Places rx m/u selector switch in AUTO b. Sets FC-3-113A potentiometer to directed value c. Places RCS m/u control switch to START 7. Stops one HDP when < 450MWe US Determines that transferring station service loads to SUT and aligning aux steam to unit 4 not required due to stabilization of reactor power at 50-60%. 6 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: -L Event No.: Page L of_1_ Event
: 2. Determines Determines NRHX  NRHX CCW CCW flow  flow already already increased increased (from (from setup) setup) 3.
: 3. Verifies Verifies load load reduction reduction rate rate && manual manual rod  rod control control maintaining maintaining TavgTref    per  expected Tavg-Tref per expected value   value as  as discussed discussed in    in crew crew brief brief 4.
: 4. Energizes Energizes PZR  PZR backup backup heaters.
heaters.
5.5. Determines Determines turbine turbine load load << 570MW 570MW && verifies verifies non-running non-running SGFP SGFP recirc recirc valve valve open open 6.6. WhenWhen directed directed by     US (
by US    (<:: 60%
60% power),
power), secures secures boration:
boration:
a.a. Places Places rxrx rn/u m/u selector selectorswitchswitch ininAUTO AUTO b.b. Sets Sets FC-3-1    1 3A potentiomete FC-3-113A       potentiometer     r toto directed directedvalue value c.c. Places Places RCSRCS rn/u m/u control controlswitch switch totoSTART START 7.7. Stops StopsoneoneHDPHDPwhen when <<45OMWe450MWe USUS        Determines Determinesthat    thattransferring transferringstationstationservice serviceloadsloadstotoSUTSUTandand aligning aligningaux  auxsteam steamtotounitunit44not notrequired requireddue            stabilizationofof duetotostabilization reactor reactorpowerpoweratat50-60%.
50-60%.
66
 
Appendix DD Appendix                                         OperatorActions Operator       Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.:    2007-30 1 2007-301             Scenario No.:
Scenario     No.: -L 3        Event No.:
Event    No.: ~ 5        Page L 7 of_1_
Page        of Event


== Description:==
== Description:==


3B RCP high vibration.
Event 
The crew res[2onds
 
[2er 3-0NOP-041.1.
== Description:==
Once vibration reaches either shaft or motor tri[2 set[2oint, the crew manually tri[2s the reactor and immediate actions of 3-EOP-E-0 are [2erformed. lillie Position Applicant's Actions or Behavior RO Recognizes I reports annunciator F-1/1 alarming Determines rising shaft & motor vibration on 3B RCP US Directs response per 3-0NOP-041.1 foldout page Critical Directs RO to manually trip the reactor per 3-0NOP-041.1 due to RCP motor vibration>
3B3B RCP RCP highhigh vibration.
5 mils or shaft vibration>
vibration. TheThe crew crew res[2onds responds [2er per 3-0NOP-041.1.
20 mils. RO Performs 3-0NOP-041.1 foldout page actions as directed by US: 1. Reports when either motor vibration>
3-ONOP-041 .1. Once Once vibration reaches vibration    reaches either either shaft shaft or or motor motor tri[2 trip set[2oint, setpoint, the the crew crew manually manually trips the tri[2s the reactor reactor and and immediate immediate actions actions ofof 3-EOP-E-0 3-EOP-E-0 are are [2erformed.
5 mils or shaft vibration>
performed.
20 mils Critical 2. Trips the reactor when directed US Directs crew perform immediate actions of 3-EOP-E-0.
Time
RO Performs immediate actions of 3-EOP-E-0:
  ~.
lillie     Position Position                                 ApplicanVs Actions Applicant's     Actions or or Behavior Behavior RO RO            Recognizes I/ reports Recognizes        reports annunciator annunciator F-1/1 F-Ill alarming alarming Determines rising Determines       rising shaft shaft & & motor motor vibration vibration on on 3B 3B RCP RCP US US            Directs response Directs    response per  per 3-0NOP-041.1 3-ONOP-041.1 foldout foldout page page Critical Critical        Directs RO Directs     RO toto manually manually trip trip the the reactor reactor per per 3-0NOP-041.1 3-ONOP-041.1 due  due to RCP   motor     vibration>
to RCP motor vibration> 55 mils        mils oror shaft shaft vibration>
vibration > 2020 mils.
mils.
RO RO           Performs 3-0NOP-041.1 Performs      3-ONOP-041.1 foldout page actions as directed by US:                  US:
: 1. Reports when either motor vibration> vibration > 5 mils or shaft vibration > 20 mils vibration>
Critical Critical       2. Trips the reactor when directed US           Directs crew perform immediate actions of 3-EOP-E-0.
RO           Performs immediate actions of 3-EOP-E-0:
1.
: 1. Verifies reactor trip
: 1. Verifies reactor trip
* Rod bottom lights on & RPls at zero
                                      .*   Rod bottom lights on &       & RPIs RPls at zero
* Rx trip & bypass bkrs open
                                      .*   Rx trip trip && bypass bypass bkrsbkrs open open
* Neutron flux decreasing
                                      .*   Neutron Neutron fluxflux decreasing decreasing 2.
: 2. Actuates SI & phase A due PZR level not maintained  
: 2. Actuates Actuates SI  SI &
<12% BOP Performs immediate actions of 3-EOP-E-0:
                                                      & phase phase A    due PZR A due   PZR level level not not maintained maintained <12%
: 1. Verifies turbine tripped
                                                                                                            <12%
* Turbine stop valves closed
BOP BOP           Performs Performs immediate immediate actionsactions of of 3-EOP-E-0:
* Closes MSR main steam stop MOVs.
3-EOP-E-0:
* Mid & East GCBs open 2. Verifies power to emergency 4kV buses
1.
* Determines both 3A & 3B 4kV buses energized
: 1. Verifies Verifies turbine turbine tripped tripped
* Determines 3D 4kV bus energized from 3B 4kV bus 7 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.: _6_ Page _1 of _3_ Event
                                    .
* Turbine Turbine stop stop valves valves closed closed
* Closes Closes MSRMSR main main steam steam stop stop MOVs.
MOVs.
                                    .
* Mid Mid &&East East GCBs GCBs open open 2.
: 2. Verifies Verifies power power to to emergency emergency 4kV 4kV buses buses
                                    .
* Determines Determines both         3A &&3B both 3A      3B 4kV 4kV buses buses energized energized
                                    .*   Determines Determines 3D     3D 4kV 4kV bus bus energized energized from from 3B 3B 4kV 4kV bus bus 77
 
Appendix DD Appendix                                             OperatorActions Operator       Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.: No.:    2007-301             Scenario No.: No.: _3_ 3        Event     No.: _6_
Event No.:              Page Page _1 Op-Test              2007-301            Scenario                                            6            j. of of_3_3 Event
 
== Description:==
 
Event     
 
== Description:==
When When 3B  3B RCP RCP isis tril2l2ed, tripped, 3B 3B 4kV4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An occurs. An automatic automatic SI  SI occurs occurs but but train train AA seguencerfails.
sequencer fails. Train Train AA ECCS ECCS equipment must eguil2ment      must be be manually manually started.
started. The The crew crew coml2letes completes 3-EOP-E-0 3-EOP-E-0 and transitions and  transitions to to al2l2licable applicable FRPs FRPs followed followed by  by 3-EOP-E-1 3-EOP-E-1..
Time          Position
          ,~      Position                                  Applicants Actions Applicant's      Actions or or Behavior Behavior RD RO          Secures 3B Secures      3B RCPRCP Recognizes /I reports Recognizes          reports rapidly rapidly falling falling RCSRCS pressure pressure andand automatic automatic SI  SI NOTE: RO NOTE:      RD may may manually manually actuate actuate SI SI && phase phase AA in in response response to to train train A  sequencer failure.
A sequencer        failure.
BOP BOP          Recognizes /I reports Recognizes          reports loss loss ofof 3B 3B 4kV bus  bus with 3B 3B EDG EDG OOS.
DOS.
US US          Directs BOP restore 3D 4kV bus per step 3c RNO then verify prompt actions per 3-EOP-E-O Attachment 3.
Directs RO  RD continue performing 3-EOP-E-0 subsequent actions.
BOP BOP          Restores 3D 4kV bus per 3-EOP-E-O step 3c RNO:
: 1. Determines no lockout on 3D 4kV bus
: 2. Verifies 3C CCWP & 3C ICWP breakers open Critical Critical      3. Opens 3AB19 & 3AD06 4.
: 4. Closes 3ADOI3AD01 & 3AA17 Verifies prompt actions per          per 3-EOP-E-O 3-EOP-E-O Attachment 3:
1.
: 1. Determines Determines only    only 3A 3A &    3C 480V
                                                                      & 30  480V LCs LCs energized energized 2.
: 2. Determines Determines MSIVs  MSIVs all all closed closed (on(on hi-hi hi-hi containment containment pressure) pressure) 3.
: 3. Verifies Verifies FW FW isolation:
isolation:
a.
: a. Places Places both both SGFP SGFP switches switches in  in STOP.
STOP.
b.
: b. Determines Determines all    all main main FWFW regulating regulating && bypass bypass valves valves closed.
closed.
c.c. Closes Closes FW  FW isolation isolation valves valves MDV-3-1408 MOV-3-1408 && 1409. 1409. Directs Directs NSD NSO locally locally close close MDV-3-1407 MOV-3-1407.      .
d.d. Determines Determines both  both SSGFWPs SSGFWPs off. off.
Critical Critical      4.
: 4. Determines Determines no      no ICWP ICWP running running and  and starts starts 3A3A && 3C 3C ICWP ICWP 5.5. Determines Determines PDV-3-4882 POV-3-4882 && 4883  4883 closed closed with with lOW ICW headers headers tied tied together.
together.
88
 
Appendix DD Appendix                                      OperatorActions Operator      Actions                                          Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301            Scenario No.:
Scenario      No.: _3_ 3          Event No.:
Event      No.: _6_  6      Page-2...
Page      2 of_3_
of 3 Event


== Description:==
== Description:==


When 3B RCP is tril2l2ed, 3B 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A seguencerfails.
Event
Train A ECCS eguil2ment must be manually started. The crew coml2letes 3-EOP-E-0 and transitions to al2l2licable FRPs followed by 3-EOP-E-1 . ...,.., Position Applicant's Actions or Behavior RO Secures 3B RCP Recognizes
/ reports rapidly falling RCS pressure and automatic SI NOTE: RO may manually actuate SI & phase A in response to train A sequencer failure. BOP Recognizes
/ reports loss of 3B 4kV bus with 3B EDG OOS. US Directs BOP restore 3D 4kV bus per step 3c RNO then verify prompt actions per 3-EOP-E-O Attachment
: 3. Directs RO continue performing 3-EOP-E-0 subsequent actions. BOP Restores 3D 4kV bus per 3-EOP-E-O step 3c RNO: 1. Determines no lockout on 3D 4kV bus 2. Verifies 3C CCWP & 3C ICWP breakers open Critical 3. Opens 3AB19 & 3AD06 4. Closes 3AD01 & 3AA17 Verifies prompt actions per 3-EOP-E-O Attachment 3: 1. Determines only 3A & 3C 480V LCs energized
: 2. Determines MSIVs all closed (on hi-hi containment pressure)
: 3. Verifies FW isolation:
: a. Places both SGFP switches in STOP. b. Determines all main FW regulating
& bypass valves closed. c. Closes FW isolation valves MOV-3-1408
& 1409. Directs NSO locally close MOV-3-1407.
: d. Determines both SSGFWPs off. Critical 4. Determines no ICWP running and starts 3A & 3C ICWP 5. Determines POV-3-4882
& 4883 closed with ICW headers tied together.
8 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.: _6_ Page -2... of_3_ Event


== Description:==
== Description:==
When When 3B 3B RCP RCP isis tripped, tripped, 3B 3B 4kV 4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An  automatic      SI occurs. An automatic SI occurs  occurs butbut train train AA sequencer sequencer fails.fails. Train Train AA ECCS equipment ECCS    equipment must  must be    manually started.
be manually      started. TheThe crewcrew completes completes 3-  3-EDP-E-0 and EOP-E-O    and transitions transitions to  to applicable applicable FRPsFRPs followed followed by by 3-EOP-E-1.
3-EDP-E-1.
IImJ Time        Position__J Position                                  Applicants Actions Applicant's      Actions or  or Behavior Behavior BOP BOP          Continues prompt Continues        prompt action action verification verification per  per 3-EOP-E-0 3-EOP-E-0 Att. Aft. 3:
3:
Critical Critical      6.
: 6. Determines only Determines        only 3A3A CCWP CCWP running running and    and starts starts 3C 3C CCWP.
CCWP.
7.
: 7. Verifies 33 CCWHXs Verifies      CCWHXs in        service, CCW in service,    COW headers headers tied tied together together &&
MOV-3-626 MOV-3-626 open    open (no(no power).
power).
8.
: 8. Determines no Determines        no ECC EGO or or ECF ECF running.
running. Starts Starts 3C 30 ECCECC && 3C 30 nd ECF. No ECF. No power available to start    start 2 a 2      ECC  or  ECF.
NOTE: May NOTE:      May start 3A  3A HHSIP HHSIP but  but not required at this point.
: 9. Determines only the U4        U4 HHSIPs & no RHRPs      RHRPs running. Starts 3A RHRP.
: 10. Determines adequate HHSI flow present, but no RHR flow present even though RCS pressure <                  < 250[650]
250[650} psig.
: 11. Starts 3A HHSIP. Shuts down either unit 4 HHSIP. Directs U4 RD realign U4 HHSIP suction to U3 RWST per Att. 1.
RO
: 12. Determines not all containment isolation phase A valves closed. Directs NSO to locally verify phase A valves MOV                                  1417,    1418, 1425 & 381 closed 1417,1418,1425
: 13. Determines
: 13. Determines train A SI      SI valves in in proper injection injection alignment alignment
: 14. Resets SI
: 14.            SI & & containment isolation isolation phase A.      A. Determines Determines containment isolation isolation phase phase BB actuated.
actuated. ResetsResets phase phase BB when when containment pressure pressure << 20  20 psig.
psig.
: 15. Determines
: 15. Determines no    no ROPs RCPs running running (should (should have have been been tripped tripped byby RD RO due  to  inadequate      RCS due to inadequate RCS subcooling) subcooling) 16.
: 16. Determines Determines containment containment pressurepressure>      > 2020 psig.
psig.
Critical Critical          a.
: a. Manually Manually startsstarts 3A 3A CSP.
CSP. Determines Determines MDV-3-880A MOV-3-880A open. open.
b.b. Directs Directs NSONSO to  to locally locally verify verify phase phase BB valves valves MDV-3-626, MOV-3-626, 716B    &  730 716B & 730 closed closed c.c. Verifies Verifies allall RCPs RCPs stopped stopped 17.
: 17. Determines Determines containment containment ventilation ventilation isolated isolated andand verifies verifies control control room room ventilation ventilation inin proper proper emergency emergency recirculation recirculation alignment.
alignment.
99


When 3B RCP is tripped, 3B 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A sequencer fails. Train A ECCS equipment must be manually started. The crew completes 3-EOP-E-O and transitions to applicable FRPs followed by 3-EOP-E-1.
Appendix 0D Appendix                                      Operator Actions Operator      Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
I Time Position BOP Critical Critical Applicant's Actions or Behavior Continues prompt action verification per 3-EOP-E-0 Att. 3: 6. Determines only 3A CCWP running and starts 3C CCWP. 7. Verifies 3 CCWHXs in service, CCW headers tied together & MOV-3-626 open (no power). 8. Determines no ECC or ECF running. Starts 3C ECC & 3C ECF. No power available to start a 2 nd ECC or ECF. NOTE: May start 3A HHSIP but not required at this point. 9. Determines only the U4 HHSIPs & no RHRPs running. Starts 3A RHRP. 10. Determines adequate HHSI flow present, but no RHR flow present even though RCS pressure < 250[650] psig. 11. Starts 3A HHSIP. Shuts down either unit 4 HHSIP. Directs U4 RO realign U4 HHSIP suction to U3 RWST per Att. 1. 12. Determines not all containment isolation phase A valves closed. Directs NSO to locally verify phase A valves MOV-3-1417,1418,1425
Op-Test No.:   2007-301 2007-301            Scenario No.:
& 381 closed 13. Determines train A SI valves in proper injection alignment
Scenario     No.: _3_ 3          Event No.:
: 14. Resets SI & containment isolation phase A. Determines containment isolation phase B actuated.
Event     No.: _6_6      Page ~
Resets phase B when containment pressure < 20 psig. 15. Determines no RCPs running (should have been tripped by RO due to inadequate RCS subcooling)
Page       3 of of _3_3 Event
: 16. Determines containment pressure>
20 psig. a. Manually starts 3A CSP. Determines MOV-3-880A open. b. Directs NSO to locally verify phase B valves MOV-3-626, 716B & 730 closed c. Verifies all RCPs stopped 17. Determines containment ventilation isolated and verifies control room ventilation in proper emergency recirculation alignment.
9 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.: _6_ Page of _3_ Event


== Description:==
== Description:==


When 3B RCP is tripped, 3B 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A sequencer fails. Train A ECCS equipment must be manually started. The crew completes 3-EOP-E-O and transitions to applicable FRPs followed by 3-EOP-E-1.
Event
Time Position Applicant's Actions or Behavior BOP Continues prompt action verification per 3-EOP-E-0 Attachment 3: 18. Directs NSO place PAHMS in service per 3-0P-094.
 
: 19. Verifies 3A & both U4 EDGs running (3B EDG is OOS). 20. Determines 3A & 3D 4kV buses still energized.
== Description:==
When 3B When     3B RCP RCP isis tripped, tripped, 3B 3B 4kV 4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An occurs. An automatic automatic SI  SI occurs occurs butbut train train AA sequencer sequencer fails.
fails. Train Train AA ECCS equipment ECCS    equipment must  must bebe manually manually started.
started. The The crew crew completes completes 3-   3-EOP-E-0 and EOP-E-O     and transitions transitions to      applicable FRPs to applicable       FRPs followed followed by by 3-EOP-E-1.
3-EOP-E-1.
Time_j Time       Position Position                               Applicants Actions Applicant's     Actions or or Behavior Behavior BOP BOP          Continues prompt Continues       prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3:  3:
: 18. Directs
: 18. Directs NSO NSO place place PAHMS PAHMS in   in service service per per 3-0P-094.
3-OP-094.
: 19. Verifies 3A
: 19.              3A & & both both U4 U4 EDGs EDGs running running (3B(3B EDG EDG is  is OOS).
DOS).
: 20. Determines 3A & 3D 4kV buses still energized.
: 21. Notifies US that prompt action verification complete.
: 21. Notifies US that prompt action verification complete.
RO Performs foldout page actions of 3-EOP-E-0 as directed:
RO         Performs foldout page actions of 3-EOP-E-0 as directed:
: 1. Determines containment conditions adverse (>180&deg;F) 2. Trips RCPs since RCS subcooling  
: 1. Determines containment conditions adverse (>180&deg;F)
< 25[65tF with U4 HHSIPs running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0 as directed 1. Determines 2 AFWPs (A & C) running. 2. Determines AFW valve alignment proper except that MOV-3-1404 did not open. 3. Determines SG levels < 6[32]%. Controls AFW flow> 345 gpm until level > 6[32]% then maintains levels 15-50%. 4. Determines annunciators A-1/2 and/or 1/3 on. If RCP seal return temps all < 235&deg;F, verifies SI reset then starts 3A charging pump at minimum speed and adjusts HCV-3-121 for proper seal injection flow 5. Determines Tc trend. If decreasing, reduces AFW flow to:::: 345 gpm until any SG level> 6[32]%. 6. Determines PORVs, normal spray, aux spray  
: 2. Trips RCPs since RCS subcooling <                   25[65]&deg;F with U4 HHSIPs
& excess letdown isolation valves closed 7. Verifies RCPs tripped (tripped earlier on foldout page) 8. Determines no SGs depressurized or depressurizing
                                                                                  < 25[65tF running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0           3-EOP-E-O as directed
: 9. Determines no SG tube ruptures 10. Determines ReS not intact; containment radiation, pressure & sump level all not normal. 10 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _ 3_ Event No.: Page_1 _ of -.L Event
: 1. Determines 2 AFWPs (A & C) running.
: 2.     Determines AFW valve alignment proper except that MOV                                 1404 1404 diddid not open.
3.
: 3. Determines Determines SG  SG levels levels << 6[32]%.
6[32]%. Controls Controls AFW flow> 345 gpm        gpm until level >> 6[32]% then maintains levels       levels 15-50%.
15-50%.
4.
: 4. Determines Determines annunciators annunciators A-1/2  A-1/2 and/or and/or 1/31/3 on.
on. IfIf RCP RCP seal seal return temps all   all << 235&deg;F, 235&deg;F, verifies verifies SISI reset then then starts starts 3A3A charging charging pump pump at at minimum minimum speed speed andand adjusts adjusts HCV-3-121 HCV-3-121 for  for proper proper seal seal injection injection flow flow 5.
: 5. Determines Determines Tc   Tc trend.
trend. IfIf decreasing, decreasing, reduces reduces AFWAFW flow flow to to:::: 345 345 gpm  until gpm until any any SGSG level level> > 6[32]%.
6[32]%.
6.
: 6. Determines Determines PORVs, PORVs, normal normal spray, spray, aux   spray && excess aux spray        excess letdown letdown isolation isolation valves valves closed closed 7.
: 7. Verifies Verifies RCPs RCPs tripped tripped (tripped (tripped earlier earlier onon foldout foldout page)page) 8.
: 8. Determines Determines no  no SGs SGs depressurized depressurized or     or depressurizin depressurizing   g 9.9. Determines Determines no  no SG     tube ruptures SG tube      ruptures 10.
: 10. Determines Determines RCS  ReS not not intact; intact; containment containment radiation, radiation, pressure pressure &&sump sump levellevel all    not normal.
all not   normal.
10 10
 
Appendix DD Appendix                                        Operator Actions Operator       Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.:    2007-301 2007-301        Scenario No.:
Scenario       No.: _ 3_3        Event No.:
Event     No.: ~  6a          Page_1 Page _iof  of -.L2 Event
 
== Description:==
 
Event  


== Description:==
== Description:==
Once Once CSFSTs CSFSTs are    are monitored monitored for  for imQlementation, implementation, ifif containment containment pressure isis still r2ressure      still above above 2020 Qsig, psig, the the crew    immediately transitions crew immediately        transitions toto 3-3-
EOP-FR-Z.1 ifif no EOP-FR-Z.1            no higher higher redred oror orange orange r2ath path exists exists..
Time lillie    Position_j Position                                Applicants Actions Applicant's      Actions or  or Behavior Behavior Directs monitoring Directs  monitoring of  of CSFs CSFs for  for implementation.
implementation.
US US        If any RCS If any  RCS cold cold legleg temperature temperature drops    drops below        320&deg;F (orange) below 320&deg;F      (orange) or or 290&deg;F (red) 290&deg;F    (red) transitions transitions to  to and and directs directs response response per  per 3-EOP-FR-P.1 3-EOP-FR-P.1 Performs actions actions per 3-EOP-FR-P.1 3-EOP-FR-P.1 as        as directed by  by US:
US:
RO        1.
: 1. Determines        RCS    pressure      << 250[650]
250[650J psig with> 1000    1000 gpm RHR flow (indication of LBLOCA)
Transitions out of 3-EOP-FR-P.1 3-EOP-FR-P1 (due to LBLOCA indication) us US                              pressure > 20 psig, CSFSTs are being monitored If containment pressure>
for implementation implementation and no higher red or orange path exists, transitions to and directs response per 3-EOP-FR-Z.1        3-EOP-FR-Z.1 RO                                  3-EOP-FR-Z.1 as directed by US:
Performs actions of 3-EOP-FR-Z.1
: 1. Determines all RCPs secured.
: 2. Stops any running NCCs
: 3. Determines containment isolation phases A &                    & BB already verified
: 4. Determines containment ventilation isolated and verifies control room ventilation in    in proper proper emergency recirculation alignment. alignment.
US US        Determines Determines no    no RHRP available.
available. IfIf 3-EOP-ECA 3-EOP-ECA-1.1          entered, determines
                                                                                            -1 .1 entered,    determines number number of  of CSPs CSPs required required fromfrom 3-EOP-ECA 3-EOP-ECA-1.1          and skips
                                                                                        -1 .1 and    skips to to step step 9.9.
RO RO        Continues Continues performing performing 3-EOP-FR-Z 3-EOP-FR-Z.1          actions as
                                                                            .1 actions    as directed directed byby US:
US:
: 1. Determines
: 1. Determines RWST            level> 155000 RWST level>          155000 gal gal && MOV-3-864A MOV-3-864NB          open 1B open 2.
: 2. Determines Determines 3A    3A CSP CSP running running &&3B  3B CSP CSP ODSOOS
: 3. Determines
: 3. Determines MOV-3-880A MOV-3-880A open    open &&MOV-3-880B MOV-3-880B closed!  closed/
deenergized deenergized under  under ECO ECO
: 4. Determines
: 4. Determines 33 CCWHXCCWHX in        service &&22 CCWP in service          CCWP running running (3A(3A &&3C) 3C) 5.5. Determines Determines only  only 3C 3C ECCECC running running (no(no power power to to other other two) two) with with associated associated bypass, bypass, inlet inlet &&outlet outlet open.
open.
6.6. Determines Determines only        3C ECF only 3C    ECF running running (no (no power power to to other other two) two) 11 11


Once CSFSTs are monitored for imQlementation, if containment r2ressure is still above 20 Qsig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange r2ath exists . ..,..., lillie Position Applicant's Actions or Behavior Directs monitoring of CSFs for implementation.
Appendix DD Appendix                                    OperatorActions Operator    Actions                                 Form Form ES-D-2 ES-D-2 Op-Test No.:
US If any RCS cold leg temperature drops below 320&deg;F (orange) or 290&deg;F (red) transitions to and directs response per 3-EOP-FR-P.1 Performs actions per 3-EOP-FR-P.1 as directed by US: RO 1. Determines RCS pressure < 250[650] psig with> 1000 gpm RHR flow (indication of LBLOCA) Transitions out of 3-EOP-FR-P.1 (due to LBLOCA indication)
Op-Test  No.:  2007-301 2007-301      Scenario No.:
US If containment pressure>
Scenario      No.: _3_3      Event No.:
20 psig, CSFSTs are being monitored for implementation and no higher red or orange path exists, transitions to and directs response per 3-EOP-FR-Z.1 RO Performs actions of 3-EOP-FR-Z.1 as directed by US: 1. Determines all RCPs secured. 2. Stops any running NCCs 3. Determines containment isolation phases A & B already verified 4. Determines containment ventilation isolated and verifies control room ventilation in proper emergency recirculation alignment.
Event   No.: ~  6a          Page 2 2 of Page        of 22 Event
US Determines no RHRP available.
If 3-EOP-ECA-1.1 entered, determines number of CSPs required from 3-EOP-ECA-1.1 and skips to step 9. RO Continues performing 3-EOP-FR-Z.1 actions as directed by US: 1. Determines RWST level> 155000 gal & MOV-3-864NB open 2. Determines 3A CSP running & 3B CSP OOS 3. Determines MOV-3-880A open & MOV-3-880B closed/ deenergized under ECO 4. Determines 3 CCWHX in service & 2 CCWP running (3A & 3C) 5. Determines only 3C ECC running (no power to other two) with associated bypass, inlet & outlet open. 6. Determines only 3C ECF running (no power to other two) 11 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.: Page 2 of 2 Event


== Description:==
== Description:==


Once CSFSTs are monitored for imQlementation, if containment Qressure is still above 20 Qsig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange Qath exists. Time Position Applicant's Actions or Behavior BOP Performs actions of 3-EOP-FR-Z.1 as directed by US: 1. Directs NSO verify CSP suction & discharge valves open. 2. Determines MSIVs closed 3. Determines no SGs faulted US Directs return to procedure and step in effect 12 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.: --2L Page _1_ of --.L Event
Event  


== Description:==
== Description:==
Once Once CSFSTs CSFSTs are    are monitored monitored for for imQlementation, implementation, ifif containment containment pressure isis still Qressure      still above above 20 20 Qsig, psig, the the crew crew immediately immediately transitions transitions to to 3-3-
EOP-FR-Z.1 ifif no EOP-FR-Z.1          no higher  red or higher red  or orange orange Qath path exists.
exists.
Time Time      Position__[
Position                              Applicants Actions Applicant's    Actions or or Behavior Behavior BOP BOP      Performs actions Performs    actions ofof 3-EOP-FR-Z.1 3-EOP-FR-Z.1 as  as directed directed by by US:
US:
1.
: 1. Directs NSO Directs      NSO verify verify CSP CSP suction suction && discharge discharge valves valves open.
open.
2.
: 2. Determines MSIVs Determines        MSIVs closed closed 3.
: 3. Determines no Determines        no SGs SGs faulted US US      Directs return to procedure and step in Directs                                          in effect 12 12


3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is running. transition is made to 3-EOP-ECA-1.1.
Appendix DD Appendix                                      Operator Actions Operator    Actions                                 Form Form ES-D-2 ES-D-2 Op-Test No.:
Measures are taken to minimize the loss of RWST inventory.
Op-Test No.:   2007-301 2007-301          Scenario No.:
Position Applicant's Actions or Behavior US Directs transition to and performance of 3-EOP-E-1.
Scenario      No.: _3_ 3    Event   No.: --2L Event No.:    6b          Page Page _1_ 1 ofof --.L 3
NOTE: Performance of 3-0NOP-004.3 is optional since there is no source of power and EOP actions are higher priority.
Event
Conducts crew brief. RO Performs actions of 3-EOP-E-1 as directed by US: 1. Determines RCPs not running 2. Determines power to one PORV block MOV available, PORVs closed & both PORV block MOVs open 3. Verifies SI reset 4. Determines only 3A charging pump has power available and pump is running at minimum speed for seal injection.
: 5. Places RCS makeup control switch to stop 6. Establishes maximum flow using 3A charging pump 7. Opens LCV-3-115B
& directs NSO locally close MOV-3-115C.
BOP Performs actions of 3-EOP-E-1 as directed by US: 1. Determines SGs not faulted. 2. Controls AFW flow> 345 gpm until level> 6[32]% then maintains levels 15-50%. 3. Directs Chemistry sample SGs for activity & check DAM-1 4. Directs HP take radiation readings on main steam lines 5. Verifies containment isolation phase A & B reset. 6. Verifies CV-3-2803 open & IA pressure>
95 psig US Determines SI can not be terminated (inadequate subcooling, RCS pressure & PZR level) 13 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.:--.illL Page --L of 3 Event


== Description:==
== Description:==


3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is running, transition is made to 3-EOP-ECA-1.1.
Event
Measures are taken to minimize the loss of RWST inventory.
Time Position Applicant's Actions or Behavior RO Continues performing 3-EOP-E-1 actions as directed by US. 1. Determines 3A CSP should continue running since containment temperature>
122&deg;F. 2. Determines RCS pressure < 250[650] psig. Recognizes/reports 3A RHRP tripped with RHR flow < 1000 gpm 3. Determines RCS pressure stable/decreasing BOP Continues performing 3-EOP-E-1 actions as directed by US: 1. Determines SG pressures stable 2. Determines 3A 4kV bus on offsite power & 3B 4kV bus deenergized
: 3. Directs U4 RO verify one computer room chiller running 4. Stops 3A EDG. Directs NSO complete shutdown per 3-0P-023.
Directs U4 RO stop U4 EDGs and have them placed in standby. US Determines no RHRP available.
Directs transition to 3-EOP-ECA-1.1 Conducts EOP transition crew brief RO Performs actions of 3-EOP-ECA-1.1 as directed by US: 1. Determines RWST level> 60000 gallons 2. Determines cold leg recirc capability not available Critical 3. Aligns makeup to U3 RWST a. Determines CVCS makeup stopped b. Directs NSO verify 3-356 closed, then open 3-365A & B c. Places FCV-3-113A in AUTO, FCV-3-114A in OPEN, FCV-3-113B & 114B in CLOSE d. Determines MOV-3-350 closed. e. Places FCV-3-113A
& 114A controllers in MANUAL f. Places RCS makeup selector switch to BORATE g. Sets BA totalizer to maximum and starts makeup h. Adjusts PW & BA flow for max flow at 1.5:1 blend 14 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _3_ Event No.:
of _3_ Event


== Description:==
== Description:==
3-EOP-E-1 is 3-EOP-E-1      is entered entered after after which which 3A3A RHRP RHRP trips.
trips. Since Since neither neither RHRP RHRP isis running,  transition running. transition is    is made made to to 3-EOP-ECA-1.1.
3-EOP-ECA-1.1. Measures Measures are are taken taken toto minimize the minimize    the loss loss ofof RWST RWST inventory.
inventory.
Time_J__Po  sition Position                                Applicants Actions Applicant's  Actions oror Behavior Behavior US US        Directs transition to and performance Directs                            performance of 3-EOP-E-1.
NOTE: Performance NOTE:      Performance of        3-ONOP-004.3 is of 3-0NOP-004.3      is optional optional since since there there is is no no source of power and EOP actions are higher priority.
Conducts crew brief. brief.
RO        Performs actions of 3-EOP-E-1 as directed by US:
: 1. Determines RCPs not running
: 2. Determines power to one PORV block MOV available, PORVs closed & both PORV block MOVs open
: 3. Verifies SI reset
: 4. Determines only 3A charging pump has power available and pump is running at minimum speed for seal injection.
: 5. Places RCS makeup control switch to stop
: 6. Establishes maximum flow using 3A charging pump
: 7. Opens LCV-3-1 LCV-3-115B 1 5B & directs NSO locally close MOV-3-1MOV-3-115C.15G.
BOP        Performs actions of 3-EOP-E-1 as directed by US:
: 11. Determines
                            . Determines SGs  SGs notnot faulted.
: 2. Controls Controls AFW flow> 345 gpm        gpm until level level> > 6[32]% then maintains levels levels 15-50%.
15-50%.
3.
: 3. Directs Directs Chemistry Chemistry sample sample SGs SGs for activity activity & check DAM-I DAM-1 4.
: 4. Directs Directs HP    take radiation readings on HP take                          on main main steam steam lines lines
: 5. Verifies
: 5. Verifies containment isolation isolation phase phase A A && BB reset.
reset.
: 6. Verifies
: 6. Verifies GV-3-2803 CV-3-2803 open  open && IA IA pressure pressure>    95 psig
                                                                                > 95  psig US US        Determines Determines SI    SI can can not not bebe terminated terminated (inadequate (inadequate subcooling, subcooling, RGS RCS pressure pressure && PZR PZR level) level) 13 13


3-EOP-E-1 is entered after which 3A RHRP tri(2s. Since neither RHRP is running, transition is made to 3-EOP-ECA-1.1.
Appendix DD Appendix                                      OperatorActions Operator    Actions                                 Form Form ES-D-2 ES-D-2 Op-Test No.:
Measures are taken to minimize the loss of RWST inventory.
Op-Test  No.:     2007-301 2007-301         Scenario No.:
Time Position Applicant's Actions or Behavior BOP Perform actions of 3-EOP-ECA-1.1 as directed by US. 1. Controls AFW flow> 345 gpm until level> 6[32]% then maintains levels 15-50%. US Determines RCS cooldown rate has exceeded 1 OO&deg;F/hr and no additional forced cooldown required RO Continues performing 3-EOP-ECA-1.1 actions as directed by US: 1. Determines only 1 ECC running & available.
Scenario     No.: _3_3      Event No.:--.illL Event   No.: 6b            Page --L Page    2 of of 33 Event
: a. Determines phase A reset b. Directs NSO open MOV-3-1417
& 1418 c. Resets & starts 2 available NCCs 2. Directs U4 RO verify at least 1 computer room chiller running US Determines CSP suction aligned to RWST. Directs running CSP secured if containment pressure < 14 psig. RO Continues performing 3-EOP-ECA-1.1 actions as directed by US: 1. Determines 2 HHSIPs running (3A & one U4 pump) 2. Verifies SI reset Critical 3. Stops 1 HHSIP 4. Determines RCS pressure < 250[650] psig, RHR flow < 1000 gpm and no RHRPs available
: 5. Determines no recirc sump suction lines open. Closes MOV-3-862A (no power to 862B) US 1. Determines RCS subcooling inadequate for RCP start & 51 termination.
Critical 2. Determines minimum 51 flow per Figure 1. Directs NSO throttle running HHSIP discharge to achieve minimum 51 flow TERMINATING Scenario is complete when HHSI flow is reduced to minimum. CUE 15 Appendix D Scenario Outline Form ES-D-1 Facility:
Turkey Point Scenario No.: 3 Op Test No.: 2007-301 Examiners:
Candidates:
US RO BOP Initial Conditions:
Mode 1, 75% Power, MOL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for retum to 100% power following a turbine valve test. Turnover:
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 & 9 in 4 hrs); B APN Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Perform monthly surveillance on 3A ECC per 3-0SP-055.1 section 7.1 immediately after shift turnover.
1ST and remote valve position verification not required.
Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) BOP 3A ECC monthly surveillance performed per 3-0SP-055.1 section 7.1. 3A TFKV905A=T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS. (N,TS) SRO 2 (I) SRO/RO TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8CH = T ONOP-028 and takes rods to manual to stop continuous inward rod movement.
3 (C) RO/BOP Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF & 3D TFE3D37A =T (C,TS) SRO NCC OOS. Requires starting another charging pump or securing the in TFE3D38T = T service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4. 4 TAKPXA1=10.0 (C) SRO/BOP 3A 1 Intake screen high t:.p. Crew responds per 3-0NOP-011.
3A 1 CWP is TAKPXA2 = 4.0 secured. 4a (R) ALL 3A2 Intake screen high t:.p. Fast load reduction per 3-0NOP-100 to 60% for TAKPXA2 = 1.0 the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure. 5 TAHUVBSB=22 (M) ALL 3B RCP high vibration.
The crew responds per 3-0NOP-041.1.
Once TAHUVBMB=
6 vibration reaches the trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-0 are performed.
6 (M)ALL When 3B RCP is tripped, 3B 4kV bus is lost and a large break LOCA occurs. TFE2Z51S = T (cont'd from An automatic SI occurs but train A sequencer fails. Train A ECCS equipment TVHHCLB = 0.1 event 5) must be manually started. The crew completes 3-EOP-E-0 and transitions to TFQ634AF=T (C) ALL applicable FRPs followed by 3-EOP-E-1.
6a Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists. 6b (C) SRO/RO 3-EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT = T running, transition is made to 3-EOP-ECA-1.1.
Measures are taken to minimize the loss of RWST inventory.
.. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 TP-2007-301 Scenario #3 Event Description Turkey Point 2007-301 Scenario #3 Event 1 -3A ECC monthly surveillance performed per 3-0SP-055.1 section 7.1. 3A ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared Event 2 -TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-0NOP-028 and takes rods to manual to stop continuous inward rod movement.
Event 3 -Loss of 3H 480V LC. Also takes 3C charging pump, 38 ECC, 38 ECF & 3D NCC Requires starting another charging pump or securing the in service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4. Event 4 -3A 1 intake screen high Crew responds per 3-0NOP-011.
3A 1 CWP is secured. Event 4a -3A2 intake screen high Fast load reduction per 3-0NOP-100 to 60% for the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure. Event 5 -38 RCP high vibration.
The crew responds per 3-0NOP-041.1.
Once vibration reaches either shaft or motor trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-0 are performed.
Event 6 -When 38 RCP is tripped, 38 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A sequencer fails. Train A ECCS equipment must be manually started. The crew completes 3-EOP-E-0 and transitions to applicable FRPs followed by E-1. Event 6a -Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.1 if no higher red or orange path exists. Event 6b EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is running, transition is made to 3-EOP-ECA-1.1.
Measures are taken to minimize the loss of RWST inventory.
2 TP-2007-301 Scenario #3 Event Description Scenario XXIII NRC 3 Simulator Operating Instructions Setup IC-16 (75% MOL) Place simulator in run Trigger lesson steps: SETUP -3B EDG ODS (actuatesTAQ5LRSB
= OFF & TAQ5B20P = RACKOUT) SETUP -B AFWP ODS (actuates TAFK244 = 0.0, TAFK002 = 0.0, TAFF01B = 0.0, TCF5MTB = T) SETUP -3A SG 2 GPD LEAK (actuates TVHHSGA = 0.0000013)
SETUP -3B CSP ODS (actuates TAM1DPOB = RACKOUT (3) & TCM1D41M = FALSE (0>> SETUP -TRAIN A SEQUENCER FAIL (actuates TFQ634AF = T) Acknowledge annunciators F-9/2 & 9/5 (3B EDG Start train A chilled water and secure train B chilled water (CR HVAC panel). Place simulator in freeze. Place clearance info tags on 3B EDG normal start switch, B AFWP T& T valve control switch & 3B CSP control switch. Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X. Provide shift turnover checklists, 3-0NOP-071.2 Att 1 and a copy of 3-0SP-055.1 section 7.1 & Attachment 1 filled out thru step 7.1.5. 3-0SP-055.1 is being performed without quarterly 1ST or remote position verification required.
Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to TavglTref (TAV) and at the RCO desk to ENVRN (ED3). Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator IIF. Event 1 -3A ECC asp failure Initiated at crew direction based on shift turnover beginning at step 7.1.6. Immediately after CV-3-2905 closes in response taking 3A ECC to STOP, trigger lesson step EVENT 1 -3A ECC INLET FAIL AS IS (actuates TFKV905A = T). The crew performs 3-0SP-055.1 sect. 7.1 to test 3A ECC beginning at step 7.1.6. Quarterly 1ST and remote position verification are not required.
Inlet valve GV-3-2905 fails to open. 3A EGG is stopped and declared Respond as NSO for steps 7.1.14 & 7.1.15. Indicate that he has portable ammeter in hand. When directed to measure 3A ECC fan current at 3B MCC (bkr 30650), report 22 amps indicated.
3 TP-2007-301 Scenario #3 Event Description Respond as NSO if asked to locally check Train A ECC CCW flow on FI-3-1472.
After 1-3 minutes, report that flow indicates zero. Respond as WCC when directed to have Mechanical maintenance investigate failure of CV-3-2905 to open. Respond as WCC if directed to take 3A ECC breaker 30650 to OFF and place it under clearance.
After 8-12 min, trigger lesson step EVENT 1 -3A ECC BKR TO OFF (actuates TCC1DMG = F) Event 2 -TM-3-408C Tavg input to rod control fails high Once 3A ECC stopped and declared 005, trigger lesson step EVENT 2 -TM-3-408C FAILS HIGH (actuates TFL 1T8CH = T). This fails Tavg input to rod control high causing maximum speed control rod insertion.
The operators respond per 3-0NOP-028 and take rod control to manual to stop inward rod movement.
This failure does not fail median Tavg for other control purposes. Tref recorder TR-3-408 continues to function.
Respond as WCC when directed to have I&C investigate failure of rod control. Respond as WCC if directed to generate a caution tag to be hung on the rod control selector switch Event 3 -Loss of 3H 480V LC After 3A2 CWP secured, trigger lesson step EVENT 3 -LOSS OF 3H LC (actuates TFE3D37A = T, then TFE3D38T = T after a 5 sec delay). This causes a loss of 3H 480V LG and along with it 3G charging pump, 38 EGG, 38 EGF&3DNGG.
The crew responds per 3-ARP-097.
GR for annunciators F-916, 1-913, 1-914 or A-514 and may enter 3-0NOP-041.
: 6. Since 3G charging pump was running, 38 charging pump is started per 3-0NOP-041.6.
Failure also puts plant in a 1hr shutdown plant action statement per TS 3.6.2.2.b since only 1 EGG is left operable.
Respond if directed to check out 3H 480V LC. After 1-3 min, report bkr 35001 feeder from 3D 480V LC tripped open with scorch marks and a burnt insulation smell. 35007 doesn't appear to have closed in (still open). Report no evidence of fire. Respond as WCC when directed to have electrical check into the loss of 3H LC. After 8-12 min, call as WCC and relay recommendation from Electrical maintenance that 3H 480V LC remain deenergized until further evaluation of the LC can be performed.
4 TP-2007-301 Scenario #3 Event Description Respond as NSO if directed to do pre-start
& post-start checks on 3B charging pump. Report all conditions normal. Respond as NSO if directed to locally control CCW to NRHX flow to maintain letdown temperature.
Click on Schema-tCOMMON SERVICES-tCOMPONENT COOLING-t valve 834-tTAKA834 BYP AROUND TCV-144-tadjust value as desired and INSERT. Respond as WCC/Mechanical if asked about status of 3A ECC since plant is now in 1 hr shutdown action statement.
Report mechanics are investigating the CV-3-2905 failure. Event 4/4a -3A1/3A2 intake screen clogging I Fast load reduction Upon completion of TM-3-408C crew brief, trigger lesson step EVENT 4 -3A1/3A2 INTAKE CLOGGING (actuates TAKPXA1 = 10.0 & TAKPXA2 = 4.0). The crew responds per 3-0NOP-011.
First 3A 1 CWP is secured per 3-0NOP-011.
When directed as NSO to check screen wash pump basket strainer Llp, click on AREA & SCREEN strainer Llp's in lower right corner of intake area & screen wash system mimic. Value reported should be < 10 psid. When directed as NSO to report status of unit 3 traveling screens, report that they are operating in high gear, are rotating.
Specific data such as waterfall height, screen Llp and screen wash pressure can be determined from the intake area & screen wash system mimic accessed earlier. ICW to CCWITPCW flows and basket strainer Llp's can be determined by clicking on requested parameters shown on the ICW system mimic. Notify BOP when waterfall height in the 3A1 intake well reaches 2.5 feet as determined by subtracting 3A 1 intake well level from indicated intake level as shown on the intake area & screen wash system mimic. Respond if called as FS/WCC regarding issuance of an ECO and manual cleaning of on 3A1 traveling screen. To take 3A1 traveling screen out of service, trigger lesson step EVENT 4 -3A1 TRAVELING SCREEN OOS FOR CLEANING (actuates TCKPD24M = F). To return 3A1 traveling screen to service, trigger lesson step EVENT 4 -3A1 TRAVELING SCREEN RETURN TO SERVICE (actuates TCKPD24M = T). Immediately after 3A1 CWP secured, trigger lesson step EVENT 4 -3A2 INTAKE REDUCED CLOGGING (actuates TAKPXA2 = 2.0). The crew reduces power per 3-0NOP-100 from 75% to <60% for the purpose of securing 3A2 CWP. 5 TP-2007-301 Scenario #3 Event Description In view of the slowly increasing on 3A2 traveling screen, crew should elect to perform a fast load reduction per 3-0NOP-1 00. At lead examiner direction, prompt this decision if necessary by calling as SM and asking for status to help crew understand problem is not going away. Additionally, call as NSO at intake structure and report debris still coming down intake canal collecting mostly around the canal banks. Respond as NSO if directed to close 3-30-002 & 3-30-004 to allow stopping the 3A2 CWP. After 1-3 min, trigger lesson step EVENT 4 -CLOSE 3-30-002/004 (actuates TAFB002 = 0.0 then TAFB004 = 0.0 30 sec later.) Report when complete.
Respond as NSO if directed to listen for seal well solenoid valve closure. Event 5 -38 RCP high vibration I Reactor trip After a 5-10% power change, trigger lesson step EVENT 5 -3B RCP HIGH VIBRATION (actuates TAHUVBSB = 22.0 on 5 min ramp & TAHUVBMB = 6.0 on 5 min ramp). The crew responds per 3-0NOP-041.
: 1. Once motor & shaft vibration reach the trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-O are performed.
Respond if notified as system engineer of increasing vibration on 38 RCP motor & shaft. Event 6 -Large break LOCA I Loss of emergency coolant recirculation Tripping 3B RCP auto triggers lesson step EVENT 6 -LARGE BREAK LOCA (actuates TVHHCLB = 0.1 when H20L09G) and EVENT 6 -3B 4KV BUS LOCKOUT (actuates TFE2Z51S = Twhen H20L09G).
The crew performs 3-EOP-E-O and must manually start train A ECGS loads due to failure of 3A sequencer entered at setup. 3A 4kV bus remains on offsite power. Respond as NSO when directed to locally close MOV-3-1407.
After 4-6 min, trigger lesson step EVENT 6 -CLOSE MOV-3-1407 (actuates TFVV07C = F). Report when complete.
Respond as NSO if directed to locally open MOV-3-8438.
After 1-3 min., trigger lesson step EVENT 6 -OPEN MOV-3-843B (actuates TFMVV020 = T). Report when complete.
Respond as U4 RO when directed to perform 3-EOP-E-0 Att 1 to align U4 HHSIPs to U3 RWST. After 1-3 min, trigger lesson step EVENT 6 -ALIGN U4 HHSIP TO U3 RWST (actuates TAMH1V41 = 1.0, TAMH1V46 = 1.0 after 1 min delay, TAMH1V37 = 0.0 after 2 min delay, TAMH4856 = 0.0 after 3 min delay). Report when complete.
Respond as NSO when directed to locally verify phase A valves MOV-3-1417, 1418, 1425 & 381 closed (all of which are in the U3 Pipe & Valve Room). After 1-3 min, 6 TP-2007-301 Scenario #3 Event Description trigger lesson step EVENT 6 -CLOSE PHASE A ISOL VALVES (actuates TFKV417C = T, TFKV418C = T after 1 min delay, TFBV60 = T after 2 min delay & TFSWVM5B = T after 3 min delay). Report when complete.
Respond as NSO when directs to locally verify phase B valves MOV-3-626, 716B & 730 closed(all of which are in the U3 Pipe & Valve Room). After 1-3 min, trigger lesson step EVENT 6 -CLOSE PHASE B ISOL VALVES (actuates TFKv626C = T, TFKV16BC = T after 1 min delay & TFKv730C = T after 2 min delay). Report when complete.
Respond as NSO when directed to place PAHMS in service on unit 3. After 8-12 minutes, trigger lesson step EVENT 6 -PLACE U3 PAHMS IN SERVICE (actuates TAC2V02A = 1.0, TAC2V02B = 1.0, TMAV21 = 1.0, TAAAV22 = 1.0 & TACA005 = 0.0). Report when complete.
Transition is made from 3-EOP-E-O to 3-EOP-FR-P.
1 which is quickly exited due to the presence of low head SI flow in response to the LBLOCA. Event 6a -Respond to High Containment Pressure Once CSFSTs are monitored for implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z.
1 if no higher red or orange path exists. Respond as NSO if directed to check CSP suction & discharge valves open. After 1-3 min., report that 3A CSP suction & discharge valves are open while 3B CSP suction & discharge valves are closed and under an ECO. Event 6b -Respond to LBLOCA with no emergency coolant recirc The crew transitions to 3-EOP-E-1 and then to 3-EOP-ECA-1.1 after it is determined that neither RHRP is available to support cold leg recirculation After 3-EOP-E-1 is entered, trigger lesson step EVENT 6b -3A RHRP TRIP (actuates TFM1D3AT = T). Respond as NSO when directed to investigate loss of 3A RHRP. After 1-3 min., report back motor very hot especially at bottom of motor casing (failed bearing).
Respond as Chemistry when directed to sample SGs for activity & check DAM-1 and as HP when directed to perform radiation readings on main steam lines. After 10-15 min. report no signs of activity or radiation levels above background.
Respond as NSO when directed to locally close 3-297 AlBIC. After 1-3 min, trigger lesson step EVENT 6b -LOCALLY CLOSE 3-297 AlBIC (actuates TAHN97A = 0.0, TAHN97B = 0.0 1 min. later & TAHN97C = 0.0 2 min. later.). 7 TP-2007-301 Scenario #3 Event Description Respond as NSO when directed to locally close LCV-3-115C.
After 1-3 min, trigger lesson step EVENT 6b -LOCALLY CLOSE LCV-3-115C (actuates TFBVC62 = T). Report when complete.
Respond as U4 RO when directed to start one train of chilled water for computer room cooling. Respond as U4 RO when directed to shutdown U4 EDGs. Respond as NSO when directed to complete shutdown of 3A, 4A & 48 EDGs per 3/4-0P-023.
Respond as NSO when directed to verify 3-356 closed, then open 3-365A & 8. After 1-3 min., trigger lesson step EVENT 6b -ALIGN CVCS M/U TO RWST (actuates TABM365B = 1.0). Report when complete.
Respond as NSO when asked to verify MOV-3-350 closed. After 1-3 min., report valve closed. Respond as NSO when directed to locally open MOV-3-1417
& 1418. After 1-3 min, trigger lesson step EVENT 6b -OPEN CCW TO NCCs (actuates TFKV417C = F, TFKV418C = F, TFKV4170 = T after 5 sec delay & TFKV4180 = T after 65 sec delay). Report when complete.
Respond as NSO when directed to locally throttle discharge of the running HHSIP (most likely 3A using valve 8888). Click on Schema-+SAFETY SYSTEM-+SAFETY INJECTION PROC-+click on 888 valve for running HHSIP-+ TAMH8888(C or D) 8888(C or D) VALVE PORT AREA-+adjust value consistent with ordered flow rate from 3-EOP-ECA-1.1 Figure 1 then INSERT. Repeat as necessary to achieve desired flow as shown at F943 on SAFETY INJECTION PROC system mimic. 8 OPERATIONS SHIFT TURNOVER REPORT Unit 3 Unit 4 Plant Status Unit 3 Unit 4 AFWP OOS (bearing failure; OOS 4 hr; ETR 24 hr) JB EDG OOS (fuel pump failed; OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed 1ST -low discharge pressure; OOS 12 hr; ETR 36 hr) Train A is protected NRC-3 2 tube leak in 3A S/G 0NOP-071.2 Attachment 1 Current: U4 B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8.1.1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req'd; 3-0P-023 sect 7.7 due next shift ifOOS > 72 hr; repair in 14 days) 3B CSP -TS 3.6.2.1 Action a (Fix in 72 hr) None = 2.06E-6* LERF = 9.28E-8 Current: B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8.1.1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req' d; fix in 14 days) None OLRM is = 2.00E-6* LERF = 9.28E-8 Unit 3 Status -, Reactor Operator Mode: 1 RCS Leakrate Accumulator Ref Levels Power: 75 Gross: 0.03 gpm A 6615 MWe: 557 Unidentified 0.02 gpm B 6640 Tavg: 567 Charging Pps: 0.01 gpm C 6625 RCS Pressure:
2235 RCS Boron Cone: 825 .. AlnlorfuaI A:tiitirncia1:ors:
i,I', "I "'/1': '/;:"\";:"ii,h;i:U.;Y:ili,"i;n'r'i
.. ': i', ......... .*. ,:iJi .. ? .. /.';"" ""'."", , , I, .* i i Annunciator:
F 9/2 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
3-0P-023 sect 7.7 due next shift. Annunciator:
F 9/5 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
3-0P-023 sect 7.7 due next shift. Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator: Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Annunciator:
Comp Actions: Current Tech Spec Action Statements: (Does Not Include "For Tracking Only Items" T.S.AS / Component:
3.7.1.2 Action 3/ B AFWP Reason: Bearing failed Entry Date: XX/Xx/XX (Previous shift) T.S.AS / Component:
3.8.1.1 Actions b & d / 3B EDG Reason: Fuel pump failed Entry Date: XX/XX/XX (2 days ago) T.S.AS / Component:
3.6.2.1 Action a / 3B CSP Reason: Failed 1ST -low discharge pressure Entry Date: XX/Xx/XX (Yesterday)
T.S.AS / Component:
3.4.3 Action a / 3B PZR backup heaters Reason: 14 day due to 3B EDG OOS Entry Date: XX/XX/XX (2 days ago) T.S.AS / Component:
3.5.2 Action f / 3B HHS1P Reason: 14 day due to 3B EDG OOS Entry Date: XX/XX/XX (2 days ago) T.S.AS / Component:
Reason: I Entry Date:
Unit 3 Status to Risk Significant Equipment:
B AFWP OOS (Bearing replacement) 3B EDG OOS (Fuel pump repair) 3B CSP OOS (Failed 1ST -low discharge pressure)
Unit 3 Risk is GREEN. Main contributor is B AFWP. Upcoming Reactivity Management Activities:
Dilute to maintain 75% power until management permission received to complete increasing power back to 100%. Upcoming Major POD Activities:
Return to 100% power if/when management permission received to increase power back to 100%. Upcoming ECOs to Hang and lor Release: None --Evolutions or Compensatory Actions in Progress:
-In process of returning power back to 100% from turbine valve test. Currently on hold at 75% awaiting management permission to continue power increase.
3-GOP-301 in use completed through step 5.97. -After shift turnover, perform monthly surveillance on 3A ECC per 3-0SP-055.1 section 7.1 immediately after shift turnover.
1ST and remote valve position verification not required.
-Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains energized at management direction due to small size and stability of tube leak rate. OSP-023.3 Att 1 & 9 for 3B EDG OOS due in 4 hrs. 3-0SP-023.1 not required since to 3B EDG OOS due to support system failure. 3-0P-023 sect 7.7 due next shift to allow 3B EDG OOS > 72 hr. General Information, Remarks, and Operator Work Around Status: See evolutions
& compensatory actions listed above. Train A is protected.
Appendix D Scenario Outline Form ES-D-1 Facility:
Turkey Point Scenario No.: 4 Op Test No.: 2007-301 Examiners:
Candidates:
US RO BOP Initial Conditions:
Mode 1, 100% Power, MOL. Just completed power increase last shift. Turnover:
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Secure 60 gpm orifice (CV-3-200B) and shutdown 1 charging pump using 3-0P-047 section 7.11. Leave 1 charging pump and 45 gpm orifice (CV-3-200A) in service. Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) ALL Close CV-3-200B and secure 1 charging pump. Shift from 2 charging pumps I 2 letdown orifices to 1 charging pump I 1 letdown orifice lineup using 3-0P-047 section 7.11. 2 (C) SRO/RO PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and TFB1PIN5 = T letdown restored.
The crew responds per 3-ARP-097.CR for annunciator A-5/5. 3 TVFCLK1 = 0.2 (C) SRO/BOP Loss of condenser vacuum. The crew responds per 3-0NOP-014.
3a TVFCLK1 = 0.0 (R)ALL Fast load reduction per 3-0NOP-1 00 until condenser vacuum leak located and isolated.
4 (I) RO/BOP L T 459 failed low. Crew responds per 3-0NOP-041.6 to restore letdown TFH1TV59 = T and 3-0NOP-049.1 to take L T 459 out of service. (I,TS) SRO 5 TVHPBOTL (M) RO/BOP RCS leak inside containment coincident with L T-3-459 failure. The crew = 0.00004 initially responds per 3-0NOP-041.3
& 3-0NOP-067.
Once RCS leakage (2gpm) (M,TS) SRO = 0.006 exceeds charging pump capacity, the crew unsuccessfully attempts to (300gpm) manually trip the reactor and immediate transition is made from 3-EOP-E-0 to TFL2XASE =T TFL2XBSE = T 3-EOP-FR-S.1.
6 TFL4AF = T (C) ALL AMSAC and SI fail to automatically actuate. AFW must be manually started TFL3SIA1 = T by opening AFWSS MOVs. Manual SI is deferred until after crew transitions TFL3SIA2 = T back to 3-EOP-E-0.
The auto start of the 2 nd CCWP on SI closes MOV-3-626 TFKV626C = T which must be opened manually if RCP seal return temperatures permit. The TVHPBOTL = crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. 0.01 .. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: _1_ Page _1_ of _1_ Event


== Description:==
== Description:==


Close CV-3-200B and secure 1 charging pump. Shift from 2 charging pumps / 2 letdown orifices to 1 charging pump / 1 letdown orifice lineup using 3-0P-047 section 7.11.
Event
Applicant's Actions or Behavior US Directs RCO to shift from 2 charging pumps /2 letdown orifices to 1 charging pump /1 letdown orifice per 3-0P-047 section 7.11 RCO Obtains copy of 3-0P-047 section 7.11. Performs actions as follows: 1. Notifies HP of intent to change letdown flow 2. Directs NSO adjust CCW flow to NRHX to maintain letdown flow within 5&deg;F of VCT temp 3. Determines 2 charging pumps running 4. If directed by US, takes TCV-3-143 to VCT DIVERT 5. Determines step 7.11.2.3 n/a 6. Takes manual control & maintains demand> 20% on running charging pumps. 7. Places PCV-3-145 in MANUAL and adjusts letdown pressure to approx. 300 psig NOTE: BOP should assist while closing CV-3-200B
: 8. Closes CV-3-200B and controls PCV-3-145 to maintain letdown pressure>
150 psig 9. Adjusts PCV-3-145 to put letdown pressure in normal (green) band then places PCV-3-145 in AUTO NOTE: When PCV-3-145 is returned to auto is when the malfunction of PC-3-145 in automatic is inserted.
Subsequent steps in this event may be delayed or not performed due to response to event 2. 10. Directs NSO adjust 3-834 to maintain stable letdown temperature
: 11. Reduces demand to 20-25% on charging pump to be shutdown then secures charging pump 12. Controls running charging pump demand to put PZR level = program then places running charging pump speed control in AUTO 13. Verifies TCV-3-143 in DEMIN NORMAL 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: 2 Page _1_ of _1_ Event


== Description:==
== Description:==
3-EOP-E-1 isis entered 3-EOP-E-1          entered after    which 3A after which    3A RHRP RHRP trips.
trips. Since Since neither neither RHRP RHRP isis running,  transition running, transition isis made made to to 3-EOP-ECA-1.1.
3-EOP-ECA-1.1. Measures Measures are are taken taken to to minimize the minimize          loss of the loss    RWST inventory.
of RWST      inventorq.
Time__[__Po Time          sition Position                              Applicants Actions Applicant's      Actions or or Behavior Behavior RO RO          Continues performing Continues      performing 3-EOP-E-1 3-EOP-E-1 actions actions as as directed directed byby US.
US.
1.
: 1. Determines 3A Determines    3A CSP CSP should should continue continue running running since since containment containment temperature> 122&deg;F.
temperature>      122&deg;F.
2.
: 2. Determines RCS Determines    RCS pressure pressure << 250[650]
250[650] psig.
psig. Recognizes/reports Recognizes/reports RHRP tripped with RHR flow << 1000 3A RHRP                                      1000 gpm gpm
: 3. Determines RCS Determines    RCS pressure pressure stable/decreasing stable/decreasing BOP        Continues performing 3-EOP-E-1 actions as directed by US:
: 1. Determines SG pressures stable
: 2. Determines 3A 4kV bus on offsite power & 3B 4kV bus deenergized      deenergizec
: 3. Directs U4 RO verify one computer room chiller running
: 4. Stops 3A EDG. Directs NSO complete shutdown per 3-0P-023.          3-OP-023.
Directs U4 RO stop U4 EDGs and have them placed in standby.
us US        Determines no RHRP available. Directs transition to 3-EOP-ECA        3-EOP-ECA-1.1  -1.1 Conducts EOP transition crew brief RO        Performs actions of 3-EOP-ECA 3-EOP-ECA-1.1  -1.1 as directed by US:
1.
: 1. Determines RWST RWST level level> > 60000 60000 gallons 2.
: 2. Determines Determines coldcold leg leg recirc recirc capability capability not not available available Critical Critical      3.
: 3. Aligns makeup makeup to  to U3 U3 RWST RWST a.
: a. Determines Determines CVCSCVCS makeup makeup stopped stopped b.
: b. Directs Directs NSO NSO verify verify 3-356 3-356 closed, closed, then then open open 3-365A 3-365A &  & BB c.
: c. Places Places FCV-3-113A FCV-3-113A in    in AUTO, AUTO, FCV-3-114A FCV-3-114A in  in OPEN, OPEN, FCVFCV-3-113B 3-113B & & 114B 114B in in CLOSE CLOSE d.
: d. Determines Determines MOV-3-350 MOV-3-350 closed.
closed.
e.
: e. Places Places FCV-3-113A FCV-3-113A && 114A  114A controllers controllers in in MANUAL MANUAL f.f. Places Places RCSRCS makeup makeup selector selector switch switch to to BORATE BORATE g.
: g. Sets Sets BA BA totalizer totalizer to to maximum maximum and  and starts starts makeup makeup h.
: h. Adjusts Adjusts PW&PW & BAflow BA flow forfor max max flow flow atat 1.5:1 1.5:1 blend blend 14 14


PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and letdown restored.
Appendix DD Appendix                                      OperatorActions Operator    Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.:
The crew resQonds Qer 3-ARP-097.CR for annunciator A-5/5. Time Position Applicant's Actions or Behavior RO Recognizes/reports annunciator A-5/5 alarms briefly Recognizes/reports loss of letdown flow and PC-3-145 failed high BOP Directs response per 3-ARP-097.CR annunciator A-5/5 for a letdown high pressure condition RO Performs actions of 3-ARP-097.CR annunciator A-5/5 as directed by BOP: 1. Determines PCV-3-145 not operating properly 2. Places PCV-3-145 in MAN and restores letdown pressure to normal (green) band & letdown flow to expected value for orifice in service US Directs WCC notify I&C of PCV-3-145 failure to operate in auto Directs placing info tag on PCV-3-145 to leave in MANUAL Evaluates no impact per TS Conducts crew brief regarding effects of failure 2 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: 3/3a Page _1_ of _3_ Event
Op-Test  No.:  2007-301 2007-301         Scenario No.:
Scenario     No.: _3_3      Event  No.: ~
Event No.:       6b        Page~
Page 3     of of_3_3 Event


== Description:==
== Description:==


Event
== Description:==
3-EOP-E-1 isis entered 3-EOP-E-1          entered after after which which 3A3A RHRP RHRP tri(2s.
trips. Since Since neither neither RHRP RHRP isis running,    transition isis made running, transition        made to to 3-EOP-ECA-1.1.
3-EOP-ECA-1.1. MeasuresMeasures are are taken taken toto minimize the minimize    the loss loss of of RWST RWST inventory.
inventory.
Time Time      Position Position                                Applicants Actions Applicant's    Actions oror Behavior Behavior BOP BOP          Perform actions Perform    actions ofof 3-EOP-ECA-1.1 3-EOP-ECA-1 .1 as  as directed directed by  by US.
US.
1.
: 1. Controls AFW Controls      AFW flow>
flow> 345345 gpm    until level>
gpm until    level > 6[32]%
6[32]% then then maintains maintains levels 15-50%.
levels    15-50%.
us US        Determines RCS Determines      RCS cooldown rate has  has exceeded 11 OO&deg;F/hr 00&deg;F/hr and no no additional forced forced cooldown required required RO                                      3-EOP-ECA-1.1 actions as directed by US:
Continues performing 3-EOP-ECA-1.1
: 1. Determines only 1I ECC running & available.
: a. Determines phase A reset
: b. Directs NSO open MOV-3-1417 & 1418
: c. Resets & starts 2 available NCCs
: 2. Directs U4 RO verify at least 1      1 computer room chiller running US        Determines CSP suction aligned to RWST. Directs running CSP secured if containment pressure << 14      14 psig.
RO        Continues performing 3-EOP-ECA  3-EOP-ECA-1.1 -1.1 actions as directed by US:
1.
: 1. Determines 22 HHSIPs HHSIPs running (3A  (3A & & one one U4 U4 pump) pump) 2.
: 2. Verifies SI  SI reset Critical Critical    3. Stops
: 3. Stops I1 HHSIPHHSIP 4.
: 4. Determines Determines RCS  RCS pressure pressure << 250[650]
250[650] psig, psig, RHR RHR flow << 1000 1000 gpm gpm and and nono RHRPs RHRPs available available
: 5. Determines
: 5. Determines no    no recirc  sump suction recirc sump    suction lines lines open.
open. Closes Closes MOV                                                                                                    MOV                              862A    (no  power 862A (no power to 862 to      B) 862B)
US US        I.
: 1. Determines Determines RCS    RCS subcooling subcooling inadequate inadequate for  for RCP              51 start && SI RCP start termination.
termination.
2.
: 2. Determines Determines minimumminimum SI  51 flow flow per per Figure Figure 1. 1. Directs Directs NSO NSO Crifica Critical throttle throttle running running HHSIP HHSIP discharge discharge to  to achieve achieve minimum minimum SI    51 flow flow TERMINATING TERMINATING    Scenario Scenario is  is complete complete whenwhen HHSI HHSI flow flow isis reduced reduced to to minimum.
minimum.
CUE CUE 15 15
Appendix D Appendix        D                                                      Scenario Outline Scenario        Outilne                                              Form ES-D-1 Form      ES-D-1 Facility:
Facility:                Turkey Point Turkey      Point                              Scenano No.:
Scenario      No.:              33      Op Op Test Test No.:
No.:        2007-301 2007-301 Examiners:
Examiners:                                                                            Candidates:
Candidates:                                                          US US RO RD BOP BOP Initial Conditions:
Initial  Conditions:        Mode 1, Mode      1, 75%
75% Power, Power, MOL,MDL, Awaiting Awaiting permission permission from from plant plant management management to      to increase increase power power back back to  100%. 3-GOP-301 to 100%.      3-GDP-301 in    in use use complete complete through through step      5.96 for step 5.96    for retum return to to 100%
100% power power following following aa turbine valve test.
Turnover:                  Equipment OOS:    DOS: 3B EDG  EDG due to failed fuel pump (OOS        (DOS 2 days; next 0-OSP-023.3 Att          AU 11 && 9 in 4 hrs); BB APN hrs);      AFW Pump Pump due  due toto bearing bearing failure failure (OOS (DOS 44 hrs;hrs; ETR ETR 2424 hrs; hrs; both both trains trains verified verified operable);
operable);
3B CSP 3B    CSP due  due to failed 1ST to failed    ST -low
                                                                -      discharge pressure low discharge      pressure (OOS(DOS 12  12 hr; hr; ETR ETR 3636 hr) hr)
Perform monthly surveillance on 3A ECC per 3-0SP-055.1          3-OSP-055.1 section 7.1 immediately after shift turnover. 1ST and remote valve position verification not required.
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, significant change in leak rate. MOV-3-1403  MD V-3-1 403 remains open at management direction due to small size and stability of tube leak rate.
Event                                      Type*
Event Type*                                                      Event Description No.
1 1                                BDP (N) BOP                3A ECC monthly surveillance performed per 3-0SP-055.1          3-DSP-055.1 section 7.1. 3A TFKV90SAT TFKV905A=T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS.                      DOS.
(N,TS) SRO 2                                SRD/RD (I) SRO/RO            TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8CH=T TFL1T8CH  =T                                ONDP-028 and takes rods to manual to stop continuous inward rod ONOP-028 movement.
3                                RD/BDP (C) RO/BOP              Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF &                              & 3D TFE3D37A ==T T                              NCC DOS.OOS. Requires starting another charging pump or securing the in C  TS SRO (C,TS)
TFE3D38T=T TFE3D38T = T service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.
4      TAKPXA1=10.0        (C) SRD/BDP SRO/BOP        3A 1 Intake screen high p.
3A1                                t:.p. Crew responds per 3-ONOP-Ol3-0NOP-011. 1. 3A 3A11 CWP is TAKPXA2 == 4.0 4.0                            secured.
4a                          (R) ALL                        Intake screen high 3A2 Intake                  high tip.
t:.p. Fast load reduction per 3-ONOP-13-0NOP-100    00 to 60% for TAKPXA2=
TAKPXA2 = 1.0 1.0                            the purpose of securing 3A2 CWP.          CWP. Manual rod control must      must be used due  due to rod control Tavg failure.
5      TAHUVBSB=22 TAHUVBSB=22 (M)
(M) ALL                3B 3B RCP high  high vibration. The crew responds per 3-ONDP-041      3-0NOP-041.1.        Once
                                                                                                                                          .1. Once TAHUVBMB=6 vibration reaches the      the trip setpoint, setpoint, the crew manually manually trips the the reactor andand TAHUVBMB= 6                                .
immediate actions of            3-EOP-E-0 are of 3-EDP-E-0      are performed.
performed.
66                          (M)
(M)ALL ALL            When 3B RCP    RCP is tripped, tripped, 3B 3B 4kV 4kV bus is lost and aa large break  break LDCA LOCA occurs.
TFE2Z51S TFE2Z51S == TT (contd (cont'd from          An automatic SI      SI occurs but but train A sequencer fails. Train A ECCS      ECCS equipment TVHHCLS event event    5)
: 5)            must be  be manually manually started. The crew completes  completes 3-EDP-E-0 3-EOP-E-0 and  and transitions to TVHHCLB == 00.11 TFQ634AF  = T      (C)
(C) ALLALL              applicable FRPs applicable      FRPs followed followed by  by 3-EDP-E-1.
3-EOP-E-1.
TFQ634AF=T 6a 6a                                                  Once CSFSTs Once      CSFSTs are  are monitored monitored for  for implementation, implementation, ifif containment containment pressure pressure is  is still still above above 20  20 psig, psig, the    crew immediately the crew    immediately transitions transitions to    3-EOP-FR-Z.1 ifif no to 3-EDP-FR-Z.1          no higher higher red red oror orange orange pathpath exists.
exists.
6b 6b                          (C)
(C) SRD/RD SRO/RO          3-EDP-E-1 3-EOP-E-1 is      is entered entered after after which which 3A3A RHRP RHRP trips.
trips. Since Since neither neither RHRP RHRP is  is TFM103AT=T TFM1D3AT = T                              running, running, transition transition isis made made to  to 3-EOP-ECA-1.1.
3-EOP-ECA-1.1. Measures Measures are are taken taken toto minimize minimize the        loss of the loss    of RWST RWST inventory.
inventory.
(N)ormal, (N)ormal, (R)eactivity,
                                .. (I)nstrument, (C)omponent, (R)eactlvlty, (l)nstrument,              (C)omponent, (M)ajor  (M)aJor 11
TP-2007-301 Scenario TP-2007-301        Scenario #3    Event Description
                                                                    #3 Event  Description Turkey Point Turkey    Point 2007-301 2007-301 Scenario Scenario #3#3 Event 11 - 3A Event      -  3A ECC ECC monthly monthly surveillance surveillance performed performed per  per 3-0SP-055.1 3-OSP-055.1 section section 7.1.
7.1. 3A 3A ECC ECC inlet inlet valve CV-3-2905 valve  CV-3-2905 fails fails to to open open and and 3A 3A ECC ECC isis declared declared ~OS.DOS.
Event 22 - TM-3-408C Event      -  TM-3-408C (Tavg(Tavg input input to to rod rod control) control) fails fails high.
high. Crew Crew responds responds per per 3-0NOP-028 3-ONOP-028 and  and takes  rods takes rods to  to manual manual to  to stop stop continuous continuous inward inward rod rod movement.
movement.
Event 33 - Loss Event      -  Loss of of 3H 3H 480V 480V LC.LC. Also Also takes takes 3C    charging pump, 3C charging      pump, 38    ECC, 38 3B ECC,      3B ECF ECF && 3D 3D NCC NCC DOS. Requires
~OS. Requires starting starting another another charging charging pumppump or or securing securing the the in service 60 gpm orifice. The in service  60  gpm  orifice. The crew responds crew  responds per  per 3-ARP-097.CR 3-ARP-097.CR for    for annunciators annunciators F-9/6,F-916, A-5/4, A-514, 1-9/3 1-913 or or 1-9/4.
1-914.
Event 44 - 3A Event      -  3A11 intake intake screen screen high high ~p. Crew responds
: p. Crew      responds per per 3-0NOP-011.
3-ONOP-01 1. 3A  3A11 CWP CWP isis secured.
secured.
Event 4a Event  4a - 3A2
              - 3A2 intake intake screen high high ~p. Fast load reduction
: p. Fast            reduction per per 3-0NOP-100 3-ONOP-100 to 60% for the purpose purpose    of  securing    3A2 CWP.
3A2    CWP. Manual rod  rod control control must must be used used duedue to to rod rod control control Tavg failure.
failure.
Event 55-- 38 Event        3B RCP high vibration. The crew responds per 3-0NOP-041.1. 3-ONOP-041.1. Once vibration reaches either shaft or motor trip setpoint, the crew manually trips the reactor and immediate reaches actions of actions  of 3-EOP-E-0 are performed.
Event 6 - When 38 Event    -          3B RCP is tripped, 38    3B 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A sequencer fails. Train A ECCS equipment must be manually automatic started. The started. The crew completes 3-EOP-E-0 and transitions to applicable FRPs followed by 3-EOP-E-1.
E-1.
Event 6a - Once CSFSTs are monitored for implementation, Event        -
implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z      3-EOP-FR-Z.1  .1 if no higher red or orange path path exists.
Event 6b EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is running, transition transition is is made made to 3-EOP-ECA 3-EOP-ECA-1.1. -1.1. Measures are taken to minimize minimize the loss loss of RWST inventory.
inventory.
22
TP-2007-301 Scenario TP-2007-301        Scenario#3  #3 Event EventDescription Description Scenario XXIII Scenario              XXIII NRC NRC 33 SimulatorOperating Simulator        Operating Instructions Instructions Setup Setup IC-16 (75%
IC-16    (75% MOL) MOL)
Place simulator Place    simulator inin runrun Trigger lesson Trigger    lesson steps:
steps:
SETUP        3B SETUP - 3B EDG ODS
            -      EDG    005 (actuatesTAQ5LRSB (actuates TAQ5LRSB =              TAQ5B2OP =
OFF && TAQ5B20P
                                                            = OFF                    = RACKOUT)
RACKOUT)
SETUP - BB AFWP SETUP        -    AFWP ODS QOS (actuates      TAFK244 =
(actuates TAFK244            TAFKOO2 =
0.0, TAFK002
                                                          = 0.0,                    TAFFO1B =
0.0, TAFF01B
                                                                            = 0.0,            = 0.0,  TCF5MTB =
0.0, TCF5MTB      = T)
T)
SETUP      -  3A  SG  2  GPD      LEAK SETUP - 3A SG 2 GPD LEAK (actuates TVHHSGA == 0.0000013)
(actuates  TVHHSGA      0.0000013)
SETUP - 3B SETUP        -  3B CSP CSP ODSOOS (actuates (actuates TAM1DPOB TAM1 DPOB = RACKOUT RACKOUT (3)        TCM1 D41 M == FALSE (3) && TCM1D41M        FALSE (0>> (0))
SETUP      -  TRAIN    A  SEQUENCE          R SETUP - TRAIN A SEQUENCER FAIL (actuates TFQ634AF  FAIL    (actuates TFQ634AF == T)  T)
Acknowledge annunciators Acknowledge          annunciators F-9/2  F-9/2 &    9/5 (3B
                                                  & 9/5  (3B EDGEDG O~S).
DOS). StartStart train train A A chilled chilled water water andand secure    train    B secure train B chilledchilled water water (CR (CR HVAC HVAC panel).
panel). Place Place simulator simulator in  in freeze.
freeze.
Place clearance Place    clearance info  info tags on 3B EDG    EDG normal normal start switch, B          B AFWP T&    T&T T valve control switch & 3B CSP control switch.
switch                                switch.
Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X.
Remove Provide shift turnover checklists, 3-0NOP-071.2 Provide                                          3-ONOP-071 .2 Att    AU 11 and a copy of 3-0SP-055.1 3-OSP-055.1 section section 7.1 7.1 & Attachment 11 filled out thru step 7.1.5. 3-0SP-055.1      3-OSP-055.1 is being performed without quarterly 1ST or remote position verification required.
without Select Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on on VPA to TavglTref Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3).
Fill Fill in blender & shutdown boron addition placards at console blender station. Data for each each IC IC may be    be found in  in the ECC ECC &  & Shutdown Guidelines Book          Book inin the simulator I/F. IIF.
Event I1 - 3A ECC OSP Event          -
asp failure Initiated      at  crew  direction Initiated at crew direction based        based on      shift turnover on shift      turnover beginning beginning at    at step step 7.1.6.
7.1.6.
Immediately Immediately after    after CV-3-2905 CV-3-2905 closes  closes in  in response response takingtaking 3A    3A ECC ECC to  to STOP, STOP, trigger trigger lesson    step    EVENT    I    3A  ECC    INLET    FAIL lesson step EVENT 1 - 3A ECC INLET FAIL AS IS (actuates TFKV9O5A
                                -                                  AS  IS  (actuates    TFKV905A == T). The crew T). The    crew performs performs 3-OSP-055.
3-0SP-055.1I sect. sect. 7.1 7.1 toto test  3A ECC test 3A    ECC beginning beginning at    at step  7.1.6. Quarterly step 7.1.6.      Quarterly 1ST  1ST and and remote remote position position verification verification are  are not not required.
required. InletInlet valve valve CV-3-2905 GV-3-2905 fails  fails to to open.
open. 3A 3A ECC    is  stopped      and  declared EGG is stopped and declared OOS.            ~OS.
Respond Respond as    as NS0 NSO forfor steps steps 7.1.14 7.1.14 && 7.1.15.
7.1.15. Indicate Indicate that that hehe has has portable portable ammeter ammeter inin hand.
hand. When When directed directed toto measure measure 3A    3A ECC ECC fan fan current current at at 3B3B MCC MCC (bkr(bkr 30650),
30650), report report 22 22 amps    indicated.
amps indicated.
33
TP-2007-301 Scenario TP-2007-301            Scenario #3 #3 Event Event Description Description Respond as Respond      as NSO NSO ififasked asked to to locally locally check check Train Train AA ECC ECC CCW  CCW flow  flow on on FI-3-1472.
Fl-3-1 472. After After 1-3 minutes, 1-3  minutes, report report thatthat flow flow indicates indicates zero. zero.
Respond as Respond      as WCC WCC when when directed directed to      have Mechanical to have      Mechanical maintenance maintenance investigate investigate failure failure ofof CV-3-2905 CV-3-2905 to open.to  open.
Respond as Respond      as WCCWCC ifif directed directed to      take 3A to take      3A ECCECC breaker breaker 30650 30650 to  to OFF OFF andand place place itit under under clearance. After clearance.      After 8-128-12 min,      trigger lesson mm, trigger        lesson step      EVENT 1I - 3A step EVENT          -  3A ECC ECC BKR BKR TO  TO OFFOFF (actuates (actuates TOOl DMG =
TCC1DMG      = F)F)
Event 22 - TM-3-408C Event          -  TM-3-408C Tavg        Tavg input input to    to rod rod control control fails  fails high high Once 3A Once    3A ECCECC stopped stopped and    and declared declared 005,    OOS, trigger trigger lesson lesson step step EVENT EVENT 22 - TM                                                                                                                    -  TM  408C FAILS 408C    FAILS HIGH  HIGH (actuates (actuates TFL TFL1T8CH 1T8CH == T). T).
This  fails  Tavg      input    to  rod  control This fails Tavg input to rod control high causing      high    caushg maximum maximum speed  speed control control rodrod insertion.
insertion.
The The  operators                            3-ONOP-028 and take rod control respond per 3-0NOP-028                                      control to manual to stop inward rod movement. This rod                      This failure failure does does not fail median Tavg        Tavg for for other other control control purposes. Tavg-  Tavg Tref recorder TR-3-408 continues to function.              function.
Respond as WCC when directed to have I&C Respond                                                          l&C investigate failure of rod control.
Respond as WCC if directed to generate a caution tag to be hung on the rod control Respond selector switch selector Event 3 - Loss of 3H 480V LC After 3A2 CWP secured,    secured, trigger lesson step EVENT 33 - LOSS OF 3H LC (actuates TFE3D37A TFE3D37A = T, then
            =  T,  then TFE3D38T ==T after aa 55 sec delay).
TFE3D38T                          delay).
This causes a loss of        of 3H 480V LC      LG andand along with it 3C    3G charging pump, 3B          38 ECC, EGG, 3B  38 ECF    &  3D EGF&3DNGG. NCC.
The crew crew responds per 3-ARP-097. CR                    GR for annunciators F-9/6,    F-916, 1-9/3, 1-913, 1-9/4 1-914 or A-5/4 A-514 and and may  enter    3-ONOP-041 may enter 3-0NOP-041. 6.            .6.
Since Since 3C3G charging charging pump    pump was  was running, 3B      38 charging charging pump pump is  is started started perper 3-ONOP-041 3-0NOP-041.6.    .6.
Failure Failure also also puts puts plant plant in in aa lhr 1hr shutdown shutdown plant  plant action action statement statement per    per TSTS 3.6.2.2.b 3.6.2.2.b since since only only I1 ECC EGG is        left operable.
is left  operable.
Respond Respond ifif directed directed to  to check check out out 3H 3H 480V 480V LC. LC. After After 1-3 1-3 mm,min, report report bkr bkr 35001 35001 feeder feeder from from 3D3D 480V 480V LC    LC tripped tripped openopen withwith scorch scorch marksmarks and and aa burnt burnt insulation insulation smell.
smell. 35007 35007 doesnt  appear        to  have    closed doesn't appear to have closed in (still open). in  (still  open). Report Report nono evidence evidence of    of fire.
fire.
Respond Respond as  as WOO WCC when when directed directed to  to have have electrical electrical check check into into the the loss loss ofof 3H 3H LC.LC. After After 8-8-
12 12 mm, min, call call as as WOO WCC and  and relay relay recommenda recommendation      tion from from Electrical Electrical maintenance maintenance that          3H that 3H 480V 480V LCLC remain remain deenergized deenergized until  until further further evaluation evaluation of ofthe the LC LC can can bebe performed.
performed.
44
TP-2007-301 Scenario TP-2007-301        Scenario #3      Event Description
                                                                  #3 Event    Description Respond as Respond      as NSO NSO ifif directed directed to to do    pre-start &
do pre-start    & post-start post-start checks checks on on 3B 3B charging charging pump.
pump.
Report all Report  all conditions conditions normal.
normal.
Respond as Respond      as NSO NSO ifif directed directed to to locally locally control control CCWCCW to  to NRHX NRHX flowflow to to maintain maintain letdown letdown temperature. Click temperature.      Click on    Schema>COMMON SERVICES-tCOMPONENT on Schema-tCOMMON                    SERVICES*COMPONENT COOLING-t            COOLING*
valve 834-tTAKA834 valve  834TAKA834 BYP        BYP AROUND AROUND TCV-144-tadjust TCV-144*adjust value    value asas desired desired and and INSERT.
INSERT.
Respond as Respond          WCC/Mechanical ifif asked as WCC/Mechanical                asked about about status status of of 3A 3A ECC ECC since since plant plant is is now now in in 11 hr hr shutdown action shutdown      action statement.
statement. Report Report mechanics mechanics are  are investigating investigating the  the CV-3-2905 CV-3-2905 failure.
failure.
414a - 3A1/3A2 Event 4/4a          3A113A2 intakeintake screen clogging I Fast load reduction Upon completion Upon    completion of    of TM-3-408C TM-3-408C crew    crew brief, brief, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1/3A2
                                                                                                            - 3A1/3A2 INTAKE INTAKE CLOGGING CLOGGING (actuates          TAKPXA1 =
(actuates TAKPXA1        10.0 &
                                                    = 10.0  & TAKPXA2 =4.0).
4.0).
3-ONOP-Ol 1. First 3A 1I CWP The crew responds per 3-0NOP-011.                                  CWP is secured per 3-0NOP-011.
3-ONOP-Ol 1.
When directed as NSO to check screen wash pump basket strainer Llp,                            p, click on Schema*C        OMMON Schema~COMMON SERVICES~INTAKE SERVlCES.lNTAKE AREA & SCREEN WASH~report                WASHreport strainer tips in lower right corner of intake area & screen wash system mimic. Value reported Llp's should be <  < 10 psid.
When directed as NSO to report status of unit 3 traveling screens, report that they are operating in high gear, are rotating. Specific data such as waterfall height, screen Llp                            lip and screen wash pressure can be determined from the intake area & screen wash system mimic accessed earlier.
ICW to CCW/TPCW CCWITPCW flows and basket strainer lips              Llp's can be determined by clicking on SchemaCO Schema~COMMON      MMON SERVICES SERVICES~INTAKE  *INTAKE COOLING COOLlNG~report  *report requested parameters shown on the lOW    ICW system mimic.
Notify Notify BOP BOP when waterfall height    height in  in the 3A13A1 intake intake well reaches 2.5        2.5 feet as as determined determined by    by subtracting subtracting 3A13A 1 intake intake well well level level from indicated indicated intake intake level level as as shown shown on  on the  intake  area the intake area &    & screen    wash wash system system mimic.
mimic.
Respond Respond ifif called called as as FS/WCC FS/WCC regarding regarding issuance issuance of  of an an ECO ECO andand manual manual cleaning cleaning of  of on on 3A1 3A1 traveling traveling screen.
screen. To To take take 3A13A1 traveling traveling screen screen outout ofof service, service, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1
            -  3A1 TRAVELING TRAVELING SCREEN  SCREEN OOS    OOS FOR FOR CLEANING CLEANING (actuates (actuates TCKPD24M            To F). To TCKPD24M == F).
return return 3A1 3A1 traveling traveling screen screen to to service, service, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1-  3A1 TRAVELING TRAVELING SCREEN SCREEN RETURN RETURN TO    TO SERVICE SERVICE (actuates (actuates TCKPD24M TCKPD24M == T).T).
Immediately Immediately after after 3A1 3A1 CWPCWP secured, secured, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A2 -  3A2 INTAKE INTAKE REDUCED          CLOGGING REDUCED CLOGGING (actuates TAKPXA2 = 2.0).
(actuates  TAKPXA2      2.0).
The The crew crew reduces reduces power powerper per 3-ONOP-IOO 3-0NOP-100 from      from 75%75% toto <60%
                                                                              <60% forfor the the purpose purpose of  of securing securing 3A23A2 CWP.
CWP.
55
TP-2007-301 Scenario TP-2007-301          Scenario #3  #3 Event Event Description Description In view In  view ofof the    slowly increasing the slowly      increasing ~p      tp onon 3A23A2 traveling traveling screen, screen, crew crew should should electelect toto perform aa fast perform        fast load load reduction reduction per  per 3-0NOP-1 3-ONOP-1 00. 00. AtAt lead lead examiner examiner direction, direction, prompt prompt thisthis decision    if  necessary        by  calling decision if necessary by calling as SM and          as  SM            asking and asking for    for status status toto help help crew crew understand understand problem is problem      is not not going going away.        Additionally, call away. Additionally,            call asas NSO NSO at  at intake intake structure structure and  and report report debris still debris  still coming coming down  down intake intake canal canal collecting collecting mostly mostly around around the        canal    banks.
the canal banks.
Respond as Respond      as NSONSO ifif directed directed to    to close close 3-30-002 3-30-002 &        3-30-004 to
                                                                            & 3-30-004      to allow allow stopping stopping the  the 3A2 3A2 CWP. After CWP. After 1-3    1-3 min,      trigger lesson mm, trigger          lesson step step EVENT EVENT 44-- CLOSE  CLOSE 3-30-002/004 3-30-002/004 (actuates  (actuates TAFBOO2 =
TAFB002      0.0 then
          = 0.0        TAFB0O4 =
then TAFB004          0.0 30
                                      = 0.0      sec later.)
30 sec            Report when complete.
later.) Report                complete.
Respond as Respond      as NSONSO ifif directed directed to        listen for to listen      for seal seal well well solenoid solenoid valve valve closure.
closure.
Event 5 - 38 Event          -  3B RCP high vibration I Reactor trip After a 5-10% power change, trigger lesson step EVENT 5 - 3B RCP HIGH                            -
VIBRATION (actuates VIBRATION          (actuates TAHUVBSB = 22.0 on 5 min          mm ramp &      TAHUVBMB =
                                                                            & TAHUVBMB      = 6.0 on 5 min mm ramp).
ramp).
The crew responds per 3-0NOP-041. 3-ONOP-041. 1. Once motor & shaft vibration reach the trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-O are performed.
Respond if notified as system engineer of increasing vibration on 38                                    3B RCP motor &        &
shaft.
Event 6 - Large break LOCA I Loss of emergency coolant recirculation Tripping 3B RCP auto triggers lesson step EVENT 6                                      6-- LARGE BREAK LOCA (actuates fl/HHCLB TVHHCLB == 0.1 when H20L09G)              and EVENT 6 - 3B 4KV BUS LOCKOUT (actuates TFE2Z51S == Twhen H2OLO9G).
TFE2Z51S                H20L09G).
The crew performs 3-EOP-E-O and must manually start train A ECCS                                  ECGS loads due to failure of 3A sequencer entered at setup. 3A 4kV bus remains on offsite power.
Respond as NSO when directed to locally close MOV-3-1                          MOV-3-1407. 407. After 4-6 mm,    min, trigger lesson lesson step EVENT EVENT 66 - CLOSE MOV-3-1
                                  -                MOV-3-1407    407 (actuates (actuates TFWO7C TFVV07C == F). F). Report when complete.
Respond Respond as    as NSO NSO ifif directed directed to  to locally locally openopen MOV-3-843B MOV-3-8438.. After    After 1-31-3 mm.,
min., trigger trigger lesson lesson step EVENT step  EVENT 66 - OPEN -  OPEN MOV-3-843B MOV-3-843B (actuates  (actuates TFMVv020 TFMVV020 == T). T). Report Report when complete. complete.
Respond Respond as    as U4U4 RO        when directed RO when        directed to  to perform perform 3-EOP-E-0 3-EOP-E-0 Aff    Att I1 to to align align U4 U4 HHSIPs HHSIPs to    to U3 U3 RWST.
RWST. After After 1-31-3 mm,min, trigger trigger lesson lesson step step EVENT EVENT 6-    6 - ALIGN ALIGN U4    U4 HHSIP HHSIP TO    TO U3U3 RWST (actuates RWST      (actuates TAMH1V41 TAMH1V41 = 1.0,    1.0, TAMH1V46 TAMH1V46 == 1.0      after 11 mm 1.0 after        delay, TAMH1V37 min delay,  TAMH1V37 == 0.0      after 22 mm 0.0 after    min delay, delay, TAMH4856 ==0.0 TAMH4856        0.0 after after 33 mm    delay). Report min delay). Report when  when complete.
complete.
Respond Respond as        NSO when as NSO        when directed directed to  to locally locally verify verify phase phase A  A valves valves MOV-3-1 MOV-3-1417,  417, 1418, 1418, 1425  &  381    closed      (all  of which 1425 & 381 closed (all of which are in the U3      are    in  the        Pipe U3 Pipe && Valve Valve Room).
Room). After After 1-31-3 mm,min, 66
TP-2007-301 Scenario TP-2007-301            Scenario #3  #3 Event Event Description Description trigger lesson trigger    lesson step  step EVENTEVENT 66 - CLOSE  -  CLOSE PHASE    PHASE AA ISOL  ISOL VALVES VALVES (actuates          TFKV41 7C =
(actuates TFKV417C      = T, T,
TFKV418C =T after 1 min delay, TFBV60 =
TFKV418C    =  T  after  1  mm    delay,    TFBV60      =T  after 22 min T after    mm delay      TFSWVM5B =
delay && TFSWVM5B      =T  after33 min T after        delay). Report mm delay). Report when complete.
when      complete.
Respond as Respond      as NSO NSO when  when directs directs to  to locally locally verify verify phase phase BB valves valves MOV-3-626, MOV-3-626, 716B    716B && 730  730 closed(all of closed(all    of which which are  are in in the the U3U3 PipePipe &      Valve Room).
                                                                    & Valve      Room). After        1-3    min,  trigger After 1-3 mm, trigger lesson step lesson      step EVENT 66 - CLOSE EVENT          -  CLOSE PHASE    PHASE B        B ISOL ISOL VALVES VALVES (actuates(actuates TFKv626C TFKV626C == T,  T, TFKV16BC TFKV16BC == T    after 11 min T after    mm delay &
delay    TFKV730C = T
        & TFKv730C              after 22 min T after                      Report when delay). Report mm delay).                    when complete.
complete.
Respond as Respond      as NSO NSO when  when directed directed to    to place place PAHMS PAHMS in    in service service on on unit unit 3.
: 3. After After 8-12 8-12 minutes,    trigger minutes, trigger lesson step lesson        step EVENT EVENT 66 - PLACE  - PLACE U3    U3 PAHMS PAHMS IN    IN SERVICE SERVICE (actuates (actuates TAC2V02A =
TAC2V02A              TAC2V02B =
1.0, TAC2V02B
              = 1.0,                    = 1.0,  TAAAV21 =
1.0, TMAV21        = 1.0,  TAAAV22 =1.0 1.0, TAAAV22              TACA0O5 =
1.0 && TACA005    = 0.0).
0.0). Report Report when when complete.
Transition is made from 3-EOP-E-O to 3-EOP-FR-P.                  3-EOP-FR-P. 11 which is quickly exited due to the presence of low head SI flow in response to the LBLOCA.
Event 6a - Respond to High Containment Pressure Once CSFSTs are monitored for implementation,            implementation, if containment pressure is still above 2Opsig, 20 psig,    the    crew      immediately transitions to 3-EOP-FR-Z.        3-EOP-FR-Z. 1I if no higher red or orange path exists.
Respond as NSO if directed to check CSP suction & discharge valves open. After 1-3 mm., report that 3A CSP suction & discharge valves are open while 3B CSP suction &
min.,
discharge discharge valves are closed and under an ECO.
Event 6b - Respond to LBLOCA with no emergency coolant recirc The crew transitions to 3-EOP-E-1 and then to 3-EOP-ECA                          3-EOP-ECA-1.1    -I. 1 after it is determined that neither neither RHRP is available to support cold leg recirculation After 3-EOP-E-1 is After                        is entered, entered, trigger trigger lessonlesson step step EVENT EVENT 6b    6b - 3A
                                                                                                      -  3A RHRP RHRP TRIP TRIP (actuates (actuates TFM1D3AT TFM1D3AT ==T). T). Respond Respond as        as NSONSO when directed  directed to  to investigate investigate loss loss of of 3A 3A RHRP.
RHRP. After 1-3      1-3 mm.,
min., report report backback motormotor very  very hothot especially especially at    at bottom bottom of  of motor motor casing casing (failed (failed bearing).
bearing).
Respond Respond as    as Chemistry Chemistry when      when directed directed to    to sample sample SG5  SGs for for activity activity &  & check check DAM-i DAM-1 and    and as  as HP    when  directed          to  perform HP when directed to perform radiation              radiation readings readings on  on main main steam steam lines.
lines. After After 10-15 10-15 mm. min.
report report no no signs signs of  of activity activity or  or radiation radiation levels levels above above background.
background.
Respond Respond as    as NSONSO when  when directed directed to    to locally locally close close 3-297A1B!C 3-297 AlBIC.. AfterAfter 1-3 1-3 mm,    trigger min, trigger step EVENT lesson step lesson              EVENT 6b      6b - LOCALLY
                                        -  LOCALLY CLOSE                    3-297 AlBIC (actuates CLOSE 3-297A1B1C                            TAHN97A == 0.0, (actuates TAHN97A        0.0, TAHN97B TAHN97B ==
0.0 1 min. later && TAHN97C ==0.0 0.0  1 mm. later    TAHN97C            0.0 22mmn.
min. later.).
later.).
77
TP-2007-301 Scenario TP-2007-301        Scenario#3  #3Event EventDescription Description Respond as Respond        as NSO NSO whenwhen directed directed toto locally locally close close LCV-3-115C.
LCV-3-115C. After  After1-3    mm, trigger 1-3 min,    trigger lesson    step  EVENT      6b    LOCALLY lesson step EVENT 6b - LOCALLY CLOSE LCV-3-115C
                                  -                CLOSE      LCV-3-1 I 5C (actuates      TFBVC62= T).
(actuatesTFBVC62      T). Report Report when complete.
when    complete.
Respond as Respond        as U4 U4 RO RO when when directed directed to to start start one one train train of of chilled chilled water water for for computer computer roomroom cooling.
cooling.
Respond as Respond      as U4U4 RO RO when when directed directed toto shutdown shutdown U4        EDGs. Respond U4 EDGs.        Respond as  as NSO NSO whenwhen directe  d  to  compl    ete  shutdo directed to complete shutdown of 3A,  wn  of  3A, 4A4A && 48 4B EDGs EDGs per per 3/4-0P-023.
3/4-OP-023.
Respond as Respond            NSO when as NSO      when directed directed toto verify verify 3-356 3-356 closed, closed, then then open      3-365A &
open 3-365A      & 8.
B. After After 1-3 1-3 mm.,  trigger    lesson min., trigger lesson step    step EVENT EVENT 6b  6b - ALIGN
                                                    -  ALIGN CVCSCVCS M/U  MIU TO TO RWST RWST (actuates    TABM365B ==
(actuates TABM365B Report when 1.0). Report 1.0).            when complete.
complete.
Respond as Respond            NSO when as NSO      when asked asked toto verify verify MOV-3-350 MOV-3-350 closed.closed. After After 1-3 1-3 min.,
mm., report report valve valve closed closed.  .
Respond as Respond          NSO when directed as NSO              directed to locally locally open open MOV-3-1417 MOV-3-1417 &      & 1418.
1418. After 1-31-3 min, mm, trigger lesson trigger    lesson stepstep EVENT 6b - OPEN CCW TO NCCs (actuates (actuates TFKV417C == F, F, TFKV418C == F, TFKV418C    F, TFKV417O      T after 5 sec delay  & TFKV418O TFKV4170 = T after 5 sec delay & TFKV4180 =      = T after 65 sec delay). Report when complete.
complete.
Respond as Respond      as NSO when directed directed to locally throttle discharge discharge of the running HHSIP (most      (most likely 3A likely  3A using using valve 8888).
888B). Click on Schema-+SAFETY Schema>SAFETY SYSTEM-+SAFETYSYSTEM*SAFETY INJECTION PROC-+click INJECTION        PROC*click on 888 valve for running HHSIP-+          HHSIP.TA    TAMH8888(C MH888B(C or D) 888B(C 8888(C or  or  D)  VALVE VALVE      PORT      AREA>ad AREA-+adjust  just value consis      tent with ordere consistent            ordered d flow rate from 3-EOP-ECA 3-EOP-ECA-1.1    -1 .1 Figure Figure 11 then INSERT. Repeat as necess        necessary          achieve ary to achiev    e desired flow as shown    at  F943 shown at F943 on      on  SAFETY      INJECTION        PROC system mimic. mimic.
88
NRC-3 NRC-3 OPERATIONS SHIFT OPERATIONS                      SHIFT TURNOVER TURNOVER REPORT          REPORT ONCOMING CREW ASSIGNMENTS Shift Mgr:                                        -
Inside SNPO:
Field Supv.:                                                                        Outside SNPO:
Admin RCO:                                                                          ANPO:
Unit 33 Unit                                                                                Unit Unit 44 Unit Supv.:                                                                        Unit Supv.:
RCO:                                                                              RCO:
NPO:                                                                              NPO:
Plant Status Plant  Status Unit 3                                                                              Unit 44 Mode:                                1                                            Mode:                                  1 Power:                              75                                            Power:                                100 MWe:                              557                                            MWe:                                759 Gross Leakrate:                    0.03                                            Gross Leakrate:                      0.04 RCS Boron Conc:                    825                                            RCS Boron Conc:                      600 Operational Concerns:
3 AFWP AFWP OOS (bearing(bearing failure; OOS 4 hr;  hi; ETR 24 hr) 3B  EDG    OOS    (fuel JB EDG OOS (fuel pump    pump  failed;  OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B 3B CSP CSP OOS OOS (failed (failed 1ST -low low discharge pressure; OOS 12 hr;      hi; ETR 36 hr)
Train  A is protected Train A is protected 22 gpd tube tube leak leak inin 3A 3A S/G - unchanged for past week (Chemistry sampling per 3-ONOP-071 3-0NOP-071.2    .2, Attachment 1.) 1 U3 Anticipated LCO Actions:
Current:
Current:
BB AFWP AFWP - TS-TS 3.7.1.2 3.7.1.2 Action 33 (trains verified operable just  just before turnover; 30  30 days to repair) 3B 3B EDG EDG - TS-TS 3.8.1.1.b.l 3.8.1.1.b.1 Actions Actions bb & dd (0-OSP-023.
(0-OSP-023.3    Att 11 & 99 every 3 Att          every 88 hi; hr; 3/4-OSP-023 3/4-0SP-023.1      start of
                                                                                                                    .l start  of other other EDGs EDGs not  reqd;    3-OP-023 sect not req'd; 3-0P-023        sect 7.7 7.7 due due next  shift if next shift    ifOOS OOS >  > 72 72 hi; hr; repair in in 14 14 days) days) 3B 3B CSP CSP - TS TS 3.6.2.1 3.6.2.1 Action Action aa (Fix        72 hi) in 72 (Fix in      hr)
Anticipated: None  None Train A is protected. OLRM is green (CDF =              = 2.06E-6;  LERF == 9.28E-8).
2.06E-6* LERF      9.28E-8 U4 Anticipated LCO Actions:
U4 Current:
Current:
BB AFWP AFWP - TS-TS 3.7.1.2 3.7.1.2 Action Action 33 (trains (trains verified verified operable  just before operable just  before turnover; turnover; 3030 days days to to repair) repair) 3B EDG 3B  EDG - TS-TS 3.8.1.1 .b. 1 Actions 3.8.1.1.b.1  Actions bb &  & dd (0-OSP-023 (0-OSP-023.3    Att 11 &
                                                                      .3 Att    & 99 every every 88 hi; hr; 3/4-OSP-023 3/4-0SP-023.1      start of
                                                                                                                  .1 start  of other other EDGs EDGs not not reqd; req' d; fix  in 14 fix in  14 days) days)
Anticipated: None  None                                                        V Train A is protected.      OLRM isis green (CDF == 2.OOE-6;
            ~&#xa5;~.=".,"'rf. OLRM                            2.00E-6* LERF LERF == 9.28E-8).
9.28E-8 Results of Offgoing Focus Area:
See g:\Ops\Common\0900
Unit 33 Status Unit        Status
-,                                                                Reactor Operator Reactor        Operator Mode:
Mode:                            1I                                RCS Leakrate RCS  Leakrate                              Accumulator Accumulator Ref      Ref Levels Levels Power:
Power:                          75 75                  Gross:
Gross:                              0.03 gpm 0.03  gpm                A A                    6615 6615 MWe:
MWe:                            557 557                  Unidentified Unidentified                        0.02 0.02 gpm gpm                BB                    6640 6640 Tavg:
Tavg:                          567 567                  Charging Pps:
Charging      Pps:                  0.01 gpm 0.01  gpm                CC                    6625 6625 RCS Pressure:
RCS    Pressure:              2235 2235 RCS    Boron Cone:
RCS Boron    Conc:            825 825
  . AlnlorfuaI Ahnnrma1 A:tiitirncia1:ors:
Anniirnbitnrs i,I', "I "'/1':        '/;:"\";:"ii,h;i:U.;Y:ili,"i;n'r'i .. ':    i',. . . ~ ~h/  .*.  , : i J i .. ? . /.';"" ""'."", ,, I,.*
i i
Annunciator:
Annunciator:      FF 9/2 9/2 - 3B 3B EDG EDG OOSOOS Comp  Actions:
Comp Actions:      O-OSP-023.3 Att O-OSP-023.3      Att 1I && 99 due due in    hours. 3/4-0SP-023.1 in 44 hours. 3/4-OSP-023.1 not not required.
required. 3-0P-023 3-OP-023 sectsect 7.7 7.7 due due next next shift.
shift.
Annunciator:
Annunciator:      FF 9/5 9/5 - 3B 3B EDG EDG OOSOOS Comp Actions:
Comp  Actions:    O-OSP-023.3 Att O-OSP-023.3      Att 11 &
                                                & 99 due due in in 4 hours. 3/4-0SP-023.1 3/4-OSP-023.1 not required.
required. 3-0P-023 3-OP-023 sectsect 7.7 7.7 due due next shift.
shift.
Annunciator:
Annunciator:
Comp Actions:
Comp  Actions:
Annunciator:
Annunciator:
Actions:
Comp Actions:
Comp Annunciator:
Annunciator:
Actions:
Comp Actions:
Comp Annunciator:
Annunciator:
Actions:
Comp Actions:
Comp Annunciator:
Annunciator:
~
Comp  Actions:
Comp Actions:
Annunciator:
Annunciator:
Comp  Actions:
Comp Actions:
Annunciator:
Annunciator:
Comp Actions:
Comp  Actions:
Annunciator:
Annunciator:
Comp Comp Actions:
Actions:
Current Tech Spec Action Statements: (Does Not Include For                      "For Tracking Only Items      Items" T.S.AS / Component:
T.S.A.S  Component:      3.7.1.2 3.7.1.2 Action 33// B  B AFWP Reason:
Reason:                    Bearing failed Entry Date:
Entry Date:                XX/XXJXX XX/Xx/XX (Previous shift)
T.S.AS // Component:
T.S.A.S    Component:      3.8.1.1 3.8.1.1 Actions Actions bb &        3B EDG
                                                      & dd / 3B Reason:
Reason:                    Fuel Fuel pump pump failed Entry Date:
Entry  Date:                XX/XX/XX XX/XX/XX (2      (2 days days ago) ago)
T.S.AS // Component:
T.S.A.S    Component:      3.6.2.1 3.6.2.1 Action Action aa // 3B 3B CSP CSP Reason:
Reason:                    Failed Failed 1ST 1ST - low low discharge discharge pressure pressure Entry Date:
Entry  Date:                XX/XX/XX XX/Xx/XX (Yesterday)
(Yesterday)
T.S.A.S T.S.AS // Component:
Component:      3.4.3  Action aa // 3B 3.4.3 Action          3B PZR PZR backup backup heaters heaters Reason:
Reason:                    14 day 14  day due due toto 3B 3B EDG EDG OOSOOS Entry Entry Date:
Date:                XX/XX/XX XX/XX/XX (2      (2 days days ago) ago)
T.S.A.S T.S.AS // Component:
Component:      3.5.2 Action 3.5.2  Action f/ f / 3B 3B HHSIP HHS1P Reason:
Reason:                    14 day 14  day due due toto 3B 3B EDG EDG OOSOOS Entry Date:
Entry  Date:                XXJXX/XX XX/XX/XX (2      (2 days days ago) ago)
T.S.AS // Component:
T.S.A.S    Component:
Reason:
Reason:
I Entry Entry Date:
Date:
Unit 33 Status Unit          Status
~
Changes to Chan~es        to Risk Risk Significant Significant Equipment:
Equipment:
B AFWP      DOS    (Bearing B AFWP OOS (Bearing replacement)  replacement) 3B    EDG OOS 3B EDG            (Fuel pump DOS (Fuel            repair) pump repair) 3B    CSP OOS 3B CSP            (Failed 1ST DOS (Failed    1ST -low low discharge discharge pressure) pressure)
Unit 33 Risk Unit      Risk isis GREEN.
GREEN. Main  Main contributor contributor isis BB AFWP.
AFWP.
Upcoming Reactivity Upcoming          Reactivity Management Management Activities:
Activities:
Dilute  to  maintain Dilute to maintain 75%  75% power power until until management management permission permission received received to  complete increasing to complete    increasing power power back back to to 100%.
100%.
Upcoming Major Upcoming          Major POD      Activities:
POD Activities:
Return Return    to  %
100 100%    power  if/when management if/when    management permission permission received received to to increase increase power power back back to to 100%.
100%.
Upcoming ECOs to Hang and lor Upcoming                                  br Release:
None None Evolutions or Compensatory Compensatory Actions in Progress:
  -  In  process    of returning power back to 100% 100% from turbine valve test. Currently on hold at 75% awaiting management permission to continue power increase. 3-GOP-301 in use completed through step 5.97.
  - After shift turnover, perform monthly surveillance on 3A ECC per 3-OSP-055.1 3-0SP-055.1 section 7.1 immediately after shift turnover. 1ST 1ST and remote valve position verification not required.
  - Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-
  -                                                                                                                              3-0NOP-071.2, Attachment 1. 1. The current sample, just completed indicates no          no significant change in leak rate. MOV-3-1 MOV-3-1403403 remains energized at management direction due to small size and stability          stability of tube leak rate.
rate.
OSP-023.3 0-OSP-023.3 Att 11 &    &99 for 3B3B EDG EDG DOS OOS due  due in    hrs. 3-OSP-023.1 in 44 hrs. 3-0SP-023.1 notnot required since since to 3B 3B EDG EDG DOS OOS duedue to support support system system failure. 3-OP-023 3-0P-023 sectsect 7.7 7.7 due due next next shift    allow 3B shift to allow  3B EDG EDG 005 OOS >> 7272 hr.
hr.
General General Information, Information, Remarks, Remarks, and  and Operator Operator Work Around  Around Status:
Status:
See evolutions See    evolutions &  &compensator compensatory    y actions actions listed listed above.
above.
Train Train A  A is is protected.
protected.
Appendix D                                                      Scenario Outline                                      Form ES-D-1 Facility:                Turkey Point                            Scenario No.:          4      Op Test No.:        2007-301 Examiners:                                                                  Candidates:                                          US RO BOP Initial Conditions:            Mode 1, 100% Power, MOL. Just completed power increase last shift.
Turnover:                      Equipment OOS: 3B EDG due to failed fuel pump (OOS 2          2 days; next 0-OSP-023.3 Att 11 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);
3B CSP due to failed 1ST -low - low discharge pressure (OOS 12 hr; ETR 36 hr)
Secure 60 gpm orifice (CV-3-200B) and shutdown 1        1 charging pump using 3-0P-047 3-OP-047 section 7.11. Leave 1  1 charging pump and 45 gpm orifice (CV-3-200A) in service.
Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.
Event                                    Type*
Event Type*                                      Event Description No.
11                            (N) ALL          Close CV-3-200B and secure 1    1 charging pump. Shift from 2 charging pumps I 2 letdown orifices to 1 I charging pump I/ 1I letdown orifice lineup using 3-0P-3-OP-047 section 7.11.
2                              (C) SRO/RO        PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and TFB1PIN5 =  = T  r                      letdown restored. The crew responds per 3-ARP-097.CR for annunciator A-5/5.
3      TVFCLK1 =  = 0.2      (C) SRO/BOP                                                                3-ONOP-Ol 4.
Loss of condenser vacuum. The crew responds per 3-0NOP-014.
Loss of condenser vacuum. The crew responds per 3-0NOP-014.
Fast load reduction per 3-0NOP-100 until condenser vacuum leak located and isolated.
3a      1vFCLK1 == 0.0 TVFCLK1      00 (R) ALL (R)ALL                                      3-ONOP-1 00 until condenser vacuum leak located Fast load reduction per 3-0NOP-1
PV;:,ilivll Applicant's Actions or Behavior BOP Recognizes/reports lowering condenser vacuum. Directs 3-0NOP-014 immediate operator action: Directs NSO place SJAE hogging jet in service US Directs performance of 3-0NOP-014 BOP Performs actions per 3-0NOP-014 as directed by US 1. Directs NSO close hogging jet drain 2. Directs NSO verify 2 nd set of SJAEs in service 3. Determines vacuum still slowly lowering US Determines vacuum> 3-0NOP-014 Enclosure 1 Directs performance of fast load reduction per 3-0NOP-1 00 Conducts crew brief per 3-0NOP-1 00 Attachment 3:
                          .                        and isolated.
* Provides reason (2 gpm tube leak requiring plant sid)
4                              (I) RO/BOP       LT-3-459 L T-3-459 failed low. Crew responds per 3-0NOP-041.6 3-ONOP-041 .6 to restore letdown TFH1TV59 = T T-3-459 out of service.
* Target power level = offline
3-ONOP-049.1 to take LLT-3-459 and 3-0NOP-049.1 (I 1S) SRO (I,TS) 5        TvHPBOU TVHPBOTL            (M) RO/BOP        RCS leak inside containment coincident with L    LT-3-459 T-3-459 failure. The crew
* Specifies load reduction rate
              = 0.00004 3-ONOP-041 .3 & 3-0NOP-067.
* Specifies boration amount & rate
initially responds per 3-0NOP-041.3        3-ONOP-067. Once RCS leakage (2gpm)
* Covers plant control parameters
                =
& contingency actions
                = 0.006 r TS SRO (M,TS) exceeds charging pump capacity, the crew unsuccessfully attempts to (300gpm)
* Covers E-O transition criteria
TFL2XASE=
* Reviews req'd actions from 3-0NOP-071.2
TFL2XASE      =TT                        manually trip the reactor and immediate transition is made from 3-EOP-E-0 to TFL2xBsE=T TFL2XBSE      =T                        3-EOP-FR-S.1.
* Solicits crew questions
TFL4AF =  = T (C) ALL          AMSAC and SI fail to automatically actuate. AFW must be manually started 6
& input Ensures load dispatcher notified of load decrease.
TFLSSIA1 =
RO When directed, initiates boration per 3-0NOP-1 00: 1. Sets BA Totalizer to amount directed 2. Sets FC-3-113A pot setting = 8.0 3. Places Rx M/U Selector Switch to BORATE 4. Places Rx M/U Control Switch to START 3 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: --+/--Event No.: 3/3a Page 2. of -.l Event
TFL3SIA1    =TT                        by opening AFWSS MOVs. Manual SI is deferred until after crew transitions nnd 2 d TFLSSIA2=T TFL3SIA2    =T                          back to 3-EOP-E-0. The auto start of the 2 CCWP on SI closes MOV-3-626 TFKV626C =   = T which must be opened manually if RCP seal return temperatures permit. The TVHPBOTL =
crew crew transitions from from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA.
0.01 (R)eactivity, (I)nstrument, (l)nstrument, (C)omponent, (M)aJor (M)ajor (N)ormal, (R)eactlvlty, 1
1
 
AppendixDD Appendix                                           OperatorActions Operator         Actions                                         Form FormES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.: 2007-301 2007-301          Scenario No.:
Scenario      No.: ~  4          Event Event No.:
No.: _1_
j_            Page Page _1_1 of of_1_
j_.
Event


== Description:==
== Description:==


Loss of condenser vacuum. The crew resl20nds l2er 3-0NOP-014.
Event  
Fast load reduction l2er 3-0NOP-1 00 until condenser vacuum leak located and isolated.
Time Position Applicant's Actions or Behavior BOP When directed per 3-0NOP-100:
: 1. Notifies load dispatcher of load reduction when directed by US 2. Makes plant page announcement regarding load reduction When directed per 3-0NOP-014, directs NSO to identify cause of lowering vacuum per step 5.5. RO When directed, continues fast load reduction per 3-0NOP-100:
: 1. Checks for T avg reduction from boration 2. Sets FC-3-113A for BA flow rate as directed BOP Reduces turbine load per 3-0NOP-1 00 at rate directed by US. RO When directed, continues fast load reduction per 3-0NOP-1 00: 1. Verifies auto rod insertion in response to turbine load reduction.
: 2. Verifies rods> RIL US Per 3-0NOP-100, notifies SM to review 0-EPIP-20101
& O-ADM-115 and ensure required notifications made RO When directed per 3-0NOP-1 00 1. Checks PZR level following program. If not increases charging flow and/or places an additional letdown orifice in service. Controls PCV-3-145 as necessary to return letdown pressure to normal (green) band. 2. Directs NSO adjust NRHX CCW flow if needed for increased charging flow. 3. Verifies load reduction rate & auto rod control maintaining T avg-T ref per expected value as discussed in crew brief 4. Energizes PZR backup heaters. BOP Relays report that cause of lowering vacuum has been found and isolated.
Reports vacuum increasing.
4 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: -L Event No.: 3/3a Page 2. of -.l Event


== Description:==
== Description:==
Close CV-3-200B Close    CV-3-200B and    and secure secure 11 charging charging pump.
pump. ShiftShift from from 22 charging charging pumps /I 22 letdown pumps          letdown orifices orifices to  to 11 charging charging pump pump /I 11 letdown letdown orifice orifice lineup using lineup    using 3-0P-047 3-OP-047 sectionsection 7.11.7.11.
  ~.Time~osition Position                                  Applicants Actions Applicant's        Actions oror Behavior Behavior US US        Directs RCO Directs      RCO to to shift shift from from 22 charging charging pumps pumps /2  / 2 letdown letdown orifices orifices to to 11 charging      pump    I  I  letdown charging pump /1 letdown orifice          orifice per per 3-0P-047 3-OP-047 section section 7.11 7.11 RCO RCO        Obtains copy Obtains      copy of of 3-0P-047 3-OP-047 section section 7.11.
7.11. Performs Performs actions actions as as follows:
follows:
1.
: 1.      Notifies HP Notifies  HP of of intent intent toto change change letdown letdown flow flow 2.
: 2.      Directs NSO Directs  NSO adjust adjust CCW CCW flow  flow toto NRHX NRHX to to maintain maintain letdown letdown flow flow within 5&deg;F of VCT temp
: 3. Determines 2 charging pumps running
: 4. If directed by US, takes TCV-3-143 to VCT DIVERT
: 5. Determines step 7.11.2.3 n/a
: 6. Takes manual control & maintains demand>            demand > 20% on running charging pumps.
: 7. Places PCV-3-145 in MANUAL and adjusts letdown pressure to approx. 300 psi  9 psig NOTE: BOP should assist while closing CV-3-200B 8.
: 8. Closes CV-3-200B CV-3-200B and    and controls PCV-3-145 PCV-3-145 to    to maintain maintain letdown letdown pressu  re>    150 pressure> 150 psig    9 psi 9.
: 9. Adjusts Adjusts PCV-3-1 PCV-3-145    45 toto put put letdown letdown pressure pressure in  in normal normal (green)
(green) bandband then then places places PCV-3-145 PCV-3-145 in        in AUTO AUTO NOTE:
NOTE: When  When PCV-3-145 PCV-3-145 is      is returned returned to  to auto auto isis when when the the malfunction malfunction of  of P0-3-145 PC-3-145 in  in automatic automatic is    is inserted.
inserted. Subsequent Subsequent steps steps in in this this event event may may be be delayed delayed or        not performed or not    performed due    due to to response response to  to event event 2. 2.
10.
: 10. Directs Directs NSO NSO adjust adjust 3-834 3-834 to  to maintain maintain stable stable letdown letdown temperature temperature
: 1. Reduces 111. Reduces demand demand to    to 20-25%
20-25% on    on charging charging pumppump to to be be shutdown shutdown then  secures    charging then secures charging pump        pump 12.
: 12. Controls Controls running running charging charging pump  pump demand demand toto putput PZR    level ==
PZR level program program thenthen places places running running charging charging pump pump speedspeed control control inin AUTO AUTO 13.
: 13. Verifies Verifies TCV-3-143 TCV-3-143 inin DEMIN    DEMIN NORMALNORMAL I1


Loss of condenser vacuum. The crew resl20nds l2er 3-0NOP-014.
Appendix D                                 Operattor Opera  or Action Actions                               Form ES-D-2 Op-Test No.:   2007-30101      Scenarrio Scena  io No.: ~ 4      Event No.:   2          Page _1_1 of _1_1 Event
Fast load reduction l2er 3-0NOP-1 00 until condenser vacuum leak located and isolated.
ime Position Applicant's Actions or Behavior US Directs stabilization of reactor power following report that loss of vacuum corrected RO When directed by US (2: 60% power), secures boration:
: a. Places rx m/u selector switch in AUTO b. Sets FC-3-113A potentiometer to directed value c. Places RCS m/u control switch to START US Exits 3-0NOP-100 Directs completion of actions per 3-0NOP-0 14 BOP Completes performing actions of 3-0NOP-014 as directed by US: 1. When condenser vacuum recovers>
26"Hg, directs NSO secure SJAE hogging jet 2. Directs NSO monitor 1 report North & South hotwell levels 3. Directs Chemistry report hotwell dissolved oxygen levels 4. Directs NSO verify condenser air inleakage
< 20"H 2 O US Evaluates reported North & South hotwell levels Determines from SM that both sets of SJAEs to remain in service Directs WCC contact Mechanical to initiate repairs to failed condenser component causing vacuum loss 5 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: Page ..1.. of --L Event


== Description:==
== Description:==
L T 459 failed low. Crew res(2onds (2er 3-0NOP-041.6 to restore letdown and 3-0NOP-049.1 to take L T-3-459 out of service. Time Position Applicant's Actions or Behavior RCO Recognizes  
P0-3-i 45 fails high in auto, PCV-3-145 closes until manual contro PC-3-1 l
/ reports failure of L T-3-459 low and loss of letdown. Performs immediate actions of 3-0NOP-041.6:
taken and letdown restored. The crew resQon responds Qerper 3-ARP-097.CR for annuncciator annun  iator A-5/5.
: 1. Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch to the ch 2 & 3 position.
Time__[_Pos Time     Positio ition n                            Applicant's Applic ants Action Actions or Behavior RO        Recognizes/reports annunannuncciator iator A-5/5 alarms briefly Recognizes/reports loss of letdown flow and PC-3-145 failed high BOP        Directs respon response per 3-ARP-097.CR annun  annuncciator iator A-5/5 for a letdown high pressure conditi condition on RO        Perform Perfor  mss action actionss of 3-ARP-097.CR annunannuncciator iator A-5/5 as directed by BOP:
: 2. With PZR level ch 2 & 3 in service, determines PZR level follows program US Directs performance of actions per 3-0NOP-041.6.
: 1. Determines PCV-3 PCV-3-1  45 not operat
RCO Performs actions per 3-0NOP-041.6 as directed by US: 1. Determines running charging pump can maintain PZR level on program. 2. Places CHANNEL SELECT PRESSURIZER LEVEL RECORDER switch to the ch 2 or ch 3 position NOTE: BOP may assist with restoration of letdown 3. Re-establishes letdown flows as follows: a. Throttles PCV-3-145 to approximately 50% open b. Manually controls PCV-3-145 to limit pressure spike c. Opens LCV-3-460, then opens CV-3-200A
                                                -145     operatiing ng proper properly ly
: d. Determines PCV-3-145 must remain in MANUAL 4. Restores PZR heaters to automatic operation US Directs performance of actions per 3-0NOP-049.1.
: 2. Places PCV-3-145 in MAN and restores letdown pressure to norma l
RCO Performs actions per 3-0NOP-049.1 as directed by US: 1. Determines L T-3-459 failed while L T-3-460/461 remain in service 2. Determines PZR level control switches already transferred US Determines TS 3.3.1 Table 3.3-1 Unit 9 affected.
(green) band & letdown flow to expec expectted ed value for orifice in service US       Directs WCC WOO notify I&Cl&C of PCV-3-145 failure to operat operatee in auto Directs placing info tag on PCV-3-145 to leave in MANUAL Evalua Evaluates no impac impactt per TS Conducts crew brief regarding effects of failure 2
Action 6 applies (6 hr to trip bistables)
 
Determines BS-3-459A 1 & A2 must be tripped Briefs crew regarding tripping bistables and effects of failure. 6 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: Page 2. of --.&#xa3; Event
Appendix D                                       Operattor Opera    or Action Actionss                                Form ES-D-2 Op-Test No.:   2007-301             Scenarrio Scena  io No.: ~  4      Event No.:     3/3a      Page _1_
: j. of _3_ 3 Event


== Description:==
== Description:==
L T 459 failed low. Crew res[2onds
Loss of conde conden  ser vacuum. The crew responds per 3-0NO nser                                          3-ONOP-014 P-014..
[2er 3-0NOP-041.6 to restore letdown and 3-0NOP-049.1 to take L T-3-459 out of service. e Position Applicant's Actions or Behavior NOTE: Subsequent steps may not be performed if annunciator G-5/3 alarms indicating leakage in containment>
Fast load reductreductiion on per 3-0NO 3-ONOP-100 P-1 00 until conde condennser ser vacuum leak located and isolated.
1 gpm. This annunciator may cause the crew to stop performance of 3-0NOP-049.1 and enter 3-0NOP-041.3 per event 5. BOP Obtains keys and opens protection rack 1 Trips bistables BS-3-459A 1 & BS-3-459A2 RCO Checks correct bistable status lights energized in response to tripping bistables (LC459A 1 & LC459A2).
Time    Positiovll PV;:,ili n                                Applicant's ants Action Actions or Behavior BOP        Recognizes/r eports lowerin lowering    conden g conde    ser vacuu nser  vacuum m..
Checks correct annunciators on in response to tripping bistables (A-8/3, A-8/4 & J-7/4). US Directs WCC initiate PWO & notify I&C Directs generation of ECO for tripped bistables 7
Directs 3-0NO3-ONOP-014 P-014 immed iate operatoperato orr action: Directs NSO place SJAE hogging jet in service US        Directs perform performance ance of 3-0NO 3-ONOP-014 P-014 BOP        Perform Perfor          actionss per 3-0NO mss action        3-ONOP-014 P-014 as directed by US
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: l Page!L of _2_ Event
: 1. Directs NSO close hogging jet drain
: 2.                                nd Directs NSO verify 2  2    set of SJAEs in service
: 3.        Determ ines vacuum still slowly lowerinloweringg US        Determines vacuu  vacuum  m>> 3-0NO 3-ONOP-014 P-014 Enclos ure 11 Directs performperformance ance of fast load reduct reductiion on per 3-0NO 3-ONOP-1 P-1 00 Conducts crew brief per 3-0NO    3-ONOP-1  P-1 00 Attachment 3:
Provides
                              *. Provid  es reason (2 gpm tube leak requiring plant sid)      s/d)
                              *. Target power level      =offline
                                                            =
                            *. Specifies load reduct reductiionon rate
                            *.      Specifies boration amount & rate
                            *.      Covers plant control paramparame  ters & contin eters      conting ency action gency  actionss
                          *.      Covers E-O E-0 transit transitiion on criteria
                          *.      Reviews req'd reqd action actionss from 3-0NO 3-ONOP-071 P-071 .2
                                                                                      .2
                          *.      Solicits crew questi questio  ns & input ons Ensures load dispat  dispatc  her notified cher  notified of load decrease.
RO RD        When directed, initiates boration per 3-0NO        3-ONOP-1P-1 00:
: 1. Sets BA Totalizer to amount directed
: 2.      Sets FC-3-1    I 3A pot setting =
FC-3-1 13A                  = 8.0
: 3. Places Rx M/U Select  Selectoorr Switch to BORATE
: 4. Places Rx M/U Control Switch to START 3
 
Appendix DD Appendix                                    Operator Actions Operator     Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test No.:   2007-301 2007-301           Scenario      No.: --+/--
Scenario No.:       4        Event Event No.:
No.: 3/3a3/3a      Page 2.
Page      2 ofof -.l 3
Event


== Description:==
== Description:==


RCS leak inside containment conincident with L T-3-459 failure. The crew initially resl20nds l2er 3-0NOP-041.3
Event
& 3-0NOP-067.
Once RCS leakage exceeds charging l2uml2 cal2acity.
the crew unsuccessfully atteml2ts to manually tril2 the reactor and immediate transition is made from 3-EOP-E-0 to 3-EOP-FR-S.1.
Time Position Applicant's Actions or Behavior RO Recognizes
/ reports rising charging flow while maintaining PZR level on program Recognizes
/ reports annunciator G-5/3 alarming BOP Recognizes
/ reports rising containment sump level on recorder Recognizes
/ reports R-3-11/12 slowly rising US Directs performance of actions per 3-0NOP-041.3 Directs STA perform 3-0SP-041.1 to determine RCS leak rate Identifies leak as inside containment but not isolable RO Performs actions of 3-0NOP-041.3 as directed by US: 1. Determines RCS inventory being maintained with 1 charging pp 2. Estimates RCS leak rate from charging/letdown mismatch 3. Closes CV-3-2819/2826 and CV-3-2821/2822 US Determines RCS leak rate> unidentified leak limit of TS 3.4.6.2.b requiring action within 4hr or commence shutdown of unit Notifies SM to refer to 0-EPIP-201 01 Directs HPSS conduct local radiation surveys & post accordingly Determines leak not isolated Directs performance of actions per 3-0NOP-067 as time permits BOP Performs actions of 3-0NOP-067 as directed by US: 1. Determines
/ reports status of R-3-11 /12 alarms. If alarming:
: a. Determines reading> alarm setpoint b. Verifies containment/control rm ventilation per Att 1 c. Directs NSO silence alarm on R-3-11/12 RM-80 skid d. Directs HP verify activity inside containment 8
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: 2-Page 2 of--L Event


== Description:==
== Description:==
Loss of Loss    of condenser condenser vacuum.
vacuum. The The crew crew resl20nds responds l2er per 3-0NOP-014.
3-ONDP-014.
Fast load Fast    load reduction reduction l2er per 3-0NOP-1 3-ONOP-1 00    00 until until condenser condenser vacuum vacuum leak leak located and located    and isolated.
isolated.
Time Time      Position Position                                Applicants Actions Applicant's    Actions or  or Behavior Behavior BOP BOP          When directed When      directed per per 3-0NOP-100:
3-ONOP-100:
1.
: 1. Notifies load Notifies  load dispatcher dispatcher of  of load load reduction reduction when directed directed by by US US
: 2.                              announcement regarding load reduction Makes plant page announcement When directed per          3-ONOP-014, directs NSO per 3-0NOP-014,                    NSO to identify cause cause of lowering vacuum per step 5.5.
RD RO          When directed, continues fast load reduction per 3-0NOP-100:        3-ONOP-100:
: 1. Checks for T      avg reduction from boration Tavg
: 2. Sets FC-3-113A FC-3-1 13A for BA flow rate as directed BOP        Reduces turbine load per 3-0NOP-1  3-ONOP-100    00 at rate directed by US.
RD RO        When directed, continues fast load reduction per 3-ONDP-100          3-0NOP-1 00::
1.
: 1. Verifies auto rod insertion in response to turbine load reduction.
2.
: 2. Verifies rods> RIL US US        Per 3-DNOP-100 3-0NOP-100,, notifies notifies SM to review 0-EPIP-2010 0-EPIP-20101    1 && 0-ADM-O-ADM-1115 15 and    ensure    required and ensure required notifications notifications mademade RD RO        When When directed directed perper 3-ONOP-100 3-0NOP-1 00
: 1. Checks
: 1. Checks PZR PZR level level following program.
program. IfIf not not increases increases charging charging flow  and/or  places flow and/or places an    an additional additional letdown letdown orifice orifice in in service.
service.
Controls Controls PCV-      3-1 45 as PCV-3-145        as necessary necessary to  to return return letdown letdown pressure pressure toto normal normal (green)
(green) band.
band.
2.
: 2. Directs Directs NSO NSO adjust adjust NRHX NRHX CCW  CCW flowflow ifif needed needed forfor increased increased charging charging flow.
flow.
: 3. Verifies
: 3. Verifies load load reduction      rate &&auto reduction rate        auto rod rod control control maintaining maintaining Tavg Tavg-Tref  per expected T ref per expected valuevalue asas discussed discussed inin crewcrew brief brief 4.
: 4. Energizes Energizes PZR  PZR backup backup heaters.
heaters.
BDP BOP        Relays Relays report report that that cause cause ofof lowering lowering vacuum vacuum has  has been been found found and and isolated.
isolated.
Reports Reports vacuum vacuum increasing.
increasing.
44


RCS leak inside containment con incident with L T-3-459 failure. The crew resl20nds l2er 3-0NOP-041.3
AppendixDD Appendix                                    OperatorActions Operator    Actions                                   Form Form ES-D-2 ES-D-2 Op-Test No.:
& 3-0NOP-067.
Op-Test No.:     2007-301 2007-301          Scenario No.:
Once RCS leakage exceeds charging l2uml2 the crew atteml2ts to tril2 the reactor and immediate transition is made from 3-EOP-E-0 to 3-EOP-FR-S.1.
Scenario    No.:-L  4      Event Event No.:
Position Applicant's Actions or Behavior BOP Continues performing actions of 3-0NOP-067 as directed by US: 2. Directs NSO report status of R-3-11/12 RM-80 monitor light 3. Determines effluent radiation monitor alarms clear, effluent release not in progress RO Recognizes I reports sudden decrease in PZR level and increase in charging pump demand US Directs performance of actions per 3-0NOP-041.3 in response to leak rate increase RO Performs actions of 3-0NOP-041.3 as directed by US: 1. Starts 2 standby charging pumps and establishes maximum charging flow 2. Closes CV 200A to isolate letdown 3. Recognizes I reports PZR level continuing to drop US Determines RCS leak rate> maximum charging flow with letdown isolated Directs reactor trip Directs crew perform immediate actions of 3-EOP-E-0.
No: 3/3a3/3a    Page2.3 of Page         of-.l3 Event
RO Performs immediate actions of 3-EOP-E-0:
: 1. Attempts reactor trip at console & VPB. Reports unable to trip reactor with reactor power> 5% US Directs STA monitor CSFs using 3-EOP-F-0 Directs transition to 3-EOP-FR-S.1 9
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _4_ Event No.: _6_ Page.L of l Event


== Description:==
== Description:==


AMSAC and SI fail to automatically actuate. AFW must be manually started by opening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
Event  
The auto start of the 2 nd CCWP on SI closes MOV-3-626 which must be opened manually if RCP seal return temperatures permit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. Time Position Applicant's Actions or Behavior US Directs performance of 3-EOP-FR-S.1 RO Performs actions per 3-EOP-FR-S.1 as directed by US: Critical BOP Critical 1. Since reactor does not respond to manual trip, verifies control rod insertion in auto or manual 2. Initiates emergency boration:
: a. Determines all 3 charging pumps running. Verifies control for one of those in MANUAL. b. Stops CVCS makeup system c. Starts 1 BATP d. Opens MOV-3-350
& HCV-3-121
: e. Determines CV-3-301A open f. Establishes emergency boration flow> 60 gpm on FI-3-110 with charging flow> 45 gpm on FI-3-122 3. Determines PZR pressure < 2335 psig 4. Determines containment purge exhaust & supply fans off and isolation dampers closed. Verifies CV-3-2819
& 2826 closed. 5. Determines reactor subcritical with reactor power < 5% and IR SUR negative Performs actions per 3-EOP-FR-S.1 as directed by US: 1. Manually trips turbine & determines turbine stop valves closed 2. Closes MSR main steam stop MOVs 3. Opens AFWSS MOVs to start AFW pumps 4. Directs FS/NSO locally trip rx trip breakers and MG set input/output breakers 5. Verifies turbine trip & Mid/East GCBs open 10 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _4_ Event No.: _6_ Page.&#xa3; of _6_ Event


== Description:==
== Description:==
Loss of Loss    ofcondenser condenservacuum.
vacuum. TheThe crew crew resl20nds responds l2er per 3-0NOP-014.
3-ONOP-01 4.
Fast load Fast  load reduction reduction l2er  3-ONOP-100 per 3-0NOP-1    00 until until condenser condenservacuum vacuum leakleak located and located    and isolated.
isolated.
Time ime        Position Position                              Applicants Actions Applicant's  Actions or  or Behavior Behavior US US          Directs stabilization Directs  stabilization of of reactor reactor power power following following report report that that loss loss of of vacuum    corrected vacuum corrected RO RO        When directed When      directed by by US US (2:
( 60%
60% power),
power), secures secures boration:
boration:
a.
: a. Places rx Places    rx m/u rn/u selector selector switch switch inin AUTO AUTO b.
: b. Sets FC-3-113A Sets  FC-3-1 1 3A potentiometer potentiometer to to directed directed value value
: c. Places RCS Places    RCS m/u control switch to START us US                3-ONOP-100 Exits 3-0NOP-100 Directs completion of actions per 3-0NOP-0 3-ONOP-014    14 BOP BOP        Completes performing actions of 3-0NOP-014 3-ONOP-014 as directed by US:        US:
: 1. When condenser vacuum recovers>    recovers > 26"Hg, 26Hg, directs NSO NSO secure SJAE hogging jet
: 2. Directs Directs NSO monitor /1 report North North &    South hotwell
                                                                              & South    hotwell levels levels 3.
: 3. Directs Directs Chemistry Chemistry report hotwell hotwell dissolved dissolved oxygen oxygen levels levels 4.
: 4. Directs Directs NSO NSO verify verify condenser airair inleakage inleakage << 20H 20"H 2O 0
2 US US        Evaluates Evaluates reported reported North North && South South hotwell hotwell levels levels Determines Determines fromfrom SM SM that that both both sets sets ofof SJAEs SJAEs to to remain remain in in service service Directs Directs WCC WCC contact contact Mechanical Mechanical to to initiate initiate repairs repairs to to failed failed condenser    component condenser component causing  causing vacuum vacuum loss loss 55


AMSAC and SI fail to automatically:
Appendix DD Appendix                                          OperatorActions Operator    Actions                                         Form Form ES-D-2 ES-D-2 Op-Test No.:
actuate. AFW must be manually:
Op-Test  No.:   2007-301 2007-301              Scenario No.:
started by: oQening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
Scenario      No.: ~  4        Event    No.: ~
The auto start of the 2 na CCWP on SI closes MOV-3-626 which must be oQened manually:
Event No.:         4        Page ..1..1 of Page          of--L 2
if RCP seal return temQeratures Qermit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. I Time Position Applicant's Actions or Behavior U5 Does not allow manual 51 until after return to 3-EOP-E-O Determines reactor subcritical and proceeds from step 8 to step 17 Directs transition back to and performance of 3-EOP-E-0 RO Performs actions per 3-EOP-E-0 as directed by U5: 1. Recognizes
Event
/ reports rx tripped with rod bottom lights on, RPI at zero & neutron flux decreasing (rx trip breakers still closed). NOTE: Automatic SI will not function.
Crew must manually SI. Critical 2. Determines PZR level < 12[50]%. Manually initiates
: 51. BOP Performs actions per 3-EOP-E-0 as directed by US: 1. Determines turbine stop valves & MSR steam stop MOVs closed with Mid/East GCBs open. 2. Determines 3A & 3B 4kV buses energized from offsite power with 3D 4kV bus aligned to 3B 4kV bus US Directs RO continue with performance of 3-EOP-E-0 subsequent actions while BOP verifies prompt actions per Attachment
: 3. BOP Verifies prompt actions per 3-EOP-E-0 Attachment 3: 1. Determines 3A, 3B, 3C, 3D & 3H 480V LCs energized
: 2. Determines MSIVs open with no active MSIS 3. Verifies FW isolation:
: a. Places both SGFP switches in STOP. b. Determines all main FW regulating
& bypass valves closed. c. Closes FW isolation valves MOV-3-1407, 1408 & 1409. d. Determines both SSGFWPs off. 4. Determines 2: 2 ICWP running POV-3-4882
& 4883 closed with ICW headers tied together.
11 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _4_ Event No.: _6_ Page --L of _6_ Event


== Description:==
== Description:==


AMSAC and SI fail to automatically actuate. AFW must be manually started by opening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
Event
The auto start of the 2 nd CCWP on SI closes MOV-3-626 which must be opened manually if RCP seal return temperatures permit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. Time Position Applicant's Actions or Behavior BOP Continues prompt action verification per 3-EOP-E-O Att. 3: Critical 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Determines 3 CCWHXs in service, 2 CCWPs running and CCW headers tied together Determines MOV-3-626 closed, containment isolation phase B not actuated & R-3-17 AlB normal. If RCP #1 seal leak-off temperature
 
< 235&deg;F, manually opens MOV-3-626 Determines 2 ECC & ECF running. Determines both U3 HHSIPs & RHRPs running. Determines RCS pressure <1600[2000]
== Description:==
psig but >250[650]
LLT-3-459 T 459 failedfailed low.
psig with adequate HHSI flow present. Determines both U3 HHSIPs running. Shuts down both U4 HHSIPs. Determines all containment isolation phase A valves closed. Determines SI valves in proper injection alignment Resets SI & containment isolation phase A. Determines containment isolation phase B not actuated.
low. Crew Crew res(2onds responds (2er  per 3-0NOP-041.6 3-ONOP-041 .6 to      to restore restore letdown and letdown        and 3-0NOP-049.1 3-ONOP-049.1 to      to take take LLT-3-459 T-3-459 out        of service.
Determines no RCPs running (should have been tripped by RO due to inadequate RCS subcooling)
out of service.
: 16. Determines containment pressure < 20 psig. 17. Determines containment ventilation isolated and verifies control room ventilation in proper emergency recirculation alignment.
Time Time        Position Position                                    Applicants Actions Applicant's      Actions or or Behavior Behavior RCO RCO            Recognizes // reports Recognizes            reports failure failure ofof LLT-3-459 T-3-459 low  low and and loss loss of of letdown.
: 18. Directs NSO place PAHMS in service per 3-0P-094.
letdown.
: 19. Verifies 3A & both U4 EDGs running (3B EDG is OOS). 20. Determines 3A, 3B & 3D 4kV buses still energized.
Performs immediate Performs        immediate actions actions of  of 3-0NOP-041.6:
: 21. Notifies US that prompt action verification complete.
3-ONOP-041 .6:
12 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _4_ Event No.: _6_ Page of l Event
1.
: 1.      Places CHANNEL Places      CHANNEL SELECT SELECT PRESSURIZER PRESSURIZER LEVEL        LEVEL CONTROL switch CONTROL          switch toto the the ch ch 22 && 33 position.
position.
: 2. With PZR PZR level ch 2 &          in service, determines PZR
                                                                  & 33 in                                PZR levellevel follows program program US US          Directs performance Directs      performance of actions per 3-0NOP-041.6.
3-ONOP-041 .6.
RCO RCO                                          3-ONOP-041 .6 as directed by US:
Performs actions per 3-0NOP-041.6
: 1. Determines running charging pump can maintain PZR level on program.
: 2. Places CHANNEL SELECT PRESSURIZER        PRESSURIZER LEVEL RECORDER switch to the ch 2 or ch 33 position NOTE:          BOP may assist with restoration of letdown
: 3.      Re-establishe Re-establishess letdown flows as follows:
: a.      Throttles PCV-3-145 to approximatel approximately      y 50% open b.
: b.      Manually Manually controls controls PCV-3-145 PCV-3-145 to    to limit limit pressure pressure spike spike c.
: c.      Opens Opens LCV-3-460, LCV-3-460, then  then opens opens CV-3-200A CV-3-200A d.
: d.      Determines Determines PCV-3-145 PCV-3-145 must  must remain remain in  in MANUAL MANUAL 4.
: 4.      Restores Restores PZR  PZR heaters heaters to  to automatic automatic operation operation US US          Directs Directs performance performance of    of actions actions perper 3-ONOP-049 3-0NOP-049.1.      .1.
RCO RCO          Performs Performs actions actions per per 3-ONOP-049 3-0NOP-049.1      .1 asas directed directed by  by US:
US:
1.1. Determines Determines LT-3-459 LT-3-459 failed failed while while LT-3-460/46 LT-3-460/461        remain inin 1 remain service service 2.2. Determines Determines PZR    PZR level level control control switches switches already already transferred transferred US US          Determines Determines TS        TS 3.3.1 3.3.1 Table Table 3.3-1 3.3-1 Unit Unit 99 affected.
affected. Action Action 66 applies applies (6    hr  to  trip  bistables)
(6 hr to trip bistables)
Determines Determines BS-3-459A1BS-3-459A 1&& A2    A2 must must be be tripped tripped Briefs Briefs crew crew regarding regarding tripping tripping bistables bistables and and effects effects of offailure.
failure.
66
 
Appendix DD Appendix                                      OperatorActions Operator      Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301            Scenario No.:
Scenario      No.: ~ 4                  No.: ~
Event No.:
Event          4        Page 2.
Page      of--.&#xa3; 2 of    2 Event
 
== Description:==
 
Event
 
== Description:==
LLT-3-459    failed low.
T 459 failed    low. Crew Crew res[2onds responds [2erper 3-0NOP-041.6 3-ONOP-041 .6 to  to restore restore letdown and letdown      and 3-0NOP-049.1 3-ONOP-049.1 to    to take take LLT-3-459 T-3-459 out out of of service.
service.
e
[_Time        Position Position                                Applicants Actions Applicant's    Actions or or Behavior Behavior NOTE: Subsequent NOTE:      Subsequent stepssteps may may notnot be be performed performed ifif annunciator annunciator G-G 5/3 alarms  indicating    leakage in 5/3 alarms indicating leakage          in containment>
containment> 11 gpm. gpm. This This annunciator may annunciator    may cause cause the the crew crew toto stop stop performance performance of  of 3-0NOP-3-ONOP-049.1 and 049.1  and enter    3-ONOP-041.3 per enter 3-0NOP-041.3          per event event 5.5.
BOP BOP          Obtains keys Obtains    keys and and opens opens protection protection rack rack 11 Trips bistables Trips  bistables BS-3-459A BS-3-459A11 &        BS-3-459A2
                                                                  & BS-3-459A2 RCO RCO          Checks correct bistable status lights energized in response to (LC459A11 & LC459A2).
tripping bistables (LC459A Checks correct annunciators on in response to tripping bistables (A-813, A-8/4 (A-8/3,  A-814 & J-7/4).
J-714).
US          Directs WCC initiate PWO & notify I&C        l&C Directs generation of ECO for tripped bistables 77
 
Appendix DD Appendix                                        OperatorActions Operator      Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-30 1 2007-301              Scenario No.:
Scenario    No.: ~  4        Event No.:
Event    No.: l 5        Page!L Page 8 of  of_2_2 Event
 
== Description:==
 
Event
 
== Description:==
RCS leak RCS    leak inside inside containment containment conincident conincident with with LLT-3-459 T-3-459 failure.
failure. The The crew initially crew    initially resl20nds responds l2erper 3-0NOP-041.3 3-ONOP-041 .3 && 3-0NOP-067.
3-ONOP-067. Once  Once RCSRCS leakage exceeds leakage      exceeds charging charging l2uml2 pump cal2acity.
capacity, thethe crew crew unsuccessfully unsuccessfully attempts to atteml2ts      to manually manually tril2 trip the the reactor reactor and and immediate immediate transition transition isis made made from  3-EOP-E-0      to  3-EOP-FR-S from 3-EOP-E-0 to 3-EOP-FR-S.1.              . 1.
Time Time        Position Position                                  Applicants Actions Applicant's      Actions or or Behavior Behavior RO RO            Recognizes // reports Recognizes          reports rising rising charging charging flowflow while while maintaining maintaining PZR  PZR level on level    on program program Recognizes!/ reports Recognizes          reports annunciator annunciator G-5/3G-5/3 alarming alarming BOP          Recognizes / reports rising containment sump level on recorder Recognizes!/ reports R-3-11/12 Recognizes                      R-3-11112 slowly rising US US          Directs performance of actions per 3-0NOP-041.3    3-ONOP-041 .3 Directs STA perform 3-0SP-041.13-OSP-041.1 to determine RCS leak rate Identifies leak as inside containment but not isolable RO RO          Performs actions of 3-0NOP-041.3 3-ONOP-041 .3 as directed by US:
1.
: 1. Determines RCS inventory being maintained with 11 charging pp                    pp 2.
: 2. Estimates RCS leak rate from charging/letd charging/letdownown mismatch
: 3. Closes CV-3-2819/2 CV-3-2819/2826    826 and CV-3-2821/2 CV-3-2821/2822    822 US US          Determines Determines RCS    RCS leakleak rate rate>> unidentified unidentified leak leak limit limit of of TS TS 3.4.6.2.b 3.4.6.2.b requiring requiring action action within within 4hr4hr or or commence commence shutdown shutdown of  of unit unit Notifies Notifies SM  SM toto refer  to 0-EPIP-201 refer to  0-EPIP-201 01  01 Directs Directs HPSS HPSS conduct conduct local local radiation radiation surveys surveys && post post accordingly accordingly Determines Determines leak  leak not not isolated isolated Directs Directs performance performance of    of actions actions per per 3-ONOP-067 3-0NOP-067 as    as time time permits permits BOP BOP            Performs Performs actions actions of of 3-ONOP-067 3-0NOP-067 as    as directed directed byby US:
US:
1.1. Determines Determines // reports reports status status ofof R-3-11/12 R-3-11 /12 alarms.
alarms. IfIfalarming:
alarming:
a.a. Determines Determines reading reading>  > alarm alarm setpoint setpoint b.b. Verifies Verifies containment/      control rm containment/control          rm ventilation ventilation per perAttAtt 11 c.c. Directs Directs NSO NSO silence silence alarm alarm on on R-3-1 R-3-11/12    RM-80 skid 1/12 RM-80      skid d.d. Directs  HP verify Directs HP    verifyactivity activityinside inside containment containment 88
 
AppendixDD Appendix                                        OperatorActions Operator        Actions                                    Form FormES-D-2ES-D-2 Op-TestNo.:
Op-Test  No.:    2007-301 2007-301            ScenarioNo.:
Scenario      No.:~    4          EventNo.:
Event    No.:2-
                                                                                      .          Page2 of--L Page          of Event
 
== Description:==
 
Event
 
== Description:==
RCSRCS leak leak inside inside containment containmentcon      conincident incident with with LLT-3-459 T-3-459 failure.
failure. The The crew initiall~
crew    initiallyresl20nds responds l2er  per3-0NOP-041.3 3-ONOP-041 .3 && 3-0NOP-067.
3-ONOP-067. Once  Once RCS RCS leakage exceeds leakage      exceeds charging charging l2uml2 pump cal2acit~,
capacity, the    crew unsuccessfull~
the crew  unsuccessfully attempts toto manuall~
atteml2ts        manuallytril2trip the the reactor reactor andand immediate immediate transition transition isis made made from  3-EOP-E-0      to  3-EOP-FR-S from 3-EOP-E-0 to 3-EOP-FR-S.1.              .1.
Time        Position Position                                  Applicants Actions Applicant's      Actions oror Behavior Behavior BOP BOP            Continues performing Continues      performing actions actions of of 3-0NOP-067 3-ONOP-067 as    as directed directed by by US:
US:
2.
: 2.      Directs NSO Directs  NSO report report status status of of R-3-11/12 R-3-11/12 RM-80 RM-80 monitor monitor light light 3.
: 3.      Determines effluent Determines      effluent radiation radiation monitor monitor alarms alarms clear, clear, effluent effluent release not release    not in in progress progress RO RO          Recognizes I/ reports sudden decrease Recognizes                                decrease in in PZR PZR level level and increase increase in  in charging pumppUmp demand demand US US                      performance of actions per 3-0NOP-041.3 Directs performance                                3-ONOP-041 .3 in response response to  to leak rate increase leak        increase RO RO                                        3-ONOP-041 .3 as directed by US:
Performs actions of 3-0NOP-041.3 1.
: 1. Starts 2 standb standby    y charging pumps and establi  establishes shes maximum charging flow 2.
: 2. Closes CV  CV 200A to isolate letdown  letdown 3.
: 3. Recog    nizes /I reports PZR Recognizes                    PZR level level continuing to to drop drop US US          Determines Determines RCS  RCS leakleak rate rate>  > maximum maximum charging charging flow flow with with letdown letdown isolated isolated Directs Directs reactor reactor trip trip Directs Directs crew crew perform perform immediate immediate actions actions of of 3-EOP-E-0.
3-EOP-E-0.
RO RO          Performs Performs immediate immediate actions actions of of 3-EOP-E-0:
3-EOP-E-0:
1.1. Attempts Attempts reactor reactor trip trip at at consol console  e && VPB.
VPB. Report Reports    unable to s unable    to trip trip reactor reactorwith    reactor power>
with reactor      power> 5%  5%
US US        Directs Directs STASTA monitor monitorCSFs CSFs usingusing 3-EOP-F-0 3-EOP-F-0 Directs Directs transition transition toto 3-EOP-FR-S 3-EOP-FR-S.1    .1 99
 
Appendix DD Appendix                                          OperatorActions Operator      Actions                                          Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-30 1 2007-301              Scenario No.:
Scenario      No.: _4_  4          Event No.:
Event      No.: _6_  6    Page.L Page 1 of  ofl 6 Event
 
== Description:==
 
Event
 
== Description:==
AMSAC AMSAC and  and SI   fail to SI fail  to automatically automatically actuate.
actuate. AFW AFW must must bebe manually manually started    by  opening started by opening AFWSS     AFWSS MOVs. MOVs. ManualManual SI   SI isis deferred deferred until until after after crew crew transitions back                                                             nnd transitions      back toto 3-EOP-E-0.
3-EOP-E-0. The  The auto      start of auto start         the 22 of the     d CCWP CCWP on   on SI SI closes MOV-3-626 closes      MOV-3-626 which  which must must be be opened opened manually manually ifif RCPRCP seal seal return return temperatures permit.
temperatures        permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to      3-EOP-E-1 to 3-EOP-E-1 to address to  address the  the SBLOCA.
SBLOCA.
Time Time       Position Position                                     Applicants Actions Applicant's     Actions or   or Behavior Behavior US US            Directs performance Directs    performance of        of 3-EOP-FR-S.1 3-EOP-FR-S.1 RO RO            Performs actions Performs        actions per  per 3-EOP-FR-S.1 3-EOP-FR-S.1 as      as directed by US:      US:
: 1. Since reactor does not respond to manual trip, verifies control rod insertion in auto or manual Critical Critical        2. Initiates emergency boration:
: a. Determines all 3 charging pumps running. Verifies control for one of those in MANUAL.
: b. Stops CVCS makeup system
: c. Starts 1      I BATP
: d. Opens MOV-3-350 & HCV-3-121
: e. Determines CV-3-301A open
: f. Establishes emergency boration flow                    flow>        gpm on Fl                                                                                                      > 60 gpm          FI                                          110 110 with with charging charging flow flow>    45 gpm
                                                                            > 45    gpm on  on Fl-3-122 FI-3-122 3.
: 3. Determines Determines PZR    PZR pressure pressure << 23352335 psigpsig 4.
: 4. Determines Determines containment purge        purge exhaust exhaust && supplysupply fans fans off off and and isolation isolation dampers dampers closed.
closed. Verifies Verifies CV-3-2819 CV-3-2819 && 2826    2826 closed.
closed.
5.
: 5. Determines Determines reactor reactor subcritical subcritical with with reactor reactor powerpower << 5%5% andand IR IR SUR SUR negative negative BOP BOP          Performs Performs actionsactions per  per 3-EOP-FR-S 3-EOP-FR-S.1      .I asas directed directed by  by US:
US:
Critical Critical        I.1. Manually Manually trips  trips turbine turbine && determines determines turbine turbine stop stop valves valves closed closed 2.
: 2. Closes Closes MSR MSR main main steam steam stopstop MOVs MOVs 3.3. Opens Opens AFWSSAFWSS MOVs  MOVs to    to start start AFW AFW pumps  pumps 4.
: 4. Directs Directs FS/NSO FS/NSO locallylocally trip trip rx rx trip trip breakers breakers and    and MG MG setset input!output input/output breakersbreakers 5.5. Verifies Verifies turbine turbine trip trip && Mid/East Mid/East GCBs GCBs open  open 10 10
 
Appendix DD Appendix                                           OperatorActions Operator         Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:  2007-301 2007-301               Scenario No.:
Scenario      No.: _4_   4          Event No.:
Event   No.: _6_ 6      Page.&#xa3; Page of     of__6_
Event


== Description:==
== Description:==


AMSAC and SI fail to automatically actuate. AFW must be manually started by opening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
The auto start of the 2 nd CCWP on SI closes MOV-3-626 which must be opened manually if RCP seal return temperatures permit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. Time Position RO Critical Applicant's Actions or Behavior Performs foldout page actions of 3-EOP-E-0 as directed:
: 1. Determines containment conditions adverse (>180&deg;F) 2. Trips RCPs if RCS subcooling
< 25[65]OF with U4 HHSIPs running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0 as directed 1. Determines 2 AFWPs (A & C) running. 2. Determines AFW valve alignment proper. 3. Determines SG levels < 6[32]%. Controls AFW flow> 345 gpm until level > 6[32]% then maintains levels 15-50%. 4. Determines annunciator A-1/3 on & verifies RCPs tripped if MOV-3-626 still closed. In that case, if RCP seal return temps all < 235&deg;F, verifies SI reset then starts 3A charging pump at minimum speed and adjusts HCV-3-121 for proper seal injection flow 5. Determines Tc slowly dropping with RCS pressure.
Determines steam dumps & steam flow not cause for Tc decrease.
Limits total AFW flow to 345 gpm until any SG level> 6[32]%. 6. Determines PORVs, normal spray, aux spray & excess letdown isolation valves closed 7. Verifies RCPs tripped if RCS subcooling
< 25[65tF with U4 HHSIPs running and SI flowpath verified 8. Determines no SGs depressurized or depressurizing
: 9. Determines no SG tube ruptures 10. Determines RCS not intact (containment radiation, pressure & sump level all not normal). US Directs transition to and performance of 3-EOP-E-1.
Conducts crew brief. 13 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _4_ Event No.: _6_
Event
Event
== Description:==
AMSAC AMSAC and  and SI SI fail fail to to automatically:
automatically actuate.
actuate. AFW AFW must must be be manually:
manually started    by  opening AFWSS started by: oQening          AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after after crew crew nna transitions back transitions      back to    3-EOP-E-0. The to 3-EOP-E-0.          The auto    start of auto start        the 22 of the      d CCWP on SI CcWP on SI closes MOV-3-626 closes      MOV-3-626 which  which mustmust be be oQened opened manually:
manually ifif RCPRCP sealseal return return temperatures Qermit.
temQeratures        permit. The The crewcrew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to      3-EOP-E-1 to 3-EOP-E-1 to address to  address the  the SBLOCA.
SBLOCA.
I Time Time      Position Position us
                            ]  Does not Does      not allow allow manual Applicants Actions Applicant's manual 51 Actions or until after SI until or Behavior Behavior after return return to  to 3-EOP-E-O 3-EOP-E-O U5 Determines reactor Determines        reactor subcritical subcritical and and proceeds proceeds from  from step step 88 to to step step 1717 Directs transition Directs      transition back  back to  to and and performance performance of      of 3-EOP-E-0 3-EOP-E-O RO          Performs actions per 3-EOP-E-0      3-EOP-E-O as    as directed by U5:      US:
: 1. Recognizes / reports rx tripped with rod bottom lights on, RPI at zero & neutron flux decreasing (rx trip breakers still closed).
NOTE: Automatic SI will not function. Crew must manually SI.
Critical        2. Determines PZR level <              < 12[50]%. Manually initiates 51.          SI.
BOP          Performs actions per 3-EOP-E-0 as directed by US:
1.
: 1. Determines turbine stop valves & MSR steam stop MOVs closed with Mid/East GCBs open.
: 2. Determines 3A & 3B 4kV buses energized from offsite power                      power with 3D 4kV bus aligned to 3B 4kV bus US          Directs Directs RO  RO continue with performance of              of 3-EOP-E-0 3-EOP-E-0 subsequent US actions      while actions while BOP    BOP verifies verifies prompt prompt actions actions per per Attachment 3. 3.
BOP BOP          Verifies Verifies prompt prompt actions actions per  per 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3:      3:
1.
: 1. Determines Determines 3A,    3A, 3B,3B, 3C, 3C, 3D3D && 3H 3H 480V 480V LOs  LCs energized energized 2.
: 2. Determines Determines MSIVs  MSIVs open  open with with no no active active MSISMSIS 3.
: 3. Verifies Verifies FW  FW isolation:
isolation:
a.
: a. Places Places both both SGFP SGFP switches switches inin STOP.
STOP.
b.b. Determines Determines all      all main main FW FW regulating regulating && bypass bypass valves valves closed.
closed.
c.c. Closes Closes FW  FW isolation isolation valves valves MOV-3-1 MOV-3-1407,          1408 && 1409.
407, 1408          1409.
d.d. Determines Determines both    both SSGFWPs SSGFWPs off. off.
4.4. Determines Determines 2: 22 ICWP    ICWP running running POV-3-4882 POV-3-4882 && 4883    4883 closed closed with with ICW ICW headers headers tied  tied together.
together.
11 11
Appendix DD Appendix                                        OperatorActions Operator      Actions                                      Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301            Scenario No.:
Scenario      No.: _4_  4          Event No.:
Event    No.: _6_  6      Page--L Page      3 ofof_6_6 Event
== Description:==
Event
== Description:==
AMSAC AMSAC and  and SI SI fail fail to  automaticallyactuate.
to automatically      actuate. AFW AFW must must be be manually manually started started by    opening AFWSS by opening      AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after after crew crew nnd transitions back transitions    back to    3-EOP-E-0. The to 3-EOP-E-0.        The auto auto start start of    the 22 of the      d CCWP CCWP on  on SI SI closes MOV-3-626 closes    MOV-3-626 which which must must be    opened manually be opened      manually ifif RCPRCP seal seal return return temperatures permit.
temperatures      permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to      3-EOP-E-1 to 3-EOP-E-1 to  address the to address        SBLOCA.
the SBLOCA.
Time Time        Position Position                                  Applicants Actions Applicant's    Actions oror Behavior Behavior BOP BOP          Continues prompt Continues      prompt actionaction verification verification per per 3-EOP-E-O 3-EOP-E-O Att. Aft. 3:
3:
5.
: 5. Determines 33 CCWHXs Determines          CCWHXs in    in service, service, 22 CCWPs CCWPs running running andand CCW headers CCW      headers tied tied together together 6.
: 6. Determines MOV-3-626 Determines        MOV-3-626 closed,closed, containment containment isolation isolation phase phase B B not actuated not  actuated &        R-3-17AJB
                                                      & R-3-17          normal.
AlB normal.
Critical Critical      7. If RCP #1 seal leak-off temperature <                < 235&deg;F, manually opens MOV-3-626
: 8. Determines 2 ECC & ~2        2 ECF running.
: 9. Determines both U3 HHSIPs & RHRPs running.
: 10. Determines RCS pressure <1600[2000] psig but >250[650]
psig with adequate HHSI flow present.
111.
: 1. Determines both U3 HHSIPs running. Shuts down both U4 HHSIPs.
12.
: 12. Determines all containment isolation phase A valves closed.
: 13. Determines
: 13. Determines SI    SI valves in  in proper injection alignment 14.
: 14. Resets SI &    & containment isolation isolation phase A. A. Determines Determines containment isolation isolation phase phase BB not not actuated.
actuated.
15.
: 15. Determines Determines no    no RCPs RCPs running running (should (should havehave been been tripped tripped by by RD RO due  to  inadequate        RCS due to inadequate RCS subcooling) subcooling) 16.
: 16. Determines Determines containment containment pressure pressure << 20 20 psig.
psig.
17.
: 17. Determines Determines containment containment ventilation ventilation isolated isolated and and verifies verifies control control room room ventilation ventilation in  in proper proper emergency emergency recirculation recirculation alignment.
alignment.
18.
: 18. Directs Directs NSO NSO place place PAHMS PAHMS in  in service service per per 3-OP-094.
3-0P-094.
: 19. Verifies
: 19. Verifies 3A3A && both both U4U4 EDGs EDGs running running (3B (3B EDG EDG isis DOS).
OOS).
20.
: 20. Determines Determines 3A,  3A, 3B3B && 3D 3D 4kV4kV buses buses still still energized.
energized.
21.
: 21. Notifies Notifies USUS that that prompt prompt action action verification verification complete.
complete.
12 12
Appendix DD Appendix                                      Operator Actions Operator      Actions                                      Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301          Scenario No.:
Scenario      No.: _4_4          Event No.:
Event  No.: _6_  6      Page ~
Page        of l 6 4 of Event
== Description:==
Event
== Description:==
AMSAC and AMSAC      and SI    fail to SI fail  to automatically automatically actuate.
actuate. AFWAFW mustmust be be manually manually started by started      opening AFWSS by opening      AFWSS MOVs. MOVs. Manual Manual SI  SI is is deferred deferred until until after after crew crew nnd transitions back transitions  back to to 3-EOP-E-0.
3-EOP-E-0. The The autoauto start start of  the 22 of the    d CCWP CcWP on  on SI SI
* closes closes MOV-3-626 MOV-3-626 which which must must bebe opened opened manually manually ifif RCP RCP seal seal return return temperatures permit.
temperatures      permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to      3-EOP-E-1 to 3-EOP-E-1 address the SBLOCA.
to address        SBLOCA.
Time
[_Time        Position                                Applicants Actions or Behavior Applicant's RO          Performs foldout page actions of 3-EOP-E-0      3-EOP-E-O as    as directed:
: 1. Determines containment conditions adverse (>180&deg;F)          (>160&deg;F)
Critical        2. Trips RCPs if RCS subcooling <              < 25[65]OF 25[65]&deg;F with U4 HHSIPs running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0        3-EOP-E-O as directed
: 1. Determines 2 AFWPs (A & C) running.
: 2. Determines AFW valve alignment proper.
: 3. Determines SG levels < 6[32]%. 6[321%. Controls AFW flow> 345 gpm until level >> 6[32]% then maintains levels 15-50%.      15-50%.
: 4. Determines annunciator A-113        A-1/3 on &  & verifies RCPs tripped if MOV-3-626 still closed. In that case, if RCP seal return temps all << 235&deg;F, verifies SI reset then starts 3A charging pump at minimum speed and adjusts HCV-3-121 for proper seal injection flow
: 5. Determines Tc slowly  slowly dropping with RCS pressure. Determines    Determines steam dumps && steam flow not cause for Tc decrease.          decrease. Limits total AFW flow to    to 345  gpm until 345 gpm      until any any SGSG level level>    6[32]%.
                                                                                                > 6[32}%.
6.
: 6. Determines Determines PORVs, PORVs, normal normal spray, spray, aux aux spray spray &    excess letdown
                                                                                                  & excess    letdown isolation isolation valves closed 7.
: 7. Verifies Verifies RCPs RCPs tripped tripped ifif RCS RCS subcooling subcooling << 25[65]&deg;F 25[65tF with with U4 U4 HHSIPs HHSIPs running running and    SI flowpath and SI    flowpath verified verified 8.
: 8. Determines Determines no    no SGs SGs depressurized depressurized or    or depressurizin depressurizing  g 9.
: 9. Determines Determines no        SG tube no SG    tube ruptures ruptures
: 10. Determines
: 10. Determines RCS    RCS notnot intact intact (containment (containment radiation, radiation, pressure pressure &    & sump sump level level all all not not normal).
normal).
US US          Directs Directs transition transition to      and performance to and  performance of      of 3-EOP-E-1.
3-EOP-E-1.
Conducts Conducts crewcrew brief.
brief.
13 13
Appendix DD Appendix                                          OperatorActions Operator      Actions                                        Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-301 2007-301            Scenario No.:
Scenario      No.: _4_ 4      Event No.:
Event      No.: _6_6              Pagelof~
Page 5 of 6 Event


== Description:==
== Description:==


AMSAC and SI fail to automatically actuate. AFW must be manually started by oQening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
Event  
The auto start of the 2 na CCWP on SI closes MOV-3-626 which must be oQened manually if RCP seal return temQeratures Qermit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. Time Position Applicant's Actions or Behavior RO Performs actions of 3-EOP-E-1 as directed by US: 1. Verifies RCPs tripped if RCS subcooling
< 25[65]OF with U4 HHSIPs running and SI flowpath verified 2. Determines power to both PORV block MOVs available, PORVs closed & both PORV block MOVs open 3. Verifies SI reset 4. Determines at least one charging pump is running with CVCS makeup stopped. 5. Starts any standby charging pumps and establishes maximum flow 6. Verifies charging pump suction transfers to RWST. BOP Performs actions of 3-EOP-E-1 as directed by US: 1 . Determines SGs not faulted. 2. Controls AFW flow> 345 gpm until level> 6[32]% then maintains levels 15-50%. 3. Directs Chemistry sample SGs for activity & check DAM-1 4. Directs HP take radiation readings on main steam lines 5. Verifies containment isolation phase A & B reset. 6. Verifies CV-3-2803 open & IA pressure>
95 psig US Determines SI can not be terminated (inadequate subcooling, RCS pressure & PZR level) RO Continues performing 3-EOP-E-1 actions as directed by US. 1. Determines 3A CSP should continue running since containment temperature>
122&deg;F. 2. Determines RCS pressure>
250[650] psig and RHR flow < 1000 gpm. Verifies SI reset and stops RHRPs. 3. Determines RCS pressure stable/decreasing 14 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301*
Scenario No.: 3 Event No.: _6_ Pagelofl Event


== Description:==
== Description:==
AMSAC and AMSAC          and SISI fail fail to  automatically actuate.
to automatically      actuate. AFWAFW must must bebe manually manually started started by      opening by oQening AFWSS AFWSS MOVs. MOVs. Manual Manual SI  SI isis deferred deferred until until after after crew crew transitions back                                                            nna transitions      back to to 3-EOP-E-0.
3-EOP-E-0. The  The auto auto start start of    the 22 of the      d CCWP ccwp on  on SISI closes MOV-3-626 closes        MOV-3-626 which  which must must be  be oQened opened manually manually ifif RCPRCP seal seal return return temperatures Qermit.
temQeratures          permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to      3-EOP-E-1 to 3-EOP-E-1 to address to    address the the SBLOCA.
SBLOCA.
Time Time      Position Position                                    Applicants Actions Applicant's      Actions or or Behavior Behavior RO RO          Performs actions Performs      actions of  of 3-EOP-E-1 3-EOP-E-1 as    as directed directed by by US:US:
1.
: 1.      Verifies RCPs Verifies  RCPs tripped tripped ifif RCS RCS subcooling subcooling << 25[65]OF 25[65]&deg;F with with U4 U4 HHSIPs running HHSIPs    running and  and SISI flowpath flowpath verified verified 2.
: 2.      Determines power Determines      power to to both both PORV PORV block block MOVs MOVs available, available, PORVs PORVs closed & both PORV block MOVs open 3.
: 3.      Verifies SI reset reset
: 4.      Determines at least  least one charging pump is running with CVCS makeup stopped.
: 5.      Starts any standby charging pumps and establishes maximum flow                          flow
: 6.      Verifies charging pump suction transfers to RWST.
BOP BOP        Performs actions of 3-EOP-E-1 as directed by US:
11 . Determines SGs not faulted.
: 2.      Controls AFW flow> 345 gpm until level            level>  > 6[32]% then maintains levels 15-50%.
15-50%.
: 3.      Directs Chemistry Chemistry sample SGs for          for activity activity &  & check DAM-i DAM-1 4.
: 4.      Directs Directs HP HP taketake radiation radiation readings readings on on main main steam steam lines lines
: 5. Verifies
: 5.      Verifies containment containment isolation isolation phase phase A  A&&B  B reset.
reset.
6.
: 6. Verifies Verifies CV-3-2803 CV-3-2803 open  open && IA  IA pressure pressure>  > 95 95 psig psig US US        Determines Determines SI    SI can can not not be be terminated terminated (inadequate (inadequate subcooling, subcooling, RCS RCS pressure pressure && PZR  PZR level) level)
RO RO        Continues Continues performing performing 3-EOP-E-1 3-EOP-E-1 actionsactions as as directed directed by by US.
US.
1.1. Determines Determines 3A    3A CSP CSP should should continue continue running running sincesince containment containment temperature>
temperature> 122&deg;F. 122&deg;F.
2.2. Determines Determines RCS  RCS pressure pressure>    > 250[650]
250[650] psigpsig andand RHR RHR flow flow << 1000 1000 gpm.
gpm. Verifies Verifies SI SI reset reset and and stops stops RHRP5.
RHRPs.
3.3. Determines Determines RCS  RCS pressure pressure stable/decrea stable/decreasing sing 14 14
AppendixDD Appendix                                      OperatorActions Operator      Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.: 2007-301*
2007-301        Scenario No.:
Scenario      No.: 33        Event No.:
Event    No.: _6_6            Pagelofl Page 6 of 6 Event


AMSAC and SI fail to automatically actuate. AFW must be manually started by oQening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-O.
== Description:==
The auto start of the 2 na CCWP on SI closes MOV-3-626 which must be oQened manually if RCP seal return temQeratures Qermit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address SBLOCA. ..,... lillie Position Applicant's Actions or Behavior US Determines LOCA exists since RCS pressure stable/decreasing and continues past step 14 in 3-EOP-E-O.
 
TERMINATING Scenario is terminated upon completion of 3-EOP-E-1 beyond step CUE 14. 15 Appendix D Scenario Outline Form ES-D-1 Facility:
Event   
Turkey Point Scenario No.: 4 Op Test No.: 2007-301 Examiners:
 
Candidates:
== Description:==
US RO BOP Initial Conditions:
AMSAC AMSAC and and SI SI fail fail toto automatically automaticallyactuate.
Mode 1, 100% Power, MOL. Just completed power increase last shift. Turnover:
actuate. AFW AFW must  must be be manually manually started  by opening started by oQening AFWSS  AFWSS MOVs.MOVs. Manual Manual SI SI isis deferred deferred until until after aftercrew crew transitions back                                                     nna transitions  back toto 3-EOP-E-O.
Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next performance of O-OSP-023.3 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs); 3B CSP due to failed 1ST -low discharge pressure (OOS 12 hr; ETR 36 hr) Secure 60 gpm orifice (CV-3-200B) and shutdown 1 charging pump using 3-0P-047 section 7.11. Leave 1 charging pump and 45 gpm orifice (CV-3-200A) in service. Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
3-EOP-E-0. The  The auto   start of auto start  ofthethe 22 d CCWP CCWP on  on SI SI closes MOV-3-626 closes   MOV-3-626 which  which must must be be oQened opened manually manually ifif RCPRCP seal seal return return temperatures Qermit.
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate. Event Event Type* Event Description No. 1 (N) ALL Close CV-3-200B and secure 1 charging pump. Shift from 2 charging pumps I 2 letdown orifices to 1 charging pump I 1 letdown orifice lineup using 3-0P-047 section 7.11. 2 (C) RO PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and TFB1PIN5 = T (C) SRO letdown restored.
temQeratures     permit. The  The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to  to 3-EOP-E-1 3-EOP-E-1 to  address SBLOCA.
The crew responds per 3-ARP-097.CR for annunciator A-5/5. 3 (C) BOP Loss of condenser vacuum. The crew responds per 3-0NOP-014.
to address  SBLOCA.
TVFCLK1 = 0.2 (C) SRO 3a TVFCLK1 = 0.0 (R) ALL Fast load reduction per 3-0NOP-100 until condenser vacuum leak located and isolated.
Time        Position lillie     Position                               Applicants Actions Applicant's   Actions oror Behavior Behavior US US        Determines LOCA Determines     LOCA exists exists since since RCS RCS pressure pressure stable/decreasing stable/decreasing and continues past and continues      past step step 14 14 in in 3-EOP-E-O.
4 (I) RO/BOP L T-3-459 failed low. Crew responds per 3-0NOP-041.6 to restore letdown TFH1TV59 = T and 3-0NOP-049.1 to take L T-3-459 out of service. (TS,I) SRO 5 TVHPBOTL (M) ALL RCS leak inside containment coincident with L T-3-459 failure. The crew = 0.00004 initially responds per 3-0NOP-041.3  
3-EOP-E-O.
& 3-0NOP-067.
TERMINATING  Scenario is TERMINATING   Scenario   is terminated terminated upon  upon completion completion of  of 3-EOP-E-1 3-EOP-E-1 beyond beyond step step CUE CUE 14.
Once RCS leakage (2gpm) (TS) SRO = 0.006 exceeds charging pump capacity, the crew unsuccessfully attempts to (300gpm) manually trip the reactor and immediate transition is made from 3-EOP-E-0 to TFL2XASE = T TFL2XBSE = T 3-EOP-FR-S.1.
14.
6 TFL4AF = T (C) BOP/RO AMSAC and SI fail to automatically actuate. AFW must be manually started TFL3SIA1 = T (C)SRO by opening AFWSS MOVs. Manual SI is deferred until after crew transitions TFL3SIA2 = T back to 3-EOP-E-0.
15 15
The auto start of the 2 nd CCWP on SI closes MOV-3-626 TFKV626C = T which must be opened manually if RCP seal return temperatures permit. The TVHPBOTL = crew transitions from 3-EOP-E-0 to 3-EOP-E-1 and then to 3-EOP-ES-1.2 for 0.01 post-LOCA cooldown & depressurization.  
 
.. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 TP-2007-301 Scenario #4 Event Description Turkey Point 2007-301 Scenario #4 Event 1 -Close CV-3-200B and secure 1 charging pump. Shift from 2 charging pumps / 2 letdown orifices to 1 charging pump / 1 letdown orifice lineup using 3-0P-047 section 7.11. Event 2 -PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and letdown restored.
AppendixDD Appendix                                                                           ScenarioOutline Scenario           Outline                                                 Form FormES-D-1ES-D-1 Facility:
The crew responds per 3-ARP-097.CR for annunciator A-5/5. Event 3 -Loss of condenser vacuum. The crew responds per 3-0NOP-014.
Facility:                        TurkeyPoint Turkey         Point                                   ScenarioNo.:
Event 3a -Fast load reduction per 3-0NOP-1 00 until condenser vacuum leak located and isolated.
Scenario       No.:               44        OpTest Op   TestNo.:
Event 4 -L T-3-459 failed low. Crew responds per 3-0NOP-041.6 to restore letdown and 3-ONOP-049.1 to take L T-3-459 out of service. Event 5 -RCS leak inside containment conincident with L T-3-459 failure. The crew initially responds per 3-0NOP-041.3  
No.:         2007-301 2007-301 Examiners:
& 3-0NOP-067.
Examiners:                                                                                        Candidates:
Once RCS leakage exceeds charging pump capacity, the crew unsuccessfully attempts to manually trip the reactor and immediate transition is made from 3-EOP-E-0 to 3-EOP-FR-S.1.
Candidates:                                                              USUS RORO BOP BOP Initial Conditions:
Event 6 -AMSAC and SI fail to automatically actuate. AFW must be manually started by opening AFWSS MOVs. Manual SI is deferred until after crew transitions back to 3-EOP-E-0.
Initial    Conditions:              Model, Mode             100% Power, 1, 100%       Power, MOL. MDL. JustJustcompleted completedpower  powerincrease increaselast  lastshift.
The auto start of the 2 nd CCWP on SI closes MOV-3-626 which must be opened manually if RCP seal return temperatures permit. The crew transitions from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA. 2 TP-2007-301 Scenario #4 Event Description Scenario XXIII NRC 4 Simulator Operating Instructions Setup IC-1 (100% MOL) Place simulator in run Trigger lesson steps: SETUP -3B EDG OOS (actuates TAQ5LRSB = OFF & TAQ5B20P = RACKOUT) SETUP -B AFWP OOS (actuates TAFK244 = 0.0, TAFK002 = 0.0, TAFF01B = 0.0, TCF5MTB = T) SETUP -3A SG 2 GPO LEAK (actuates TVHHSGA = 0.0000013)
shift.
SETUP -3B CSP OOS (actuates TAM1 DPOB = RACKOUT (3) & TCM1 D41 M = FALSE (0)) SETUP -A TWS (actuates TFL2XASE = T & TFL2XBSE = T) SETUP -AMSAC FAIL (actuates TFL4AF = T) SETUP -AUTO SI FAIL (actuates TFL3SlA1 = T & TFL3SlA2 = T) SETUP -MOV-3-626 CLOSE ON SI (actuates TFKV626C = Twhen K10A12R) Start 3B charging pump & place associated controller in auto. Open CV-3-200B.
Turnover:
Allow plant to stabilize.
Turnover:                          EquipmentOOS:
Adjust valve 834 on CCW system mimic as needed to stabilize letdown temp within 5&deg;F of VCT temp. Setting parameter TAKA834=0.63 puts CCW flow up to 800 gpm and will stabilize/reduce letdown temp after CV-3-200B is open. Start train A chilled water and secure train B chilled water (CR HVAC panel). Acknowledge alarms F-9/2 & 9/5 (3B EDG OOS) and place simulator in freeze. Place clearance info tags on 3B EDG normal start switch, B AFWP T& T valve control switch & 3B CSP control switch. Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X. Provide shift turnover checklists and 3-0NOP-071.2 Att 1. Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to TavglTref (TAV) and at the RCO desk to ENVRN (ED3). Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator IIF. Event 1 -Shift to 1 charging pump & 1 letdown orifice Initiated at crew direction in response to shift turnover.
Equipment             DOS: 3B 3B EDGEDG due duetotofailed failed fuel fuel pump pump(OOS (DOS22 days; days; next nextperformance performance ofofO-OSP- 0-DSP-023.3 023.3 inin 44 hrs); hrs); BBAFWAFW Pump Pumpdue  due toto bearing bearing failure failure (OOS (DOS 44 hrs;  hrs; ETR ETR 24 24 hrs);
The crew will secure one of the letdown orifices and shutdown one charging pump using 3-0P-047 section 7.11 Respond as HP when notified of reduction in letdown flow. 3 TP-2007-301 Scenario #4 Event Description Respond as NSO when directed to adjust CCW flow to NRHX to maintain letdown temp within 5&deg;F of VCT temp. or to maintain stable letdown temp. Click on COMMON TAKA834 BYP AROUND desired value then INSERT. Flow is indicated above valve 777. TAKA834=0.15 sets CCW flow to 220 gpm and should stabilize letdown temp. If asked as SM, tell crew that it is not necessary to bypass CVCS demineralizers.
hrs); 3B3B CSP CSP duedue toto failed 1ST failed       1ST-low
Crew should mark step 7.11.2.3 as nla and perform step 7. 11.2.4 to reduce letdown flow. Respond as NSO if directed to do post-shutdown checks on the charging pump secured in this event. . Event 2 -PC-3-145 fails high in auto When PCV-3-145 is returned to auto after closing CV-3-200B, trigger lesson step EVENT 2 -PC-3-145 FAILS HIGH IN AUTO (actuates TFB1PIN5 = T). PC-3-145 failing high in auto also fails PCV-3-145 closed causing letdown to be lost initially causing annunciator A-515 to briefly alarm. The crew should restore proper letdown flow by manually operating PC-3-145 to throttle PCV-3-145.
                                                    -  lowdischarge discharge pressure pressure (OOS (DOS 12    12 hr; hr; ETR ETR 36 36 hr) hr)
3-ARP-097.CR for annunciator A-515 should be referenced to do this. Respond as WCC if directed to have I&C troubleshoot PT-3-145.
Secure 60 Secure          60 gpm gpm orifice orifice (CV-3-200B)
Respond as NSO if directed to check the condition of PCV-3-145.
(CV-3-200B) and    and shutdown shutdown 11 charging charging pump         using 3-0P-047 pump using      3-OP-047 section section 7.11. Leave 7.11.       Leave 11 charging charging pump pump and  and 4545 gpm gpm orifice orifice (CV-3-200A)
After 1-3 min., report valve full open with no obvious malfunctions.
(CV-3-200A) inin service.
Event 3/3a -Loss of condenser vacuum 1 Fast load reduction Upon restoration of letdown with charging & letdown flows balanced, trigger lesson step EVENT 3 -CONDENSER VACUUM LEAK 0.2 (actuates TVFCLK1 = 0.2). The crew should respond using 3-0NOP-014 to place the hogging jet in service and investigate the cause of the condenser vacuum loss. Respond as NSO when directed to place the hogging jet in service, wait 1-3 min then trigger lesson step EVENT 3 -PLACE HOGGING JET IN SERVICE (actuates TAFB072 = 1.0 then TAFB010 = 1.0 15 sec later) and EVENT 3 -CONDENSER VACUUM LEAK 0.1 (actuates TVFCLK1 = 0.1). Report when done. The loss of condenser vacuum should force the crew to initiate a fast load reduction per 3-0NOP-100.
service.
4 TP-2007-301 Scenario #4 Event Description Modulate condenser vacuum leak as needed to keep condenser vacuum above minimum vacuum (22"Hg) for generator load> 531 MWe as shown on 3-0NOP-014 Enclosure
Known tube Known          tube leak leak inin 3A 3A S/GS/G (2(2 gpd) gpd) - unchanged unchanged for    for last last week.
: 1. Click on node TVFCLK1 3E7B SHELL LEAK PORT new selected value then INSERT. Respond as NSO when directed to close hogging jet drain 3-30-045 and place the standby set of SJAEs in service. No simulator action necessary.
week. Chemistry Chemistry samples samples are  are being being taken      per  3-ONOP-071 .2, Attachment taken per 3-0NOP-071.2,                     Attachment 1.1. The    The current current sample, sample, just just completed completed indicates indicates no no significant change significant        change inin leak leak rate.
After 2-4 min, report complete.
rate. MOV-3-1403 MOV-3-1403 remains   remains open  open at at management management directiondirection duedue to to small small size and size    and stability stability ofof tube tube leak leak rate.
Respond as FS/NSO when directed to identify cause of low condenser vacuum per 3-ONOP-014 step 5.5. Once load has been reduced 5-10%, identify leak source as a broken condenser loop seal sight glass. Trigger lesson step EVENT 3 -ISOLATE CONDENSER VACUUM LEAK (actuates TVFCLK1 = 0.0), then report sight glass isolated.
rate.
Respond as System when notified of the fast load reduction.
Event Event                                 Event Type*
Respond as SM referring to 0-EPIP-201 01 & 0-ADM-115 for fast load reduction Respond as NSO if directed to remove the hogging jet from service (vacuum> 26"Hg & cause of vacuum loss corrected) per 3-0NOP-014 step 5.6. After 1-3 min, trigger lesson step EVENT 3 -SECURE HOGGING JET (actuates TAFB010
Event Type*                                                         Event Description Event     Description No.
= 0.0 then TAFB072 = 0.015 sec later). Report when complete.
No.
Respond as NSO if directed to check for deviation between North & South hotwell levels. Click on then read hotweilleveis shown under each B WATER BOX. Report any deviation to the crew. Respond as NSO if directed to report condenser air inleakage.
11                                (N) ALL (N)     ALL                 Close CV-3-200B and secure Close                              secure 11 charging charging pump. Shift    Shift from 22 charging       pumps I/
Respond < 21.1 scfm. Respond as Chemistry if directed to report condenser hotwell dissolved O 2 levels. If asked as SM whether to place one set of SJAE in standby, reply that the crew should leave both sets in service until the sight glass is repaired.
charging pumps 22 letdown letdown orifices to 11 charging pump        pump I/ 11 letdown orifice lineup  lineup using using 3-0P-3-OP-047 section 7.11.
Event 4 -L T 459 fails low After condenser vacuum leak isolated, trigger lesson step EVENT 4 -LT-3-459 FAILS LOW (actuates TFH1TV59 = T) and lesson step EVENT 5 -2 GPM PZR SURGE LINE LEAK (actuates TVHPBOTL = 0.00004).
2 2                                (C) RO (C)    RD                  PC-3-145 fails high in auto, PCV-3-145 closes until manual control PC-3-145                                                                                  control taken taken andand TFB1PIN5=T TFB1PIN5     =T                                     letdown restored. The crew responds per 3-ARP-097.CR letdown                                                          3-ARP-097.CR for      for annunciator annunciator A-   A C SRO (C)    SRO 5/5.
This causes letdown isolation and alarms on annunciators A-8/4, 9/3, 9/4, 8-3/1. The crew should respond per 3-0NOP-041.6 and restore letdown once L T-3-459 is selected out as a controlling channel. The crew should also respond per 3-0NOP-049.
5/5.
1 but may delay taking L T-3-459 OOS to address the ReS leak issue requiring entry into event 5. This leak will cause G-5/3 alarm in about 25 minutes. 5 TP-2007-301 Scenario #4 Event Description Respond as wee when directed to initiate a PWO and notify I&e of the failure. Once letdown is reestablished and PZR level control restored, annunciators A-9/3 & 9/4 wi/! turn off. Restoring PZR control group heaters will turn off annunciator 8-9/3. After bistables are tripped, the only annunciators remaining on due this failure are A-8/3, 8/4 and J-7/4. Event 5 -RCS leak in containment Once the crew exits 3-0NOP-049.1 either after tripping bistables or early due to detection of the leak, trigger lesson step EVENT 5 -5 GPM PZR SURGE LINE LEAK (actuates TVHPBOTL = 0.00011).
33                                (C) BOP (C)     BOP                 Loss of condenser vacuum. The crew responds per 3-ONDP-014                      3-0NOP-014..
This will increase the leak rate from 2 to 5 gpm actuate annunciator G-5/3 if it not already on. Once the leak becomes evident, the crew should respond using 3-0NOP-041.3.
TVFCLK1 TVFCLK1      =0.2
3-0NOP-067 may also be entered when R-3-11/12 alarm due to the leak. Once the decision has been made to shutdown based on leak rate> TS limits, trigger lesson step EVENT 5 -PZR SURGE LINE LEAK GREATER THAN CHARGING (actuates TVHPBOTL = 0.006). This will increase RCS leak rate to 300 gpm requiring a reactor trip per 3-0NOP-041.3 since the leak exceeds charging pump capacity.
                          =
Respond as SM when notified to refer to 0-EPIP-201
0.2 (C)
: 01. Respond as HP when notified to conduct local radiation surveys & post radiation areas. Respond as System if notified of the decision to trip the reactor. Respond as NSO if directed to check status of RM-80 green monitor light. After 1-3 min., report green light on. If directed to silence the local alarm and check for abnormal indications, after 1-3 min., report alarm silenced and RM-80 otherwise normal. Respond as ehemistry/HP is directed to verify actual activity inside containment Events 6 -A TWS/Small break LOCA The crew unsuccessfully attempts to trip the reactor and immediately transitions from 3-EOP-E-O to 3-EOP-FR-S.1.
(C) SROSRO 3a 3a       TVFCLK1                 (R)
ATWS & AMSAC failures were entered at setup. The crew needs to manually trip the turbine and open AFWSS MOVs to initiate AFWflow. Upon entry into 3-EOP-FR-S.1, trigger lesson step EVENT 6 -PZR SURGE LINE LEAK REQUIRING SI (actuates TVHPBOTL = 0.01) to drop PZR pressure below the SI setpoint.
(R) ALLALL                  Fast load reduction per 3-ONDP-1    3-0NOP-100           until condenser vacuum leak 00 until                                leak located located TVFCLK1      =00
Although PZR pressure may be below the SI setpoint, SI will not automatically actuate due to failures entered at setup. The crew should not manually SI until after transition made back to 3-EOP-E-0.
                          =
6 TP-2007-301 Scenario #4 Event Description Respond as NSO when directed to locally trip rx trip breakers and MG set input & output breakers.
0.0 and V
After this direction has been given and emergency boration has been established, trigger lesson step EVENT 6 -LOCAL TRIP MG SET BREAKERS (actuates TCE6DQ7C = F, TCE6DQ8C = F after 10 sec delay, TAE3108L = TRIP after 20 sec delay, TAE3401L = TRIP after 30 sec delay). Report when complete and report both reactor trip breakers stuck in the closed position.
and isolated.
Manual SI results in an auto start of the 3A CCWP. This triggers closure of MOV-3-626 from setup. Once MOV-3-626 closes, trigger lesson step EVENT 6 -ALLOW MANUAL OPEN MOV-3-626 (actuates TFKV626C = F when IMK19380).
44                                (I)
When MOV-3-626 control switch is taken to OPEN, the closure fai/ure clears and the valve opens. Respond as NSO when directed to place PAHMS in service on unit 3. After 8-12 minutes, trigger lesson step EVENT 6 -PLACE U3 PAHMS IN SERVICE (actuates TAC2V02A = 1.0, TAC2V02B = 1.0, TAAAV21 = 1.0, TMAV22 = 1.0 & TACA005 = 0.0). Report when complete.
(I) RO/BOP RO/BOP                LT-3-459 LT-3-459 failedfailed low.
The crew completes 3-EOP-E-O and transitions to 3-EOP-E-1 to address the SBLOCA. Respond as Chemistry when directed to sample SGs for activity & check DAM-1 and as HP when directed to perform radiation readings on main steam lines. After 10-15 min. report no signs of activity or radiation levels above background.
low. Crew Crew responds responds per   per 3-ONOP-041 3-0NOP-041.6         to restore
After maximum charging flow has been established, trigger lesson step EVENT 6-INCREASE RCS LEAKAGE (actuates TVHPBOTL = 0.02) to cause stable/decreasing RCS pressure when 3-EOP-E-1 step 14 is reached. If necessary insert additional leakage as needed (use any RCS leak node to ensure RCS pressure is stable/decreasing at that point). Respond as NSO/FS when directed to close in cold leg recirc breakers.
                                                                                                                                                  .6 to  restore letdown letdown TFH1TV59 TFH1TV59 = TT  =                                  and (TS      I) SRD              and 3-DNOP-049 3-0NOP-049.1       .1 toto take take LT-3-459 LT-3-459 out  out of of service.
Wait 1-3 min, then trigger lesson step EVENT 6 -CLOSE CL RECIRC BKRS (actuates TCM2D06M = T, TCM1 D09M = T after 5 sec delay, TCM2D04M = T after 15 sec delay, TCM1 D11 M = T after 20 sec delay, TCM1 D03M = T after 30 sec delay, TCM1 D04M = T after 35 sec delay, TCM1 D10M = T after 45 sec delay, TCM2D05M = T after 50 sec delay, TCM1 D12M = T after 60 sec delay & TCM2D03M = T after 65 sec delay). Respond affirmatively as NSO when asked to verify containment spray & charging pump room doors closed. Respond as HP when directed to survey pipe & valve and electrical penetration rooms for radiation.
service.
Respond as Chemistry when directed to align PASS for on-line sampling/analysis of the RCS. 7 OPERATIONS SHIFT TURNOVER REPORT REW ASSIGNMENTS Unit 3 Unit 4 Plant Status Unit 3 Unit 4 AFWP OOS (bearing failure; OOS 4 hr; ETR 24 hr) 3B EDG OOS (fuel pump failed; OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed 1ST -low discharge pressure; OOS 12 hr; ETR 36 hr) Train A is protected NRC-4 2 tube leak in 3A S/G 0NOP-071.2 Attachment 1 U3 Current: B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8. 1. 1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req'd; 3-0P-023 sect 7.7 due next shift ifOOS > 72 hr; repair in 14 days) 3B CSP -TS 3.6.2.1 Action a (Fix in 72 hr) None . OLRM is = 2.06E-6* LERF = 9.28E-8 Current: B AFWP -TS 3.7.1.2 Action 3 (trains verified operable just before turnover; 30 days to repair) 3B EDG -TS 3.8.1.1.b.1 Actions b & d (0-OSP-023.3 Att 1 & 9 every 8 hr; 3/4-0SP-023.1 start of other EDGs not req'd; fix in 14 days) None OLRM is = 2.00E-6* LERF = 9.28E-8 Unit 3 Status Reactor Operator Mode: 1 RCS Leakrate Accumulator Ref Levels Power: 100 Gross: 0.03 gpm A 6615 MWe: 760 Unidentified 0.02 gpm B 6640 "tavg: 574 Charging Pps: 0.01 gpm C 6625 RCS Pressure:
(TS,I)     SRO 55          1VHPBOTL TVHPBOTL             (M)
2235 RCS Boron Cone: 750 Abl1'ormg.l  
(M) ALL ALL                RCS RCS leak leak inside inside containment containment coincident coincident with with LT-3-459 LT-3-459 failure.
*.  
failure. The The crew crew
**
                =0.00004                                       initially initially responds responds per  per 3-ONOP-041 3-0NOP-041.3       .3 && 3-ONOP-067 3-0NOP-067.         Once RCSRCS leakage leakage (2gpm)           (TS (TS) SRO SRO
                                                                                                                                                . Once
                  =
                  =0006 0.006                 /                    exceeds exceeds charging charging pump pump capacity, capacity, the the crew crew unsuccessful unsuccessfully       attempts to ly attempts      to (300gpm)
TFL2xAS= T TFL2XASE =T                                        manually trip manually       trip the the reactor reactor and and immediate immediate transition transition isis made made fromfrom 3-EDP-E-0 3-EOP-E-0 to    to TFL2xBsE TFL2XBSE =TT  =
3-EOP-FR-S 3-EOP-FR-S.1.      .1.
66          TFL4AFT TFL4AF =T             (C) BDP/RD (C)     BOP/RO             AMSAC AMSAC and    and SISI fail fail to to automatically automatically actuate.
actuate. AFW AFW must must be  be manually manually started started TFL3SIAI T                                          by TFL3SIA1 =T =
C   SRO                       opening AFWSS by opening       AFWSS MOVs. MOVs. Manual Manual SI   SI isis deferred deferred until until after aftercrew crewtransitions transitions TFL3SIA2                (C)SRO                                                                                      nd TFL3SIA2 =T
                          =  T                                  back backto  to 3-EOP-E-0.
3-EOP-E-0. The    The auto auto start start of   the 21Kg ofthe    2 CCWP CCWP on    on SI SI closes closes MOV-3-626 MOV-3-626 TFKv626c TFKV626C =   =  TT                                which which must must be be opened opened manually manually ififRCP  RCP sealseal return return temperatures temperatures permit.permit. The The TVHPBOTL       =
crewtransitions crew     transitionsfrom from 3-EOP-E-0 3-EOP-E-0toto 3-EOP-E-1 3-EOP-E-1 and   and then then toto 3-EOP-ES-1 3-EOP-ES-1.2         for
                                                                                                                                                                            .2 for TVHPBOTL =
001 0.01                                       post-LOCA post-LOCAcooldowncooldown &&depressurizat depressurization. ion.
(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 11
 
TP-2007-301 TP-20  07-301 Scena Scenarrio io #4
                                                                      #4 Event Event Descri Description Turkey Turke      Point 2007-3 y Point      2007-301 01 Scena Scenario rio #4
                                                  #4 Event 11 - Close Event          Close CV                          CV-3-200B200B andand secure secure 11 chargi charginngg pump.
pump. Shift Shift from from 22 chargi charginngg pumps pumps // 22 letdow n  orificess to letdown orifice        to 1I chargi chargin ngg pump pump //11 letdow letdownn orifice orifice lineup lineup using using 3-0P-3-OP-0047 47 section section 7.11.
7.11.
Event 22 - PC-3-1 Event          P0-3-145     fails high 45 fails    high inin auto, auto, PCV-3 PCV-3-145
                                                              -145 closes closes until until manua manual contro restored.                                                                                    control taken and and letdow letdown restore  d. TheThe crew crew respon responds     per 3-ARP ds per    3-ARP-097.C
                                                        -097.CR forfor annun annunc    iator A-5/5.
ciator  A-5/5.
Event 33 - Loss Event          Loss ofof conde condense nserr vacuum vacuum. The crew crew respon responds per 3-0NO ds per    3-ONOP-014P-014..
Event 3a Event  3a - Fast Fast load load reduct reductiion on per per 3-0NO 3-ONOP-1P-iDO    until conde 00 until   condense nserr vacuu vacuum m leak leak locate located d and isolated.
isolate Event 4 - LLT-3-4 Event            T-3-4559            low. Crew respon 9 failed low.             responds   per 3-0NO ds per   3-ONOP-041P-041 .6
                                                                                      .6 to restore restore letdown and 3-ONOP-049.1 to take LLT-3-4      T-3-4559  9 out of service.
Event 5 - RCS leak inside contai      contain  ment conincident with LLT-3-4 nment                          T-3-4559 9 failure. The crew initially responds respon  ds per 3-0NO3-ONOP-041                                                                                initially P-041 .3.3 & 3-0NO 3-ONOP-067 P-067.. Once RCS leakag leakage     exceeds e excee  ds chargi chargin capacity, the crew unsuc g
ng  pump unsucccessfu essfulllly y attempts to manua manuallylly trip the reacto reactorr and immediate transition is made from 3-EOP   3-EOP-E-O-E-0 to 3-EOP-FR-S -FR-S..1.
1.
Event 6 - AMSAC and SI fail to automatically actuat          actuate.e. AFW must be manua  manually lly started by opening AFWSAFWSS MOVs. Manual SI is deferred until after crew transitions n
2 d                                                                back   to 3-EOP 3-EOP-E-O.
                                                                                                                      -E-0.
The auto start of the 2 nd CCWP on SI closes        closes MOV-3 MOV-3-626
                                                                      -626 which must be opene    opened d manua manua  lly lly if RCP seal return tempe  temperaturatureress permit. The crew transitions from 3-EOP    3-EOP-E-O
                                                                                                -E-0 to 3-EOP-E-1 to addresss the SBLOC addres            SBLOCA. A.
22
 
TP-2007-301 TP-20    07-301 ScenaScenario rio #4
                                                                          #4 Event Event Descri Description Scenar Sce    nariio      XXIIII NRC o XXII        NRC 4 Simulator Simul          Operating ator Opera          Instructio ting Instru    ctions ns Setup Setu    p Ic-i (100%
IC-1   (100% MOL) MOL)
Place simula Place    simulator     in run tor in  run Triggerr lesson Trigge    lesson steps:
steps:
SETU P - 3B SET  UP    - 3B EDG EDG OOS DOS (actuate (actuates   TAQ5LRSB s TAQ5LR    SB == OFF OFF && TAQ5B TAQ5B20P20P == RACKO RACKOUT)
UT)
SETUP SETU    P-B    B AFWP AFWP OOS (actuate  (actuatess TAFK24    4=
TAFK244           TAFKOO2
                                                              = 0.0, TAFK00    2 =              B=   0.0, TCF5MTB =
                                                                                  = 0.0, TAFF01 TAFFO1B  = 0.0,              = T)
SETUP SETU    P - 3A SG 2 GPO
              -              GPD LEAK (actuate  (actuatess TVHHS TVHHSGA GA == 0.00000 0.0000013) 13)
SETUP SETU    P - 3B CSP OOS (actuate (actuatess TAM1 TAM1 DPOB DPOB == RACKO RACKOUT UT (3)
(3) && TCM1 D41   M = FALSE (0))
D41 M SETUP SETU        -  ATW P - A TWS   S (actuate (actuatess TFL2XA TFL2XASE   SE =    & TFL2XB
                                                      =T & TFL2XBSE SE = = T)
SETUP SETU        - AMSAC P - AMSA          FAIL (actuate C FAIL     (actuatess TFL4AF TFL4AF == T)
SETUP SETU        - AUTO SI FAIL (actuate P - AUTO                    (actuatess TFL3SlA TFL3SIAI 1 =       TFL3SIA2
                                                                = T & TFL3Sl  A2 = T)
SET SETU  UP    -  MOV-3-62 P - MOV-     3-626 6 CLOS CLOSE     E ON SI (actuate (actuatess TFKV62 TFKV626C 6C =  T when K10A12
                                                                                    = Twhen     K10A12R)R)
Start 3B chargcharging      pump & place assoc ing pump                      associate iated d contro controlle llerr in auto.
auto. Open CV  plant to stabili plant      stabilize.                                                                                    CV-3-20 200B.
0B. Allow Adju ze. Adjusstt valve valve 834 on CCW     ccw system system mimicmimic as neede needed   d to stabili letdown                                                                                                       stabi  ze lize letdow                within 5&deg;F of VCT temp.
n temp within                            temp. Settin Setting g param paramete  eterr TAKA TAKA83 834=0 4=0.63 63  puts   CCW ccw flow up to 800 gpm and will stabili        stabilize/ze/red redu uce ce letdow letdown   n temp after CV CV-3-20  200B0B is open.
open.
Start train A chilled chilled water water and secur  secure e train B chilled chilled water water (CR HVAC panel)       panel)..
Acknowle Ackno    wledg dgee alarms F-9/2 F-9/2 & 9/5 (3B EDG OOS)          OOS) and place simula    simulatortor in freez freeze e..
Place cleara Place    clearancence info tags on 3B EDG norma          normall start switch switch,, B AFWP switch & 3B CSP cont                                                                        AFWP T&T  T& T valv valve e cont controroll switch                         roll swit contro    switchch..
Remove Remo    ve AFW train 2 orang  orangee tag from B AFW        AFWP   P tachomete meterr just below below ann. panel  panel X.
Providee shift turno Provid              turnov ver er chec check  klist listss and 3-ON 3-0NO    OP-0 P-07171 .2.2 Att 1. 1.
Sele Selec  ctt 3A QSPQSPD  DS S to page 211 (SAT     (SAT)) and 3B QSP    QSPD  DS S to page 212 (RVL). Set ERD on VPA to Tavg                                                                                                          ERDA    DS ADS Tavgl/Tref Tref (TAV) and at the RCO desk to ENV                  ENVR  RN N (ED3 (ED3))..
Fill in blen blend  der er & shut shutddow own  n boro boron n addi additio tionn placa placarrdsds at cons conso    ole le blen blend  er stati der    station on.. Data for each IC IC may be foun  found d in the ECC & Shut      Shutd  dow own n Guid Guide  eline lines s Boo Bookk in the simusimula lator tor I/F.
IIF.
Eventt I1 - Shif Shiftt to I1 cha charrgin  ging  g pump & I1 letdo      letdown   wn orifi orificcee Initi ated Initiat  ed at crew direction     tion in response to shift turnover.
The crew will secu  securree one of  of the letdo letdow wnn orifi orifice cess and and shutshutd dowown n one char charg    ing pum ging  pump     using p usin  g 3-OP 3-0P--047047 secti sectioonn 7.11 Resp Respo  ond nd asas HPHP when notif notifieiedd of of redu reducction tion inin letdo letdow  wnn flow.
33
 
TP-2007-301 TP-20  07-301 ScenaScenarrio io #4
                                                                              #4 Event Event Descri Description Respond Respo      nd as as NSO NSO when when direct directeded to to adjust adjust CCW CCW flow flow to to NRHX NRHX to to maint mainta  ain in letdow letdownn temp temp within within 5&deg;F  5&deg;F of of VCT temp.
temp. or  or to to maint mainta    in stable ain  stable letdow letdownn temp.
temp. Click Click on on Sche Schemma~ a>
COMMON COMM          ON SERVSERVICES ICES~COM  >COMPONE  PONENT    NT COOL COOLlNG~  INGvalv >valvee 834~
834*TAK TAKAA834 834 BYPBYP AROUND TCV-1 AROU                TCV-144~en 44--*eter nter desire desired d value then then INSER INSERT. Flow Flow isis indica indicatteded above above valve 777. TAKA 777.      TAKA834=0 834=0.15
                                . 15 sets CCW COW flow  flow to 220 gpm and should       should stabili stabiliz zee letdow letdown temp.
temp.
IfIf asked asked as  as SM, tell crew that itit is      is not not neces necessary sary to bypas bypass s CVCS demin  demineraeralize lizerrs.
s.
Crew shoul Crew       should   d mark step 7.11.27.11.2.3 .3 as nla n/a and perfor perform m step 7. 7.11 11.2.4
                                                                                                    .2.4 to reduc reduce   e letdow letdown flow.
flow.
Respond Respo        nd as NSO if direct directed ed to do post-spost-shuhutdo tdow  wn  checks n check    s on the charg chargin ingg pump secur secureded event...
in this event.
Event 2 - PC-3-145 fails high in auto When PCV-3-145 is return When                              returned ed to auto after closin    closing   g CV                                                                                          CV-3-200B, 200B, trigge triggerr lesson lesson step EVENT 2        2-- PC                        PC-3-145 145 FAILS HIGH IN AUTO (actuate              (actuates         N5 = T).
TFB1PIN5=T s TFB1PI        ).
PC-3-145 PC      145 failing high in auto also fails PCV-          PCV-3     -145 closed 3-145    closed causin causing g letdown to be lost causing initially causin          annunciat g annun          or A-515 ciator  A-5/5 to briefly alarm. The crew shoul          should   d restor restore e prope properr letdown flow by manu      manually       operating ally opera            P0-3-145 ting PC    145 to throttl throttle e PCV-3-145. 3-ARP   3-ARP-09  -097.C 7.CR R for annunciat annun      ciatoror A-515 A-5/5 shoul should          reference d be refere      nced d to do this.
Respond Respo      nd as WCC WOO if direct directed ed to have I&C   l&C troubl troubleshoeshoo  ott PT                                                                                            PT-3-1  45.
145.
Respond Respo      nd as NSO if direct  directed ed to check check the condition of PCV-3-145. After 1-3 min.,
valve full open with no obviou                                                                                          mi, report obviouss malfu malfun    ctions.
nction  s.
Event 313a      3/3a - Loss of condenser vacuum 1 I Fast load reduction Upo Upon     n restoratio      n of letdow ration      letdown   n with char  charg ging ing & letdoletdow  wnn flow flows s balanced, trigg    trigge  err lesso lesson   n step EVENT 3 - COND ENSER VACUUM UM LEAK 0.2 (actuat  (actuateess TVFC TVFCLKLK11 == 0.2).
The crew shou      shoulldd respond usin  using g 3-ON 3-0NO    OP-0 P-01414 to place the hogg    hoggiingng jet in servi serviccee and inve invest    stiga igate te the caus cause e of the condconde    ense nserr vacu vacuu  umm loss.
Respond as NSO when direc                  directteded to place the hogging             ing jet in servi servic  ce, e, wait 1-3 1-3 mm min then trigg trigge  err lesso lessonn step EVENTT 33 - PLACE HOGG              HOGGING   ING JET IN SERVICE ICE (actuat (actuateess TAFB TAFB07    O722 == 1.0 1.0 then TAFB TAFB010100 == 1.0 1.0 15 15 sec   later) and EVENT sec later)                  T 33 - CONDENSE
                                                                                    -           ENSER    R VACU VACUUM   UM LEAK 0.1 (actuat 0.1      (actuateess TVFC TVFCLKLK11 ==0.1).
0.1). Repo Reporrtt when done  done..
The loss of cond      conde ense nserr vacu vacuu  umm shou shoulldd force the crew to initiate a fast load redu              reduc    tion per ction    per 3-ONO 3-0NO P-100  P- 100..
44
 
TP-2007-301 Scena  Scenarrioio #4 Event Event Descri Description Modullate Modu    ate conde condense nserr vacuu vacuum   m leak as neede needed d to keep conde  condense  nserr vacuu vacuum       above m above minimum vacuu vacuum       (22Hg m (22"H      g)) for gener generator       load > 531 MWe as shown ator load>                            shown on 3-0NO 3-ONOP-0  P-01414 Enclosur Enclo  suree 1.1. Click on Sche  Schemma~F a>FEEDW  EEDWATER  ATER~CON*CODENS  NDENER~l  SER--eak
                                                                                                    -leak node 3E7B  3E7B~>
TVFCLK1 3E7B SHELL LEAK PORT AREA                        AREA~ent*enter    er new select selected ed value then INSERT.
Respond Respo    nd as NSONSO when direct  directeded to close hoggi hoggin  ngg jet drain 3-30-0 3-30-04545 and place the standby set of SJAE  SJAEss in servic service.e. No simulator action neces      necessary sary.. After 2-4 min, complete                                                                                                      mm, report compl  ete..
Respond Respo            FS!NSO when direct nd as FS/NS                      directed         identiffyy cause ed to identi        cause of low conde  condense        vacuum nserr vacuu      m per 3-ONOP-01 ONOP    -014 4 step 5.5. Once load has been reduc              reduced   ed 5-10%, identi  identiffyy leak sourc source   e as a broken broke      condense n conde      nserr loop ioop seal sight glass. glass. Trigg Trigger     lesson step EVENT 3 - ISOLATE er lesson                            -
CONDENSE COND      ENSER VACUUM LEAK (actuate              (actuatess TVFCLK TVFCLK1 1 == 0.0), then report report sight glass isolated.
Respond Respo              System nd as Syste      m when notified of the fast load reduc            reducti  on.
tion.
Respond Respo    nd as SM referri referrin  ngg to 0-EPI 0-EPIP     -201 01 & 0-ADM-1 P-201                          15 for fast load reduc
                                                                                  -115                      reducti  on tion Respond Respo  nd as NSO if direct  directed         remove ed to remov      e the hoggi hoggin  ngg jet from servic service   (vacuuum>
e (vacu      m > 26"Hg 26Hg & &
cause of vacuu cause        vacuum   m loss correc corrected) ted) per 3-0NO3-ONOP-0  P-014 14 step 5.6. After 1-3 min,     mm, trigge triggerr lesson step EVENT 3 - SECURE HOGGING JET (actuate lesson                            -
(actuatess TAFB01 TAFB0IO  0== 0.0 then TAFB07 TAFBO72  2 = 0.015 0.0 15 Reportt when compl sec later). Repor                complete ete..
Respond Respo    nd as NSO if direct  directed         check for deviat ed to check             deviatiion on betwe between en North & South hotwehotwellll levels.. Click on Sche levels                  Schema*FE ma~FEEDW  EDWA    ATER TER--~CON>CONDENS DENSER    ER then read hotwe  hotwellilleve levelsis shown under shown     under each B WATER BOX. Repor                Reportt any deviatdeviatiionon to the crew.
Respond Respo    nd as NSO if direct  directeded to report conde condense nserr air inleak inleakage age.. Respo Respond   nd < 21.1 scfm.
Respond Respo  nd as Chemistry if direct    directeded to report cond  conde  ense nserr hotwel hotwelll disso dissollved ved 02    levels..
O2 levels asked as SM whet If asked                wheth  her er to place one set of SJAE in standby, reply that the crew should leave both sets in servic  servicee until the sight glass is repair      repaired.ed.
Event 4    4- L     T 45 LT-3    -459   9 fails low Afte Afterr condenserenser vacuvacuu    um m leak isolat isolated, ed, trigg trigge  err lesson lesson step EVENT 4 - LT      -  LT-3-4    59 459 FAILS LOW (actuat  (actuateess TFH1T TFH1TV  V59  = T) and lesson 59 =            lesson step EVENT 5 - 2 GPM PZR SURGE LINE LEAK (actuat (actuateess TVHP TVHPB BOTL OTL == 0.0000 0.000044)).
This caus cause  ess letdown isolatio isolation n and alarms on annu    annun  nciat  orss A-8/4, 9/3, 9/4, B-3/1.
ciator                          8-3/1. The crew shou shoulld d respond per 3-ON    3-0NO  OP-0 P-041 41.6
                                                          .6 and resto restorre  e letdown once LT  L T-3-45459 9 is select selecteded out as a contro controlling lling chan chann  nel.
el. The crew shou  shoulldd also respond per 3-ONO                  P-049.. 1 3-0NO P-049          I but may delay taking L T-3-459 OOS to addr            addre  ess ss the RCS ReS leak issue requiri  requiringng entry into even  eventt 5.
This leak will causcause  e G-5/3 alarm in abou      aboutt 25 minu minuttes.es.
5
 
TP-2007-301 TP-20      07-301 Scena Scenario     #4 Event rio #4 Event Descri Description ption Respond Respo      nd asas wee WCC when when direct directed ed toto initiate initiate aa PWO PWO and and notify notify I&e I&C ofof the the failure failure..
Once letdow Once       letdown     is reesta n is reestablisblishe hed    and PZR d and     PZR level level contro controll restor restored,ed, annun annunciatciatororss A-9/3 A-9/3 && 9/49/4 will turn wi/! turn off.
off Resto Restoringring PZRPZR contro controll group group heate heaters willwill turn turn off off annun annunciatciatoror  8-9/3.
8-9/3     . After Afte r bistables bistab          are trippe les are    tripped,    the only d, the     only annun annunciat    ors ciator      remaining s remai  ning on due  due this this failure failure are are A-8/3, A-8/3, 8/48/4 and J-7/4.
and    J-7/4.
Event 5 - RCS leak in cont Even            -
contain  ainm  menentt Once the crew exits 3-0NO          3-ONOP-0  P-049  49.1
                                                          .1 eithe r after trippitripping ng bistab bistables les or early due to detection of the leak, trigge        triggerr lesson lesson step EVEN  EVENT   T 5 - 5 GPM PZR SURG (actuates
                                                                                      -                      SURGE   E LINE LEAK    LEAK (actuate      TVHPBOTL s TVHPB            0.00011).
OTL = 0.00011        This will increa
                                        ). This          increase se the leakleak rate from 2 to 5 gpm actuate annunciat annun      ciatoror G-5/3 G-5/3 if itit not alread alreadyy on. Once the leak becom        becomes   es eviden evident, t, the crew shoul  should d respond using   using 3-0NO 3-ONOP-0 P-041  41.3.3.. 3-0NO 3-ONOP-0  P-067 67 may also be entere  entered   d when R-3-1 R-3-1 1/12 1/12 alarm due to the leak.
Once the decision has been made                    made to shutdshutdow  own n based based on leak rate>
triggerr lesson                                                                                          rate > TS limits  limits,,
trigge        lesson step EVEN  EVENT     T 5 - PZR SURG    SURGE   E LINE LEAK LEAK GREA GREATE TER R  THAN CHAR CHARGI    GINGNG (actuate (actuatess TVHPB TVHPBOTL OTL = 0.006).
0.006).
increase This will increa        se RCS leak rate to 300 gpm requir            requiring ing a reacto reactorr trip per 3-0NO 3-ONOP-0    P-041    .3 41.3 since the leak excee  exceeds       charging ds charg      ing pump pump capac capacity.ity.
Respond Respo      nd as SM when notifie    notified d to refer to 0-EPIO-EPIP-2 P-201010101..
Respond Respo      nd as HP when notifie    notified d to condu conduct ct local radiat radiation ion surve surveys ys & post radiatradiation ion areas.
Respond Respo    nd as Syste System m if notifie notified d of the decisi decision on to trip the reacto reactor. r.
Respond Respo      nd as NSO if direct  directed ed to chec check   statuss of RM-k statu          RM-80   green 80 gree        monit n mon      or light. Afte itor          Afterr 1-3 mm., report min.,    report greegreen n light on. If direc directteded to silen silencce  e the local alarm and check      check for abno  abnorrmalmal indic indicaation tions,s, after 1-3 min.,mm., report report alarm silenc silenced ed and RM-80 RM-80 othe  otherw rwisise  norma e norm    al.l.
Resp Respo  ondnd as Chemehemistry istry/H/HP P is direc directteded to verif verify   actuall activ y actua    activitityy insid inside     conta e cont    inmen ainm    entt Events 6      6 - ATW A TWS     S/Sm
                                  /Sma    allll breakk LOC  LOCA     A The crew unsu    unsuc cces  sfulllly cessfu      y attempts to trip the react      reacto orr and immimme  ediat diatelelyy trans transiition tions    s from 3-EOP EOP-E -E-0 -O to 3-EO 3-EOP   P-FR
                              -FR-S-S..1.1. A  TWS & AMSA ATWS           AMSAC     C failu failure ress were enterentere  edd at setup setup.. The crew need needs s to manmanu  ually ally trip the turbi turbin  nee and open AFW    AFWS    SSS MOV MOVss to initia initiatete AFW AFWfflow.low.
Upo Upon n entry entry intointo 3-EO 3-EOP   P-FR
                                      -FR-S -S.1,
                                                .1, trigg trigge err lesso lesson n step EVEEVEN  NTT 66 - - PZR SUR PZR    SURG  GE E LINE LEAK LEA    K REQREQU  UIRIRING ING SI  SI (actuat (actuate  esTVH s TVHPB  PBOT OTLL=0.01    to
                                                                = 0.01))tO    drop PZR drop   PZR presspressure ure belo below   the SI wthe        SI setpo setpoiint.nt. Alth Althouough gh PZR press pressure ure may be   be belo below w the SI setpo setpoiint,nt, SI will not auto autom  mati aticall callyy actuate te due to failufailureress enter entere  edd atat setup setup.. The crewcrew shou shoulldd not man  manu    ally SI ually    SI until until after after trans transiition tion madmade  e back back to to 3-EO 3-EOP   P-E-
                                                  -E-0.0.
66
 
TP-2007-301 TP-20    07-301 Scena Scenarrio io #4#4 Event Event Descri Description Respond Respo    nd as as NSO NSO when when direct directeded toto locally locally triptrip rxrx trip trip break breakers ers and and MG  MG set set input input && outpu outputt breakers.
break          After this ers. After     this direct direction ion hashas been been givengiven and   and emer emergency gency borat borationion hashas been been established estab  lished,, trigge triggerr lesson lesson step step EVEN EVENT 66 - LOCA    LOCAL TRIP  TRIP MG (actuates TCE6DQ7C Q7C =
MG SET SET BREABREAKERS  KERS (actuate s TCE6D              F, TCE6D
                              = F, TCE6DQ8C Q8C =   F after
                                                    = F after 10 10 sec sec delay, delay, TAE310 TAE31O8L8L =TRIP TRIP after TRIP after after 20 20 sec sec delay, delay, TAE340 TAE34O1L 1L ==
TRIP   after 30 30 sec sec delay). Reportt when delay). Repor        when compcompletelete andand report report both both reacto reactorr trip breakbreakers ers stuck in the closed the  closed positio position.                                                                                                           in Manual Manu        SI result al SI  results s inin an auto start of the      the 3A CCWPCCWP.. This   This trigge triggersrs closur closure e of MOV-MOV-3-6263-626 from setup.
setup. Once MOV-    MOV-3-626 3-626 close closes, trigge triggerr lesson lesson step EVEN EVENT 66 - ALLO W MANUAL OPEN MOV-           MOV-3-626 3-626 (actuate (actuates   TFKV626C s TFKV62    6C =   F when IMK193  80). When
                                                                              = F        1MK19380). When MOV- MOV-3-6263-626 control switch is taken to          to OPEN, the closur    closure       failure clears e fai/ure       clears and the valve opens    opens..
Respond Respo    nd as NSO when direct        directe  edd to place PAHM PAHMS in servic    servicee on unit 3. After 8-12 minute minut    s, trigge es,  triggerr lesson lesson step EVENT 6 - PLACE U3 PAHM                        PAHMS S IN SERVICE (actuate  (actuatess TAC2VO2A TAC2V  02A =  1.0, TAC2V
                = 1.0, TAC2VO2B          1.0, TAAAV2 02B == 1.0,   TAAAV21 1 = 1.0, TMAV2        2=
TAAAV22      = 1.0 & TACA0  05 =
TACAOO5            Reportt when
                                                                                                    = 0.0). Repor complete compl  ete..
The crew comp  completeletess 3-EOP-E-O and transi        transition tionss to 3-EOP-E-1 to addre      address ss the SBLOCA.
Respond Respo    nd as ChemChemiistry stry when direct directed ed to sample SGs for activity & check            check DAM-1 DAM-i and as HP when direct  directeded  to   perform perfor        radiatiion m radiat    on readin readings gs on main steam lines. After 10-15 min.
report no signs signs of activity or radiat                                                                                    mm.
radiatiion on levels above above backg backgrou roundnd..
After maximum charg    chargin  ingg flow has been establishe          lished  d,, trigge triggerr lesson lesson step EVENT 6-           6 INCRE INCR      ASE RCS LEAKAGE (actuate EASE                                  (actuatess TVHP TVHPB  BOTL                  cause stable
                                                                            = 0.02) to cause OTL =                      stable/dec/decre reasi asing ng RCS pressure when 3-EOP-E-1 step 14 is reached. If neces                            necessarysary insert additi additio    nal leakage as onal neededd (use any RCS leak node to ensur neede                                                    ensuree RCS pressure is stable       stable/dec/decre reasi asing ng at that point)..
point)
Respond Respo    nd as NSO/NSO/F  FS S when direc  directted ed to close in cold leg recirc break        breakers.ers. Wait 1-3 mm,    min, then trigg      er trigger lesso lesson n step EVENT 6 - CLOSE CL RECIRC BKRS (actuat (actuateess TCM2 TCM2D DO6M 06M == T, TCM1 DO9M D09M == T after 5 sec delay, TCM2  TCM2D  DO4M 04M = T after 15 15 sec delay, delay, TCM1 Dli D11 M M = T after 20 sec delay, delay, D03M ==T after 30 sec delay, TCM1 DO4M
                                                                                                  =
TCM1 DO3M                                          D04M ==T after 35 sec delay, delay, TCM1 Di  OM ==T after D10M        after 45 sec delay, delay, TCM2 TCM2D    05M ==T after 50 sec delay, TCM1 D12M ==T after 60 sec delay DO5M                                                                    delay & TCM2 TCM2DDO3M 03M == T after 65 sec delay).
delay).
Resp Respo    ond nd affirma    tively as NSO when aske affirm atively                              asked d to verify cont  contaainm inmenentt spray & chargin charging   g pump room door      doors s close closed   d..
Resp Respo  ondnd as HP  HP when direc  directteded to surv surve eyy pipe & valve and electric    electricalal pene penettratio rationn rooms for radiati    on.
radiation.
Resp Respo  ond nd as Chemistry   istry when direc  directteded to align PASS for on-line     on-lin e samp sampling/ling/aanaly nalysisiss of of the the RCS.
77
 
[      NRC-4 NRC-4 OPER OPE        RATATIONS IONS SHIFT TURNOV              NOVER  ER REPREPO    ORT RT ONCOMING CRE      REW W ASSI ASSIGN  GNM MENENTSTS Shift Mgr:
Inside SNPO:
Field Supv.:
Outside SNPO:
AdminRCO:
ANPO:
Unit 33 Unit Unit Supv.:
Unit Unit 44 Unit Supv.:
RCO:
RCO:
NPO:
NPO:
Plan t Statu Status Unit 33 Mode:
Unit 4  4 1                                        Mode:
Power:                                100                                      Power:                              100 MWe:                                  760                                        MWe:                              759 Gross Leakrate:                      0.03                                      Gross Leakrate:                    0.04 RCS Boron Conc:                      750                                        RCS Boron Cone:                    600 Operational Concerns:
3 AFWP OOS (bearing failure ; OOS 4 hr; ETR 24 hr)
I 3B EDG OOS (fuel pump failed; OOS            005 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed 1ST -low         low discha rge pressure; OOS 12 hr; ETR 36 hr)
Train A is protec protectteded 2 gpd tube leak in 3A S/G - unchanged for past week (Chemistry sampli ng per 3-0NO 3-ONOP-071 P-071 .2
                                                                                                              .2, Attachment 11.)
U3 Anticipated LCO Actions:
Current:
B AFWP - TS 3.7.1.2 Action 33 (trains verified operable just before turnov er; 30 days to repair) 3B EDG --TS       3.8.1.1 TS 3.8.    .b.1 Actions b &
: 1. 1.b.1              & d (0-OS (0-OSP -023.33 Att 11 &
P-023.          & 9 every 88 hr; 3/4-0S 3/4-OSP-023 P-023..1l start of other EDGs not reqd; req'd; 3-0P-0 3-OP-023 sect 7.7 due next shift if  OOS >
ifOOS   > 72 hr; repair in 14 days) 3B CSP - TS 3.6.2.1 Action a (Fix in 72 hr)
Anticipated: None Train A is protected.. OLRM is green (CDF =            = 2.06E-6;6* LERF = 9.28E-8). 8 U4 Anticipated LCO Actions:
Current:
B B AFWP - TS 3.7.1.2
                  -    3.7.1.2 Action 33 (trains verified operable just before turnover; 30 days to repair) 3B 3B EDG - TS 3.8.1.13.8.1.1.b.1
                                .b. I Actions b & d (0-OSP (0-OSP-023.
                                                              -023.33 Att I1 & 99 every every 88 hr; 3/4-OS 3/4-0S P-023 P-023..1l start of of other EDGs not reqd; req'd; fix in 14 days)
Anticipated: None Train A is protect
            ""~N'<"'1",Orf.
ed. OLRM OLRM is green (CDF == 2.OOE  2.00E--6; 6* LERF = 9.28E-8). 8 Results of Offgoiug Focus Area:
See g:\Ops\Common\0900
 
Unit 3 Stat        Status     us
,r-~
Reactor Oper Reac                  Operator Mode:                                   1I                                          RCS Leakra RCS       Leakrate   te                                                      Accum Accumulator       ulator Ref    Ref Levels Levels Power Power:                                 100 100                    Gross:                                               0.03 0.03 gpm                                     A                               6615 MWe:
MWe:                                    760                   Uniden tified                                        0.02 gpm                                     B                               6640 Tavg:
      "tavg:                                 574                 [Charg Chargiing  ng Pps:
Pps:                               0.01 gpm                                       C                               6625 RCS Pressu RCS    Pressure:                       2235 RCS Boron Cone: Conc:                  750 Abl1'o
      ,&hnnrmg.l rmql    Annnu .~;f giitnr
                                  ~!:!:;li\",r;::';:,'~j c          l\;gv;Y,i!tl:,:;N~!:;,liT;;,;Hl;;~:il,;:';;;,.*:;'i'fr/'l!')~'>, *. ;.~'l****'.::;:**r;~~r);~t';;~;li!:~I'Fi\Y.X1f~;:;;
:;~(!.*i.:~;II,;**,i.;",i~:.1*H~~i'J{:*;i};f:;:,;.'.:I',';.
Annunciator:
Annunciator:
F 9/2 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
Annunc  iator:        F 9/2 - 3B EDG OOS Comp Actions Actions::       OOSP-O23.3 O-OSP-     023.3 Att 11 &      & 9 due in 4 hours. 3/4-0SP   3/4-OSP-023.-023.11 not requiredrequired.. 3-0P-0    3-OP-023 sect 7.7 due next shift.
3-0P-023 sect 7.7 due next shift. Annunciator:
Annunciator:
F 9/5 -3B EDG OOS Comp Actions: O-OSP-023.3 Att 1 & 9 due in 4 hours. 3/4-0SP-023.1 not required.
Annunc  iator:        F 9/5 - 3B  3B EDG OOS Actions::
3-0P-023 sect 7.7 due next shift. Annunciator:
Comp Actions           O-OSP-023.3 O-OSP-     023.3 Att 11 &      & 9 due in 4 hours. 3/4-0SP   3/4-OSPO23. -023.11 not required required.. 3-0P-0    3-OP-023 sect 7.7 due next shift.
Comp Actions: Annunciator:
Annunciator:
Comp Actions: Annunciator:
Annunc    iator:
Comp Actions: Annunciator:
Actions::
Comp Actions: Annunciator:  
Comp Actions Annunciator:
-Comp Actions: Annunciator:
Annunc    iator:
Comp Actions: Annunciator:
Actions::
Comp Actions: Annunciator:
Comp Actions Annunciator:
Comp Actions: Current Tech Spec Action Statements: (Does Not Include "For Trackin2 Only Items" T.S.A.S / Component:
Annunc  iator:
3.7.1.2 Action 3 / B AFWP Reason: Bearing failed Entry Date: XX/XX/XX (Previous shift) T.S.A.S / Component:
Actions::
3.8.1.1 Actions b & d / 3B EDG Reason: Fuel pump failed Entry Date: XX/XX/XX (2 days ago) T.S.A.S / Component:
Comp Actions Annunciator:
3.6.2.1 Action a / 3B CSP Reason: Failed 1ST -low discharge pressure Entry Date: XX/Xx/XX (Yesterday)
Annunc  iator:
T.S.A.S / Component:
Actions::
3.4.3 Action a / 3B PZR backup heaters Reason: 14 day due to 3B EDG OOS Entry Date: XX/XX/XX (2 days ago) T.S.A.S / Component:
Comp Actions Annunciator:
3.5.2 Action f / 3B HHSIP Reason: 14 day due to 3B EDG OOS Entry Date: Xx/XX/XX (2 days ago) T.S.A.S / Component:
Annunc  iator:
Reason: I Entry Date:
-            Actions::
Unit 3 Status Changes to Risk Significant Equipment:
Comp Actions Annunciator:
8 AFWP OOS (8earing replacement) 38 EDG OOS (Fuel pump repair) 38 CSP OOS (Failed 1ST -low discharge pressure)
Annunc  iator:
Unit 3 Risk is GREEN. Main contributor is 8 AFWP. Upcoming Reactivity Management Activities:
Comp Actions Actions::
Dilute to maintain 100% power. Upcoming Major POD Activities:
Annunciator:
Continue to repair OOS equipment.
Annunc  iator:
Upcoming ECOs to Hang and lor Release: None Evolutions or Compensatory Actions in Progress:  
Actions::
-Just returned power back to 100% last shift. -After shift turnover, secure 60 gpm orifice (CV-3-2008) and shutdown 1 charging pump using 3-0P-047 section 7.11. Leave 1 charging pump and 45 gpm orifice (CV-3-200A) in service. -Known tube leak in 3A S/G (2 gpd) -unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, Attachment
Comp Actions Annunciator:
: 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains energized at management direction due to small size and stability of tube leak rate. OSP-023.3 Att 1 & 9 for 38 EDG OOS due in 4 hrs. 3-0SP-023.1 not required since to 38 EDG OOS due to support system failure. 3-0P-023 sect 7.7 due next shift to allow 38 EDG OOS > 72 hr. General Information, Remarks, and Operator Work Around Status: See evolutions
Annunc  iator:
& compensatory actions listed above. Train A is protected.
Actions::
Appendix 0 Scenario Outline Form ES-O-1 Facility:
Comp Actions Current Curre    nt Tech Spec Action Statements: (Does Not Include "For                                            For Trac  Track          king in2 Only Items"        Items T.S.A.
Turkey Point Scenario No.: 5 Op Test No.: 2007-301 Examiners:
T.S.A.SS / Component:             3.7.1.2 Action 33 / B AFWP Reason:
Candidates:
Reason:                           Bearing failed Bearing Entry Date:                       XX/XX/XX (Previous shift)
US RO BOP Initial Conditions:
T.S.A.
Mode 2,4% power, MOL. Turbine rolling at 1800 RPM ready to sync generator to grid. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Turnover:
T.S.A.SS / Component:             3.8.1.1 Action Actionss b &    & dd// 3B EDG Reason Reason::                        Fuel pump failed Entry Date:                     XX/XX/XX (2 days ago)
Equipment OOS: None significant Place unit on line and increase power per 3-GOP-301 beginning with step 5.52.3 Event Event Type* Event Description No. 1 (N) ALL Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. 1a TFFXOILB;T (TS) SRO Once feed regulating valves are placed in automatic, an NSO calls in that the B AFWP governor has an oil leak. 2 !rvKD001X; 1.0 I (C) SRO/BOP 3A (running)
T.S.A.
TPCWP bearing failure. Failure of 3B (standby)
T.S.A.SS / Component:             3.6.2.1 Action a / 3B CSP Reason Reason::                          Failed 1ST 1ST - low discha discharg  rgee pressu pressurree Entry Date:                       XX/XX XX/Xx /XX (Yeste    (Yesterrday) day)
TPCWP to 2 min ramp automatically start following trip of running pump. The crew responds per 3-TFK3B11S;T ONOP-008 and manually starts the 3B TPCWP. 3 (I) BOP 3B s/g controlling feed flow transmitter FT-3-487 fails high causing 3B FRV TFF1M86H; T (I,TS) SRO (FCV-3-488 to fail closed). Manual operator action is required to control 3B s/g level and avoid a reactor trip. The crew responds per 3-0NOP-049.1.
T.S.A.
4 (R) SRO/BOP PT-3-1608 fails high. CV-3-1608 fails open and increases steam flow 3-4%. TFS1MREH; T (C)RO The crew responds per 0-ADM-200 for a secondary plant transient.
T.S.A.SS / Component:             3.4.3 Action aa / 3B      3B PZR backup heaters Reason Reason::                         14 day due to 3B EDG OOS Entry Date:                       XX/XX/XX (2 days ago)
Manual turbine load reduction is required to return reactor power to 30%. Once power TFSVV13A; T is stabilized at 30%, the CV-3-1608 isolation valve is closed, but some ADV steam leakage still exists. 5 (C) ALL Main generator exciter air coolers TPCW flow is partially blocked resulting in TVUJINF ; 0.95 (M) ALL a high air temperature condition.
T.S.A.
The crew responds per 3-ARP-097.CR for TVUJINFB;0.95 annunciator E-9/4. The crew manually trips the reactor when exciter hot gas TVUJINFC;0.95 temperature exceeds 90&deg;C and performs the actions of 3-EOP-E-0.
T.S.A.SS / Component:             3.5.2 Action f/      f / 3B HHSIP Reason Reason::                         14 day due to 3B EDG OOS Entry Date:                      XX/XX Xx/XX /XX (2 days ago)
Once the reactor is tripped, the switch yard relays out. 3B EDG starts but fails to TVUJINFD;0.95 automatically load 3B 4kv bus due to a bus stripping failure. 3A EDG fails to start and can not be manually started. 6 TFP8SWYD ;T (C) ALL The crew transitions to 3-EOP-ECA-0.0.
T.S.A.
MOV-3-1405 fails to open and with B TFQ5GAFS ;T AFWP OOS with an oil leak requires C AFWP to supply both units. Manual TFQ6XABF ;T bus stripping is performed with the exception of 3B TPCWP breaker 3AB11 TFK3B11S ;T which has a blown control power fuse and can not be opened from VPA. 3A TFFXM05; T 4kV bus is repowered via the SBO tie from unit 4. Then 3AB11 is locally K30P11BG; F opened allowing 3B EDG to reenergize 3B & 3D 4kV bus. Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. K30P11BR; F 6a The crew stabilizes the plant using 3-EOP-ECA-0.2 since PZR level < 17[50]% or SI actuated due to the effects of the steam leak. .. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: l Event No.: _1_ Page_1_of Event
T.S.A.SS / Component:
nent:
Reason Reason::
II Entry Date:
 
Unit 33 Status Unit              Status
~,
ChangestotoRisk Changes            RiskSignificant SignificantEquipment:
Equipment:
B  AFWPOOS 8 AFWP        OOS(8earing (Bearingreplacement) replacement) 383BEDG LDGOOS  OOS(Fuel (Fuelpumppumprepair) repair) 3B  CSP    OOS 38 CSP OOS (Failed  (Failed1ST 1ST-low lowdischarge dischargepressure) pressure)
Unit33Risk Unit    RiskisisGREEN.
GREEN. Main  Maincontributor contributorisis8BAFWP.
AFWP.
Upcoming Reactivity Upcoming          ReactivityManagement ManagementActivities:
Activities:
Dilute  to  maintain    100%
Dilute to maintain 100% power. power.
Upcoming Major Upcoming        Major POD POD Activities:
Activities:
Continue    to  repair  DOS Continue to repair OOS equipment. equipment.
Upcoming ECOs Upcoming        ECOs to to Hang Hang andand lorbr Release:
Release:
None None
~c Evolut  ions or Evolutions      or Compe      nsatory Action Compensatory          Actions s in Progre Progress:  ss:
    -   Just  returned    power    back  to  100%
    - Just returned power back to 100% last shift. last  shift.
    - After After shift shift turnover, turnover, secure secure 60 60 gpm gpm orifice orifice (CV-3-200B (CV-3-2008)) and  and shutdown shutdown 11 charging charging pump pump using using 3-OP-047 3-0P-047 section section 7.11.
7.11.
Leave Leave 11 charging charging pumppump andand 45 45 gpm gpm orifice orifice (CV-3-200A (CV-3-200A)) in  in service.
service.
    - Known Known tube tube leak leak inin 3A 3A S/G S/G (2 (2 gpd) gpd) - unchan unchanged  ged forfor last last week.
week. Chemistry Chemistry sample samples    are being s are  being taken taken per per 3-ONOP-3-0NOP-071.2,  Attachment 071.2, Attachment 1.       1. The The current current sample, sample, justjust completed completed indicates        no significant indicates no  significant change change in in leak leak rate.
rate. MOV-3-1 MOV-3-1403 403 remains remains energiz energizeded at at manag managementement direction direction duedue to to small small size size and and stability  of tube stability of  tube leak leak rate.
rate.
    -    0-QSP-023.3 0-OSP-023.3 Att
    - system              Att I1 &&99 for for 3B 38 EDG EDG OOS OOS duedue inin 44 hrs.
hrs. 3-OSP-023.1 3-0SP-023.1 not not required required since since to to 3B 38 EDG EDG DOS OOS due due to to support support failure. 3-OP-023 system failure. 3-0P-023 sect 7.7  sect  7.7 due due next next shift shift to to allow allow 3B38 EDG EDG DOS OOS >> 72 72 hr.
hr.
Genera General  l Inform    ation, Remar Information,      Remarks, ks, and and Operat Operator or Work Work ArounAround d Status:
Status:
See    evolutions See evolutions &compe
                        &            nsatory actions compensatory        actions listed listed above.
above.
Train Train AA isis protected.
protected.
 
Appendix 0D Appendix                                                                  Scenario Outline Scenario          Outline                                                Form Form ES-O-1ES-D-1 Facility:
Facility:                    Turkey Point Turkey        Point                              Scenario No.:
Scenario      No.:              55      Op Test Op    Test No.:
Nd.:        2007-301 2007-301 Examiners:
Examiners:                                                                                Candidates:
Candidates:                                                              US US RO RD BOP BOP Initial Conditions:
Initial  Conditions:            Mode 2,4%
Mode      2, 4% power, power, MOL.      Turbine rolling MDL. Turbine          rolling atat 1800 1800 RPMRPM readyready toto sync sync generator generator to  to grid.
grid, Increase Increase load, place load,    place the the feed feed regulating regulating valves valves in  in automatic automatic and  and hold hold power power at  at 30%
30% for for aa flux flux map.
map.
Turnover:
Turnover:                        Equipment OOS:
Equipment        005: None None significant significant Place unit Place      unit on on line line and and increase increase powerpower per per 3-GOP-301 3-GOP-301 beginning beginning with with stepstep 5.52.3 5.52.3 Event Event                                Event    Type*
Event Type*                                                      Event Description Event      Description No.
No.
11                            (N) ALL                 Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating place                  regulating valves in    in automatic and hold    hold power power at  at 30% for a flux map.
1a 1a          TFFxoiLs = T (TS) SRO                Once feed regulating valves are placed in automatic, an NSO calls in that the TFFXOILB;T B AFWP governor has an oil leak.
2 2      KDoo1x1o/
          !rvKD001X;      1.0 I    (C) SRO/BOP            3A (running) TPCWP bearing failure. Failure of 3B (standby) TPCWP to mm ramp 22 min ramp                                  automatically start following trip of running pump. The crew responds per 3-TFK3B11S=T TFK3B11S;T                                    ONOP-008 and manually starts the 3B TPCWP.
3                             (I) BOP                3B s/g controlling feed flow transmittertransmiffer FT-3-487 fails high causing 3B FRV TFF1M86H =T TFF1M86H;      T                              (FCV-3-488 to fail closed). Manual operator action is required to control 3B
                                        ]-5\ SRO (I,TS) s/g level and avoid a reactor trip. The crew responds per 3-ONOP-049                3-0NOP-049.1.     .1.
4                              (R) SRO/BOP            PT-3-1 608 fails high. CV-3-1608 PT-3-1608                      CV-3-1 608 fails open and increases steam flow 3-4%.
(C) R                  The crew responds per 0-ADM-200 for a secondary plant transient. Manual S1MREH=T TFS1MREH;        T      (C)RO turbine load reduction is required to return reactor power to 30%. Once power TFSVV13A; T is stabilized at 30%, the CV-3-1608 isolation valve is closed, but some ADV steam leakage still exists.
55                              (C) ALL                Main generator exciter air coolers TPCW flow is                    is partially blocked resulting in      in TVuJINF TVUJINF =; 0.95                                aa high high air temperature condition.condition. The crew  crew responds responds per    per 3-ARP-097.C 3-ARP-097.CR      R for (M) ALL (M
TVUJINFB=O TVUJINFB;0.95  95 annunciator E-9/4. The crew manually trips the                  the reactor when exciter hot gas 1VUJINFC=O.95 temperature exceeds 90CC        90&deg;C and performs the actions    actions of  of 3-EOP-E-0.
3-EOP-E-0. Once the TVUJINFC;0.95                                            .    .
reactor is is tripped, tripped, the switchyard switch yard relays out. out. 3B 3B EDG starts starts but but fails fails to to TVUJiNFDO95 TVUJINFD;0.95 automatically automatically load  load 3B3B 4kv 4kv bus due due to aa bus stripping stripping failure. 3A  3A EDG fails to start  and can not start and                be manually not be    manually started.
started.
TFP8SWYD TFP8SWYD T 66                      ;T (C) ALL (C)    ALL            The The crew crew transitions to      to 3-EOP-ECA 3-EOP-ECA-0.0.  -0.0. MOV-3-1405 MOV-3-1405 fails    fails to to open open andand with with BB TFQ5GAFS=T TFQ5GAFS ;T                                    AFWP AFWP DOS  OOS with with anan oil oil leak leak requires requires C  C AFWP AFWP to    to supply supply both both units.
units. Manual Manual TFQ6XABF TFQ6XABF =T  ;T                              bus stripping bus    stripping is  is performed performed with with the the exception exception of  of 3B 3B TPCWP TPCWP breaker breaker 3AB1 3AB111 TFK3B11S=T TFK3B11S ;T                                  which which has has aa blown blown control control power power fusefuse and and can can not not bebe opened opened fromfrom VPA.
VPA. 3A 3A TFFXMO5 TFFXM05;  = TT 4kV 4kV busbus isis repowered repowered via        the SBO via the  SBO tie tie from from unit unit 4. 4. Then Then 3AB13AB111 is  is locally locally K3OP11BG      = F opened allowing opened      allowing 3B  3B EDGEDG to to reenergize reenergize 3B  3B && 3D3D 4kV 4kV bus.
bus. Transition Transition is  is made made K30P11BG;      F to to 3-EOP-ECA 3-EOP-ECA-0.2      -0.2 due due to to the the effects effects of of the the steam steam leak.leak.
K3OPi1BR K30P11BR;  = F F 6a 6a                                                      The    crew stabilizes The crew      stabilizes the  the plant plant using using 3-EOP-ECA 3-EOP-ECA-0.2            since PZR
                                                                                                                                  -0.2 since    PZR level level <<
117[50]%
7[50]% or  or SISI actuated actuated due due toto the the effects effects of of the the steam steam leak.
leak.
(N)ormal,                    ..
(N)ormal, (R)eactivity, (R)eactlvlty, (l)nstrument, (I)nstrument, (C)omponen (C)omponent,      t, (M)ajor (M)aJor 11
 
AppendixDD Appendix                                            OperatorActions Operator        Actions                                        Form FormES-D-2 ES-D-2 Op-TestNo.:
Op-Test  No.: 2007-301 2007-30 1            ScenarioNo.:    No.:l 5 Scenario                              Event EventNo.:No.:_1_  1              Page 1 of~
Page_1_of           4 EventDescription:
Event  


== Description:==
== Description:==
Placeunit Place      uniton  on line lineper per3-GOP-301 3-GOP-301 beginning beginningwith  with step step5.52.3.
5.52.3. Increase Increase load,    place load, place the      thefeedfeed regulating regulating valves valvesinin automatic automaticand    and hold hold power powerat  at 30% for 30%      foraa fluxflux map.
map.
_Time Time    Position Position                                        Applicants Actions Applicant's      Actions or or Behavior Behavior u
US        Directs RO, Directs      RO, BOP BOP && SG          (surrogate operator)
SG (surrogate        operator) placeplace unit unit onon line line and and increas    e  power increase power to 30%.      to  30%.
BOP BOP      Performs actions Performs        actions of    of 3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3:
5.52.3:
: 1. Verifies
: 1.      Verifies exciter exciter DC    DC regulator regulator isis in in full full lower lower (10%
(10% indicated) indicated)
: 2. Closes
: 2.      Closes exciter exciter fieldfield breaker breaker && verifies verifies exciter exciter ammeter ammeter 50-90 = 50-90 amps amps
: 3. Verifies
: 3. Verifies all  all 33 generator generator voltmeters          =
voltmeters = 11-171 1-17 kV kV
: 4. Slowly increasesincreases DC      DC regulator regulator until exciter ammeterammeter =      = 100-130 100-130 amps & all 3 generator generator voltmeters          =
voltmeters = 21.5-22.5 21.5-22.5 kV.
: 5. Places voltage voltage regulator regulator control control in TEST 6.
: 6. Adjusts AC regulator Adjusts              regulator control control to null AC-DC regulator regulator mismatch mismatch
: 7. Places voltag voltage    e regulator regulator control control in ON
: 8. Places East GCB sync switch to MANU                    MANUAL    AL 9.
: 9. Adjust Adjusts    s turbine speed  speed using using govern governor      until synchr or until    synchroscope        rotating oscope rotatin      g slowly slowly in  in FAST FAST directidirectionon 10.
: 10. Adjust Adjusts    s AC AC regulat regulator or contro      to equaliz controll to  equalize    incoming e incom              running ing && runnin      voltage g voltag  e 111.
: 1. Verifie Verifies  s steam steam dumps dumps set  set upup per per Enclos Enclosure ure 22 RO RO      Manua Manually lly contro controls ls rodrod positio position n toto contro controll Tavg Tavg per per Enclos Enclosureure 22 Comm Commences ences performperformance  ance of  of Attach  ment 44 when Attachment          when directe directed    by US d by  US BOP BOP      Contin Continues ues perform performing  ing actions actions of  of3-GOP 3-GOP-301
                                                                                  -301 as  as directe directed    by US:
d by    US:
12.
: 12. Perform Performs    s auto auto synchr        onization synchronization a.a. Places Places East EastGCB  GCB syncsync switch switch toto AUTO AUTO b.b. Above Above synchr            oscope, determ synchroscope,          determines ines EastEastGCB GCBwhitewhite light lightflashes flashes atat 1212oclock o'clock && inadve        rtent protect inadvertent    protection      scheme ion schem            armed amber e armed      amberlightlight I it.
lit.
c.c. Before Beforesynchr          oscope reache synchroscope            reachess 1 11    o'clock, 1 oclock        depresses
                                                                                                , depres              holds ses &&holds auto      sync      pushbu auto sync pushbutton        tton andandobserv observes      EastGCB es East      GCBclosure closure d.d. Places PlacesEast  EastGCB  GCBsync syncswitch switchtotoOFFOFF e.e. Match Matches  es flags flagson onEastEastGCB GCBswitch switch f.f. Determ Determines ines inadve        rtent protect inadvertent      protection    scheme ion schem            armedamber e armed      amberlightlightoff off 11


Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Time Position Applicant's Actions or Behavior US Directs RO, BOP & SG (surrogate operator) place unit on line and increase power to 30%. BOP Performs actions of 3-GOP-301 beginning with step 5.52.3: 1. Verifies exciter DC regulator is in full lower (10% indicated)
Appendix D                                 Operattor Opera  or Action Actions                                   Form ES-D-2 Op-Test No.: 2007-301           Scenarrio Scena  io No.: ~          Event No.: _1_
: 2. Closes exciter field breaker & verifies exciter ammeter = 50-90 amps 3. Verifies all 3 generator voltmeters
j_          Pag Page e~o    of f~
= 11-17 kV 4. Slowly increases DC regulator until exciter ammeter = 100-130 amps & all 3 generator voltmeters
= 21.5-22.5 kV. 5. Places voltage regulator control in TEST 6. Adjusts AC regulator control to null AC-DC regulator mismatch 7. Places voltage regulator control in ON 8. Places East GCB sync switch to MANUAL 9. Adjusts turbine speed using governor until synchroscope rotating slowly in FAST direction
: 10. Adjusts AC regulator control to equalize incoming & running voltage 11. Verifies steam dumps set up per Enclosure 2 RO Manually controls rod position to control Tavg per Enclosure 2 Commences performance of Attachment 4 when directed by US BOP Continues performing actions of 3-GOP-301 as directed by US: 12. Performs auto synchronization
: a. Places East GCB sync switch to AUTO b. Above synchroscope, determines East GCB white light flashes at 12 o'clock & inadvertent protection scheme armed amber light lit. c. Before synchroscope reaches 11 o'clock, depresses
& holds auto sync pushbutton and observes East GCB closure d. Places East GCB sync switch to OFF e. Matches flags on East GCB switch f. Determines inadvertent protection scheme armed amber light off 1 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: _1_
Event
Event
== Description:==
Place unit on line Qerper 3-GOP-301 beginning with steQ    step 5.52.3 5.52.3.. Increa Increassee load, Qlace place the feed regula regulatting ing valves in automatic and hold Qower  power at 30% for a flux maQ.
map.
Time    Position                            Applicant's Applic  ants Action Actions or Behavior
[_Time BOP        Increas Increa    es turbine load to 40 MWe in 5-10 MWe increm ses                                              increments.
ents.
US        Directs monitoring automatic control program values per PCB Section IV Figure 5. Notifies SM of any unexp  unexpe  cted deviat ected  deviatiions.
ons.
BOP        Verifies atmos Verifie    atmosp  heric steam dumps close per Enclosure 2.
pheric US      When turbine load sufficie sufficiently  increas ntly increa  ed, directs SG operat sed,                operatoorr open FW isolation valves, transfer SG level controls from FW bypass to main FW controll valves and place SG level contro ls in auto.
NOTE : Once SG level control in auto, SG operat    operatoorr (surrog (surrogate ate operat operatoor) r)
will leave the simulator floor.
BOP      Continues Contin  ues performing action actionss of 3-GOP-301 as directed by US:
: 13. Verifies SG level being controlled 50+/-5%
: 14. Verifies Main FW control valves in auto &        & FW bypass valves closed RO        Continues Contin  ues performing action actionss of 3-GOP-301 as directed by US:
: 1. When reacto      power>
reactorr power    > 10%
: a. Determ ines Power Above P-10      P-i 0 VPA status light ON &    & At Power Trips Blocked VPA status light OFF
: b. Presses &    & holds Intermed Range Trip Manuall Block A &          & B logic consollee pushb conso    pushbu  ttons 2-4 secon uttons        seconddss
: c. Determ ines Inter Rng Trip Blocked VPA status light ON
: d. Presses &  & holds Power Lo Range Trip Manua  Manuall Block A &    & B logic consollee push conso      pushbu  ttonss 2-4 secon button          seconddss
: e. Determ ines Pwr Rng Trip Blocked VPA status light ON BOP      Contin Continuesues perfor perform  ing action ming  actionss of 3-GOP-301 as directed by US:
: 15. Determ ines NIS IR &    & Lo PR Trips blocked on DDPS
: 16. Notifies Chemi stry to samplsamplee RCS per TS 3.4.8
: 17. Places Mid GCB sync switch to MANUAL
: 18. Verifies incom    ng =
incomiing  = running voltage voltage && synchr synchroscop oscope  e@        oclock
                                                                                          @ 12 o'clock 2
AppendixDD Appendix                                              OperatorActions Operator        Actions                                        Form FormES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.: 2007-301 2007-301          Scenario No.:
Scenario        No.: ~  5        Event Event No.:
No.: _1_ 1          Page~of_4_
Page 3 of 4 Event
== Description:==
Event   
== Description:==
Place unit Place      unit onon line line perper3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3.
5.52.3. Increase Increase load,    place    the  feed load, place the feed regulating  regulating valves valves inin automatic automatic and and hold hold power power atat 30% for 30%      for aa flux flux map.
map.
I Time lillie    Position Position                                    Applicants Actions Applicant's      Actions or  or Behavior Behavior BOP BOP      Continues performing Continues        performing actions acUonsof  of 3-GOP-301 3-GOP-301 as      as directed directed by  by US:
US:
: 19. When
: 19. When bothboth sync sync lights lights out, out, closes closes MidMid GCB GCB
: 20. Places
: 20. Places Mid Mid GCB GCB sync sync switch switch to to OFF OFF
: 21. Adjusts
: 21. Adjusts generator generator MVARs  MVARs as    as directed directed by by System System
: 22. Places
: 22. Places GCMGCM in    in service service
: a. Verifies generator
: a.                generator H2    H  pressure =
2 pressure        = 65-75 65-75 psig psig
: b. Directs NSO verify local
: b.                                local filter oil oil free & & set H2 2 gas flow == 16 H                  16
: c. Verifies VPA power light ON
: d. Presses Alarm Reset PB & Manual Start Only PB if lit
: e. Verifies Auto Sampler Ready light ON & printer stamping between 0.75-1 0.75-1.0; .0; marks date & time
: 23. Directs NSO complete 3-OP-072        3-0P-072 section 5.0 & commence MSR              MSR purge at 70 MWe per 3-OP-072.1    3-0P-072.1 section 5.1
: 24. Verifies Feedwater Pump Turbine Runback switch in DEFEAT 25.
: 25. Places Places Steam Steam Dump  Dump Control Switch to ON.        ON. Places Places Steam Steam DumpDump Mode Mode Selector Selector Switch Switch in  in RESET RESET then then to to AUTO AUTO 26.
: 26. When When atmospheric atmospheric steam    steam dumps dumps closed, closed, adjusts adjusts setpoints setpoints to to 1000 1000 psig psig && verifies verifies controls controls in in AUTO AUTO 27.
: 27. At At 130 130 MWe, MWe, transfers transfers house house loadsloads from from SUTSUT toto Aux Aux Transformer Transformer a.
: a. Places Places 3A  3A 4kV4kV busbus AuxAux Xfmr Xfmr synch synch switch switch toto ON ON b.b. Verifies Verifies incoming incoming::::: running running voltage voltage && synchroscope synchroscope ::::: 12 12 oclock o'clock c.c. Places Places && holdsholds Aux Aux Xfmr Xfmr to to 3A 3A 4kV 4kV bus bus bkr bkr sw sw inin CLOSE, CLOSE, verifies verifies redred light    on, SUT light on,    SUT to to 3A 3A 4kV 4kV bus bus current current decreases decreases &&
Aux Aux Xfmr Xfmr to  to 3A 3A 4kV 4kV busbus current current increases.
increases.
d.d. Releases Releases Aux    Aux Xfmr Xfmrto  to 3A 3A 4kV 4kV bus bus bkrbkr sw, sw, verifies verifies SUT SUT bkr bkrtrips, trips, SUT SUT to  to 3A 3A 4kV4kV bus      current == 00 &&Aux bus current              Aux Xfmr Xfmrto to 3A 3A 4kV 4kV bus bus current current increases.
increases.
e.e. Matches Matchesflags  flags on on SUT SUTtoto 3A 3A4kV4kVbus bus f.f. Places Places 3A  3A4kV 4kVbus busAux AuxXfmr Xfmrsynch synch switch switch toto OFF OFF g.g. Repeats Repeatswith  with3B  3B4kV4kVbusbus power powersupply.
supply.
33
AppendixDD Appendix                                          OperatorActions Operator    Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.: 2007-301 2007-30 1          Scenario No.:.2....
Scenario      No.: 5          Event No.:
Event    No.: _1_1          Page-+/-.
Page 4 of    of~4 Event
== Description:==
Event
== Description:==
Place unit Place    unit on    line per on line  per 3-GOP-301 3-GOP-301 beginning beginning withwith step step 5.52.3.
5.52.3. Increase Increase load, place load,    place thethe feed feed regulating regulating valves valves inin automatic automatic and  and hold hold power power at at 30% for 30%    for aa flux flux map.
map.
Time Time    Position Position                                    Applicants Actions Applicant's    Actions oror Behavior Behavior BOP BOP          Coordinates with Coordinates          with RORD toto increase increase && stabilize stabilize turbine    load =:: 225 turbine load        225 MWe MWe When NSO When      NSO reports reports MSRMSR drains drains to  condenser restricting to condenser      restricting orifice orifice open, open, opens MSR opens      MSR purge purge valves valves CV-3-2910/2911/2912/2913 CV-3-2910/291 1/2912/2913 and        and directs directs NSO NSO check for check      for purge purge lineline steam steam flow.
flow.
At approximately At  approximately 150      150 MWe:
MWe:
                      *.      Closes Turbine Closes    Turbine Drain Drain Valves Valves
                      *.      Directs local closure of turbine stop valve drains
                      *.      Verifies SG blowdown aligned for at power operation per 3-0P-071            3-OP-071
                      *.      Directs NSO verify PSS voltmeter reading 0 +/-              +/- 1I Volt. Once    exciter &
bus voltages determined stable, places PSS control switch                      to to ON At approximatel approximately      y 200 MWe, begins placing MSRs in service per 3-0P-              3-OP-072.1 section 5.2:
                              .*  Verifies MSR steam supply timing cam installed correctly with follower set at CLOSED CLOSED position &      & follower stop set at 95%
                            .*    Places Places MSR MSR steam supply supply timing control valvesvalves switch switch to ON ON
                            .*    Monitors Monitors MSR  MSR outlet outlet temp temp rate rate of of change change << 100&deg;F/hr 100&deg;F/hr RD RO      Coordinates Coordinates with    with BOP BOP to  to increase increase && stabilize stabilize reactor    power ==30%
reactor power        30%
using using control control rods rods && dilution dilution per per 0-OP-046.
0-OP-046.
Verifies Verifies control control rods rods maintaining maintaining AFD AFD perper 0-OP-059.9 0-OP-059.9 Verifies Verifies IR  IR High High Level Level RodRod Stop Stop bistable bistable status status light light at at 20%
20% power.
power.
Verifies Verifies IR  IR High High Level Level Trip Trip bistable bistable status status light light at at 25%
25% power.
power.
44
Appendix DD Appendix                                  Operator Actions Operator  Actions                                Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.: 2007-301 2007-301        Scenario No.:
Scenario    No.: 55          Event No.:
Event    No.: -1.&sect;..
la      Page Page _1_
j of of _1_
1 Event


== Description:==
== Description:==


Place unit on line Qer 3-GOP-301 beginning with steQ 5.52.3. Increase load, Qlace the feed regulating valves in automatic and hold Qower at 30% for a flux maQ. Time Position Applicant's Actions or Behavior BOP Increases turbine load to 40 MWe in 5-10 MWe increments.
US Directs monitoring automatic control program values per PCB Section IV Figure 5. Notifies SM of any unexpected deviations.
BOP Verifies atmospheric steam dumps close per Enclosure
: 2. US When turbine load sufficiently increased, directs SG operator open FW isolation valves, transfer SG level controls from FW bypass to main FW control valves and place SG level controls in auto. NOTE: Once SG level control in auto, SG operator (surrogate operator) will leave the simulator floor. BOP Continues performing actions of 3-GOP-301 as directed by US: 13. Verifies SG level being controlled 50+/-5% 14. Verifies Main FW control valves in auto & FW bypass valves closed RO Continues performing actions of 3-GOP-301 as directed by US: 1. When reactor power> 10% a. Determines Power Above P-10 VPA status light ON & At Power Trips Blocked VPA status light OFF b. Presses & holds Intermed Range Trip Manual Block A & B logic console pushbuttons 2-4 seconds c. Determines Inter Rng Trip Blocked VPA status light ON d. Presses & holds Power Lo Range Trip Manual Block A & B logic console push buttons 2-4 seconds e. Determines Pwr Rng Trip Blocked VPA status light ON BOP Continues performing actions of 3-GOP-301 as directed by US: 15. Determines NIS IR & Lo PR Trips blocked on DDPS 16. Notifies Chemistry to sample RCS per TS 3.4.8 17. Places Mid GCB sync switch to MANUAL 18. Verifies incoming = running voltage & synchroscope
@ 12 o'clock 2 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: Event No.: _1_
Event
Event
== Description:==
Once feed Once    feed regulating regulating valves valves are    placed in are I2laced    in automatic, automatic, an an NSO NSO calls calls in in that the that  the BB AFWP AFWP governor governor hashas anan oil oil leak.
leak.
Time e      Position Position                            Applicants Actions Applicant's    Actions or or Behavior Behavior BOP BOP      Relays report Relays    report from from NSO NSO ofof oil oil leak leak on on BB AFWP AFWP governor governor US US      Declares B Declares      AFWP out B AFWP    out of of service service Determines TS Determines      TS 3.7.1.2 3.7.1.2 action action statement statement 33 applies:
applies:
                          *. Verify two operable independent AFW trains in 4 hr
                          *. Fix B AFWP in  in 30 days WCC have Mechanical troubleshoot & fix B AFWP Directs wee WOO generate & hang EeO Directs wee                            ECO on B AFWP 55
Appendix DD Appendix                                        Operator Actions Operator    Actions                                    Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test    No.:  2007-301 2007-301          Scenario No.:
Scenario    No.: l 5      Event No.:
Event    No.: _2_2          Page_1 Page _      of _ 1_
1 of    1 Event


== Description:==
== Description:==


I ..... , lillie Position Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Applicant's Actions or Behavior BOP Continues performing actions of 3-GOP-301 as directed by US: 19. When both sync lights out, closes Mid GCB 20. Places Mid GCB sync switch to OFF 21. Adjusts generator MVARs as directed by System 22. Places GCM in service a. Verifies generator H2 pressure = 65-75 psig b. Directs NSO verify local filter oil free & set H2 gas flow = 16 c. Verifies VPA power light ON d. Presses Alarm Reset PB & Manual Start Only PB if lit e. Verifies Auto Sampler Ready light ON & printer stamping between 0.75-1.0; marks date & time 23. Directs NSO complete 3-0P-072 section 5.0 & commence MSR purge at 70 MWe per 3-0P-072.1 section 5.1 24. Verifies Feedwater Pump Turbine Runback switch in DEFEAT 25. Places Steam Dump Control Switch to ON. Places Steam Dump Mode Selector Switch in RESET then to AUTO 26. When atmospheric steam dumps closed, adjusts setpoints to 1000 psig & verifies controls in AUTO 27. At 130 MWe, transfers house loads from SUT to Aux Transformer
Event  
: a. Places 3A 4kV bus Aux Xfmr synch switch to ON b. Verifies incoming:::::
running voltage & synchroscope
::::: 12 o'clock c. Places & holds Aux Xfmr to 3A 4kV bus bkr sw in CLOSE, verifies red light on, SUT to 3A 4kV bus current decreases
& Aux Xfmr to 3A 4kV bus current increases.
: d. Releases Aux Xfmr to 3A 4kV bus bkr sw, verifies SUT bkr trips, SUT to 3A 4kV bus current = 0 & Aux Xfmr to 3A 4kV bus current increases.
: e. Matches flags on SUT to 3A 4kV bus f. Places 3A 4kV bus Aux Xfmr synch switch to OFF g. Repeats with 3B 4kV bus power supply. 3 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.:.2....
Event No.: _1_ Page-+/-. of Event


== Description:==
== Description:==
3A    (running) TPeWp 3A (running}  TPCWP bearing bearing failure.
failure. Failure Failure of of 3B 3B (standby}
(standby) TPeWp TPCWP toto automatically automatically start start following following tri(2 trip of of running running (2um(2.
pump. The    crew The crew responds (2er res(2onds    per 3-0NOP-008 3-ONOP-008 and    and manually manually starts starts the the 3B 3B TPeWp TPCWP..
Time  ,
lillie    Position Position  j                            Applicants Actions Applicant's    Actions or or Behavior Behavior RO RO        Recognizes/reports annunciator Recognizes/reports      annunciator 1-5/1,      5/2 &
1-5/1, 5/2  & 5/4 5/4 alarms alarms US US        Directs response Directs  response perper 3-0NOP-008 3-ONOP-008 BOP BOP                    actions of Performs actions      of 3-0NOP-008 3-ONOP-008 as      as directed directed by US:US:
: 1. Determines annunciator 1-5/1  I-S/i & & 5/2 alarmed
: 2. Determines 3A TPeWpTPCWP tripped &      & 3B TPeWp TPCWP did not auto start
: 3. Determines offsite power is available and starts 3B TPeWp        TPCWP
: 4. Determines 11 TPeWp TPCWP now running &          & annunciator 1-5/4 no longer alarming
: 5. Determines SI not actuated and POV-3-4882 &              & 4883 open
: 6. Determines annunciator 1-5/5 not alarming
: 7. Directs NSO locally check TPCW  TPeW supply header temp << 110&deg;F      1 10&deg;F and stable/decrea  sing stable/decreasing
: 8. Directs NSO locally verify TPCW TPeW basket strainer Ap      IIp << 1.5 1.5 psid
: 9. Determines all generator-rel generator-relatedated temperature alarms all OFF
: 10. Determines
: 10. Determines allall SGFP, cond pp    pp & & HDP HDP bearing bearing temp alarms alarms OFFOFF
: 1. Determines 111. Determines all TPCW TPeW alarms alarms OFF
: 12. Directs
: 12. Directs NSO NSO check check TPCW TPeW cooled cooled components temperature stable/decrea  sing stable/decreasing US US        Directs Directs WCCwee have have Electrical Electrical && Mechanical Mechanical maintenance maintenance investigate investigate 3A 3A TPCWP TPeWp failure failure Directs Directs WCCwee generate generate ECO EeO and and take take 3A3A TPCWP TPeWp out  out of of service service 66


Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Time Position Applicant's Actions or Behavior BOP Coordinates with RO to increase & stabilize turbine load =:: 225 MWe When NSO reports MSR drains to condenser restricting orifice open, opens MSR purge valves CV-3-2910/2911/2912/2913 and directs NSO check for purge line steam flow. At approximately 150 MWe:
AppendixDD Appendix                                      OperatorActions Operator      Actions                                         Form Form ES-D-2 ES-D-2 Op-Test No.:
* Closes Turbine Drain Valves
Op-Test No.:     2007-30 1 2007-301           Scenario No.:
* Directs local closure of turbine stop valve drains
Scenario      No.: 2.. 5       Event    No.: ~
* Verifies SG blowdown aligned for at power operation per 3-0P-071
Event No.:                 Page-1 Page 3                1ofof_1_ 1 Event
* Directs NSO verify PSS voltmeter reading 0 +/- 1 Volt. Once exciter & bus voltages determined stable, places PSS control switch to ON At approximately 200 MWe, begins placing MSRs in service per 3-0P-072.1 section 5.2:
* Verifies MSR steam supply timing cam installed correctly with follower set at CLOSED position & follower stop set at 95%
* Places MSR steam supply timing control valves switch to ON
* Monitors MSR outlet temp rate of change < 100&deg;F/hr RO Coordinates with BOP to increase & stabilize reactor power = 30% using control rods & dilution per 0-OP-046.
Verifies control rods maintaining AFD per 0-OP-059.9 Verifies IR High Level Rod Stop bistable status light at 20% power. Verifies IR High Level Trip bistable status light at 25% power. 4 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 5 Event No.: -1.&sect;.. Page _1_ of _1_ Event


== Description:==
== Description:==


Once feed regulating valves are I2laced in automatic, an NSO calls in that the B AFWP governor has an oil leak. e Position Applicant's Actions or Behavior BOP Relays report from NSO of oil leak on B AFWP governor US Declares B AFWP out of service Determines TS 3.7.1.2 action statement 3 applies:
Event  
* Verify two operable independent AFW trains in 4 hr
* Fix B AFWP in 30 days Directs wee have Mechanical troubleshoot
& fix B AFWP Directs wee generate & hang EeO on B AFWP 5 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: l Event No.: _2_ Page_1 _ of _ 1_ Event


== Description:==
== Description:==
3B    s/g controlling 3B slg    controlling feed feed flow flow transmitter transmitterFT    487 fails FT-3-487      fails high high causing causing 3B  3B FRV (FCV-3-488 FRV    (FCV-3-488 to  to fail fail closed).
closed). Manual Manual o(2erator operator action action isis reguired required to  to control 3B control    3B slg s/g level level and and avoid avoid aa reactor reactor tri(2.
trip. The The crew crew res(2onds responds (2erper 3                          ONOP-049.1.
ONOP-049.1.
Time Time        Position Position                                Applicants Actions Applicant's      Actions or or Behavior Behavior BOP BOP          Recognizes 1I reports Recognizes        reports failure failure of of FT-3-487 FT-3-487 low low and and loss loss ofof FW FW toto 3B 3B SG  (FCV-3-488 closed).
SG (FCV-3-488        closed).
Takes manual Takes    manual control control of  of FCV-3-488 FCV-3-488 and  and restores restores 3B  3B SGSG level level to to program program US US          Directs performance Directs  performance of    of actions actions per per 3-0NOP-049.1.
3-ONOP-049.1.
BOP                                        3-ONOP-049.1 as directed by US:
Performs actions per 3-0NOP-049.1
: 1. Determines FT-3-487 failed while FT-3-486 remains in service                  service
: 2. Transfers controlling FW flow channel for 3B SG to ch IV NOTE: Operator may also take controlling steam flow channel for                          for 3B 38 SG to ch IV as well US        Determines TS 3.3.1 Table 3.3-1 Unit 12              12 affected. Action 6 applies (6 hr hr to trip bistables)
Determines Determines BS-3-488B1 BS-3-488B1,, B2    B2 &&C  C must must bebe tripped tripped Briefs Briefs crew crew regarding regarding tripping tripping bistables bistables and and effects effects of of failure.
failure.
BOP BOP        Obtains Obtains keys keys and and opens opens protection protection rack rack 1818 Trips Trips bistables bistables BS-3-488B1 BS-3-488B1,, BS-3-488B2 BS-3-488B2 && BS-3-488CBS-3-488C RCO RCO        Checks Checks correct correct bistable bistable status status light light energized energized in  in response response to  to tripping tripping bistables bistables (FC488B1).
(FC488B1).
Checks Checks correct correct annunciators annunciators on    on inin response response to    to tripping tripping bistables bistables (C-412 (C-4/2 && C-5/2).
C-5/2).
US US        Directs Directs WCC WCC initiate initiate PWOPWO && notify notify l&C I&C Directs Directs generation generation of  of ECO ECO for for tripped tripped bistables bistables Directs Directs local local reset resetof ofAMSAC AMSAC trouble trouble alarm alarm (annunciator (annunciatorD-716)  D-7/6) ifif actuated actuated 77


3A (running}
AppendixDD Appendix                                                OperatorActions Operator      Actions                                        Form Form ES-D-2 ES-D-2 Op-Test No.:
TPeWp bearing failure. Failure of 3B (standby}
Op-Test         No.: 2007-301 2007-301          Scenario No.:
TPeWp to automatically start following tri(2 of running (2um(2. The crew res(2onds (2er 3-0NOP-008 and manually starts the 3B TPeWp . ...... , lillie Position Applicant's Actions or Behavior RO Recognizes/reports annunciator 1-5/1, 5/2 & 5/4 alarms US Directs response per 3-0NOP-008 BOP Performs actions of 3-0NOP-008 as directed by US: 1. Determines annunciator 1-5/1 & 5/2 alarmed 2. Determines 3A TPeWp tripped & 3B TPeWp did not auto start 3. Determines offsite power is available and starts 3B TPeWp 4. Determines 1 TPeWp now running & annunciator 1-5/4 no longer alarming 5. Determines SI not actuated and POV-3-4882
Scenario       No.:...L5      Event No.:
& 4883 open 6. Determines annunciator 1-5/5 not alarming 7. Directs NSO locally check TPeW supply header temp < 110&deg;F and stable/decreasing
Event    No.: _4_ 4            Page_1_
: 8. Directs NSO locally verify TPeW basket strainer IIp < 1.5 psid 9. Determines all generator-related temperature alarms all OFF 10. Determines all SGFP, cond pp & HDP bearing temp alarms OFF 11. Determines all TPeW alarms OFF 12. Directs NSO check TPeW cooled components temperature stable/decreasing US Directs wee have Electrical
Page 1 of     of_1_ 1 Event
& Mechanical maintenance investigate 3A TPeWp failure Directs wee generate EeO and take 3A TPeWp out of service 6 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2.. Event No.: Page -1 of _1_ Event


== Description:==
== Description:==


3B slg controlling feed flow transmitter FT 487 fails high causing 3B FRV (FCV-3-488 to fail closed). Manual o(2erator action is reguired to control 3B slg level and avoid a reactor tri(2. The crew res(2onds (2er 3-ONOP-049.1.
Event      
Time Position Applicant's Actions or Behavior BOP Recognizes 1 reports failure of FT-3-487 low and loss of FW to 3B SG (FCV-3-488 closed). Takes manual control of FCV-3-488 and restores 3B SG level to program US Directs performance of actions per 3-0NOP-049.1.
BOP Performs actions per 3-0NOP-049.1 as directed by US: 1. Determines FT-3-487 failed while FT-3-486 remains in service 2. Transfers controlling FW flow channel for 3B SG to ch IV NOTE: Operator may also take controlling steam flow channel for 38 SG to ch IV as well US Determines TS 3.3.1 Table 3.3-1 Unit 12 affected.
Action 6 applies (6 hr to trip bistables)
Determines BS-3-488B1, B2 & C must be tripped Briefs crew regarding tripping bistables and effects of failure. BOP Obtains keys and opens protection rack 18 Trips bistables BS-3-488B1, BS-3-488B2
& BS-3-488C RCO Checks correct bistable status light energized in response to tripping bistables (FC488B1).
Checks correct annunciators on in response to tripping bistables (C-4/2 & C-5/2). US Directs WCC initiate PWO & notify I&C Directs generation of ECO for tripped bistables Directs local reset of AMSAC trouble alarm (annunciator D-7/6) if actuated 7 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: ...L Event No.: _4_ Page_1_ of _1_ Event


== Description:==
== Description:==
PT-3-1 608 fails PT-3-160B        fails high.
high. CV-3-160B CV-3-1 608 failsfails ol2en open andand increases increases steam steam flow flow 3-4%. The 3-4%. The crew crew resl20nds responds l2erper 0-ADM-200 0-ADM-200 for        a secondarY for a secondary plant  I2lant transient. Manual transient. Manual turbine turbine load load reduction reduction isis reguired required to  to return return reactor reactor power    to 30%. Once    power 120wer to 30%. Once 120wer isis stabilized stabilized at at 30%,
30%, the the CV-3-160B CV-3-1 608 isolation valve isolation    valve isis closed, closed, but but some some ADVADV steam steam leakage leakage still still exists.
exists.
II _Time T;,..., ....
    ...    ,~
Position Position                                  Applicants Actions Applicant's    Actions or or Behavior Behavior BOP BOP      Recognizes/reports lowering Recognizes/reports            lowering generator generator MW  MW Recognizes/reports PT-3-160B Recognizes/reports            PT-3-1 608 fails fails high high && CV-3-160B CV-3-1 608 failed failed openopen RO RO      Recognizes/reports 4-5%
Recognizes/reports            4-5% reactor reactor power power increase increase Recognizes/reports Tavg << Tref Recognizes/reports US      Determines CV-3-160B CV-3-1 608 failure open caused Tavg-Tref deviation Directs taking manual control of CV-3-160B. CV-3-1 608.
When informed of CV-3-160B CV-3-1 608 failure, directs local isolation of CV-3-160B      CV-3-1 608 BOP BOP      Consistent with 0-ADM-200 section 5.4.3 guidance for response to                            to secondary pant transient:
1.
: 1. Reduces turbine load    load to match Tavg        =Tref 2.
: 2. Attempts manual  manual closure of    of CV-3-1608 CV-3-160B &    & determines determines CV-3-1608 CV-3-160B failed open 3.
: 3. Directs Directs NSO NSO locally locally investigate investigate CV-3-1 CV-3-160B 608 4.
: 4. Relays Relays report report from from NSO NSO of  of steam steam coming coming from from unit unit 33 silencer silencer 5.
: 5. Directs Directs NSO NSO locally locally close close CV-3-1 CV-3-160B      isolation valve 608 isolation      valve 6.
: 6. Relays Relays report report from from NSO NSO thatthat steam steam flow flow not not completely completely stopped stopped with with isolation isolation valve valve closed.
closed.
7.
: 7. Adjusts Adjusts turbine turbine loadload asas necessary necessary to  to match match TavgTavg ==TrefTref US US      Determines Determines CV-3-1608 CV-3-160B isolation isolation valve valve leaking leaking by  by Directs Directs WCCWCC have have Mechanical Mechanical maintenance maintenance investigate investigate CV-3-1 CV-3-160B 608 Directs Directs caution caution tagtag generated generated for  for CV-3-1 CV-3-160B 608 inin manual manual 88


PT-3-160B fails high. CV-3-160B fails ol2en and increases steam flow 3-4%. The crew resl20nds l2er 0-ADM-200 for a secondarY I2lant transient.
Appendix DD Appendix                                            OperatorActions Operator        Actions                                         Form Form ES-D-2 ES-D-2 Op-Test No.:
Manual turbine load reduction is reguired to return reactor 120wer to 30%. Once 120wer is stabilized at 30%, the CV-3-160B isolation valve is closed, but some ADV steam leakage still exists. T;,..., .... Position Applicant's Actions or Behavior II ... BOP Recognizes/reports lowering generator MW Recognizes/reports PT-3-160B fails high & CV-3-160B failed open RO Recognizes/reports 4-5% reactor power increase Recognizes/reports Tavg < Tref US Determines CV-3-160B failure open caused Tavg-Tref deviation Directs taking manual control of CV-3-160B.
Op-Test No.:   2007-301 2007-301                Scenario No.:
When informed of CV-3-160B failure, directs local isolation of CV-3-160B BOP Consistent with 0-ADM-200 section 5.4.3 guidance for response to secondary pant transient:
Scenario        No.: 2 5            Event No.:
: 1. Reduces turbine load to match Tavg = Tref 2. Attempts manual closure of CV-3-160B
Event     No.: 2 5        Page~of_2_
& determines CV-3-160B failed open 3. Directs NSO locally investigate CV-3-160B
Page 9 of 2 Event
: 4. Relays report from NSO of steam coming from unit 3 silencer 5. Directs NSO locally close CV-3-160B isolation valve 6. Relays report from NSO that steam flow not completely stopped with isolation valve closed. 7. Adjusts turbine load as necessary to match Tavg = Tref US Determines CV-3-160B isolation valve leaking by Directs WCC have Mechanical maintenance investigate CV-3-160B Directs caution tag generated for CV-3-160B in manual 8 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2 Event No.: 2 Event


== Description:==
== Description:==


Main generator exciter air coolers TPCW flow is Qartially:
Event  
blocked resulting in a high air temQerature condition.
The crew resQonds Qer 3-ARP-097.CR for annunciator E-9/4. The crew manually:
triQs the reactor when exciter hot gas temQerature exceeds 90&deg;C and Qerforms the actions of 3-EOP-E-0.
Once the reactor is triQQed, the switchy:ard relay:s out. 3B EDG starts but fails to automatically:
load 3B 4kv bus due to a bus striQQing failure. 3A EDG fails to start and can not be manually:
started. e Position Applicant's Actions or Behavior BOP Recognizes 1 reports annunciator E-9/4 alarming RO Reads actions for 3-ARP-097.CR for annunciator E-9/4 BOP Performs actions consistent with 3-ARP-097.CR for annunciator E-9/4 as read by RO 1. Verifies alarm using recorder R-3-347 (VPA) 2. Monitors exciter air temperature closely 3. If hot air temp 2: 8rC reduce MVAR while maintaining grid voltage 2: 232 kV 4. If hot air temp 2: 8rC with MVAR=O, maintain grid voltage 2: 232 kV & reduce generator load using 3-0NOP-100 until hot air temp < 8rC 5. If hot air temp 2: 8rC & increasing due to unknown cause advises US to consider tripping reactor & turbine 6. If hot air temp> 90&deg;C & no expectation of fast recovery advises US to tripping reactor & turbine and enter 3-EOP-E-0 US Determines hot air temp> 90&deg;C & no expectation of fast recovery Directs reactor trip Directs crew perform immediate actions of 3-EOP-E-0.
RO Performs immediate actions of 3-EOP-E-0:
: 1. Verifies reactor trip
* Rod bottom lights on & RPls at zero
* Rx trip & bypass bkrs open
* Neutron flux decreasing 9
Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 2-Event No.: 2-Event


== Description:==
== Description:==
Main generator Main      generator exciterexciter airair coolers coolers TPCW TPCW flow flow isis Qartially:
partially blocked blocked resulting inin aa high resulting              high airair temQerature temperature condition.
condition. The The crew crew resQonds responds Qer per 3                        ARP-097.CR for ARP-097.CR            for annunciator annunciator E-9/4. E-914. TheThe crew manually trips the reactor crew    manually:    triQs  the reactor when exciter when      exciter hot hot gas gas temQerature temperature exceedsexceeds 90&deg;C 90&deg;C andand Qerforms performs the  the actions    of    3-EOP-E-0.
actions of 3-EOP-E-0. Once            Once the the reactor reactor isis triQQed, tripped, thethe switchy:ard switchyard relay:s relays out. 3B out. 3B EDGEDG startsstarts butbut fails fails to    automatically load to automatically:      load 3B3B 4kv 4kv bus bus due due to to aa bus bus stripping failure.
striQQing        failure. 3A    EDG fails 3A EDG        fails to to start start and and can can notnot be be manually:
manually started.
started.
Time e        Position Position BOP J    Recognizes!1 reports Applicants Actions Applicant's reports annunciator Actions or annunciator E-9/4 or Behavior Behavior BOP            Recognizes                                          E-9/4 alarming alarming RO RO              Reads actions Reads        actions for for 3-ARP-097.CR 3-ARP-097.CR for          annunciator E-9/4 for annunciator      E-9/4 BOP            Performs actionsactions consistent with 3-ARP-097.CR3-ARP-097.CR for annunciator E-            E 9/4 as read by RO
: 1. Verifies alarm using recorder R-3-347 (VPA)
: 2. Monitors exciter air temperature closely
: 3. If hot air temp 2: 8rC      87&deg;C reduce MVAR while maintaining grid voltage 2: 232 kV
: 4. If hot air temp 2: 8rC    87&deg;C with MVAR=O, MVAR=0, maintain grid voltage 2:
232 kV &      & reduce generator load using 3-ONOP-100    3-0NOP-100 until hot air temp << 87&deg;C  8rC
: 5. If hot air temp 2: 87&deg;C    8rC &    & increasing due to unknown unknown cause advises        US    to advises US to consider  consider tripping tripping reactor reactor &  & turbine 6.
: 6. IfIf hot hot air air temp temp>    > 90&deg;C 90&deg;C &  & no no expectation expectation of    of fast fast recovery recovery advises advises US US to  to tripping tripping reactor reactor &  & turbine turbine andand enter enter 3-EOP-E-0 3-EOP-E-0 US US          Determines Determines hot            air temp hot air    temp>      90&deg;C && no
                                                                      > 90&deg;C        no expectation expectation of  of fast fast recovery recovery Directs Directs reactor reactor triptrip Directs Directs crew  crew perform perform immediate immediate actions actions of of 3-EOP-E-0.
3-EOP-E-0.
RO RO          Performs Performs immediate immediate actions actions of  of 3-EOP-E-0:
3-EOP-E-0:
1.1. Verifies Verifies reactor reactor triptrip
                                    ** Rod  Rod bottom bottom lights lights onon &&RPIs RPls atat zero zero
* Rx Rx trip trip &&bypass bypass bkrsbkrs open open
                                    .*      Neutron Neutron flux flux decreasing decreasing 99


Main generator exciter air coolers TPCW flow is blocked resulting in a high air temQerature condition.
Appendix D                                    Operattor Opera    or Action Actions                                  Form ES-D-2 Op-Te st No.:  2007-301            Scenarrio Scena    io No.:  2-5      Event No.:    2-5      Pag Page e~o  2 of f22 Event
The crew resQonds Qer 3-ARP-097.CR for annunciator E-9/4. The crew triQs the reactor when exciter hot gas temQerature exceeds 90&deg;C and Qerforms the actions of 3-EOP-E-0.
 
Once the reactor is triQQed, the out. 3B EDG starts but fails to load 3B 4kv bus due to a bus striQQing failure. 3A EDG fails to start and can not be started. Time Time Time BOP Performs immediate actions of 3-EOP-E-0:
== Description:==
: 1. Verifies turbine tripped
Main generator         exciterr air cooler tor excite        coolerss TPCW flow is Qartia" partially~ blocked resulting in a high air temQe temperrature ature conditi condition.
* Turbine stop valves closed
on. The crew resQon responds Qer per 3-ARP-0 97.CR for annun    annuncciator iator E-9/4.
* Closes MSR main steam stop MOVs
E-914. The crew manua"~  lly triQs trips the reacto reactorr exciterr hot gas temQe when excite                  temperrature ature excee exceed dss 90&deg;C and Qerfor perform mss the actionss of 3-EOP-E-0. Once the reacto action                                      reactorr is triQQed tripped, the switchyard
* Mid & East GCBs open 2. Verifies power to emergency 4kV buses
                                                                                                  ~ard rela~s relays out. 3B EDG starts but fails to automa    automatically tica"~ load 3B 4kv bus due to a bus stripping failure . 3A EDG fails to start and can not be manua lly striQQi                                                                      "~ started.
* Determines neither 3A or 3B 4kV buses energized
Time         Time                                                 Time BOP         Perform Perfor    mss immediate action actionss of 3-EOP-E-0:
* Attempts emergency start of 3A EDG and recognizes/
: 1.       Verifiess turbine tripped Verifie
                                  *. Turbine stop valves closed Turbin
                                  **   Closes MSR main steam stop MOVs
                                  *. Mid & East GCBs GOBs open
: 2. Verifies power to emerg Verifie                emergeency ncy 4kV buses
                                *. Determines neithe neitherr 3A or 3B 4kV buses energienergiz  ed zed
                                *. Attempts Attemp      emergeency ts emerg      ncy start of 3A EDG and recognizes!  izes/
reports start failure.
reports start failure.
* Recognizes/reports 3B EDG running, but output breaker not closed US When determines that 3A EDG does not respond to emergency start & 3B EDG running but output breaker did not close, directs transition to 3-EOP-ECA-0.0 step 1 10 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 5 Event No.: _ 6_ Page _1 of _5 _ Event
                                *. Recognizes/reports 3B EDG running, but output breaker not closed US         When determines that 3A EDG does not respond to emerg              emergeency ncy start & 3B EDG running but output breaker did not close, directs transition to 3-EOP-ECA-0.0 step 1          1 10
 
AppendixDD Appendix                                             OperatorActions Operator        Actions                                          Form FormES-D-2 ES-D-2 Op-TestNo.:
No.:    2007-30 1              Scenario No.: No.: 55                        No.:_ 6_        Page Page_11 of Op-Test          2007-301                Scenario                            Event EventNo.:          6                    of _5_5 Event
 
== Description:==
 
== Description:==
The The crew crewtransitions transitionstoto 3-EOP-ECA-0.0.
3-EOP-ECA-0.0. MOV-3-1405                    fails toto ol2en Event                                                                              MOV-3-1 405 fails              open andand with B  AFWP with B AFWP OOS with anOOS    with  an oiloil leak leak reguires requires CC AFWPAFWP toto SUl2l2ly supplyboth both units.
units.
Manual bus Manual      bus stril2l2ing stripping isis l2erformed performed with  with the the excel2tion exception of  of3B3B TPCWP TPCWP breaker3AB11 breaker    3AB1 1 whichwhich hashas aa blown blown controll2ower control power fuse  fuse and and can can notnot bebe opened from ol2ened    from VPA.
VPA. 3A  3A 4kV 4kV busbus isis rel20wered repowered via  via the the SBO SBO tie tie from unit from    unit 4.
4.
Then 3AB11 Then    3AB1 1 isis locally locally ol2ened opened allowing allowing 3B 3B EDG EDG to  to reenergize reenergize 3B  3B && 3D3D 4kV bus.
4kV  bus. Transition Transition isis made made to        3-EOP-ECA-0.2 due to 3-EOP-ECA-0.2            due toto the  effects of the effects    of the the steam leak.
steam    leak.
Time_J Time        Position Position                                      Applicants Actions Applicant's      Actions or  or Behavior Behavior US US              Directs performance Directs      performance of        of 3-EOP-ECA-O.O 3-EOP-ECA-O.O RO RO              Performs actions Performs        actions per per 3-EOP-ECA-O.O 3-EOP-ECA-O.O as              directed by as directed      by US:US:
1.
: 1.      Verifies reactor trip Verifies
                                      *. Rod bottom lights on & RPls at zero
                                      *. Rx trip & bypass bkrs open
: 2.      Determines PZR PORVs Determines                PORVs closed Critica Criticall        3. Verifie Verifies  s letdow letdown  n isolatio isolation  n valves closed
: 4. Determ Determines ines excess letdow letdown    isolated n isolate  d 5.
: 5. Verifie Verifies  s SI SI reset BOP BOP            Perform Performs    s actions actions perper 3-EOP 3-EOP-ECA-0.0
                                                                          -ECA-0.0 as    as directe directed    by US:
d by  US:
Critical Critical        1.
: 1.      Verifie Verifies  s turbine turbine tripped tripped
                                      . Alread Already  y verified verified turbine turbine stop stop valves valves && MSRMSR mainmain steam steam stop stop MOVs MOVs closed closed
* Determ Determines ines Mid Mid && EastEast GCBs GCBs open open 2.2. Determ Determines ines only only one one AFWPAFWP runninrunning    for both g for    both units.
units. Establi Establishes shes 270    gpm    to 270 gpm to Unit    Unit 3.3.
3.3. Verifie Verifies s 3A3A 4kV 4kV bus bus strippe stripped. Determines
: d. Determ      ines 3B 3B 4kV 4kV bus bus strippi stripping ng failed failed and and verifie verifies s 3B 3B 4kV4kV bus bus strippe stripped    with  the  exception d with the exception of        of 3AB1 3AB11  1 (3B (3B TPCW TPCWP)  P) which which cancan not notbe betripped tripped..
4.4. Sends Sends NSO  NSO toto investi investigate      3AB11 gate 3AB1    1 5.5. Determ Determinesines neither neither3A  3A&&3B  3B4kV 4kVbuses busesenergiz energizeded 1111
 
Appendix 0D Appendix                                        Operator Actions Operator      Actions                                      Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test  No.:    2007-30 1 2007-301           Scenario    No.: _ 5_
Scenario No.:         5           Event   No.: _66_
Event No.:              Page --.&#xa3; Page       2 of of _5_5 Event


== Description:==
== Description:==


The crew transitions to 3-EOP-ECA-0.0.
Event
MOV-3-1405 fails to ol2en and with B AFWP OOS with an oil leak reguires C AFWP to SUl2l2ly both units. Manual bus stril2l2ing is l2erformed with the excel2tion of 3B TPCWP breaker 3AB11 which has a blown controll2ower fuse and can not be ol2ened from VPA. 3A 4kV bus is rel20wered via the SBO tie from unit 4. Then 3AB11 is locally ol2ened allowing 3B EDG to reenergize 3B & 3D 4kV bus. Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. Time Position Applicant's Actions or Behavior US Directs performance of 3-EOP-ECA-O.O RO Performs actions per 3-EOP-ECA-O.O as directed by US: 1. Verifies reactor trip
* Rod bottom lights on & RPls at zero
* Rx trip & bypass bkrs open 2. Determines PZR PORVs closed Critical 3. Verifies letdown isolation valves closed 4. Determines excess letdown isolated 5. Verifies SI reset BOP Performs actions per 3-EOP-ECA-0.0 as directed by US: Critical 1. Verifies turbine tripped
* Already verified turbine stop valves & MSR main steam stop MOVs closed
* Determines Mid & East GCBs open 2. Determines only one AFWP running for both units. Establishes 270 gpm to Unit 3. 3. Verifies 3A 4kV bus stripped.
Determines 3B 4kV bus stripping failed and verifies 3B 4kV bus stripped with the exception of 3AB11 (3B TPCWP) which can not be tripped. 4. Sends NSO to investigate 3AB11 5. Determines neither 3A & 3B 4kV buses energized 11 Appendix 0 Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _ 5_ Event No.: _6 _ Page --.&#xa3; of _5_ Event


== Description:==
== Description:==
The The crew crew transitions transitions to to 3-EOP-ECA-0.0.
3-EOP-ECA-0.0. MOV-3-1405 MOV-3-1 405 failsfails to to oQen open and and with BB AFWP with    AFWP OOS  OOS with with an an oil oil leak leak reguires requires CC AFWP AFWP to    to sUQQly supply bothboth units.
units.
Manual bus Manual    bus striQQing stripping isis Qerformed performed with  with the the exceQtion exception of of 3B 3B TPCWP TPCWP breaker 3AB11 breaker    3AB1 1 which which has has aa blown blown control control Qower power fuse fuse andand can can not not be be opened from oQened    from VPA.
VPA. 3A3A 4kV4kV bus bus is is reQowered repowered via via the SBO tie from unit the  SBO    tie  from  unit 4.
4.
Then 3AB11 3AB1 1 is is locally locally oQened opened allowing allowing 3B    EDG to 3B EDG    to reenergize reenergize 3B  3B && 3D 3D 4kV bus.Transition 4kV  bus.Transition is  is made made to  to 3-EOP-ECA-0.2 3-EOP-ECA-0.2 due    due toto the the effects effects ofof the the steam    leak.
steam leak.
I~osition Time        Position                                  Applicants Actions or Behavior Applicant's                  Behavior BOP            Continues performing actions per 3-EOP-ECA-0.0 3-EOP-ECA-0.0 as directed by US:
: 6. Determines 3A &      & 3B 4kV bus lockout relays reset.
: 7. Determines 3A EDG locked out. Attempts unsuccessfully    unsuccessfully to reset 3A EDG lockout then relays report from NSO of EDG failure. Determines 3B EDG not locked out.
: 8. Determines 3A EDG can not be manually started
: 9. Determines 3B EDG running, but output breaker not closed due to failure of 3AB1 3AB111 to open.
US            Determines neither 3A or 38          3B 4kV bus energized.
Critical        Directs BOP80P work to restore power to 3A or 3B                38 4kV buses
                                    . 3A 4kV bus from SBO      S80 tie bkr per 3-ONOP-004 3-0NOP-004.2      .2
                                    .*  3B 38 4kV bus from 3B        38 EDG when 3ABI  3A811I opens Directs RO continue performing 3-EOP-ECA        3-EOP-ECA-O.O -O.O RO            Continues performing actions per              per 3-EOP-ECA 3-EOP-ECA-O.O  -O.O as directed by      by US:
US:
Critical        6.
: 6. Places Places non-running non-running equipmentequipment switches switches to  to pull-to-lock pull-to-Iock or  or Critical off  (U3 HHSIPs, off (U3    HHSIPs, CSPs,CSPs, ECCs,ECCs, ECFs, ECFs, RHRPs RHRPs &    & CCWPs)
CCWPs)
      /-"
7.
: 7. Determines Determines from from U4 U4 RORO that that U4 U4 HHSI HHSI aligned aligned to to U4 U4 CCW CCW 8.
: 8. Determines Determines PZR  PZR level level cannot cannot be be maintained>
maintained> 17%  17%
9.
: 9. Directs  NSO locally Directs NSO                  open MOV-3-843A locally open      MOV-3-843A or    or BB 10.
: 10. StartsaU4HH Starts a U4 HHSIP    SlP
: 1. Directs 111.            NSO locally Directs NSO        locally close      3-297 AlBIC,, MOV-3-381 close 3-297A1B/C        MO\t-3-381 && MOV MOV                                    626 626 12 12
Appendix D Appen    D                                    Operattor Opera  or Action Actionss                                Form ES-D- 2 Op-Test No.:
Op-Te          2007-301            Scenarrio Scena    io No.: _S_
5        Event No.:
Event  No.: _6_    Pag Page e~o
                                                                                              ..... of fL Event


The crew transitions to 3-EOP-ECA-0.0.
== Description:==
MOV-3-1405 fails to oQen and with B AFWP OOS with an oil leak reguires C AFWP to sUQQly both units. Manual bus striQQing is Qerformed with the exceQtion of 3B TPCWP breaker 3AB11 which has a blown control Qower fuse and can not be oQened from VPA. 3A 4kV bus is reQowered via the SBO tie from unit 4. Then 3AB11 is locally oQened allowing 3B EDG to reenergize 3B & 3D 4kV bus.Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak.
The crew transitions to 3-EOP-ECA-             0.0. MOV-3
Applicant's Actions or Behavior BOP Continues performing actions per 3-EOP-ECA-0.0 as directed by US: 6. Determines 3A & 3B 4kV bus lockout relays reset. 7. Determines 3A EDG locked out. Attempts unsuccessfully to reset 3A EDG lockout then relays report from NSO of EDG failure. Determines 3B EDG not locked out. 8. Determines 3A EDG can not be manually started 9. Determines 3B EDG running, but output breaker not closed due to failure of 3AB11 to open. US Determines neither 3A or 38 4kV bus energized.
                                                          -ECA- 0.0. MO V-3-1  405 fails to oQen
Critical Directs 80P work to restore power to 3A or 38 4kV buses
                                                                                -140S          open and with 8B AFWP OOS with an oil leak reguire  requiress C AFWP to sUQQly supply both units.
* 3A 4kV bus from S80 tie bkr per 3-0NOP-004.2
Manual bus striQQi stripping is Qerfor perform  ed with the exceQ med            excepttion ion of 38 3B TPCW TPCWP breaker 3A811 3AB1 1 which has a blown control Qower   power fuse and can not be opened oQene    d from VPA. 3A 4kV bus is reQow  repowe  red via the S80 ered          SBO tie from unit 4.
* 38 4kV bus from 38 EDG when 3A811 opens Directs RO continue performing 3-EOP-ECA-O.O RO Continues performing actions per 3-EOP-ECA-O.O as directed by US: Critical 6. Places non-running equipment switches to pull-to-Iock or off (U3 HHSIPs, CSPs, ECCs, ECFs, RHRPs & CCWPs) /-" 7. Determines from U4 RO that U4 HHSI aligned to U4 CCW 8. Determines PZR level cannot be maintained>
3AB1 I is locally oQene Then 3A811                  opened    allowing d allowin    3B EDG to reener g 38            reenerg ize 38 gize  3B & 3D 4kV bus.Tr ansitio n is made to 3-EOP-ECA-    -ECA- 0.2 due to the effects of the steam leak.
17% 9. Directs NSO locally open MOV-3-843A or B 10. Starts a U4 HHSIP 11. Directs NSO locally close 3-297 AlBIC, MO\t-3-381
Time      Positio n                              Applicant's Applic  ants Action Actionss or 8ehav Behavior RO            NOTE: How many steps are actual      actuallly y perfor performmed ed by the RO depen depend dss on when power is restored across the SBO x-tie by the BOP.
& MOV-3-626 12 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _S_ Event No.: _6_
Continue Contin          perform uess perfor    ing action ming    actions s per 3-EOP-ECA-
Event
                                                                                -ECA-O O.O
                                                                                        .O as direct directeded by US:
: 12. Determines MSIVs & bypas    bypass  es closed, main FW & bypass ses control valves closed and SG blowdo blowdown wn isolation valves closed
: 13. Determ ines leak on 3C SG (thru CV-3-1    CV-3-i 608)
: 14. Verifie s SI reset Critical              Isolates
: 15. Isolate    s AFW to 3C SG.
: 16. Directs NSO open AFSS- 3-007 to restore A AFWP . Once this is done, increa increas es AFW flow to ~ 34S ses                    345 gpm to 3A & 38 3B SG.
: 17. Directs NSO open breaker for MOV-3    MOV-3-1405
                                                                              -140S
: 18. Verifies SG samplsamplee lines isolated
: 19. Determ ines CV-3-1CV-3-1 608 failed open & local isolation valve closed but leaks by.
: 20. Controls AFW flow to 3A & 3B        38 SGs 345~34S gpm until either SG level level> > 6[32]%
: 21. Determ ines no SG tubes ruptured (R-3-1S,         5, R-3-19 & DAM-DAM-1i). ).
Directs HP confirm by local surveys on MS lines.
NOTE: 3A 4kV bus can only be powere      power ed d from the SBO x-tie using 3-ONOP-004.2. 3B 4kV bus can be restored by opening 3B TPCWP breakerr 3ABI 3AB111 which will allow reenerg reenergizatio izationn from 38 3B EDG. This will occur after the crew has repowe repoweredred 3A 4kV bus from the SBO x-tie.
13 13
 
Appendix DD Appendix                                          OperatorActions Operator     Actions                                       Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test   No.:   2007-30 1 2007-301             Scenario No.:
Scenario     No.: _5_ 5          Event     No.: _6_
Event No.:        6      Page -.1.
Page      4 ofof ~ 5 Event


== Description:==
== Description:==


The crew transitions to 3-EOP-ECA-0.0.
Event  
MOV-3-140S fails to oQen and with 8 AFWP OOS with an oil leak reguires C AFWP to sUQQly both units. Manual bus striQQing is Qerformed with the exceQtion of 38 TPCWP breaker 3A811 which has a blown control Qower fuse and can not be oQened from VPA. 3A 4kV bus is reQowered via the S80 tie from unit 4. Then 3A811 is locally oQened allowing 38 EDG to reenergize 38 & 3D 4kV bus.Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. Time Position Applicant's Actions or 8ehavior RO NOTE: How many steps are actually performed by the RO depends on when power is restored across the SBO x-tie by the BOP. Continues performing actions per 3-EOP-ECA-O.O as directed by US: 12. Determines MSIVs & bypasses closed, main FW & bypass control valves closed and SG blowdown isolation valves closed 13. Determines leak on 3C SG (thru CV-3-1608)
: 14. Verifies SI reset Critical 15. Isolates AFW to 3C SG. 16. Directs NSO open AFSS-3-007 to restore A AFWP. Once this is done, increases AFW flow to 34S gpm to 3A & 38 SG. 17. Directs NSO open breaker for MOV-3-140S
: 18. Verifies SG sample lines isolated 19. Determines CV-3-1608 failed open & local isolation valve closed but leaks by. 20. Controls AFW flow to 3A & 38 SGs gpm until either SG level> 6[32]% 21. Determines no SG tubes ruptured (R-3-1S, R-3-19 & DAM-1). Directs HP confirm by local surveys on MS lines. NOTE: 3A 4kV bus can only be powered from the SBO x-tie using 3-ONOP-004.2.
3B 4kV bus can be restored by opening 3B TPCWP breaker 3AB11 which will allow reenergization from 3B EDG. This will occur after the crew has repowered 3A 4kV bus from the SBO x-tie. 13 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _5_ Event No.: _6_ Page -.1. of Event


== Description:==
== Description:==
The crew The    crew transitions transitions toto 3-EOP-ECA-0.0.
3-EOP-ECA-0.0. MOV-3-1405 MOV-3-1405 fails fails to to ol2en open and and with with BB AFWP AFWP OOS OOS withwith an  oil leak an oil  leak reguires requires CC AFWP AFWP to  to SUl2l2ly supply both both units. Manual units. Manual busbus stril2l2ing stripping isis l2erformed performed with  with the    exception of the excel2tion    of 3B 3B TPCWP breaker TPCWP        breaker 3AB11 3AB1 I which which has has aa blown blown controll2owerfuse control power fuse and  and can can not be not  be ol2ened opened fromfrom VPA.
VPA. 3A 3A 4kV 4kV busbus isis rel20wered repowered via via the the SBO SBO tietie from from unit 4.
unit  4. Then Then 3AB11 3AB1 1 isis locally locally ol2ened opened allowing allowing 3B  3B EDG EDG toto reenergize reenergize 3B  3B 3D 4kV
                        && 3D    4kV bus.Transition bus.Transjtion isis made made to      3-EDP-ECA-0.2 due to 3-EOP-ECA-0.2          due toto the the effects effects ofof the steam the  steam leak.
leak.
Time
  ~.
lillie      Position Position                                Applicants Actions Applicant's    Actions or  or Behavior Behavior BOP            Performs actions from 3-0NOP-004.2 Performs                          3-ONOP-004.2 when directed by              by US:
: 1. Determines 3A 4kV bus stripped but not yet energized        energized
: 2. Determines 3A 4kV bus lockout reset
: 3. Verifies SI reset
: 4. Determines 3A 4kV bus lockout has tripped and can not be reset
: 5. Determines U3 SUT potential white light on VPA is OFF
: 6. Determines U4 SUT potential white light on VPA is OFF
: 7. Determines 3B 4kV bus deenergized. Determines      Determines from U4    U4 RO both 4A & 4B 4kV buses energized.
: 8. Determines Determines 3D 4kV  4kV bus lockout reset Critical Critical        9.
: 9. Realigns Realigns 3D  3D 4kV 4kV busbus to to 3A 3A 4kV 4kV bus.
bus.
                                    .*    Opens Opens 3AB19 3AB19 &  & 3AD06 3AD06
                                    .*  Closes Closes 3ADOI 3AD01 &  & 3AA17 3AA17 10.
: 10. Determines Determines 3AD073AD07 blue blue light light onon 11.
: 11. Determines Determines from from U4 U4 RO RO that that 4D4D 4kV 4kV bus bus energized energized from from 4B 4B 4kV 4kV bus bus which which is    on the is on    the 4B4B EDG.
EDG.
12.
: 12. Directs Directs U4    RO place U4 RO    place non-running non-running safeguards safeguards equipment equipment in    in P-T-L P-T-L oror OFF OFF onon 4B4B 4kV 4kV busbus 13.
: 13. Closes Closes 3AD07 3AD07 thenthen directs directs U4 U4 RO RO close close 4AD07.
4AD07.
14.
: 14. Determines Determines 3A  3A 4kV 4kV bus bus energized energized && SI  SI reset reset us US          Directs Directs transition transition to  to 3-EOP-ECA 3-EOP-ECA-O.O          step 32.
                                                                            -0.0 step      32.
Directs Directs BOP BOP restore restore 3B 3B 4kV 4kV busbus using using 3-ONOP-004 3-0NOP-004.3    .3 14 14


The crew transitions to 3-EOP-ECA-0.0.
Appendi Appen dixx DD                                        Operator Opera          Actions tor Action    s                                        Form Form ES-D-ES-D-2 2 Op-Test Op-Te      No.:
MOV-3-1405 fails to ol2en and with B AFWP OOS with an oil leak reguires C AFWP to SUl2l2ly both units. Manual bus stril2l2ing is l2erformed with the excel2tion of 3B TPCWP breaker 3AB11 which has a blown controll2owerfuse and can not be ol2ened from VPA. 3A 4kV bus is rel20wered via the SBO tie from unit 4. Then 3AB11 is locally ol2ened allowing 3B EDG to reenergize 3B & 3D 4kV bus.Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. lillie Position Applicant's Actions or Behavior BOP Performs actions from 3-0NOP-004.2 when directed by US: 1. Determines 3A 4kV bus stripped but not yet energized
st No.:      2007-301 2007-3  01          Scenario Scena          No.: _5_
: 2. Determines 3A 4kV bus lockout reset 3. Verifies SI reset 4. Determines 3A 4kV bus lockout has tripped and can not be reset 5. Determines U3 SUT potential white light on VPA is OFF 6. Determines U4 SUT potential white light on VPA is OFF 7. Determines 3B 4kV bus deenergized.
rio No.:      5        Event No.:
Determines from U4 RO both 4A & 4B 4kV buses energized.
Event    No.: _6_ 6              Pag Page e~o  5 of. f~  ..
: 8. Determines 3D 4kV bus lockout reset Critical 9. Realigns 3D 4kV bus to 3A 4kV bus.
Event Descri Event  Descripti  on:
* Opens 3AB19 & 3AD06
ption:    The crew The     crew transit transitionionss to to 3-EOP 3-EOP-EC  -ECA- A-0.
* Closes 3AD01 & 3AA17 10. Determines 3AD07 blue light on 11. Determines from U4 RO that 4D 4kV bus energized from 4B 4kV bus which is on the 4B EDG. 12. Directs U4 RO place non-running safeguards equipment in P-T -L or OFF on 4B 4kV bus 13. Closes 3AD07 then directs U4 RO close 4AD07. 14. Determines 3A 4kV bus energized
0.0.0. MOV-3 MOV-3-1  -1405 405 fails fails to to oQen open and and with BB AFWP with      AFWP OOS     OOS withwith anan oil oil leak leak reguire requires  sC C AFWP AFWP to     to sUQQly supply both both units. Manua units. Manuall bus  bus striQQi strippingng isis Qerfor performed med withwith the the exceQ exceptiontion ofof 3B 3B TPCWP TPCW          breakerr 3AB11 P breake          3AB1 1 which which has has aa blown blown contro controll Qower power fusefuse and and can can not be not   be oQene opened      from VPA.
& SI reset US Directs transition to 3-EOP-ECA-O.O step 32. Directs BOP restore 3B 4kV bus using 3-0NOP-004.3 14 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _5_ Event No.: _6_
d from     VPA. 3A  3A 4kV 4kV busbus isis reQow repowere eredd via via the the SBO SBO  tie tie from from unit 4.
Event
unit   4. Then Then 3AB  3AB1111 is is locally locally oQene opened  d allowin allowing g 3B3B EDGEDG to  to reener  gizee 3B reenergiz      3B
                        && 3D 3D 4kV4kV bus.Tr bus.Transi      tion ansitio      is made n is   made to to 3-EOP 3-EOP-EC  -ECA- A-0.
0.22 due due toto the the effects effec  ts of of the steam the    steam leak.
leak.
Time Time        Position Positio n                                    Applican Applic      ts Action ant's   Actions   s or Behav Behavior ior RO          Performs Perfor          actions ms action        s of 3-EOP 3-EOP-EC -ECA-OA-O.O as directdirected  ed by US:
Determin
: 1. Determ            es CET < 1200&deg;F ines              1200&deg;F
: 2. Determin Determ        es 3A 4kV bus power ines                      powered  ed from U4 via SBO x-tie and both 4A & 4B 4kV buses    buses power powered  ed from respec respective tive EDGs EDGs
: 3. Determin Determ    ineses 3A & 3B SG ADVs      ADVs contro controlli lling ng in auto at 1000 psig with 3C SG  SC ADV failed failed open with leaking leaking isolatio isolationn valve.
valve.
: 4. Closes breake Closes      breakers      3AA08 & 3M rs 3AA08          3AA14 to energienergize  ze 3A & 3C 480V LC.
Verifiess 3H 480V LC energi Verifie                          energizedzed.. If 3B 4kV bus energi  energized zed,, verifie verifiess 3B & 3D 380V LC energi      energized zed..
: 5. Directs U4 RO perform Directs                perform steps 35b-e. 35b-e.
: 6. Veri  fiess one aux bldg exha Verifie                          exhau  ust st fan & SEP SFP exhau exhaust  st fan runn runnin  g.
ing.
: 7. Dire  cts NSO start SEP Directs                      SFP cool cooling ing wate waterr pum pump  p
: 8. Dire  cts Chem Directs    Chemiistrystry verif verifyy U3 SFPSFP,, plan plantt vent & SJA  SJAE      SPING E SPIN    Gss runn runniningg BOP BOP        Perfo Perforrms ms actio action nss of 3-ON 3-0NO  OP-0 P-004 04.3.3 when when direcdirecte tedd by by US:
US:
1.
: 1. ReceReceiv ives/  relayys es/rela    s repo reportrt that 3AB1 3AB 11I beinbeingg open opene  edd
: 2. Dete
: 2. Determ    rmin    es 3B ines    3B 4kV 4kV busbus strip strippi ping ng com compl plete ete 3.
: 3. Dete Determrmin    es 3B ines    3B 4kV 4kV busbus lock lockououtt relay relay reset reset 4.
: 4. Veri    fiess SI Verifie      SI reset reset 5.
: 5. Dete Determ rmin    es 3B ines    3B EDG EDG lock lockououtt reset reset &  & 3B 3B EDG EDG runn runniningg 6.
: 6. DeteDeterm rmin    es 3B ines    3B sequ seque  ence ncer r oper operabablele 7.
: 7. Man Manua uallylly sync synchr hron  izes 3B onizes    3B EDGEDG to  to 3B 3B 4kV 4kV busbus 8.
: 8. RepoRepor  rtsts 3B 3B 4kV4kV bus bus now now enerenergigized zed US US        Dete Determ  rmin  es PZR ines    PZR level level << 17%
17%. Direct
                                                                      . Dire  ctss trans transi  tion to ition    to 3-EO 3-EOP     -ECA-P-EC  A-O O.2.
                                                                                                                              .2.
15 15
 
Appendix DD Appendix                                     OperatorActions Operator     Actions                                     Form Form ES-D-2 ES-D-2 Op-Test No.:
Op-Test No.:   2007-301 2007-301        Scenario No.:
Scenario     No.: _5_ 5                No.: ~
Event No.:
Event              6a        Page Page _1_ iofof _2_ 2 Event


== Description:==
== Description:==


The crew transitions to 3-EOP-ECA-0.0.
Event  
MOV-3-1405 fails to oQen and with B AFWP OOS with an oil leak reguires C AFWP to sUQQly both units. Manual bus striQQing is Qerformed with the exceQtion of 3B TPCWP breaker 3AB11 which has a blown control Qower fuse and can not be oQened from VPA. 3A 4kV bus is reQowered via the SBO tie from unit 4. Then 3AB 11 is locally oQened allowing 3B EDG to reenergize 3B & 3D 4kV bus.Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. Time Position Applicant's Actions or Behavior RO Performs actions of 3-EOP-ECA-O.O as directed by US: 1. Determines CET < 1200&deg;F 2. Determines 3A 4kV bus powered from U4 via SBO x-tie and both 4A & 4B 4kV buses powered from respective EDGs 3. Determines 3A & 3B SG ADVs controlling in auto at 1000 psig with 3C SG ADV failed open with leaking isolation valve. 4. Closes breakers 3AA08 & 3M 14 to energize 3A & 3C 480V LC. Verifies 3H 480V LC energized.
If 3B 4kV bus energized, verifies 3B & 3D 380V LC energized.
: 5. Directs U4 RO perform steps 35b-e. 6. Verifies one aux bldg exhaust fan & SFP exhaust fan running. 7. Directs NSO start SFP cooling water pump 8. Directs Chemistry verify U3 SFP, plant vent & SJAE SPINGs running BOP Performs actions of 3-0NOP-004.3 when directed by US: 1. Receives/relays report that 3AB 11 being opened 2. Determines 3B 4kV bus stripping complete 3. Determines 3B 4kV bus lockout relay reset 4. Verifies SI reset 5. Determines 3B EDG lockout reset & 3B EDG running 6. Determines 3B sequencer operable 7. Manually synchronizes 3B EDG to 3B 4kV bus 8. Reports 3B 4kV bus now energized US Determines PZR level < 17%. Directs transition to 3-EOP-ECA-O.2.
15 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: _5_ Event No.: Page _1_ of _2_ Event


== Description:==
== Description:==
The crew The  crew stabilizes stabilizes the    plant using the plant    using 3-EOP-ECA-O.2 3-EOP-ECA-0.2 since  since PZR PZR level level <<
171501% or 17[501%    or SSII actuated actuated duedue to to the the effects effects ofof the  steam  leak.
the steam leak.
Time_j__Pos Time          ition Position                              Applicants Actions Applicant's      Actions or  or Behavior Behavior US US        Directs performance Directs  performance of      of actions actions per per 3-EOP-ECA-O.2 3-EOP-ECA-O.2 NOTE: Starting NOTE:      Starting loads loads onon 3A130 3A/3D 4kV 4kV busbus && 3A13C13H 3A/3C/3H 480V 480V LC LC requires coordination requires      coordination with  with the the U4 U4 ROHO for  48 for 4B EDG load EOG    load management. Loads management.          Loads started started on on 38 3B 4kV 4kV bus bus && 38130 3B/3D 480V 480V LC  requires    one    operator LC requires one operator to              watch 38 to watch    3B EOG EDG load load while while the the other operates the    the load's load&#xe1; control switch.
RO                    3-EOP-ECA-0.2 actions as directed by Performs 3-EOP-ECA-O.2                                            by US:
: 1. Verifies SI reset
: 2. Determines RWST level> 155,000 gal Critical Critical    3. Manually aligns ECCS valves for proper SI alignment (SI valve amber lights all bright)
: 3. Determines no CCWP running
: 4. Determines 3 CCWHX in service
: 5. Starts 2 CCWPs 6.
: 6. Determines COW  CCW headers headers tied together together
: 7. Starts 3A & 3B
: 7.                    38 HHSIP.
HHSIP. Stops the running U4          U4 HHSIP.
HHSIP.
8.
: 8. Starts Starts 3A 3A &  & 3B 3B RHRP.
9.
: 9. Starts2ECCs Starts 2 ECCs &2    & 2 ECFs ECFs
: 10. Manually
: 10. Manually actuates actuates containment containment isolation isolation phase phase A  A && verifies verifies associated    white associated white lightslights onon VPB VPB allall bright.
bright.
11.
: 11. Determines Determines containment containment purge  purge exhaust exhaust && supply supply fans fans OFF OFF
: 12. Verifies
: 12. Verifies CRCR ventilation ventilation inin proper proper emergency emergency recircrecirc alignment alignment 13.
: 13. Determines Determines containment containment spray  spray notnot required required (pressure (pressure << 2020 psig) psig) 14.
: 14. Determines Determines RWST RWST level>level> 155,000 155,000 gal gal
: 15. Places
: 15. Places both both CSP5 CSPs inin standby standby 16.
: 16. Determines Determines RCP  RCP sealseal injection injection isolated isolated 1616


The crew stabilizes the plant using 3-EOP-ECA-O.2 since PZR level < 17[501% or S I actuated due to the effects of the steam leak. Time Position Applicant's Actions or Behavior US Directs performance of actions per 3-EOP-ECA-O.2 NOTE: Starting loads on 3A130 4kV bus & 3A13C13H 480V LC requires coordination with the U4 RO for 48 EOG load management.
AppendixDD Appendix                                      OperatorActions Operator  Actions                                    Form FormES-D-2 ES-D-2 Op-TestNo.:
Loads started on 38 4kV bus & 38130 480V LC requires one operator to watch 38 EOG load while the other operates the load's control switch. RO Performs 3-EOP-ECA-O.2 actions as directed by US: Critical 1. 2. 3. 3. 4. 5. 6. 7. 8. 9. Verifies SI reset Determines RWST level> 155,000 gal Manually aligns ECCS valves for proper SI alignment (SI valve amber lights all bright) Determines no CCWP running Determines 3 CCWHX in service Starts 2 CCWPs Determines CCW headers tied together Starts 3A & 38 HHSIP. Stops the running U4 HHSIP. Starts 3A & 3B RHRP. Starts 2 ECCs & 2 ECFs 10. Manually actuates containment isolation phase A & verifies associated white lights on VPB all bright. 11. Determines containment purge exhaust & supply fans OFF 12. Verifies CR ventilation in proper emergency recirc alignment
Op-Test No.: 2007-301 2007-30 1        ScenarioNo.:
: 13. Determines containment spray not required (pressure
Scenario     No.: 55      EventNo.:
< 20 psig) 14. Determines RWST level> 155,000 gal 15. Places both CSPs in standby 16. Determines RCP seal injection isolated 16 Appendix D Operator Actions Form ES-D-2 Op-Test No.: 2007-301 Scenario No.: 5 Event No.: Page2of2 Event
Event     No.:~  6a        Page2of2 Page 2 of 2 EventDescription:
Event  


== Description:==
== Description:==
Thecrewcrewstabilizes stabilizesthe thegiant plantusing using3-EOP-ECA-0.2 The                                          3-EOP-ECA-0.2 since since PZR    level<<
PZRlevel I 7[501%    or  SI actuate 17[50]% or SI actuatedddue    duetotothe theeffects effectsofofthe thesteam steamleak.
leak.
i Time Time      Position Position                              Applicants Actions Applicant's    Actions or or Behavior Behavior BOP BOP        Performs 3-EOP-ECA-O.2 Performs        3-EOP-ECA-O.2 actions actions as  as directed directed by  by US:
US:
Critical Critical    1. Determines
: 1. Determines no  no ICWPs ICWPs running.
running. Starts Starts 22 ICWPs.
ICWPs.
: 2. Verifies
: 2. Verifies POV-3-4882 POV-3-4882 && 4883 4883 closed.
closed.
3.
: 3. Determines ICW Determines      ICW headers headers tied tied together together 4.
: 4. Directs NSO Directs    NSO place place PAHMs PAHMs in  in service service per per 3-0P-094 3-OP-094 5.
: 5. Controls AFW Controls    AFW flow flow to to 3A 3A && 3B 3B SGsSGs ~345 345 gpm gpm until until either either SG SG level level 6[32]%. Then
                              >> 6[32]%. Then maintains maintains 3A3A && 3B    SG  levels  15-50%.
3B SG levels 15-50%.
US US        Directs transition Directs    transition to and performance performance of 3-EOP-E-1 3-EOP-E-1 TERMINATING    Scenario is terminated TERMINATING CUE      Scenario          terminated upon completion completion of 3-EOP-ECA-O.2 3-EOP-ECA-O.2 CUE 17 17
Appendix0D Appendix                                                                            ScenarioOutline Scenario            Outine                                                Form FormES-O-1 ES-D-1 Facility:
Facility:                          TurkeyPoint Turkey        Point                                ScenarioNo.:
Scenario        No.:              55      Op OpTestTestNo.:
No.:          2007-301 2007-301 Examiners:
Examiners:                                                                                          Candidates:
Candidates:                                                                    USUS RO RO 80P BOP InitialConditions:
Initial      Conditions:              Mode2,2, 4%    4% power, power, MOL. MOL.Turbine Turbinerolling rollingatat18001800RPM RPMreadyreadytotosync Mode                                                                                              syncgenerator generatortotogrid. grid. Increase Increase load, place load,      placethethefeed feed regulating regulatingvalves valvesinin automatic automaticand    and hold hold power poweratat20%  20%for  foraaflux fluxmap.
map.
Turnover:
Turnover:                            EquipmentOOS:
Equipment          OOS: NoneNone significant significant Place unit Place      unit on on line line and and increase increase powerpowerper  per3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3 5.52.3 Event Event                                    Event Type*
Event      Type*                                                      Event Description Event    Description No.
No.
11                                (N) ALL (N)    ALL                Place unit Place    unit on on line line per per 3-GOP-301 3-GOP-301 beginning beginning with  with step step 5.52.3.
5.52.3. Increase Increase load, load, place the place    the feed feed regulating regulating valvesvalves in in automatic automatic and  and hold hold power power at  at 20%
20% for for aa flux flux map.
map.
1a1a                                  (TS) SRO (TS)    SRO              Once feed Once    feed regulating regulating valves are      are placed placed in  in automatic, TFFXOLB =T TFFXOILB      = 1                                                                                                  automatic, an    an NSO NSO callscalls in in that that thethe 8B AFWP AFWP governor governor has  has an  an oil oil leak.
leak.
22      vK0001X TVKD001 x == 1.0 1.o I    (C) SRO/80P (C)    SRO/BOP          3A (running) TPCWP bearing failure. Failure of 38                        3B (standby)
(standby) TPCWP TPCWP to      to mm ramp 22 min ramp automatically start following trip of running pump. The crew                        crew responds responds per    per 3                TFK3B11S=
TFK3B11S = T    T                                ONOP-008 and manually starts the 38                    3B TPCWP.
3 3                                  (I) 80P (I)  BOP                3B slg 38    s/g controlling feed flow transmitter FT-3-487 fails high TFF1M86H=
high causing causing 38    3B FRVFRV TFF1M86H = T    T                                (FCV-3-488t (FCV-3-488 to      o fail closed). Manual operator action is required                          to control3B control 38 lTS (I,TS)
SRO SRO                                                                                              required to
                                                /                s/g level and avoid a slg                            a reactor trip. The crew responds per              per 3-0NOP-049.1.
3-ONOP-049.1.
44                                  (R)
(R) SRO/BOP SRO/80P          PT-3-1 PT-3-1608  608 fails high. CV-3-1608 fails open and increases steam                      steam flow flow 3-4%.
3-4%.
The The crew crew responds responds per    per 0-ADM-200 0-ADM-200 for aa secondary secondary plant transient.transient. Manual Manual TFS1MREH = T            ((C)) RRO                turbine load
:3::-                                                          load reduction is      is required to return reactor power      power to  to 30%.
30%. Once Once power power TFSW13A=T is is stabilized stabilized at  at 30%,
30%, the  the CV-3-1608 CV-3-1608 isolation isolation valve valve is is closed, closed, but but some some ADV  ADV steam steam leakage leakage still still exists.
exists.
55                                (C)
(C) ALL ALL              Main Main generator generator exciterexciter air air coolers coolers TPCW TPCW flow  flow isis partially partially blocked blocked resulting resulting in  in TVuJNF=O.      95 (M                        aa high high air air temperature temperature condition.
condition. The The crew crew responds responds per  per 3-ARP-097.C 3-ARP-097.CR            for R for TVUJINF = 0.95 (M) ALLALL              annunciator TVUJINFB=    O.95 TVUJINFB=0.95         
                                            /
annunciator E-9f4. E-9/4. The The crewcrew manually manually tripstrips the the reactor reactor when when exciter exciter hothot gas gas TVUJINFC=    0 95 temperature temperature exceeds exceeds 90C    90&deg;C andand performs performs the  the actions actions of  of 3-EOP-E-0.
3-EOP-E-0. Once    Once the  the TVUJINFC=0.95 TVUJINFD=
reactor reactor isis tripped, tripped, the the switchyard switchyard relaysrelays out. 38 EDG out. 3B    EDG starts starts butbut fails fails to to TVUJINFD=0.950.95 automatically automatically load  load 3B  38 4kv 4kv busbus due due toto aa bus bus stripping stripping failure.
failure. 3A 3A EDGEDG fails fails toto start start and and can can notnot bebe manually manually started.
started.
66        TFP8SWYD        T TFP8SWYD=T              (C)ALL (C) ALL                The The crew crewtransitions transitions to    to 3-EOP-ECA 3-EOP-ECA-0.0.          MOV-3-1405 fails
                                                                                                                        -00. MOV-3-1405              fails to to open open and and with with B8 TFQ5GAFS=        T                                AFWP TFQ5GAFS =T                                        AFWP OOS  OOS withwith an an oiloil leak leak requires requires CCAFWP AFWP to    to supply supply bothboth units.
units. Manual Manual TFQSXABF TFQ6XABF==T    T                                bus bus stripping stripping isis performed performed with  with the the exception exception of    of3B38 TPCWP TPCWP breaker breaker 3AB1 3A811  1 TFK3811S=
TFK3B11S =TT which which has hasaablown blown control control power powerfuse fuse and and cancan notnotbebeopened openedfrom  from VPA.
VPA. 3A  3A TFFXMOS                                          4kV 4kV busbusisis repowered repowered via    via the the SBO S80tie tiefrom from unit unit4.4. Then Then 3AB1 3A811  1 isis locally locally TFFXM05==1T K3OP11BG=
opened opened allowing allowing3B    38 EDG EDGtoto reenergize reenergize3B    38&&3D  3D4kV 4kVbus.bus.Transition Transition isismade  made K30P11BG =FF toto 3-EOP-ECA 3-EOP-ECA-0.2    -0.2 due duetotothe theeffects effectsof  ofthe thesteam steamleak.leak.
K3OP11BR K30P11BR= =F F 6a 6a                                                            The Thecrewcrewstabilizes stabilizesthe  theplant plantusing using3-EOP-ECA 3-EOP-ECA-0.2  -O.2 sincesincePZR PZRlevel level<<
17[50j%
17[50]%ororSISIactuated actuateddue    duetotothetheeffects effectsofofthe thesteam steamleak. leak.
(Normal,                        ..
(N)ormal, (R)eactivity, (R)eactlvlty, (l)nstrument, (I)nstrument, (C)omponen (C)omponent.      t, (M)ajor (M)aJor 11
TP-2007-301 Scenario TP-2007-301          Scenario#5  #5Event EventDescription Description Turkey Point Turkey        Point2007*301 2007-301 Scenario Scenario#5    #5 Event 11 - Place Event        -  Place unitunit on on line line per per 3-GOP-301 3-GOP-301 beginning beginning withwith step step 5.52.3.
5.52.3. Increase Increase load,load, place place the the feed  regulating        valves    in automatic feed regulating valves in automatic and hold            and    hold power poweratat 20%
20% for foraa flux flux map.
map.
Event 1la Event      a - Once
                  -  Once feedfeed regulating regulating valves valves areare placed placed inin automatic, automatic, an  an NSO    calls inin that NSO calls        that the the BB AFWP      governor has AFWP governor                has anan oil oil leak.
leak.
Event 22 - 3A Event        -        (running) TPCWP 3A (running)        TPCWP bearingbearing failure.
failure. Failure Failure of of 3B 3B (standby)
(standby) TPCWP TPCWP to    to automatically automatically start  following        trip  of running start following trip of running pump. The      pump. The crewcrew responds responds per per 3-0NOP-008 3-ONOP-008 and  and manually manually starts starts the 3B the    3B TPCWP.
TPCWP.
Event 33 - 3B Event        -    3B slg sfg controlling controlling feedfeed flow flow transmitter transmitter FT-3-487 FT-3-487 fails fails high high causing causing 3B3B FRVFRV (FCV                                                                                                                            (FCV  488 to 488        fail closed).
to fail      closed). Manual Manual operator operator action action isis required required to  control  3B  slg to control 3B s/g level and avoid level  and    avoid aa reactor reactor trip. The trip. The crewcrew responds responds per  per 3-0NOP-049.1.
3-ONOP-049.1.
Event 44 - PT-3-1608 Event        -    PT-3-1 608 fails fails high.
high. CV-3-1608 CV-3-1608 fails fails open open and and increases increases steam steam flow flow 3-4%.
3-4%. The  The crew crew responds        per  0-ADM-200 responds per 0-ADM-200 for                for aa secondary secondary plant plant transient.
transient. Manual Manual turbine turbine load load reduction reduction is    is required to required      to return return reactor reactor power to 30%. Once power is              is stabilized at 30%, the CV-3-1608 CV-3-1 608 isolation valve isolation      valve is  is closed, closed, but some ADV steam leakage        leakage still exists.
Event 55 - Main Event        -  Main generator generator exciter air coolers TPCW flow is partially blocked resulting in                      in aa high high air air temperature          condition.
temperature condition. The crew responds per 3-ARP-097.CR              3-ARP-097.CR for annunciator E-9/4. The            The crew crew manually trips manually        trips the the reactor reactor when exciter hot gas temperature exceeds 90&deg;C and performs                performs the  the actions actions of  of 3-EOP-E-0.
3-EOP-E-0. Once    Once the reactor is tripped, the switchyard relays out. 3B EDG                EDG starts but starts  but fails  to automatically fails to  automatically load 3B 4kv bus due to a bus stripping failure. 3A EDG fails to                            to start start and and can can notnot be be manually manually started.
Event Event 66 - The The crewcrew transitions to 3-EOP-ECA 3-EOP-ECA-0.0.  -0.0. MOV-3-1 MOV-3-1405  405 fails to open and with BB AFWP      AFWP OOS    with      an OOS with an oil leak  oil  leak requires C    C AFWP to supply supply both units.
units. Manual Manual busbus stripping is  is performed performed with with the the exception exception of      of 3B 3B TPCWP breaker 3AB1        3AB111 which has  has aa blown control power power fuse fuse andand can can not not bebe opened opened from    from VPA.
VPA. 3A 3A 4kV 4kV busbus is is repowered repowered via  via the the SBO SBO tietie from from unit unit 4.
: 4. Then Then 3AB1 3AB111 is is locally locally opened opened allowing allowing 3B  3B EDG EDG to to reenergize reenergize 3B  3B & & 3D 3D 4kV 4kV bus.
bus. Transition Transition isis made made to    to 3-EOP-3-EOP-ECA-0.2 ECA-0.2 due    due to  to the the effects effects of of the the steam steam leak.
leak.
Event Event 6a  6a - The The crew crew stabilizes stabilizes thethe plant plant using using 3-EOP-ECA 3-EOP-ECA-0.2 -0.2 since since PZR    level << 17[50]%
PZR level        17[50]% or    or SI SI actuated actuated due  due to  to the the effects effects of of the the steam steam leak.
leak.
22
TP-2007-301 Scenario TP-2007-301          Scenario#5  #5Event EventDescription Description Scenario XXIII Scenario                  XXIII NRC NRC 55 SimulatorOperating Simulator          OperatingInstructions Instructions Setup Setup IC-20 (4%
IC-20      (4% MOL,  MOL, ReadyReadytoto syncsync generator generatortoto grid)grid) oror Ic-i  15    (7%
IC-115 (7% MOL with    MOL    with atmospheric atmospheric dump  dump valves valves CV-3-1606 CV-3-1 606 inin auto  auto @ @ 30%,
30%, CV-3-1607 CV-3-1 607 inin auto auto closed closed &  & CV-3-1608 CV-3-i 608 inin manual manual @    @  50%,
50%,    ready ready    to to  sync sync generatorto generator    to grid) grid)
Place simulator
, Place      simulator inin run    run Trigger lesson Trigger        lesson steps:steps:
SETU    P    -  3B SETUP - 3B TPCWPP AUTO  TPCW        AUTO STARTSTART FAIL  FAIL (actuatesTFK3B11S (actuates TFK3B11S =Tthen=Tthen Fwhen F when IMK3RB11)
IMK3RB11 SETUP - 3A SETUP          -  3A EDG EDG START START FAIL FAIL (actuates (actuates TFQ5GAFS TFQ5GAFS = T)    T)
SETUP - 3B SETUP          -  3B 4KV4KV BUS BUS STRIPPING STRIPPING FAIL    FAIL (actuates (actuates TFQ6XABF TFQ6XABF == T)  T)
SETUP - BB AFWP SETUP          -    AFWP GOV    GOV OIL OIL LEAK LEAK (actuates (actuates TFFXOILB TFFXOILB = T) T)
SETUP - MOV-3-1405 SETUP          -  MOV-3-1 405 FAILS    FAILS TO  TO OPEN OPEN (actuates (actuates TFFXM05 TFFXMO5 == T)  T)
Ensure ADV Ensure        ADV setup setup per per 3-GOP-301 3-GOP-301 Enclosure Enclosure 22 with reactor            power &
reactor power          & Tavg Tavg stable, stable. Start Start train  A  chilled train A chilled            water  and  secure train secure    train B B chilled chilled water (CR  (CR HVAC HVAC panel).panel).
Acknowledge any Acknowledge                any alarms and place simulatorsimulator in freeze.
Provide shift Provide        shift turnover turnover checklists checklists &  & copy of 3-GOP-301 3-GOP-301        completed completed thru step 5.52.2. 5.52.2. The The crew is crew    is to to place place the unit on line and increase  increase power to          30% for a flux map.
Select 3A Select    3A QSPDSQSPDS to page 211 (SAT) and 3B QSPDS                QSPDS to page 212 (RVL).        (RVL). Set ERDADS ERDADS on  VPA on VPA to Tavg/T to    Tavg/Tref  ref (TAV) and at the RCO desk to ENVR            ENVRN    N (ED3).
Fill in blende Fill in  blenderr & shutdo  shutdownwn boron additioaddition n placard placards        console s at consol        blenderr station e blende      station.. Data Data forfor each each IC  IC maymay be  be found in the ECC &        & Shutdo Shutdown  wn Guidel Guidelines        Book ines Book in      in the  simulator    IIF.
simulator I/F.
Event Event lila    1/1a - Place Place unitunit on      line I1B on line        B AFWP AFWP out    out of  of service service Initiate Initiated  d by  by crew crew based based on  on shift shift turnov turnover. er.
The The crew crew perform performs    s 3-GOP 3-GOP-301 -301 beginn beginning ing at at step  5.52.3 to step 5.52.3      to synchr synchronize        generator onize genera    tor toto grid grid, in  crease power increase          power andand swap swap s/gs/g level level contro controll toto main main feedfeed reg reg valves valves contro controlling lling inin automa      tic. Note    that  a surrog automatic. Note that a surrogate operator      ate  operato    r will will be be require required  d toto mainta maintain          level.
SG level.
in SG Respon Respond    d ifif asked asked as  as SM SM that that auto auto synchr    onization isis to synchronization            to bebe used used for for placing placing the the main main genera    tor generatoron        on line.
line. (Step (Step 5.54 5.54 isis n/a) n/a)
Respon Respond    d as  as System System ifif notifie notifiedd of of placing placing Unit Unit 33 on on the the grid grid and and increas increasing    powerto ing power      to 20%
20%
(135 (135 MWe)
MWe).      . IfIfasked asked about aboutVARSVARS,  , reques request  t 100 100 MVAR MVARout    out at at 100%
100% power.power.
Respon Respond    d as  as Chemi Chemistrystry when when notifie    d toto sample notified      samplefor  for 15%
15%powerpowerchangechange (TS (TS 3.4.8) 3.4.8) 33


The crew stabilizes the giant using 3-EOP-ECA-0.2 since PZR level < 17[50]% or SI actuated due to the effects of the steam leak. i Time Position Applicant's Actions or Behavior BOP Performs 3-EOP-ECA-O.2 actions as directed by US: Critical 1. Determines no ICWPs running. Starts 2 ICWPs. 2. Verifies POV-3-4882
TP-2007-301 Scena Scenarrio io #5 Event Event Descri Description Once feed regul regulatin ating    valves g valve    s are placed in autom  automati    c, call in as a turbin atic,                turbinee bldg. NSO and repor reportt that the B AFWP gover        governor nor has an oil leak (oil leak entere    enteredd at setup) setup)..
& 4883 closed. 3. Determines ICW headers tied together 4. Directs NSO place PAHMs in service per 3-0P-094 5. Controls AFW flow to 3A & 3B SGs gpm until either SG level > 6[32]%. Then maintains 3A & 3B SG levels 15-50%. US Directs transition to and performance of 3-EOP-E-1 TERMINATING Scenario is terminated upon completion of 3-EOP-ECA-O.2 CUE 17 Appendix 0 Scenario Outline Form ES-O-1 Facility:
Respond Respo  nd as NSO if direct directed ed to mechanicaanicalllyly trip B AFWP. Click on Sche    Schemma~a>
Turkey Point Scenario No.: 5 Op Test No.: 2007-301 Examiners:
FEEDWATE FEED    WATE  R>A R~AU    UX X FIW STEA STEAM>L M~LOOA-->
Candidates:
A~TC      F5MT TCF5M    TBB - LOA AFW TURB B MECH TRIP
US RO 80P Initial Conditions:
  ~*TR TRUEUE then INSERT. Repor    Reportt when compl complete  ete..
Mode 2, 4% power, MOL. Turbine rolling at 1800 RPM ready to sync generator to grid. Increase load, place the feed regulating valves in automatic and hold power at 20% for a flux map. Turnover:
Respond Respo  nd as NSO if directdirecteded to verify GCM filter free of oil & set H2 gas flow at 16. After mm., report compl 2-4 min.,            completeete..
Equipment OOS: None significant Place unit on line and increase power per 3-GOP-301 beginning with step 5.52.3 Event Event Type* Event Description No. 1 (N) ALL Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 20% for a flux map. 1a TFFXOILB =T (TS) SRO Once feed regulating valves are placed in automatic, an NSO calls in that the 8 AFWP governor has an oil leak. 2 TVKD001 x = 1.0 I (C) SRO/80P 3A (running)
Respond Respo  nd as NSO if directdirecteded to comp complete    3-OP-072 lete 3-0P-     072 sectio sectionn 5.0 to place steam traps in service.
TPCWP bearing failure. Failure of 38 (standby)
servic e. After 7-10 min.mm. report compl  complete ete..
TPCWP to 2 min ramp automatically start following trip of running pump. The crew responds per 3-TFK3B11S = T ONOP-008 and manually starts the 38 TPCWP. 3 (I) 80P 38 slg controlling feed flow transmitter FT-3-487 fails high causing 38 FRV TFF1M86H = T (I,TS) SRO (FCV-3-488 to fail closed). Manual operator action is required to control 38 slg level and avoid a reactor trip. The crew responds per 3-0NOP-049.1.
Respond Respo  nd as NSO if directdirected        perform ed to perfor    m local action actions s to initiate MSR tube bundl bundle  e purge purge 3-OP-072 per 3-0P-  072.1.1..
4 (R) SRO/80P PT-3-1608 fails high. CV-3-1608 fails open and increases steam flow 3-4%. TFS1MREH = T (C) RO The crew responds per 0-ADM-200 for a secondary plant transient.
Respond Respo  nd as NSO if direct directeded to check check Bently Bently-Neva-Nevad daa for turbin turbine  vibratiion e vibrat  on alarm alarm.. Reset Reset expected expec      turbine ted turbin      eccenttricity e eccen    ricity alarm alarm.. Click on Sche  Schemma~a>T TURBINES URBIN    ES-->T
Manual turbine load reduction is required to return reactor power to 30%. Once power TFSW13A=T is stabilized at 30%, the CV-3-1608 isolation valve is closed, but some ADV steam leakage still exists. 5 (C) ALL Main generator exciter air coolers TPCW flow is partially blocked resulting in TVUJINF = 0.95 (M) ALL a high air temperature condition.
                                                                                              ~ TURB URBO    VISOR OVIS    ORYY
The crew responds per 3-ARP-097.CR for TVUJINFB=0.95 annunciator E-9/4. The crew manually trips the reactor when exciter hot gas TVUJINFC=0.95 temperature exceeds 90&deg;C and performs the actions of 3-EOP-E-0.
  >LOA->TC
Once the reactor is tripped, the switchyard relays out. 38 EDG starts but fails to TVUJINFD=0.95 automatically load 38 4kv bus due to a bus stripping failure. 3A EDG fails to start and can not be manually started. 6 TFP8SWYD=T (C) ALL The crew transitions to 3-EOP-ECA-0.0.
~LOA      ~ TCUFUFRS RST  T - TURBINE BENTLY-NEVADA              VADA ALARM RESE RESETT*TR~ TRUE UE then INSERT.
MOV-3-1405 fails to open and with 8 TFQ5GAFS =T AFWP OOS with an oil leak requires C AFWP to supply both units. Manual TFQ6XABF =T bus stripping is performed with the exception of 38 TPCWP breaker 3A811 TFK3B11S = T which has a blown control power fuse and can not be opened from VPA. 3A TFFXM05 = T 4kV bus is repowered via the S80 tie from unit 4. Then 3A811 is locally K30P11BG = F opened allowing 38 EDG to reenergize 38 & 3D 4kV bus. Transition is made to 3-EOP-ECA-0.2 due to the effects of the steam leak. K30P11BR = F 6a The crew stabilizes the plant using 3-EOP-ECA-0.2 since PZR level < 17[50]% or SI actuated due to the effects of the steam leak. .. (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent. (M)aJor 1 TP-2007-301 Scenario #5 Event Description Turkey Point 2007*301 Scenario #5 Event 1 -Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 20% for a flux map. Event 1 a -Once feed regulating valves are placed in automatic, an NSO calls in that the B AFWP governor has an oil leak. Event 2 -3A (running)
Respond Respo  nd as SM if askedasked about about transf transferri erring ng main turbin turbinee load from the govergovernor nor to the load limit. Direct crew to wait until after power    power reaches 30% powe      powerr before before doing this.
TPCWP bearing failure. Failure of 3B (standby)
Respond Respo  nd as NSO if directdirected ed to check check PSS voltm voltmeter eter inside the voltag voltage    regulator e regula  tor cabinet.
TPCWP to automatically start following trip of running pump. The crew responds per 3-0NOP-008 and manually starts the 3B TPCWP. Event 3 -3B slg controlling feed flow transmitter FT-3-487 fails high causing 3B FRV (FCV-3-488 to fail closed). Manual operator action is required to control 3B slg level and avoid a reactor trip. The crew responds per 3-0NOP-049.1.
cabine    Reportt back that meter
Event 4 -PT-3-1608 fails high. CV-3-1608 fails open and increases steam flow 3-4%. The crew responds per 0-ADM-200 for a secondary plant transient.
: t. Repor                  meter reads reads zero volts.
Manual turbine load reduction is required to return reactor power to 30%. Once power is stabilized at 30%, the CV-3-1608 isolation valve is closed, but some ADV steam leakage still exists. Event 5 -Main generator exciter air coolers TPCW flow is partially blocked resulting in a high air temperature condition.
Respond Respo        asked as Chemistry to verify SGs nd if asked                                    SG5 are within 0-NC  0-NCO  OP-0 P-002 02 limits. As chemistry reque request    power be held at or below 30% until SG chemistry verified within st power limits.
The crew responds per 3-ARP-097.CR for annunciator E-9/4. The crew manually trips the reactor when exciter hot gas temperature exceeds 90&deg;C and performs the actions of 3-EOP-E-0.
As React Reactor    Engine or Engin      ering,, reque eering    request  st power be held at 30% until flux map compl        complete ete..
Once the reactor is tripped, the switchyard relays out. 3B EDG starts but fails to automatically load 3B 4kv bus due to a bus stripping failure. 3A EDG fails to start and can not be manually started. Event 6 -The crew transitions to 3-EOP-ECA-0.0.
Respond Respo    nd as SM/FS SM/ES if askedasked to verify 3-0SP 3-OSP-08  -0899 step 7.1.2 compcomplete letedd during turbine turbine startup.
MOV-3-1405 fails to open and with B AFWP OOS with an oil leak requires C AFWP to supply both units. Manual bus stripping is performed with the exception of 3B TPCWP breaker 3AB11 which has a blown control power fuse and can not be opened from VPA. 3A 4kV bus is repowered via the SBO tie from unit 4. Then 3AB11 is locally opened allowing 3B EDG to reenergize 3B & 3D 4kV bus. Transition is made to ECA-0.2 due to the effects of the steam leak. Event 6a -The crew stabilizes the plant using 3-EOP-ECA-0.2 since PZR level < 17[50]% or SI actuated due to the effects of the steam leak. 2 TP-2007-301 Scenario #5 Event Description Scenario XXIII NRC 5 Simulator Operating Instructions Setup IC-20 (4% MOL, Ready to sync generator to grid) or IC-115 (7% MOL with atmospheric dump valves CV-3-1606 in auto @ 30%, CV-3-1607 in auto closed & CV-3-1608 in manual @ 50%, ready to sync generator to grid) , Place simulator in run Trigger lesson steps: SETUP -3B TPCWP AUTO START FAIL (actuatesTFK3B11S
startu    Reportt that this surv
=Tthen Fwhen IMK3RB11)
: p. Repor                  surve eilla illance  requirem nce requir    emen entt met satisfa satisfactorily ctorily.
SETUP -3A EDG START FAIL (actuates TFQ5GAFS = T) SETUP -3B 4KV BUS STRIPPING FAIL (actuates TFQ6XABF = T) SETUP -B AFWP GOV OIL LEAK (actuates TFFXOILB = T) SETUP -MOV-3-1405 FAILS TO OPEN (actuates TFFXM05 = T) Ensure ADV setup per 3-GOP-301 Enclosure 2 with reactor power & Tavg stable, Start train A chilled water and secure train B chilled water (CR HVAC panel). Acknowledge any alarms and place simulator in freeze. Provide shift turnover checklists
Respond Respo  nd as FS/NSO if aske    asked  d abou aboutt statu status  s of hydro hydrogen gen gas dryer. Repo Reporrtt that it is in servi servicce.
& copy of 3-GOP-301 completed thru step 5.52.2. The crew is to place the unit on line and increase power to 30% for a flux map. Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3). Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator IIF. Event 1/1a -Place unit on line 1 B AFWP out of service Initiated by crew based on shift turnover.
e.
The crew performs 3-GOP-301 beginning at step 5.52.3 to synchronize generator to grid, increase power and swap s/g level control to main feed reg valves controlling in automatic.
Respond Respo  nd as FS/N FS/NS  SOO if aske asked  d to begin placin placingg MSR5MSRs in servi serviccee per 3-OP 3-0P--072 072.1
Note that a surrogate operator will be required to maintain SG level. Respond if asked as SM that auto synchronization is to be used for placing the main generator on line. (Step 5.54 is n/a) Respond as System if notified of placing Unit 3 on the grid and increasing power to 20% (135 MWe). If asked about VARS, request 100 MVAR out at 100% power. Respond as Chemistry when notified to sample for 15% power change (TS 3.4.8) 3 TP-2007-301 Scenario #5 Event Description Once feed regulating valves are placed in automatic, call in as a turbine bldg. NSO and report that the B AFWP governor has an oil leak (oil leak entered at setup). Respond as NSO if directed to mechanically trip B AFWP. Click on FIW
                                                                                                        .1..
-LOA AFW TURB B MECH TRIP TRUE then INSERT. Report when complete.
Powe Pow  err shou shoulldd be stabi stabili lized zed at 30%, Tavg          =554.5
Respond as NSO if directed to verify GCM filter free of oil & set H2 gas flow at 16. After 2-4 min., report complete.
                                                          = 554.5&deg;F      turbine load ==225 MWe.
Respond as NSO if directed to complete 3-0P-072 section 5.0 to place steam traps in service. After 7-10 min. report complete.
of & turbine 4
Respond as NSO if directed to perform local actions to initiate MSR tube bundle purge per 3-0P-072.1.
 
Respond as NSO if directed to check Bently-Nevada for turbine vibration alarm. Reset expected turbine eccentricity alarm. Click on TURBOVISORY TCUFRST -TURBINE BENTLY-NEVADA ALARM RESET TRUE then INSERT. Respond as SM if asked about transferring main turbine load from the governor to the load limit. Direct crew to wait until after power reaches 30% power before doing this. Respond as NSO if directed to check PSS voltmeter inside the voltage regulator cabinet. Report back that meter reads zero volts. Respond if asked as Chemistry to verify SGs are within 0-NCOP-002 limits. As chemistry request power be held at or below 30% until SG chemistry verified within limits. As Reactor Engineering, request power be held at 30% until flux map complete.
TP-200 TP-20        7-301Scena 07-301      Scenar  rioio#5#5Event EventDescriDescrip  ption tion Event Even        t 22 - 3A  3ATPCW TPCWPP bear      bearin ingg failur failuree Oncesteam Once         steam dump  dumps          havebeen s have        beenrealigrealign  ned edfor fornormnormal al at atpowepower  r opera operati  tionon (or (oras directed direc              by  lead ted by lead examiner), exa  min    er),trigge trigger                                                                                  as lessonstep r lesson        step EVENEV  EN  TT  22 -  3A 3A  TPCW TPC    WP P  BEAR BE        ING FA    ILU  RE FAILURE (actuate    (actu  ates  TVKDOO    1X==1.0 AR    ING s TVKD0    01X      1.0onon22minmm ramp).
Respond as SM/FS if asked to verify 3-0SP-089 step 7.1.2 completed during turbine startup. Report that this surveillance requirement met satisfactorily.
ramp).
Respond as FS/NSO if asked about status of hydrogen gas dryer. Report that it is in service. Respond as FS/NSO if asked to begin placing MSRs in service per 3-0P-072.1.
Annunc Annun          iators ciator        1-5/1  ,  5/2 s 1-5/1, 5/2 && 5/4      5/4allallalarm alarmwhen  when 3A    3A TPCW TPCWP   P trips.
Power should be stabilized at 30%, Tavg = 554.5 of & turbine load = 225 MWe. 4 TP-2007-301 Scenario #5 Event Description Event 2 -3A TPCWP bearing failure Once steam dumps have been realigned for normal at power operation (or as directed by lead examiner), trigger lesson step EVENT 2 -3A TPCWP BEARING FAILURE (actuates TVKD001X = 1.0 on 2 min ramp). Annunciators 1-5/1, 5/2 & 5/4 all alarm when 3A TPCWP trips. The crew responds per 3-ONOP-008.
trips. The The crew crewrespo        ndssper ONOP-008.
The 80P will need to start 38 TPCWP manually since the auto start function was failed at startup. Respond as NSO if directed to locally check 3A TPCWP. Report back that the inboard motor bearing is smoking and very hot. If directed to do post-start checks on 3B TPCWP, report back that the pump is running normally.
ONOP        -008. The  The 80P BOP will willneed needtotostart  start38 respond          per3- 3-3B TPCWTPCWP    P  manu man      ally uall  y  since sinc e  the the   auto auto  start star fun  ctio functionn was    was failed failedat  atstartu startup                                                                                              t p..
Respond as NSO when directed to locally check TPCW supply temp (TI-3-1432)
Respon Respo      ndd as as NSONSO ififdirect directeded to  to locally locaNy check check 3A    3A TPCW TPCWP    P.. Repor Reportt back back that that the the inboar mo    tor  bea    ring motor bearing is smoki    is  smo  kin                                                                                                  inboardd ngg and and veryvery hot.hot. IfIf direct directed ed to to  do do  post-s pos    t-sttart art check che      s  on  3B TPCWP                                                                                                                      cks on 3B TPCW        P,, report report backback thatthat thethe pump pump isis runnin runningg normanormallly. ly.
<110&deg;F and stable/decreasing.
Respon Respo      ndd as as NSO NSO when when directdirected      to locally locally check ed to                check TPCW  TPCW suppl  supply    y temp temp (TI                                                                                                                                (Tl-3-11432)
Click on TURBINE PLANT TPCW HEAT EXCHANGERS.
      <11    0&deg;F    and
TPCW supply header temperature at top of page. Respond as NSO when directed to locally verify TPCW basket strainer From TPCW HEAT EXCHANGERS system mimic page, click on FROM ICW PUMPS.
    <110&deg; F and stable      stab  le/d  ecreasing.                                                                                      432)
on basket strainers downstream of POV-4882 & 4883. Respond as NSO when directed to check temperature of components cooled by TPCW. After 8-10 min., report all temperatures stable. When requested as OCC, after 8-10 min rack out breaker 3AA11 by triggering lesson step EVENT 2 -RACK OUT BKR 3AA11 (actuates TAK3A11P = RACKOUT(3)).
                                      /decre    asing. Click Click on on Sche Schemama~C  *COOMMO  MM      ONN SERV        ICES SER  VICES*TURBINE ~ TURB        INE PLANT PLAN            COOLING T COOL        lNG~  >TPCWTPCW HEAT  HEAT EXCH  EXCHANGE    ANGERS. RS.  ~repo r    epo  rtrt TPCW TPC    W    supply sup        heade ply header        r temperrature tempe        ature at  at top top ofof page.
If it is desired to skip events 1& 2 and begin the scenario here, reset to IC-125 Event 3 -FT 487 fails high After CV-3-1608 isolated, trigger lesson step EVENT 3 -FT-3-487 FAILS HIGH (actuates TF1 M87H = T). This causes FT-3-487 to fail high which causes FCV-3-488 to fail closed. To avoid automatic reactor trip on 38 slg low level, the operator must take manual control of FCV-3-488 and restore feed flow and return slg level back to program. The crew responds per 3-0NOP-049.
page.
1 and takes FT-3-487 out of service. 38 s/g level control is returned to automatic using FT-3-486 for control. Respond as WCC if directed to initiate a PWO and contact I&C. Also respond as WCC if directed to generate an ECO for the bistables tripped per 3-0NOP-049.1.
Respon Respo        ndd asas NSO NSO when  when direct directed ed to to locally locally verify verify TPCW TPCW baske  baskett strainstrainer er ~p.
Respond as FS/NSO if directed to reset the AMSAC TROUBLE alarm (D-7/6) at the AMSAC panel in the Cable Spreading Room. After 2-4 min., trigger lesson step EVENT 3 -RESET AMSAC TROUBLE (actuates TCL4RST = T). Report when complete.
LIp. From From TPCW HEAT EXCH HEAT        EXCHANGE    ANGERS    RS system system mimic                                                                                          TPCW mimic page,page, clickclick on on  FROM FRO    M    ICW ICW      PUM      PS.    ~repo    rt on baskebaskett strain strainer                                                                                      PU  MP    S.    *report ~p's  LIps on                          erss downs downstr      eam of POV-tream          POV-4      882 & 4883.
5 TP-2007-301 Scenario #5 Event Description Event 4 -PT-3-1608 fails high I CV-3-1608 fails open After FT-3-487 bistables tripped & 3B SG level control returned to automatic, trigger lesson step EVENT 4 -PT-3-1608 FAILS HIGH I CV-3-1608 FAILS OPEN (actuates TFS1MREH = T & TFSVV49D=0.1 then TFSW13A = T 5 sec later). CV-3-1608 fails open and increases steam flow. Without operator action, power will eventually stabilize at 34-35%. Consistent with 0-ADM-200 sect. 5.4.3 for a secondary plant transient, manual turbine load is reduced to return reactor power to 30%. If crew is slow to take action, call as reactor engineering and ask why power is so far over the 30% hold which was supposed to be in progress.
4882          4883.
Respond as NSO if directed to close the air isolation valve and bleed air off the CV-3-160B operator.
Respon Respo        ndd asas NSO NSO when when direct directed            check tempe ed to check          temperrature ature of comp compon    onent entss cooled cooled by  by TPCW TPCW..
This will have no effect. Report steam continues to come out of the silencer with the greatest noiselvibration on eV-3-160B.
Aft    er After 8-10  8-10 min.,
Once power is stabilized at 30%, CV-3-1608 can be locally isolated.
mm., report report all tempetemperrature aturess stable stable..
When directed as NSO, wait 2-4 min then trigger lesson step EVENT 4 -LOCALLY ISOLATE CV-3-1608 (actuates TASBV003 = 0.0 on 1 min ramp). When complete, report that with the valve closed, although much less than before, some steam flow is still visible out the silencer.
When reque When          requessted  ted as OCC,  0CC, afte  afterr 8-1    0 min mm rack out bre 8-10                            break akeerr 3AA3AA1II1 by trig    triggegerring less    on  step    EV lesson step EVENT 22 - RACK EN            RACK OU                                                                                          ing OUT  T BKBKR  R 3AA 3AA1I 1I (actu(actuate atess TAK3A1 TAK3A11P = RAC    RACKO  KOU  UT(3)).
Respond if called as the wee to get Mechanical assistance in isolating 3e SG ADV. Event 5 -Exciter air cooler TPCW blockage I Reactor trip After FT-3-487 failure crew brief, trigger lesson step EVENT 5 -EXCITER AIR COOLER TPCW BLOCKAGE (actuates TVUJINF = 0.98, TVUJINFB = 0.98, TVUJINFC = 0.98 & TVUJINFD = 0.98 all on 1 min ramp). This will cause exciter air temperature to increase.
T(3)).
The crew responds per 3-ARP-097.CR for annunciator E-9/4. When exciter hot gas temperature reaches 90"C, the crew manually trips the reactor and 3-EOP-E-0 immediate actions performed.
If If itit is is des desireiredd to skip eve  event ntss 1&1& 22 and beg    begin in the sce  scenanarrio    here, io her    e, resreset et to IC- IC-121255 Ev Even  entt 33 - FT-FT                              48 4877 fai    ls hig fails      high  h Aft After  er CVCV-3--3-11608 608 isolisolatateded,, trig triggegerr less lessonon stepstep EV  EVEN ENTT 33 - FT- FT 3-448787 FAFAILSILS HIG HIGH (actu (actuate atess TEl TF1 M87 M87H H == T).
Events 6 -Loss of all AC power After the immediate actions of 3-EOP-E-0 are complete, trigger lesson steps EVENT 6 -3AB11 STUCK CLOSED (actuates TFK3B11S = T), then EVENT 6 -LOSS OF SWITCHYARD (actuates TFP8SWYD = T, K30P11 BG = F, K30P11 BR = F, TCE2Eon = T & TCE2E07T = T). This causes a loss of AC power from the startup transformer.
T).
38 EDG starts but fails to automatically load 38 4kv bus due to a bus stripping failure. 3A EDG fails to start and can not be manually started. The crew transitions to 3-EOP-ECA-0.0.
H Thi This  s cau cause sess FT-FT-3-3-448787 toto fail fail hig highh whiwhichch cau cause  sess FCV FCV-3  4-488 88 to to fail fail clos closeded.. To  To avo avoid id auto autom    mat  ic  reac  tor  trip atic reacto r trip on      on 3B38 s/g slg low low leve level,I the the opeopera ratotor r  must mu    st  take take      manu man    ual al  contro control ofl  of FCV FCV-3     4  88 and
MOV-3-1405 failure to open (entered at setup) with 8 AFWP OOS (from event 1) requires C AFWP to supply both units. Manual bus stripping is performed with the exception of 38 TPCWP breaker 3A811 which has a blown breaker trip circuit control power fuse and can not be opened from VPA. Prior to closure of the S80 tie from unit 4, 3A8 11 is locally opened allowing 38 6 TP-2007-301 Scenario #5 Event Description EDG to reenergize 38 & 3D 4kV bus. Transition is made to 3-EOP-ECA-O.
              -488      and rest restor oree feed feed flowflow and and retu    rn s/g return      slg leve level l  back bac  k    to to   progra program. Them. The crewcrew resp respo    ondndss per per 3-O3-0NO NOP-0 P-049 49..11andand taketakes  s FT-FT 3-448787 outout ofofserv servic ice.e. 38 3B   s/g s/g    level leve      contro l con  trol l isis retu return  rneedd to to auto autom mat    ic usin atic  using g FT-FT-3-3-448686 forfor con controtrol.l.
10r ECA-O.2 depending on plant conditions at that time. Respond as NSO if directed to locally trip 3B1 & 3B2 CWP breakers 3AB16 & 3AB18. Trigger lesson step EVENT 6 -TRIP 3A816 AND 3A818 (actuates TCK4CC = F then TCK 4DC = F 1 min later). Report when complete.
Res Respo  ponnd  d as as WCWCC  C ififdire directcteded toto init  iate aa PW initiate      PWO  O andand con contatactct l&C I&C. . AlsAlso    respo o resp      ondnd asasWC  WCC  C ifif dire direct  cted ed toto gen genereratatee an    EC an ECOfor O    forthethe bist  ableles bistab      s trip trippepedd perper3-O3-0NO NOP-0   P-049 49.1  .1.
If called as NSO to investigate breaker 3AB11, report that the breaker is closed, the blue & white lights are on while the red & green lights are off (indicative of a blown trip circuit fuse -reference PTN EWD 5613-E-27 sheet 1 B). Respond as NSO if asked to locally reset 3A EDG start failure relay by pressing alarm reset pushbutton.
Res Respo  ponnd d as  as FS/  NSOO ififdire FS/NS                  cted direct  edtoto rese reset t the theAM  AMSA  SACCTR    TROU OUBL    BLE E alaralarm m (D-  (D-7/6 7/6) )atatthethe AM AMSA  SACC pan        el  in  the panel in the Cable  Cab    le Spr Spreaeadding ing Roo  Roomm. .Aft After er 2-42-4 mmmin.,.,  trigge trig  ger  r  lesson less    on    step    EVEN step EVENTT 33 - RE  RESE SETTAM    AMSASACCTR        OUBL TROU          E (actu BLE            atessTCL (actuate        4RSTT==T).
Report back that the 3A EDG turbocharger suffered catastrophic failure with considerable damage to EDG exhaust piping. Respond as NSO if asked to check which unit CCW is supplying U4 HHSIPs. Report that U4 CCW is supplying U4 HHSIPs. Respond as NSO if asked to locally open MOV-3-843A or B. After 2-4 min., trigger either lesson step EVENT 6 -LOCALLY OPEN MOV-843A (actuates TFMVV010 = T) or EVENT 6 -LOCALLY OPEN MOV-8438 (actuates TFMVV020 = T). Report when complete.
TCL4RS          T). Rep Repor ort twhewhen n com compl    ete.
Respond as NSO if asked to locally isolate RCP seals by closing 3-297 AlBIC, MOV-3-381 & MOV-3-626.
plete.
Trigger lesson step EVENT 6 -LOCALLY ISOLATE RCP SEALS (actuates TAHN97A = 0.0, TAHN978 = 0.0 after 1 min delay, TAHN97C = 0.0 after 2 min delay, TF8VC60 = T after 3 min delay & TFKV626C = T after 4 min delay). Report when complete.
55
Respond as NSO if directed to open AFSS-3-007 to restore train 2 steam flow to C AFWP. After 1-3 min., trigger lesson step EVENT 6 -OPEN AFSS-3-007 (actuates TAFF07 = 1.0 on 30 sec ramp). Report when complete.
 
Respond as NSO if directed to deenergize and close MOV-3-1405.
TP-2007-TP-20    07-301301 ScenaScenariorio #5 #5 Event EventDescri Descripti ption on Event Even      t 44 - PT-3  PT-3-1  -1608 608 failsfails high high II CV-3 CV-3-1    -1608 608 fails After FT                        -
After 1-3 min., trigger lesson step EVENT 6 -DEENERGIZE MOV-1405 (actuates TCF5MA27 = F). Respond as NSO if asked about status of steam from the 3C SG AOV CV-3-1608.
fails open  open After      FT-3-487  487 bistabbistable  less trippe tripped d && 3B  3B SG SG level level contr control    ol return returne    edd to to autom automat  atic,ic, trig ger    less trigge r lesson step    on    step EVEN EVENT    T 44-   PT-3-1
Report that steam is still coming out of the silencer on the unit 3 main steam platform.
                                                          - PT        608 1608      FAlL (actuates                                                                 FAILS    S  HIG HIGH    H  II CV                                                                                                              CV-      1608 3-16    08  FAILS FAIL       OPEN S OPEN (actuate      TFS1MREH s TFS1M        REH = T & TFSVV49D=0
Respond as U4 RO when status of U4 4kV buses is requested.
                                    = T & TFSVV49D=0.1        .1 then thenTFSW1 TFSW13    3A A == TT55 sec sec later).
Report that 4A & 4B 4kV buses are both on their respective EDGs and 40 4kV bus is aligned to 4B 4kV bus. Respond as U4 RO when requested to place 4B 4kV bus non-running ESF loads in T-L or OFF. Trigger lesson step EVENT 6 -48 4KV ESF LOADS PTL (actuates TCE2E24T = T, TCE2E20T = T & TCE2E27T = T). If 4B HHSIP is not running, trigger lesson step EVENT 6 -48 HHSIP PTL (actuates TFM2D48S = T & V80H30 = T). After 1-3 min., report complete.
later).
7 TP-2007-301 Scenario #5 Event Description Respond as U4 RO when requested to close 4AD07. Trigger lesson step EVENT 6-CLOSE 4AD07 (actuates TCE2E33C = T). Respond as U4 RO when asked about 4B EDG loading. Click on POWER &
CV-3-16 CV      1608  08 fails falls open open and  and increa increas  seses steam steam flow. flow. Witho Without  ut opera operato  torr action action,, powe power  r will will even  tuall  y    stabi eventually stabilize at      lize    at 34-35 34-35%.        Consiste
DIESEL LOGIC & PROT 4A & 4B
                                                      %. Consi        stent nt with with 0-ADM 0-ADM-2      -200  00  sect.
* and report MW reading under breaker 4AB21. After 3A 4kV bus energized from the SBO x-tie, between steps 32 & 35 of 3-EOP-ECA-0.0 call as NSO and tell crew that 3AB11 is being opened locally. Trigger lesson step EVENT 6 -LOCALLY OPEN 3AB11 (actuates TFK3B11S = F followed by TCK3B11C = F 5 sec later). Respond as U4 RCO if directed to perform steps 35b-e of 3-EOP-ECA-0.0.
sect. 5.4.3 5.4.3  for for  a  secon a second    dary ary plant transie plant      transient,        manual nt, manu              turb The al turbin        load is e load      is reduc reduce  edd to to return return reacto reactor    r powe powerr to  to 30%.
Respond as NSO when directed to start SFP cooling water pump. Tell RO just before starting, then trigger lesson step EVENT 6 -START SFPCWP (actuates TCC4CL 15 = T). Event 6a -Loss of all AC power recovery This event entered when 3-EOP-ECA-0.0 completed.
30%.
Transition is made to 3-EOP-ECA 0.2 since SI is required (based on PZR level <17%) due to the leak on 3C SG ADV CV-3-1608. Respond as NSO if directed to check if MOV-3-1426
IfIf crew crew isis slow slow to    to take take action action,, call call as as reacto reactorr enginengineer eering ing and   and ask over the the 30%                                                                                                ask whywhy powepowerr isis so so far far over              30% hold  hold which which was  was suppo suppos    seded to to be be in in progre progress. ss.
& 1427 are closed. After 1-3 min., report that these valves are closed. Note that it is not required to close MOV-3-6386 since MOV-3-381 is closed in the same line. Respond as NSO when directed to place PAHMS in service on unit 3. After 8-12 minutes, trigger lesson step EVENT 6 -PLACE U3 PAHMS IN SERVICE (actuates TAC2V02A = 1.0, TAC2V02B = 1.0, TAAAV21 = 1.0, TAAAV22 = 1.0 & TACA005 = 0.0). Report when complete.
Respond Respo      nd as  as NSO NSO ifif direct directed  ed toto close close the  the airair isolati isolation on valve valve and    and bleedbleed airair off off the the CV                                                                                                                                                    CV    1608      oper 160B operaator.      tor. ThisThis willwill have have no no effect.
8 J NRC-5 OPERATIONS SHIFT TURNOVER REPORT ONCOMING CREW ASSIGNMENTS Shift Mgr: Inside SNPO: Field Supv.: Outside SNPO: Admin RCO: ANPO: Unit 3 Unit 4 Unit Supv.: Unit Supv.: RCO: RCO: NPO: NPO: Plant Status Unit 3 Unit 4 Mode: 2 Mode: 1 Power: 4 Power: 100 MWe: 549.5 MWe: 759 Gross Leakrate:
effect. ReporReportt steamsteam contincont        uess to inue      to   come com    e  out out  of of  the the silencer silenc          with the er with        the greate greates        noise/vib stt noisel  vibratratio ionn onon eV                                                                                    CV-3-1  160B.
0.03 Gross Leakrate:
608.
0.04 RCS Boron Cone: 1244 RCS Boron Cone: 600
Once powe Once        powerr is      is stabil stabiliz  izeded atat 30%,
',') ,'1l;:::{:t;,\:\
30%, CV-3-CV-3-11608  608 can be      be locall locally    y isolat isolated ed.. When When directdirected ed as    NSO    ,  wai as NSO, wait 2-4 min    t  2-4    mm then trigge    triggerr lesson lesson step EVEN      EVENT    T 44-- LOCA LOC    ALL LLY Y  ISOLA ISOL      TE ATE CV-3-CV  1608 (actuate 1608      (actuates      TASBVOO3 s TASBV      003 = 0.0 on 11 min mm ramp).      When compl ramp). When          complete  ete,, report repo  rt  that with the valve  valv  e closed closed,,
;',\}i"J
although althou          much less than before gh much                              before,, some some steam  steam flow is still visible Respond                                                                                                visib    le  out the silenc silen    er.
-'Train A is protected Turbine rolling at 1800 RPM ready to sync generator to grid. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Place unit on line and increase power per 3-GOP-301 beginning with step 5.52.3 U3 Anticipated LCO Actions: , Current: None Anticipated:
cer.
None Train A is protected.
Respo                called as the wee nd if called                        WCC to get Mech      Mechani        cal assist anical      assistan  ance  ce in isolati isolatingng 3e3C SG ADV. ADV.
OLRM is green (CDF = 1.42E-6; LERF = 9.28E-8).
Event 5 Even                  Exciter t 5 - Exciter air cool              cooler      TPCW block er TPCW              blocka      age ge I Reac Afte Reactor    tor trip Afterr FT            FT-3-487  487 failurfailuree crew brief,    brief, trig trigge  gerr lesson lesson step EVEN      EVENT      T 5 - EXCIT
U4 Anticipated LCO Actions: Current: None Anticipated:
                                                                                                                        - EXCITER    ER AIR COOLER TPC COOL ER TPCW                W BLOC BLOCKA      KAGE GE (actuate (actuatess TVUJI TVUJIN  NFF = 0.98, TVUJI TVUJIN      FB == 0.98, TVUJI NFB              TVUJINNFCFC = 0.98 &
None Train A is protected.
TVUJI    NFD    = 0.98 0.98 &
OLRM is green (CDF = 1.42E-6; LERF = 9.28E-8).
TVUJIN    FD =    0.98 allall on on 11 mm min ramp ramp).).
Results of OffgoingFocus Area: See g:\Ops\Common\0900 Unit 3 Status Reactor Operator Mode: 2 RCS Leakrate Accumulator Ref Levels Power: 4 Gross: 0.03 gpm A 6615 MWe: 0 Unidentified 0.02gpm B 6640 Tavg: 549.5 Charging Pps: 0.01 gpm C 6625 RCS Pressure:
This will cau  cause  se excit excite  err air temp tempe  eratu rature re to incre increaase. se. The crew resp        respo  ondndss per 3-AR3-ARP  P--
2235 RCS Boron Cone: 1244 i:;;}\,fi'fi lal ** ;",,'l
097.
..
097.CR  CR    for  ann annun  uncciator iator E-9/E-9/4. 4. Whe When  n excit excite  err hot gas tem  tempe  per  rature atur    e  reach reac    es hes        CC, 90"C, 90        the crew man  manu  ually ally trips the reac    reacto torr and 3-EO3-EOP    P-E-
**
                                                                              -E-0 0 imm immeediat diate  e actio action  nss perfo perforrmed med..
Annunciator:
Eve Even    nts ts 66 - Los
None abnormal Comp Actions: Annunciator:
                      -  Loss    s of all AC    AC pow  powe    err Afte After  r the the imm imme      edia diatete acti action onss of of 3-EO 3-EOP    P-E-
Comp Actions: Annunciator:
                                                                        -E-0 0 are are comcomp    plet lete,  e, trig trigge        lesson gerr lesso          steps n step    s EVE    NT EVEN T 6-    6 - 3AB3AB1II1 STU    STUC    CK  K CLO CLOS  SEDED (actu      atesT (actuate  s TFK3B1 FK3BllS      = T), then 1S =T),        then EVE  EVEN  NTT  6 6-  -  LOSS LOS    S OFOF SWI SWIT    TCH CHYA YAR    RD D (actu    atess TFP8S (actuate      TFP8SW  WYDYD == T, T, K3OP1 K30P111 BG  BG == F, F, K3OP1 K30P111 BR BR == F, F, TCE2E TCE2E      on = TT && TCE2E OIT          TCE2EO7T This                                                                                                                                            07T  = T).
Comp Actions: Annunciator:
T).
Comp Actions: Annunciator:
This cau cause sess aa loss loss of ofAC AC pow powe  err from from the the start startuupp trans transfform ormer    er.. 3B38 EDGEDG star starts    but falls ts but    fails to to auto autom  mati  callyy load aticall        load 3B  38 4kv 4kv busbus duedue to to aa busbus strip stripp ping ing failu failure re.. 3A 3A EDG  EDG failsfails  to to   start star  t  and and can can not not bebe manmanu    ually ally start starte ed.d. The The crew crew trans transiition tions s toto 3-EO 3-EOP        -ECA-P-EC      A-0.0.0.
Comp Actions: Annunciator:
0.
Comp Actions: Annunciator: Comp Actions: Annunciator:
MOV MOV--3-14 3-140  055 failu failurere to to open      (en open (enter  tereedd atat setup setup)  ) with with B8 AFW AFWP          OOS (from P OOS          (from eveevent    1) nt 1) req requir uirees s CC AFWAFWP      P toto supp suppl  lyy both both units units..
Comp Actions: Annunciator:
Man Manu    ual al bus bus stripstripp  ping ing is is perfo perfor  rmed med withwith the the exce excep  ption tion of of3B 38 TPC TPCW    WPP bre break akeer    3A811 r 3AB  11 whic    h  has which has aa blow      blown    n bre break akeer r trip trip circu circuitit cont contro rollpowpowe  err fuse fuse and  and can  can notnot bebe    opene opened fromd  from VPA VPA.. Prio Prior r toto closu closur  ree ofofthethe SBO S80 tie tie from from unitunit 4,4, 3AB3A8I11  I isis local locally      opene ly ope    neddallow allowiing ng 3B 38 66
Comp Actions: Annunciator:
 
Comp Actions: Current Tech Spec Action Statements: (Does Not Include "For Trackim! Only Items" T.S.A.S ! Component:
TP-200 TP-20          7-301Scena 07-301         Scenar  rioio#5
None Reason: Entry Date: T.S.A.S ! Component:
                                                                                        #5Event EventDescri Descrip ption tion EDGtotoreene EDG            reenerg rgizeize38  3B&&3D  3D4kV  4kVbus. bus. Trans Transit    ionisismade ition        madetoto3-EOP  3-EOP-ECA-        O. .10r ECA    -O. 2   dep  end ECA-O.2 depending on plant    ing    on  plantcondit conditi
Reason: Entry Date: T.S.A.S ! Component:
                                                                                                                          -ECA-O        br3-EOP3-EOP--
Reason: Entry Date: T.S.A.S! Component:
onsatatthat ions          thattime.
Reason: Entry Date: T.S.A.S ! Component:
time.
Reason: Entry Date: T.S.A.S ! Component:
Respon Respo      nddas  asNSO NSOififdirectdirecteded totolocally locallytrip trip3B13B1 &&3B2  3B2CWP CWPbreak  breake  ersrs3AB1      6 &&3AB18          .
Reason: Entry Date:
Trig    ger Trigger lesson  less  onstepstep EVEN EVENTT66- TRIP                                                                    3AB16            3AB18.
Unit 3 Status Changes to Risk Significant Equipment:
                                                            -  TRIP3A81  3AB16  6 ANDAND 3A813AB    8 18  (actuate  s (actuatesTCK4C      C = FFthen
Unit 3 Risk is GREEN. Upcoming Reactivity Management Activities:
    ==FF 11min mm later). Report later). Repor          whencompl complet TCK4CC            thenTCKTCK4DC 4DC t when                  ete.e.
Sync generator to grid. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Upcoming Major POD Activities:
IfIfcalled called as  as NSONSOtoto investinvesti    gate break igate      breake    err3AB11 3AB1 1,      reportthat
Sync generator to grid. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. Upcoming ECOs to Hang and lor Release: None ,-Evolutions or Compensatory Actions in Progress:
                                                                                      , report      thatthe blu  e  &  whi  te  ligh                                                                          the break breake  errisis closed closed,  , the the blue & white lights are        ts  are on on while while the  the redred && green green lights ligh circ  uit  fuse                                                                          ts are are  off off  (indica (ind  icattive ive  of of aa blown blo  wn  trip trip circuit fuse - refere-  referen  nce ce PTN PTN EWD  EWD 5613- 5613-E  E-27-27 sheet sheet 1IB) B)..
Turbine rolling at 1800 RPM ready to sync generator to grid. Place unit on line and increase power per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating valves in automatic and hold power at 30% for a flux map. General Information, Remarks, and Operator Work Around Status: See evolutions
Respon Respo      ndd asas NSO NSO ifif askedasked to  to locally locally reset reset 3A  3A EDGEDG start start failure failure relay relay by  by press    ingg alarm rese  t  pus  hbu  tton reset pushbutton. Repor t back . Rep    ort  back that                                                                      pressin        alarm that thethe 3A  3A EDGEDG turboc turb  ochharge arg  err  suffer suff    ed ered    catast  rophic fail  ure    wit h failure with consid  conside      rable dama damage                                                                        cata  stro  phi  c erable                ge to  to EDG EDG exhau exhaus  stt piping piping..
& compensatory actions above. Train A is protected.}}
Respon Respo      ndd as as NSO NSQ ifif asked asked to  to check check whichwhich unit  unit CCW CCW isis supply supplying  ing U4 U4 HHSIP HHSIPs. s. Repor that that U4  U4 CCWCOW isis supplysupplying U4      U4 HHSIP HHSIPs.                                                                          Reportt s.
Respon Respo      ndd asas NSO NSO ifif askedasked to  to locally locally openopen MOV- MOV-3    3-843
                                                                                          -843A  A or or B.
B. After After 2-4 min.,  mm., trigge eith    er  less  on either lesson step EVEN  step    EVENT 66 - LOCA      LOCALLY OPEN                                                                triggerr OPEN MOV-   MO    V-8843A 43A    (actuate EVENT EVEN      T 66 - LOCA LOCALLY            OPEN MOV-(actu    s  TFMVV ates TFMVVO1O == T) 010      T) or or LLY OPEN              MOV-8        43B (actuate 8438      (actuatess TFMVV TFMVVO    2O == T). Repor 020          Reportt when when compl complet    ete.e.
Respon Respo      ndd as as NSONSO ifif asked asked to locallylocally isolate isolate RCP  RCP seals seals by closin closing    g 3-297 3-297AAlBIC 381    &  MO    V-3 381 & MOV- 3-626 . Trigg-62  6. Trig  ger    lesson step EVEN                                                            1B/C,, MOV-MOV-33--
er  lesson                EV  EN  T  6 6- - LOCA LO  CA  LLY      ISOLA ISO        TE    RCP (actu (actuateatess TAHN9 TAHN97A = 0.0, TAHN97B =
7A =0.0, TAHN978 =0.0 after 1 LA          RCP SEAL  SEALS    S mm 1 min mm delay, delay, TAH TAHN9N97  C ==0.0 after 2 mm 7C                  min delay delay,, TFB TF8VCVC660 O  =TT after after 33 min delay delay & & TFK TFKV62V626C6C = T    after 4 mmn T after    min delay delay).). Rep Repor  ortt whe when  n com
                                                                                                                                                =
compl  plet ete.
e.
Res Respo  ponnd  d as as NS NSO O if dire direct cted ed to ope        n AF open      AFSS  SS--3-007 3-007 to rest  restororee trai train n 22 stea steam      flow to m flow        to C C AF    WP  .
AFWP . After Aft  er 1-3 1-3 mm min., ., trig  gerr less trigge              on lesson step step EV  EVENENTT 6- 6 - OP OPEN EN    AFSS      007 AFSS-3-007 (actu      (actuate
  = 1.0 atess TAF TAFF07 1.0 on on 30 30 sec sec ramp ramp).). Rep Repor  ortt whe when   n com compl  plete.
ete.
FO7 Res Respo  ponnd  d as as NS NSO  O ifif dire directcted ed to to dee    nerrgize gize and deene                and closclosee MOMOV- V-33-140
                                                                                                            -1405. 5. Aft After     1-3 mm er 1-3    min.,
trig  ger    less  on trigger lesson step EV    step      EVEN ENTT 66 - DE                                                                                      .,
                                                        - DEEN E NE    RG ERGI    IZE ZE MO  MOV-V-11405405 (actu (actuate atess TCF TCF5M    A27 5MA27 F).   = F).
Res Respo ponnd  d asas NS NSO O ifif ask askeded aboabout ut stat    us of status      of stea steam m from from the the 3C3C SG SG AD  AOV V CV  CV                                                                                                                                    11608.
Rep    ort  that Repor t that stea          m isis still                                                                                              608.
steam          still com    ing comin g out  out of of the the sile  nceer silenc    r on on the the uni unit    3  main t 3 main stea    steam      platfor m plat      form  m..
Res    pon  d Respo nd as U4  as    U4 RORO whe  when  n stat    us of status      of U4 U4 4kV4kV bus buseses isis req requeuessted.
ted. Rep  Reporortt that that 4A4A && 4B  4B 4kV 4kV bus  buses es are    bot  h  on are both on their  thei  r resp respe ecti    ve ED ctive    EDGsG5 and and 4D 40 4kV4kV busbus isis aligaligne nedd toto 4B 4B 4kV4kV bus bus.  .
Res Respo  ponnd d as as U4U4 RO ROwhe  when  n req requeuessted ted toto plac place e 4B4B4kV4kVbus  bus non non-ru
                                                                                                            -runnning ning ESF  ESF loadloads  s mnin PP-T-L      or  OF    F. Trig T-L or OFF. Triggerless      ger          on step lesson      step EV  EVEN ENTT66 -4B  -   484KV 4KVESF  ESF LO  LOAD AD    SS  PTL PTL      (actuate  s  TCE2E (actuates TCE2E24        24T
  =T,T,TCE  2E2O20T TCE2E      T =TT&&TCE  TCE2E2E27        T). IfIf4B T ==T).
27T              4B HH      SIP isisnot HHSIP            notrun T
runnin nin  g, g,   trigge trig  ger    r lesson less  on    step   EVEN        T
  -4B 48 HH  HHSIPSIP PTL PTL(actu      atessTFM (actuate          2D448SBS ==TT&&V80 step    EV    EN    T 66 TFM2D                        H30 ==T).
V80H30        T).Aft After er 1-3 1-3mm min.,., repreport ort com compl    ete.
plete.
77
 
TP-20 TP- 20007-7-3301 01 Sce Scenar narioio #5
                                                                            #5 EveEvent nt DesDescrip cription tion Respo Re  spond nd as as U4 U4 RORO wh whenen req reques uested ted toto clo close  se 4AD 4AD0    7. Tri
: 07. Trigg gge CLOS CL  OSEE 4A 4AD0 D077 (act (actuate uatess TCE err les lesson son ste stepp EVEVEN ENTT 6- 6 TCE2E 2E333C  =T).
3C = T).                                                                                 -
Respo Re  spond nd asas U4U4 RORO wh whenen ask askeded abo aboutut 4B 4B ED  EDG G loa loadin ding.
: g. Clic Click POWE PO  WER    R && SYSYNC~E                                                                       k onon ScSchheemma a~S  *STANDBY      BY
                              ->EMEMERG  RGENENCYCY DIEDIES  SE EL L  LO rep ort report MW  MW rea                                                    LO  GI GIC C   &
                                                                                    &  PRO PR    OT T ~E>EDDG  G 4A 4A  && 4B 4B
* readin dingg und underer bre breake akerr 4AB 4AB2    1.
* and and 21.
After Aft    3A 4kV er 3A    4kV bus bus ene energiz rgized  from the ed from    the SBSBO x-ti  x-tie,  betwe e, bet    weenen ste 0.0 cal 0.0  calll as as NSNSO andand tell tell cre                                                    steps 32  32 & 35 35 of of 3-E 3-EOP -ECA-crew thathat 3AB 3ABI  11  I  is is    bei bei  ng ng    ope ope EV  EN  T EVEN 66 - LO      LOCALLY OP                                                      ned      loc loc ally  . Tri Trigg ggeerr lesson step les OPEN 3A  3AB1BI1I (act (actuate uates TFKTFK  3B11S 3B1  1S == FF follo followe wedd by byTTCK cK33B1 Bllc 1C = = F F 55 sec sec late later).
Respo Re  spond as  as U4 U4 RC RCO ifif dire direct cteed  to per d to  perform form ste    steps 35b-e of 3-EOP-ECA-                A-00.0
                                                                                                                    .0..
Respo nd as NS Re                  NSO wh when en dire direct cteedd to start SF  SEP coolin    ling g wa water pump. Tell RO just before starting, then trig  trigg  er ger leslesson step EV  EVEN T 6 - START SFPCWP (actuate (act uates TCC TCC4C4CL  15 =
L15  = T).
Even Ev  ent 6a - Lo  -  Lossss of all AC power recovery Th Thiis s event entered wh      when en 3-EOP-ECA-     A-00.0.0 completed. Transition            tion is made to 3-EOP-EC 0.2 since SI is require    uired    (based on PZR level <17 d (ba                                                                                            -ECA  A 3-1608.                                                                <1 7%%) )  due to the leak on 3C SG AD V CV-Respond as NSO if dire        directcteedd to check if MOV-3-1 report that the se valves are clo                                        -14426 26 & 1427 are clo        closed. Af Aftter er 1-3 min closed. Note that it is not requir                                                      mm.,
sin ce MOV-3    V-3-3-3881                                                                uireed d  to clo clo se  MO MO  V-3 V-   -63386 3-6    86 closed in the same lin 1 is clo                          linee..
Respond as NSO when dire            direct  edd to place PAHMS in ser cte minut min  utees, s, tri triggg                                                                servic vice on unit 3. Af      Aftter er 8-12 gerer lesson step EVENT 6 - PLAC TA TACC2V 2V002A
                                                          -              E  U3    PA  HM    S  IN  SE SE    RVICE (actuates RV 2A == 1.0, TAC2VO 2V0 2B == 1.0, 1.0, TAAAV21 == 1.0, 1.0, TAAAV22 == 1.0    1.0 && TAC TACAOOA0055 == 0.0). Reportt when complete.
88
 
J      NR NRC-5 C-5 OP OPE          ER      RAT    ATI          IOONS  NS SH  SHIFT  IFT TU TURN  RNOV OVER      ER RE        PO REP    ORT RT ONCO ON            COMIMIN NG  G CR CREW EW AS  ASSIG Shift Shi ft MgMgr:r:                                                                                                      SIGN  NM  MEN  ENTS TS Fie  ld Field Sup  Supv.
v.::                                                                                                          Insi Insidede SNP SNPO  O::
Admi Adm      n RC in RCOO:                                                                                                          Out Outsidsidee SNP SNPO O::
ANANPO: PO:
Uni Un    itt 33 Unitt Sup Uni      Supv.
v.::                                                                                                                                      Un Uniitt 44 RC RCO  O::                                                                                                                  Uni Unitt Sup    v.::
Supv.
NP NPO: O:                                                                                                                    RCO RCO::
NPO NPO::
Plan Pla  ntt Sta Stattusus Uniitt 33 Un Mode:
Mod  e:                                                                                                                                              Un Uniitt 44 Po  we                                                    22 Pow    r:
er:                                                                                                                  Mo Mode:  de:
MW                                                        44                                                                                                          1 MW e:  e:                                            549                                                                  Pow Powe    er:
r:
Gross                                              549 .5                                                                                                            100 100 Gro        Leakr ss Lea    kratatee::                            0.03                                                                MW MWe:
RC                                                                                                                                                                  759 S  Bo  ron RCS Bor on Connc: Co      e:                          124                                                                  Gro Gross  ss Lea Leakr krat  e::
ate 124 4                                                                                                          0.04 RCS RCS Bor  Boron on ConConc:e:                600 Op)f:a
  ;Ope  era    tio ti() na.l na.(Jo l Coll.cnc
                                  ~ii:ern l1S:s:
                                                ',') ,'1l;:::{:t;,\:\ ;',\}i"J
:*                                ~,\; }}~{i~,~t
-'TTr  ain rai  nA  A isis pro protect tecteded Turbi Tur  bin nee roll rollining g at 1800 RPM ready aut  omatic                                                                  to sync generator to grid        grid.. Increase load, place the feed autom      atic and and hol holdd power at 30% for a flu                                                                                                  feed regulatin ting x
flux ma mapp..                                                                   g valves in Pla  ce  uni  t Place unit on lin on    linee and increase power per 3-GOP-301 beginning with ste step  p 5.52.3 U3    An U3 An tici  ticipa patted ed LCLCO Ac  Acttio  ion  nss::                              I, Cu  rre Current:nt:              No None ne An Antici ticipat pated:ed:      No None  ne Tra Trainin AA is is pro protectectteded.. OLRM  RM is        is green          en (CD  (CDFF = 11.4  .422E-E-66;; LE LERRFF == 9.2 9.28E 8E--8) 8)..
U4 U4 AnAntic ticiipa patteded LC LCO  O AcActtioion    ns:  s:
Cu  rre Current: nt:              No None ne An Antici ticipat pated:ed: No    None  ne Tra Trainin AA isis pro protectectted ed.. OL OLRM RM isis gre          green    en (CD  (CDFF == 1.4  1.42E 2E--6; 6; LELER RFF == 9.2 9.28E 8E-
                                                                                                                                -8)8)..
Re Ressuults lts of ofOfOff fgogoi mg    Foocu cuss Ar ngF              Are    eaa:    :
See See g:\
g:\OOpps\C s\Com      mo ommon\0    n\0900 900
 
UnUniitt 33 St        Sta  atu  tuss Rea Re    acct  tororOp    Ope    era  ratortor Mode:
Mod      e:
Po                                              22                                    RCS Lea RCS        Leakr Powwe    er:r:                                  44 kraatete                                                  Acc Accum  umula MWe:e:                                                          Gross Gro  ss::                                                                                                      ulator torRef RefLev    Level  elss MW                                                                                                                       0.03gpm 0.03        gpm Ta                                              00              Unden Uni  identi  fiedd tifie AA                            661 66155 Tavvg:  g:                                      549.5.5 549                Charg 002gp 0.0    2 gpm    m                      BB RCS Pre                                                        Cha  rginingg PpsPps: :                                                                                                      664 66400 RCS          Press ssuure re::                  22355                                                                  0.01 0.01 gpm  gpm                          CC RC                                          223                                                                                                                                            662 66255 S
RCS Boron ConBo    ron    Conc:                124 e:            12444 i:;;}\Ah
            ,fi'finnrm          1 Ann lal **;",,'l **~~~
un .n\f[
citn;,,::
rc;(**I:.;t.\I;~j)}~;~
                                                                                ?i*;..i~;.?lU':'v:;:~;::***C(\Y'*{\:i*i;*l01'~~i?ii~i::/\*<1~:
Annun  uncicia    tor::                                                                                                              ;I;;\~:;.;:t~*~'~)r1;:i~\i:~~fl~(~*~,':::~%1]:l)*~:1~;~'?;~i':'
Ann              ator              None Non      abnorm e abn  ormalal                                                                                                                                              i;.'fiifr1l'i.iR,;;;,,*.liV.
Comp Com          Ac p Actions:tio  ns:
An  nun Annunciator:   cia  tor  :
Comp Com      p ActiActio    ns:
ons:
An    nun Annunciator: cia  tor  :
Comp Com            Actio p Acti        ns:
ons:
An    nun Annunciator    cia  tor::
Comp Com      p ActiActio    ns:
ons:
Annun Ann    unci  cia  tor::
ator Comp Com            Actio p Acti        ns:
ons:
An Annnun  unci cia  tor ator:   :
Comp Com          Actio p Acti        ns:
ons:
Annun Ann      unci  cia  tor::
ator Co    mp Comp Actitio  Ac      ns:
~                          ons:
An    nun Annunciato    cia  torr::
Comp Com            Ac  tio p Actions:   ns:
Annun Ann      unci ciaator tor::
Co    mp Comp Actiion  Act        s:
ons:
An Ann  nun unci ciaator tor::
Co    mp Comp Actiion Act          s:
ons:
Cu Curre  rrent  nt Te  Tec  chh Sp    ecc Ac Spe    Acttio ionn St Staate meent tem  ntss:: (D (Do  oes es Nott Inc  Includ T.S    .A. S    /
T.S.A.S ! Component:Co  mp    one nt:                                                              ludee F  "Fo  orr Tr Tra  acckikinm!  g On  Only  ly Ite Item No Nonene                                                                                                                  mss" Re Rea  aso  n:
son:
En Entr tryy Dat Date  e::
T.S    .A.
T.S.A.S ! CoS  /      mppon oneent:
nt:
Com Rea Reason:son  :
En Entr tryy Dat Date  e::
T.S  .A. S T.S.A.S ! Co    /        mppon oneent:
nt:
Com Re Rea aso  n:
son:
En Entrtryy Dat Date  e::
T.S T.S.A. S
        .A.S ! Co
                /    Com mppon oneent:
nt:
Re Reaaso    n:
son:
En  tryyDat Entr      Date  e::
TS T.S..A. S A.S !Co/    Com mppon oneent:
nt:
Rea Reason son: :
En  tryyDat Entr      Date  e: :
T.S T.S..A. S A.S !Co/    Com mppon oneent:
nt:
Re aso Rea      n:
son:
En tryyDat Entr      Date e: :
 
Chang Cha  ngees    to Ris s to    Riskk Sig Signifi nifcan Uniitt 33 St Un            Statuatus    s
  /~
icant    Equip t Equ    ipm me  nt:
ent :
Unit 3  Riskk isis GR Uni t 3 Ris          GREENEEN..
Upcom Upc  ominging Rea React    iviity ctiv    ty Man Managageem meent    Activ nt Act      itie iviti  s:
es:
Syncc gen Syn      genera erator tor toto grid grid.. Incr Increa easse    load,, plac e load      placee the the feed feed regu regulat ing latin    valves g valv    es inin auto automat matic ic and and hold hol d pow power er at at 30%
30% for for aa flux flux map map..
Upcom Upc  ominging Maj Major    POD Act or POD      Activ    itie iviti es:s:
Syncc gen Syn      generaerator tor toto grid grid.. Incr Increa easse    load, plac e load    placee the the feed feed regu regulat ing latin    valves g valv  es  in auto in  automat ic and and hold hold pow power er at at 30%
30% for aa flux map map..
Upcom Upc  ominging ECO ECOs  s to HanHang and lor    for Rel Releaeasse:
e:
,-  Nonee Non Evolu Evo    tio luti  ns or Com ons      Comp      enssatatoory pen          ry AcActtioionnss in Progress:
Tur  bine rolli Tur bine    rolling ng  at  18000 RPM rea  readdy y to sync genera    erator tor to grid. Pla beg beginn inniing ng wit withh ste step p 5.52.3. Inc                                                Plac cee uni unitt on line line and inc incrrea eassee power per 3-GOP Incrrea eassee load, place the feed reg                                                                    OP--30 301 1
map map..                                                                                ulat regu    ingg valves in latin                in auto automat matic ic and and hol hold d power atat 30%
30% for for aa flux Ge Genner  all Inf era    Infoorm rma atio tionn,, Re  maark Rem      rkss,, and and Op Ope  era torr Wo rato    Work rk Ar Arooun See    evo See evoluti    ons                                                                    d Sta und  Statustus::
lutio ns && com compensat      ory sato ry actions ons  abo abo  ve.
Tra in  A  is  pro                                                ve.
Tra in A is prottect ecte ed.
d.}}

Latest revision as of 23:32, 11 March 2020

301 Simulator Scenarios (Section 4)
ML101590390
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/28/2010
From:
NRC/RGN-II
To:
References
Download: ML101590390 (131)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Turkey Point Scenario No.: 1 1 Op Test No.: 2007-301 Examiners: Candidates: US RD RO BOP Initial Conditions: Mode 1, 1 75% Power, MOL, MDL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return to 100% power following a turbine valve test.

Turnover: Equipment OOS:DOS: 3B EDG due to failed fuel pump (OOS (DOS 22 days; next 0-OSP-023.3 AU 1 &

Att 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS (005 4 hrs; ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST -low- low discharge pressure (OOS (DOS 12 hr; ETR 36 hr)

Perform 3C ICWP isolation valve cycling test per step 7.1.3 of 3-0SP-019.3.

3-OSP-01 9.3. Steps 7.1.1 && 7.1.2 for 3A and 3B ICWP are not scheduled for this shift.

Known tube leak in 3A S/G SIG (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-0NOP-071.2, 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

I 1 (N) SRO/BOP 3-OSP-019.3 step 7.1.3.

3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 2 (I) RO/BOP Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = = T per 3-0NOP-059.8.

TSI SRO (TS,I) 3 See event 4a PT-3-1 604 fails low. The crew responds per 3-ARP-097.CR for annunciator PT-3-1604 TFS1ML3LT TFS1ML3L =T below 0-7/4.

D-7/4.

4 (C) BOP 3-ONOP-004.4. TS are Loss of 3C 4kV bus. The crew responds per 3-0NOP-004.4.

TFE2Z52S = = T evaluated for loss of the A SSGFWP.

(C TS) SRO (C,

4a (R) SRO/BOP PT-3-1 604 failure and requires manual action Automatic runback fails due to PT-3-1604 to reduce power < 60 % b-b level. The crew

% to avoid reactor trip on s/g 10-10 I RO (I) RD 3-ONOP-089.

responds per 3-0NOP-089.

TVFACN3O.1 TYFACN3 = 0.1 < 60% power, a 3C SG feed break occurs 5 (M) ALL Once reactor power stabilized <

TFW98M=T inside containment. A manual reactor trip is required before any SG level TCF1009M =

TCF1D09M = F drops < < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is TFL2XASE = = T MOV-3-1 409 breaker trips &

performed. The MOV-3-1409 & FCV-3-498 fails to close leaving TFL2XBSE = = T an uncontrolled feed path to 3C SG if 3A SGFP started.

6 (C) ALL C AFWP trips on overspeed prematurely at 6300 RPM (from setup). The trip TAFXSRPC =

= can not be reset. B B AFWP is OOS.

DOS. A AFWP starts, but runs out of steam eaoo.o 6300.0 pressure from the 3C feed line fault. Efforts to realign A AFWP to train 2 2 TCF5MTC == TT TCF5MTC steam are prevented by AFSS-3-007 stuck closed. SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < 345 gpm and is eventually required to initiate feed && bleed since all SGs << 32% narrow range with adverse containment conditions.

(R)eactivity, (I)nstrument, (N)ormal, (R)eactlvlty, (M)ajor (l)nstrument, (C)omponent, (M)aJor 1

1

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 ScenarioNo.:

Scenario No.:_1_ 1 EventNo.:

Event No.:_1_ Page 1 Page_1_

j_ofof_1_j_

EventDescription:

Event

Description:

30 ICWP 3C CWPdischarge dischargeisolation isolationvalve valvecycling cyclingtest testperper3-0SP-019.3 3-OSP-01 9.3 step step 7.1.3.

7.1.3.

=

Time Time J Position Position J Directs BOP Applicants Actions Applicant's Actions or or Behavior Behavior US US Directs BOP to to have have NSONSO cyclecycle 3C30 ICWP CWP discharge discharge isolation isolation valve, valve, 3 50-332 per 50-332 per 3-0SP-019.3, 3-OSP-019.3, sectionsection 7.1. 7.1.

Directs BOP Directs BOP start start 3B 3B ICWP ICWP && sid s/d 3C3C ICWP ICWP per per 3-0P-019 3-OP-Ol 9 section section 5.3.

5.3.

BOP BOP Obtains copies Obtains copies ofof 3-0SP-019.3, 3-OSP-019.3, section section 7.1 7.1 && 3-0P-019, 3-OP-019, section section 5.3.

5.3.

Perform s actions as Performs actions as follows: follow s:

1.

1. Starts 3B Starts 3B ICWP ICWP && stops stops 3C 3C ICWPICWP per per 3-0P-019 3-OP-019 section section 5.3 5.3 a.
a. Verifies NSO Verifies NSO understands understands ICWPs ICWPs to to be be started/stopped started/stopped
b. Directs NSO Directs NSO verify oil in 3B ICWP ICWP sightglass sightglass & & 3B 3B ICWP ICWP discha dischargerge valve open
c. Starts 3B ICWP & checks VPA ammeter> ammeter> zero
d. Directs NSO locally check 3B ICWP visible packing packing leakoff leakoff
e. Stops 30 3C ICWP & checks ammeter VPA ammet er ==zero
f. Directs NSO NSO locally do do post-st post-stopop check 2.
2. Has Has RO record 30 3C ICWP ICWP as as inoper inoperable.

able.

3.

3. Directs Directs NSONSO perform perform stepssteps 7.1.3.3 7.1.3.3 thru thru 7.1.3.6 7.1.3.6 NOTE NOTE:: NSO NSO has has signof signoff f proced procedure ure copycopy inin field field and and will will perform perform steps steps 7.1.3.3 7.1.3.3 thru thru 7.1.3.6 7.1.3.6 and and will will notify notify BOP BOP when when these these steps steps are are done.

done.

4.4. Starts Starts 30 3C ICWP ICWP per per 3-OP-0 3-0P-019 section 5.3 19 section 5.3 toto verify verify operab operability.

ility.

a.

a. Verifie Verifiess NSO NSO unders understands tands ICWPs ICWPs to to be be started started/stopped

/stopped b.b. Directs Directs NSO NSO verify verify oil oil inin 30 3C ICWP ICWP sightgl sightglass 3C ICWP ass && 30 ICWP discha rge valve discharge valve open open c.c. Starts Starts 303C ICWP ICWP && checks checks VPA VPA ammet ammeter> zero er> zero d.d. Directs Directs NSO NSO locally locallycheck check 30 3C ICWP ICWPvisiblevisible packin packing leakoff g leakoff 5.5. Has Has RO RO record record 30 3C ICWP ICWPas asback backininservice service. .

6.6. Since Sincethisthisisisthe thelast lastIOWP ICWPdischa discharge valvetotobe rge valve becycled cycled, stops

, stops 3B or 30 ICWP per 3B or 3C ICWP per 3-0P-019 3-OP-0 section5.3.

19 section 5.3.

a.a. Stops Stops3B 3Boror303CICWPICWP&&checks checksVPA VPAammetammeter er =zero zero b.b. Directs DirectsNSONSOlocally locallydo dopost-st post-stop check op check RO RO Record Records s 30 3CICWP ICWPOOS OOSand andreturn returntotoservice servicewhenwhenadviseadvised byBOP.

d by BOP.

11

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_ 1 Event Event No.:No.: _2_ 2 Page Page _1_ 1 ofof_2_2 Event

Description:

Event

Description:

Power range Power range NI NI channel channel N-42 N-42 upper upper detector detector fails fails high.

high. The The crew crew responds per responds per 3-0NOP-059.8.

3-ONOP-059.8.

Time

[_Time Position Position ApplicanVs Actions Applicant's Actions or or Behavior Behavior RO RO Recognizes // reports Recognizes reports PRNI PRNI channel channel N-42 N-42 upper upper detector detector failed failed high.

high.

  • . annunciator B-2/2, annunciator B-2/2, 3/6, 3/6, 5/5, 5/5, 6/1, 6/1, 6/3, 6/3, 6/4, 9/2 && G-5/1, 6/4, 9/2 G-511, 5/2 5/2
  • . N-42 power N-42 power range range channel channel indication indication on on console console fails fails high high
  • . N-42 axial N-42 axial flux flux indication indication on on console console fails fails high high
  • . N-42 upper N-42 upper detector detector indication indication on on NIS NIS racks racks fails fails high high NOTE: There NOTE: There are are no no immediate actions actions for for this this failure failure N-42 N-42 US 3-ONOP-059.8 Directs response per 3-0NOP-059.8 RO!

RO/ Performs subsequent actions of 3-0NOP-059.8 3-ONOP-059.8 as directed by US:

BOP 1. Places dropped rod mode switch for N-42 in BYPASS.

2. Places right rod stop bypass switch to bypass N-42.
3. Transfers upper section comparator defeat switch to N-42.
4. Transfers lower section comparator defeat switch to N-42.
5. Transfers right power mismatch bypass switch to bypass N-42.

6.

6. Transfers comparator channel defeat defeat switch switch to N-42.

N-42.

7.

7. Pulls Pulls instrument instrument powerpower fuses from N-42 N-42 drawer drawer BB US US Evaluates Evaluates impactimpact per per TS TS 3.3.1.

3.3.1. Table Table 3.3-13.3-1 units units 2, 2, 5, 5, 66 &1

& 17 apply.

7 apply.

Actions Actions 22 (6hr),

(6hr), 77 (lhr)

(1 hr)& & 1313 (6hr)

(6hr) all all in in effect.

effect.

Conducts Conducts crew crew brief brief regarding regarding effects effects of of N-42 N-42 failure failure and and of of tripping tripping bistables bistables as as directed directed in in 3-ONOP-059 3-0NOP-059.8 .8 BOP BOP Obtains Obtains keys, keys, opens opens doordoor toto and and trips trips following following bistables bistables inin protection protection channel channel II,II, rack rack 11:

11:

.* BS-3-422B1 BS-3-422B1 (OPiT (OPilT trip) trip)

.* BS-3-422B2 BS-3-422B2 (OPIiT (OPilT rod rod stop) stop)

.It BS-3-422C1 BS-3-422C1 (OTtT (OTilT trip) trip)

.* BS-3-422C2 BS-3-422C2 (OThT (OTilT rod rod stop) stop)

Closes Closes protection protection rackrack door doorwhen when done.done.

22

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-30 1 Scenario No.:

Scenario No.: _1_

1 EventNo.:

Event No.: _2_2 Page.....L Page 2 ofof_2_

2 Event

Description:

Event

Description:

Power range Power range NINI channel channel N-42N-42 u[2[2er upperdetector detectorfails fails high.

high. The The crew crew responds per 3-0NOP-059.8.

res[2onds [2er 3-ONOP-059.8.

Time

,.... Position Dosition Applicants Actions Applicant's Actions oror Behavior Behavior RD RO Monitors bistable Monitors bistable status status lights lights and and annunciator annunciator panels panels forfor expected expected indications while bistables being indications while bistables being tripped.tripped.

US US 1. Directs notification

1. Directs notification ofof I&e l&C
2. Directs
2. Directs STA STA monitor monitor QPTR QPTR perper 3-0SP-059.1 3-OSP-059.100(reactor (reactor power power approx. 75%)

approx. 75%)

3. Directs
3. Directs wee WCC generate generate clearance clearance for for tripped tripped bistables bistables 33

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: _1_ 1 No.: --l. Page Page _1_

Event Event No.: j of_1_

of ..i.

Event

Description:

Event

Description:

PT-3-1 604 fails PT-3-1604 fails low.

low. The The crew crew responds responds per per 3-ARP-097.CR 3-ARP-097.CR for for annunciator D-7/4.

annunciator D-7/4.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Acknowledges alarm Acknowledges alarm D-7/4.

D-7/4.

Perform actions Perform actions of of 3-ARP-097.CR 3-ARP-097.CR for for annunciator annunciator D-7/4.

D-7/4.

1.1. Recognizes/reports CV-3-2011 Recognizes/reports CV-3-201 1 openopen andand PT-3-1604 PT-3-1 604 failed.

failed.

2.

2. Determines no Determines other automatic no other automatic actions actions have have occurred.

occurred.

3. Determines reactor Determines reactor power increased due to CV-3-2011 CV-3-201 1 failure failure but still but still << 100%

100%

4. Determines SGFP suction pressure> pressure > 260 psig.
5. When directed by US, closes CV-3-2011. CV-3-201 1.
6. CV-3-1 900 closed.

Directs NSO verify CV-3-1900

7. Determines 2 HDPs running as required since turbine load>

450 MWe RO Reads 3-ARP-097.C 3-ARP-097.CR R for annunciator D-7/4 Observes decrease in Tavg & & increase in reactor power due to CV-3-2011 failure US US Directs Directs closure of CV-3-201 CV-3-20111 once once itit has has been been determined determined thatthat SGFP SGFP suction suction pressure>

pressure> 260 260 psig psig Determines Determines effects of PT-3-1 effects of PT-3-1604 failure (e.g, 604 failure (e.g, no no turbine turbine runback runback on on loss loss of of SGFP).

SGFP).

Conducts Conducts crewcrew brief brief regarding regarding effects effects of of PT-3-1 PT-3-1604 failure.

604 failure.

Directs Directs WCC WCC have I&C investigate have l&C investigate // fix fix PT-3-1604 PT-3-1604 failure.

failure.

IfIf QPTR QPTR directed directed in in event event 2,2, then then allows allows power>

power> 75%

75%

44

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_1 Event No.:

Event No.: 4/4a 4/4a Page Page_1_1 of of2 2 Event

Description:

Event

Description:

Loss of Loss of 3C 3C 4kV 4kV bus.

bus. 3B3B SGFP SGFP isis lost.

lost. Automatic Automatic run back fails runback fails due due toto PT-3-1 604 failure PT-3-1604 failure and and requires requires manual manual action action to to reduce power << 60 reduce power 60 % %

to avoid reactor trip to avoid reactor trip on S/9 on b-b s/g 10-10 level. The level. The crew crew responds responds per per 3-0NOP-3-ONOP-089 and 089 and 3-0NOP-004.4.

3-ONOP-004.4. TS TS are are evaluated evaluated for for loss loss ofof the the AA SSGFWP SSGFWP..

Time_J Position I II I It:: Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports loss Recognizes/reports loss of of 3B 3B SGFP SGFP

steam > feed feed flow) flow)

    • 3B SGFP breaker open indication indication with ammeter =0
  • . Slowly dropping level in all SGs Notices absence absence of runback and takes 3B SGFP control switch to to trip. Recognizes/reports Recognizes/reports failure of turbine to runback.

US US Directs performance of immediate actions per 3-ONOP-089 3-0NOP-089 including manual turbine runback to << 60% turbine load or as needed to reduce steam flow << available feedwater flow.

Verifies automatic automatic actions actions per per 3-ONOP-089 3-0NOP-089::

BOP BOP 1.

1. Manually Manually reduces reduces turbine turbine load load 2.
2. Performs Performs fast fast load load reduction reduction to to << 60%

60% turbine turbine load or as load or as needed needed to to reduce reduce steam steam flow flow << available available feedwater feedwater flow.flow.

3.

3. Verifies Verifies condenser condenser steam steam dumps dumps openopen as as necessary necessary based based on on Tavg-Tref mismatch.

Tavg-Tref mismatch.

4.

4. Verifies Verifies main main FW FW regulating regulating valves valves throttle throttle as as necessary necessary to to return return SG SG level level to to program program (60%).

(60%).

RO RO Verifies Verifies automatic automatic actions actions per per 3-ONOP-089 3-0NOP-089:  :

1.1. Verifies Verifies autoauto rod rod insertion insertion inin response response to to turbine turbine load load reduction reduction toto reduce reduce Tavg/Tref Tavg/Tref mismatch mismatch 2.2. Verifies Verifies PZR PZR level level && pressure pressure control:

control:

a.a. Charging Charging pump pump speed speed changes changes toto maintain maintain PZR PZR level level b.b. PZR PZR heaters heatersI /normal normalspraysprayfunction function as asneeded neededtoto maintain maintain PZR PZR pressure pressureapprox approx22352235 psig psig 55

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_1 Event Event No.:No.: 4/4a 4/4a Page Page _2_ 2 of of _2_

2 Event

Description:

Event

Description:

Loss of Loss of 3C 30 4kV 4kV bus.

bus. 3B3B SGFP SGFP is is lost.

lost. Automatic Automatic runback runback fails fails due due to to PT-3-1 604 failure PT-3-1604 failure and and reguires requires manual manual action action to reduce 120wer to reduce power << 60 60 %%

to avoid to avoid reactor reactor tril2 trip on on s/g b-b level.

s/q 10-10 level. The The crew crew resl20nds responds l2er per 3-0NOP-3-ONOP-089 and 089 and 3-0NOP-004.4.

3-ONOP-004.4. TS TS are are evaluated evaluated for for loss loss ofof the the AA SSGFWP.

SSGFWP.

Time__[

Time Position Position ApplicanVs Actions Applicant's Actions or or Behavior Behavior US US Directs subsequent Directs subsequent actions actions perper 3-0NOP-089.

3-ONOP-089.

BOP BOP Performs remainder Performs remainder of of subsequent subsequent actionsactions per per 3-0NOP-089.

3-ONOP-089.

1. Verifies SG levels and pressures stabilized
2. Verifies steam dumps closed.
3. Marks control room charts with date/time/cause date/time/cause of runback Performs remainder of subsequent actions per 3-0NOP-089. 3-ON OP-089.

RO 1. Verifies Tavg matches Tref

2. Verifies PZR level & pressure stabilized.
3. Marks control room charts with date/time/cause date/time/cause of runback BOP Determines loss of 3B SGFP due to loss of 30 3C 4kV bus US Directs actions per 3-ONOP-004 3-0NOP-004.4 .4 BOP Performs actions as directed by US per 3-ONOP-004 3-0NOP-004.4: .4:

1.

1. Stabilizes plant following manual turbine runback run back 2.
2. Determines Determines 3A 3A && 3B3B 4kV 4kV buses buses both both energized energized
3. Determines
3. Determines 3C 3C 4kV 4kV busbus lockout lockout tripped NOTE: Attempts Attempts mademade to to reset lockout lockout will be unsuccessful will be unsuccessful..
4. Directs
4. Directs FS/NSO FS/NSO locally locally investigate investigate 3C 3C 4kV 4kV busbus us US Directs Directs WCC WCC have have Electrical Electrical maint.

maint. investigate investigate 30 3C 4kV 4kV bus bus lockout.

lockout.

Determines Determines no no further further actions actions perper 3-ONOP-004 3-0NOP-004.4 can be

.4 can be performed performed until 3C 4kV until 30 4kV busbus lockout lockout reset.

reset.

Directs Directs SMSM to to review review 0-ADM-01 0-ADM-0111 to to see see ifif ERT ERT should should be be activated.

activated.

Directs Directs System System && DOS DCS 0-ADM-115 0-ADM-115 notification notification about about runback.

runback.

Directs Directs Ohemistry Chemistry notification notification to to sample sample ROSRCS (15% (15% power power change) change)

Determines Determines TS TS 3.7.1.6 3.7.1.6 Action Action a. a. (30 (30 days) days) applies applies forfor AA SSGFWP SSGFWP (if (iftime time permits this evaluation).

permits this evaluation).

Conducts Conducts crew crew brief brief regarding regarding effects effects ofof loss loss ofof 30 3C 4kV4kV bus.

bus.

66

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_ 1 No.: ~

Event No.:

Event ..... Pagelof_4_

Page .1... of 4 Event

Description:

Event

Description:

Once reactor Once reactor [:2ower power stabilized stabilized << 60% power, aa 3C 60% [:2ower, 30 SG SG feedfeed break break occurs inside containment.

occurs inside containment. AA manual manual reactor reactor tri[:2 trip isis reguired required beforebefore ani any SG level SG level dro[:2s drops << 10%

10% since since thethe automatic automatic reactor reactor tri[:2 trip isis failed.

failed. 3-EOP-3-EOP-E-0 isis [:2erformed.

E-O performed. The The MOV-3-1409 MOV-3-1 409 breaker trips &

breaker tri[:2s & FCV-3-498 FCV-3-498 fails fails to to close leaving close leaving an an uncontrolled uncontrolled feed feed [:2ath path to to 3C 30 SGSG ifif 3A3A SGFP SGFP started started..

.....Time Position lillie Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes and Recognizes and reports reports dropping dropping 3C 3C SGSG levels levels and and feedwater feedwater flows flows

steam > feed feed flow)flow)

  • . Slowly dropping level Slowly level in in all all SGs SGs Recommends manual rx Recommends rx trip before any SG level drops < 10% NR.

US US Determines a loss of FW flow is occurring and directs RO to Critical Critical manually trip the reactor before any SG level drops < < 10% NR.

Directs crew perform 3-EOP-E-0 immediate actions & & foldout page.

RD RO Performs immediate actions of 3-EOP-E-0:

1. Verifies reactor trip

. Rod bottom lights on & & RPIs RPls at zero

.* Rx trip && bypass bkrs open

.* Neutron Neutron flux decreasing decreasing 2.

2. Determines Determines SI SI eventually eventually actuates actuates on on SG SG pressure pressure txP>100 LlP>1 00 psi psi BOP BOP Performs Performs immediate immediate actions actions of of 3-EOP-E-0:

3-EOP-E-0:

1.

1. Verifies Verifies turbine turbine tripped tripped

.

  • Turbine Turbine stop stop valves valves closed closed

.* Closes Closes MSRMSR mainmain steam steam stop stop MOVs MOVs

.* Mid Mid &&East East GCBs GCBs open open 2.2. Verifies Verifies power power to to emergency emergency 4kV 4kV buses buses 3.3. Determines Determines both both 3A3A &&3B 3B 4kV 4kV buses buses energized energized with with 3D 3D 4kV 4kV bus energized bus energized from from 3B 3B 4kV 4kV bus bus RD RO Trips Trips RCPs RCPs ififsubcooling subcooling << 25[65]°F 25[65]OF per per 3-EOP-E-0 3-EOP-E-0 foldout foldout page.

page.

77

Appendix 0D Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_ 1 Event No.:

Event No.: _5_ 5 Page -2 Page 2 of_4_

of 4 Event

Description:

Event

Description:

Once reactor Once reactor power power stabilized stabilized << 60% 60% power, power, aa 3C30 SGSG feed feed break break occurs inside occurs inside containment.

containment. A A manual manual reactor reactor trip trip is is required before any required before any SG level SG level drops drops << 10%

10% since since the automatic reactor the automatic reactor trip trip is is failed.

failed. 3-EOP-3-EOP-E-0 is E-O is performed.

performed. The MOV-3-1409 MOV-3-1 409 breakerbreaker trips trips & & FCV-3-498 FCV-3..498 fails to leaving an close leaving an uncontrolled uncontrolled feed path path to 3C 30 SGSG ifif 3A 3A SGFP SGFP started.

Time e Position Position j Applicants Actions or Behavior Applicant's Behavior BOP Performs 3-EOP-E-0 foldout page actions when directed by US US

1. Isolates AFW to 3C (faulted) SG
2. Opens ADVs on 3A & 3B SG SG to stabilize RCS hot leg temp.

US Directs BOP verify prompt actions per 3-EOP-E-0 Attachment 3.

Directs RO continue performance of 3-EOP-E-0 subsequent actions.

BOP Verifies prompt actions per 3-EOP-E-0 Attachment 3:

1. Determines 3A, 3B, 3C, 30, 3D & 3H 480V LCs LOs energized
2. Determines status of MSIVs MSIV5 (still open) and closes them if any MS isolation signal actuated (should not be).
3. Verifies FW isolation:
a. Determines FCV-3-498 not closed. Attempts unsuccessfully unsuccessfully to close valve using controller. Determines other 2 main FW regulating valves closed.
b. Determines all main FW regulating bypass valves closed.
c. Closes MOV-3-1 MOV-3-1407 407 & 1408.

1408. Determines MOV-3-1 MOV-3-1409 409 has no power. Directs NSO to locally close valve.

d. Determines A SSGFWP not available & BB SSGFWP SSGFWP off.
4. Verifies at least 2 ICWPs running, POV-3-4882 & 4883 closed with lOW ICW headers tied together.
5. Verifies 33 CCWHXs in service, 3A & 3B CCWPs running, COW CCW headers headers tied together & & MOV-3-626 MOV-3-626 open. open.
6. Determines Determines 22 ECCs ECCs & & all all 33 ECFs running.

7.

7. Determines Determines allall 44 HHSIPs HHSIPs & & 22 RHRPs running
8. Determines RCS pressure> 1600 1600 psig (no(no HHSI HHSI flow) 9.
9. Shuts down both Shuts down both unitunit 44 HHSIPs HHSIPs 10.
10. Determines Determines allall containment isolation isolation phase phase A valvesvalves closed.

closed.

88

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 11 No.: ~

Event No.:

Event 5 Page -..2..

Page 3 ofof ~ 4 Event

Description:

Event

Description:

Once reactor Once reactor power power stabilized stabilized << 60% 60% power, power, aa 3C 3C SG SG feedfeed break break occurs inside occurs inside containment.

containment. AA manual manual reactor reactor trip trip isis required required before before any any SG level SG level drops drops << 10%

10% since since thethe automatic automatic reactor reactor trip trip isis failed.

failed. 3-EOP-3-EOP-E-O performed. The E-0 isis performed. The MOV-3-1409 MOV-3-1 409 breaker breaker trips trips && FCV-3-498 FCV-3-498 fails fails to to close leaving an uncontrolled close leaving an uncontrolled feed feed path path toto 3C 30 SG SG ifif 3A3A SGFP SGFP started.

started.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Continues prompt Continues prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 AttachmentAttachment 3: 3:

1 1. Determines

11. Determines all all SI SI valves valves in in proper proper injection injection alignment alignment
12. Resets
12. Resets SI SI && containment containment isolation isolation phase phase A. A.
13. IfIf RCPs
13. RCPs running, running, opens MOV-3-1417 MOV-3-1417 & & 1418 1418 then then resets/starts resets/starts all available all available NCCs.
14. Determines containment pressure remained < 20 psig.
15. Determines containment ventilation isolated and control room ventilation in proper emergency recirculation alignment.
16. Directs NSO place PAHMS in service per 3-0P-094. 3-OP-094.
17. Verifies 3A & both U4 EDGs running (3B EDG is OOS).
18. Determines 3A, 3B & 3D 4kV buses still energized.
19. Notifies US that prompt action verification complete.

RO Performs subsequent actions of 3-EOP-E-O as directed:

1.

1. Determines no AFWPs will be running.
a. A AFWP slowly losing steam supply as 30 3C SG depressurizes through the the FW FW break break into into containment.
b. BAFWPOOS
b. BAFWP OOS c.
c. C C AFWP AFWP started, started, increased increased speedspeed but but then then mechanically mechanically tripped. Directs Directs NSO NSO investigate investigate C AFWP and C AFWP and attempt attempt toto reset reset trip trip (3-ONOP-07 (3-0NOP-075 Att. 44 may 5 Att. may be be used used for for guidance).

guidance).

2.

2. Determines Determines AFW AFW valvevalve alignment alignment proper proper 3.
3. Recognizeslr Recognizes/reports eports SGs SGs levels levels & & AFW AFW flow flow 4.
4. Determines Determines RCP RCP thermal thermal barrier barrier alarms alarms off.off.

5.

5. Determines Determines RCS RCS temptemp dropping dropping due due toto feed feed break.

break. Limits Limits AFW AFW flow flow toto 345

=345 gpmgpm ifif directed directed to to reduce reduce cooldown.

cooldown.

6.

6. Determines Determines PZR PZR PORVs, PORVs, normalnormal spray, spray, auxaux spray spray && excess excess letdown letdown isolation isolation valves valves closed.

closed.

7.7. Stops RCPs ifif running Stops RCPs running && triptrip criteria criteria met met 8.8. Determines Determines 3C 3C SGSG faulted.

faulted.

99

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _1_

1 No.: _5_

Event No.:

Event 5 Page~of_4_

Page 4 of 4 Event

Description:

Event

Description:

Once reactor Once reactor l20wer power stabilized stabilized << 60% power, aa 3C 60% l2ower, 30 SG SG feed feed break break occurs inside occurs inside containment.

containment. AA manual manual reactor reactor tril2 trip isis reguired before an~

required before any SG level SG level drol2s drops << 10% since the 10% since the automatic automatic reactor reactor tril2 trip is is failed.

failed. 3-EOP-3-EOP-E-0 is E-O is l2erformed.

performed. The The MOV-3-1409 MOV-3-1 409 breaker breaker tril2s trips && FCV-3-498 FCV-3-498 fails fails to to close leaving close leavinq anan uncontrolled uncontrolled feed feed l2ath path to to 3C 30 SGSG ifif 3A3A SGFP SGFP started.

started.

Time Position Position Applicants Actions or Applicant's or Behavior Behavior US 1.

1. If all SG levels <

If < 6[32]% and AFW flow < < 345 gpm at 3-EOP-E-O step 8, directs transition to 3-EOP-FR-H.1.

3-EOP-FR-H.1.

2. Determines 3C SG faulted
3. Directs STA monitor CSFSTs (red path on Heat Sink CSF)
4. 3-EOP-FR.H.1 Directs transition to 3-EOP-FR.H.1 10 10

Appendix D Appendix D Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.: _ 1_

Scenario No.: 1 No.: _6 Event No.:

Event 6_ Page _1_

Page 1 of of --2...

2 Event

Description:

Event

Description:

CC AFWP AFWP tril2s trips on on oversl2eed overspeed I2rematurely prematurely at at 6300 RPM (from 6300 RPM (from setul2}.

setup). TheThe trip can tril2 can not not be reset. BB AFWP be reset. AFWP is is OOS.

OOS. A A AFWP AFWP starts, starts, but but runs runs out out ofof steam I2ressure steam pressure from from the the 3C 3C feed feed line line fault.

fault. Efforts Efforts to to realign realign A A AFWP AFWP to to train 22 steam train steam are are I2revented prevented by by AFSS-3-007 AFSS-3-007 stuck closed. SSGFW SSGFW can not be used due to loss of 3C 4kV bus and a dead batte!y battery on B B SSGFWP. The crew transitions to 3-EOP-FR-H.1 when AFW flow < < 345 qpm and gl2m and is eventually eventually reguired required toto initiate feed & & bleed since since all SGs <<

all SGs narrow range 32% narrow range with adverse adverse containment containment conditions.

Time Position Applicants Actions or Behavior Applicant's US Directs response per 3-EOP-FR-H.1.

Performs actions per 3-EOP-FR-H.1 as directed by US:

RCO 1. Determines RCS pressure> intact SG pressure

2. Determines RCS Tavg >350°F BOP Performs actions per 3-EOP-FR-H.1 as directed by US:
1. Per step 2 Caution, informs US that all SG narrow range level << 32%

US Since all narrow range SG levels << 32%, directs immediate transition to steps 11-19 of 3-EOP-FR-H.1.

Critical Directs initiation of feed & & bleed per steps 11-19 of 3-EOP-FR-H.1.

RO Performs actions of 3-EOP-FR-H.1 as directed by US:

1.

1. Determines SI & containment isolation phase A already initiated Critical 2. Stops all running RCPs
3. Determines 2 HHSIPs HHSIPs running & SI valves in proper injection alignment
4. Determines PORV block MOVs open and energized Critical 5.
5. Opens bothboth PORVs PORVs for adequate adequate RCS bleed bleed path.

path.

6.

6. Determines Determines CV-3-2803 CV-3-2803 open (IA to containment) containment) 7.
7. Determines Determines SI SI &

& containment isolation isolation phase A already already reset.

8.

8. Determines Determines both unit 33 HHSIPs both unit running &

HHSIPs running & both both unit unit 44 HHSIPs HHSIPs already already stopped and in stopped and in standby.

standby.

11 11

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 11 Event No.:

Event No.: _6_ 6 Page--L Page 2 of of--L 2

Event

Description:

Event

Description:

CC AFWP AFWP tril2Strips on on oversl2eed overspeed I2rematurely prematurely at at 6300 6300 RPMRPM (from (from setul2).

setup).

The trip can not be reset.

The tril2 can not be reset. BB AFWP AFWP isis OOS.

OOS. AA AFWPAFWP starts, starts, but but runs runs out of out of steam steam I2ressure pressure fromfrom the the 3C 3C feed feed line line fault.

fault. Efforts Efforts to to realign realign AA AFWP to AFWP train 22 steam to train steam are are I2revented prevented by by AFSS-3-007 AFSS-3-007 stuck stuck closed.

closed.

SSGFW can SSGFW can not not be be used used due due toto loss loss of of 3C 3C 4kV4kV bus bus and and aa dead dead battery battery on BB SSGFWP.

on SSGFWP. The The crew crew transitions transitions toto 3-EOP-FR-H.1 3-EOP-FR-H.1 when when AFW AFW flow flow

<<345 gpm and 345 gl2m and isis eventually required to eventually reguired to initiate feed &

initiate feed & bleed bleed since since all all SGs << 32%

SGs 32% narrow narrow range range with with adverse adverse containment containment conditions.

conditions.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Performs actions Performs actions of of 3-EOP-FR-H.1 3-EOP-FR-H.1 as as directed directed by by US:

US:

11 . Reverifies

. Reverifies SI SI && phase phase A A equipment equipment actuated actuated using using 3-EOP-E-0 3-EOP-E-0 Attachment 33 (performed Attachment (performed withwith same same results results as in as in event event 5).

5).

2. Determines status of Determines placing PAHMS of placing PAHMS in in service (directed (directed NSONSO to do this in event 5). Completes PAHMS alignment in control room 3-OP-094 if NSO reports field actions complete.

per 3-0P-094 US Determines RCS heat removal adequate.

TERMINATING TERMINATING CUE Scenario terminated when feed & bleed alignment complete (3-CUE EOP-FR-H.1 step 22).

12 12

Appendix 0D Appendix Scenario Outline Scenario Outline Form Form ES-O-1 ES-D-1 Facility:

Facility: Turkey Point Turkey Point Scenario No.:

Scenario No.: 11 Op Test No.:

Op Test No.: 2007-301 2007-30 1 Examiners:

Examiners: Candidates:

Candidates: US US RO RO BOP BOP Initial Conditions:

Initial Conditions: Mode 1, Mode 1, 75%

75% Power, Power, MOL, MOL, Awaiting Awaiting permission permission from from plant plant management management to to increase increase powerpower back back to 100%.

to 100%. 3-GOP-301 3-GOP-301 inin use use complete complete through through stepstep 5.96 5.96 for for retum return to to 100%

100% power power following following aa turbine valve turbine valve test.

test.

Turnover:

Tumover: Equipment OOS:

Equipment OOS: 3B EDG due 3B EDG due to to failed failed fuel fuel pump pump (OOS (OOS 22 days; days; next next performance performance of of O-OSP-0-OSP-023.3 in 023.3 in 44 hrs);

hrs); BB AFW AFW PumpPump due due to bearing failure to bearing failure (OOS (OOS 44 hrs; hrs; ETR ETR 24 24 hrs);

hrs); 3B3B CSP CSP due due to to failed 1ST failed 1ST -low

- low discharge discharge pressure pressure (OOS (OOS 12 12 hr; hr; ETR ETR 36 36 hr) hr)

Perform 3C Perform ICWP isolation 3C ICWP isolation valve valve cycling cycling test test per perstep 7.1.3 of step 7.1.3 of 3-0SP-019.3.

3-OSP-019.3. Steps Steps 7.1.1 7.1.1 && 7.1.2 7.1.2 for 3A andand 3B ICWPICWP were completed completed by by the offgoing offgoing shift.

Known tube Known tube leak leak inin 3A 3A S/G S/G (2 (2 gpd) gpd) - unchanged unchanged for for last last week.

week. Chemistry Chemistry samples samples are are being being taken per taken per 3-0NOP-071.2, 3-ONOP-071 .2, Attachment Attachment 1. 1. The The current current sample, sample, just completed completed indicates indicates no no significant change in leak rate. MOV-3-1403 remains open at management direction direction due due to small stability of tube leak size and stability leak rate.

rate.

Event Event Type*

Event Type* Event Description No.

No.

1 1 (N)SRO/BO (N) SRO/BOP P 3C ICWP discharge isolation valve cycling test per 3-0SP-019.3 3-OSP-019.3 step 7.1.3.

22 (I) RO/BOP Power range NI channel N-42 upper detector fails high. The crew responds TFN1P2AH = T TFN1P2AH T (TSI)SRO per 3-0NOP-059.8.

(TS,I) SRO 33 See See event 4a PT-3-1 604 fails low. The crew responds per 3-ARP-097.C PT-3-1604 3-ARP-097.CR R for annunciator TFS1 ML3L = T TFS1ML3L T below D-7/4.

0-7/4.

44 (C) BOP Loss of 303C 4kV bus. The crew responds per 3-ONOP-004 3-0NOP-004.4. .4. TS are TFE2z525 TFE2Z52S == TT evaluated for loss of the A SSGFWP.

(C (C, TS) SRO 4a 4a (R) SRO/BOP Automatic runback fails due to PT-3-1 PT-3-1604 604 failure and requires manual action (I to reduce power << 60 % to avoid reactor trip on slg b-b on s/g 10-10 level. The crew (I) RO responds per 3-ONOP-089 3-0NOP-089..

55 TVFACN3O.1 TVFACN3 = 0.1 (M) ALL Once reactor power stabilized << 60% power, aa 3C SG feed break occurs TFW98M TFW98M=T = T inside containment. A manual manual reactor trip is is required before any any SGSG level level TCF1009M=F TCF1D09M = F drops drops << 10%

10% sincesince the the automatic automatic reactor trip trip is is failed. 3-EOP-E-0 3-EOP-E-0 is is TFL2XAS TFL2XASE ==T T performed. The The MOV-3-1 MOV-3-1409 409 breaker breaker trips trips && FCV-3-498 fails to to close close leaving leaving TFL2xBsE=T TFL2XBSE = T an an uncontrolled uncontrolled feed path path to to 303C SGSG ifif 3A 3A SGFP SGFP started.

started.

66 (C)

(C) ALL ALL CC AFWP AFWP tripstrips onon overspeed overspeed prematurely prematurely at at 6300 6300 RPM RPM (from (from setup).

setup). The The trip trip TAFXSRPC TAFXSRPC =

= can can not not be reset. BB AFWP be reset. AFWP is is OOS.

OOS. A A AFWP AFWP starts, starts, but but runs runs outout ofof steam steam 6300.0 6300.0 pressure pressure fromfrom thethe 303C feed line fault.

feed line fault. Efforts Efforts to to realign realign A A AFWP AFWP to to train train 22 TcF5MTC=T TCF5MTC = T steam steam areare prevented prevented by by AFSS-3-007 AFSS-3-007 stuck stuck closed.

closed. SSGFW SSGFW can can not not bebe used used due to loss due to loss ofof 303C 4kV 4kV bus and aa dead bus and battery on dead battery on BB SSGFWP.

SSGFWP. The The crew crew transitions transitions to to 3-EOP-FR-H 3-EOP-FR-H.1 .1 when when AFW AFW flowflow << 345 345 gpm gpm andand is is eventually eventually required required to to initiate feed && bleed initiate feed bleed since since all all SGs SGs << 32% 32% narrow narrow range range withwith adverse adverse containment containment conditions.

conditions.

(N)ormal, (N)ormal, (R)eactivity, (R)eactlvity, (l)nstrument, (I)nstrument, (C)omponen (C)omponent, t, (M)ajor (M)aJor 11

TP-2007-301 Scenario TP-2007-301 Scenario #1 #1 Event Event Description Description Turkey Point Turkey Point 2007-301 2007-301 Scenario Scenario #1 #1 Event 11 --30 Event ICWP discharge 3C ICWP discharge isolation isolation valve valve cycling cycling test per 3-0SP-019.3 test per 3-OSP-019.3 step step 7.1.3 7.1.3 Event 22 - Power Event - Power range range NI NI channel channel N-42 N-42 upper upper detector detector fails fails high.

high. The The crew crew responds responds per per 3-3-

ONOP-059.8.

ONOP-059.8.

Event 33 - PT-3-1604 Event - PT-3-1604 fails fails low.

low. The The crew crew responds responds per per 3-ARP-097.CR 3-ARP-097.CR for annunciator 0-7/4.

for annunciator D-714.

Event 44 - Loss Event - Loss ofof 3C 4kV bus.

30 4kV bus. The The crew crew responds responds per 3-ONOP-004.4. TS per 3-0NOP-004.4. TS are are evaluated evaluated for for loss loss of the of the AA SSGFWP.

SSGFWP.

Event 4a Event 4a - Automatic run

- runback back fails due to PT PT-3-1 604 failure and requires manual action to 1604 reduce reduce power <

< 60 % avoid reactor

% to avoid reactor trip on slgs/g 10-10 b-b level.

level. The crew crew responds responds per per 3-0NOP-3-ONOP-089.

Event 55 - Once Event - Once reactor power stabilized <<60% 60% power, a 3C 30 SG feed break occurs inside containment. A containment. A manual reactor trip is required before any SG level drops < 10% since the automatic reactor trip is failed. 3-EOP-E-0 is performed. The MOV-3-1409 automatic MOV-3-1 409 breaker trips & FCV-FCV 3-498 fails to close leaving an uncontrolled feed path to 3C 3-498 fails 30 SG if 3A SGFP started.

Event 66 - C Event - C AFWP AFWP tripstrips on overs overspeed peed prematurely at 6300 RPM (from setup). The trip can not be reset.

be reset. B B AFWP AFWP is is OOS. A AFWP starts, but runs out of steam pressure from the 3C 30 feed line fault. Efforts fault. Efforts toto realign A AFWP to train 2 steam are prevented by AFSS-3-007 stuck closed.

SSGFW SSGFW can not be used due to loss of 3C 4kV bus and a dead battery on B SSGFWP. The crew transitions transitions to 3-EOP-FR-H 3-EOP-FR-H.1 .1 when AFW flow << 345 gpm and is eventually required to initiate feed & bleed since all SGs <

initiate < 32% narrow range with adverse containment conditions.

22

TP-2007-301 Scenario TP-2007-301 Scenario #1 Event Description

  1. 1 Event Description Scenario XXIII NRC Scenario NRC 1I Simulator Operating Simulator Operating Instructions Instructions Setup 10-16 (75%

IC-16 (75% MOL)MOL)

Place simulator Place simulator in run in run Trigger lesson steps:

SETUP - AUTO REACTOR TRIP FAIL (actuates

- (actuates TFL2XASE TFL2XASE == T, T, TFL2XBSE TFL2XBSE == T,T, TFL2XASE TFL2XASE == FF when when IML2CRXT && TFL2XBSE == FF when IML2CRXT)

IML2CRXT ML2CRXT)

SETUP - 3B EDG

- EDG OOS DOS (actuates (actuates TA05LRSB TAQ5LRSB == OFF OFF (0)

(0) && TA05B20P TAQ5B2OP == RACKOUT RACKOUT (3)) (3))

SETUP - B AFWP OOS

- DOS (actuates TAFK244 == 0.0, TAFK002 TAFKOO2 == 0.0, TAFF01B TAFF01 B == 0.0, TCF5MTB == T)

SETUP - 3A SG 2 GPO

- GPD LEAK (actuates TVHHSGA = 0.0000013)

SETUP - 3B CSP OOS (actuates

- (actuates TAM1DPOB TAM1 DPOB == RACKOUT RACKOUT (3) (3) & TCM1 D41 M

& TCM1D41 M == FALSE)

FALSE)

SETUP - C AFWP OVERSPEED

- OVERSPEED TRIP (actuates (actuates TAFXSRPC =6300.0, TCF5MTC == Twhen T when F50SlAFC F50SAFC EQ 6290)

EO Start 3A ICWP and stop 3B ICWP. (Leave 3A & 3C 30 ICWP running). Start train A chilled water and secure train B chilled water (CR HVAC panel).

Acknowledge annunciators F-9/2 Acknowledge F-912 & F-9/5 (3B EDG) and place simulator in freeze.

Place clearance info tags on 3B EDG normal start switch, B AFWP T& T&T T valve control switch & 3B CSP control switch.

Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X.

3-ONOP-071 .2 Att 1.

Provide shift turnover checklists and 3-0NOP-071.2 Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on VPA to Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3).

Fill in blender & shutdown boron addition placards at console blender station. Data for each IC may be found in the ECC & Shutdown Guidelines Book in the simulator I/F.

Event I1 - 3C ICWP discharge isolation valve test Initiated from shift turnover immediately after shift turnover.

The crew will start 3B 38 ICWP & & stop 3C ICWP per 3-OP-019 3-0P-019 section 5.3, then NSO begins performing 3-OSP-019.3 3-0SP-019.3 step 7.1.3.

Respond Respond as as NSO NSO ifif directed directed to perform perform pre-start checks checks for 3B 3B ICWP ICWP & post-shutdown

& post-shutdow n checks for 30 ICWP. Report 3C ICWP. Report all conditions normal.

Step 7.1.3.1 Step 7.1.3.1 - Done

- Done byby securing 30 3C ICWP.

ICWP.

Step Step 7.1.3.2 7.1.3.2 - Call

- as NSO Call as NSO andand request RD RO loglog 3C3C ICWP ICWP inoperable.

inoperable.

Step Step 7.1.3.3 7.1.3.3 - Trigger

- Trigger lesson lesson step step EVENT EVENT I1 - REMOVE 3AD05

- 3AD05 CLOSE CLOSE CKT CKT FUSES FUSES (actuates (actuates TFK2GO5A TFK2G05A == T)T) 33

TP-2007-301 Scenario TP-2007-301 Scenario #1 #1 Event Event Description Description Step 7.1.3.4 Step 7.1.3.4 - Trigger

- Trigger lesson lesson step step EVENT EVENT 1I - CLOSE

- CLOSE 3-50-332 3-50-332 (actuates (actuates TAKB332 TAKB332 == 0.00.0 on on 60 60 ramp), then trigger lesson step sec ramp), then trigger lesson step EVENT 1I - OPEN sec EVENT - OPEN 3-50-332 3-50-332 (actuates (actuates TAKB332 1.0 on TAKB332 == 1.0 on 60 60 sec ramp).

sec ramp).

Step 7.1.3.5 Step 7.1.3.5 - Trigger

- Trigger lesson lesson step EVENT 1I - INSTALL step EVENT - INSTALL 3AD05 3AD05 CLOSECLOSE CKT CKT FUSES FUSES (actuates TFK2G05A (actuates TFK2GO5A == F). F).

Step 7.1.3.6 Step 7.1.3.6 - NSO

- NSO field field verification verification of lights on of lights on 3AD05.

3AD05.

Step 7.1.3.7 - Respond Step 7.1.3.7 - Respond as as NSO NSO when when directed directed to to do do pre-start pre-start checks checks on on 3C 3C ICWP ICWP and and report pump report pump ready.

ready. Respond Respond as NSO when as NSO when directed directed to to do post-start checks and do post-start checks and report report pump running pump running normally.

normally.

Step 7.1.3.9 Step 7.1.3.9 - Respond

- Respond as as NSO NSO whenwhen directed directed to to perform perform post-shutdown post-shutdown checks checks on on ICWP just shutdown.

ICWP just shutdown. Report pump Report pump shutdown shutdown satisfactorily.

satisfactorily.

Event 2 - PRNI N-42

- N-42 upper upper detetctor fails high 3-OSP-019.3 step 7.1.3 complete, trigger lesson step EVENT 2 - PRNI N-42 Once 3-0SP-019.3 -

UPPER DET FAILS HIGH (actuates P2AH =

(actuates TFN1 P2AH T).

= T).

This actuates annunciators 8-2/2, B-2/2, 3/6, 5/5, 6/1, 6/3, 6/4, 9/2 The crew responds per 3-0NOP-059.8 3-ONOP-059. 8 and takes PRNI N-42 out of service per steps 5.1.1.1 thruthru5.1.1.7.

5.1.1.7.

Step 5. 5.1.1.1

1. 1. 1 actuates 8-8/4. B-8/4.

Step 5.1.1.2 clears 8-6/3. B-6/3.

Step 5.1.1.3 clears 8-2/2. B-2/2.

Step 5. 5.1.1.6

1. 1.6 clears 8-6/4.B-6/4.

Step 5.1.1 .7.a - Respond as AOM/I&C if asked whether or not to pull instrument fuses.

5.1.1.7.a -

Reply that fuses should be pulled. All annunciators clear except 8-6/1, B-6/1, 6/5 & 8/4.

Step 5.1.1 .7.c - Tripping bistabies 5.1.1.7.c bistables actuates B-3/5,8-3/5, 3/6 & & reflash ref/ash for B-5/5.

8-5/5.

Step 5.1.1.8 - Respond as WCC/I&C

- WCC/l&C when called regarding N-42 failure.

Step 5.1.1.9 5.1.1.9 - Respond as Rx Engineering Engineering I STA when directed directed to perform aa QPTR Step 5.1.1.10 - Not applicable.

Step 5.1.1.11 Step 5.1.1.11 - Respond Respond as as WOO WCC ifif directed directed to generate generate ECO ECO for tripped tripped bistables.

Event 33 - PT-3-1 Event -

PT-3-1604 604 fails low low After PRNI After PRNI N-42 N-42 takentaken outout of of service, service, trigger trigger lesson lesson step step EVENT EVENT 3- 3 - PT-3-1604 PT-3-1604 FAILS LOW FAILS LOW (actuates (actuates TFS1 TFS1 ML3L ML3L = T).

T).

PT PT-3-16041604 failure cause cause CV-3-20 CV-3-2011 11 to to automatically automatically open open and and itit is is failed that that way way to to prevent prevent closure closure from from thethe console console control control switch.

switch. The The crew crew responds responds per per 3-ARP-097.

3-ARP-097.CR CR for annunciator for annunciator 0-7/4. D-7/4.

Respond Respond as as NSO NSO ifif directed directed to to verify verify CV-3-1 CV-3-1900 closed. Click 900 closed. Click on Schema~

on Schema>

FEEDWATE FEEDWATER R HEATING HEATING~HIGH >HIGH PRESS PRESS FW FW HEATERS HEATERS && RHTR RHTR && HTR HTR DRAINDRAIN TANKS>r TANKS~report eport CV-3-1 CV-3-1900900 position position (see (see farfar right right side side of of mimic).

mimic).

Crew should Crew should determine determine SGFP SGFP suction suction pressure pressure> 260 psig

> 260 psig with with 22 HDP5 HOPs running running so so fast fast load load reduction reduction isis not not required.

required.

44

TP-2007-301 Scenario TP-2007-301 Scenario #1 Event Description

  1. 1 Event Description Event 44-- Loss Event Loss of of 3C3C 4kV4kV bus bus The plant The plant is is stabilized stabilized following following CV-3-2011 CV-3-2011 failure failure open, open, trigger trigger lesson step EVENT lesson step EVENT 4 LOSS OF 3C 4KV BUS 4 - LOSS OF 3C 4KV BUS (actuates TFE2Z52S == T).

- (actuates TFE2Z52S T).

This causes This causes aa loss loss of of 383B SGFP.

SGFP. The The crew crew may may take the 38 take the 38 SGFP SGFP control control switch switch to to STOP which STOP which ordinarily ordinarily would would openopen thethe breaker breaker and and initiate initiate automatic turbine runback.

automatic turbine runback.

Since the Since the PT-3-1604 PT-3-1604 failure failure inin event event 33 also also defeats defeats the automatic loss the automatic loss ofof SGFP SGFP turbine turbine runback, the runback, the crew crew must must manually manually run run back back power power to to << 60%

60% per 3-ONOP-089. The crew per 3-0NOP-OS9. The crew should also respond should also respond per per 3-0NOP-004.4 3-ONOP-004.4 due due to loss of to loss the 3C of the 3C 4kV 4kV bus.

bus. TSTS are are evaluated for evaluated for the the loss loss ofof the the AA SSGFWP.

SSGFWP.

Respond ifif called Respond called as as NSO NSO to investigate 3C to investigate 3C 4kV 4kV bus.

bus. After After 1-3 1-3 min, mm, report report that that the the lockout relay has actuated lockout relay has actuated and the bus and the bus enclosure enclosure smells smells of of overheated overheated insulation.

insulation, IfIf directed to reset directed reset 3C 4kV bus 3C 4kV lockout relay, bus lockout relay, report report that that the the lockout will will not not reset.

reset.

Respond if called as WCC/Electrical WCC/Electrical to investigate 3C 4kV bus lockout. lockout. Do not fix this malfunction before the end of the scenario.

malfunction Respond if called as System & Duty Call Supervisor per O-ADM-115.

Respond O-ADM-1 15.

Respond if called as SM to review O-ADM-011 O-ADM-O1 I regarding need for an ERT.

Respond if called as Chemistry about RCS sampling following a a>> 15% power change.

Respond as NSO if directed to cross-tie E MCCs MCC5 per 3-OP-007 3-0P-007 sect 7.1. No further action required during this scenario.

Event 55 - 3C SG main feed line failures After the plant is stabilized <60% < 60% power, at lead examiner direction, trigger lesson step EVENT 5 - 3C FW step EVENT 5 - 3C FW LINE FAIL LINE FAIL (actuates TVFACN3 ==0.1, (actuates TVFACNS TFVV98M ==TT && TOF1 0.1, TFVV98M DO9M =F).

TCF1D09M F). A main main feed break break occurs on 3C feed line inside containment. A manual manual reactor trip is required before before any any SGSG level level drops << 10% 10% since since thethe automatic automatic reactor trip is is failed. 3 EOP-E-0 EOP-E-O is performed.

performed. The MOV-3-1409 breaker breaker trips && FCV-3-498 FCV-3-49S fails to close. This creates a feed path path toto the faulted 3C 3C SG SG should should feed be be restored.

restored.

55

TP-2007-301 Scenario TP-2007-301 Scenario#1#1 Event EventDescription Description Events 66 - Loss Events Loss of ofAFWAFWII Heat Heat sink sink Entered upon Entered upon completion completion of of3-EOP-E-O 3-EOP-E-O steps steps 1-4.

1-4.

C AFWP trips on oversp eed C AFWP trips on overspeed prematurely at premat urely at6300 6300RPM RPM(from (from setup).

setup). TheThe trip trip can can not notbebe reset. BB AFWP reset. AFWPisis OOS. OOS. AA AFWPAFWP starts, starts, butbutrunsruns out outof ofsteam steampressure pressure from from the feed the feed line fault line fault onon 3C3C feed feedline.

line. Efforts Efforts to to realign realign AA AFWP AFWP toto train train 22 steam steam isisprevented preventedby by AFSS-3-007being AFSS-3-007 being stuck stuck closed.

closed. SSGFW SSGFWcan can notnotbebe used used due due toto aa dead deadbattery battery on on BB SSGFWP (A SSGFWP (A SSGFWP SSGFWP not not available available due due to to loss loss of 3C 4kV bus). The crew transitions to of3C 4kV bus). The crew transitions to 3-EOP -FR-H .

3-EOP-FR-H. 1 when AFW I when AFWflow flow << 345 345 gpmgpm and and isis eventually eventuallyrequired required to to initiate initiate feed feed &&

bleed since bleed since SG SG levels levels areare <<32% narrowrange 32% narrow range withwith adverse adverse containment con tainment conditions.

conditions.

IfIf asked asked as as NSO NSO to locally reset to locally reset CC AFWP AFWP overspeed overspeed trip trip (3-0NOP-075 (3-ONOP-075 Attachment Attachment 4), 4),

respon d that the C AFWP respond that the C AFWP overspeed trip oversp eed trip can can not not be be reset.

reset.

asked as IfIf asked as NSO NSO to to align align train train 22 steam steam to to the the AA AFWP AFWP by by opening opening AFSS-3-007, AFSS-3-007, report report that AFSS-that AFSS-3-007 3-007 willwill not not open.

open. Request Request mechanical mechanical maintenance maintenance assistance.

assistance.

Respond as Respond WCC/Mechanical Maintenance as WCC/Mechanical Maintenance ifif asked asked to troubleshoot/fix troubleshootlfix C C AFWP AFWP mechanical trip mechanical trip and and AFSS-3-007.

AFSS-3-007.

Respond as Respond as NSO NSO if asked to locally close MOV-3-1409 MOV-3-1 409 or 3-20-333. 3-20-333. Delay local closure closure of these valves of these valves until after feed & bleed initiated

& initiated then trigger lesson step EVENT EVENT 66 - -

LOCALLY CLOSE LOCALLY CLOSE MOV-3-1409 MOV-3-1409 (actuates TFFVV09C TFFvv09C == T) and report when complete. complete.

3A SGFP 3A SGFP should should not be started since an uncontrollable uncontrollable feed path exists to 3C SG. SG. With With level [33%]

level < [33%J

< wide range, feed flow must be limited to 100 gpm to the faulted SG SG (3-(3-EOP-F EOP-FR-H. R-H. 1 1 step 4 caution 2).

Respo Respond nd as NSO when directe directed d to place PAHM PAHMS S in service on unit 3. After 8-12 minute minutes, s, trigger trigger lesson step EVEN EVENT T 66 - PLAC

- PLACE PAHMS E U3 PAHM IN SERV S IN SERVICE ICE (actuates (actuates TAC2V02A = 1.0, TAC2V02B =1.0, TAC2VO2A = 1.0, TAC2VO2B = TAAAV21 ==1.0, 1.0, TAAAV21 1.0, TAAAV22 TAAAV22 == 1.0 TACA005 ==0.0).

&TACAOO5 1.0 & Report when 0.0). Report compl complete. ete.

66

I NRC-I NRC-i t,,~...~~~.. '"

O 1> l OPERATIONS SHIFT OPERATIONS SHIFTTURNOVERTURNOVER REPORT REPORT

t

..s;, ~..

"Olear 1.'\0 ONCOMING CREW ONCOMING CREWASSIGNMENTS ASSIGNMENTS Shift Mgr:

Shift Mgr: Inside InsideSNPO:

SNPO:

FieldSupv.:

Field Supv.: Outside OutsideSNPO:

SNPO:

AdminRCO:

Admin RCO: ANPO:

ANPO:

Unit 33 Unit Unit Unit 44 UnitSupv.:

Unit Supv.: Unit UnitSupv.:

Supv.:

RCO:

RCO: RCO:

RCO:

NPO:

NPO: NPO:

NPO:

Plant Status Plant Status Unit 33 Unit Unit Unit 44 Mode:

Mode: 11 Mode: 1 Mode:

Power:

Power: 75 75 Power: 100 Power: 100 MWe: 557 557 MWe: MWe:

MWe: 759 759 Gross Leakrate:

Gross Leakrate: 0.03 0.03 Gross Gross Leakrate:

Leakrate: 0.04 0.04 RCS Boron RCS Boron Cone: Conc: 825 825 RCS Boron Cone: 600 Conc: 600 Operational Concerns:.i<

Operational Concerns: .**.. .' .. ..f!: I 3 AFWP

.~ .~ APWP OOS (bearing OOS (bearing failure; failure; OOS 4 hr; ETR 24 hr) 3B EDG 3B EDG OOS OOS (fuel (fuel pump failed; OOS 2 days; next 0-OSP-023.3 pump failed; O-OSP-023.3 in 4 hr) 3B CSP OOS (failed 3B CSP OOS (failed IST -low discharge 1ST low discha rge pressu re; OOS 12 hr; ETR 36 hr) pressure; Train A is Train A is protected protect ed 22 gpd gpd tube tube leak leak in in 3A 3A S/G S/G - unchan unchangedged for past week (Chem istry sampli (Chemistry sampling 3-0NOP-071.2, ng per 3-ONO Attachment 1.)

P-07 1.2, Attach ment 1.)

U3 Antici pated U3 Anticipated LCO Actions: LCO Action s:

Curren Current: t:

BB AFWP APWP - TS -

TS 3.7.1.2 3.7.1.2 Action Action 33 (trains (trains verifie verifiedd operab operable le just just before before turnov turnover; 30 days er; 30 days toto repair) repair) 3B EDG -TS 3B EDG - TS 3.S.1.1.b.l 3.8.1.1 .b.1 Action Actions s bb && dd (0-OSP -023.3 Att (0-OSP-023.3 Att 11 && 99 every every 8S hr; hr; 3/4-OS 3/4-0SP-023.1 start of P-023.1 start of other other EDGs not reqd; 3-OP-0 23 sect 7.7 EDGs not req'd; 3-0P-023 sect 7.7 due next shift due next shift if OOS >> 72 ifOOS 72 hr; hr; repair repair in in 14 14 days) days) 3B3B CSP CSP- TS -

TS 3.6.2.1 3.6.2.1 Action Action aa (Fix (Pix inin 72 72 hr) hr)

Anticip Anticipated: ated: None None Train A Train A isis protect protected. ed. OLRM OLRM isis green green (CDF (CDP ==2.06E-2.06E-6; LERP ==9.28E-6; LERF 9.2SE-S).

8).

U4 Anticip ated U4 Anticipated LCO Actions: LCO Action s:

Curren Current: t:

BBAFWPAPWP -TS -

TS 3.7.1.2 3.7.1.2Action Action 33 (trains (trains verifie d operab verified operablele just justbefore beforeturnov turnover; 30 days er; 30 days toto repair) repair) 3B EDG 3B EDG - TS 3.8.1.1-TS 3.S.1. i.b.1

.b.l Action Actions s bb && dd(0-OSP -023.3 Att (0-OSP-023.3 Att 11&& 99every every8Shr;hr; 3/4-OS 3/4-0SP-023.1 startof P-023.1 start ofother other EDGs not reqd; fix in 14 EDGs not req' d; fix in 14 days) days)

Anticip Anticipated:ated: None None Train TrainAAisisprotect protected. ed. OLRM OLRMisisgreen green(CDF (CDP==2.OOE 2.00E-6; LERP =9.28E-

-6; LERF 9.2SE-S).

8).

Result s of Offgoi Results of Offgoing Focus Area: ng Focus Area:

See g:\Ops\Common\0900

~. See g :\0p s\Common\0900

Unit 3 3 Stat Status us

!~-~

Reac tor Oper Operator Mode: 1I RCS Leakrate Power: Accumulator Accum Ref Levels 75 Gross: 0.03 gpm MWe: A 6615 557 Unidentified Tavg: 567 Chargi ng Pps:

0.02 gpm 0.01 gpmgpmj

( B 6640 C 6625 RCS Pressure: 2235 RCS Boron Cone:Conc: 825

,.Abbd Ahnnr 'r.ll1al.Ahliunciai m1 Annnn ~rs::V!;.,:;,!\',i;t~.,:~j(J;<.

bitnrc  ! '.' \ \ ".1 ,?;!,.:!~ *."It:; '. ';'.,::;.'!:,!' * '::!!( *. \.,; .!!~i,;,r[T;t*;: *..*****.J~~).;;!!I':\ !!:,l.!'!.**.f!~¥~r!>!;

Annunciator:

Annunc iator: F 9/2 - 3B EDG OOS Actions::

Comp Actions O-OSP-023 O-OSP- 023.3.3 Att 11 & 9 due in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. 3/4-0SP 3!4-OSP-023. -023.11 not required required.. 3-0P-0 3-OPO23 sect 7.7 due next shift.

Annunciator:

Annunc iator: F 9/5 - 3B EDG OOS Actions::

Comp Actions O-OSP-023.3 O-OSP- 023.3 Att 11 & 9 due in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. 3/4-0SP 3/4-OSP-023. -023.11 not requiredrequired.. 3-0P-0 3-OP-023 sect 7.7 due next shift.

Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

.!~-

Comp Actions Actions::

Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

Actions::

Comp Actions Current Curre nt Tech Spec Action Statem ents: (Does (Does Not Include "For For Track Trackiin2 ng Only Items" Items T.S.A.S / Component:

T.S.A.S 3.7.1.2 Action 3/ 3 / B AFWP Reason:

Reason: Bearing failed Bearing Entry Date: XX/XX/XX XX/Xx JXX (Previous shift)

T.S.A.S / Component:

T.S.A.S 3.8.1.1 Actions Actions b & d / 3B EDG Reason:

Reason: Fuel pump failed Entry Date: XX/XX/XX (2 days ago)

T.S.A.S / Component:

T.S.A.S 3.6.2.1 Action a / 3B CSP Reason:

Reason: Failed 1ST - low discharg dischargee pressur pressuree Entry Date: XX/XX/XX XX/Xx IXX (Yester (Yesterday) day)

T.S.A.S / Component:

T.S.A.S 3,4.3 Action a / 3B PZR backup heaters

3.4.3 Reason

Reason: 14 day due to 3B EDG OOS Entry Date: XXIXX/XX Xx/Xx !XX (2 days ago)

T.S.A.S / Component:

T.S.A.S 3.5.2 Action ff// 3B HHSIP Reason:

Reason: 14 day due to 3B EDG OOS Entry Date: XX!XX/XX (2 days ago)

Xx/XX T.S.A.S / Component:

T.S.A.S Reason:

Reason:

'j Entry Date:

Unit 33 Status Unit Status ChangestotoRisk Changes RiskS!gnificant SignificantEquipment:

Equipment:

B AFWP OOS (Bearing B AFWP OOS (Bearing replacement) replace ment) 3BEDG 3B EDGOOS OOS(Fuel (Fuelpump pumprepair) repair) 3B CSPOOS 3BCSP QOS(Failed (Failed1ST 1ST-low lowdischarge dischargepressure) pressure)

Unit 3 Risk is GREEN.

Unit 3 Risk is GREEN. Main Maincontributor contributorisisBBAFWP.AFWP.

Upcoming Reactivity Upcoming ReactivityManagement ManagementActivities:

Activities:

Dilute toto maintain Dilute maintain 75% 75% power power until until management management permission permission received received toto complete complete increasing increasing power power back back toto 100%.

100%.

Upcoming Major Upcoming Major POD POD Activities:

Activities:

Return to Return to 100%

100% powerpower if/when if/when management management permission permission received received to to increase increase power power back back toto 100%.

100%.

Upcoming ECOs Upcoming EGOs to to Hang Hang and and lor br Release:

Release:

None None Evolut Evolutionsions or or Compe nsatory Action Compensatory Actions s in Progre Progress: ss:

- InIn proces s of returning power back to 100%

process of returning power back to 100% from turbine from turbine valve valve test.

test. Currently Currently on on hold hold at at 75%

75% awaiting awaiting manag managementement permission permission to to continue continue power power increase.

increase. 3-GOP-301 3-GOP-301 in in use use completed completed through through stepstep 5.97.

5.97.

- After After shift shift turnover, turnover, perform perform 3C 3C ICWP ICWP isolation isolation valve valve cycling cycling test test per per step step 7.1.3 7.1.3 of of 3-OSP-01 3-0SP-019.3 (steps 7.1.1 9.3 (steps 7.1.1 & & 7.1.2 7.1.2 for for 3A and 3A and 3B 3B ICWP ICWP are are not not schedu scheduled led for for this this shift).

shift).

- Known Known tube

- 071.2, tube leak leak inin 3A 3A S/GS/G (2(2 gpd) gpd) - unchan unchanged ged forfor last last week.

week. Chemistry Chemistry sample samples are being s are being taken taken per per 3-ONOP-3-0NOP-Attachment 1.

071.2, Attachment 1. The current The current sample, sample, justjust completed completed indicates indicates no no significant significant change change in in leak leak rate.

rate. MOV-3-1 MOV-3-1403 remains 403 remains energized energized at at manag ement direction management direction duedue to to small small size size and and stability stability of of tube tube leak leak rate.

rate.

OSP-023.3 0-OSP-023.3 Att Att 11 && 99 for for 3B 3B EDG EDG OOSOOS due due inin 44 hrs.

hrs. 3-OSP-023.1 3-0SP-023.1 not not required required since since 3B 3B EDG EDG QOS OOS duedue toto support support system failure. 3-OP-023 sect 7.7 due system failure. 3-0P-023 sect 7.7 due next shift to next shift to allow allow 3B 3B EDG EDG QOS OOS >> 72 72 hr.

hr.

Genera General l Inform ation, Remar Information, Remarks, ks, and and Operat Operator or Work Work ArounAround d Status:

Status:

See evolutions & compe nsatory actions See evolutions & compensatory actions listed above. listed above.

Train Train AA isis protected.

protected.

Appendix D . Scenario Outline Form ES-D-1 Facility: Turkey Point Scenario No.: 2 Op Test No.: 2007-301 Examiners: candidates:

.. Candidates: US RO BOP Initial Conditions: Mode 1, 1 50% Power, MOL. Power on hold at 50% following inadvertent trip of 3B SGFP while investigation in progress.

Turnover: Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att 1 1 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST -low - low discharge pressure (OOS 12 hr; ETR 36 hr)

Need to swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-0053-OP-005 section 7.4 after shift turnover to support possible emergent maintenance on 3A CCW pump (vibration increase last shift).

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

1 1 (N) SRO/BOP 3-OP-005 section 7.4.

Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-005 2 (I) BOP/RO First stage impulse pressure channel PT-3-446 fails low. The crew responds TFS1MASL=T TFS1MABL=T (T5 I) SRO (TS,I) 3-ONOP-028 to stop inward rod movement by taking rod control to per 3-0NOP-028 3-ONOP-049.1.

manual and then 3-0NOP-049.1.

3 (C) ALL 1 2OVAC power panel 3P09 normal inverter fails. The auto swap to the CVT 120VAC TFE6X06F = T 3-ONOP-003.9.

also fails leaving 3P09 deenergized. The crew responds per 3-0NOP-003.9.

TCE6DI1C =T 3-ONOP-003.9 Attachment 1.

3P09 is swapped over to the spare inverter per 3-0NOP-003.9 4 TFCMM2A4=T TFCMM2A4 =T (M)ALL (M) ALL The 3A steam generator tube leak grows to 2 gpm. R-3-19 fails to respond.

TVHHSGA =

TVHHSGA= (I) SRO/BOP 3-ONOP-071 .2 The crew responds per 3-0NOP-071.2 0.002 (TS) SRO 4a (R) ALL A load reduction from 50% power is initiated and performed per 3-0NOP-3-ONOP-071.2 5 TVHHSGA =

TVHHSGA= (M) ALL The 3A steam generator tube leak grows from 2 gpm into a rupture. The 0.4 (contd from (cont'd reactor is tripped and 3-EOP-E-0 performed. MOV-3-1433 fails to close TFSW33C=T event 4) requiring manual isolation of MSIVs.

6 (C) ALL When transition is made from 3-EOP-E-0 to 3-EOP-E-3, the startup transformer locks out. 3A EDG starts but the output breaker does not TFQ5A2OA =

TFQ5A20A = T close and 3-EOP-ECA-0.0 is entered. 3A EDG output breaker automatically close, TAQ5LRSB =T is manually closed and the crew transitions back to 3-EOP-E-3. Only 3A & 3D TFP1S38S = T

- 4kV bus are now available from 3A EDG.EDO. 3-EOP-E-3 is performed to cooldown and depressurize the RCS to stop primary-secondary leak flow.

(N)ormal, (R)eactlvlty, (R)eactivity, (I)nstrument, (l)nstrument, (C)omponent, (M)aJor (M)ajor 1

1

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 22 Event Event No.:

No.: _1_1 Page _1_

Page 1 of of _1_

I Event

Description:

Event

Description:

Swap 3D Swap 3D 4kV 4kV busbus power power supply supply to to 3A 3A 4kV 4kV busbus per per 3-0P-005 3-OP-005 section section 7.4.

Time Time [ Position Position Directs BOPBOP to Applicants Actions Applicant's to transfer Actions oror Behavior Behavior US US Directs transfer 3D 3D 4kV 4kV bus bus supply supply from from 3B 3B 4kV 4kV bus bus to to 3A 3A 4kV 4kV bus per bus per 3-0P-005 3-OP-005 sectionsection 7.4.

7.4.

Directs BOP Directs BOP start start 3A 3A ICWP ICWP && sid s/d 3C 30 ICWP ICWP per per 3-0P-019 3-OP-019 section section 5.3.

5.3.

BOP BOP Obtains copies of 3-0P-005, Obtains 3-OP-005, section 7.4 & 3-0P-019,3-OP-019, section 5.3.

Performs actions Performs actions asas follows:

follows:

1. Starts 3A ICWP CWP & stops 3C 30 ICWP per per 3-0P-019 3-OP-019 section 5.3
a. Verifies NSO understands ICWPs to be started/stopped started/stopped
b. Directs NSO verify oil in 3A ICWP sightglass & 3A ICWP discharge valve open
c. Starts 3A ICWP & checks for amperage on VPA ammeter
d. Directs NSO locally check 3A ICWP visible packing leakoff
e. Stops 3C 30 ICWP & checks zero amperage on VPA ammeter
f. Directs NSO locally do post-stop check
2. Opens 3AB19 and then 3AD06 NOTE: 3C CCWP & 3C ICWP are OOS while 3D 4kV bus is deenergized TS 3.7.2 - 77 day action statement & TS 3.7.3 - 30 day action statement.

3.

3. Closes Closes 3ADO13AD01 and and then then 3AA17 3AA 17 4.
4. Directs Directs NSO NSO to locally locally check 3D 3D 4kV 4kV bus voltage 3744-4576 3744-4576 volts volts on on cubicle 3AD08.

3AD08.

5.

5. Starts Starts 30 3C ICWP ICWP per per 3-OP-019 3-0P-019 section section 5.35.3 to to verify verify operability.

operability.

a.

a. Verifies Verifies NSO NSO understands understands ICWPsICWPs to to be be started/stopp started/stopped ed b.
b. Directs Directs NSONSO verify verify oil oil in in 30 3C ICWP ICWP sightglass sightglass && 303C ICWP ICWP discharge discharge valvevalve open open c.c. Starts Starts 303C ICWP ICWP && checks checks forfor amperage amperage on on VPA VPA ammeter ammeter d.
d. Directs Directs NSONSO locally locally check check 3C 3C ICWP ICWP visible visible packing packing leakoff leakoff 6.
6. At At SM SM direction, direction, stops stops 30 3C ICWP ICWP perper 3-OP-019 3-0P-019 section section 5.3.

5.3.

a.

a. Stops Stops 3C 3C ICWP ICWP && checks checks zero zero amperage amperage on on VPA VPA ammeter ammeter b.b. Directs Directs NSONSO locally locally do do post-stop post-stop check check RO RO Assists Assists BOPBOP as as directed directed by by US.

US.

I1

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: -2...

2 Event Event No.: No.: _2_ 2 Page Page _1_ 1 of of_2_ 2 Event

Description:

Event

Description:

First stage First stage iml2ulse impulse I2ressure pressure channelchannel PT-3-446 PT-3-446 fails fails low.

low. The The crew crew responds l2er resl20nds per 3-0NOP-028 3-ONOP-028 to stop inward to stOI2 inward rodrod movement movement by by taking rod taking rod control to control manual and to manual then 3-0NOP-049.1.

and then 3-ONOP-049.1.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports ch Recognizes/reports ch III Ill first first stage stage impulse impulse pressure pressure PT-3-446 PT-3-446 failed failed low.

low.

  • . annunciators C-6/1, annunciators 0-6/1, 6/2, 6/2, 6/3 6/3 (due (due toto change change in in SG SC level level program program setpoint from setpoint from 60% 60% to to 50%)

50%)

  • . 0-7/1, 7/2, 7/3 steam line C-7/1, line hi flow & C-8/30-8/3 stm dump due to failure
  • . P1-3-446 indication PI-3-446 indication on VPA fails low
  • . Control rods inserting in automatic RO RO Recognizes/reports control rods inserting in automatic Recognizes/reports When PT-3-446 failure recognized, performs immediate action of 3-ONOP-028 for continuous insertion of an RCC control bank: Places rod control in MANUAL and verifies rods stop moving.

US Directs response per 3-ON OP-028 3-0NOP-028 RO Performs subsequent actions of 3-ONOP-028 3-0NOP-028 as directed by US:

1. IfIf directed, withdraws control rods to restore Tavg =Tref 1.

2.

2. Determines Determines rods rods above above RIL RIL from VPA VPA recorder (or (or PCB PCB section section VII VII figure 3).

3).

3. Determines
3. Determines PRNIPRNI N-44N-44 did not fail did not fail 4.
4. After After PT-3-447 PT-3-447 selected selected for for 1 1st stage st stage pressure pressure control, control, places places rods rods back in back in auto auto 5.
5. Determines Determines TM-408 TM-408 medianmedian Tavg Tavg selector selector not not failed failed BOP BOP Performs Performs subsequent subsequent actions actions of of 3-ONOP-028 3-0NOP-028 as as directed directed byby US:

US:

1.1. IfIf directed, directed, reduces reduces turbine turbine load load to to restore Tavg ==Tref restore Tavg Tref

2. Selects
2. Selects Channel Channel Select Select First First Stage Stage Control Control toto ch ch IV IV (PT-3-447)

(PT-3-447)

US US Directs Directs WOOWCC notify notify I&C I&C ofof PT-3-446 PT-3-446 failure.failure.

Directs Directs response response per per 3-ONOP-049 3-0NOP-049.1 .1 22

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: 22 Event Event No.:

No.: _2_ 2 Page-Lof_2_

Page 2 of 2 Event

Description:

Event

Description:

First stage First stage impulse impulse pressure pressure channel channel PT 446 fails PT-3-446 fails low.

low. The The crew crew responds per responds per 3-0NOP-028 3-ONOP-028 to to stop stop inward inward rod rod movement by movement by taking taking rod rod control to control to manual manual andand then then 3-0NOP-049.1.

3-ONOP-049.1.

_Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Performs actions Performs actions ofof 3-0NOP-049.1 3-ONOP-049.1 as as directed directed by by US:

US:

1.

1. Determine PT-3-446 Determine PT-3-446 failedfailed by by comparison comparison to to PT-3-447, PT-3-447, PT-3-1604 PT-3-1 604 and expected and expected value based based on on turbine load. load.
2. PT-.3-447 selected for 11 Verifies PT-3-447 sstt stage impulse impulse pressure pressure control
3. Verifies PT-3-447 reading normally US Evaluates impact per TS:

3.3.1. Table 3.3-1 units 12 &17b apply. Actions 6 (6hr) & 7 (1hr) (lhr) in effect.

3.3.2. Table 3.3-2 units 1f if & 4d. Action 15 (6hr) applies.

Conducts crew brief regarding effects of PT 446 failure and of tripping PT-3-446 bistables as directed in 3-0NOP-049.1 3-ONOP-049.1 Attachment 4 BOP Continues performing actions of 3-ONOP-049 3-0NOP-049.1 .i as directed by US:

Obtains keys, opens door to and trips following bistables in protection protection channel III, rack 16: 16:

.* BS-3-446-i BS-3-446-1 (Turbine (Turbine powerpower >10%

>10% input input toto P-7)

P-7)

.* BS-3-446-2 BS-3-446-2 (70%(70% turbturb load load limit limit runback run back permissive) permissive)

.* BS-3-474 BS-3-474 (SG(SG A A hi hi steam steam flow) flow)

.* BS-3-484 BS-3-484 (SG(SG BB hi hi steam steam flow) flow)

    • BS-3-494 BS-3-494 (SG(SG C C hi hi steam steam flow) flow)

Closes Closes protection protection rack rack door door whenwhen done.

done.

Places Places SteamSteam Dump Dump to to Condenser Condenser Mode Mode switchswitch in in MANUAL MANUAL RO RO Monitors Monitors bistable bistable status status lights lights and and annunciator annunciator panels panels forfor expected expected indications indications while while bistables bistables being being tripped.

tripped.

US US 1.1. Directs Directs NSO NSO bypass bypass power power 11 on on AMSAC AMSAC per per Attachment Attachment 55 2.2. Directs Directs notification notification ofof l&C I&C 3.3. Directs Directs WCC WCC generate generate clearance clearance for for tripped tripped bistables bistables 33

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: .L 2 Event No.: ~

Event No.: 3 Page Page _1_1 of_3_

of 3 Event

Description:

Event

Description:

12OVAC Qower 120VAC power Qanel panel 3P09 3P09 normalnormal inverter inverter fails.

fails. The The auto auto swaQ swap toto the the CVT also CVT also fails fails leaving leaving 3P093P09 deenergized.

deenergized. The The crew responds per 3-crew resQonds Qer 3-ONOP-003.9. 3P09 ONOP-003.9. 3P09 isis swaQQed swapped over over to to the the sQare spare inverter inverter Qer per 3-3-

ONOP-003.9 Attachment ONOP-003.9 Attachment 1. 1.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes 1/ reports Recognizes reports loss loss ofof 3P09 3P09 120VAC 120VAC vital vital inst inst bus bus

  • . Loss of Loss of all all ch ch IV IV instrumentation instrumentation (yellow(yellow labels) labels)
  • . Loss of Loss of controller controller for for BB SG SG FRV FRV RO Recognizes 1I reports loss of 3P09 120VAC 120VAC vital inst bus
  • . Loss of all ch IV instrumentation instrumentation (yellow labels)
  • . Loss of controllers for PZR pressure, level & & spray valves
  • . Letdown isolation Determines a reactor trip has not occurred US Directs performance of 3-ONOP-003 3-0NOP-003.9 .9 Determines unit operating in in mode 11 Directs Directs FS/NSO FS/NSO to to restore restore power power to to 3P09 3P09 per Attachment 11 && RO per Attachment RO restore PZR pressure PZR pressure and and level level control control per per Attachment 4. 4.

RO RO Performs Performs actionsactions of of 3-ONOP-003 3-0NOP-003.9 as directed

.9 as directed by by US:

US:

1.

1. Places Places rods rods in in MANUAL MANUAL 2.
2. Reduces Reduces charging charging flow flow toto minimum minimum reqd req'd for for seal seal injection injection using using aa charging charging pump pump in in manual manual speed speed control control 3.
3. Determines Determines PORVs PORVs closed closed 4.4. Maintains Maintains Tavg,Tavg, rx rx power, power, PZR pressure &&PZR PZR pressure PZR level level inin normal normal control control bands bands BOP BOP Performs Performs actionsactions of of 3-ONOP-003 3-0NOP-003.9 as directed

.9 as directed by by US:

US:

1.1. Determines Determines steam steam dump dump to to condenser condenser mode mode already already inin MAN MAN 2.2. Determines Determines 3B 3B SGSG inin auto auto lockup.

lockup. Increases Increases 3B 3B SG SG blowdown blowdown flow as necessary flow as necessaryto to control control 3B 3B SG SG level.

level.

3.3. Maintains Maintains SG SG levels levels inin normal normal control control band band 44

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 22 Event Event No.:No.: ~ 3 Page-l.,

Page 2 of of~ 3 Event

Description:

Event

Description:

120 VAC power 120VAC power panelpanel 3P09 3P09 normal normal inverter inverter fails.

fails. The The auto auto swap swap toto the the CVT also CVT also fails fails leaving 3P09 deenergized.

leaving 3P09 deenergized. The The crew crew responds responds per 3-per 3-ONOP-003.9. 3P09 ONOP-003.9. 3P09 isis swapped swapped over over toto the the spare spare inverter inverter per per 3-3-

ONOP-003.9 Attachment ONOP-003.9 Attachment 1. 1.

II. Time Time Position Position ApplicanVs Actions Applicant's Actions or or Behavior Behavior RO RO Performs 3-0NOP-003.9 Performs 3-ONOP-003.9 AttachmentAttachment 44 when when directed directed byby US:

US:

1.

1. Determines PORVs Determines PORVs closed closed 2.
2. Directs FS/NSO Directs FS/NSO go go to rack 46 to rack 46 && press/hold press/hold in in relay relay LC459CX LC459CX 3.
3. Manually operate Manually operate PZR PZR heaters heaters to to return return pressure pressure to to normal.

normal.

4. Restores letdown Restores letdown
a. Determines B CCW COW header flow normal.
b. Determines letdown orifice isolation valves closed
c. Opens CV-3-204 then opens LCV-3-460
d. Manually controls PCV-3-145 to control letdown pressure
e. Opens letdown orifice isolation valve(s) for desired flow us US Briefs crew on effects of loss of 3P09 using Enclosure 1.

Evaluates TS impact: 3.8.3.1.j 3.B.3.1.j applies. Action c. (2hrto (2hr to reenergize; 24 hrhr to reenergize from inverter).

BOP BOP Coordinates Coordinates with FS/NSO FS/NSO to to restore 3P09 3P09 per per 3-ONOP-003 3-0NOP-003.9 .9 Att 1.1.

1.

1. Informs Informs FS/NSO FS/NSO that that DSDS inverter inverter not not currently currently in in use use 2.
2. When informed informed that 3P09 3P09 about about to to be be reenergized, reenergized, turns turns off off both both groups groups of of PZR PZR backup backup heaters heaters 3.
3. Observes Observes components components reenergizing reenergizing as as 3P09/3P24 3P09/3P24 breakers breakers closed closed in in 4.
4. Relays Relays notification notification from from F5/NSO FS/NSO that that all all 3P09/3P24 3P09/3P24 breakers breakers closed closed in in NOTE:

NOTE: Auto/Manua Auto/Manual l controllers controllers should should notnot bebe returned returned to to AUTO AUTO until vital power completely until vital power completely restored. restored. When When powerpower isis restored restored toto an an Auto/Manua Auto/Manual l station, station, the the AUTO AUTO light light will will turn turn onon for for approx.

approx. 1515 sec sec after which after which the the MANUAL MANUAL light light turns turns onon indicating indicating that that manual manual control control isis now nowavailable.

available.

55

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.:L 2 Event EventNo.:No.:-L 3 Page23 of_3_

Page of 3 Event

Description:

Event

Description:

12OVAC Qower 120VAC powerQanelpanel 3P09 3P09 normal normal inverter inverterfails.

fails. The The auto auto swaQ swaptotothethe CVT also CVT also fails fails leaving 3P09 deenergized.

leaving 3P09 deenergized. The The crew crew responds Qer resQonds per3 ONOP-003.9. 3P09 ONOP-003.9. 3P09 isis swaQQed swapped over overtoto the the sQare spare inverter inverterQerper3-3-

ONOP-003.9 Attachment ONOP-003.9 Attachment 1. 1.

Timee r_Tim Position Position J Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Restores auto Restores auto controls controls on on Encl End 11 as as 3P09 3P09 breakers breakers are are closed closed in:

in:

1.

1. Restores auto Restores auto PZR PZR pressure pressure control control perper Att Att 44 section section 22 a.
a. Directs NSO Directs NSO release release LC459CX LC459CX b.
b. Restore charging Restore charging pumps, pumps, PZRPZR heaters heaters && spray spray valves valves toto auto control auto control
2. Determines annunciators Determines annunciators indicate indicate correctly correctly for plant plant conditions conditions
3. Returns rods to auto once PRNI N-44 N-44 reenergized reenergized BOP BOP Restores auto controls on Ene!

Restores End 11 as 3P09 breakers breakers are closed in: in:

1. Returns 3B SG level control to automatic Returns automatic
a. Manually control FCV-3-488 to return SG level to to 60+/-5%

60+/-5%

and match feed flow ==steam flow

b. Places 3B SG level control in auto 2.
2. Places Places steam dump dump to conden condenser mode selecto ser mode selector to RESET r to RESET and and then to AUTO to AUTO 3.
3. Determines Determines annunc iators indicate annunciators indicate correctly correctly for for plant plant conditions conditions 66

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.:-.£..

2 EventNo.:

Event No.:--L Page 4 Page_1_..j...ofof_1_

.J...

Event

Description:

Event

Description:

The 3A The 3Asteam steamgenerator generatortube tube leak growstoto 22 QI;~m.

leakgrows gpm. R-3-19 R-3-1 9fails failstoto respond. The res(2ond. The crew crewres(2onds responds (2er per3-0NOP-071.2.

3-ONOP-071 .2.

I Time Ti...,,,

,~

Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports increase Recognizes/reports increase inin 3A 3A SGSG tube tube leak leak rate rate

  • . R-3-15 SJAE R-3-15 SJAE effluent effluent PRMS PRMS rising/alarming rising/alarming
  • . SJAE SPING SJAE SPING RAD-3-6417 RAD-3-6417 rising/alarming rising/alarming (see (see ERDADS)

ERDADS)

NOTE: R-3-19 NOTE: R-3-19 is is failed failed as as isis RO RO Recognizes/reports increase Recognizes/reports increase in in 3A 3A SGSG tube tube leak leak rate rate

  • . Slight increase increase in charging charging flow to maintain maintain PZR level level
  • . Chg/letdn flow mismatch Chg/letdn mismatch approx.

approx. 2 gpm (see ERDADS) ERDADS) us US Directs perform ance of 3-0NOP-071.2 performance 3-ONOP-071 .2 Directs Chemi stry notific Chemistry ation to sample SGs & main steam notification steam lines lines forfor activity per 0-NCA0-NCAP-1 P-10404 Directs Directs HP HP notific ation to notification to take take rad rad reading readings on mn s on mn stm stm && blowd blowdown own BOP BOP Perform Performs s actions actions of of 3-ONO 3-0NOP-071.2 P-071 .2 as as directe directed by US:

d by US:

1.

1. Determ Determines ines R-3-1 R-3-15 5 alarm alarm valid valid (>(> alarm alarm setpoin setpointt && operab operable) le) 2.
2. Perform Performs s notific ations as notifications as directe directed by US.

d by US.

RO RO Perform Performs s actions actions of of 3-ONO 3-0NOP-071.2 P-071 .2 as as directe directed by US:

d by US:

1.1. Determ Determines ines PZR PZR level level stable stable 2.2. Determ Determines ines chargin charging g pump pump suction suction remain remains aligned to s aligned to VCT VCT 3.3. Determ Determinesines SG SG tube tube leak leak rate rate 22 gpm gpm using using VCTVCT level level trend, trend, RC5 RCS leakleak rate rate calcula tion and/or calculation and/orSJAE/

SJAE/R-3-15 activity R-3-1 5 activity vs. vs. SGSG tube leakag e curves (PCB tube leakage curves (PCB section section 55figures figures 14/15) 14/15)

US US Determ Determines ines unit unitshould should be be inin mode mode 33inin 33hr hr Ensure Ensures s load loaddispatc dispatcherher notified notifiedof ofload loaddecrea decrease.se.

77

Appendix D Operattor Opera or Action Actionss Form ES-D-2 Op-Test No.: 2007-301 01 Scenarrio Scena io No.: 2 Event No.: 4a Page _1 1 of L2 Event

Description:

A load reductreductiionon from 50% power is initiate d and perform performed per 3-ONOP-071 -071.2 .2..

Time Position Applicant's Applic ants Actions or Behavior US Conducts crew brief per 3-0NO 3-ONOP-071 P-071 .2.2 foldout page:

  • . Specifies load reduct reductiion on rate
  • . Target power level = offline
  • . Specifies tube leak rate and affected slg s/g
  • . Covers action actionss required after unit is offline
  • . Specif ies method of reactivity control includi including ng boration amount & rate
  • . Covers E-O E-0 transition criteria
  • . Solicits crew questi questioonsns & input Notifie Notifiess SM to review EPlan, 0-ADM 0-ADM-115-115 and make required notifica notificationstions inlcudi inlcuding verifying ng verifyin g NRC Resident notifica notification tion BOP When directed per 3-0NO 3-ONOP-071 P-071 .2:

.2:

1. Notifie Notifies load dispat dispatc cher her of load reduct reductiionon when directed by US
2. Makes plant page annou announ nceme cemen ntt regarding load reduct reductiion on
3. When leaking slg s/g identifi identified, ed, closes & deenedeenerrgizes gizes affected slgs/g AFW steam supply MOV per Att 2 (may be done by RO depen dependding ing on when this action directed)

When directed, initiates boration per 3-0NO 3-ONOP-071P-071 .2:

.2:

RO

1. Places Rx MIU M/U Select Selecto orr Switch to BORATE
2. Places Rx MIU M/U Control Switch to START
3. Sets FC-3-1 FC-3-1 13A1 3A pot setting = = 8.0
4. Sets BA Totalizer to amount directed (powe (powerr reduct reductiionon to 25%

at 85 gal per 10% = = 213 gal.)

5. Returns CVCS mlu rn/u to auto when boration compl comple te ete BOP Reduc Reduces es turbine load per 3-0NO3-ONOP-1 P-100 00 at rate directed by US.

8

Appendi Appen dixx DD Operator Opera Actions tor Action s Form Form ES-D- 2 ES-D-2 Op-Test Op-Te No.:

st No.: 2007-301 2007-3 01 Scenario Scena No.: L 2 rio No.: Event No.:

Event No.: 4a 4a Page-Page ..£ 2 ofofL 2 Event Descri Event Descripti on:

ption: AA fast fast load load reduct reduction from 50%

ion from 50% power power isis initiate initiatedd and and perform performed ed per ONO P-1 ONOP -100. 00. per 3-3-

Time Time Position Positio n Applican Applic Vs Action ant's Actions s oror Behav Behavior ior RO RO NOTE:

NOTE Extent to

Extent to which which 3-0NO 3-ONOP-0 P-071 71.2

.2 action actions s perfor med depen performed depend d on point when on point when SGTR SGTR inserte inserted d When directe When directed per 3-0NO d per 3-ONOP-0 P-071 71.2

.2::

1.

1. Verifies Verifie load reduct s load reduction ion rate rate && auto auto rod rod inserti insertionon mainta maintaini ining ng Tavg T avg-Tref per expec T ref per expected value as ted value as discus discussedsed in in crew crew brief brief NOTE:: Rods NOTE Rods << RIL RIL not not expec expectedted atat this this power power levellevel 2.
2. Checks Check PZR level s PZR level followi followingng progra program. m. IfIf not increa ses chargi increases ng charging and/or places flow and/or places anan additio additionanall letdow letdown n orifice orifice in service servi ce
3. Dete rmin Determ ines es NRHX NRHX CCW flow alread alreadyy increa increased sed (from setup) setup)
4. Energizes Energ izes PZR backu backup heaters.

p heater s.

5. Verifiess conde Verifie condense nserr steam dumpsdumps operat operating ing proper properlyly
6. Plac es stati Places station on service service load loadss on U3 SUT
7. Veri fiess blowdo Verifie blowdow wnn isolate isolatedd from leaking leaking s/g
8. Dire cts NSO align aux steam from U4 per Atta Directs Attachchmment ent 6
9. Dete Determ rmin es ines turbi ne load << 570M turbine 570MW W & verif verifieiess non-non-ru nning runn ing SGF SGFP P recir recirc c valv valvee open 10.
10. Dete Determrmin es only ines only one one HDPHDP & & SGF SGFP P runn runnin ingg 111.
1. Veri fiess both Verifie both HDPHDPs s stop stoppepedd << 300 300 MW MWe e 12.
12. Stop Stops s 11 cond ensa conde nsate te pum pump p << 275 275 MW MWe e 13.
13. Open Opens s SGF SGFP P recir recircc valv valves es onon runn runnin ingg SGF SGFP P << 200 200 MWMWe e 14.
14. Open s turbi Opens turbine ne drain drain valv valveses << 150 150 MWMWe e 99

Appendi Appen dixx0D Operato Opera torrAction Actions s Form FormES-D- 2 ES-D-2 Op-Tes Op-Te sttNo.:

No.: 2007-30 2007-3 01 1 Scenar Scena riQio No.:

No.:.L 2 Event Event No.:

No.:~ 5 Page-.1Q..

Page 10 of of~ 3 Event Descri Event Descripti on: The ption: The 3A 3Asteamsteam genera generattor ortube tube leak leak grows grows fromfrom 22 g[2m gpm into into aa rU[2ture . The reac tor rupture. The reacto r isis tri[2[2ed tripped and and 3-EOP 3-EOP-E- -E-00 [2erfor performed med.. MOV-3 MOV-3-1 -1433 433 fails to close requiring manuall isolatio fails to clos e reguiri ng manua isolation n ofof MSIVs MSIVs..

Time Time Position Positio n Applican Applic ts Action ant's Actions s oror Behav Behavior ior RO RO Recogn Recog izes // reports nizes reports falling falling PZRPZR levels levels andand rising rising chargi charging ng flows flows us US Determin Determ ines es anan increa increas see inin SG SG tubetube leak leak rate rate isis occurr occurringing and directs respon respons and directs per 3-0NO see per 3-ONOP-0 P-071 71.2.2 foldou foldoutt page page RO RO Respon Respo ndsds perper 3-0NO 3-ONOP-0 P-071 71.2.2 to to droppi dropping ng PZR PZR level:

level:

rrd 3 j 1.

1. StartsStarts 3 chargi charging ng pump pump and and establ establis ishes hes maxim maximum um flow rate rate
2. Isolate
2. Isolates letdown s letdow flow n flow 3.
3. Determin Determ ineses PZRPZR level still droppidropping ng
4. Recommends Recom mends reacto reactorr trip due to inabilit inabilityy to mainta maintain in PZR level US Directs Direct s RO to manu manuall allyy trip the reacto reactorr per 3-0NO 3-ONOP-0 P-071 71 .2

.2 due due Critical Critica inability to inabili ty to maintaiin mainta n PZR level.level.

Directs crew perform Directs perform immed immediat iatee actio action nss of 3-EOP 3-EOP-E- -E-0.

0.

RO Performs Perfor ms imm immed ediat iatee acti actiononss of 3-EO 3-EOP -E-0:

P-E- 0:

1.

1. Veri Verifiefiess reac reacto torr trip

.* Rod bottobottom m light lights s on on & RPls at

& RPls at zero zero

  • Rx Rx trip trip && bypbypassass bkrs bkrs ope open n

. Neut Neutro ronn flux flux dec decrea reassing ing 2.

2. Act Actuatuatees s SISI && phaphase se AA due due PZR PZR level level not not main mainta ined taine <12%

d <12%

BOP BOP Perfo Perforrms ms imm immed ediat iatee actio action nss of of 3-EO 3-EOP -E-0:

P-E- 0:

1.1. Veri Verifiefiess turbi turbine ne tripp tripped ed

  • Turb Turbin inee stop stop valvvalveses clos closeded

.* Atte Attemp mpts ts closi closing ng MSR MSR main main stea steam stop MOV m stop MOVs s..

Cri ticall Critica Rec Recog ognnizes izes MOV MOV-3 14

-143333 fail failed ed to to clos close e &&closcloses es MSIMSIVsVs

. Mid

  • Mid && Eas East t GOB GCBs s open open 2.2. Veri Verifiefiess powpower er toto eme emerg rgeency ncy 4kV 4kV busbuses es

.* Dete Determ rmin es both ines both 3A 3A&& 3B 3B 4kV4kVbus buses energi es ene rgizzed ed

  • Dete Determ rmin es 3D ines 3D 4kV4kVbus busene energi rgizzed from 3B ed from 3B4kV4kVbus bus 10 10

Appendix 0D Operattor Opera or Action Actions Form ES-D- 2 Op-Te st No.: 2007-301 Scenarrio Scena io No.: _2_ 2 Event No.: _5_ 5 Page 2 of_3_

of 3 Event

Description:

The 3A steam generator tor tube leak grows from 2 gpm into a rupture.

reactorr is tripped and 3-EOP-E-0 performed. MOV-3 The reacto MOV-3-1 433 fails to

-1433 close requiring manual isolation of MSIVs MSIVs..

Time Position Applic ant's ants Actions or Behavior US Directs BOP verify prompt action actionss per 3-EOP-E-0 Attachment 3.

Directs RO contin ue with perforperform ance of 3-EOP-E-0 subse mance subseqquent uent actions.

BOP Verifies prompt action Verifie actionss per 3-EOP-E-0 Attach ment 3:

1. Determ ines 3A, 3B, 3C, 30, 3D & 3H 480V LCs energi energiz ed zed
2. Determ ines MSIVs all closed
3. Verifies FW isolation:

Verifie

a. Places running SGFP switch in STOP STOP..
b. Determ ines all main FW regula regulatting ing & bypas bypasss valves closed.
c. Closes FW isolation valves.
d. Determ ines both SSGF SSGFW WPs Ps off.
4. Verifies 3A & 3B ICWP Verifie CWPss running, POV-3 -4882 & 4883 closed with ICW 10W heade headerrss tied together.
5. Verifies 3 CCWH Xs in service, 3A & 3B CCWP5 s running, CCW headerrss tied together & MOV-3 heade MOV-3-626-626 open.
6. Determ ines 2 ECCs & all 3 ECFs running.
7. Determines all 4 HHSIP s & 2 RHRP s running
8. Check s for HHSI flow if RCS pressure < 1600 psig
9. Shuts down both unit 4 HHSIP s
10. Determ ines all contai contain ment isolation phase A valves closed.

nment

11. Determ ines all SI valves in proper injection alignm alignment
12. Resets SI & contaicontain ment isolation phase A.

nment

13. If RCPs running, opens MOV-3 MOV-3-1417

-1417 & 1418 then resets resets//starts starts all available NCCs.

14. Determ ines contai contain ment pressure remained <

nment < 20 psig.

15. Determ ines contai contain ment ventilation isolated and control room nment ventilation in proper emerg emergeency ncy recirculation alignm ent.

11

Appendix0D Appendix OperatorActions Actions Form Operator FormES-D-2 ES-D-2 Op-TestNo.:

No.: 2007-301 ScenarioNo.: No.:_2_ 2 Op-Test 2007-301 Scenario EventNo.:

Event No.:_5_ Page~ of ~

Page ......

EventDescription:

Event

Description:

The3A The 3Asteam steamgenerator generatortube tubeleakleakgrows growsfromfrom22gpm gpminto intoaarupture.

rupture.

Thereactor The reactorisistripped trippedand and3-EOP-E-0 3-EOP-E-0performed.

performed. MOV-3-1433 MOV-3-1 433fails failstoto closerequiring close requiring manual manualisolation isolationof MSIVs.

of MSIVs.

Time Time Position Position ApplicanVs Actions Applicant's Actions or or Behavior Behavior BOP BOP Continues prompt Continues prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3:3:

16. Directs
16. Directs NSONSO place place PAHMS PAHMS inin service service perper 3-0P-094.

3-OP-094.

17. Verifies
17. Verifies 3A 3A && both both U4 U4 EDGs EDGs running running (3B(3B EDG EDG isis OOS).

OCS).

18. Determines
18. Determines 3A, 3A, 3B3B && 3D 3D 4kV 4kV buses buses still still energized.

energized.

19. Notifies
19. Notifies US US that that prompt prompt action action verification verification complete.

complete.

RO RO Performs foldout Performs foldout page page actions actions ofof 3-EOP-E-0 3-EOP-E-0 as as directed:

directed:

1.

1. RCPs ifif RCS Trips RCPs RCS subcooling subcooling << 25°F25°F with HHSIP HHSIP running running and and SII flowpath S flowpath verified verified
2. Identifies 3A SG level increasing Identifies increasing in an uncontrolled uncontrolled ri ica Critical manner >6% and isolates manner isolates all FW flow to 3A SG Performs subsequent Performs subsequent actions of 3-EOP-E-0 3-EOP-E-0 as directed directed
1. Determ Determinesines 2 AFWPAFWPss (A & C) runnin running.g.
2. Determ Determinesines AFW valve alignm alignmentent proper 3.
3. Determ Determinesines at at least least 3A 3A SGSG level level> 6%. Contro

> 6%. Controls AFW flow ls AFW flow to to intact SGs intact SGs (3B &(3B & 3C) 3C) to to mainta maintain levels 15-50%

in levels 15-50%

4.

4. Determ ines annunc Determines iators A-1/1, annunciators 1/2 && 1/3 A-1 /1,1/2 1/3 all all off.

off.

5.

5. Determ ines Tc Determines Tc stable.

stable.

6.

6. Determ ines PORV Determines PORVs, s, norma normal spray, aux l spray, aux spray spray && excess excess letdow letdown n isolatio n isolation valves valves closed closed 7.7. Trips Trips RCPs RCPs ifif RCS RCS subcoo ling << 25°F subcooling 25°F with with HHSIP HHSIP runnin running and g and SI SI flowpa flowpathth verifie verifiedd 8.8. Determ ines no Determines no SGs SGs depres depressurized surized or or depres depressurizing surizing 9.9. Determ Determinesines SG SG tube tube rupture ruptured (R-3-15 d (R-3-1 alarm && 3A 5 alarm 3ASG SG level) level)

US US Based Basedon on SG SGtubetube rupture rupture:  :

1.1. Directs DirectsSTA STAmonito monitor r CSFST CSFSTs (red path s (red pathon on Heat HeatSink SinkCSF)

CSF) 2.2. Directs Directstransiti transitionon to to3-EOP 3-EOP-E-3.

-E-3.

1212

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _2_ 2 No.: _6_

Event No.:

Event 6 Page_1_of~

Page 1 of 4 Event

Description:

Event

Description:

When When transition transition isis made made from from 3-EOP-E-0 3-EOP-E-0 to to 3-EOP-E-3, 3-EOP-E-3, the the startu(2 startup transformer transformer locks locks out.

out. 3A 3A EDG EDG starts starts but but the the out(2ut output breaker breakerdoesdoes notnot automatically close, automatically close, and and 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.

entered. 3A 3A EDG EDG out(2ut output breaker isis manually breaker manually closed closed andand the the crew crew transitions transitions backback toto 3-EOP-E-3.

3-EOP-E-3.

Only 3A Only 3A && 3D3D 4kV 4kV bus bus are are now now available available from from 3A 3A EDG.

EDG. 3-EOP-E-3 3-EOP-E-3 isis performed to (2erformed to cooldown cooldown and and de(2ressurize depressurize the the RCS RCS to to stO(2 stop (2rimarv-primary-secondary leak secondary leak flow.

flow.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports LOOP Recognizes/reports LOOP causing causing loss loss ofof all all AC AC power:

power:

  • . 3A 4kV 3A 4kV bus bus deenergized.

deenergized. 3A 3A EDG EDG did did not not start start..

  • . 3B 4kV 3B 4kV bus bus deenergized.

deenergized. 3B 3B EDG EDG OOS OOS..

US US Determines loss of all AC power exists and directs performance of 3-EOP-ECA-O.O performance 3-EOP-ECA-O.O beginning with step 33

1. Determines reactor & turbine already tripped per 3-EOP-E-0
2. Determines RCS Tavg >350°F RCO RCO Performs actions per 3-EOP-ECA 3-EOP-ECA-0.0 -0.0 as directed by US:

1.

1. Determines PORVs closed, letdown & & excess letdown isolated
2. Determines SI reset BOP BOP Performs Performs actions per per 3-EOP-ECA 3-EOP-ECA-0.0 -0.0 as as directed directed by by US:

US:

1.

1. Determines Determines 22 AFWPs AFWPs running running 2.
2. Increases Increases AFWAFW flowflow to to 345 345 gpm gpm to to intact intact SGs SGs 3.
3. Verifies Verifies 4kV 4kV bus bus stripping stripping using using Attachments Attachments 11 && 2. 2.

4.

4. Determines Determines 3A 3A && 3B 3B 4kV 4kV buses buses both both deenergized deenergized with with lockout lockout relays relays reset reset 5.5. Determines Determines 3A 3A EDG EDG lockout lockout reset reset && 3B 3B EDG EDG OOS OOS 6.6. Determines Determines 3A 3A EDG EDG running, running, 3A 3A 4kV 4kV bus bus stripped stripped && SI SI reset reset Critical Critical 7.7. Manually Manually closes closes 3AA20 3AA20 and and energiz energizes es 3A3A4kV4kV bus bus BOP BOP Determines Determines 3D 3D 4kV 4kV bus bus energized energized fromfrom 3A 3A4kV 4kV busbus 13 13

AppendixDD OperatorActions Actions Form Appendix Operator FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 ScenarioNo.:

Scenario No.:_2_ 2 EventNo.:

Event No.:_6_ 6 Page20f_4_

Page ...... of 4 EventDescription:

Event

Description:

When Whentransition transitionisismademadefromfrom3-EOP-E-0 3-EOP-E-0 toto3-EOP-E-3, 3-EOP-E-3, the thestartul2 startup transfo transformerrmerlockslocksout.

out. 3A 3AEDG EDGstarts starts but butthe theoutl2ut outputbreaker breakerdoes does notnot automaticallyclose, automaticalll:: close, and and 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.entered. 3A 3A EDG OUtl2ut EDG output breakerisis manualll::

breaker manuallyclosedclosed andand thethe crew crewtransitions transitions backbacktoto 3-EOP-E-3.

3-EOP-E-3.

Only 3A Onll:: 3A && 3D3D 4kV4kV bus bus are are now now available available from from 3A EDG. 3-EOP-E-3 3A EDG. 3-EOP-E-3 isis performed toto cooldown l2erformed cooldown and and del2ressurize depressurize the the RCS RCS to to stOI2 stop I2rimarv-primary-second ary leak secondary leak flow. flow.

i._Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RCO/BOP RCO/BOP Restarts ECCS Restarts ECCS loads loads on on 3A 3A EDG EDG as as directed directed by by US:

US:

Critical Energizes 3A, Critical ** Energizes 3A, 3C3C && 3H 3H 480V 480V LC LC

  • . 3A &

3A & either either U4U4 HHSIP, HHSIP, 3A 3A RHRP RHRP

    • 3A &

3A & 3C 3C CCWPs, CCWPs, 3A & 3C ICWPs ICWPs

    • 3B & 3C ECCs, 3B & 3C ECFs ECFs US US Directs monitoring Directs monitoring of CSFs for implementation.

implementation.

Directs transition Directs transition to and performance performance of 3-EOP-E-3.

3-EOP-E-3.

Defers performance Defers performance of 3-ONO 3-0NOP-004.3P-004.3 since there is no source source of of power and stoppin stopping g pri-sec leak is higher priorit priorityy Determ Determines ines from 3-ONO P-071.2 (event 3-0NOP-071.2 (event 4) 4) that that 3A 3A SG SG is is rupture ruptured.d.

RO RO Perform Performs s actions actions of of 3-EOP 3-EOP-E-3 -E-3 asas directe directed by US:

d by US:

1.

1. Determ Determinesines RCPs RCPs not not runnin running g BOP BOP Perform Performs s actions actions of of 3-EOP 3-EOP-E-3 -E-3 as as directe directed d byby US:

US:

11 . Adjust Adjusts s 3A 3A SG SG steam steam dumpdump to to atmosp atmosphere setpoint here setpoin to 1060 t to 1060 psig psig and and determ ines CV determines 1606 closed CV-3-1606 closed 2.2. Determ Determinesines 3A3A SGSG level level> 6% and

> 6% and FW FW flow flow toto 3A 3A SGSG isolate isolatedd 3.3. Determ Determinesines AFWS AFWSS S train train 11from from 3C 3C SG SG && train train 22from from 3B 3B SG SG Critica Criticall 4.4. Verifie Verifies s MOV- 3-1 403 closed MOV-3-1403 closed && deener deenergized gized (may (maybe be perform performed ed previo usly ininevent previously event4a)4a) 5.5. Determ Determinesines CV 6275A closed CV-3-6275A closed 6.6. Verifie Verifiess aux auxsteam steamsupplie supplied from U4 d from U4directe directedd perper3-ONO 3-0NOP-071.2 P-071 .2 7.7. Determ Determinesines 3A3AMS)V MSIV&&MOV- MOV-3-1427/1426/1425 3-1 427/1 426/1 425 already alreadyclosedclosed 8.8. Determ Determinesines nonos/gs s/g'sfaulted faulted 9.9. Contro Controlsls AFWAFWflowflowtotointact intactSGsSGstotomainta maintainin NRNRlevel level15-50%

15-50%

14 14

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-30 1 ScenarioNo.:

Scenario No.:_2_ 2 EventNo.:

Event No.:_ 6_6 Page~of_4 Page 3 of _4 EventDescription:

Event

Description:

When When transition transition isis made madefrom from 3-EOP-E-0 3-EOP-E-0toto 3-EOP-E-3, 3-EOP-E-3, the thestartuQ startup transfo rmer locks transformer locks out. 3A out. 3A EDG EDG starts starts but butthe the outQut outputbreaker breakerdoes does notnot automaticallyclose, automatically close, andand 3-EOP-ECA-0.0 3-EOP-ECA-0.0 isis entered.entered. 3A3A EDG EDG outQut output breaker isis manually breaker manuallyclosed closed and and the the crew crewtransitions transitions back back toto 3-EOP-E-3.

3-EOP-E-3.

Only Only 3A 3A & 3D 4kV

& 3D 4kV busbus areare now now available available from from 3A3A EDG.

EDG. 3-EOP-E-3 3-EOP-E-3 isis performed to Qerformed to cooldown cooldown and and deQressurize depressurize the the RCS RCS toto stop I2rimarv-stOI2 primary-secondary leak seconda!y leak flow flow..

.....Time Position lillie Position Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Continues performance Continues performance of of 3-EOP-E-3 3-EOP-E-3 actions actions asas directed directed byby US:

US:

1.1. Determines power Determines power to to one one PORVPORV block block MOVMOV available, available, PORVs PORVs closed &

closed & both both PORV PORV block block MOVs MOVs openopen 2.

2. Verifies SI Verifies SI & & phase phase A reset A reset
3. Determines RCS Determines RCS pressure>

pressure > 250 psig & & stops 3A RHRPRHRP BOP BOP Continues performing Continues performing actions of 3-EOP-E-3 3-EOP-E-3 as directed directed by by US:

US:

1.

1. Determines CV-3-2803 Determines CV-3-2803 open & & IA pressure>

pressure > 95 psig 2.

2. Determines no offsite power availab Determines available le to 3A1B/D 3A/B/D 4kV buses due due to to lockout U3 SUT lockout
3. Determ Determinesines 3A SG pressure>

pressure > 500 psig US US Determ Determines ines require required d CET CET temper temperatureature for cooldo cooldown based on wn based on 3A3A SG SG pressu pressure re per per 3-EOP -E-3 step 3-EOP-E-3 step I11a table.

Ia table.

BOP BOP Fully Fully opens opens 3B 3B && 3C 3C steam steam dumpsdumps to to atmosp atmosphere.

here.

Critica Criticall RO RO Contin Continues ues perform performance ance of of 3-EOP 3-EOP-E-3 actions as

-E-3 actions as directe directedd byby US:

US:

11 Starts Starts 3A3A or or 3C 3C chargin charging g pump, pump, stops stops RCS RCS makeu makeup, takes p, takes runnin running g chargin charging g pump pump speed speed to to maxim maximum um &&adjusts adjusts HVC-3 HVC-3-121

-121 for for proper proper sealseal injectio n flow.

injection flow.

2.2. Opens Opens LCV-3 -1 I SB &&directs LCV-3-115B directs NSONSO locally locallyclose close MOV-MOV-3-115C 3-1 1 SC 3.3. Inform Informs s USUS when when CET CET temper temperature ature <<value value from from step step I11laatable table 4.4. Determ ines RCS Determines RCS CET CET subcoo subcooling ling >>50°F50°F BOP BOP Contin Continues ues perform performance ance of of3-EOP 3-EOP-E-3 actionsas

-E-3 actions as directe directed byUS:

d by US:

I.1 . Closes Closes3B 3B&&3C 3CSG SGsteam steamdump dumpto toatmosp atmosphere whenCET here when CET temper ature <<value temperature valuefrom fromstep stepha 11atable table 2.2. Determ ines 3A Determines 3ASG SGpressu pressure re stable/

stable/increasing.

increasing.

15 15

Appendi Appen dixxDD Operato Opera torrAction Actions s Form Form ES-D-ES-D2-2 Op-Tes Op-Te st tNo.:

No.: 2007-3 2007-30101 Scenar Scena rio No.: _ 2_

io No.: 2 Event No.: _6_6 EventNo.: Page Page ~of_ 4 of 4_ 4 EventDescri Event Descripti on: When ption: When transit transition ion isis made made fromfrom 3-EOP 3-EOP-E-

-E-O0 toto 3-EOP 3-EOP-E--E-3, 3, the the startu(2 transfor merlocks startup transfo rmer locks out.

out. 3A 3A EDG EDG starts starts but but the the out(2ut output breake rrdoes automati autom callyclose, close, and bre ake doe s not not atically and 3-EOP 3-EOP-EC-ECA- A-0.

0.00 isis entere entered d.. 3A 3A EDG out(2ut breakerrisis manua EDG outp ut breake manually closed and lly closed and the the crew crew transit transition ionss back Only 3A back to to 3-EOP 3-EOP-E--E-3. 3.

Only 3A & & 3D 3D 4kV 4kV busbus are are now now availab availablele from from 3A 3A EDG.

EDG. 3-EOP 3-EO -E-33 isis P-E-performed (2erfor med to to cooldo cooldow wnn and and de(2re depressssurize urize thethe RCS RCS to to sto(2 stop (2rimar primary-v-sec ond secondaCi ary leak leak flow flow.

Time 111110:; Position Positio n Applican Applic ts Action ant's Actions s or or Behav ior Behavior US US Depress Depre urizes ssurize RCS to s RCS to stop stop primar primary-s y-secoeconndary dary leak leak per per 3-EOP 3-EOP-E--E-33

1. Dete rmin
1. Determines es norma normall spray spray not not availab available le Critical Critica 2. Opens
2. Opens one one PORV PORV.. Close Closes s PORV PORV when when RCS RCS press pressu ure re << SG SG pressu press re with ure with PZRPZR level>

level> 17%

17% OR OR PZRPZR level>

level > 71%

71% OR OR RCS RCS GET subco CET subcoo ling <30°F oling <30°F.. Determ Determin ineses RCS RCS pressu pressure increa sing increasing 3.

3. Determin Determ es ines SI termin terminatiation on criteria criteria met. Stops Stops 3A & & U4 HHSIP HHSIPs. s.

TERMINATI TERMIN ON ATION SI termin terminat ed after ated after stopp stoppin ing g prima primaryry-sec

-secondondar CUE aryy leak.

1616

Appendix Appen dix DD Scenario Scena Outline rio Outline Form Form ES-D-1 ES-D-i Facility:

Facility: Turkey Point Turkey Point Scenario Scenari No.:

o No.: 22 Op Test No.:

op Test No.: 2007-30 2007-301 1 Examiners:

Examin ers: Candidates:

Candida tes: US US RO RO BOP BOP Initial Conditio Initial Conditions: ns: Mode 1, Mode 1, 50%

50% Power, Power, MOL, MOL, Turnover:

Turnove r: Equipment Equipm ent OOS:

OOS: 3B 3B EDG EDG due due toto failed failed fuel fuel pump pump (OOS(DOS 22 days; days; next next perform performance ance ofof O-OSP-023.3 in 023.3 in 44 hrs);

hrs); BB AFW AFW PumpPump due 0-DSP-due to bearing bearing failure failure (OOS (DOS 44 hrs; hrs; ETR ETR 2424 hrs);

hrs); 3B 3B CSP CSP due failed 1ST failed 1ST -low low dischar discharge pressure due to to ge pressur (DOS 12 e (OOS 12 hr; hr; ETR ETR 3636 hr) hr)

Need to Need to swap swap 3D 3D 4kV4kV bus bus power power supply supply to to 3A 3A 4kV 4kV bus bus per per 3-0P-00 3-OP-005 5 section 7.4 after shift turnoverr to turnove to support support upcomi upcoming emergent mainten ng emerge maintenanceance on 3A 3A CCW CCW pump.

pump.

Known tube Known tube leakleak in in 3A3A S/G SIG (2 (2 gpd) gpd) - unchan unchanged for last week. Chemis Chemistrytry sample samples areare being being taken per per 3-0NOP 3-ONOP-071 -071.2,.2, Attachm Attachment ent 1. 1. The current current sample, sample, just comple signifi completedted indicate indicat s no es no cant significant change in in leak rate.

rate. MOV MOV-3-11403 403 remains remains open at managemanagementment directio directionn due to small size and stability size stability of tube leak rate.

Event Type*

Event Type* Event Descrip Descriptiontion No.

11 SRO/BOP (N) SRO/BO P Swap 3D 4kV bus power supply to 3A 4kV bus per 3-0P-00 3-DP-005 5 section 7.4.

2 (I) BOP/RO BOP/RO First stage impulse impulse pressur pressuree channell PT-3-44 PT-3-4466 fails low. The crew respond respondss TFS1MAB TFS1MABL l ==TT (TS,I) SRO per 3-0NOP 3-ONOP-028 -028 to stop inward rod movem ent by taking rod control control to manual and then 3-0NOP manual 3-ONOP-049. -049.1.1.

3 (C) ALL 1 2OVAC power panel 3P09 normal 120VAC TFE6X06F =T normal inverter inverter fails. The auto swap to the CVT TCE6DllC =T also fails leaving 3P09 deenerg deenergized.

ized. The crew respond respondss per 3-0NOP 3-ONOP-003.

-003.9.

9.

3P09 is swapp swappe edd over to the spare inverter inverter per 3-0NOP 3-DNOP-003.-003.9 9 Attachm Attachmentent 1.

4 TFCMM2A4 TFCMM2A4 =T = T (M) ALL The 3A steam generat generator or tube leak grows to 2 gpm. R-3-19 R-3-1 9 fails to respond respond..

TVHHSGA TVHHSGA = = SRO/BOP (I) SRO/BO P The crew respond respondss per 3-0NOP3-ONOP-071 -071.2.2 0.002 (TS) SRO 4a (R) ALL A fast load reducti reductio onn from 50% power is initiate initiatedd and performed per 3-ONO 3-0NOP 100 P--

5 TVHHSGA==

TVHHSGA (M) ALL The 3A steam genera generattor or tube leak grows from 22 gpm into aa rupture 0.4 0.4 (contd (cont'd from rupture.. The reactor is tripped and 3-EOP 3-EOP--E-0 E-0 performed. MOV- MOV 1433 fails to close 3-1433 TFSW33C ==T T event 4) requiri requirin ngg manua manuall isolatio isolation n of of MSIVs MSIVs..

66 (C) ALL When transiti transitio onn is made from 3-EOP 3-EOP--E-0 E-0 to 3-EOP 3-EOP--E-3, E-3, the the startup startup transfo transforrmermer locks out. 3A EDG starts but the output breake breakerr does does not TF05A20A ==TT TFQ5A20A not TA05lRSB =T automa automatically tically close, and and 3-EOP 3-EOP--ECA-ECA-0.0.00 is entered entered.. 3A EDG output breake breaker r TFP1S38S =T is manua manuallly ly closed and the crew transiti transitioons ns back to 3-EOP 3-EOP--E-3.E-3. Only 3A & & 3D 3D 4kV 4kV bus are now now availab availabllee from 3A EDG. 3-EOP 3-EOP--E-3E-3 is is performed to cooldo cooldow wnn and and depres depress surize urize the RCS to stop primar primaryy-seco

-second ndary ary leak leak flow.

(N)orm (N)orma al,l, (R)eac ..

tivity, (R)eact lvlty, (l)nstru (I)nstrum ment, ent, (C)om (C)omp ponent onent,, (M)ajo (M)aJor r 11

TP-2007-TP-20 301 Scena 07-301 Scenario rio #2#2 Event Event Descri Descripti ption on Turkey Turke Point 2007-3 y Point 2007-301 Scenario 01 Scena #2 rio #2 Event 11 - Swap Event Swap 3D 3D 4kV4kV bus bus power power supply supply to to 3A 3A 4kV 4kV bus bus per per 3-0P-0 3-OP-005 05 section section 7.4. 7.4.

Event 22 - First Event First stage stage impuls impulse pressure e pressu channel re chann PT-3-446 el PT-3-4 46 fails fails low.

low. The The crew crew respon responds ds perper 3 ONO P-02 ONOP -0288 to to stop stop inward inward rodrod movem movemen entt byby taking taking rodrod contro cont rol l to to manua man uall and and then then 3-0NO 3-ON P-OP-049.

049.1.1.

Event 33-- 120VA Event 12OVAC power panel C power panel 3P093P09 norma normall inverte inverterr fails.

fails. The The autoauto swap swap to to the the CVT CVT alsoalso fails leaving 3P09 leaving 3P09 deene deenergiz ed.. The rgized The crew crew respon fails responds per 3-0NO ds per 3-ONOP-0 P-003 03.9.9. . 3P09 3P09 is is swapp swap ed ped over to spare inve rter spare inverte r per per 3-0NO 3-ONOP-0 P-003 03.9 Attachm

.9 Attach over to the the ent 1.

ment 1.

Event 44 - The Event The 3A3A steam steam genera generator tube leak tor tube leak grows grows to to 22 gpm.

gpm. R-3-19 R-3-19 fails fails to to respon respond. d. The The crew responds respon ds per per 3-0NO 3-ONOP-0 71 P-071 .2..2. crew Event 4a - A fast load Event load reduct reduction from 50%

ion from 50% power power is initiate initiatedd and and perfor performedmed per 3-0NO 3-ONOP-1 P-100 00..

Event 55 - The Event - The 3A steam genera generator tor tube leak growsgrows from 2 gpm into a rupture tripp ed and and 3-EOP3-EOP-E- rupture.. The reactoreactorr is tripped -E-00 perform performed ed.. MOV-3 MOV-3-1 433 fails to close requiri

-1433 requ iring ng manua MSIVs..

MSIVs man uall isolatio isola n of tion Event 6 - When Event When transit transition made from 3-EOP ion is made 3-EOP-E-

-E-0 0 to 3-EOP 3-EOP-E- -E-3, 3, the startup startup transfo transform rmerer locks locks out.

out. 3A EDG start EDG startss but the output output breake breakerr does not autom automati aticall cally y close, close , and 3-EOP 3-EO -ECA-P-EC 0.0 A-0. 0 isis enter ed.

entered. 3A 3A EDG output output breake breakerr is manua manually closed and the crew transit lly closed trans ionss back to 3-EOP ition 3-EO -E-P-E-

3. Only
3. Only 3A 3A & & 3D 4kV bus are now availab availablele from 3A EDG. EDG. 3-EOP 3-EOP-E- -E-3 3 is perfor performedmed to cooldo cooldow wnn and depres and depressu rize the RCS to stop primar surize primary-s econndary y-seco dary leak flow flow..

22

TP-2007-301 Scena Scenarrioio #2 Event Description Scenario XXII XXIIII NRC 2 Simula Simul tor Opera ator Operattinging Instru Instruc tions ctions Setup IC-2 (50% MOL)

Place simulator in run.

Trigger lesson steps:

SETU P - 3B EDG OOS (actuate (actuatess TAQ5LR TAQ5LRSB SB == OFF (0) & & TAQ5B TAQ5B2OP RACKOUT 20P = RACKO (3))

UT (3>>

SETU P - B AFWP OOS

- QOS (actuate (actuatess TAFK24 TAFK2444 = TAFKO022 =

= 0.0, TAFK00 = 0.0, TAFF01 TAFF01B B== 0.0, TCF5MTB = = T)

SETU P - 3A SG 2 GPO GPD LEAK (actuate(actuatesTVH HSGA s TVHHS GA =O.00

= 0.00000 0001313))

SETU P - 3B CSP OOS

- 005 (actuate (actuatess TAM1D TAM1 DPOBPOB = RACKOUT

= RACKO TCM1 D41 UT (3) & TCM1D 41 M = FALSE)

FALSE)

SETU P - 3P09 AUTO SWAP TO CVT FAIL FAlL (actuate (actuatess TFE6X0 TFE6XO6F 6F =

= T)

SETU P - R-3-1

- R-3-1 99 FAIL AS IS (actuate(actuatess TFCMM TFCMM2A4 2A4 == T)

SETU P - MOV-3-1

- 3-143 4333 FAIL AS IS (actuate (actuatess TFSVV33C = =T)

T)

SETU P - 3A EDG BKR AUTO CLOSE FAIL (actuate (actuatess TFQ5A TFQ5A2OA 20A == T then = = F when IMQ5A2 IMQ5A200)0C)

Selectt chann Selec Ill as the 11 channeell III sstt stage turbin turbine e impulse press pressu re contro ure controlling channeell on VPA.

lling chann Start train A chilled water and secure train B chilled water (CR HVAC panel)panel)..

Acknowledg Ackno wledge e any alarm alarmss (B-2/2, B-2/3, B-213, 0-6/2 D-612 & E-2/5 normal for 50% power power;; F-9/2 F-912 & F- F 9/5 due to 3B EDG OOS) and place simulator in freeze freeze..

Place cleara clearan nce ce info tags on 3B EDG normall start switch, B AFWP T&T valve control switch & 3B CSP control switch.

Remov Remo vee AFW train 2 orang orange e tag from B AFWP tacho tachom eter just below ann. panel X.

meter Provide shift turnover check checkllists ists and 3-0NO 3-ONOP-071P-071 .2 .2 Att 1.

Selectt 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 Selec (RVL). Set ERDADS on VPA to Tavg/Tavg/T ref (TAV) and at the RCO desk to ENVRN (ED3)

Tref (ED3)..

Fill in blend blende err & shutd shutdoown wn boron addition placar placard dss at conso consollee blend blendeerr station. Data Jor each IC may be found in the ECC & Shutd for Shutdoown wn Guide Guidellines ines Book in the simulator IIF. I/F.

3

TP-200 TP-20 7-301 Scena 07-301 Scenar io#2 rio #2Event EventDescri Descripti ptionon Event Even t 11-S wap 3D

- Swap 3D 4kV 4kV busbus to to 3A3A4kV 4kV bus Initiate bus Initiat eddby bycrew crewper pershiftshiftturno turnoveverrusing using3-0P- 3-OP-0 00505sect sect 7.4.

7.4.

Crewmust Crew muststart start3A 3A ICWP ICWPand andsecur secure 3C ICWP e 3C ICWPper per3-0P-3-OP-0 019 ..

19..

Respon Respo ndd ifif direct directed ed as as NSONSO toto perfor perform pre-sta m pre-st artrt check checks s for for 3A 3A ICWP ICWP and and post-post-shu tdo wn shutdown check checks for 3C s for 30 ICWP ICWP.. Repor Reportt allall condit conditi ions ons norma normall..

Respon Respo ndd ifif direct directed ed toto locally locally verify verify voltag voltage e onon 3D 3D 4kV 4kV bus.

bus. Click Click onon Sche Schema ma~M *MAAIN IN PO WE R DlS POWER DISTRI8UTlO TR lBU TION N 4KV && 480V

~4KV 480V AC~3AC*3D D 4KV4KV 8US~

BUS Repo

>R rtt voltag epor e indica voltage indicat ted on 3D on 3D busbus mimic mimic.. ed As SM, As SM, direct direct crewcrew to to leave leave 3A 3A && 383B ICWP ICWPs s inin servic service e Respon Respo ndd ifif direct directeded asas NSONSO to to perfor perform pre-sta m pre-st rt check art checks s for for 3C 30 ICWP ICWP and and post-post-shutdo shutd ownwn check checks for 30 s for 3C ICWP ICWP.. Repor Reportt allall condit conditiions ons norma normall..

Eventt 2 - PT Even PT--3-44 3-446 (chann 6 (chan Ill 11 el III nel st stage impu st stage Fol lowing impullse se pres pressu surere)) fails fails low Follow ing trans transferfer of 3D 4kV of 3D 4kV bus to 3A 4kV bus, bus, trigge triggerr lesson lesson step EVEN EVENT T 22 - PT-PT-3-446 FAILS 3-446 FAILS LOW LOW (actuate (actuatess TFS1M ABL =T).

TFS1 MABL Cre w Crew willwill respo respond nd per 3-0NO 3-ONOP-02B P-028 and take rod contro mo controll to manu manual al to stop inwar inward d rod rod vem ent.

movement. Then The n the respond crew will respo nd to the instru instrum ment ent fai/ure failure per 3-0NO 3-ONOP-049P-049.. 1.1.

Responnd Respo d if direct directeded as NSONSO to reset reset AMAMSA SAC trou troubl e. Aft ble. After min, trig er 1-3 mm, trigge gerr less lesson step EV EN T EVENT 2 - BY BYPAPASS AM SAC PO on step AMSA WER I1 (actu POWE (actuate ate TCL TCL4P14P1 BA == T then TCL TCL4P1 4P1 BB == TT after after 30 30 sec sec and TCL 4RSTT == TT after and TCL4RS after an an addi tionaall 30 sec). Res addition Reset etss ann annun uncciator iator D-70-716. Repor

/6. Rep ortt whe when compl n com ete.

plete.

Res Respoponnd d if dire cted direct ed as WC wee C to init iate PW initiate PWO O and and not notify I&C.. Als ify l&C Also respo o resp nd as wee as WC dire cted to directed to gener gen erat atee aa clea rannce ce for bist ond C ifif cleara able bistab les s trip trippepedd for PT- PT 446 failure 3-446 fail ure .

Ann Annun uncciator iator 0-8 /3 alar C-BI3 alarm mss whewhen n PT-PT-3-3-4446 46 fails fai/s..

Ann unc Annunciatoriatorss 0-6 /1, 6/2 C-611, 612 && 6/3 alar 613 alarm m unt il ch until ch IV IV l 1st stag stage impuls e imp ulsee pre press ssuure select re sele ed for cted for con trol control. .

Ann Annununcciator iatorss C-7 /1, 7/2, C-711, 712, 7/3713 alar m due alarm due toto trip trippin pingg bistbistab ableles.

s.

44

TP-2007-TP-20 07-301 301 Scena Scenar io#2 rio #2 Event Event Descri Descripti ption on Event Even t 33-L- Loss ossof3 of 3P09PO9 After crew After crew briefbrieffor for PT PT-3-4 44646 failure failure,, at at lead lead exam examin iner er direct directio ion, n, trigge trigger r lesson lesson step EVENTT 33 - LOSS EVEN LOSS OF OF 3D 3D INV/3 INV/3P step P09 09 (actuate (actuates TCE6DI1 s TCE6D I1CC ==T). T)

Thi s dee This deene ner gizes 3D rgizes 3D inverte inverter.r. Since Since the the auto auto transf transfer er to to CVT CVTwas was fai/edfailedat at setup, setup, 120V 120V vitalinstru vital instrum ent pan ment panel 3P09 el 3P09 isis deene deenerrgizedgized.. The The crew crew respo resp nds ond s per per 3-0NO 3-O NO P-003 .

P-003. 9 and 9 and reenerg reene izes 3P09 rgizes 3P09 from from the the OSDS inverte inverter.r.

Respon Respo ndd asas FS/NS FS/NSO O when when direct directed to check ed to check out out 3P09 3P09 && 3D 3D inverte inverter.r. After After 1-3 1-3 min, report 3P09 report 3P09 deene deenerrgized gized with with no mm, no other other unusuunusua all condit conditiions ons and and 3D 3D invert inv er DC input breake erte r DC input break err CB1 CBI trippe tripped d..

Respon Respo ndd asas WCCWOO ifif direct directed ed to to have have Electr Electriical cal check check out out 3P09 3P09 for for reene reenerg rgizat ization.

ion. AfterAfter 8-1 8-122 min, mm, report report 3P09 3P09 okay okay to to reene reenerg ize from rgize from OS DS invert inverte er. r.

When direct When directed ed asas FS/NS FS/NSO to to reene reenerg ize 3P09 rgize 3P09 from from OS DS invert inverte er,r, wait wait 1-3 1-3 minmm then triggerr the trigge the follow following lesson then ing lesso steps per n steps per 3-0NO 3-ONOP-003 P-OO39 .9 Att.

Att . 1:

1:

Step 1:

Step 1: EVEN EVENT 33 - OPEN OPEN 3D 3D INVER INVERTER TER CB6 CB6 (actuate (actuates s TCEDI4 TCEDI4C C ::: F)F)

Step 2a:

Step 2a: EVEN EVENT 33 - OPEN OPEN ALL 3P09 3P09 BREA BREAKERS KERS (actuate (actuates s TCE621 TCE6217 7S:::

S = T) T)

Step 2b: EVEN Step EVENT 3 - OPEN OPEN ALL 3P24 3P24 BREA BREAKERS TCM2DX KERS (actuate (actuates s TCC2D TCC2DL LM3 M3 F,::: F, TCC2D TCC2DLLM M :::= F, F,

TCM2D 3M = F, X3M::: F, TCC2D TCC2DL E = F, LE::: F, TCC2D TCC2DP PEE == F, TCF1D TCF1DA A3M:::

F, TCN14 TCN14O 3M = F, F, TCK724 TCK7240 07:::

7 = F,F, TCCMP TCCMP2 248:::

48 =

F, 9M=F,, TCN14 09M=F TcN14I0 M=F&Tc 10M:::F &TCN1 N14411M::

1IM=F) :F)

Step 5a: EVEN Step EVENT 3 - 3P09A 3P09A SWIT SWITC CH H TO ALTE ALTER RNAT NATE E (actuate (actuatess TAE6X3 TAE6X34 :::= ALTER ALTERN NATE)

ATE)

Ste Step p 6: Call as NSO NSO & & reque requesstt RO take both both group groupss of PZR backu backup p heate hea tersrs to to OFF.

OFF.

Ste Step p 7: EVENT 3 EVEN 3-C LOSE

- CLOS 3P09 MAIN E 3P09 MAINII3 /13/o2 IO2 (actuate (actuatess TCE6D TCE6DS S4C4C= ::: T, T, TCF TCF1D 1DA A2M:::

2M= T after 5 sec & TCH19O 2M ::: T after 1100 sec) 1902M T Step 8:

Step EVENT 3 EVEN T 3 - CLOS CL OSE OTHE OTHER 3P09 3P09 BREA BREAKERS KERS (actuate (actuatess TCE TCE6D 6DP P2C:::

2C = T, T, TCE TCE6D 6DP 3C =::: T after 5 sec, TCE P3C TCE6D 6DP 4C =::: T after 10 P4C 10 sec, TCM TCM2D 2D9 95M:::

5M T after 15 15 sec, sec, TCE TCE6D 6DP 5C P5C ::: T after 20 sec, TCE

= TCE6D 6DP 6C =::: T after P6C after 25 sec, TCE TCE6D 6DP P7C 7C ::: T after 30 30 sec, TCC TCCMDMDR E T after 35 sec, TCE RE::: TCE6D 6DP 8C T after P8C::: after 40 40 sec, TCN TCN191 191 1M:::

1 M = TT after 45 sec, sec, TCN TCN191

=TT after 50 sec, TCC TCCMD MDR E3 == TT after 55 RE3 19122M M 55 sec, TCB TCB2M 2M9 915 I5 =::: T after after 6060 sec, sec, TCE6D TCE 6D5 58C  ::: T T after after 65 sec, sec, TCD TCD2M 2MC CL T after CCL = after 70 8C

= 70 sec, sec, TCE TCE6D 6DP 9C =::: T after P9C after 7575 sec, sec, TCM TCM2D 2D99TM TCE TCE6D6D556C6C ::: TT after TM =::: TT after after 8080 sec sec & &

after 85 85 sec) sec)

Ste Step p 9:9: EV EVEN ENTT 33 CLOS- CLOSE E 3P23P24 4 BR BREA EAKE KERS RS (actu(actuate atess TCCTCC2D 2DLLM3 M3 ::: F, F, TCC TCC2D 2DLLM M =::: FF after after 55 sec, sec, TCM TCM2D 2DX 3M = FF after X3M::: after 10 10 sec, sec, TCC TCC2D 2DLLE:::

E = FF after after 15 15 sec,sec, TCCTCC2D 2DP PE:::

E F after 20

= F after 20 sec, sec, TCF 1 DA3M TCF1D = F A3M ::: F after after 25 25 sec, sec, TCK TCK724 724007:::

7 = FF after after 30 30 sec, sec, TCCTCCMP MP2248:::

48 FF after after 35 35 sec, sec, TCN 14O9M TCN140 9M =::: FF after after 40 40 sec, sec, TCN TCN141141O0M:::

M = FF after after 45 45 secsec && TCNTCN141 141 11M M =::: FF after after 50 50 sec) sec)

Ste Step p 10:

10: EV EVENENTT 33 - 3Y0 3Y07B 7B SW SWIT ITC CHH TO TO BA BACK CK UP UP OS DS INVER INV ER TER TER (actuate (actu ates s TAE TAE6X2 6X244 :::

ALT ALTERERN ATE)

NATE)

Ste Step p 12:

12: CallCall as as NS NSO O and and rep ort Att.1 report Att.1 com compl pletete.

e.

Res Respo ponnd d asas NS NSO O ifif dire directcted ed toto dep depre ressss andand holdhold relarelay y LC LC45 4599X X to to allo alloww rest restor oraation tion of of letd letdowownn andand PZR pre ssu PZR press urelle re/leve vell con troll.. Afte contro After r 1-3 1-3 mm,min, trigtrigge ger r lesson less on step step EVEN EVE NT T 3-PRE PRES SSS II HOL HOLD D LC LC45 4599CXCX (actu 3 -

atess T0H (actuate 24599C TCH245 T). Wh c =::: T). When en diredirect cted ed to to releas rele e LC459 trig gerr less on step ase LC 459 CX, 0X, trigge lesson step EV EVEN ENTT 33 - RE - RELE LEA ASESE LC LC45 4599CXCX (actu (actuate atess TCH TCH24524599C C == F). F).

Ann Annun uncciator iator F-1 F-112/2 rem remai ainsns in in due due to to fail ure of failure of3D 3D invinverte erter.r. Ann Annun uncciator iator B-7/ 8-711 1 willwill rem remai ainn on on until until PRN I N-4 4 PRNI N-44 rod stop rod stop byp bypas asss swi tch isis take switch taken n toto rese reset. t.

55

TP-200 TP- 2007-3 7-30101 Sce Scenario #2 Eve Event Des Description Ev Even ent 4/4414aa - 3A SG 2 gpm tube lea Once Once the the pro k

proces cesss of of 3P3P09 restoration has begun les les son step EV ste EVENT 4 - 3A SG 2G (crew brief complete), trigger 2GP PM M TU TU BE BE LEA LEAK K (act (actuate uatess TVH TVHHSG Crew sho Cre should see see incincrearease se in R-3R-3-15 & SJA HSGA == 0.00 0.002) 2)

ONOP SJA E SP SP IN ING G rea din din gs gs and res ON OP-07

-071.21.2. An Annunnunciator H-1/4 ala pon d peperr 3-alarms rms soo soo n aft afte err lea k rat rate e inc inc 19 fail 19 failure ure ententere d at setup, act rea rea se.

se. Du Duee to the R action ions trig triggergered ed by R-3-19 hig h radiati perforformed manua nually lly//lo loccal ly.. The iati on on ala rm mumust be ally The crew should init init iate iate a fas 100 100 to rem remove the unit from t loa d red uct ion per 3-03-ONONOP- P-from servic vicee..

Respond as NS Re NSO ifif ask ed to check unit 3 con denser air inle con den inleakakaagege.. Re port 0 scfm.

Respond as Ch Re Chemistry wh when en dire direct cteed d to sample SG s and MS line liness per 0-NCA After Aft 15-20 min er 15- mm, ide idenntif tifyy elevated act CAP-1P-1 04.

actiivit vityy in the 3A SG.

Respo nd as HP wh Re when en dire directcteedd to perfor formm rad readings on MS & blo wd ow 10- 15 min mm, report radiation slightl htlyy> n line lines. Aft After

> backgroun d on 3A MS line. HP direct dire cteed d to survey Tur Turbi binne e De ck aro und SJA E effl ma y als o be efflue uen ntt & rope off con tam ina ted areas.

Respond as NS O wh when en dire directcteedd to realig lign n aux steam to Un Uniitt 4 per 3-0

3. AftAfter er 2-4 minmm, trigger lesson step EVENT 3-ONONOP-0 P-071.71 .22 Att.

Att.

TAFF07 FO75 =

4 -

- AL IGN AU X STE ST EA AMM FR FRO OMM U4 (act FO2 =

= 0.0, TAFF02 = 1.0 after 60 sec

& TAFFOO (actuates F007 = 0.0 after 120 sec) sec).. Report wh Annun An nunciator 0-4 D-4/6/6 will will alarm during this wh en com ple te.

this proproces cess.

Re spond as NSO wh when dire direct cteedd to loc locaally lly check CV 1150 5000 && byp bypassass valve 3-20-014.

After Aft er 1-3 min mm, report both val valves clo closed sed.

Re spond as Sys Syste m wh tem when notified that Un Uniitt 3 is to be rem oved from servic e.

Re spond as SM wh when notified to refe referr to 0-EPIP-201 01 & 0-ADM

-1

-1115.

5.

Event 5 - 3A SGTR I Reactor tri trip p I Safety injection At evaluator dir direction after 5-10% po pow weerr reduction (in any cas casee before reaching 25% po pow weer) r),, trigger lesson step EVENT 5 0.4)..

0.4) - 3A SG TUBE RUPTURE (actuate s TVHHSG HSGA A==

The crew should recognize the inc increa rease in tube leakage to >> chargi Perr 3-0 Pe 3-ONONOP-0 P-071.

71.2, the crew should rgin ngg pump cap capacity.

uld trip the reactor and enter 3-E steam stop MO MOV-3 V-3-1-14433 33 fai OP -E- 0. MS R main faillur uree to close requir uireess ma nua nua ll level < 12% requir clo sur e of all MSIVs. PZR uireess manua nuall safety inje inject ion ctio n..

Respond as NSO when dir direect edd to place PAHMS in servic cte minut min utees,s, trigger lesson step EVENT vice on unit 3. After 8-12 5 - PLACE U3 PAHMS IN SE SERV RVICE TAC2VO 2V02A = = 1.0, TAC2VO 2V02B 28 = 1.0, (actuatess 1.0, TAAAV21 = = 1.0, 1.0, TAAAV22 == 1.0 1.0 & TAC comple te. TACAOO A005 == 0.0). Report wh en 66

TP-2007-3 01 Scenario #2 Event Description 7 -301 Ev Even entt 6 - Lo- Loss ss of offoffsit site power I 3A EDG auto Imme Imm dia edi tely ate ly after entry into start fails o 3-EOP-E-3, trigger lesson ste LO CKOUT I LO LOOP (act (actuate p EVENT 6 - U3 SUT -

uates TFP1S31S3S 8SS = T)

A spurio riouus lock s loc outt on the unit 3 SUT combin kou failure ure (from setup) and 38 EO bined with with 3A EO EDG output breaker auto clo fail EDG OOS (also from setup) cau closese AC power. 3-EOP-ECA-O.O is ent causes a momentary ry loss of al/ all ered and the 3A EO EDG output breaker is manua closed clo sed afte afterr whwhiich ch the crew retu return nua lly lly rnss to 3-EOP-E-3 to complete res ponse pon se to the SGTR.

Re spond as NSO if dire direct edd to check the condition of the cte 3A EO EDG running unl 3A EOEDG. Aft After 1-3 min mm, report unload oaded, oth erw ise nothing unusua ma nual out put bre aker clo l. If ask ed to mo nitor 3A EO EDG afte afterr closursure, report EO EDG running sat satiisfa sfaccto toririly ly..

Re spond as Sys Syste m//SA tem SAC O if ask ed about U3 SUT loc bein bei ngg dis pat ched to check out the tran lock outt.. Re kou Rep porortt that per sonnel are transf sfo orm rme err (sw itch yard still available).

Re spond as U4 RO wh when dire direct cteedd to perform 3-E OP-E-0 Att 11 to U3 RWRWST ST.. Aft After er 1-3 minmm, trigger lesson step EVENT align U4 HH HHSIPSIPs to RWST (act RW (actuate uates TAMH1V 6

6- - AL IGN U4 HH HH SIP TO U3 H1 V41 41 == 1.0, TAM TAMH1V H1V46 46 == 1.0 afte afterr 11 min mm dela delayy,, TAM TAMH1VH1V37 37 = 0.0 afte afterr 2 min TAMH48 TAM H485656 = afterr 3 min

= 0.0 afte mm dela delayy,,

mm dela delayy).

). Rep Re ortt wh por when complete.

Re spond as NSO wh when diredirect edd to loc cte locaally lly verify pha se A val valves MO V-3-1 closed clo sed (in the U3 Pipe & Va Vallveve Ro -1441717 & 1418 Roo omm). After 1-3 min

). Aft mm , trig ger les CLOSE MOV-3-1 CL -1441717 & 1418 (act son ste p EV ENT 6 - -

(actuates TFKV417C = = T & TFK TFKV418C =

when com wh complete. afterr 11 min

= T afte mm dela Rep

). Re delayy). ortt por Re spond as NSO wh when dire direct cte edd to loclocaally lly clo closese LC LCV-3 V-3-11-115C 5C.. Aft After les son step EVENT 6 - LOCALLY er 1-3 min mm, trig ger

- LLY CLOSE LCV-3-1 -1115C SC (act uate when com wh compleplete. s TFB VC6 2 = T). Re Reppor ortt When dire Wh direct cte ed d as FS/NSO to deenergize MO 3 min V-3-1 -14403 03 by opening bkr 400 4D01-2 1-28, afte mm, trig ger les son step EV ENT 6 6-- DEENERGIZE MOV-3 afterr 1-Re port wh when com ple te. If dire V-3 -14

-14 03 03( actu (actates uate TC s F5M TCF B28 5MB 28 =F)

= F)..

directcteedd to verify MO V-3-1 -14403 03 clo closed that this is the case. sed, afte afterr 1-3 min mm, report If dire directcte edd to align auxiliary steam supply from or afte afterr 2-4 min U4,, eith er report that this is alre U4 alread mm, trigger lesson step EVENT 44- adyy don e TAFF07

- AL IGN AU X STE ST EA AM M FRO FR OM M U4 (actuates FO75 == 0.0, TAFFO2 F02 = = 1.0 afte afterr 60 sec & TAFFOO F007 = = 0.0 afte afterr 120 sec) sec).. ReRep ort An Annnununc cia iato torr 0-4 D-4/6 will will alarm during this pro por t wh wh en com plete.

procescess.

If asked as NSO to loc locaally lly verify MO V-3-1 -14 425 closed 25 clo sed, afte afterr 1-3 minmm, report that this is the case.

The crew may try to reenergize 38 4kV bus using 3-0 3-ONONOP-0P-004. 04.33.. Since 38 OOS and the U3 SUT is locked 3B EO EDG is out, such attempts will will be unsuccess essful ful..

7

NR C-2 OP OPE ER RAT ATI IOONS NS SH SHIFT IFT TU TURN RNOV OVER ER RE PO REP ORT RT ONCO ON COMI MIN NG G CRCREW EW AS ASSIG Shift Mgr: SIGN NM MENENTS TS Field Supv.: Inside SNPO:

Admin RCO: Outside SNPO:

ANPO:

Unit Un it 33 Unit Supv.: Un Unit it 44 RCO: Unit Supv.:

NPO: RCO:

NPO:

Plan Pla ntt Sta Stat tusus Unit 33 Un Mode: Un Unit 44 1

Power: Mode:

50 1 MWe: Power:

348 100 Gross Leakrate: MWe:

0.03 759 RCS Boron Conc: Gross Leakrate:

907 0.04 RCS Boron Conc:

600 Operational Concerns:

3 AF AFWP WP OOS (bearin aring failur g fail uree;; OOS 4 hr; ETR 24 hr) 3B 3B ED EDG G OO OOS S (fue (fuell pump fail faileded;; OOS 2 days; next 0-OSP-3B CSP 3B CSP OOS (fai (failed SP-02 023 3.3.3 in 4 hr) 1ST -lo led IST loww disc dischahar rge ge pre ssu Tra re; OO S 12 hr; ETR 36 hr)

Trainin A A is protecttected ed..

Swap Sw ap 3D3D 4kV bus power supply to 3A 4kV bus per 3-O 3-0 P-005 sectio ma maint inteenanannce ce on 3A CCWP (vi tionn 7.4 to support possib sibllee emergent ent (vib brarati tioon n increase las last t shif shi t).

ft).

22 gpd gpd tube lea k leak in 3A S/G - unchanged for past we Po Pow weerr on hold at 50% follow wee ekk (Chemistry sampli plinngg per per 3-O 3-0 NOP-0 foIl ing . inadverte rten ntt 3B P-077l.21.2,, Attachment nt 1.)

1.)

3B SGFP FP .

trip wh wh ile' ile investiga. tion in progress.

U3 Anticipated LC LeO o Ac tio ns:

Cu Currre rennt:t:

BB AF AFWP WP - TS TS 3.7.1.2

.1.2 Ac Acttio ionn 33 (trainsins verifieifiedd operab rablele jus justt bef 3B 3B EDG -T - TSS 3.8 .l.1 before ore tur turn ove nov er;r; 30 30 day dayss toto rep repair air))

.l.1.b.1

.b.1 Ac Acttioionnss bb & dd (0-(0-OOS SP-P-0023 23..3 EDGs Att 3 Att 1 1 & 99 eve eve ry ry 8 8 hr; hr; 3/4 3/4 -0S

-O P-0 23.

Gs not not reqreq 'd; 3-O d; 3-0 P-023 23 secsectt 7.7 SP -02 3.1 1 starrtt of sta of oth other er 3B 7.7 due due nex nextt shi shifftt if ifOOO OSS > 72 72 hr; rep 3B CS CSPP - TS 3.6 TS 3.6..2.12.1 Ac Acttioionn aa (Fi(Fix x in

> hr; rep air air in in 14 14 day day s) s)

Anticipated: No in 72 72 hr) hr)

Nonene Train A is protected.. OLRM OLRM is is green (CDF = 2.0 2.06E 6E--6; 6* LE LERF U4 RF = 9.2 9.28E8E--8) 8.

U4 Anticipated LCO Actions:

Cu Currre rennt:t:

B B AFAFWP WP - TS TS 3.7 3.7.1.2

.1.2 Ac Acttio ionn 33 (tra (trains ins ver verifie ifiedd ope operab rable lejus justt bef 3B 3B ED EDG G -T- TS 3.8.1.1 S 3.8 before ore tur turn novoveer;r; 30 30 day dayss to to rep repair air)

.1.1.b.1

.b.1 Ac Acttioion nss bb & & dd (0-(0-OOSSP-P-0023 23..3 )

Att 3 Att I1 &

& 9 9 eve eve ry ry 88 hr; hr; 3/4 3/4 -0S

-O P-0 23.

ED EDGs Gs not not req d; req'd; fix fix in in 14 14 day days)

SP -02 3.1 1 star sta rtt of ofoth other er Anticipated: No s)

Nonene Train A is protected. OLRM is green (CDF 2.OOE-6; LERF Results of Offgomg Focus Ar

=

= 9.28E-8).

ea:

See g:\Ops\Common\0900

Uniitt 33 St Un Statu atus s

.'- Reac Re actor tor OpOpe era rator tor Mode:

Mod e:

Powe 1I RCS Lea RCS Leakr Pow er:r: 50 kraatete Acc 50 Gross Gro ss:: Accumumulaulator tor Ref Ref Lev elss Level MWe:e:

MW 0.03 gpm 0.03 gpm 348 348 Unden Uni identi fiedd tifie AA 661 66155 Tavg:

Tav g: 0.02 gpm 0.02 gpm 559 559 Charg Cha ing rgin Pps::

g Pps BB 664 66400 RC RCS Pre S Pressu ssure: re: 223 0.01 gpm 0.01 gpm CC 22355 662 66255 RC S RCS Boron Con Bo ron Conc: 907 e: 907 Ab AI____.

.rnn()riux,ma iiiu l AIi Anhtin nunciaf ciatororss:: ' . .  :

.':;,,< ',i) ':: '.': 'i!, ,!I :';

.... ,*. t<:~;,.l!, !., .>t~,;i:;.

Annunci Ann unciato atorr:: FF 9/2 9/2 - 3B 3B EDG EDG OOS OOS

)

\i:::!i,".:;'7 * ' ..';:!?\*C:

Compp Acti Com Action ons: s: O-OSP-0 SP-023 O-O 23.3.3 Att Aft 11 && 99 due due in in 44 hou hours.

rs. 3/4-Ann unc iato r: 3/4-OS 0SPP-0 23..11 not

-023 not requ require iredd.. 3-0P Annunciator: FF 9/5 9/5 - 3B 3B EDGEDG OOS OOS 3-OP-0

-023 23 sect sect 7.7 7.7 due due nex next shif shift.t.

Compp Acti Com Actionons: s: O-OSP-0 SP-023 O-O .3 Att 23.3 Att 11 && 99 due due in in 44 hou hours.

rs. 3/4-Ann unc iato 3/4-OS 0SPP-0 23..11 not

-023 not requ require iredd.. 3-0P Annunciatorr:: 3-OP-0

-023 23 sect sect 7.7 7.7 due due nex next shif shift.

Compp Acti Com Action ons: s:

Ann unc Annunciiato atorr::

Compp Acti Com Actionons: s:

Ann Annunci unciato atorr::

Compp Acti Com Actionons: s:

Annunci Ann unciato atorr::

Compp Acti Com Action ons:s:

Ann unc Annunciator: iato r:

Compp Acti Com Action s:

..~

ons:

Ann Annunci unciato atorr::

Compp Acti Com Action ons:s:

Annunci Ann unciato atorr::

Com p Comp Actiion Act ons:s:

Ann unc Annunciator: iato r:

Com Compp Act Actiion ons:s:

Cu Curre rrent nt Te Tec ch h SpSpe ecc AcActtioion n Statements: s: (D(Do oes es Not Includ T.S T.S.A.S.AS // Com Compon ludee F "Fo orr Tra Tracki ckingng On Onlyly Ite Itemmss" ponent:

ent: 3.7.1.2 Action 1.2 Action 33//BB AF AFW WPP Rea son Reason:: Bearing ring fail faile edd Ent Entrryy Dat Date e:: XX Xx//XXXx//XX XX (Previo viou uss shif shift)t)

T.S .A.S T.S .AS / Com / Compon ponent: 3.8. 1.1 ent: Act 3.8.1.1 Actiion ons s bb & & dd //3B 3B ED EDGG Rea Reasonson:: Fue Fuell pum pumpp fail faile edd Ent Entrryy Dat Date e:: XX XX//XXXX//XX XX (2 (2 day days s ago ago))

T.S .A.S T.S .AS / Com / Compon ponent: 3.6. 2.1 ent: Act 3.6.2.1 Action ion aa // 3B 3B CSP CSP Rea Reasonson:: Fai Failled ed 1ST 1ST - low low discdischar harggee pre ssu pres re sure Ent Entrryy Dat Date e:: XX XX//XXXX//XX XX (Ye (Yester sterday day) )

T.S .A.S T.S.A.S / Com / Compon ponent: 3.4.

ent: 3.4.33 Act Actiion on aa // 3B 3B PZR PZR bac back kup up hea heatters Rea Reason son:  : 14 ers 14 day day due due to to 3B3B ED EDG G OO OOS S Ent Entrryy Dat Date e:: XX XX/XX/XxIXX/XX (2 (2 day days s ago ago))

T.S T.S.A.S

.AS / Com/ Compon ponent: 3.5.

ent: 3.5.22 Act ion Action f /3Bf/ 3B HH HHS SIPIP Rea Reason son:: 14 14 day day due due to to 3B 3B ED EDG G OO OOS S Ent Entrryy Dat Date e:: XX XX/IXX XX//XX XX (2 (2 day days s ago ago) )

T.S T.S..A.S /

A.S / Com Compon ponent:ent:

Rea Reason son: :

IEnt ryy Dat Entr Date e::

Chang Cha ngees s toto Ris Riskk Sig Signifi nifican Uniitt 3 St Un Statu atus s cantt Equ Equipm ipmentent::

BB AFW AFWP DOSS (Be P OO (Bearin aringg rep replace lacemen ment) t) 3B EDG 3B EDG OO DOSS (Fu(Fuelel pum pumpp repa repair) ir) 3B CSP 3B CSP OO DOSS (Fa (Failed iled 1ST 1ST -lolow dischar w disc hargege pres pressu re))

sure Unitt 33 Risk Uni Risk isis GR GREEN EEN.. Mai Main contribu n con tributotorr isis BB AFW AFWP P..

Upcomi Upc omn9_ing Rea Reactiv ctivity ity Man Manag ageemmeent Activiti nt Act ivities:

es:

Dilute Dilu to mai te to maintai ntain 50%

50% pow power er unti untill 3B 3B SGF SG FPP inadvert inad vertent trip cau ent trip return retu rn 3B3B SGF SGFP P toto serv service and causese eva evaluat luateded and and manmanageagement perm and com commen mence ce powpower er incr increas eased ed to 100 permisissio sionn received to 100%.

Upcom Upc oming Maj Major POD Act or POD Activiti ivities:

es:

Return to Ret to 100 100% pow power er if/w if/when hen man management perm permis sion issio n received to com commen mence power incr increas ease.

Upcom ing ECO ECOs s to Hang and lor br RelReleaeasse:e:

None

/"~~

Evolu Evo tio luti ns or Com ons Comp penenssatato ry Act ory Actioion ns s in Progre gress:

ss:

- Awa

- Awaiti ng perm iting permis sionn to restart 3B SGF issio SGFP P and com inadver commence power incr increas ease to 100%.

verttent ent trip of 3B SGF SGFP P while inve investi gati  %. Power on hol hold d at 50% foll folloowi winng stig atioon progre n in prog ressss.. g

- Afte

- Afterr shift turnover, swap 3D 4kV bus power sup support possible emergent sup ply ply to 3A 4kV bus per 3-O 3-0 P-0 P-005 sec nt maintenance on 3A CC section tion 7.4 after shift turnover to

- Known tube tube leak in 3A S/G (2 gpd) CCW W pump (vibratio rationn incr increas ease last shift).

- unchanged for last week. Che Chemis 071.2, Att Attaach chm menentt 1. The cur mistry try samples are being taken per currren entt sam sample,ple, just completed ind icat 3-0 NO P-3-O remains ene energiz rgized at managemen indi catees s no sign sign ific ificaant nt change in leak rate. MOV-3-140 mentt direction due to sma ll small size and stab -14033 OSP-023.3 Att 11 && 9 for 3B ED EDG G DO OOS due in 4 hrs. 3-O stability ility of tub tubee leak rate.

system fail failuure 3-0 SP-SP-023.1 not req requ uire iredd since to 3B ED re.. 3-O P-023 sec 3-0 P-0 sectt 7.7 due nex nextt shift to allow EDGG DO OOS S due to sup suppor portt w 3B ED EDGG DOOOS >> 72 72 hr.

General eral Information tion,, Remarks, and Op Ope era torr Work rato rk Around Status tus:

See evoluti lutioons ns & & compensato satoryry actions listedd abo abo ve.

ve.

Trainin A is proprottect ecteed.

d.

Appendix D Scenario Outline Form ES-D-1 Facility: Turkey Point Scenario No.:

Scenario 33 Op Test No.: 2007-301 Examiners:

Examiners: Candidates:

Candidates: US US RO RO BOP Initial Conditions:

Initial Mode 1, 75% Power, MOL, MDL, Awaiting permission from plant management to increase power back to 100%. 3-GOP-301 in use complete through step 5.96 for return retum to 100%

100% power following a turbine valve test.

Turnover: Equipment OOS:005: 3B EDG due to failed fuel pump (OOS 2 days; next 0-OSP-023.3 Att AU 11 &

& 9 in 4 hrs); B AFW Pump due to bearing failure (OOS (005 4 hrs; ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST -low - low discharge pressure (OOS (DOS 12 12 hr; ETR 36 hr) 3-OSP-055.1 section 7.1 immediately after shift Perform monthly surveillance on 3A ECC per 3-0SP-055.1 turnover. 1ST and remote valve position verification not required.

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, significant change in leak rate. MOV-3-1403 remains open at management direction due to small size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

11 (N) BOP 3A ECC monthly surveillance performed per 3-0SP-055.1 3-OSP-055.1 section 7.1. 3A TFKV9O5AT TFKV905A =T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS. DOS.

(N,TS) SRO 22 (I) SRO/RO TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8ci-1 =

TFL1T8CH = T ONOP-028 and takes rods to manual to stop continuous inward rod movement.

3 (C) RO/BOP Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF & & 3D TFE3D37A = = T NCC OOS.DOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)

TFE3D38T=T TFE3D38T =T / service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.

4 TAFcPxA1=1o.o TAKPXA1=10.0 (C) SRO/BOP 3A11 Intake screen high Llp.

3A 3-ONOP-Ol 1. 3A

p. Crew responds per 3-0NOP-011. 3A11 CWP is TAKPXA2 == 4.0 secured.

4a (R) ALL 3A2 Intake screen high p. 3-ONOP-100 to 60% for Llp. Fast load reduction per 3-0NOP-100 TAKPxA2=1.o TAKPXA2 = 1.0 the purpose of securing 3A2 CWP. Manual rod control must be used due to rod control Tavg failure.

5 TAHUVBSB=22 (M) ALL 3B RCP high vibration. The crew responds per 3-ONOP-041 38 3-0NOP-041.1..1. Once TAHUVBMB=6 vibration reaches the trip setpoint, the crew manually trips the reactor and TAHUVBMB= 6 .

immediate actions of 3-EOP-E-0 are performed.

6 (M) ALL When 3B RCP is tripped, 3B 38 4kV bus is lost and a large break LOCA occurs.

TF2Z51S TFE2Z51S =T=T (cont'd from (contd An automatic SI occurs but train A sequencer fails. Train A ECCS equipment event 5) must be manually started. The crew completes 3-EOP-E-0 and transitions to TVHHCLB == 00.11 TFQ634AF =T T (C) ALL applicable FRPs followed by 3-EOP-E-1.

6a Once CSFSTs are monitored for implementation, if containment pressure is is still above 20 psig, the crew immediately immediately transitions to 3-EOP-FR-Z.1 ifif no higher red or orange pathpath exists.

6b (C) SRO/RO 3-EOP-E-1 is is entered after which 3A RHRP trips. Since neither RHRP is TFM1D3AT=1 TFM1D3AT=T running, transition is made to 3-EOP-ECA-1.1. Measures are taken to minimize the loss of RWST inventory.

(R)eactlvlty, (I)nstrument, (C)omponent, (M)ajor (N)ormal, (R)eactivity, (M)aJor Ii; 11

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-30 1 Scenario No.:

Scenario No.: ~3 Event No.:

Event No.: _1_1 Page _1_

Page 1 of of _1_

1 Event

Description:

Event

Description:

3A ECC monthly 3A EGG monthly surveillance surveillance performed performed per per 3-0SP-055.1 3-OSP-055.1 section section 7.1.

7.1.

3A ECC inlet 3A EGG valve GV-3-2905 inlet valve OV-3-2905 fails fails to to open open andand 3A 3A EGG ECC isis declared declared DOS.

OOS.

Time Time Position Position Applicants Actions or Applicant's or Behavior Behavior US US Obtains SM Obtains SM permission permission and and directs directs BOPBOP to to perform perform 3A3A EGG ECC monthly monthly operability test per 3-0SP-055.1 3-OSP-055.1 section 7.1 beginningbeginning at step 7.1.6.

7.1.6.

BOP BOP Obtains copy Obtains of 3-0SP-055.1 copy of 3-OSP-055.1 section section 7.1.7.1. Performs Performs actions actions as as follows follows beginning at step 7.1.6:

1. Places 3A EGGECC switch to STOP
2. CV-3-2905, GV-3-2814 Determines GV-3-2905, CV-3-2814 & GV-3-2908 CV-3-2908 all closed.
3. Determines steps 7.1.10, 11 & & 13 n/a since 1ST & & remote position verification not required.
4. ECC & records start time on Att. 11 Starts 3A EGG
5. Directs NSO perform steps 7.1.14 & 15 to measure current
6. CV-3-2905 did not open Recognizes & reports GV-3-2905
7. Stops 3A EGGECC fan & records time on Att.1 NOTE: May leave switch in STOP rather than return to AUTO since 3A .

ECC OOS with CV-3-2905 GV-3-2905 failed closed

8. Determines CV-3-2814 GV-3-2814 open & CV-3-2908 GV-3-2908 closed
9. Determines COW GGW flow on Fl-3-1 470 is zero & records on Att. 11 FI-3-1470 10.
10. Notifies US US 3A EGO EGG failed test due to CV-3-2905 GV-3-2905 failure to open US US Notifies Notifies SM 3A EGO SM 3A EGG DOS OOS Directs Directs WOO have Mechanical WGG have Mechanical investigate/fi investigate/fix x OV-3-2905.

GV-3-2905.

Determines Determines TS TS 3.6.2.2 3.6.2.2 action a. applies action a. applies (72(72 hr) hr)

May directs May directs WCO WGG place 3A EGO place 3A EGG under under EGO EGO 11

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: ~ 3 Event No.:

Event No.: 22 Page_1_

Page 1 of of 11 Event

Description:

Event

Description:

TM-3-408C (Tavg TM-3-408C input toto rod (Tavg inl2ut rod control}

control) fails fails high.

high. Crew responds l2er Crew resl20nds per 3-3-

ONOP-028 and ONOP-028 and takes takes rods rods to to manual manual to to stOI2 stop continuous continuous inward inward rod rod movement.

movement.

Time I Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RORO Recognizes/reports control Recognizes/reports control rods rods inserting inserting inin automatic automatic Performs immediate Performs immediate action action of of 3-0NOP-028 3-ONOP-028 for for continuous continuous insertion insertion of of an RCC an RCC control control bank:

bank: Places Places rod rod control control in in MANUAL MANUAL and and verifies rods verifies rods stop moving.

stop moving.

US US Directs response per 3-0NOP-028 Directs 3-ONOP-028 RO RO Performs subsequent actions of 3-0NOP-028 3-ONOP-028 as directed by US: US:

1. If directed, withdraws control rods to restore Tavg Tref =
2. Determines rods above RIL from VPA recorder (or PCB section VII figure 3).
3. Determines PRNI N-44 did not fail
4. Determines RCS Tavg Tl-3-412D,TI-3-412D, 422D & 432D not failed BOP BOP Performs subsequent actions of 3-ONOP-028 3-0NOP-028 as directed by US:

1.

1. IfIf directed, directed, reduces turbine load to restore Tavg Tavg ==Tref 2.
2. Determines Determines PT-3-446 PT-3-446 & & 447 447 did did not not fail US US Directs Directs WCC WCC notify notify I&C I&C of of rod rod control control failure.

failure.

Directs Directs WCC WCC hang hang caution caution tagtag onon rod rod control control selector selector to to leave leave switch switch inin MANUAL MANUAL Performs Performs applicable applicable actions actions of of 3-ONOP-049 3-0NOP-049.1 .1 ifif TM-3-408 TM-3-408 failure failure suspected suspected 1.1. Determines Determines RCS RCS Tavg Tavg Tl-3-412D, TI-3-412D, 422D 422D && 432D 432D not not failed failed 2.2. Determines Determines no no control control switches switches require require transfer transfer 3.3. Evaluates Evaluates no no impact impact per perTS TS 4.4. Determines Determines no no bistable bistable switches switches require require tripping tripping per perAttAtt 4,4, no no AMSAC-rela AMSAC-related ted channels channels failed failed and and PT-3-446/44 PT-3-446/447 did not 7 did notfail fail 5.5. Conducts Conducts crewcrew brief briefregarding regarding effects effects ofofrodrod control control failure failure 22

Appendix 0D Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 3 Event No.:

Event No.: _3_ 3 Page_1 Page _1 of of _ 2_

2 Event

Description:

Event

Description:

Loss of Loss of 3H 480V LC.

3H 4BOV LC. Also Also takes takes 3C 30 charging charging l2uml2, pump, 3B3B ECC, ECC, 3B 3B ECF ECF

&& 3D 3D NCC NCC OOS.

OOS. Reguires Requires starting starting another another charging l2uml2 or securing charging pump or securing the in the in service service 60 60 gl2m gpm orifice.

orifice. The The crew crew resl20nds responds l2erper 3-ARP-097.CR 3-ARP-097.CR for annunciators F-9!6, A-5/4, for annunciators F-9/6, A-5/4, 1-9/3 1-9/3 or or 1-9/4.

1-9/4.

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior BOP BOP Recognizes/reports annunciator Recognizes/reports annunciator F-9/6, F-916, X-2/6 X-2/6 & & X-5/1.

X-5/1.

Recognizes/reports both Recognizes/reports both 3H3H 4BOV 480V LC LC feeder feeder breakers breakers open open indicating indicating loss of power loss power to that LC. LO.

RO Recognizes/reports annunciator 1-9/3, 1-9/4, Recognizes/reports 1-9/4, J-7/1 & J-B/1 J-8/1 (later A-5/4) 3-ARP-097.CR for annunciator F-9/6 Directs actions from 3-ARP-097.CR Recognizes/reports loss of 3C Recognizes/reports 30 charging pump, 3B ECC, 3B ECF, 3D NOC NCC and 3D 480V 4BOV MCC.

BOP Performs actions per 3-ARP-097.CR 3-ARP-097.CR for annunciator F-9/6

1. Determines 3H 480V 4BOV LC auto bus transfer failed
2. Determines 30 3C & 3D 480V 4BOV LC both energized US Directs WOO WCC have Electrical investigate loss of 3H 480V 4BOV LC BOP Directs 3-ONOP-041 3-0NOP-041.6 .6 entry from 3-ARP-097.C 3-ARP-097.CR R for annunciator A-9/3 US US Directs Directs response per per 3-ONOP-041 3-0NOP-041.6 .6 RO Performs Performs actions actions perper 3-ONOP-041 3-0NOP-041.6 .6 as as directed directed by by US:

US:

1.

1. Starts Starts standby standby (3B)

(3B) charging charging pumppump US US Evaluates Evaluates TS TS 3.8.3.1 3.B.3.1.a.a or as applicable or bb as applicable (c (c from from U4 U4 point point of of view) view)

On U3 - Action On U3 - Action a. a. applies applies (8 (B hr) hr)

On On U4 U4 - Table

- Table 3.8-2 3.B-2 7272 hr hr action action since since 4A2/4B2 4A2/4B2 battery battery chargers chargers not not required required by by 3.8.2.1.c 3.B.2.1.c or or dd Evaluates Evaluates TS TS 3.6.2.2.b 3.6.2.2.b as as applicable applicable requiring requiring plant hr shutdown plant 11 hr shutdown since only since only 11 EOC ECC left left operable operable Conducts Conducts crew crew brief brief regarding regarding effects effects ofof loss loss ofof 3H 3H 480V 4BOV LO LC && 3D 3D 480V 4BOV MOO and requirement MCC and requirement to to commence commence actionaction to to shutdown shutdown plant.

plant.

33

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 3 No.:..+/-.

Event No.:

Event 4 Page Page_1_1 of of_1_1 Event

Description:

Event

Description:

3A1 3A Intake screen 1 Intake screen high high 1\p.

tip. Crew Crew responds responds per per3-0NOP-011.

3-ONOP-Ol 1. 3A 1 3A1 CWP isis secured CWP secured..

Time_J lillie Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports rising Recognizes/reports rising 1\p tp onon 3A 3A11 CWP CWP Reports annunciator Reports annunciator 1-3/3 1-3/3 when when itit alarms alarms US US Directs performance Directs performance of of 3-0NOP-011 3-ONOP-Ol 1 BOP BOP Performs actions Performs actions of of 3-0NOP-011 3-ONOP-Ol 1 as as directed directed by by US:

US:

1.

1. Verifies 22 screen Verifies screen wash wash pumps pumps running running
2. Directs NSO Directs NSO monitor monitor & reportreport screen wash pump pump basket basket strainers 1\p strainers tp
3. Directs NSO verify all traveling screens operating in high gear gear

& all rotating

4. Directs NSO to monitor & report presence of traveling screen screen waterfall, debris carryover, screen wash water pressure (> 60 60 psig)and nozzle spray over entire screen psig)'and NOTE: If a waterfall is reported or 3A1 3A 1 traveling screen Ap f1p pegged pegged high, crew should skip ICW/CCW && IC ICWITPCW W/TPC W checks and go go toto step 7 to check for conditions to stop aa CWP.
5. Directs Directs NSOs NSOs report:

a.

a. ICWICW flows flows toto CCWHXs CCWHXs & & basket basket strainer strainer ps 1\p's b.
b. ICWICW flows flows toto TPCWHXs TPCWHXs & & basket basket strainer strainer ips1\p's US US Determines Determines 3A1 3A 1 traveling traveling screen screen £p 1\p still still well well above above normal normal Loops Loops between between steps steps 11 && 77 until until 3A1 3A 1 traveling traveling screen screen waterfall waterfall height reported height reported> > 2.5 2.5 ftft When When 3A1 3A 1 traveling traveling screen screen waterfall waterfall reported reported> 2.5 ft,

> 2.5 ft, directs directs shutdown shutdown of of 3A1 3A1 CWP CWP BOP BOP Continues Continues performing performing actions actions of of 3-ONOP-Ol 3-0NOP-011 as directed I as directed by by US:

US:

6.6. Stops Stops 3A13A 1CWP CWP when when directed directed by by USUS inin response response to to report report ofof waterfall waterfall> > 2.5 2.5 ftft 7.7. Determines Determines ICWP ICWP secured secured inin 3A1 3A 1intake intakewellwell US US Directs Directs FS/WCC FS/wCC coordinate coordinate performance performanceof ofAtt.

Att. 11toto clean clean 3A13A 1 intake intakewell.

well. Notifies Notifiesplant plantmanagement management. .

44

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.:~ 3 EventNo.:

Event No.:~ Page~

Page 4a j.. of of_2_

Event

Description:

Event

Description:

3A2 intake 3A2 intake screen screen high p. Fast high Llp. Fastloadload reduction reduction per per3-0NOP-1 3-ONOP-100 00 toto 60% for 60% forthe the purpose purpose of securing 3A2 ofsecuring 3A2 CWP.

CWP. Manual Manual rodrod control control must must be used be used due due to to rod rod control control Tavg Tavg failure.

failure.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes II reports Recognizes reports rising rising 3A23A2 traveling traveling screen screen Llp tp US US Determines that Determines that conditions conditions will will soon soon require require securing securing 3A23A2 CWP CWP and and directsdirects performance performance of of aa fast fast load load reduction reduction per per 3-0NOP-1 3-ONOP-1 00 00 to <60%

to <60% to to allow allow shutdown shutdown of the 22 of the dnd CWP.

cwp.

Contacts FS/wCC Contacts FSIWCC and and determines determines 3A 3A11 intake intake well well cleaning cleaning not not compl complete so ete so 3A3A11 CWPCWP can can notnot bebe started.

started.

Conducts crew brief Conducts brief per 3-0NOP-100 3-ONOP-100 Attachment Attachment 3: 3:

  • . Provides reason (2 gpm tube leak requiring Provides requiring plant sid) sld)
  • . Target power level Target =

= offline

  • . Specifies load reduction Specifies reduction rate
  • . Specifies boration Specifies boration amoun amountt & rate

.* Covers plant contro controll parame parameters contingency ters & contin gency actions

.* Covers E-0 E-O transit ion criteria transition criteria

.* Review Reviews s reqd req'd actions actions from from 3-ONO 3-0NOP-071.2 P-071 .2

.* Solicit Solicits s crew crew questio questions ns && input input Ensure Ensures s load load dispatc dispatcher her notified notified of of load load decrea decrease.

se.

RO RO When When directe directed, d, initiate initiates s boratio boration per 3-ONO n per 3-0NOP-100:

P-1 00:

1.1. Sets Sets BABA Totaliz Totalizer er to to amoun amount directed t directe d 2.2. Sets Sets FC-3-1 FC-3-113A 1 3A pot setting =8.0 pot setting 8.0 3.3. PlacesPlaces Rx Rx MIUM/U Selecto Selector r Switch Switch to to BORATE BORATE 4.4. Places Places Rx Rx MIUM/U Control Control Switch Switch to to STAR START T BOP BOP When When directe directed d per per3-ONO P-100:

3-0NOP-100:

1.1. Notifies Notifies load loaddispatc dispatcherher ofofloadload reducti reduction when directe on when directedd bybyUSUS 2.2. Makes Makesplantplantpage pageannoun announcement cement regard regarding loadreducti ing load reduction on 55

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 3 Event No.:

Event No.: 4a 4a Page.£ Page 2 ofof--1.2 Event

Description:

Event

Description:

3A2 intake 3A2 intake screen screen high high b.12.

p. Fast Fast load load reduction reduction l2er per 3-0NOP-1 3-ONOP-100 00 to to 60% for the purpose of 60% for the I2Ur120Se ofsecuring securing 3A2 3A2 CWP.

CWP. Manual Manual rod rod control control must must be used be used duedue toto rod rod control control Tavg Tavg failure.

failure.

I Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RD RO When directed, When directed, continues continues fast fast load load reduction reduction per per 3-0NOP-100:

3-DNOP-100:

1.

1. Checks for Checks for Tavg Tavg reduction reduction from from boration boration 2.
2. Sets FC-3-113A Sets FC-3-1 1 3A for for BA BA flow flow rate rate asas directed directed BDP BOP Reduces turbine Reduces turbine load load per per 3-0NOP-100 3-ONDP-100 at at rate rate directed directed byby US.

US.

RD RO When directed, continues fast load reduction per 3-0NOP-100:

When 3-ONOP-100:

1. Manually inserts rods in response to turbine load reduction.

NOTE: Rods << RIL not expected at this power level US US Per 3-DNOP-100 Per 3-0NOP-100,, notifies SM to review 0-EPIP-2010 0-EPIP-20101 O-ADM-1 & 0-ADM-1 15 and ensure required notifications made 115 RD RO When directed directed per 3-DNDP-1 3-0NOP-1 00 1.

1. Checks Checks PZR PZR level level following program. IfIf not not increases increases charging charging flow flow and/or and/or places places an an additional additional letdown letdown orifice orifice in in service service 2.
2. Determines Determines NRHX NRHX CCW CCW flow flow already already increased increased (from (from setup) setup) 3.
3. Verifies Verifies load load reduction reduction rate rate && manual manual rod rod control control maintaining maintaining TavgTref per expected Tavg-Tref per expected value value as as discussed discussed in in crew crew brief brief 4.
4. Energizes Energizes PZR PZR backup backup heaters.

heaters.

5.5. Determines Determines turbine turbine load load << 570MW 570MW && verifies verifies non-running non-running SGFP SGFP recirc recirc valve valve open open 6.6. WhenWhen directed directed by US (

by US (<:: 60%

60% power),

power), secures secures boration:

boration:

a.a. Places Places rxrx rn/u m/u selector selectorswitchswitch ininAUTO AUTO b.b. Sets Sets FC-3-1 1 3A potentiomete FC-3-113A potentiometer r toto directed directedvalue value c.c. Places Places RCSRCS rn/u m/u control controlswitch switch totoSTART START 7.7. Stops StopsoneoneHDPHDPwhen when <<45OMWe450MWe USUS Determines Determinesthat thattransferring transferringstationstationservice serviceloadsloadstotoSUTSUTandand aligning aligningaux auxsteam steamtotounitunit44not notrequired requireddue stabilizationofof duetotostabilization reactor reactorpowerpoweratat50-60%.

50-60%.

66

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: -L 3 Event No.:

Event No.: ~ 5 Page L 7 of_1_

Page of Event

Description:

Event

Description:

3B3B RCP RCP highhigh vibration.

vibration. TheThe crew crew res[2onds responds [2er per 3-0NOP-041.1.

3-ONOP-041 .1. Once Once vibration reaches vibration reaches either either shaft shaft or or motor motor tri[2 trip set[2oint, setpoint, the the crew crew manually manually trips the tri[2s the reactor reactor and and immediate immediate actions actions ofof 3-EOP-E-0 3-EOP-E-0 are are [2erformed.

performed.

Time

~.

lillie Position Position ApplicanVs Actions Applicant's Actions or or Behavior Behavior RO RO Recognizes I/ reports Recognizes reports annunciator annunciator F-1/1 F-Ill alarming alarming Determines rising Determines rising shaft shaft & & motor motor vibration vibration on on 3B 3B RCP RCP US US Directs response Directs response per per 3-0NOP-041.1 3-ONOP-041.1 foldout foldout page page Critical Critical Directs RO Directs RO toto manually manually trip trip the the reactor reactor per per 3-0NOP-041.1 3-ONOP-041.1 due due to RCP motor vibration>

to RCP motor vibration> 55 mils mils oror shaft shaft vibration>

vibration > 2020 mils.

mils.

RO RO Performs 3-0NOP-041.1 Performs 3-ONOP-041.1 foldout page actions as directed by US: US:

1. Reports when either motor vibration> vibration > 5 mils or shaft vibration > 20 mils vibration>

Critical Critical 2. Trips the reactor when directed US Directs crew perform immediate actions of 3-EOP-E-0.

RO Performs immediate actions of 3-EOP-E-0:

1.

1. Verifies reactor trip

.* Rod bottom lights on & & RPIs RPls at zero

.* Rx trip trip && bypass bypass bkrsbkrs open open

.* Neutron Neutron fluxflux decreasing decreasing 2.

2. Actuates Actuates SI SI &

& phase phase A due PZR A due PZR level level not not maintained maintained <12%

<12%

BOP BOP Performs Performs immediate immediate actionsactions of of 3-EOP-E-0:

3-EOP-E-0:

1.

1. Verifies Verifies turbine turbine tripped tripped

.

  • Turbine Turbine stop stop valves valves closed closed

MOVs.

.

  • Mid Mid &&East East GCBs GCBs open open 2.
2. Verifies Verifies power power to to emergency emergency 4kV 4kV buses buses

.

  • Determines Determines both 3A &&3B both 3A 3B 4kV 4kV buses buses energized energized

.* Determines Determines 3D 3D 4kV 4kV bus bus energized energized from from 3B 3B 4kV 4kV bus bus 77

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.: No.: 2007-301 Scenario No.: No.: _3_ 3 Event No.: _6_

Event No.: Page Page _1 Op-Test 2007-301 Scenario 6 j. of of_3_3 Event

Description:

Event

Description:

When When 3B 3B RCP RCP isis tril2l2ed, tripped, 3B 3B 4kV4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An occurs. An automatic automatic SI SI occurs occurs but but train train AA seguencerfails.

sequencer fails. Train Train AA ECCS ECCS equipment must eguil2ment must be be manually manually started.

started. The The crew crew coml2letes completes 3-EOP-E-0 3-EOP-E-0 and transitions and transitions to to al2l2licable applicable FRPs FRPs followed followed by by 3-EOP-E-1 3-EOP-E-1..

Time Position

,~ Position Applicants Actions Applicant's Actions or or Behavior Behavior RD RO Secures 3B Secures 3B RCPRCP Recognizes /I reports Recognizes reports rapidly rapidly falling falling RCSRCS pressure pressure andand automatic automatic SI SI NOTE: RO NOTE: RD may may manually manually actuate actuate SI SI && phase phase AA in in response response to to train train A sequencer failure.

A sequencer failure.

BOP BOP Recognizes /I reports Recognizes reports loss loss ofof 3B 3B 4kV bus bus with 3B 3B EDG EDG OOS.

DOS.

US US Directs BOP restore 3D 4kV bus per step 3c RNO then verify prompt actions per 3-EOP-E-O Attachment 3.

Directs RO RD continue performing 3-EOP-E-0 subsequent actions.

BOP BOP Restores 3D 4kV bus per 3-EOP-E-O step 3c RNO:

1. Determines no lockout on 3D 4kV bus
2. Verifies 3C CCWP & 3C ICWP breakers open Critical Critical 3. Opens 3AB19 & 3AD06 4.
4. Closes 3ADOI3AD01 & 3AA17 Verifies prompt actions per per 3-EOP-E-O 3-EOP-E-O Attachment 3:

1.

1. Determines Determines only only 3A 3A & 3C 480V

& 30 480V LCs LCs energized energized 2.

2. Determines Determines MSIVs MSIVs all all closed closed (on(on hi-hi hi-hi containment containment pressure) pressure) 3.
3. Verifies Verifies FW FW isolation:

isolation:

a.

a. Places Places both both SGFP SGFP switches switches in in STOP.

STOP.

b.

b. Determines Determines all all main main FWFW regulating regulating && bypass bypass valves valves closed.

closed.

c.c. Closes Closes FW FW isolation isolation valves valves MDV-3-1408 MOV-3-1408 && 1409. 1409. Directs Directs NSD NSO locally locally close close MDV-3-1407 MOV-3-1407. .

d.d. Determines Determines both both SSGFWPs SSGFWPs off. off.

Critical Critical 4.

4. Determines Determines no no ICWP ICWP running running and and starts starts 3A3A && 3C 3C ICWP ICWP 5.5. Determines Determines PDV-3-4882 POV-3-4882 && 4883 4883 closed closed with with lOW ICW headers headers tied tied together.

together.

88

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_ 3 Event No.:

Event No.: _6_ 6 Page-2...

Page 2 of_3_

of 3 Event

Description:

Event

Description:

When When 3B 3B RCP RCP isis tripped, tripped, 3B 3B 4kV 4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An automatic SI occurs. An automatic SI occurs occurs butbut train train AA sequencer sequencer fails.fails. Train Train AA ECCS equipment ECCS equipment must must be manually started.

be manually started. TheThe crewcrew completes completes 3- 3-EDP-E-0 and EOP-E-O and transitions transitions to to applicable applicable FRPsFRPs followed followed by by 3-EOP-E-1.

3-EDP-E-1.

IImJ Time Position__J Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Continues prompt Continues prompt action action verification verification per per 3-EOP-E-0 3-EOP-E-0 Att. Aft. 3:

3:

Critical Critical 6.

6. Determines only Determines only 3A3A CCWP CCWP running running and and starts starts 3C 3C CCWP.

CCWP.

7.

7. Verifies 33 CCWHXs Verifies CCWHXs in service, CCW in service, COW headers headers tied tied together together &&

MOV-3-626 MOV-3-626 open open (no(no power).

power).

8.

8. Determines no Determines no ECC EGO or or ECF ECF running.

running. Starts Starts 3C 30 ECCECC && 3C 30 nd ECF. No ECF. No power available to start start 2 a 2 ECC or ECF.

NOTE: May NOTE: May start 3A 3A HHSIP HHSIP but but not required at this point.

9. Determines only the U4 U4 HHSIPs & no RHRPs RHRPs running. Starts 3A RHRP.
10. Determines adequate HHSI flow present, but no RHR flow present even though RCS pressure < < 250[650]

250[650} psig.

11. Starts 3A HHSIP. Shuts down either unit 4 HHSIP. Directs U4 RD realign U4 HHSIP suction to U3 RWST per Att. 1.

RO

12. Determines not all containment isolation phase A valves closed. Directs NSO to locally verify phase A valves MOV 1417, 1418, 1425 & 381 closed 1417,1418,1425
13. Determines
13. Determines train A SI SI valves in in proper injection injection alignment alignment
14. Resets SI
14. SI & & containment isolation isolation phase A. A. Determines Determines containment isolation isolation phase phase BB actuated.

actuated. ResetsResets phase phase BB when when containment pressure pressure << 20 20 psig.

psig.

15. Determines
15. Determines no no ROPs RCPs running running (should (should have have been been tripped tripped byby RD RO due to inadequate RCS due to inadequate RCS subcooling) subcooling) 16.
16. Determines Determines containment containment pressurepressure> > 2020 psig.

psig.

Critical Critical a.

a. Manually Manually startsstarts 3A 3A CSP.

CSP. Determines Determines MDV-3-880A MOV-3-880A open. open.

b.b. Directs Directs NSONSO to to locally locally verify verify phase phase BB valves valves MDV-3-626, MOV-3-626, 716B & 730 716B & 730 closed closed c.c. Verifies Verifies allall RCPs RCPs stopped stopped 17.

17. Determines Determines containment containment ventilation ventilation isolated isolated andand verifies verifies control control room room ventilation ventilation inin proper proper emergency emergency recirculation recirculation alignment.

alignment.

99

Appendix 0D Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_ 3 Event No.:

Event No.: _6_6 Page ~

Page 3 of of _3_3 Event

Description:

Event

Description:

When 3B When 3B RCP RCP isis tripped, tripped, 3B 3B 4kV 4kV bus bus isis lost lost and and aa large large break break LOCA LOCA occurs. An occurs. An automatic automatic SI SI occurs occurs butbut train train AA sequencer sequencer fails.

fails. Train Train AA ECCS equipment ECCS equipment must must bebe manually manually started.

started. The The crew crew completes completes 3- 3-EOP-E-0 and EOP-E-O and transitions transitions to applicable FRPs to applicable FRPs followed followed by by 3-EOP-E-1.

3-EOP-E-1.

Time_j Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Continues prompt Continues prompt action action verification verification perper 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3: 3:

18. Directs
18. Directs NSO NSO place place PAHMS PAHMS in in service service per per 3-0P-094.

3-OP-094.

19. Verifies 3A
19. 3A & & both both U4 U4 EDGs EDGs running running (3B(3B EDG EDG is is OOS).

DOS).

20. Determines 3A & 3D 4kV buses still energized.
21. Notifies US that prompt action verification complete.

RO Performs foldout page actions of 3-EOP-E-0 as directed:

1. Determines containment conditions adverse (>180°F)
2. Trips RCPs since RCS subcooling < 25[65]°F with U4 HHSIPs

< 25[65tF running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0 3-EOP-E-O as directed

1. Determines 2 AFWPs (A & C) running.
2. Determines AFW valve alignment proper except that MOV 1404 1404 diddid not open.

3.

3. Determines Determines SG SG levels levels << 6[32]%.

6[32]%. Controls Controls AFW flow> 345 gpm gpm until level >> 6[32]% then maintains levels levels 15-50%.

15-50%.

4.

4. Determines Determines annunciators annunciators A-1/2 A-1/2 and/or and/or 1/31/3 on.

on. IfIf RCP RCP seal seal return temps all all << 235°F, 235°F, verifies verifies SISI reset then then starts starts 3A3A charging charging pump pump at at minimum minimum speed speed andand adjusts adjusts HCV-3-121 HCV-3-121 for for proper proper seal seal injection injection flow flow 5.

5. Determines Determines Tc Tc trend.

trend. IfIf decreasing, decreasing, reduces reduces AFWAFW flow flow to to:::: 345 345 gpm until gpm until any any SGSG level level> > 6[32]%.

6[32]%.

6.

6. Determines Determines PORVs, PORVs, normal normal spray, spray, aux spray && excess aux spray excess letdown letdown isolation isolation valves valves closed closed 7.
7. Verifies Verifies RCPs RCPs tripped tripped (tripped (tripped earlier earlier onon foldout foldout page)page) 8.
8. Determines Determines no no SGs SGs depressurized depressurized or or depressurizin depressurizing g 9.9. Determines Determines no no SG tube ruptures SG tube ruptures 10.
10. Determines Determines RCS ReS not not intact; intact; containment containment radiation, radiation, pressure pressure &&sump sump levellevel all not normal.

all not normal.

10 10

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _ 3_3 Event No.:

Event No.: ~ 6a Page_1 Page _iof of -.L2 Event

Description:

Event

Description:

Once Once CSFSTs CSFSTs are are monitored monitored for for imQlementation, implementation, ifif containment containment pressure isis still r2ressure still above above 2020 Qsig, psig, the the crew immediately transitions crew immediately transitions toto 3-3-

EOP-FR-Z.1 ifif no EOP-FR-Z.1 no higher higher redred oror orange orange r2ath path exists exists..

Time lillie Position_j Position Applicants Actions Applicant's Actions or or Behavior Behavior Directs monitoring Directs monitoring of of CSFs CSFs for for implementation.

implementation.

US US If any RCS If any RCS cold cold legleg temperature temperature drops drops below 320°F (orange) below 320°F (orange) or or 290°F (red) 290°F (red) transitions transitions to to and and directs directs response response per per 3-EOP-FR-P.1 3-EOP-FR-P.1 Performs actions actions per 3-EOP-FR-P.1 3-EOP-FR-P.1 as as directed by by US:

US:

RO 1.

1. Determines RCS pressure << 250[650]

250[650J psig with> 1000 1000 gpm RHR flow (indication of LBLOCA)

Transitions out of 3-EOP-FR-P.1 3-EOP-FR-P1 (due to LBLOCA indication) us US pressure > 20 psig, CSFSTs are being monitored If containment pressure>

for implementation implementation and no higher red or orange path exists, transitions to and directs response per 3-EOP-FR-Z.1 3-EOP-FR-Z.1 RO 3-EOP-FR-Z.1 as directed by US:

Performs actions of 3-EOP-FR-Z.1

1. Determines all RCPs secured.
2. Stops any running NCCs
3. Determines containment isolation phases A & & BB already verified
4. Determines containment ventilation isolated and verifies control room ventilation in in proper proper emergency recirculation alignment. alignment.

US US Determines Determines no no RHRP available.

available. IfIf 3-EOP-ECA 3-EOP-ECA-1.1 entered, determines

-1 .1 entered, determines number number of of CSPs CSPs required required fromfrom 3-EOP-ECA 3-EOP-ECA-1.1 and skips

-1 .1 and skips to to step step 9.9.

RO RO Continues Continues performing performing 3-EOP-FR-Z 3-EOP-FR-Z.1 actions as

.1 actions as directed directed byby US:

US:

1. Determines
1. Determines RWST level> 155000 RWST level> 155000 gal gal && MOV-3-864A MOV-3-864NB open 1B open 2.
2. Determines Determines 3A 3A CSP CSP running running &&3B 3B CSP CSP ODSOOS
3. Determines
3. Determines MOV-3-880A MOV-3-880A open open &&MOV-3-880B MOV-3-880B closed! closed/

deenergized deenergized under under ECO ECO

4. Determines
4. Determines 33 CCWHXCCWHX in service &&22 CCWP in service CCWP running running (3A(3A &&3C) 3C) 5.5. Determines Determines only only 3C 3C ECCECC running running (no(no power power to to other other two) two) with with associated associated bypass, bypass, inlet inlet &&outlet outlet open.

open.

6.6. Determines Determines only 3C ECF only 3C ECF running running (no (no power power to to other other two) two) 11 11

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_3 Event No.:

Event No.: ~ 6a Page 2 2 of Page of 22 Event

Description:

Event

Description:

Once Once CSFSTs CSFSTs are are monitored monitored for for imQlementation, implementation, ifif containment containment pressure isis still Qressure still above above 20 20 Qsig, psig, the the crew crew immediately immediately transitions transitions to to 3-3-

EOP-FR-Z.1 ifif no EOP-FR-Z.1 no higher red or higher red or orange orange Qath path exists.

exists.

Time Time Position__[

Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Performs actions Performs actions ofof 3-EOP-FR-Z.1 3-EOP-FR-Z.1 as as directed directed by by US:

US:

1.

1. Directs NSO Directs NSO verify verify CSP CSP suction suction && discharge discharge valves valves open.

open.

2.

2. Determines MSIVs Determines MSIVs closed closed 3.
3. Determines no Determines no SGs SGs faulted US US Directs return to procedure and step in Directs in effect 12 12

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_ 3 Event No.: --2L Event No.: 6b Page Page _1_ 1 ofof --.L 3

Event

Description:

Event

Description:

3-EOP-E-1 is 3-EOP-E-1 is entered entered after after which which 3A3A RHRP RHRP trips.

trips. Since Since neither neither RHRP RHRP isis running, transition running. transition is is made made to to 3-EOP-ECA-1.1.

3-EOP-ECA-1.1. Measures Measures are are taken taken toto minimize the minimize the loss loss ofof RWST RWST inventory.

inventory.

Time_J__Po sition Position Applicants Actions Applicant's Actions oror Behavior Behavior US US Directs transition to and performance Directs performance of 3-EOP-E-1.

NOTE: Performance NOTE: Performance of 3-ONOP-004.3 is of 3-0NOP-004.3 is optional optional since since there there is is no no source of power and EOP actions are higher priority.

Conducts crew brief. brief.

RO Performs actions of 3-EOP-E-1 as directed by US:

1. Determines RCPs not running
2. Determines power to one PORV block MOV available, PORVs closed & both PORV block MOVs open
3. Verifies SI reset
4. Determines only 3A charging pump has power available and pump is running at minimum speed for seal injection.
5. Places RCS makeup control switch to stop
6. Establishes maximum flow using 3A charging pump
7. Opens LCV-3-1 LCV-3-115B 1 5B & directs NSO locally close MOV-3-1MOV-3-115C.15G.

BOP Performs actions of 3-EOP-E-1 as directed by US:

11. Determines

. Determines SGs SGs notnot faulted.

2. Controls Controls AFW flow> 345 gpm gpm until level level> > 6[32]% then maintains levels levels 15-50%.

15-50%.

3.

3. Directs Directs Chemistry Chemistry sample sample SGs SGs for activity activity & check DAM-I DAM-1 4.
4. Directs Directs HP take radiation readings on HP take on main main steam steam lines lines
5. Verifies
5. Verifies containment isolation isolation phase phase A A && BB reset.

reset.

6. Verifies
6. Verifies GV-3-2803 CV-3-2803 open open && IA IA pressure pressure> 95 psig

> 95 psig US US Determines Determines SI SI can can not not bebe terminated terminated (inadequate (inadequate subcooling, subcooling, RGS RCS pressure pressure && PZR PZR level) level) 13 13

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_3 Event No.:--.illL Event No.: 6b Page --L Page 2 of of 33 Event

Description:

Event

Description:

3-EOP-E-1 isis entered 3-EOP-E-1 entered after which 3A after which 3A RHRP RHRP trips.

trips. Since Since neither neither RHRP RHRP isis running, transition running, transition isis made made to to 3-EOP-ECA-1.1.

3-EOP-ECA-1.1. Measures Measures are are taken taken to to minimize the minimize loss of the loss RWST inventory.

of RWST inventorq.

Time__[__Po Time sition Position Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Continues performing Continues performing 3-EOP-E-1 3-EOP-E-1 actions actions as as directed directed byby US.

US.

1.

1. Determines 3A Determines 3A CSP CSP should should continue continue running running since since containment containment temperature> 122°F.

temperature> 122°F.

2.

2. Determines RCS Determines RCS pressure pressure << 250[650]

250[650] psig.

psig. Recognizes/reports Recognizes/reports RHRP tripped with RHR flow << 1000 3A RHRP 1000 gpm gpm

3. Determines RCS Determines RCS pressure pressure stable/decreasing stable/decreasing BOP Continues performing 3-EOP-E-1 actions as directed by US:
1. Determines SG pressures stable
2. Determines 3A 4kV bus on offsite power & 3B 4kV bus deenergized deenergizec
3. Directs U4 RO verify one computer room chiller running
4. Stops 3A EDG. Directs NSO complete shutdown per 3-0P-023. 3-OP-023.

Directs U4 RO stop U4 EDGs and have them placed in standby.

us US Determines no RHRP available. Directs transition to 3-EOP-ECA 3-EOP-ECA-1.1 -1.1 Conducts EOP transition crew brief RO Performs actions of 3-EOP-ECA 3-EOP-ECA-1.1 -1.1 as directed by US:

1.

1. Determines RWST RWST level level> > 60000 60000 gallons 2.
2. Determines Determines coldcold leg leg recirc recirc capability capability not not available available Critical Critical 3.
3. Aligns makeup makeup to to U3 U3 RWST RWST a.
a. Determines Determines CVCSCVCS makeup makeup stopped stopped b.
b. Directs Directs NSO NSO verify verify 3-356 3-356 closed, closed, then then open open 3-365A 3-365A & & BB c.
c. Places Places FCV-3-113A FCV-3-113A in in AUTO, AUTO, FCV-3-114A FCV-3-114A in in OPEN, OPEN, FCVFCV-3-113B 3-113B & & 114B 114B in in CLOSE CLOSE d.
d. Determines Determines MOV-3-350 MOV-3-350 closed.

closed.

e.

e. Places Places FCV-3-113A FCV-3-113A && 114A 114A controllers controllers in in MANUAL MANUAL f.f. Places Places RCSRCS makeup makeup selector selector switch switch to to BORATE BORATE g.
g. Sets Sets BA BA totalizer totalizer to to maximum maximum and and starts starts makeup makeup h.
h. Adjusts Adjusts PW&PW & BAflow BA flow forfor max max flow flow atat 1.5:1 1.5:1 blend blend 14 14

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _3_3 Event No.: ~

Event No.: 6b Page~

Page 3 of of_3_3 Event

Description:

Event

Description:

3-EOP-E-1 isis entered 3-EOP-E-1 entered after after which which 3A3A RHRP RHRP tri(2s.

trips. Since Since neither neither RHRP RHRP isis running, transition isis made running, transition made to to 3-EOP-ECA-1.1.

3-EOP-ECA-1.1. MeasuresMeasures are are taken taken toto minimize the minimize the loss loss of of RWST RWST inventory.

inventory.

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior BOP BOP Perform actions Perform actions ofof 3-EOP-ECA-1.1 3-EOP-ECA-1 .1 as as directed directed by by US.

US.

1.

1. Controls AFW Controls AFW flow>

flow> 345345 gpm until level>

gpm until level > 6[32]%

6[32]% then then maintains maintains levels 15-50%.

levels 15-50%.

us US Determines RCS Determines RCS cooldown rate has has exceeded 11 OO°F/hr 00°F/hr and no no additional forced forced cooldown required required RO 3-EOP-ECA-1.1 actions as directed by US:

Continues performing 3-EOP-ECA-1.1

1. Determines only 1I ECC running & available.
a. Determines phase A reset
b. Directs NSO open MOV-3-1417 & 1418
c. Resets & starts 2 available NCCs
2. Directs U4 RO verify at least 1 1 computer room chiller running US Determines CSP suction aligned to RWST. Directs running CSP secured if containment pressure << 14 14 psig.

RO Continues performing 3-EOP-ECA 3-EOP-ECA-1.1 -1.1 actions as directed by US:

1.

1. Determines 22 HHSIPs HHSIPs running (3A (3A & & one one U4 U4 pump) pump) 2.
2. Verifies SI SI reset Critical Critical 3. Stops
3. Stops I1 HHSIPHHSIP 4.
4. Determines Determines RCS RCS pressure pressure << 250[650]

250[650] psig, psig, RHR RHR flow << 1000 1000 gpm gpm and and nono RHRPs RHRPs available available

5. Determines
5. Determines no no recirc sump suction recirc sump suction lines lines open.

open. Closes Closes MOV MOV 862A (no power 862A (no power to 862 to B) 862B)

US US I.

1. Determines Determines RCS RCS subcooling subcooling inadequate inadequate for for RCP 51 start && SI RCP start termination.

termination.

2.

2. Determines Determines minimumminimum SI 51 flow flow per per Figure Figure 1. 1. Directs Directs NSO NSO Crifica Critical throttle throttle running running HHSIP HHSIP discharge discharge to to achieve achieve minimum minimum SI 51 flow flow TERMINATING TERMINATING Scenario Scenario is is complete complete whenwhen HHSI HHSI flow flow isis reduced reduced to to minimum.

minimum.

CUE CUE 15 15

Appendix D Appendix D Scenario Outline Scenario Outilne Form ES-D-1 Form ES-D-1 Facility:

Facility: Turkey Point Turkey Point Scenano No.:

Scenario No.: 33 Op Op Test Test No.:

No.: 2007-301 2007-301 Examiners:

Examiners: Candidates:

Candidates: US US RO RD BOP BOP Initial Conditions:

Initial Conditions: Mode 1, Mode 1, 75%

75% Power, Power, MOL,MDL, Awaiting Awaiting permission permission from from plant plant management management to to increase increase power power back back to 100%. 3-GOP-301 to 100%. 3-GDP-301 in in use use complete complete through through step 5.96 for step 5.96 for retum return to to 100%

100% power power following following aa turbine valve test.

Turnover: Equipment OOS: DOS: 3B EDG EDG due to failed fuel pump (OOS (DOS 2 days; next 0-OSP-023.3 Att AU 11 && 9 in 4 hrs); BB APN hrs); AFW Pump Pump due due toto bearing bearing failure failure (OOS (DOS 44 hrs;hrs; ETR ETR 2424 hrs; hrs; both both trains trains verified verified operable);

operable);

3B CSP 3B CSP due due to failed 1ST to failed ST -low

- discharge pressure low discharge pressure (OOS(DOS 12 12 hr; hr; ETR ETR 3636 hr) hr)

Perform monthly surveillance on 3A ECC per 3-0SP-055.1 3-OSP-055.1 section 7.1 immediately after shift turnover. 1ST and remote valve position verification not required.

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, significant change in leak rate. MOV-3-1403 MD V-3-1 403 remains open at management direction due to small size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

1 1 BDP (N) BOP 3A ECC monthly surveillance performed per 3-0SP-055.1 3-DSP-055.1 section 7.1. 3A TFKV90SAT TFKV905A=T ECC inlet valve CV-3-2905 fails to open and 3A ECC is declared OOS. DOS.

(N,TS) SRO 2 SRD/RD (I) SRO/RO TM-3-408C (Tavg input to rod control) fails high. Crew responds per 3-TFL1T8CH=T TFL1T8CH =T ONDP-028 and takes rods to manual to stop continuous inward rod ONOP-028 movement.

3 RD/BDP (C) RO/BOP Loss of 3H 480V LC. Also takes 3C charging pump, 3B ECC, 3B ECF & & 3D TFE3D37A ==T T NCC DOS.OOS. Requires starting another charging pump or securing the in C TS SRO (C,TS)

TFE3D38T=T TFE3D38T = T service 60 gpm orifice. The crew responds per 3-ARP-097.CR for annunciators F-9/6, A-5/4, 1-9/3 or 1-9/4.

4 TAKPXA1=10.0 (C) SRD/BDP SRO/BOP 3A 1 Intake screen high p.

3A1 t:.p. Crew responds per 3-ONOP-Ol3-0NOP-011. 1. 3A 3A11 CWP is TAKPXA2 == 4.0 4.0 secured.

4a (R) ALL Intake screen high 3A2 Intake high tip.

t:.p. Fast load reduction per 3-ONOP-13-0NOP-100 00 to 60% for TAKPXA2=

TAKPXA2 = 1.0 1.0 the purpose of securing 3A2 CWP. CWP. Manual rod control must must be used due due to rod control Tavg failure.

5 TAHUVBSB=22 TAHUVBSB=22 (M)

(M) ALL 3B 3B RCP high high vibration. The crew responds per 3-ONDP-041 3-0NOP-041.1. Once

.1. Once TAHUVBMB=6 vibration reaches the the trip setpoint, setpoint, the crew manually manually trips the the reactor andand TAHUVBMB= 6 .

immediate actions of 3-EOP-E-0 are of 3-EDP-E-0 are performed.

performed.

66 (M)

(M)ALL ALL When 3B RCP RCP is tripped, tripped, 3B 3B 4kV 4kV bus is lost and aa large break break LDCA LOCA occurs.

TFE2Z51S TFE2Z51S == TT (contd (cont'd from An automatic SI SI occurs but but train A sequencer fails. Train A ECCS ECCS equipment TVHHCLS event event 5)

5) must be be manually manually started. The crew completes completes 3-EDP-E-0 3-EOP-E-0 and and transitions to TVHHCLB == 00.11 TFQ634AF = T (C)

(C) ALLALL applicable FRPs applicable FRPs followed followed by by 3-EDP-E-1.

3-EOP-E-1.

TFQ634AF=T 6a 6a Once CSFSTs Once CSFSTs are are monitored monitored for for implementation, implementation, ifif containment containment pressure pressure is is still still above above 20 20 psig, psig, the crew immediately the crew immediately transitions transitions to 3-EOP-FR-Z.1 ifif no to 3-EDP-FR-Z.1 no higher higher red red oror orange orange pathpath exists.

exists.

6b 6b (C)

(C) SRD/RD SRO/RO 3-EDP-E-1 3-EOP-E-1 is is entered entered after after which which 3A3A RHRP RHRP trips.

trips. Since Since neither neither RHRP RHRP is is TFM103AT=T TFM1D3AT = T running, running, transition transition isis made made to to 3-EOP-ECA-1.1.

3-EOP-ECA-1.1. Measures Measures are are taken taken toto minimize minimize the loss of the loss of RWST RWST inventory.

inventory.

(N)ormal, (N)ormal, (R)eactivity,

.. (I)nstrument, (C)omponent, (R)eactlvlty, (l)nstrument, (C)omponent, (M)ajor (M)aJor 11

TP-2007-301 Scenario TP-2007-301 Scenario #3 Event Description

  1. 3 Event Description Turkey Point Turkey Point 2007-301 2007-301 Scenario Scenario #3#3 Event 11 - 3A Event - 3A ECC ECC monthly monthly surveillance surveillance performed performed per per 3-0SP-055.1 3-OSP-055.1 section section 7.1.

7.1. 3A 3A ECC ECC inlet inlet valve CV-3-2905 valve CV-3-2905 fails fails to to open open and and 3A 3A ECC ECC isis declared declared ~OS.DOS.

Event 22 - TM-3-408C Event - TM-3-408C (Tavg(Tavg input input to to rod rod control) control) fails fails high.

high. Crew Crew responds responds per per 3-0NOP-028 3-ONOP-028 and and takes rods takes rods to to manual manual to to stop stop continuous continuous inward inward rod rod movement.

movement.

Event 33 - Loss Event - Loss of of 3H 3H 480V 480V LC.LC. Also Also takes takes 3C charging pump, 3C charging pump, 38 ECC, 38 3B ECC, 3B ECF ECF && 3D 3D NCC NCC DOS. Requires

~OS. Requires starting starting another another charging charging pumppump or or securing securing the the in service 60 gpm orifice. The in service 60 gpm orifice. The crew responds crew responds per per 3-ARP-097.CR 3-ARP-097.CR for for annunciators annunciators F-9/6,F-916, A-5/4, A-514, 1-9/3 1-913 or or 1-9/4.

1-914.

Event 44 - 3A Event - 3A11 intake intake screen screen high high ~p. Crew responds

p. Crew responds per per 3-0NOP-011.

3-ONOP-01 1. 3A 3A11 CWP CWP isis secured.

secured.

Event 4a Event 4a - 3A2

- 3A2 intake intake screen high high ~p. Fast load reduction

p. Fast reduction per per 3-0NOP-100 3-ONOP-100 to 60% for the purpose purpose of securing 3A2 CWP.

3A2 CWP. Manual rod rod control control must must be used used duedue to to rod rod control control Tavg failure.

failure.

Event 55-- 38 Event 3B RCP high vibration. The crew responds per 3-0NOP-041.1. 3-ONOP-041.1. Once vibration reaches either shaft or motor trip setpoint, the crew manually trips the reactor and immediate reaches actions of actions of 3-EOP-E-0 are performed.

Event 6 - When 38 Event - 3B RCP is tripped, 38 3B 4kV bus is lost and a large break LOCA occurs. An automatic SI occurs but train A sequencer fails. Train A ECCS equipment must be manually automatic started. The started. The crew completes 3-EOP-E-0 and transitions to applicable FRPs followed by 3-EOP-E-1.

E-1.

Event 6a - Once CSFSTs are monitored for implementation, Event -

implementation, if containment pressure is still above 20 psig, the crew immediately transitions to 3-EOP-FR-Z 3-EOP-FR-Z.1 .1 if no higher red or orange path path exists.

Event 6b EOP-E-1 is entered after which 3A RHRP trips. Since neither RHRP is running, transition transition is is made made to 3-EOP-ECA 3-EOP-ECA-1.1. -1.1. Measures are taken to minimize minimize the loss loss of RWST inventory.

inventory.

22

TP-2007-301 Scenario TP-2007-301 Scenario#3 #3 Event EventDescription Description Scenario XXIII Scenario XXIII NRC NRC 33 SimulatorOperating Simulator Operating Instructions Instructions Setup Setup IC-16 (75%

IC-16 (75% MOL) MOL)

Place simulator Place simulator inin runrun Trigger lesson Trigger lesson steps:

steps:

SETUP 3B SETUP - 3B EDG ODS

- EDG 005 (actuatesTAQ5LRSB (actuates TAQ5LRSB = TAQ5B2OP =

OFF && TAQ5B20P

= OFF = RACKOUT)

RACKOUT)

SETUP - BB AFWP SETUP - AFWP ODS QOS (actuates TAFK244 =

(actuates TAFK244 TAFKOO2 =

0.0, TAFK002

0.0, TAFFO1B

0.0, TAFF01B

0.0, = 0.0, TCF5MTB

0.0, TCF5MTB = T)

T)

SETUP - 3A SG 2 GPD LEAK SETUP - 3A SG 2 GPD LEAK (actuates TVHHSGA == 0.0000013)

(actuates TVHHSGA 0.0000013)

SETUP - 3B SETUP - 3B CSP CSP ODSOOS (actuates (actuates TAM1DPOB TAM1 DPOB = RACKOUT RACKOUT (3) TCM1 D41 M == FALSE (3) && TCM1D41M FALSE (0>> (0))

SETUP - TRAIN A SEQUENCE R SETUP - TRAIN A SEQUENCER FAIL (actuates TFQ634AF FAIL (actuates TFQ634AF == T) T)

Acknowledge annunciators Acknowledge annunciators F-9/2 F-9/2 & 9/5 (3B

& 9/5 (3B EDGEDG O~S).

DOS). StartStart train train A A chilled chilled water water andand secure train B secure train B chilledchilled water water (CR (CR HVAC HVAC panel).

panel). Place Place simulator simulator in in freeze.

freeze.

Place clearance Place clearance info info tags on 3B EDG EDG normal normal start switch, B B AFWP T& T&T T valve control switch & 3B CSP control switch.

switch switch.

Remove AFW train 2 orange tag from B AFWP tachometer just below ann. panel X.

Remove Provide shift turnover checklists, 3-0NOP-071.2 Provide 3-ONOP-071 .2 Att AU 11 and a copy of 3-0SP-055.1 3-OSP-055.1 section section 7.1 7.1 & Attachment 11 filled out thru step 7.1.5. 3-0SP-055.1 3-OSP-055.1 is being performed without quarterly 1ST or remote position verification required.

without Select Select 3A QSPDS to page 211 (SAT) and 3B QSPDS to page 212 (RVL). Set ERDADS on on VPA to TavglTref Tavg/Tref (TAV) and at the RCO desk to ENVRN (ED3).

Fill Fill in blender & shutdown boron addition placards at console blender station. Data for each each IC IC may be be found in in the ECC ECC & & Shutdown Guidelines Book Book inin the simulator I/F. IIF.

Event I1 - 3A ECC OSP Event -

asp failure Initiated at crew direction Initiated at crew direction based based on shift turnover on shift turnover beginning beginning at at step step 7.1.6.

7.1.6.

Immediately Immediately after after CV-3-2905 CV-3-2905 closes closes in in response response takingtaking 3A 3A ECC ECC to to STOP, STOP, trigger trigger lesson step EVENT I 3A ECC INLET FAIL lesson step EVENT 1 - 3A ECC INLET FAIL AS IS (actuates TFKV9O5A

- AS IS (actuates TFKV905A == T). The crew T). The crew performs performs 3-OSP-055.

3-0SP-055.1I sect. sect. 7.1 7.1 toto test 3A ECC test 3A ECC beginning beginning at at step 7.1.6. Quarterly step 7.1.6. Quarterly 1ST 1ST and and remote remote position position verification verification are are not not required.

required. InletInlet valve valve CV-3-2905 GV-3-2905 fails fails to to open.

open. 3A 3A ECC is stopped and declared EGG is stopped and declared OOS. ~OS.

Respond Respond as as NS0 NSO forfor steps steps 7.1.14 7.1.14 && 7.1.15.

7.1.15. Indicate Indicate that that hehe has has portable portable ammeter ammeter inin hand.

hand. When When directed directed toto measure measure 3A 3A ECC ECC fan fan current current at at 3B3B MCC MCC (bkr(bkr 30650),

30650), report report 22 22 amps indicated.

amps indicated.

33

TP-2007-301 Scenario TP-2007-301 Scenario #3 #3 Event Event Description Description Respond as Respond as NSO NSO ififasked asked to to locally locally check check Train Train AA ECC ECC CCW CCW flow flow on on FI-3-1472.

Fl-3-1 472. After After 1-3 minutes, 1-3 minutes, report report thatthat flow flow indicates indicates zero. zero.

Respond as Respond as WCC WCC when when directed directed to have Mechanical to have Mechanical maintenance maintenance investigate investigate failure failure ofof CV-3-2905 CV-3-2905 to open.to open.

Respond as Respond as WCCWCC ifif directed directed to take 3A to take 3A ECCECC breaker breaker 30650 30650 to to OFF OFF andand place place itit under under clearance. After clearance. After 8-128-12 min, trigger lesson mm, trigger lesson step EVENT 1I - 3A step EVENT - 3A ECC ECC BKR BKR TO TO OFFOFF (actuates (actuates TOOl DMG =

TCC1DMG = F)F)

Event 22 - TM-3-408C Event - TM-3-408C Tavg Tavg input input to to rod rod control control fails fails high high Once 3A Once 3A ECCECC stopped stopped and and declared declared 005, OOS, trigger trigger lesson lesson step step EVENT EVENT 22 - TM - TM 408C FAILS 408C FAILS HIGH HIGH (actuates (actuates TFL TFL1T8CH 1T8CH == T). T).

This fails Tavg input to rod control This fails Tavg input to rod control high causing high caushg maximum maximum speed speed control control rodrod insertion.

insertion.

The The operators 3-ONOP-028 and take rod control respond per 3-0NOP-028 control to manual to stop inward rod movement. This rod This failure failure does does not fail median Tavg Tavg for for other other control control purposes. Tavg- Tavg Tref recorder TR-3-408 continues to function. function.

Respond as WCC when directed to have I&C Respond l&C investigate failure of rod control.

Respond as WCC if directed to generate a caution tag to be hung on the rod control Respond selector switch selector Event 3 - Loss of 3H 480V LC After 3A2 CWP secured, secured, trigger lesson step EVENT 33 - LOSS OF 3H LC (actuates TFE3D37A TFE3D37A = T, then

= T, then TFE3D38T ==T after aa 55 sec delay).

TFE3D38T delay).

This causes a loss of of 3H 480V LC LG andand along with it 3C 3G charging pump, 3B 38 ECC, EGG, 3B 38 ECF & 3D EGF&3DNGG. NCC.

The crew crew responds per 3-ARP-097. CR GR for annunciators F-9/6, F-916, 1-9/3, 1-913, 1-9/4 1-914 or A-5/4 A-514 and and may enter 3-ONOP-041 may enter 3-0NOP-041. 6. .6.

Since Since 3C3G charging charging pump pump was was running, 3B 38 charging charging pump pump is is started started perper 3-ONOP-041 3-0NOP-041.6. .6.

Failure Failure also also puts puts plant plant in in aa lhr 1hr shutdown shutdown plant plant action action statement statement per per TSTS 3.6.2.2.b 3.6.2.2.b since since only only I1 ECC EGG is left operable.

is left operable.

Respond Respond ifif directed directed to to check check out out 3H 3H 480V 480V LC. LC. After After 1-3 1-3 mm,min, report report bkr bkr 35001 35001 feeder feeder from from 3D3D 480V 480V LC LC tripped tripped openopen withwith scorch scorch marksmarks and and aa burnt burnt insulation insulation smell.

smell. 35007 35007 doesnt appear to have closed doesn't appear to have closed in (still open). in (still open). Report Report nono evidence evidence of of fire.

fire.

Respond Respond as as WOO WCC when when directed directed to to have have electrical electrical check check into into the the loss loss ofof 3H 3H LC.LC. After After 8-8-

12 12 mm, min, call call as as WOO WCC and and relay relay recommenda recommendation tion from from Electrical Electrical maintenance maintenance that 3H that 3H 480V 480V LCLC remain remain deenergized deenergized until until further further evaluation evaluation of ofthe the LC LC can can bebe performed.

performed.

44

TP-2007-301 Scenario TP-2007-301 Scenario #3 Event Description

  1. 3 Event Description Respond as Respond as NSO NSO ifif directed directed to to do pre-start &

do pre-start & post-start post-start checks checks on on 3B 3B charging charging pump.

pump.

Report all Report all conditions conditions normal.

normal.

Respond as Respond as NSO NSO ifif directed directed to to locally locally control control CCWCCW to to NRHX NRHX flowflow to to maintain maintain letdown letdown temperature. Click temperature. Click on Schema>COMMON SERVICES-tCOMPONENT on Schema-tCOMMON SERVICES*COMPONENT COOLING-t COOLING*

valve 834-tTAKA834 valve 834TAKA834 BYP BYP AROUND AROUND TCV-144-tadjust TCV-144*adjust value value asas desired desired and and INSERT.

INSERT.

Respond as Respond WCC/Mechanical ifif asked as WCC/Mechanical asked about about status status of of 3A 3A ECC ECC since since plant plant is is now now in in 11 hr hr shutdown action shutdown action statement.

statement. Report Report mechanics mechanics are are investigating investigating the the CV-3-2905 CV-3-2905 failure.

failure.

414a - 3A1/3A2 Event 4/4a 3A113A2 intakeintake screen clogging I Fast load reduction Upon completion Upon completion of of TM-3-408C TM-3-408C crew crew brief, brief, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1/3A2

- 3A1/3A2 INTAKE INTAKE CLOGGING CLOGGING (actuates TAKPXA1 =

(actuates TAKPXA1 10.0 &

= 10.0 & TAKPXA2 =4.0).

4.0).

3-ONOP-Ol 1. First 3A 1I CWP The crew responds per 3-0NOP-011. CWP is secured per 3-0NOP-011.

3-ONOP-Ol 1.

When directed as NSO to check screen wash pump basket strainer Llp, p, click on Schema*C OMMON Schema~COMMON SERVICES~INTAKE SERVlCES.lNTAKE AREA & SCREEN WASH~report WASHreport strainer tips in lower right corner of intake area & screen wash system mimic. Value reported Llp's should be < < 10 psid.

When directed as NSO to report status of unit 3 traveling screens, report that they are operating in high gear, are rotating. Specific data such as waterfall height, screen Llp lip and screen wash pressure can be determined from the intake area & screen wash system mimic accessed earlier.

ICW to CCW/TPCW CCWITPCW flows and basket strainer lips Llp's can be determined by clicking on SchemaCO Schema~COMMON MMON SERVICES SERVICES~INTAKE *INTAKE COOLING COOLlNG~report *report requested parameters shown on the lOW ICW system mimic.

Notify Notify BOP BOP when waterfall height height in in the 3A13A1 intake intake well reaches 2.5 2.5 feet as as determined determined by by subtracting subtracting 3A13A 1 intake intake well well level level from indicated indicated intake intake level level as as shown shown on on the intake area the intake area & & screen wash wash system system mimic.

mimic.

Respond Respond ifif called called as as FS/WCC FS/WCC regarding regarding issuance issuance of of an an ECO ECO andand manual manual cleaning cleaning of of on on 3A1 3A1 traveling traveling screen.

screen. To To take take 3A13A1 traveling traveling screen screen outout ofof service, service, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1

- 3A1 TRAVELING TRAVELING SCREEN SCREEN OOS OOS FOR FOR CLEANING CLEANING (actuates (actuates TCKPD24M To F). To TCKPD24M == F).

return return 3A1 3A1 traveling traveling screen screen to to service, service, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A1- 3A1 TRAVELING TRAVELING SCREEN SCREEN RETURN RETURN TO TO SERVICE SERVICE (actuates (actuates TCKPD24M TCKPD24M == T).T).

Immediately Immediately after after 3A1 3A1 CWPCWP secured, secured, trigger trigger lesson lesson step step EVENT EVENT 44 - 3A2 - 3A2 INTAKE INTAKE REDUCED CLOGGING REDUCED CLOGGING (actuates TAKPXA2 = 2.0).

(actuates TAKPXA2 2.0).

The The crew crew reduces reduces power powerper per 3-ONOP-IOO 3-0NOP-100 from from 75%75% toto <60%

<60% forfor the the purpose purpose of of securing securing 3A23A2 CWP.

CWP.

55

TP-2007-301 Scenario TP-2007-301 Scenario #3 #3 Event Event Description Description In view In view ofof the slowly increasing the slowly increasing ~p tp onon 3A23A2 traveling traveling screen, screen, crew crew should should electelect toto perform aa fast perform fast load load reduction reduction per per 3-0NOP-1 3-ONOP-1 00. 00. AtAt lead lead examiner examiner direction, direction, prompt prompt thisthis decision if necessary by calling decision if necessary by calling as SM and as SM asking and asking for for status status toto help help crew crew understand understand problem is problem is not not going going away. Additionally, call away. Additionally, call asas NSO NSO at at intake intake structure structure and and report report debris still debris still coming coming down down intake intake canal canal collecting collecting mostly mostly around around the canal banks.

the canal banks.

Respond as Respond as NSONSO ifif directed directed to to close close 3-30-002 3-30-002 & 3-30-004 to

& 3-30-004 to allow allow stopping stopping the the 3A2 3A2 CWP. After CWP. After 1-3 1-3 min, trigger lesson mm, trigger lesson step step EVENT EVENT 44-- CLOSE CLOSE 3-30-002/004 3-30-002/004 (actuates (actuates TAFBOO2 =

TAFB002 0.0 then

0.0 TAFB0O4

then TAFB004 0.0 30

= 0.0 sec later.)

30 sec Report when complete.

later.) Report complete.

Respond as Respond as NSONSO ifif directed directed to listen for to listen for seal seal well well solenoid solenoid valve valve closure.

closure.

Event 5 - 38 Event - 3B RCP high vibration I Reactor trip After a 5-10% power change, trigger lesson step EVENT 5 - 3B RCP HIGH -

VIBRATION (actuates VIBRATION (actuates TAHUVBSB = 22.0 on 5 min mm ramp & TAHUVBMB =

& TAHUVBMB = 6.0 on 5 min mm ramp).

ramp).

The crew responds per 3-0NOP-041. 3-ONOP-041. 1. Once motor & shaft vibration reach the trip setpoint, the crew manually trips the reactor and immediate actions of 3-EOP-E-O are performed.

Respond if notified as system engineer of increasing vibration on 38 3B RCP motor & &

shaft.

Event 6 - Large break LOCA I Loss of emergency coolant recirculation Tripping 3B RCP auto triggers lesson step EVENT 6 6-- LARGE BREAK LOCA (actuates fl/HHCLB TVHHCLB == 0.1 when H20L09G) and EVENT 6 - 3B 4KV BUS LOCKOUT (actuates TFE2Z51S == Twhen H2OLO9G).

TFE2Z51S H20L09G).

The crew performs 3-EOP-E-O and must manually start train A ECCS ECGS loads due to failure of 3A sequencer entered at setup. 3A 4kV bus remains on offsite power.

Respond as NSO when directed to locally close MOV-3-1 MOV-3-1407. 407. After 4-6 mm, min, trigger lesson lesson step EVENT EVENT 66 - CLOSE MOV-3-1

- MOV-3-1407 407 (actuates (actuates TFWO7C TFVV07C == F). F). Report when complete.

Respond Respond as as NSO NSO ifif directed directed to to locally locally openopen MOV-3-843B MOV-3-8438.. After After 1-31-3 mm.,

min., trigger trigger lesson lesson step EVENT step EVENT 66 - OPEN - OPEN MOV-3-843B MOV-3-843B (actuates (actuates TFMVv020 TFMVV020 == T). T). Report Report when complete. complete.

Respond Respond as as U4U4 RO when directed RO when directed to to perform perform 3-EOP-E-0 3-EOP-E-0 Aff Att I1 to to align align U4 U4 HHSIPs HHSIPs to to U3 U3 RWST.

RWST. After After 1-31-3 mm,min, trigger trigger lesson lesson step step EVENT EVENT 6- 6 - ALIGN ALIGN U4 U4 HHSIP HHSIP TO TO U3U3 RWST (actuates RWST (actuates TAMH1V41 TAMH1V41 = 1.0, 1.0, TAMH1V46 TAMH1V46 == 1.0 after 11 mm 1.0 after delay, TAMH1V37 min delay, TAMH1V37 == 0.0 after 22 mm 0.0 after min delay, delay, TAMH4856 ==0.0 TAMH4856 0.0 after after 33 mm delay). Report min delay). Report when when complete.

complete.

Respond Respond as NSO when as NSO when directed directed to to locally locally verify verify phase phase A A valves valves MOV-3-1 MOV-3-1417, 417, 1418, 1418, 1425 & 381 closed (all of which 1425 & 381 closed (all of which are in the U3 are in the Pipe U3 Pipe && Valve Valve Room).

Room). After After 1-31-3 mm,min, 66

TP-2007-301 Scenario TP-2007-301 Scenario #3 #3 Event Event Description Description trigger lesson trigger lesson step step EVENTEVENT 66 - CLOSE - CLOSE PHASE PHASE AA ISOL ISOL VALVES VALVES (actuates TFKV41 7C =

(actuates TFKV417C = T, T,

TFKV418C =T after 1 min delay, TFBV60 =

TFKV418C = T after 1 mm delay, TFBV60 =T after 22 min T after mm delay TFSWVM5B =

delay && TFSWVM5B =T after33 min T after delay). Report mm delay). Report when complete.

when complete.

Respond as Respond as NSO NSO when when directs directs to to locally locally verify verify phase phase BB valves valves MOV-3-626, MOV-3-626, 716B 716B && 730 730 closed(all of closed(all of which which are are in in the the U3U3 PipePipe & Valve Room).

& Valve Room). After 1-3 min, trigger After 1-3 mm, trigger lesson step lesson step EVENT 66 - CLOSE EVENT - CLOSE PHASE PHASE B B ISOL ISOL VALVES VALVES (actuates(actuates TFKv626C TFKV626C == T, T, TFKV16BC TFKV16BC == T after 11 min T after mm delay &

delay TFKV730C = T

& TFKv730C after 22 min T after Report when delay). Report mm delay). when complete.

complete.

Respond as Respond as NSO NSO when when directed directed to to place place PAHMS PAHMS in in service service on on unit unit 3.

3. After After 8-12 8-12 minutes, trigger minutes, trigger lesson step lesson step EVENT EVENT 66 - PLACE - PLACE U3 U3 PAHMS PAHMS IN IN SERVICE SERVICE (actuates (actuates TAC2V02A =

TAC2V02A TAC2V02B =

1.0, TAC2V02B

1.0, = 1.0, TAAAV21

1.0, TMAV21 = 1.0, TAAAV22 =1.0 1.0, TAAAV22 TACA0O5 =

1.0 && TACA005 = 0.0).

0.0). Report Report when when complete.

Transition is made from 3-EOP-E-O to 3-EOP-FR-P. 3-EOP-FR-P. 11 which is quickly exited due to the presence of low head SI flow in response to the LBLOCA.

Event 6a - Respond to High Containment Pressure Once CSFSTs are monitored for implementation, implementation, if containment pressure is still above 2Opsig, 20 psig, the crew immediately transitions to 3-EOP-FR-Z. 3-EOP-FR-Z. 1I if no higher red or orange path exists.

Respond as NSO if directed to check CSP suction & discharge valves open. After 1-3 mm., report that 3A CSP suction & discharge valves are open while 3B CSP suction &

min.,

discharge discharge valves are closed and under an ECO.

Event 6b - Respond to LBLOCA with no emergency coolant recirc The crew transitions to 3-EOP-E-1 and then to 3-EOP-ECA 3-EOP-ECA-1.1 -I. 1 after it is determined that neither neither RHRP is available to support cold leg recirculation After 3-EOP-E-1 is After is entered, entered, trigger trigger lessonlesson step step EVENT EVENT 6b 6b - 3A

- 3A RHRP RHRP TRIP TRIP (actuates (actuates TFM1D3AT TFM1D3AT ==T). T). Respond Respond as as NSONSO when directed directed to to investigate investigate loss loss of of 3A 3A RHRP.

RHRP. After 1-3 1-3 mm.,

min., report report backback motormotor very very hothot especially especially at at bottom bottom of of motor motor casing casing (failed (failed bearing).

bearing).

Respond Respond as as Chemistry Chemistry when when directed directed to to sample sample SG5 SGs for for activity activity & & check check DAM-i DAM-1 and and as as HP when directed to perform HP when directed to perform radiation radiation readings readings on on main main steam steam lines.

lines. After After 10-15 10-15 mm. min.

report report no no signs signs of of activity activity or or radiation radiation levels levels above above background.

background.

Respond Respond as as NSONSO when when directed directed to to locally locally close close 3-297A1B!C 3-297 AlBIC.. AfterAfter 1-3 1-3 mm, trigger min, trigger step EVENT lesson step lesson EVENT 6b 6b - LOCALLY

- LOCALLY CLOSE 3-297 AlBIC (actuates CLOSE 3-297A1B1C TAHN97A == 0.0, (actuates TAHN97A 0.0, TAHN97B TAHN97B ==

0.0 1 min. later && TAHN97C ==0.0 0.0 1 mm. later TAHN97C 0.0 22mmn.

min. later.).

later.).

77

TP-2007-301 Scenario TP-2007-301 Scenario#3 #3Event EventDescription Description Respond as Respond as NSO NSO whenwhen directed directed toto locally locally close close LCV-3-115C.

LCV-3-115C. After After1-3 mm, trigger 1-3 min, trigger lesson step EVENT 6b LOCALLY lesson step EVENT 6b - LOCALLY CLOSE LCV-3-115C

- CLOSE LCV-3-1 I 5C (actuates TFBVC62= T).

(actuatesTFBVC62 T). Report Report when complete.

when complete.

Respond as Respond as U4 U4 RO RO when when directed directed to to start start one one train train of of chilled chilled water water for for computer computer roomroom cooling.

cooling.

Respond as Respond as U4U4 RO RO when when directed directed toto shutdown shutdown U4 EDGs. Respond U4 EDGs. Respond as as NSO NSO whenwhen directe d to compl ete shutdo directed to complete shutdown of 3A, wn of 3A, 4A4A && 48 4B EDGs EDGs per per 3/4-0P-023.

3/4-OP-023.

Respond as Respond NSO when as NSO when directed directed toto verify verify 3-356 3-356 closed, closed, then then open 3-365A &

open 3-365A & 8.

B. After After 1-3 1-3 mm., trigger lesson min., trigger lesson step step EVENT EVENT 6b 6b - ALIGN

- ALIGN CVCSCVCS M/U MIU TO TO RWST RWST (actuates TABM365B ==

(actuates TABM365B Report when 1.0). Report 1.0). when complete.

complete.

Respond as Respond NSO when as NSO when asked asked toto verify verify MOV-3-350 MOV-3-350 closed.closed. After After 1-3 1-3 min.,

mm., report report valve valve closed closed. .

Respond as Respond NSO when directed as NSO directed to locally locally open open MOV-3-1417 MOV-3-1417 & & 1418.

1418. After 1-31-3 min, mm, trigger lesson trigger lesson stepstep EVENT 6b - OPEN CCW TO NCCs (actuates (actuates TFKV417C == F, F, TFKV418C == F, TFKV418C F, TFKV417O T after 5 sec delay & TFKV418O TFKV4170 = T after 5 sec delay & TFKV4180 = = T after 65 sec delay). Report when complete.

complete.

Respond as Respond as NSO when directed directed to locally throttle discharge discharge of the running HHSIP (most (most likely 3A likely 3A using using valve 8888).

888B). Click on Schema-+SAFETY Schema>SAFETY SYSTEM-+SAFETYSYSTEM*SAFETY INJECTION PROC-+click INJECTION PROC*click on 888 valve for running HHSIP-+ HHSIP.TA TAMH8888(C MH888B(C or D) 888B(C 8888(C or or D) VALVE VALVE PORT AREA>ad AREA-+adjust just value consis tent with ordere consistent ordered d flow rate from 3-EOP-ECA 3-EOP-ECA-1.1 -1 .1 Figure Figure 11 then INSERT. Repeat as necess necessary achieve ary to achiev e desired flow as shown at F943 shown at F943 on on SAFETY INJECTION PROC system mimic. mimic.

88

NRC-3 NRC-3 OPERATIONS SHIFT OPERATIONS SHIFT TURNOVER TURNOVER REPORT REPORT ONCOMING CREW ASSIGNMENTS Shift Mgr: -

Inside SNPO:

Field Supv.: Outside SNPO:

Admin RCO: ANPO:

Unit 33 Unit Unit Unit 44 Unit Supv.: Unit Supv.:

RCO: RCO:

NPO: NPO:

Plant Status Plant Status Unit 3 Unit 44 Mode: 1 Mode: 1 Power: 75 Power: 100 MWe: 557 MWe: 759 Gross Leakrate: 0.03 Gross Leakrate: 0.04 RCS Boron Conc: 825 RCS Boron Conc: 600 Operational Concerns:

3 AFWP AFWP OOS (bearing(bearing failure; OOS 4 hr; hi; ETR 24 hr) 3B EDG OOS (fuel JB EDG OOS (fuel pump pump failed; OOS 2 days; next 0-OSP-023.3 in 4 hr) 3B 3B CSP CSP OOS OOS (failed (failed 1ST -low low discharge pressure; OOS 12 hr; hi; ETR 36 hr)

Train A is protected Train A is protected 22 gpd tube tube leak leak inin 3A 3A S/G - unchanged for past week (Chemistry sampling per 3-ONOP-071 3-0NOP-071.2 .2, Attachment 1.) 1 U3 Anticipated LCO Actions:

Current:

Current:

BB AFWP AFWP - TS-TS 3.7.1.2 3.7.1.2 Action 33 (trains verified operable just just before turnover; 30 30 days to repair) 3B 3B EDG EDG - TS-TS 3.8.1.1.b.l 3.8.1.1.b.1 Actions Actions bb & dd (0-OSP-023.

(0-OSP-023.3 Att 11 & 99 every 3 Att every 88 hi; hr; 3/4-OSP-023 3/4-0SP-023.1 start of

.l start of other other EDGs EDGs not reqd; 3-OP-023 sect not req'd; 3-0P-023 sect 7.7 7.7 due due next shift if next shift ifOOS OOS > > 72 72 hi; hr; repair in in 14 14 days) days) 3B 3B CSP CSP - TS TS 3.6.2.1 3.6.2.1 Action Action aa (Fix 72 hi) in 72 (Fix in hr)

Anticipated: None None Train A is protected. OLRM is green (CDF = = 2.06E-6; LERF == 9.28E-8).

2.06E-6* LERF 9.28E-8 U4 Anticipated LCO Actions:

U4 Current:

Current:

BB AFWP AFWP - TS-TS 3.7.1.2 3.7.1.2 Action Action 33 (trains (trains verified verified operable just before operable just before turnover; turnover; 3030 days days to to repair) repair) 3B EDG 3B EDG - TS-TS 3.8.1.1 .b. 1 Actions 3.8.1.1.b.1 Actions bb & & dd (0-OSP-023 (0-OSP-023.3 Att 11 &

.3 Att & 99 every every 88 hi; hr; 3/4-OSP-023 3/4-0SP-023.1 start of

.1 start of other other EDGs EDGs not not reqd; req' d; fix in 14 fix in 14 days) days)

Anticipated: None None V Train A is protected. OLRM isis green (CDF == 2.OOE-6;

~¥~.=".,"'rf. OLRM 2.00E-6* LERF LERF == 9.28E-8).

9.28E-8 Results of Offgoing Focus Area:

See g:\Ops\Common\0900

Unit 33 Status Unit Status

-, Reactor Operator Reactor Operator Mode:

Mode: 1I RCS Leakrate RCS Leakrate Accumulator Accumulator Ref Ref Levels Levels Power:

Power: 75 75 Gross:

Gross: 0.03 gpm 0.03 gpm A A 6615 6615 MWe:

MWe: 557 557 Unidentified Unidentified 0.02 0.02 gpm gpm BB 6640 6640 Tavg:

Tavg: 567 567 Charging Pps:

Charging Pps: 0.01 gpm 0.01 gpm CC 6625 6625 RCS Pressure:

RCS Pressure: 2235 2235 RCS Boron Cone:

RCS Boron Conc: 825 825

. AlnlorfuaI Ahnnrma1 A:tiitirncia1:ors:

Anniirnbitnrs i,I', "I "'/1': '/;:"\";:"ii,h;i:U.;Y:ili,"i;n'r'i .. ': i',. . . ~ ~h/ .*. , : i J i .. ? . /.';"" ""'."", ,, I,.*

i i

Annunciator:

Annunciator: FF 9/2 9/2 - 3B 3B EDG EDG OOSOOS Comp Actions:

Comp Actions: O-OSP-023.3 Att O-OSP-023.3 Att 1I && 99 due due in hours. 3/4-0SP-023.1 in 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br />. 3/4-OSP-023.1 not not required.

required. 3-0P-023 3-OP-023 sectsect 7.7 7.7 due due next next shift.

shift.

Annunciator:

Annunciator: FF 9/5 9/5 - 3B 3B EDG EDG OOSOOS Comp Actions:

Comp Actions: O-OSP-023.3 Att O-OSP-023.3 Att 11 &

& 99 due due in in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. 3/4-0SP-023.1 3/4-OSP-023.1 not required.

required. 3-0P-023 3-OP-023 sectsect 7.7 7.7 due due next shift.

shift.

Annunciator:

Annunciator:

Comp Actions:

Comp Actions:

Annunciator:

Annunciator:

Actions:

Comp Actions:

Comp Annunciator:

Annunciator:

Actions:

Comp Actions:

Comp Annunciator:

Annunciator:

Actions:

Comp Actions:

Comp Annunciator:

Annunciator:

~

Comp Actions:

Comp Actions:

Annunciator:

Annunciator:

Comp Actions:

Comp Actions:

Annunciator:

Annunciator:

Comp Actions:

Comp Actions:

Annunciator:

Annunciator:

Comp Comp Actions:

Actions:

Current Tech Spec Action Statements: (Does Not Include For "For Tracking Only Items Items" T.S.AS / Component:

T.S.A.S Component: 3.7.1.2 3.7.1.2 Action 33// B B AFWP Reason:

Reason: Bearing failed Entry Date:

Entry Date: XX/XXJXX XX/Xx/XX (Previous shift)

T.S.AS // Component:

T.S.A.S Component: 3.8.1.1 3.8.1.1 Actions Actions bb & 3B EDG

& dd / 3B Reason:

Reason: Fuel Fuel pump pump failed Entry Date:

Entry Date: XX/XX/XX XX/XX/XX (2 (2 days days ago) ago)

T.S.AS // Component:

T.S.A.S Component: 3.6.2.1 3.6.2.1 Action Action aa // 3B 3B CSP CSP Reason:

Reason: Failed Failed 1ST 1ST - low low discharge discharge pressure pressure Entry Date:

Entry Date: XX/XX/XX XX/Xx/XX (Yesterday)

(Yesterday)

T.S.A.S T.S.AS // Component:

Component: 3.4.3 Action aa // 3B 3.4.3 Action 3B PZR PZR backup backup heaters heaters Reason:

Reason: 14 day 14 day due due toto 3B 3B EDG EDG OOSOOS Entry Entry Date:

Date: XX/XX/XX XX/XX/XX (2 (2 days days ago) ago)

T.S.A.S T.S.AS // Component:

Component: 3.5.2 Action 3.5.2 Action f/ f / 3B 3B HHSIP HHS1P Reason:

Reason: 14 day 14 day due due toto 3B 3B EDG EDG OOSOOS Entry Date:

Entry Date: XXJXX/XX XX/XX/XX (2 (2 days days ago) ago)

T.S.AS // Component:

T.S.A.S Component:

Reason:

Reason:

I Entry Entry Date:

Date:

Unit 33 Status Unit Status

~

Changes to Chan~es to Risk Risk Significant Significant Equipment:

Equipment:

B AFWP DOS (Bearing B AFWP OOS (Bearing replacement) replacement) 3B EDG OOS 3B EDG (Fuel pump DOS (Fuel repair) pump repair) 3B CSP OOS 3B CSP (Failed 1ST DOS (Failed 1ST -low low discharge discharge pressure) pressure)

Unit 33 Risk Unit Risk isis GREEN.

GREEN. Main Main contributor contributor isis BB AFWP.

AFWP.

Upcoming Reactivity Upcoming Reactivity Management Management Activities:

Activities:

Dilute to maintain Dilute to maintain 75% 75% power power until until management management permission permission received received to complete increasing to complete increasing power power back back to to 100%.

100%.

Upcoming Major Upcoming Major POD Activities:

POD Activities:

Return Return to  %

100 100% power if/when management if/when management permission permission received received to to increase increase power power back back to to 100%.

100%.

Upcoming ECOs to Hang and lor Upcoming br Release:

None None Evolutions or Compensatory Compensatory Actions in Progress:

- In process of returning power back to 100% 100% from turbine valve test. Currently on hold at 75% awaiting management permission to continue power increase. 3-GOP-301 in use completed through step 5.97.

- After shift turnover, perform monthly surveillance on 3A ECC per 3-OSP-055.1 3-0SP-055.1 section 7.1 immediately after shift turnover. 1ST 1ST and remote valve position verification not required.

- Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being taken per 3-ONOP-

- 3-0NOP-071.2, Attachment 1. 1. The current sample, just completed indicates no no significant change in leak rate. MOV-3-1 MOV-3-1403403 remains energized at management direction due to small size and stability stability of tube leak rate.

rate.

OSP-023.3 0-OSP-023.3 Att 11 & &99 for 3B3B EDG EDG DOS OOS due due in hrs. 3-OSP-023.1 in 44 hrs. 3-0SP-023.1 notnot required since since to 3B 3B EDG EDG DOS OOS duedue to support support system system failure. 3-OP-023 3-0P-023 sectsect 7.7 7.7 due due next next shift allow 3B shift to allow 3B EDG EDG 005 OOS >> 7272 hr.

hr.

General General Information, Information, Remarks, Remarks, and and Operator Operator Work Around Around Status:

Status:

See evolutions See evolutions & &compensator compensatory y actions actions listed listed above.

above.

Train Train A A is is protected.

protected.

Appendix D Scenario Outline Form ES-D-1 Facility: Turkey Point Scenario No.: 4 Op Test No.: 2007-301 Examiners: Candidates: US RO BOP Initial Conditions: Mode 1, 100% Power, MOL. Just completed power increase last shift.

Turnover: Equipment OOS: 3B EDG due to failed fuel pump (OOS 2 2 days; next 0-OSP-023.3 Att 11 & 9 in 4 hrs); B AFW Pump due to bearing failure (OOS 4 hrs; ETR 24 hrs; both trains verified operable);

3B CSP due to failed 1ST -low - low discharge pressure (OOS 12 hr; ETR 36 hr)

Secure 60 gpm orifice (CV-3-200B) and shutdown 1 1 charging pump using 3-0P-047 3-OP-047 section 7.11. Leave 1 1 charging pump and 45 gpm orifice (CV-3-200A) in service.

Known tube leak in 3A S/G (2 gpd) - unchanged for last week. Chemistry samples are being 3-ONOP-071 .2, Attachment 1. The current sample, just completed indicates no taken per 3-0NOP-071.2, MOV-3-1 403 remains open at management direction due to small significant change in leak rate. MOV-3-1403 size and stability of tube leak rate.

Event Type*

Event Type* Event Description No.

11 (N) ALL Close CV-3-200B and secure 1 1 charging pump. Shift from 2 charging pumps I 2 letdown orifices to 1 I charging pump I/ 1I letdown orifice lineup using 3-0P-3-OP-047 section 7.11.

2 (C) SRO/RO PC-3-145 fails high in auto, PCV-3-145 closes until manual control taken and TFB1PIN5 = = T r letdown restored. The crew responds per 3-ARP-097.CR for annunciator A-5/5.

3 TVFCLK1 = = 0.2 (C) SRO/BOP 3-ONOP-Ol 4.

Loss of condenser vacuum. The crew responds per 3-0NOP-014.

3a 1vFCLK1 == 0.0 TVFCLK1 00 (R) ALL (R)ALL 3-ONOP-1 00 until condenser vacuum leak located Fast load reduction per 3-0NOP-1

. and isolated.

4 (I) RO/BOP LT-3-459 L T-3-459 failed low. Crew responds per 3-0NOP-041.6 3-ONOP-041 .6 to restore letdown TFH1TV59 = T T-3-459 out of service.

3-ONOP-049.1 to take LLT-3-459 and 3-0NOP-049.1 (I 1S) SRO (I,TS) 5 TvHPBOU TVHPBOTL (M) RO/BOP RCS leak inside containment coincident with L LT-3-459 T-3-459 failure. The crew

= 0.00004 3-ONOP-041 .3 & 3-0NOP-067.

initially responds per 3-0NOP-041.3 3-ONOP-067. Once RCS leakage (2gpm)

=

= 0.006 r TS SRO (M,TS) exceeds charging pump capacity, the crew unsuccessfully attempts to (300gpm)

TFL2XASE=

TFL2XASE =TT manually trip the reactor and immediate transition is made from 3-EOP-E-0 to TFL2xBsE=T TFL2XBSE =T 3-EOP-FR-S.1.

TFL4AF = = T (C) ALL AMSAC and SI fail to automatically actuate. AFW must be manually started 6

TFLSSIA1 =

TFL3SIA1 =TT by opening AFWSS MOVs. Manual SI is deferred until after crew transitions nnd 2 d TFLSSIA2=T TFL3SIA2 =T back to 3-EOP-E-0. The auto start of the 2 CCWP on SI closes MOV-3-626 TFKV626C = = T which must be opened manually if RCP seal return temperatures permit. The TVHPBOTL =

crew crew transitions from from 3-EOP-E-0 to 3-EOP-E-1 to address the SBLOCA.

0.01 (R)eactivity, (I)nstrument, (l)nstrument, (C)omponent, (M)aJor (M)ajor (N)ormal, (R)eactlvlty, 1

1

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 4 Event Event No.:

No.: _1_

j_ Page Page _1_1 of of_1_

j_.

Event

Description:

Event

Description:

Close CV-3-200B Close CV-3-200B and and secure secure 11 charging charging pump.

pump. ShiftShift from from 22 charging charging pumps /I 22 letdown pumps letdown orifices orifices to to 11 charging charging pump pump /I 11 letdown letdown orifice orifice lineup using lineup using 3-0P-047 3-OP-047 sectionsection 7.11.7.11.

~.Time~osition Position Applicants Actions Applicant's Actions oror Behavior Behavior US US Directs RCO Directs RCO to to shift shift from from 22 charging charging pumps pumps /2 / 2 letdown letdown orifices orifices to to 11 charging pump I I letdown charging pump /1 letdown orifice orifice per per 3-0P-047 3-OP-047 section section 7.11 7.11 RCO RCO Obtains copy Obtains copy of of 3-0P-047 3-OP-047 section section 7.11.

7.11. Performs Performs actions actions as as follows:

follows:

1.

1. Notifies HP Notifies HP of of intent intent toto change change letdown letdown flow flow 2.
2. Directs NSO Directs NSO adjust adjust CCW CCW flow flow toto NRHX NRHX to to maintain maintain letdown letdown flow flow within 5°F of VCT temp
3. Determines 2 charging pumps running
4. If directed by US, takes TCV-3-143 to VCT DIVERT
5. Determines step 7.11.2.3 n/a
6. Takes manual control & maintains demand> demand > 20% on running charging pumps.
7. Places PCV-3-145 in MANUAL and adjusts letdown pressure to approx. 300 psi 9 psig NOTE: BOP should assist while closing CV-3-200B 8.
8. Closes CV-3-200B CV-3-200B and and controls PCV-3-145 PCV-3-145 to to maintain maintain letdown letdown pressu re> 150 pressure> 150 psig 9 psi 9.
9. Adjusts Adjusts PCV-3-1 PCV-3-145 45 toto put put letdown letdown pressure pressure in in normal normal (green)

(green) bandband then then places places PCV-3-145 PCV-3-145 in in AUTO AUTO NOTE:

NOTE: When When PCV-3-145 PCV-3-145 is is returned returned to to auto auto isis when when the the malfunction malfunction of of P0-3-145 PC-3-145 in in automatic automatic is is inserted.

inserted. Subsequent Subsequent steps steps in in this this event event may may be be delayed delayed or not performed or not performed due due to to response response to to event event 2. 2.

10.

10. Directs Directs NSO NSO adjust adjust 3-834 3-834 to to maintain maintain stable stable letdown letdown temperature temperature
1. Reduces 111. Reduces demand demand to to 20-25%

20-25% on on charging charging pumppump to to be be shutdown shutdown then secures charging then secures charging pump pump 12.

12. Controls Controls running running charging charging pump pump demand demand toto putput PZR level ==

PZR level program program thenthen places places running running charging charging pump pump speedspeed control control inin AUTO AUTO 13.

13. Verifies Verifies TCV-3-143 TCV-3-143 inin DEMIN DEMIN NORMALNORMAL I1

Appendix D Operattor Opera or Action Actions Form ES-D-2 Op-Test No.: 2007-30101 Scenarrio Scena io No.: ~ 4 Event No.: 2 Page _1_1 of _1_1 Event

Description:

P0-3-i 45 fails high in auto, PCV-3-145 closes until manual contro PC-3-1 l

taken and letdown restored. The crew resQon responds Qerper 3-ARP-097.CR for annuncciator annun iator A-5/5.

Time__[_Pos Time Positio ition n Applicant's Applic ants Action Actions or Behavior RO Recognizes/reports annunannuncciator iator A-5/5 alarms briefly Recognizes/reports loss of letdown flow and PC-3-145 failed high BOP Directs respon response per 3-ARP-097.CR annun annuncciator iator A-5/5 for a letdown high pressure conditi condition on RO Perform Perfor mss action actionss of 3-ARP-097.CR annunannuncciator iator A-5/5 as directed by BOP:

1. Determines PCV-3 PCV-3-1 45 not operat

-145 operatiing ng proper properly ly

2. Places PCV-3-145 in MAN and restores letdown pressure to norma l

(green) band & letdown flow to expec expectted ed value for orifice in service US Directs WCC WOO notify I&Cl&C of PCV-3-145 failure to operat operatee in auto Directs placing info tag on PCV-3-145 to leave in MANUAL Evalua Evaluates no impac impactt per TS Conducts crew brief regarding effects of failure 2

Appendix D Operattor Opera or Action Actionss Form ES-D-2 Op-Test No.: 2007-301 Scenarrio Scena io No.: ~ 4 Event No.: 3/3a Page _1_

j. of _3_ 3 Event

Description:

Loss of conde conden ser vacuum. The crew responds per 3-0NO nser 3-ONOP-014 P-014..

Fast load reductreductiion on per 3-0NO 3-ONOP-100 P-1 00 until conde condennser ser vacuum leak located and isolated.

Time Positiovll PV;:,ili n Applicant's ants Action Actions or Behavior BOP Recognizes/r eports lowerin lowering conden g conde ser vacuu nser vacuum m..

Directs 3-0NO3-ONOP-014 P-014 immed iate operatoperato orr action: Directs NSO place SJAE hogging jet in service US Directs perform performance ance of 3-0NO 3-ONOP-014 P-014 BOP Perform Perfor actionss per 3-0NO mss action 3-ONOP-014 P-014 as directed by US

1. Directs NSO close hogging jet drain
2. nd Directs NSO verify 2 2 set of SJAEs in service
3. Determ ines vacuum still slowly lowerinloweringg US Determines vacuu vacuum m>> 3-0NO 3-ONOP-014 P-014 Enclos ure 11 Directs performperformance ance of fast load reduct reductiion on per 3-0NO 3-ONOP-1 P-1 00 Conducts crew brief per 3-0NO 3-ONOP-1 P-1 00 Attachment 3:

Provides

  • . Provid es reason (2 gpm tube leak requiring plant sid) s/d)
  • . Target power level =offline

=

  • . Specifies load reduct reductiionon rate
  • . Specifies boration amount & rate
  • . Covers plant control paramparame ters & contin eters conting ency action gency actionss
  • . Covers E-O E-0 transit transitiion on criteria
  • . Reviews req'd reqd action actionss from 3-0NO 3-ONOP-071 P-071 .2

.2

  • . Solicits crew questi questio ns & input ons Ensures load dispat dispatc her notified cher notified of load decrease.

RO RD When directed, initiates boration per 3-0NO 3-ONOP-1P-1 00:

1. Sets BA Totalizer to amount directed
2. Sets FC-3-1 I 3A pot setting =

FC-3-1 13A = 8.0

3. Places Rx M/U Select Selectoorr Switch to BORATE
4. Places Rx M/U Control Switch to START 3

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.: --+/--

Scenario No.: 4 Event Event No.:

No.: 3/3a3/3a Page 2.

Page 2 ofof -.l 3

Event

Description:

Event

Description:

Loss of Loss of condenser condenser vacuum.

vacuum. The The crew crew resl20nds responds l2er per 3-0NOP-014.

3-ONDP-014.

Fast load Fast load reduction reduction l2er per 3-0NOP-1 3-ONOP-1 00 00 until until condenser condenser vacuum vacuum leak leak located and located and isolated.

isolated.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP When directed When directed per per 3-0NOP-100:

3-ONOP-100:

1.

1. Notifies load Notifies load dispatcher dispatcher of of load load reduction reduction when directed directed by by US US
2. announcement regarding load reduction Makes plant page announcement When directed per 3-ONOP-014, directs NSO per 3-0NOP-014, NSO to identify cause cause of lowering vacuum per step 5.5.

RD RO When directed, continues fast load reduction per 3-0NOP-100: 3-ONOP-100:

1. Checks for T avg reduction from boration Tavg
2. Sets FC-3-113A FC-3-1 13A for BA flow rate as directed BOP Reduces turbine load per 3-0NOP-1 3-ONOP-100 00 at rate directed by US.

RD RO When directed, continues fast load reduction per 3-ONDP-100 3-0NOP-1 00::

1.

1. Verifies auto rod insertion in response to turbine load reduction.

2.

2. Verifies rods> RIL US US Per 3-DNOP-100 3-0NOP-100,, notifies notifies SM to review 0-EPIP-2010 0-EPIP-20101 1 && 0-ADM-O-ADM-1115 15 and ensure required and ensure required notifications notifications mademade RD RO When When directed directed perper 3-ONOP-100 3-0NOP-1 00
1. Checks
1. Checks PZR PZR level level following program.

program. IfIf not not increases increases charging charging flow and/or places flow and/or places an an additional additional letdown letdown orifice orifice in in service.

service.

Controls Controls PCV- 3-1 45 as PCV-3-145 as necessary necessary to to return return letdown letdown pressure pressure toto normal normal (green)

(green) band.

band.

2.

2. Directs Directs NSO NSO adjust adjust NRHX NRHX CCW CCW flowflow ifif needed needed forfor increased increased charging charging flow.

flow.

3. Verifies
3. Verifies load load reduction rate &&auto reduction rate auto rod rod control control maintaining maintaining Tavg Tavg-Tref per expected T ref per expected valuevalue asas discussed discussed inin crewcrew brief brief 4.
4. Energizes Energizes PZR PZR backup backup heaters.

heaters.

BDP BOP Relays Relays report report that that cause cause ofof lowering lowering vacuum vacuum has has been been found found and and isolated.

isolated.

Reports Reports vacuum vacuum increasing.

increasing.

44

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.:-L 4 Event Event No.:

No: 3/3a3/3a Page2.3 of Page of-.l3 Event

Description:

Event

Description:

Loss of Loss ofcondenser condenservacuum.

vacuum. TheThe crew crew resl20nds responds l2er per 3-0NOP-014.

3-ONOP-01 4.

Fast load Fast load reduction reduction l2er 3-ONOP-100 per 3-0NOP-1 00 until until condenser condenservacuum vacuum leakleak located and located and isolated.

isolated.

Time ime Position Position Applicants Actions Applicant's Actions or or Behavior Behavior US US Directs stabilization Directs stabilization of of reactor reactor power power following following report report that that loss loss of of vacuum corrected vacuum corrected RO RO When directed When directed by by US US (2:

( 60%

60% power),

power), secures secures boration:

boration:

a.

a. Places rx Places rx m/u rn/u selector selector switch switch inin AUTO AUTO b.
b. Sets FC-3-113A Sets FC-3-1 1 3A potentiometer potentiometer to to directed directed value value
c. Places RCS Places RCS m/u control switch to START us US 3-ONOP-100 Exits 3-0NOP-100 Directs completion of actions per 3-0NOP-0 3-ONOP-014 14 BOP BOP Completes performing actions of 3-0NOP-014 3-ONOP-014 as directed by US: US:
1. When condenser vacuum recovers> recovers > 26"Hg, 26Hg, directs NSO NSO secure SJAE hogging jet
2. Directs Directs NSO monitor /1 report North North & South hotwell

& South hotwell levels levels 3.

3. Directs Directs Chemistry Chemistry report hotwell hotwell dissolved dissolved oxygen oxygen levels levels 4.
4. Directs Directs NSO NSO verify verify condenser airair inleakage inleakage << 20H 20"H 2O 0

2 US US Evaluates Evaluates reported reported North North && South South hotwell hotwell levels levels Determines Determines fromfrom SM SM that that both both sets sets ofof SJAEs SJAEs to to remain remain in in service service Directs Directs WCC WCC contact contact Mechanical Mechanical to to initiate initiate repairs repairs to to failed failed condenser component condenser component causing causing vacuum vacuum loss loss 55

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 4 Event No.: ~

Event No.: 4 Page ..1..1 of Page of--L 2

Event

Description:

Event

Description:

LLT-3-459 T 459 failedfailed low.

low. Crew Crew res(2onds responds (2er per 3-0NOP-041.6 3-ONOP-041 .6 to to restore restore letdown and letdown and 3-0NOP-049.1 3-ONOP-049.1 to to take take LLT-3-459 T-3-459 out of service.

out of service.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RCO RCO Recognizes // reports Recognizes reports failure failure ofof LLT-3-459 T-3-459 low low and and loss loss of of letdown.

letdown.

Performs immediate Performs immediate actions actions of of 3-0NOP-041.6:

3-ONOP-041 .6:

1.

1. Places CHANNEL Places CHANNEL SELECT SELECT PRESSURIZER PRESSURIZER LEVEL LEVEL CONTROL switch CONTROL switch toto the the ch ch 22 && 33 position.

position.

2. With PZR PZR level ch 2 & in service, determines PZR

& 33 in PZR levellevel follows program program US US Directs performance Directs performance of actions per 3-0NOP-041.6.

3-ONOP-041 .6.

RCO RCO 3-ONOP-041 .6 as directed by US:

Performs actions per 3-0NOP-041.6

1. Determines running charging pump can maintain PZR level on program.
2. Places CHANNEL SELECT PRESSURIZER PRESSURIZER LEVEL RECORDER switch to the ch 2 or ch 33 position NOTE: BOP may assist with restoration of letdown
3. Re-establishe Re-establishess letdown flows as follows:
a. Throttles PCV-3-145 to approximatel approximately y 50% open b.
b. Manually Manually controls controls PCV-3-145 PCV-3-145 to to limit limit pressure pressure spike spike c.
c. Opens Opens LCV-3-460, LCV-3-460, then then opens opens CV-3-200A CV-3-200A d.
d. Determines Determines PCV-3-145 PCV-3-145 must must remain remain in in MANUAL MANUAL 4.
4. Restores Restores PZR PZR heaters heaters to to automatic automatic operation operation US US Directs Directs performance performance of of actions actions perper 3-ONOP-049 3-0NOP-049.1. .1.

RCO RCO Performs Performs actions actions per per 3-ONOP-049 3-0NOP-049.1 .1 asas directed directed by by US:

US:

1.1. Determines Determines LT-3-459 LT-3-459 failed failed while while LT-3-460/46 LT-3-460/461 remain inin 1 remain service service 2.2. Determines Determines PZR PZR level level control control switches switches already already transferred transferred US US Determines Determines TS TS 3.3.1 3.3.1 Table Table 3.3-1 3.3-1 Unit Unit 99 affected.

affected. Action Action 66 applies applies (6 hr to trip bistables)

(6 hr to trip bistables)

Determines Determines BS-3-459A1BS-3-459A 1&& A2 A2 must must be be tripped tripped Briefs Briefs crew crew regarding regarding tripping tripping bistables bistables and and effects effects of offailure.

failure.

66

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 4 No.: ~

Event No.:

Event 4 Page 2.

Page of--.£ 2 of 2 Event

Description:

Event

Description:

LLT-3-459 failed low.

T 459 failed low. Crew Crew res[2onds responds [2erper 3-0NOP-041.6 3-ONOP-041 .6 to to restore restore letdown and letdown and 3-0NOP-049.1 3-ONOP-049.1 to to take take LLT-3-459 T-3-459 out out of of service.

service.

e

[_Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior NOTE: Subsequent NOTE: Subsequent stepssteps may may notnot be be performed performed ifif annunciator annunciator G-G 5/3 alarms indicating leakage in 5/3 alarms indicating leakage in containment>

containment> 11 gpm. gpm. This This annunciator may annunciator may cause cause the the crew crew toto stop stop performance performance of of 3-0NOP-3-ONOP-049.1 and 049.1 and enter 3-ONOP-041.3 per enter 3-0NOP-041.3 per event event 5.5.

BOP BOP Obtains keys Obtains keys and and opens opens protection protection rack rack 11 Trips bistables Trips bistables BS-3-459A BS-3-459A11 & BS-3-459A2

& BS-3-459A2 RCO RCO Checks correct bistable status lights energized in response to (LC459A11 & LC459A2).

tripping bistables (LC459A Checks correct annunciators on in response to tripping bistables (A-813, A-8/4 (A-8/3, A-814 & J-7/4).

J-714).

US Directs WCC initiate PWO & notify I&C l&C Directs generation of ECO for tripped bistables 77

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: ~ 4 Event No.:

Event No.: l 5 Page!L Page 8 of of_2_2 Event

Description:

Event

Description:

RCS leak RCS leak inside inside containment containment conincident conincident with with LLT-3-459 T-3-459 failure.

failure. The The crew initially crew initially resl20nds responds l2erper 3-0NOP-041.3 3-ONOP-041 .3 && 3-0NOP-067.

3-ONOP-067. Once Once RCSRCS leakage exceeds leakage exceeds charging charging l2uml2 pump cal2acity.

capacity, thethe crew crew unsuccessfully unsuccessfully attempts to atteml2ts to manually manually tril2 trip the the reactor reactor and and immediate immediate transition transition isis made made from 3-EOP-E-0 to 3-EOP-FR-S from 3-EOP-E-0 to 3-EOP-FR-S.1. . 1.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Recognizes // reports Recognizes reports rising rising charging charging flowflow while while maintaining maintaining PZR PZR level on level on program program Recognizes!/ reports Recognizes reports annunciator annunciator G-5/3G-5/3 alarming alarming BOP Recognizes / reports rising containment sump level on recorder Recognizes!/ reports R-3-11/12 Recognizes R-3-11112 slowly rising US US Directs performance of actions per 3-0NOP-041.3 3-ONOP-041 .3 Directs STA perform 3-0SP-041.13-OSP-041.1 to determine RCS leak rate Identifies leak as inside containment but not isolable RO RO Performs actions of 3-0NOP-041.3 3-ONOP-041 .3 as directed by US:

1.

1. Determines RCS inventory being maintained with 11 charging pp pp 2.
2. Estimates RCS leak rate from charging/letd charging/letdownown mismatch
3. Closes CV-3-2819/2 CV-3-2819/2826 826 and CV-3-2821/2 CV-3-2821/2822 822 US US Determines Determines RCS RCS leakleak rate rate>> unidentified unidentified leak leak limit limit of of TS TS 3.4.6.2.b 3.4.6.2.b requiring requiring action action within within 4hr4hr or or commence commence shutdown shutdown of of unit unit Notifies Notifies SM SM toto refer to 0-EPIP-201 refer to 0-EPIP-201 01 01 Directs Directs HPSS HPSS conduct conduct local local radiation radiation surveys surveys && post post accordingly accordingly Determines Determines leak leak not not isolated isolated Directs Directs performance performance of of actions actions per per 3-ONOP-067 3-0NOP-067 as as time time permits permits BOP BOP Performs Performs actions actions of of 3-ONOP-067 3-0NOP-067 as as directed directed byby US:

US:

1.1. Determines Determines // reports reports status status ofof R-3-11/12 R-3-11 /12 alarms.

alarms. IfIfalarming:

alarming:

a.a. Determines Determines reading reading> > alarm alarm setpoint setpoint b.b. Verifies Verifies containment/ control rm containment/control rm ventilation ventilation per perAttAtt 11 c.c. Directs Directs NSO NSO silence silence alarm alarm on on R-3-1 R-3-11/12 RM-80 skid 1/12 RM-80 skid d.d. Directs HP verify Directs HP verifyactivity activityinside inside containment containment 88

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-301 ScenarioNo.:

Scenario No.:~ 4 EventNo.:

Event No.:2-

. Page2 of--L Page of Event

Description:

Event

Description:

RCSRCS leak leak inside inside containment containmentcon conincident incident with with LLT-3-459 T-3-459 failure.

failure. The The crew initiall~

crew initiallyresl20nds responds l2er per3-0NOP-041.3 3-ONOP-041 .3 && 3-0NOP-067.

3-ONOP-067. Once Once RCS RCS leakage exceeds leakage exceeds charging charging l2uml2 pump cal2acit~,

capacity, the crew unsuccessfull~

the crew unsuccessfully attempts toto manuall~

atteml2ts manuallytril2trip the the reactor reactor andand immediate immediate transition transition isis made made from 3-EOP-E-0 to 3-EOP-FR-S from 3-EOP-E-0 to 3-EOP-FR-S.1. .1.

Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior BOP BOP Continues performing Continues performing actions actions of of 3-0NOP-067 3-ONOP-067 as as directed directed by by US:

US:

2.

2. Directs NSO Directs NSO report report status status of of R-3-11/12 R-3-11/12 RM-80 RM-80 monitor monitor light light 3.
3. Determines effluent Determines effluent radiation radiation monitor monitor alarms alarms clear, clear, effluent effluent release not release not in in progress progress RO RO Recognizes I/ reports sudden decrease Recognizes decrease in in PZR PZR level level and increase increase in in charging pumppUmp demand demand US US performance of actions per 3-0NOP-041.3 Directs performance 3-ONOP-041 .3 in response response to to leak rate increase leak increase RO RO 3-ONOP-041 .3 as directed by US:

Performs actions of 3-0NOP-041.3 1.

1. Starts 2 standb standby y charging pumps and establi establishes shes maximum charging flow 2.
2. Closes CV CV 200A to isolate letdown letdown 3.
3. Recog nizes /I reports PZR Recognizes PZR level level continuing to to drop drop US US Determines Determines RCS RCS leakleak rate rate> > maximum maximum charging charging flow flow with with letdown letdown isolated isolated Directs Directs reactor reactor trip trip Directs Directs crew crew perform perform immediate immediate actions actions of of 3-EOP-E-0.

3-EOP-E-0.

RO RO Performs Performs immediate immediate actions actions of of 3-EOP-E-0:

3-EOP-E-0:

1.1. Attempts Attempts reactor reactor trip trip at at consol console e && VPB.

VPB. Report Reports unable to s unable to trip trip reactor reactorwith reactor power>

with reactor power> 5% 5%

US US Directs Directs STASTA monitor monitorCSFs CSFs usingusing 3-EOP-F-0 3-EOP-F-0 Directs Directs transition transition toto 3-EOP-FR-S 3-EOP-FR-S.1 .1 99

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: _4_ 4 Event No.:

Event No.: _6_ 6 Page.L Page 1 of ofl 6 Event

Description:

Event

Description:

AMSAC AMSAC and and SI fail to SI fail to automatically automatically actuate.

actuate. AFW AFW must must bebe manually manually started by opening started by opening AFWSS AFWSS MOVs. MOVs. ManualManual SI SI isis deferred deferred until until after after crew crew transitions back nnd transitions back toto 3-EOP-E-0.

3-EOP-E-0. The The auto start of auto start the 22 of the d CCWP CCWP on on SI SI closes MOV-3-626 closes MOV-3-626 which which must must be be opened opened manually manually ifif RCPRCP seal seal return return temperatures permit.

temperatures permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to 3-EOP-E-1 to 3-EOP-E-1 to address to address the the SBLOCA.

SBLOCA.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior US US Directs performance Directs performance of of 3-EOP-FR-S.1 3-EOP-FR-S.1 RO RO Performs actions Performs actions per per 3-EOP-FR-S.1 3-EOP-FR-S.1 as as directed by US: US:

1. Since reactor does not respond to manual trip, verifies control rod insertion in auto or manual Critical Critical 2. Initiates emergency boration:
a. Determines all 3 charging pumps running. Verifies control for one of those in MANUAL.
b. Stops CVCS makeup system
c. Starts 1 I BATP
d. Opens MOV-3-350 & HCV-3-121
e. Determines CV-3-301A open
f. Establishes emergency boration flow flow> gpm on Fl > 60 gpm FI 110 110 with with charging charging flow flow> 45 gpm

> 45 gpm on on Fl-3-122 FI-3-122 3.

3. Determines Determines PZR PZR pressure pressure << 23352335 psigpsig 4.
4. Determines Determines containment purge purge exhaust exhaust && supplysupply fans fans off off and and isolation isolation dampers dampers closed.

closed. Verifies Verifies CV-3-2819 CV-3-2819 && 2826 2826 closed.

closed.

5.

5. Determines Determines reactor reactor subcritical subcritical with with reactor reactor powerpower << 5%5% andand IR IR SUR SUR negative negative BOP BOP Performs Performs actionsactions per per 3-EOP-FR-S 3-EOP-FR-S.1 .I asas directed directed by by US:

US:

Critical Critical I.1. Manually Manually trips trips turbine turbine && determines determines turbine turbine stop stop valves valves closed closed 2.

2. Closes Closes MSR MSR main main steam steam stopstop MOVs MOVs 3.3. Opens Opens AFWSSAFWSS MOVs MOVs to to start start AFW AFW pumps pumps 4.
4. Directs Directs FS/NSO FS/NSO locallylocally trip trip rx rx trip trip breakers breakers and and MG MG setset input!output input/output breakersbreakers 5.5. Verifies Verifies turbine turbine trip trip && Mid/East Mid/East GCBs GCBs open open 10 10

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _4_ 4 Event No.:

Event No.: _6_ 6 Page.£ Page of of__6_

Event

Description:

Event

Description:

AMSAC AMSAC and and SI SI fail fail to to automatically:

automatically actuate.

actuate. AFW AFW must must be be manually:

manually started by opening AFWSS started by: oQening AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after after crew crew nna transitions back transitions back to 3-EOP-E-0. The to 3-EOP-E-0. The auto start of auto start the 22 of the d CCWP on SI CcWP on SI closes MOV-3-626 closes MOV-3-626 which which mustmust be be oQened opened manually:

manually ifif RCPRCP sealseal return return temperatures Qermit.

temQeratures permit. The The crewcrew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to 3-EOP-E-1 to 3-EOP-E-1 to address to address the the SBLOCA.

SBLOCA.

I Time Time Position Position us

] Does not Does not allow allow manual Applicants Actions Applicant's manual 51 Actions or until after SI until or Behavior Behavior after return return to to 3-EOP-E-O 3-EOP-E-O U5 Determines reactor Determines reactor subcritical subcritical and and proceeds proceeds from from step step 88 to to step step 1717 Directs transition Directs transition back back to to and and performance performance of of 3-EOP-E-0 3-EOP-E-O RO Performs actions per 3-EOP-E-0 3-EOP-E-O as as directed by U5: US:

1. Recognizes / reports rx tripped with rod bottom lights on, RPI at zero & neutron flux decreasing (rx trip breakers still closed).

NOTE: Automatic SI will not function. Crew must manually SI.

Critical 2. Determines PZR level < < 12[50]%. Manually initiates 51. SI.

BOP Performs actions per 3-EOP-E-0 as directed by US:

1.

1. Determines turbine stop valves & MSR steam stop MOVs closed with Mid/East GCBs open.
2. Determines 3A & 3B 4kV buses energized from offsite power power with 3D 4kV bus aligned to 3B 4kV bus US Directs Directs RO RO continue with performance of of 3-EOP-E-0 3-EOP-E-0 subsequent US actions while actions while BOP BOP verifies verifies prompt prompt actions actions per per Attachment 3. 3.

BOP BOP Verifies Verifies prompt prompt actions actions per per 3-EOP-E-0 3-EOP-E-0 Attachment Attachment 3: 3:

1.

1. Determines Determines 3A, 3A, 3B,3B, 3C, 3C, 3D3D && 3H 3H 480V 480V LOs LCs energized energized 2.
2. Determines Determines MSIVs MSIVs open open with with no no active active MSISMSIS 3.
3. Verifies Verifies FW FW isolation:

isolation:

a.

a. Places Places both both SGFP SGFP switches switches inin STOP.

STOP.

b.b. Determines Determines all all main main FW FW regulating regulating && bypass bypass valves valves closed.

closed.

c.c. Closes Closes FW FW isolation isolation valves valves MOV-3-1 MOV-3-1407, 1408 && 1409.

407, 1408 1409.

d.d. Determines Determines both both SSGFWPs SSGFWPs off. off.

4.4. Determines Determines 2: 22 ICWP ICWP running running POV-3-4882 POV-3-4882 && 4883 4883 closed closed with with ICW ICW headers headers tied tied together.

together.

11 11

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _4_ 4 Event No.:

Event No.: _6_ 6 Page--L Page 3 ofof_6_6 Event

Description:

Event

Description:

AMSAC AMSAC and and SI SI fail fail to automaticallyactuate.

to automatically actuate. AFW AFW must must be be manually manually started started by opening AFWSS by opening AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after after crew crew nnd transitions back transitions back to 3-EOP-E-0. The to 3-EOP-E-0. The auto auto start start of the 22 of the d CCWP CCWP on on SI SI closes MOV-3-626 closes MOV-3-626 which which must must be opened manually be opened manually ifif RCPRCP seal seal return return temperatures permit.

temperatures permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to 3-EOP-E-1 to 3-EOP-E-1 to address the to address SBLOCA.

the SBLOCA.

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior BOP BOP Continues prompt Continues prompt actionaction verification verification per per 3-EOP-E-O 3-EOP-E-O Att. Aft. 3:

3:

5.

5. Determines 33 CCWHXs Determines CCWHXs in in service, service, 22 CCWPs CCWPs running running andand CCW headers CCW headers tied tied together together 6.
6. Determines MOV-3-626 Determines MOV-3-626 closed,closed, containment containment isolation isolation phase phase B B not actuated not actuated & R-3-17AJB

& R-3-17 normal.

AlB normal.

Critical Critical 7. If RCP #1 seal leak-off temperature < < 235°F, manually opens MOV-3-626

8. Determines 2 ECC & ~2 2 ECF running.
9. Determines both U3 HHSIPs & RHRPs running.
10. Determines RCS pressure <1600[2000] psig but >250[650]

psig with adequate HHSI flow present.

111.

1. Determines both U3 HHSIPs running. Shuts down both U4 HHSIPs.

12.

12. Determines all containment isolation phase A valves closed.
13. Determines
13. Determines SI SI valves in in proper injection alignment 14.
14. Resets SI & & containment isolation isolation phase A. A. Determines Determines containment isolation isolation phase phase BB not not actuated.

actuated.

15.

15. Determines Determines no no RCPs RCPs running running (should (should havehave been been tripped tripped by by RD RO due to inadequate RCS due to inadequate RCS subcooling) subcooling) 16.
16. Determines Determines containment containment pressure pressure << 20 20 psig.

psig.

17.

17. Determines Determines containment containment ventilation ventilation isolated isolated and and verifies verifies control control room room ventilation ventilation in in proper proper emergency emergency recirculation recirculation alignment.

alignment.

18.

18. Directs Directs NSO NSO place place PAHMS PAHMS in in service service per per 3-OP-094.

3-0P-094.

19. Verifies
19. Verifies 3A3A && both both U4U4 EDGs EDGs running running (3B (3B EDG EDG isis DOS).

OOS).

20.

20. Determines Determines 3A, 3A, 3B3B && 3D 3D 4kV4kV buses buses still still energized.

energized.

21.

21. Notifies Notifies USUS that that prompt prompt action action verification verification complete.

complete.

12 12

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _4_4 Event No.:

Event No.: _6_ 6 Page ~

Page of l 6 4 of Event

Description:

Event

Description:

AMSAC and AMSAC and SI fail to SI fail to automatically automatically actuate.

actuate. AFWAFW mustmust be be manually manually started by started opening AFWSS by opening AFWSS MOVs. MOVs. Manual Manual SI SI is is deferred deferred until until after after crew crew nnd transitions back transitions back to to 3-EOP-E-0.

3-EOP-E-0. The The autoauto start start of the 22 of the d CCWP CcWP on on SI SI

  • closes closes MOV-3-626 MOV-3-626 which which must must bebe opened opened manually manually ifif RCP RCP seal seal return return temperatures permit.

temperatures permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to 3-EOP-E-1 to 3-EOP-E-1 address the SBLOCA.

to address SBLOCA.

Time

[_Time Position Applicants Actions or Behavior Applicant's RO Performs foldout page actions of 3-EOP-E-0 3-EOP-E-O as as directed:

1. Determines containment conditions adverse (>180°F) (>160°F)

Critical 2. Trips RCPs if RCS subcooling < < 25[65]OF 25[65]°F with U4 HHSIPs running and SI flowpath verified Performs subsequent actions of 3-EOP-E-0 3-EOP-E-O as directed

1. Determines 2 AFWPs (A & C) running.
2. Determines AFW valve alignment proper.
3. Determines SG levels < 6[32]%. 6[321%. Controls AFW flow> 345 gpm until level >> 6[32]% then maintains levels 15-50%. 15-50%.
4. Determines annunciator A-113 A-1/3 on & & verifies RCPs tripped if MOV-3-626 still closed. In that case, if RCP seal return temps all << 235°F, verifies SI reset then starts 3A charging pump at minimum speed and adjusts HCV-3-121 for proper seal injection flow
5. Determines Tc slowly slowly dropping with RCS pressure. Determines Determines steam dumps && steam flow not cause for Tc decrease. decrease. Limits total AFW flow to to 345 gpm until 345 gpm until any any SGSG level level> 6[32]%.

> 6[32}%.

6.

6. Determines Determines PORVs, PORVs, normal normal spray, spray, aux aux spray spray & excess letdown

& excess letdown isolation isolation valves closed 7.

7. Verifies Verifies RCPs RCPs tripped tripped ifif RCS RCS subcooling subcooling << 25[65]°F 25[65tF with with U4 U4 HHSIPs HHSIPs running running and SI flowpath and SI flowpath verified verified 8.
8. Determines Determines no no SGs SGs depressurized depressurized or or depressurizin depressurizing g 9.
9. Determines Determines no SG tube no SG tube ruptures ruptures
10. Determines
10. Determines RCS RCS notnot intact intact (containment (containment radiation, radiation, pressure pressure & & sump sump level level all all not not normal).

normal).

US US Directs Directs transition transition to and performance to and performance of of 3-EOP-E-1.

3-EOP-E-1.

Conducts Conducts crewcrew brief.

brief.

13 13

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _4_ 4 Event No.:

Event No.: _6_6 Pagelof~

Page 5 of 6 Event

Description:

Event

Description:

AMSAC and AMSAC and SISI fail fail to automatically actuate.

to automatically actuate. AFWAFW must must bebe manually manually started started by opening by oQening AFWSS AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after after crew crew transitions back nna transitions back to to 3-EOP-E-0.

3-EOP-E-0. The The auto auto start start of the 22 of the d CCWP ccwp on on SISI closes MOV-3-626 closes MOV-3-626 which which must must be be oQened opened manually manually ifif RCPRCP seal seal return return temperatures Qermit.

temQeratures permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to 3-EOP-E-1 to 3-EOP-E-1 to address to address the the SBLOCA.

SBLOCA.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Performs actions Performs actions of of 3-EOP-E-1 3-EOP-E-1 as as directed directed by by US:US:

1.

1. Verifies RCPs Verifies RCPs tripped tripped ifif RCS RCS subcooling subcooling << 25[65]OF 25[65]°F with with U4 U4 HHSIPs running HHSIPs running and and SISI flowpath flowpath verified verified 2.
2. Determines power Determines power to to both both PORV PORV block block MOVs MOVs available, available, PORVs PORVs closed & both PORV block MOVs open 3.
3. Verifies SI reset reset
4. Determines at least least one charging pump is running with CVCS makeup stopped.
5. Starts any standby charging pumps and establishes maximum flow flow
6. Verifies charging pump suction transfers to RWST.

BOP BOP Performs actions of 3-EOP-E-1 as directed by US:

11 . Determines SGs not faulted.

2. Controls AFW flow> 345 gpm until level level> > 6[32]% then maintains levels 15-50%.

15-50%.

3. Directs Chemistry Chemistry sample SGs for for activity activity & & check DAM-i DAM-1 4.
4. Directs Directs HP HP taketake radiation radiation readings readings on on main main steam steam lines lines
5. Verifies
5. Verifies containment containment isolation isolation phase phase A A&&B B reset.

reset.

6.

6. Verifies Verifies CV-3-2803 CV-3-2803 open open && IA IA pressure pressure> > 95 95 psig psig US US Determines Determines SI SI can can not not be be terminated terminated (inadequate (inadequate subcooling, subcooling, RCS RCS pressure pressure && PZR PZR level) level)

RO RO Continues Continues performing performing 3-EOP-E-1 3-EOP-E-1 actionsactions as as directed directed by by US.

US.

1.1. Determines Determines 3A 3A CSP CSP should should continue continue running running sincesince containment containment temperature>

temperature> 122°F. 122°F.

2.2. Determines Determines RCS RCS pressure pressure> > 250[650]

250[650] psigpsig andand RHR RHR flow flow << 1000 1000 gpm.

gpm. Verifies Verifies SI SI reset reset and and stops stops RHRP5.

RHRPs.

3.3. Determines Determines RCS RCS pressure pressure stable/decrea stable/decreasing sing 14 14

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301*

2007-301 Scenario No.:

Scenario No.: 33 Event No.:

Event No.: _6_6 Pagelofl Page 6 of 6 Event

Description:

Event

Description:

AMSAC AMSAC and and SI SI fail fail toto automatically automaticallyactuate.

actuate. AFW AFW must must be be manually manually started by opening started by oQening AFWSS AFWSS MOVs.MOVs. Manual Manual SI SI isis deferred deferred until until after aftercrew crew transitions back nna transitions back toto 3-EOP-E-O.

3-EOP-E-0. The The auto start of auto start ofthethe 22 d CCWP CCWP on on SI SI closes MOV-3-626 closes MOV-3-626 which which must must be be oQened opened manually manually ifif RCPRCP seal seal return return temperatures Qermit.

temQeratures permit. The The crew crew transitions transitions from from 3-EOP-E-0 3-EOP-E-0 to to 3-EOP-E-1 3-EOP-E-1 to address SBLOCA.

to address SBLOCA.

Time Position lillie Position Applicants Actions Applicant's Actions oror Behavior Behavior US US Determines LOCA Determines LOCA exists exists since since RCS RCS pressure pressure stable/decreasing stable/decreasing and continues past and continues past step step 14 14 in in 3-EOP-E-O.

3-EOP-E-O.

TERMINATING Scenario is TERMINATING Scenario is terminated terminated upon upon completion completion of of 3-EOP-E-1 3-EOP-E-1 beyond beyond step step CUE CUE 14.

14.

15 15

AppendixDD Appendix ScenarioOutline Scenario Outline Form FormES-D-1ES-D-1 Facility:

Facility: TurkeyPoint Turkey Point ScenarioNo.:

Scenario No.: 44 OpTest Op TestNo.:

No.: 2007-301 2007-301 Examiners:

Examiners: Candidates:

Candidates: USUS RORO BOP BOP Initial Conditions:

Initial Conditions: Model, Mode 100% Power, 1, 100% Power, MOL. MDL. JustJustcompleted completedpower powerincrease increaselast lastshift.

shift.

Turnover:

Turnover: EquipmentOOS:

Equipment DOS: 3B 3B EDGEDG due duetotofailed failed fuel fuel pump pump(OOS (DOS22 days; days; next nextperformance performance ofofO-OSP- 0-DSP-023.3 023.3 inin 44 hrs); hrs); BBAFWAFW Pump Pumpdue due toto bearing bearing failure failure (OOS (DOS 44 hrs; hrs; ETR ETR 24 24 hrs);

hrs); 3B3B CSP CSP duedue toto failed 1ST failed 1ST-low

- lowdischarge discharge pressure pressure (OOS (DOS 12 12 hr; hr; ETR ETR 36 36 hr) hr)

Secure 60 Secure 60 gpm gpm orifice orifice (CV-3-200B)

(CV-3-200B) and and shutdown shutdown 11 charging charging pump using 3-0P-047 pump using 3-OP-047 section section 7.11. Leave 7.11. Leave 11 charging charging pump pump and and 4545 gpm gpm orifice orifice (CV-3-200A)

(CV-3-200A) inin service.

service.

Known tube Known tube leak leak inin 3A 3A S/GS/G (2(2 gpd) gpd) - unchanged unchanged for for last last week.

week. Chemistry Chemistry samples samples are are being being taken per 3-ONOP-071 .2, Attachment taken per 3-0NOP-071.2, Attachment 1.1. The The current current sample, sample, just just completed completed indicates indicates no no significant change significant change inin leak leak rate.

rate. MOV-3-1403 MOV-3-1403 remains remains open open at at management management directiondirection duedue to to small small size and size and stability stability ofof tube tube leak leak rate.

rate.

Event Event Event Type*

Event Type* Event Description Event Description No.

No.

11 (N) ALL (N) ALL Close CV-3-200B and secure Close secure 11 charging charging pump. Shift Shift from 22 charging pumps I/

charging pumps 22 letdown letdown orifices to 11 charging pump pump I/ 11 letdown orifice lineup lineup using using 3-0P-3-OP-047 section 7.11.

2 2 (C) RO (C) RD PC-3-145 fails high in auto, PCV-3-145 closes until manual control PC-3-145 control taken taken andand TFB1PIN5=T TFB1PIN5 =T letdown restored. The crew responds per 3-ARP-097.CR letdown 3-ARP-097.CR for for annunciator annunciator A- A C SRO (C) SRO 5/5.

5/5.

33 (C) BOP (C) BOP Loss of condenser vacuum. The crew responds per 3-ONDP-014 3-0NOP-014..

TVFCLK1 TVFCLK1 =0.2

=

0.2 (C)

(C) SROSRO 3a 3a TVFCLK1 (R)

(R) ALLALL Fast load reduction per 3-ONDP-1 3-0NOP-100 until condenser vacuum leak 00 until leak located located TVFCLK1 =00

=

0.0 and V

and isolated.

44 (I)

(I) RO/BOP RO/BOP LT-3-459 LT-3-459 failedfailed low.

low. Crew Crew responds responds per per 3-ONOP-041 3-0NOP-041.6 to restore

.6 to restore letdown letdown TFH1TV59 TFH1TV59 = TT = and (TS I) SRD and 3-DNOP-049 3-0NOP-049.1 .1 toto take take LT-3-459 LT-3-459 out out of of service.

service.

(TS,I) SRO 55 1VHPBOTL TVHPBOTL (M)

(M) ALL ALL RCS RCS leak leak inside inside containment containment coincident coincident with with LT-3-459 LT-3-459 failure.

failure. The The crew crew

=0.00004 initially initially responds responds per per 3-ONOP-041 3-0NOP-041.3 .3 && 3-ONOP-067 3-0NOP-067. Once RCSRCS leakage leakage (2gpm) (TS (TS) SRO SRO

. Once

=

=0006 0.006 / exceeds exceeds charging charging pump pump capacity, capacity, the the crew crew unsuccessful unsuccessfully attempts to ly attempts to (300gpm)

TFL2xAS= T TFL2XASE =T manually trip manually trip the the reactor reactor and and immediate immediate transition transition isis made made fromfrom 3-EDP-E-0 3-EOP-E-0 to to TFL2xBsE TFL2XBSE =TT =

3-EOP-FR-S 3-EOP-FR-S.1. .1.

66 TFL4AFT TFL4AF =T (C) BDP/RD (C) BOP/RO AMSAC AMSAC and and SISI fail fail to to automatically automatically actuate.

actuate. AFW AFW must must be be manually manually started started TFL3SIAI T by TFL3SIA1 =T =

C SRO opening AFWSS by opening AFWSS MOVs. MOVs. Manual Manual SI SI isis deferred deferred until until after aftercrew crewtransitions transitions TFL3SIA2 (C)SRO nd TFL3SIA2 =T

= T back backto to 3-EOP-E-0.

3-EOP-E-0. The The auto auto start start of the 21Kg ofthe 2 CCWP CCWP on on SI SI closes closes MOV-3-626 MOV-3-626 TFKv626c TFKV626C = = TT which which must must be be opened opened manually manually ififRCP RCP sealseal return return temperatures temperatures permit.permit. The The TVHPBOTL =

crewtransitions crew transitionsfrom from 3-EOP-E-0 3-EOP-E-0toto 3-EOP-E-1 3-EOP-E-1 and and then then toto 3-EOP-ES-1 3-EOP-ES-1.2 for

.2 for TVHPBOTL =

001 0.01 post-LOCA post-LOCAcooldowncooldown &&depressurizat depressurization. ion.

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor (N)ormal, (R)eactlvlty, (I)nstrument, (C)omponent, (M)aJor 11

TP-2007-301 TP-20 07-301 Scena Scenarrio io #4

  1. 4 Event Event Descri Description Turkey Turke Point 2007-3 y Point 2007-301 01 Scena Scenario rio #4
  1. 4 Event 11 - Close Event Close CV CV-3-200B200B andand secure secure 11 chargi charginngg pump.

pump. Shift Shift from from 22 chargi charginngg pumps pumps // 22 letdow n orificess to letdown orifice to 1I chargi chargin ngg pump pump //11 letdow letdownn orifice orifice lineup lineup using using 3-0P-3-OP-0047 47 section section 7.11.

7.11.

Event 22 - PC-3-1 Event P0-3-145 fails high 45 fails high inin auto, auto, PCV-3 PCV-3-145

-145 closes closes until until manua manual contro restored. control taken and and letdow letdown restore d. TheThe crew crew respon responds per 3-ARP ds per 3-ARP-097.C

-097.CR forfor annun annunc iator A-5/5.

ciator A-5/5.

Event 33 - Loss Event Loss ofof conde condense nserr vacuum vacuum. The crew crew respon responds per 3-0NO ds per 3-ONOP-014P-014..

Event 3a Event 3a - Fast Fast load load reduct reductiion on per per 3-0NO 3-ONOP-1P-iDO until conde 00 until condense nserr vacuu vacuum m leak leak locate located d and isolated.

isolate Event 4 - LLT-3-4 Event T-3-4559 low. Crew respon 9 failed low. responds per 3-0NO ds per 3-ONOP-041P-041 .6

.6 to restore restore letdown and 3-ONOP-049.1 to take LLT-3-4 T-3-4559 9 out of service.

Event 5 - RCS leak inside contai contain ment conincident with LLT-3-4 nment T-3-4559 9 failure. The crew initially responds respon ds per 3-0NO3-ONOP-041 initially P-041 .3.3 & 3-0NO 3-ONOP-067 P-067.. Once RCS leakag leakage exceeds e excee ds chargi chargin capacity, the crew unsuc g

ng pump unsucccessfu essfulllly y attempts to manua manuallylly trip the reacto reactorr and immediate transition is made from 3-EOP 3-EOP-E-O-E-0 to 3-EOP-FR-S -FR-S..1.

1.

Event 6 - AMSAC and SI fail to automatically actuat actuate.e. AFW must be manua manually lly started by opening AFWSAFWSS MOVs. Manual SI is deferred until after crew transitions n

2 d back to 3-EOP 3-EOP-E-O.

-E-0.

The auto start of the 2 nd CCWP on SI closes closes MOV-3 MOV-3-626

-626 which must be opene opened d manua manua lly lly if RCP seal return tempe temperaturatureress permit. The crew transitions from 3-EOP 3-EOP-E-O

-E-0 to 3-EOP-E-1 to addresss the SBLOC addres SBLOCA. A.

22

TP-2007-301 TP-20 07-301 ScenaScenario rio #4

  1. 4 Event Event Descri Description Scenar Sce nariio XXIIII NRC o XXII NRC 4 Simulator Simul Operating ator Opera Instructio ting Instru ctions ns Setup Setu p Ic-i (100%

IC-1 (100% MOL) MOL)

Place simula Place simulator in run tor in run Triggerr lesson Trigge lesson steps:

steps:

SETU P - 3B SET UP - 3B EDG EDG OOS DOS (actuate (actuates TAQ5LRSB s TAQ5LR SB == OFF OFF && TAQ5B TAQ5B20P20P == RACKO RACKOUT)

UT)

SETUP SETU P-B B AFWP AFWP OOS (actuate (actuatess TAFK24 4=

TAFK244 TAFKOO2

0.0, TAFK00 2 = B= 0.0, TCF5MTB

= 0.0, TAFF01 TAFFO1B = 0.0, = T)

SETUP SETU P - 3A SG 2 GPO

- GPD LEAK (actuate (actuatess TVHHS TVHHSGA GA == 0.00000 0.0000013) 13)

SETUP SETU P - 3B CSP OOS (actuate (actuatess TAM1 TAM1 DPOB DPOB == RACKO RACKOUT UT (3)

(3) && TCM1 D41 M = FALSE (0))

D41 M SETUP SETU - ATW P - A TWS S (actuate (actuatess TFL2XA TFL2XASE SE = & TFL2XB

=T & TFL2XBSE SE = = T)

SETUP SETU - AMSAC P - AMSA FAIL (actuate C FAIL (actuatess TFL4AF TFL4AF == T)

SETUP SETU - AUTO SI FAIL (actuate P - AUTO (actuatess TFL3SlA TFL3SIAI 1 = TFL3SIA2

= T & TFL3Sl A2 = T)

SET SETU UP - MOV-3-62 P - MOV- 3-626 6 CLOS CLOSE E ON SI (actuate (actuatess TFKV62 TFKV626C 6C = T when K10A12

= Twhen K10A12R)R)

Start 3B chargcharging pump & place assoc ing pump associate iated d contro controlle llerr in auto.

auto. Open CV plant to stabili plant stabilize. CV-3-20 200B.

0B. Allow Adju ze. Adjusstt valve valve 834 on CCW ccw system system mimicmimic as neede needed d to stabili letdown stabi ze lize letdow within 5°F of VCT temp.

n temp within temp. Settin Setting g param paramete eterr TAKA TAKA83 834=0 4=0. .63 63 puts CCW ccw flow up to 800 gpm and will stabili stabilize/ze/red redu uce ce letdow letdown n temp after CV CV-3-20 200B0B is open.

open.

Start train A chilled chilled water water and secur secure e train B chilled chilled water water (CR HVAC panel) panel)..

Acknowle Ackno wledg dgee alarms F-9/2 F-9/2 & 9/5 (3B EDG OOS) OOS) and place simula simulatortor in freez freeze e..

Place cleara Place clearancence info tags on 3B EDG norma normall start switch switch,, B AFWP switch & 3B CSP cont AFWP T&T T& T valv valve e cont controroll switch roll swit contro switchch..

Remove Remo ve AFW train 2 orang orangee tag from B AFW AFWP P tachomete meterr just below below ann. panel panel X.

Providee shift turno Provid turnov ver er chec check klist listss and 3-ON 3-0NO OP-0 P-07171 .2.2 Att 1. 1.

Sele Selec ctt 3A QSPQSPD DS S to page 211 (SAT (SAT)) and 3B QSP QSPD DS S to page 212 (RVL). Set ERD on VPA to Tavg ERDA DS ADS Tavgl/Tref Tref (TAV) and at the RCO desk to ENV ENVR RN N (ED3 (ED3))..

Fill in blen blend der er & shut shutddow own n boro boron n addi additio tionn placa placarrdsds at cons conso ole le blen blend er stati der station on.. Data for each IC IC may be foun found d in the ECC & Shut Shutd dow own n Guid Guide eline lines s Boo Bookk in the simusimula lator tor I/F.

IIF.

Eventt I1 - Shif Shiftt to I1 cha charrgin ging g pump & I1 letdo letdown wn orifi orificcee Initi ated Initiat ed at crew direction tion in response to shift turnover.

The crew will secu securree one of of the letdo letdow wnn orifi orifice cess and and shutshutd dowown n one char charg ing pum ging pump using p usin g 3-OP 3-0P--047047 secti sectioonn 7.11 Resp Respo ond nd asas HPHP when notif notifieiedd of of redu reducction tion inin letdo letdow wnn flow.

33

TP-2007-301 TP-20 07-301 ScenaScenarrio io #4

  1. 4 Event Event Descri Description Respond Respo nd as as NSO NSO when when direct directeded to to adjust adjust CCW CCW flow flow to to NRHX NRHX to to maint mainta ain in letdow letdownn temp temp within within 5°F 5°F of of VCT temp.

temp. or or to to maint mainta in stable ain stable letdow letdownn temp.

temp. Click Click on on Sche Schemma~ a>

COMMON COMM ON SERVSERVICES ICES~COM >COMPONE PONENT NT COOL COOLlNG~ INGvalv >valvee 834~

834*TAK TAKAA834 834 BYPBYP AROUND TCV-1 AROU TCV-144~en 44--*eter nter desire desired d value then then INSER INSERT. Flow Flow isis indica indicatteded above above valve 777. TAKA 777. TAKA834=0 834=0.15

. 15 sets CCW COW flow flow to 220 gpm and should should stabili stabiliz zee letdow letdown temp.

temp.

IfIf asked asked as as SM, tell crew that itit is is not not neces necessary sary to bypas bypass s CVCS demin demineraeralize lizerrs.

s.

Crew shoul Crew should d mark step 7.11.27.11.2.3 .3 as nla n/a and perfor perform m step 7. 7.11 11.2.4

.2.4 to reduc reduce e letdow letdown flow.

flow.

Respond Respo nd as NSO if direct directed ed to do post-spost-shuhutdo tdow wn checks n check s on the charg chargin ingg pump secur secureded event...

in this event.

Event 2 - PC-3-145 fails high in auto When PCV-3-145 is return When returned ed to auto after closin closing g CV CV-3-200B, 200B, trigge triggerr lesson lesson step EVENT 2 2-- PC PC-3-145 145 FAILS HIGH IN AUTO (actuate (actuates N5 = T).

TFB1PIN5=T s TFB1PI ).

PC-3-145 PC 145 failing high in auto also fails PCV- PCV-3 -145 closed 3-145 closed causin causing g letdown to be lost causing initially causin annunciat g annun or A-515 ciator A-5/5 to briefly alarm. The crew shoul should d restor restore e prope properr letdown flow by manu manually operating ally opera P0-3-145 ting PC 145 to throttl throttle e PCV-3-145. 3-ARP 3-ARP-09 -097.C 7.CR R for annunciat annun ciatoror A-515 A-5/5 shoul should reference d be refere nced d to do this.

Respond Respo nd as WCC WOO if direct directed ed to have I&C l&C troubl troubleshoeshoo ott PT PT-3-1 45.

145.

Respond Respo nd as NSO if direct directed ed to check check the condition of PCV-3-145. After 1-3 min.,

valve full open with no obviou mi, report obviouss malfu malfun ctions.

nction s.

Event 313a 3/3a - Loss of condenser vacuum 1 I Fast load reduction Upo Upon n restoratio n of letdow ration letdown n with char charg ging ing & letdoletdow wnn flow flows s balanced, trigg trigge err lesso lesson n step EVENT 3 - COND ENSER VACUUM UM LEAK 0.2 (actuat (actuateess TVFC TVFCLKLK11 == 0.2).

The crew shou shoulldd respond usin using g 3-ON 3-0NO OP-0 P-01414 to place the hogg hoggiingng jet in servi serviccee and inve invest stiga igate te the caus cause e of the condconde ense nserr vacu vacuu umm loss.

Respond as NSO when direc directteded to place the hogging ing jet in servi servic ce, e, wait 1-3 1-3 mm min then trigg trigge err lesso lessonn step EVENTT 33 - PLACE HOGG HOGGING ING JET IN SERVICE ICE (actuat (actuateess TAFB TAFB07 O722 == 1.0 1.0 then TAFB TAFB010100 == 1.0 1.0 15 15 sec later) and EVENT sec later) T 33 - CONDENSE

- ENSER R VACU VACUUM UM LEAK 0.1 (actuat 0.1 (actuateess TVFC TVFCLKLK11 ==0.1).

0.1). Repo Reporrtt when done done..

The loss of cond conde ense nserr vacu vacuu umm shou shoulldd force the crew to initiate a fast load redu reduc tion per ction per 3-ONO 3-0NO P-100 P- 100..

44

TP-2007-301 Scena Scenarrioio #4 Event Event Descri Description Modullate Modu ate conde condense nserr vacuu vacuum m leak as neede needed d to keep conde condense nserr vacuu vacuum above m above minimum vacuu vacuum (22Hg m (22"H g)) for gener generator load > 531 MWe as shown ator load> shown on 3-0NO 3-ONOP-0 P-01414 Enclosur Enclo suree 1.1. Click on Sche Schemma~F a>FEEDW EEDWATER ATER~CON*CODENS NDENER~l SER--eak

-leak node 3E7B 3E7B~>

TVFCLK1 3E7B SHELL LEAK PORT AREA AREA~ent*enter er new select selected ed value then INSERT.

Respond Respo nd as NSONSO when direct directeded to close hoggi hoggin ngg jet drain 3-30-0 3-30-04545 and place the standby set of SJAE SJAEss in servic service.e. No simulator action neces necessary sary.. After 2-4 min, complete mm, report compl ete..

Respond Respo FS!NSO when direct nd as FS/NS directed identiffyy cause ed to identi cause of low conde condense vacuum nserr vacuu m per 3-ONOP-01 ONOP -014 4 step 5.5. Once load has been reduc reduced ed 5-10%, identi identiffyy leak sourc source e as a broken broke condense n conde nserr loop ioop seal sight glass. glass. Trigg Trigger lesson step EVENT 3 - ISOLATE er lesson -

CONDENSE COND ENSER VACUUM LEAK (actuate (actuatess TVFCLK TVFCLK1 1 == 0.0), then report report sight glass isolated.

Respond Respo System nd as Syste m when notified of the fast load reduc reducti on.

tion.

Respond Respo nd as SM referri referrin ngg to 0-EPI 0-EPIP -201 01 & 0-ADM-1 P-201 15 for fast load reduc

-115 reducti on tion Respond Respo nd as NSO if direct directed remove ed to remov e the hoggi hoggin ngg jet from servic service (vacuuum>

e (vacu m > 26"Hg 26Hg & &

cause of vacuu cause vacuum m loss correc corrected) ted) per 3-0NO3-ONOP-0 P-014 14 step 5.6. After 1-3 min, mm, trigge triggerr lesson step EVENT 3 - SECURE HOGGING JET (actuate lesson -

(actuatess TAFB01 TAFB0IO 0== 0.0 then TAFB07 TAFBO72 2 = 0.015 0.0 15 Reportt when compl sec later). Repor complete ete..

Respond Respo nd as NSO if direct directed check for deviat ed to check deviatiion on betwe between en North & & South hotwehotwellll levels.. Click on Sche levels Schema*FE ma~FEEDW EDWA ATER TER--~CON>CONDENS DENSER ER then read hotwe hotwellilleve levelsis shown under shown under each B WATER BOX. Repor Reportt any deviatdeviatiionon to the crew.

Respond Respo nd as NSO if direct directeded to report conde condense nserr air inleak inleakage age.. Respo Respond nd < 21.1 scfm.

Respond Respo nd as Chemistry if direct directeded to report cond conde ense nserr hotwel hotwelll disso dissollved ved 02 levels..

O2 levels asked as SM whet If asked wheth her er to place one set of SJAE in standby, reply that the crew should leave both sets in servic servicee until the sight glass is repair repaired.ed.

Event 4 4- L T 45 LT-3 -459 9 fails low Afte Afterr condenserenser vacuvacuu um m leak isolat isolated, ed, trigg trigge err lesson lesson step EVENT 4 - LT - LT-3-4 59 459 FAILS LOW (actuat (actuateess TFH1T TFH1TV V59 = T) and lesson 59 = lesson step EVENT 5 - 2 GPM PZR SURGE LINE LEAK (actuat (actuateess TVHP TVHPB BOTL OTL == 0.0000 0.000044)).

This caus cause ess letdown isolatio isolation n and alarms on annu annun nciat orss A-8/4, 9/3, 9/4, B-3/1.

ciator 8-3/1. The crew shou shoulld d respond per 3-ON 3-0NO OP-0 P-041 41.6

.6 and resto restorre e letdown once LT L T-3-45459 9 is select selecteded out as a contro controlling lling chan chann nel.

el. The crew shou shoulldd also respond per 3-ONO P-049.. 1 3-0NO P-049 I but may delay taking L T-3-459 OOS to addr addre ess ss the RCS ReS leak issue requiri requiringng entry into even eventt 5.

This leak will causcause e G-5/3 alarm in abou aboutt 25 minu minuttes.es.

5

TP-2007-301 TP-20 07-301 Scena Scenario #4 Event rio #4 Event Descri Description ption Respond Respo nd asas wee WCC when when direct directed ed toto initiate initiate aa PWO PWO and and notify notify I&e I&C ofof the the failure failure..

Once letdow Once letdown is reesta n is reestablisblishe hed and PZR d and PZR level level contro controll restor restored,ed, annun annunciatciatororss A-9/3 A-9/3 && 9/49/4 will turn wi/! turn off.

off Resto Restoringring PZRPZR contro controll group group heate heaters willwill turn turn off off annun annunciatciatoror 8-9/3.

8-9/3 . After Afte r bistables bistab are trippe les are tripped, the only d, the only annun annunciat ors ciator remaining s remai ning on due due this this failure failure are are A-8/3, A-8/3, 8/48/4 and J-7/4.

and J-7/4.

Event 5 - RCS leak in cont Even -

contain ainm menentt Once the crew exits 3-0NO 3-ONOP-0 P-049 49.1

.1 eithe r after trippitripping ng bistab bistables les or early due to detection of the leak, trigge triggerr lesson lesson step EVEN EVENT T 5 - 5 GPM PZR SURG (actuates

- SURGE E LINE LEAK LEAK (actuate TVHPBOTL s TVHPB 0.00011).

OTL = 0.00011 This will increa

). This increase se the leakleak rate from 2 to 5 gpm actuate annunciat annun ciatoror G-5/3 G-5/3 if itit not alread alreadyy on. Once the leak becom becomes es eviden evident, t, the crew shoul should d respond using using 3-0NO 3-ONOP-0 P-041 41.3.3.. 3-0NO 3-ONOP-0 P-067 67 may also be entere entered d when R-3-1 R-3-1 1/12 1/12 alarm due to the leak.

Once the decision has been made made to shutdshutdow own n based based on leak rate>

triggerr lesson rate > TS limits limits,,

trigge lesson step EVEN EVENT T 5 - PZR SURG SURGE E LINE LEAK LEAK GREA GREATE TER R THAN CHAR CHARGI GINGNG (actuate (actuatess TVHPB TVHPBOTL OTL = 0.006).

0.006).

increase This will increa se RCS leak rate to 300 gpm requir requiring ing a reacto reactorr trip per 3-0NO 3-ONOP-0 P-041 .3 41.3 since the leak excee exceeds charging ds charg ing pump pump capac capacity.ity.

Respond Respo nd as SM when notifie notified d to refer to 0-EPIO-EPIP-2 P-201010101..

Respond Respo nd as HP when notifie notified d to condu conduct ct local radiat radiation ion surve surveys ys & post radiatradiation ion areas.

Respond Respo nd as Syste System m if notifie notified d of the decisi decision on to trip the reacto reactor. r.

Respond Respo nd as NSO if direct directed ed to chec check statuss of RM-k statu RM-80 green 80 gree monit n mon or light. Afte itor Afterr 1-3 mm., report min., report greegreen n light on. If direc directteded to silen silencce e the local alarm and check check for abno abnorrmalmal indic indicaation tions,s, after 1-3 min.,mm., report report alarm silenc silenced ed and RM-80 RM-80 othe otherw rwisise norma e norm al.l.

Resp Respo ondnd as Chemehemistry istry/H/HP P is direc directteded to verif verify actuall activ y actua activitityy insid inside conta e cont inmen ainm entt Events 6 6 - ATW A TWS S/Sm

/Sma allll breakk LOC LOCA A The crew unsu unsuc cces sfulllly cessfu y attempts to trip the react reacto orr and immimme ediat diatelelyy trans transiition tions s from 3-EOP EOP-E -E-0 -O to 3-EO 3-EOP P-FR

-FR-S-S..1.1. A TWS & AMSA ATWS AMSAC C failu failure ress were enterentere edd at setup setup.. The crew need needs s to manmanu ually ally trip the turbi turbin nee and open AFW AFWS SSS MOV MOVss to initia initiatete AFW AFWfflow.low.

Upo Upon n entry entry intointo 3-EO 3-EOP P-FR

-FR-S -S.1,

.1, trigg trigge err lesso lesson n step EVEEVEN NTT 66 - - PZR SUR PZR SURG GE E LINE LEAK LEA K REQREQU UIRIRING ING SI SI (actuat (actuate esTVH s TVHPB PBOT OTLL=0.01 to

= 0.01))tO drop PZR drop PZR presspressure ure belo below the SI wthe SI setpo setpoiint.nt. Alth Althouough gh PZR press pressure ure may be be belo below w the SI setpo setpoiint,nt, SI will not auto autom mati aticall callyy actuate te due to failufailureress enter entere edd atat setup setup.. The crewcrew shou shoulldd not man manu ally SI ually SI until until after after trans transiition tion madmade e back back to to 3-EO 3-EOP P-E-

-E-0.0.

66

TP-2007-301 TP-20 07-301 Scena Scenarrio io #4#4 Event Event Descri Description Respond Respo nd as as NSO NSO when when direct directeded toto locally locally triptrip rxrx trip trip break breakers ers and and MG MG set set input input && outpu outputt breakers.

break After this ers. After this direct direction ion hashas been been givengiven and and emer emergency gency borat borationion hashas been been established estab lished,, trigge triggerr lesson lesson step step EVEN EVENT 66 - LOCA LOCAL TRIP TRIP MG (actuates TCE6DQ7C Q7C =

MG SET SET BREABREAKERS KERS (actuate s TCE6D F, TCE6D

= F, TCE6DQ8C Q8C = F after

F after 10 10 sec sec delay, delay, TAE310 TAE31O8L8L =TRIP TRIP after TRIP after after 20 20 sec sec delay, delay, TAE340 TAE34O1L 1L =

TRIP after 30 30 sec sec delay). Reportt when delay). Repor when compcompletelete andand report report both both reacto reactorr trip breakbreakers ers stuck in the closed the closed positio position. in Manual Manu SI result al SI results s inin an auto start of the the 3A CCWPCCWP.. This This trigge triggersrs closur closure e of MOV-MOV-3-6263-626 from setup.

setup. Once MOV- MOV-3-626 3-626 close closes, trigge triggerr lesson lesson step EVEN EVENT 66 - ALLO W MANUAL OPEN MOV- MOV-3-626 3-626 (actuate (actuates TFKV626C s TFKV62 6C = F when IMK193 80). When

= F 1MK19380). When MOV- MOV-3-6263-626 control switch is taken to to OPEN, the closur closure failure clears e fai/ure clears and the valve opens opens..

Respond Respo nd as NSO when direct directe edd to place PAHM PAHMS in servic servicee on unit 3. After 8-12 minute minut s, trigge es, triggerr lesson lesson step EVENT 6 - PLACE U3 PAHM PAHMS S IN SERVICE (actuate (actuatess TAC2VO2A TAC2V 02A = 1.0, TAC2V

1.0, TAC2VO2B 1.0, TAAAV2 02B == 1.0, TAAAV21 1 = 1.0, TMAV2 2

TAAAV22 = 1.0 & TACA0 05 =

TACAOO5 Reportt when

= 0.0). Repor complete compl ete..

The crew comp completeletess 3-EOP-E-O and transi transition tionss to 3-EOP-E-1 to addre address ss the SBLOCA.

Respond Respo nd as ChemChemiistry stry when direct directed ed to sample SGs for activity & check check DAM-1 DAM-i and as HP when direct directeded to perform perfor radiatiion m radiat on readin readings gs on main steam lines. After 10-15 min.

report no signs signs of activity or radiat mm.

radiatiion on levels above above backg backgrou roundnd..

After maximum charg chargin ingg flow has been establishe lished d,, trigge triggerr lesson lesson step EVENT 6- 6 INCRE INCR ASE RCS LEAKAGE (actuate EASE (actuatess TVHP TVHPB BOTL cause stable

= 0.02) to cause OTL = stable/dec/decre reasi asing ng RCS pressure when 3-EOP-E-1 step 14 is reached. If neces necessarysary insert additi additio nal leakage as onal neededd (use any RCS leak node to ensur neede ensuree RCS pressure is stable stable/dec/decre reasi asing ng at that point)..

point)

Respond Respo nd as NSO/NSO/F FS S when direc directted ed to close in cold leg recirc break breakers.ers. Wait 1-3 mm, min, then trigg er trigger lesso lesson n step EVENT 6 - CLOSE CL RECIRC BKRS (actuat (actuateess TCM2 TCM2D DO6M 06M == T, TCM1 DO9M D09M == T after 5 sec delay, TCM2 TCM2D DO4M 04M = T after 15 15 sec delay, delay, TCM1 Dli D11 M M = T after 20 sec delay, delay, D03M ==T after 30 sec delay, TCM1 DO4M

=

TCM1 DO3M D04M ==T after 35 sec delay, delay, TCM1 Di OM ==T after D10M after 45 sec delay, delay, TCM2 TCM2D 05M ==T after 50 sec delay, TCM1 D12M ==T after 60 sec delay DO5M delay & TCM2 TCM2DDO3M 03M == T after 65 sec delay).

delay).

Resp Respo ond nd affirma tively as NSO when aske affirm atively asked d to verify cont contaainm inmenentt spray & chargin charging g pump room door doors s close closed d..

Resp Respo ondnd as HP HP when direc directteded to surv surve eyy pipe & valve and electric electricalal pene penettratio rationn rooms for radiati on.

radiation.

Resp Respo ond nd as Chemistry istry when direc directteded to align PASS for on-line on-lin e samp sampling/ling/aanaly nalysisiss of of the the RCS.

77

[ NRC-4 NRC-4 OPER OPE RATATIONS IONS SHIFT TURNOV NOVER ER REPREPO ORT RT ONCOMING CRE REW W ASSI ASSIGN GNM MENENTSTS Shift Mgr:

Inside SNPO:

Field Supv.:

Outside SNPO:

AdminRCO:

ANPO:

Unit 33 Unit Unit Supv.:

Unit Unit 44 Unit Supv.:

RCO:

RCO:

NPO:

NPO:

Plan t Statu Status Unit 33 Mode:

Unit 4 4 1 Mode:

Power: 100 Power: 100 MWe: 760 MWe: 759 Gross Leakrate: 0.03 Gross Leakrate: 0.04 RCS Boron Conc: 750 RCS Boron Cone: 600 Operational Concerns:

3 AFWP OOS (bearing failure ; OOS 4 hr; ETR 24 hr)

I 3B EDG OOS (fuel pump failed; OOS 005 2 days; next 0-OSP-023.3 in 4 hr) 3B CSP OOS (failed 1ST -low low discha rge pressure; OOS 12 hr; ETR 36 hr)

Train A is protec protectteded 2 gpd tube leak in 3A S/G - unchanged for past week (Chemistry sampli ng per 3-0NO 3-ONOP-071 P-071 .2

.2, Attachment 11.)

U3 Anticipated LCO Actions:

Current:

B AFWP - TS 3.7.1.2 Action 33 (trains verified operable just before turnov er; 30 days to repair) 3B EDG --TS 3.8.1.1 TS 3.8. .b.1 Actions b &

1. 1.b.1 & d (0-OS (0-OSP -023.33 Att 11 &

P-023. & 9 every 88 hr; 3/4-0S 3/4-OSP-023 P-023..1l start of other EDGs not reqd; req'd; 3-0P-0 3-OP-023 sect 7.7 due next shift if OOS >

ifOOS > 72 hr; repair in 14 days) 3B CSP - TS 3.6.2.1 Action a (Fix in 72 hr)

Anticipated: None Train A is protected.. OLRM is green (CDF = = 2.06E-6;6* LERF = 9.28E-8). 8 U4 Anticipated LCO Actions:

Current:

B B AFWP - TS 3.7.1.2

- 3.7.1.2 Action 33 (trains verified operable just before turnover; 30 days to repair) 3B 3B EDG - TS 3.8.1.13.8.1.1.b.1

.b. I Actions b & d (0-OSP (0-OSP-023.

-023.33 Att I1 & 99 every every 88 hr; 3/4-OS 3/4-0S P-023 P-023..1l start of of other EDGs not reqd; req'd; fix in 14 days)

Anticipated: None Train A is protect

""~N'<"'1",Orf.

ed. OLRM OLRM is green (CDF == 2.OOE 2.00E--6; 6* LERF = 9.28E-8). 8 Results of Offgoiug Focus Area:

See g:\Ops\Common\0900

Unit 3 Stat Status us

,r-~

Reactor Oper Reac Operator Mode: 1I RCS Leakra RCS Leakrate te Accum Accumulator ulator Ref Ref Levels Levels Power Power: 100 100 Gross: 0.03 0.03 gpm A 6615 MWe:

MWe: 760 Uniden tified 0.02 gpm B 6640 Tavg:

"tavg: 574 [Charg Chargiing ng Pps:

Pps: 0.01 gpm C 6625 RCS Pressu RCS Pressure: 2235 RCS Boron Cone: Conc: 750 Abl1'o

,&hnnrmg.l rmql Annnu .~;f giitnr

~!:!:;li\",r;::';:,'~j c l\;gv;Y,i!tl:,:;N~!:;,liT;;,;Hl;;~:il,;:';;;,.*:;'i'fr/'l!')~'>, *. ;.~'l****'.::;:**r;~~r);~t';;~;li!:~I'Fi\Y.X1f~;:;;

~(!.*i.
~;II,;**,i.;",i~:.1*H~~i'J{:*;i};f:;:,;.'.:I',';.

Annunciator:

Annunc iator: F 9/2 - 3B EDG OOS Comp Actions Actions:: OOSP-O23.3 O-OSP- 023.3 Att 11 & & 9 due in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. 3/4-0SP 3/4-OSP-023.-023.11 not requiredrequired.. 3-0P-0 3-OP-023 sect 7.7 due next shift.

Annunciator:

Annunc iator: F 9/5 - 3B 3B EDG OOS Actions::

Comp Actions O-OSP-023.3 O-OSP- 023.3 Att 11 & & 9 due in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. 3/4-0SP 3/4-OSPO23. -023.11 not required required.. 3-0P-0 3-OP-023 sect 7.7 due next shift.

Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

- Actions::

Comp Actions Annunciator:

Annunc iator:

Comp Actions Actions::

Annunciator:

Annunc iator:

Actions::

Comp Actions Annunciator:

Annunc iator:

Actions::

Comp Actions Current Curre nt Tech Spec Action Statements: (Does Not Include "For For Trac Track king in2 Only Items" Items T.S.A.

T.S.A.SS / Component: 3.7.1.2 Action 33 / B AFWP Reason:

Reason: Bearing failed Bearing Entry Date: XX/XX/XX (Previous shift)

T.S.A.

T.S.A.SS / Component: 3.8.1.1 Action Actionss b & & dd// 3B EDG Reason Reason:: Fuel pump failed Entry Date: XX/XX/XX (2 days ago)

T.S.A.

T.S.A.SS / Component: 3.6.2.1 Action a / 3B CSP Reason Reason:: Failed 1ST 1ST - low discha discharg rgee pressu pressurree Entry Date: XX/XX XX/Xx /XX (Yeste (Yesterrday) day)

T.S.A.

T.S.A.SS / Component: 3.4.3 Action aa / 3B 3B PZR backup heaters Reason Reason:: 14 day due to 3B EDG OOS Entry Date: XX/XX/XX (2 days ago)

T.S.A.

T.S.A.SS / Component: 3.5.2 Action f/ f / 3B HHSIP Reason Reason:: 14 day due to 3B EDG OOS Entry Date: XX/XX Xx/XX /XX (2 days ago)

T.S.A.

T.S.A.SS / Component:

nent:

Reason Reason::

II Entry Date:

Unit 33 Status Unit Status

~,

ChangestotoRisk Changes RiskSignificant SignificantEquipment:

Equipment:

B AFWPOOS 8 AFWP OOS(8earing (Bearingreplacement) replacement) 383BEDG LDGOOS OOS(Fuel (Fuelpumppumprepair) repair) 3B CSP OOS 38 CSP OOS (Failed (Failed1ST 1ST-low lowdischarge dischargepressure) pressure)

Unit33Risk Unit RiskisisGREEN.

GREEN. Main Maincontributor contributorisis8BAFWP.

AFWP.

Upcoming Reactivity Upcoming ReactivityManagement ManagementActivities:

Activities:

Dilute to maintain 100%

Dilute to maintain 100% power. power.

Upcoming Major Upcoming Major POD POD Activities:

Activities:

Continue to repair DOS Continue to repair OOS equipment. equipment.

Upcoming ECOs Upcoming ECOs to to Hang Hang andand lorbr Release:

Release:

None None

~c Evolut ions or Evolutions or Compe nsatory Action Compensatory Actions s in Progre Progress: ss:

- Just returned power back to 100%

- Just returned power back to 100% last shift. last shift.

- After After shift shift turnover, turnover, secure secure 60 60 gpm gpm orifice orifice (CV-3-200B (CV-3-2008)) and and shutdown shutdown 11 charging charging pump pump using using 3-OP-047 3-0P-047 section section 7.11.

7.11.

Leave Leave 11 charging charging pumppump andand 45 45 gpm gpm orifice orifice (CV-3-200A (CV-3-200A)) in in service.

service.

- Known Known tube tube leak leak inin 3A 3A S/G S/G (2 (2 gpd) gpd) - unchan unchanged ged forfor last last week.

week. Chemistry Chemistry sample samples are being s are being taken taken per per 3-ONOP-3-0NOP-071.2, Attachment 071.2, Attachment 1. 1. The The current current sample, sample, justjust completed completed indicates no significant indicates no significant change change in in leak leak rate.

rate. MOV-3-1 MOV-3-1403 403 remains remains energiz energizeded at at manag managementement direction direction duedue to to small small size size and and stability of tube stability of tube leak leak rate.

rate.

- 0-QSP-023.3 0-OSP-023.3 Att

- system Att I1 &&99 for for 3B 38 EDG EDG OOS OOS duedue inin 44 hrs.

hrs. 3-OSP-023.1 3-0SP-023.1 not not required required since since to to 3B 38 EDG EDG DOS OOS due due to to support support failure. 3-OP-023 system failure. 3-0P-023 sect 7.7 sect 7.7 due due next next shift shift to to allow allow 3B38 EDG EDG DOS OOS >> 72 72 hr.

hr.

Genera General l Inform ation, Remar Information, Remarks, ks, and and Operat Operator or Work Work ArounAround d Status:

Status:

See evolutions See evolutions &compe

& nsatory actions compensatory actions listed listed above.

above.

Train Train AA isis protected.

protected.

Appendix 0D Appendix Scenario Outline Scenario Outline Form Form ES-O-1ES-D-1 Facility:

Facility: Turkey Point Turkey Point Scenario No.:

Scenario No.: 55 Op Test Op Test No.:

Nd.: 2007-301 2007-301 Examiners:

Examiners: Candidates:

Candidates: US US RO RD BOP BOP Initial Conditions:

Initial Conditions: Mode 2,4%

Mode 2, 4% power, power, MOL. Turbine rolling MDL. Turbine rolling atat 1800 1800 RPMRPM readyready toto sync sync generator generator to to grid.

grid, Increase Increase load, place load, place the the feed feed regulating regulating valves valves in in automatic automatic and and hold hold power power at at 30%

30% for for aa flux flux map.

map.

Turnover:

Turnover: Equipment OOS:

Equipment 005: None None significant significant Place unit Place unit on on line line and and increase increase powerpower per per 3-GOP-301 3-GOP-301 beginning beginning with with stepstep 5.52.3 5.52.3 Event Event Event Type*

Event Type* Event Description Event Description No.

No.

11 (N) ALL Place unit on line per 3-GOP-301 beginning with step 5.52.3. Increase load, place the feed regulating place regulating valves in in automatic and hold hold power power at at 30% for a flux map.

1a 1a TFFxoiLs = T (TS) SRO Once feed regulating valves are placed in automatic, an NSO calls in that the TFFXOILB;T B AFWP governor has an oil leak.

2 2 KDoo1x1o/

!rvKD001X; 1.0 I (C) SRO/BOP 3A (running) TPCWP bearing failure. Failure of 3B (standby) TPCWP to mm ramp 22 min ramp automatically start following trip of running pump. The crew responds per 3-TFK3B11S=T TFK3B11S;T ONOP-008 and manually starts the 3B TPCWP.

3 (I) BOP 3B s/g controlling feed flow transmittertransmiffer FT-3-487 fails high causing 3B FRV TFF1M86H =T TFF1M86H; T (FCV-3-488 to fail closed). Manual operator action is required to control 3B

]-5\ SRO (I,TS) s/g level and avoid a reactor trip. The crew responds per 3-ONOP-049 3-0NOP-049.1. .1.

4 (R) SRO/BOP PT-3-1 608 fails high. CV-3-1608 PT-3-1608 CV-3-1 608 fails open and increases steam flow 3-4%.

(C) R The crew responds per 0-ADM-200 for a secondary plant transient. Manual S1MREH=T TFS1MREH; T (C)RO turbine load reduction is required to return reactor power to 30%. Once power TFSVV13A; T is stabilized at 30%, the CV-3-1608 isolation valve is closed, but some ADV steam leakage still exists.

55 (C) ALL Main generator exciter air coolers TPCW flow is is partially blocked resulting in in TVuJINF TVUJINF =; 0.95 aa high high air temperature condition.condition. The crew crew responds responds per per 3-ARP-097.C 3-ARP-097.CR R for (M) ALL (M

TVUJINFB=O TVUJINFB;0.95 95 annunciator E-9/4. The crew manually trips the the reactor when exciter hot gas 1VUJINFC=O.95 temperature exceeds 90CC 90°C and performs the actions actions of of 3-EOP-E-0.

3-EOP-E-0. Once the TVUJINFC;0.95 . .

reactor is is tripped, tripped, the switchyard switch yard relays out. out. 3B 3B EDG starts starts but but fails fails to to TVUJiNFDO95 TVUJINFD;0.95 automatically automatically load load 3B3B 4kv 4kv bus due due to aa bus stripping stripping failure. 3A 3A EDG fails to start and can not start and be manually not be manually started.

started.

TFP8SWYD TFP8SWYD T 66 ;T (C) ALL (C) ALL The The crew crew transitions to to 3-EOP-ECA 3-EOP-ECA-0.0. -0.0. MOV-3-1405 MOV-3-1405 fails fails to to open open andand with with BB TFQ5GAFS=T TFQ5GAFS ;T AFWP AFWP DOS OOS with with anan oil oil leak leak requires requires C C AFWP AFWP to to supply supply both both units.

units. Manual Manual TFQ6XABF TFQ6XABF =T ;T bus stripping bus stripping is is performed performed with with the the exception exception of of 3B 3B TPCWP TPCWP breaker breaker 3AB1 3AB111 TFK3B11S=T TFK3B11S ;T which which has has aa blown blown control control power power fusefuse and and can can not not bebe opened opened fromfrom VPA.

VPA. 3A 3A TFFXMO5 TFFXM05; = TT 4kV 4kV busbus isis repowered repowered via the SBO via the SBO tie tie from from unit unit 4. 4. Then Then 3AB13AB111 is is locally locally K3OP11BG = F opened allowing opened allowing 3B 3B EDGEDG to to reenergize reenergize 3B 3B && 3D3D 4kV 4kV bus.

bus. Transition Transition is is made made K30P11BG; F to to 3-EOP-ECA 3-EOP-ECA-0.2 -0.2 due due to to the the effects effects of of the the steam steam leak.leak.

K3OPi1BR K30P11BR; = F F 6a 6a The crew stabilizes The crew stabilizes the the plant plant using using 3-EOP-ECA 3-EOP-ECA-0.2 since PZR

-0.2 since PZR level level <<

117[50]%

7[50]% or or SISI actuated actuated due due toto the the effects effects of of the the steam steam leak.

leak.

(N)ormal, ..

(N)ormal, (R)eactivity, (R)eactlvlty, (l)nstrument, (I)nstrument, (C)omponen (C)omponent, t, (M)ajor (M)aJor 11

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-30 1 ScenarioNo.: No.:l 5 Scenario Event EventNo.:No.:_1_ 1 Page 1 of~

Page_1_of 4 EventDescription:

Event

Description:

Placeunit Place uniton on line lineper per3-GOP-301 3-GOP-301 beginning beginningwith with step step5.52.3.

5.52.3. Increase Increase load, place load, place the thefeedfeed regulating regulating valves valvesinin automatic automaticand and hold hold power powerat at 30% for 30% foraa fluxflux map.

map.

_Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior u

US Directs RO, Directs RO, BOP BOP && SG (surrogate operator)

SG (surrogate operator) placeplace unit unit onon line line and and increas e power increase power to 30%. to 30%.

BOP BOP Performs actions Performs actions of of 3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3:

5.52.3:

1. Verifies
1. Verifies exciter exciter DC DC regulator regulator isis in in full full lower lower (10%

(10% indicated) indicated)

2. Closes
2. Closes exciter exciter fieldfield breaker breaker && verifies verifies exciter exciter ammeter ammeter 50-90 = 50-90 amps amps
3. Verifies
3. Verifies all all 33 generator generator voltmeters =

voltmeters = 11-171 1-17 kV kV

4. Slowly increasesincreases DC DC regulator regulator until exciter ammeterammeter = = 100-130 100-130 amps & all 3 generator generator voltmeters =

voltmeters = 21.5-22.5 21.5-22.5 kV.

5. Places voltage voltage regulator regulator control control in TEST 6.
6. Adjusts AC regulator Adjusts regulator control control to null AC-DC regulator regulator mismatch mismatch
7. Places voltag voltage e regulator regulator control control in ON
8. Places East GCB sync switch to MANU MANUAL AL 9.
9. Adjust Adjusts s turbine speed speed using using govern governor until synchr or until synchroscope rotating oscope rotatin g slowly slowly in in FAST FAST directidirectionon 10.
10. Adjust Adjusts s AC AC regulat regulator or contro to equaliz controll to equalize incoming e incom running ing && runnin voltage g voltag e 111.
1. Verifie Verifies s steam steam dumps dumps set set upup per per Enclos Enclosure ure 22 RO RO Manua Manually lly contro controls ls rodrod positio position n toto contro controll Tavg Tavg per per Enclos Enclosureure 22 Comm Commences ences performperformance ance of of Attach ment 44 when Attachment when directe directed by US d by US BOP BOP Contin Continues ues perform performing ing actions actions of of3-GOP 3-GOP-301

-301 as as directe directed by US:

d by US:

12.

12. Perform Performs s auto auto synchr onization synchronization a.a. Places Places East EastGCB GCB syncsync switch switch toto AUTO AUTO b.b. Above Above synchr oscope, determ synchroscope, determines ines EastEastGCB GCBwhitewhite light lightflashes flashes atat 1212oclock o'clock && inadve rtent protect inadvertent protection scheme ion schem armed amber e armed amberlightlight I it.

lit.

c.c. Before Beforesynchr oscope reache synchroscope reachess 1 11 o'clock, 1 oclock depresses

, depres holds ses &&holds auto sync pushbu auto sync pushbutton tton andandobserv observes EastGCB es East GCBclosure closure d.d. Places PlacesEast EastGCB GCBsync syncswitch switchtotoOFFOFF e.e. Match Matches es flags flagson onEastEastGCB GCBswitch switch f.f. Determ Determines ines inadve rtent protect inadvertent protection scheme ion schem armedamber e armed amberlightlightoff off 11

Appendix D Operattor Opera or Action Actions Form ES-D-2 Op-Test No.: 2007-301 Scenarrio Scena io No.: ~ Event No.: _1_

j_ Pag Page e~o of f~

Event

Description:

Place unit on line Qerper 3-GOP-301 beginning with steQ step 5.52.3 5.52.3.. Increa Increassee load, Qlace place the feed regula regulatting ing valves in automatic and hold Qower power at 30% for a flux maQ.

map.

Time Position Applicant's Applic ants Action Actions or Behavior

[_Time BOP Increas Increa es turbine load to 40 MWe in 5-10 MWe increm ses increments.

ents.

US Directs monitoring automatic control program values per PCB Section IV Figure 5. Notifies SM of any unexp unexpe cted deviat ected deviatiions.

ons.

BOP Verifies atmos Verifie atmosp heric steam dumps close per Enclosure 2.

pheric US When turbine load sufficie sufficiently increas ntly increa ed, directs SG operat sed, operatoorr open FW isolation valves, transfer SG level controls from FW bypass to main FW controll valves and place SG level contro ls in auto.

NOTE : Once SG level control in auto, SG operat operatoorr (surrog (surrogate ate operat operatoor) r)

will leave the simulator floor.

BOP Continues Contin ues performing action actionss of 3-GOP-301 as directed by US:

13. Verifies SG level being controlled 50+/-5%
14. Verifies Main FW control valves in auto & & FW bypass valves closed RO Continues Contin ues performing action actionss of 3-GOP-301 as directed by US:
1. When reacto power>

reactorr power > 10%

a. Determ ines Power Above P-10 P-i 0 VPA status light ON & & At Power Trips Blocked VPA status light OFF
b. Presses & & holds Intermed Range Trip Manuall Block A & & B logic consollee pushb conso pushbu ttons 2-4 secon uttons seconddss
c. Determ ines Inter Rng Trip Blocked VPA status light ON
d. Presses & & holds Power Lo Range Trip Manua Manuall Block A & & B logic consollee push conso pushbu ttonss 2-4 secon button seconddss
e. Determ ines Pwr Rng Trip Blocked VPA status light ON BOP Contin Continuesues perfor perform ing action ming actionss of 3-GOP-301 as directed by US:
15. Determ ines NIS IR & & Lo PR Trips blocked on DDPS
16. Notifies Chemi stry to samplsamplee RCS per TS 3.4.8
17. Places Mid GCB sync switch to MANUAL
18. Verifies incom ng =

incomiing = running voltage voltage && synchr synchroscop oscope e@ oclock

@ 12 o'clock 2

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: ~ 5 Event Event No.:

No.: _1_ 1 Page~of_4_

Page 3 of 4 Event

Description:

Event

Description:

Place unit Place unit onon line line perper3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3.

5.52.3. Increase Increase load, place the feed load, place the feed regulating regulating valves valves inin automatic automatic and and hold hold power power atat 30% for 30% for aa flux flux map.

map.

I Time lillie Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Continues performing Continues performing actions acUonsof of 3-GOP-301 3-GOP-301 as as directed directed by by US:

US:

19. When
19. When bothboth sync sync lights lights out, out, closes closes MidMid GCB GCB
20. Places
20. Places Mid Mid GCB GCB sync sync switch switch to to OFF OFF
21. Adjusts
21. Adjusts generator generator MVARs MVARs as as directed directed by by System System
22. Places
22. Places GCMGCM in in service service
a. Verifies generator
a. generator H2 H pressure =

2 pressure = 65-75 65-75 psig psig

b. Directs NSO verify local
b. local filter oil oil free & & set H2 2 gas flow == 16 H 16
c. Verifies VPA power light ON
d. Presses Alarm Reset PB & Manual Start Only PB if lit
e. Verifies Auto Sampler Ready light ON & printer stamping between 0.75-1 0.75-1.0; .0; marks date & time
23. Directs NSO complete 3-OP-072 3-0P-072 section 5.0 & commence MSR MSR purge at 70 MWe per 3-OP-072.1 3-0P-072.1 section 5.1
24. Verifies Feedwater Pump Turbine Runback switch in DEFEAT 25.
25. Places Places Steam Steam Dump Dump Control Switch to ON. ON. Places Places Steam Steam DumpDump Mode Mode Selector Selector Switch Switch in in RESET RESET then then to to AUTO AUTO 26.
26. When When atmospheric atmospheric steam steam dumps dumps closed, closed, adjusts adjusts setpoints setpoints to to 1000 1000 psig psig && verifies verifies controls controls in in AUTO AUTO 27.
27. At At 130 130 MWe, MWe, transfers transfers house house loadsloads from from SUTSUT toto Aux Aux Transformer Transformer a.
a. Places Places 3A 3A 4kV4kV busbus AuxAux Xfmr Xfmr synch synch switch switch toto ON ON b.b. Verifies Verifies incoming incoming::::: running running voltage voltage && synchroscope synchroscope ::::: 12 12 oclock o'clock c.c. Places Places && holdsholds Aux Aux Xfmr Xfmr to to 3A 3A 4kV 4kV bus bus bkr bkr sw sw inin CLOSE, CLOSE, verifies verifies redred light on, SUT light on, SUT to to 3A 3A 4kV 4kV bus bus current current decreases decreases &&

Aux Aux Xfmr Xfmr to to 3A 3A 4kV 4kV busbus current current increases.

increases.

d.d. Releases Releases Aux Aux Xfmr Xfmrto to 3A 3A 4kV 4kV bus bus bkrbkr sw, sw, verifies verifies SUT SUT bkr bkrtrips, trips, SUT SUT to to 3A 3A 4kV4kV bus current == 00 &&Aux bus current Aux Xfmr Xfmrto to 3A 3A 4kV 4kV bus bus current current increases.

increases.

e.e. Matches Matchesflags flags on on SUT SUTtoto 3A 3A4kV4kVbus bus f.f. Places Places 3A 3A4kV 4kVbus busAux AuxXfmr Xfmrsynch synch switch switch toto OFF OFF g.g. Repeats Repeatswith with3B 3B4kV4kVbusbus power powersupply.

supply.

33

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-30 1 Scenario No.:.2....

Scenario No.: 5 Event No.:

Event No.: _1_1 Page-+/-.

Page 4 of of~4 Event

Description:

Event

Description:

Place unit Place unit on line per on line per 3-GOP-301 3-GOP-301 beginning beginning withwith step step 5.52.3.

5.52.3. Increase Increase load, place load, place thethe feed feed regulating regulating valves valves inin automatic automatic and and hold hold power power at at 30% for 30% for aa flux flux map.

map.

Time Time Position Position Applicants Actions Applicant's Actions oror Behavior Behavior BOP BOP Coordinates with Coordinates with RORD toto increase increase && stabilize stabilize turbine load =:: 225 turbine load 225 MWe MWe When NSO When NSO reports reports MSRMSR drains drains to condenser restricting to condenser restricting orifice orifice open, open, opens MSR opens MSR purge purge valves valves CV-3-2910/2911/2912/2913 CV-3-2910/291 1/2912/2913 and and directs directs NSO NSO check for check for purge purge lineline steam steam flow.

flow.

At approximately At approximately 150 150 MWe:

MWe:

  • . Closes Turbine Closes Turbine Drain Drain Valves Valves
  • . Directs local closure of turbine stop valve drains
  • . Verifies SG blowdown aligned for at power operation per 3-0P-071 3-OP-071
  • . Directs NSO verify PSS voltmeter reading 0 +/- +/- 1I Volt. Once exciter &

bus voltages determined stable, places PSS control switch to to ON At approximatel approximately y 200 MWe, begins placing MSRs in service per 3-0P- 3-OP-072.1 section 5.2:

.* Verifies MSR steam supply timing cam installed correctly with follower set at CLOSED CLOSED position & & follower stop set at 95%

.* Places Places MSR MSR steam supply supply timing control valvesvalves switch switch to ON ON

.* Monitors Monitors MSR MSR outlet outlet temp temp rate rate of of change change << 100°F/hr 100°F/hr RD RO Coordinates Coordinates with with BOP BOP to to increase increase && stabilize stabilize reactor power ==30%

reactor power 30%

using using control control rods rods && dilution dilution per per 0-OP-046.

0-OP-046.

Verifies Verifies control control rods rods maintaining maintaining AFD AFD perper 0-OP-059.9 0-OP-059.9 Verifies Verifies IR IR High High Level Level RodRod Stop Stop bistable bistable status status light light at at 20%

20% power.

power.

Verifies Verifies IR IR High High Level Level Trip Trip bistable bistable status status light light at at 25%

25% power.

power.

44

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 55 Event No.:

Event No.: -1.§..

la Page Page _1_

j of of _1_

1 Event

Description:

Event

Description:

Once feed Once feed regulating regulating valves valves are placed in are I2laced in automatic, automatic, an an NSO NSO calls calls in in that the that the BB AFWP AFWP governor governor hashas anan oil oil leak.

leak.

Time e Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Relays report Relays report from from NSO NSO ofof oil oil leak leak on on BB AFWP AFWP governor governor US US Declares B Declares AFWP out B AFWP out of of service service Determines TS Determines TS 3.7.1.2 3.7.1.2 action action statement statement 33 applies:

applies:

  • . Fix B AFWP in in 30 days WCC have Mechanical troubleshoot & fix B AFWP Directs wee WOO generate & hang EeO Directs wee ECO on B AFWP 55

Appendix DD Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: l 5 Event No.:

Event No.: _2_2 Page_1 Page _ of _ 1_

1 of 1 Event

Description:

Event

Description:

3A (running) TPeWp 3A (running} TPCWP bearing bearing failure.

failure. Failure Failure of of 3B 3B (standby}

(standby) TPeWp TPCWP toto automatically automatically start start following following tri(2 trip of of running running (2um(2.

pump. The crew The crew responds (2er res(2onds per 3-0NOP-008 3-ONOP-008 and and manually manually starts starts the the 3B 3B TPeWp TPCWP..

Time ,

lillie Position Position j Applicants Actions Applicant's Actions or or Behavior Behavior RO RO Recognizes/reports annunciator Recognizes/reports annunciator 1-5/1, 5/2 &

1-5/1, 5/2 & 5/4 5/4 alarms alarms US US Directs response Directs response perper 3-0NOP-008 3-ONOP-008 BOP BOP actions of Performs actions of 3-0NOP-008 3-ONOP-008 as as directed directed by US:US:

1. Determines annunciator 1-5/1 I-S/i & & 5/2 alarmed
2. Determines 3A TPeWpTPCWP tripped & & 3B TPeWp TPCWP did not auto start
3. Determines offsite power is available and starts 3B TPeWp TPCWP
4. Determines 11 TPeWp TPCWP now running & & annunciator 1-5/4 no longer alarming
5. Determines SI not actuated and POV-3-4882 & & 4883 open
6. Determines annunciator 1-5/5 not alarming
7. Directs NSO locally check TPCW TPeW supply header temp << 110°F 1 10°F and stable/decrea sing stable/decreasing
8. Directs NSO locally verify TPCW TPeW basket strainer Ap IIp << 1.5 1.5 psid
9. Determines all generator-rel generator-relatedated temperature alarms all OFF
10. Determines
10. Determines allall SGFP, cond pp pp & & HDP HDP bearing bearing temp alarms alarms OFFOFF
1. Determines 111. Determines all TPCW TPeW alarms alarms OFF
12. Directs
12. Directs NSO NSO check check TPCW TPeW cooled cooled components temperature stable/decrea sing stable/decreasing US US Directs Directs WCCwee have have Electrical Electrical && Mechanical Mechanical maintenance maintenance investigate investigate 3A 3A TPCWP TPeWp failure failure Directs Directs WCCwee generate generate ECO EeO and and take take 3A3A TPCWP TPeWp out out of of service service 66

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: 2.. 5 Event No.: ~

Event No.: Page-1 Page 3 1ofof_1_ 1 Event

Description:

Event

Description:

3B s/g controlling 3B slg controlling feed feed flow flow transmitter transmitterFT 487 fails FT-3-487 fails high high causing causing 3B 3B FRV (FCV-3-488 FRV (FCV-3-488 to to fail fail closed).

closed). Manual Manual o(2erator operator action action isis reguired required to to control 3B control 3B slg s/g level level and and avoid avoid aa reactor reactor tri(2.

trip. The The crew crew res(2onds responds (2erper 3 ONOP-049.1.

ONOP-049.1.

Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes 1I reports Recognizes reports failure failure of of FT-3-487 FT-3-487 low low and and loss loss ofof FW FW toto 3B 3B SG (FCV-3-488 closed).

SG (FCV-3-488 closed).

Takes manual Takes manual control control of of FCV-3-488 FCV-3-488 and and restores restores 3B 3B SGSG level level to to program program US US Directs performance Directs performance of of actions actions per per 3-0NOP-049.1.

3-ONOP-049.1.

BOP 3-ONOP-049.1 as directed by US:

Performs actions per 3-0NOP-049.1

1. Determines FT-3-487 failed while FT-3-486 remains in service service
2. Transfers controlling FW flow channel for 3B SG to ch IV NOTE: Operator may also take controlling steam flow channel for for 3B 38 SG to ch IV as well US Determines TS 3.3.1 Table 3.3-1 Unit 12 12 affected. Action 6 applies (6 hr hr to trip bistables)

Determines Determines BS-3-488B1 BS-3-488B1,, B2 B2 &&C C must must bebe tripped tripped Briefs Briefs crew crew regarding regarding tripping tripping bistables bistables and and effects effects of of failure.

failure.

BOP BOP Obtains Obtains keys keys and and opens opens protection protection rack rack 1818 Trips Trips bistables bistables BS-3-488B1 BS-3-488B1,, BS-3-488B2 BS-3-488B2 && BS-3-488CBS-3-488C RCO RCO Checks Checks correct correct bistable bistable status status light light energized energized in in response response to to tripping tripping bistables bistables (FC488B1).

(FC488B1).

Checks Checks correct correct annunciators annunciators on on inin response response to to tripping tripping bistables bistables (C-412 (C-4/2 && C-5/2).

C-5/2).

US US Directs Directs WCC WCC initiate initiate PWOPWO && notify notify l&C I&C Directs Directs generation generation of of ECO ECO for for tripped tripped bistables bistables Directs Directs local local reset resetof ofAMSAC AMSAC trouble trouble alarm alarm (annunciator (annunciatorD-716) D-7/6) ifif actuated actuated 77

AppendixDD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.:...L5 Event No.:

Event No.: _4_ 4 Page_1_

Page 1 of of_1_ 1 Event

Description:

Event

Description:

PT-3-1 608 fails PT-3-160B fails high.

high. CV-3-160B CV-3-1 608 failsfails ol2en open andand increases increases steam steam flow flow 3-4%. The 3-4%. The crew crew resl20nds responds l2erper 0-ADM-200 0-ADM-200 for a secondarY for a secondary plant I2lant transient. Manual transient. Manual turbine turbine load load reduction reduction isis reguired required to to return return reactor reactor power to 30%. Once power 120wer to 30%. Once 120wer isis stabilized stabilized at at 30%,

30%, the the CV-3-160B CV-3-1 608 isolation valve isolation valve isis closed, closed, but but some some ADVADV steam steam leakage leakage still still exists.

exists.

II _Time T;,..., ....

... ,~

Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Recognizes/reports lowering Recognizes/reports lowering generator generator MW MW Recognizes/reports PT-3-160B Recognizes/reports PT-3-1 608 fails fails high high && CV-3-160B CV-3-1 608 failed failed openopen RO RO Recognizes/reports 4-5%

Recognizes/reports 4-5% reactor reactor power power increase increase Recognizes/reports Tavg << Tref Recognizes/reports US Determines CV-3-160B CV-3-1 608 failure open caused Tavg-Tref deviation Directs taking manual control of CV-3-160B. CV-3-1 608.

When informed of CV-3-160B CV-3-1 608 failure, directs local isolation of CV-3-160B CV-3-1 608 BOP BOP Consistent with 0-ADM-200 section 5.4.3 guidance for response to to secondary pant transient:

1.

1. Reduces turbine load load to match Tavg =Tref 2.
2. Attempts manual manual closure of of CV-3-1608 CV-3-160B & & determines determines CV-3-1608 CV-3-160B failed open 3.
3. Directs Directs NSO NSO locally locally investigate investigate CV-3-1 CV-3-160B 608 4.
4. Relays Relays report report from from NSO NSO of of steam steam coming coming from from unit unit 33 silencer silencer 5.
5. Directs Directs NSO NSO locally locally close close CV-3-1 CV-3-160B isolation valve 608 isolation valve 6.
6. Relays Relays report report from from NSO NSO thatthat steam steam flow flow not not completely completely stopped stopped with with isolation isolation valve valve closed.

closed.

7.

7. Adjusts Adjusts turbine turbine loadload asas necessary necessary to to match match TavgTavg ==TrefTref US US Determines Determines CV-3-1608 CV-3-160B isolation isolation valve valve leaking leaking by by Directs Directs WCCWCC have have Mechanical Mechanical maintenance maintenance investigate investigate CV-3-1 CV-3-160B 608 Directs Directs caution caution tagtag generated generated for for CV-3-1 CV-3-160B 608 inin manual manual 88

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: 2 5 Event No.:

Event No.: 2 5 Page~of_2_

Page 9 of 2 Event

Description:

Event

Description:

Main generator Main generator exciterexciter airair coolers coolers TPCW TPCW flow flow isis Qartially:

partially blocked blocked resulting inin aa high resulting high airair temQerature temperature condition.

condition. The The crew crew resQonds responds Qer per 3 ARP-097.CR for ARP-097.CR for annunciator annunciator E-9/4. E-914. TheThe crew manually trips the reactor crew manually: triQs the reactor when exciter when exciter hot hot gas gas temQerature temperature exceedsexceeds 90°C 90°C andand Qerforms performs the the actions of 3-EOP-E-0.

actions of 3-EOP-E-0. Once Once the the reactor reactor isis triQQed, tripped, thethe switchy:ard switchyard relay:s relays out. 3B out. 3B EDGEDG startsstarts butbut fails fails to automatically load to automatically: load 3B3B 4kv 4kv bus bus due due to to aa bus bus stripping failure.

striQQing failure. 3A EDG fails 3A EDG fails to to start start and and can can notnot be be manually:

manually started.

started.

Time e Position Position BOP J Recognizes!1 reports Applicants Actions Applicant's reports annunciator Actions or annunciator E-9/4 or Behavior Behavior BOP Recognizes E-9/4 alarming alarming RO RO Reads actions Reads actions for for 3-ARP-097.CR 3-ARP-097.CR for annunciator E-9/4 for annunciator E-9/4 BOP Performs actionsactions consistent with 3-ARP-097.CR3-ARP-097.CR for annunciator E- E 9/4 as read by RO

1. Verifies alarm using recorder R-3-347 (VPA)
2. Monitors exciter air temperature closely
3. If hot air temp 2: 8rC 87°C reduce MVAR while maintaining grid voltage 2: 232 kV
4. If hot air temp 2: 8rC 87°C with MVAR=O, MVAR=0, maintain grid voltage 2:

232 kV & & reduce generator load using 3-ONOP-100 3-0NOP-100 until hot air temp << 87°C 8rC

5. If hot air temp 2: 87°C 8rC & & increasing due to unknown unknown cause advises US to advises US to consider consider tripping tripping reactor reactor & & turbine 6.
6. IfIf hot hot air air temp temp> > 90°C 90°C & & no no expectation expectation of of fast fast recovery recovery advises advises US US to to tripping tripping reactor reactor & & turbine turbine andand enter enter 3-EOP-E-0 3-EOP-E-0 US US Determines Determines hot air temp hot air temp> 90°C && no

> 90°C no expectation expectation of of fast fast recovery recovery Directs Directs reactor reactor triptrip Directs Directs crew crew perform perform immediate immediate actions actions of of 3-EOP-E-0.

3-EOP-E-0.

RO RO Performs Performs immediate immediate actions actions of of 3-EOP-E-0:

3-EOP-E-0:

1.1. Verifies Verifies reactor reactor triptrip

    • Rod Rod bottom bottom lights lights onon &&RPIs RPls atat zero zero
  • Rx Rx trip trip &&bypass bypass bkrsbkrs open open

.* Neutron Neutron flux flux decreasing decreasing 99

Appendix D Operattor Opera or Action Actions Form ES-D-2 Op-Te st No.: 2007-301 Scenarrio Scena io No.: 2-5 Event No.: 2-5 Pag Page e~o 2 of f22 Event

Description:

Main generator exciterr air cooler tor excite coolerss TPCW flow is Qartia" partially~ blocked resulting in a high air temQe temperrature ature conditi condition.

on. The crew resQon responds Qer per 3-ARP-0 97.CR for annun annuncciator iator E-9/4.

E-914. The crew manua"~ lly triQs trips the reacto reactorr exciterr hot gas temQe when excite temperrature ature excee exceed dss 90°C and Qerfor perform mss the actionss of 3-EOP-E-0. Once the reacto action reactorr is triQQed tripped, the switchyard

~ard rela~s relays out. 3B EDG starts but fails to automa automatically tica"~ load 3B 4kv bus due to a bus stripping failure . 3A EDG fails to start and can not be manua lly striQQi "~ started.

Time Time Time BOP Perform Perfor mss immediate action actionss of 3-EOP-E-0:

1. Verifiess turbine tripped Verifie
  • . Turbine stop valves closed Turbin
  • . Mid & East GCBs GOBs open
2. Verifies power to emerg Verifie emergeency ncy 4kV buses
  • . Determines neithe neitherr 3A or 3B 4kV buses energienergiz ed zed
  • . Attempts Attemp emergeency ts emerg ncy start of 3A EDG and recognizes! izes/

reports start failure.

  • . Recognizes/reports 3B EDG running, but output breaker not closed US When determines that 3A EDG does not respond to emerg emergeency ncy start & 3B EDG running but output breaker did not close, directs transition to 3-EOP-ECA-0.0 step 1 1 10

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

No.: 2007-30 1 Scenario No.: No.: 55 No.:_ 6_ Page Page_11 of Op-Test 2007-301 Scenario Event EventNo.: 6 of _5_5 Event

Description:

Description:

The The crew crewtransitions transitionstoto 3-EOP-ECA-0.0.

3-EOP-ECA-0.0. MOV-3-1405 fails toto ol2en Event MOV-3-1 405 fails open andand with B AFWP with B AFWP OOS with anOOS with an oiloil leak leak reguires requires CC AFWPAFWP toto SUl2l2ly supplyboth both units.

units.

Manual bus Manual bus stril2l2ing stripping isis l2erformed performed with with the the excel2tion exception of of3B3B TPCWP TPCWP breaker3AB11 breaker 3AB1 1 whichwhich hashas aa blown blown controll2ower control power fuse fuse and and can can notnot bebe opened from ol2ened from VPA.

VPA. 3A 3A 4kV 4kV busbus isis rel20wered repowered via via the the SBO SBO tie tie from unit from unit 4.

4.

Then 3AB11 Then 3AB1 1 isis locally locally ol2ened opened allowing allowing 3B 3B EDG EDG to to reenergize reenergize 3B 3B && 3D3D 4kV bus.

4kV bus. Transition Transition isis made made to 3-EOP-ECA-0.2 due to 3-EOP-ECA-0.2 due toto the effects of the effects of the the steam leak.

steam leak.

Time_J Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior US US Directs performance Directs performance of of 3-EOP-ECA-O.O 3-EOP-ECA-O.O RO RO Performs actions Performs actions per per 3-EOP-ECA-O.O 3-EOP-ECA-O.O as directed by as directed by US:US:

1.

1. Verifies reactor trip Verifies
  • . Rod bottom lights on & RPls at zero
  • . Rx trip & bypass bkrs open
2. Determines PZR PORVs Determines PORVs closed Critica Criticall 3. Verifie Verifies s letdow letdown n isolatio isolation n valves closed
4. Determ Determines ines excess letdow letdown isolated n isolate d 5.
5. Verifie Verifies s SI SI reset BOP BOP Perform Performs s actions actions perper 3-EOP 3-EOP-ECA-0.0

-ECA-0.0 as as directe directed by US:

d by US:

Critical Critical 1.

1. Verifie Verifies s turbine turbine tripped tripped

. Alread Already y verified verified turbine turbine stop stop valves valves && MSRMSR mainmain steam steam stop stop MOVs MOVs closed closed

  • Determ Determines ines Mid Mid && EastEast GCBs GCBs open open 2.2. Determ Determines ines only only one one AFWPAFWP runninrunning for both g for both units.

units. Establi Establishes shes 270 gpm to 270 gpm to Unit Unit 3.3.

3.3. Verifie Verifies s 3A3A 4kV 4kV bus bus strippe stripped. Determines

d. Determ ines 3B 3B 4kV 4kV bus bus strippi stripping ng failed failed and and verifie verifies s 3B 3B 4kV4kV bus bus strippe stripped with the exception d with the exception of of 3AB1 3AB11 1 (3B (3B TPCW TPCWP) P) which which cancan not notbe betripped tripped..

4.4. Sends Sends NSO NSO toto investi investigate 3AB11 gate 3AB1 1 5.5. Determ Determinesines neither neither3A 3A&&3B 3B4kV 4kVbuses busesenergiz energizeded 1111

Appendix 0D Appendix Operator Actions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.: _ 5_

Scenario No.: 5 Event No.: _66_

Event No.: Page --.£ Page 2 of of _5_5 Event

Description:

Event

Description:

The The crew crew transitions transitions to to 3-EOP-ECA-0.0.

3-EOP-ECA-0.0. MOV-3-1405 MOV-3-1 405 failsfails to to oQen open and and with BB AFWP with AFWP OOS OOS with with an an oil oil leak leak reguires requires CC AFWP AFWP to to sUQQly supply bothboth units.

units.

Manual bus Manual bus striQQing stripping isis Qerformed performed with with the the exceQtion exception of of 3B 3B TPCWP TPCWP breaker 3AB11 breaker 3AB1 1 which which has has aa blown blown control control Qower power fuse fuse andand can can not not be be opened from oQened from VPA.

VPA. 3A3A 4kV4kV bus bus is is reQowered repowered via via the SBO tie from unit the SBO tie from unit 4.

4.

Then 3AB11 3AB1 1 is is locally locally oQened opened allowing allowing 3B EDG to 3B EDG to reenergize reenergize 3B 3B && 3D 3D 4kV bus.Transition 4kV bus.Transition is is made made to to 3-EOP-ECA-0.2 3-EOP-ECA-0.2 due due toto the the effects effects ofof the the steam leak.

steam leak.

I~osition Time Position Applicants Actions or Behavior Applicant's Behavior BOP Continues performing actions per 3-EOP-ECA-0.0 3-EOP-ECA-0.0 as directed by US:

6. Determines 3A & & 3B 4kV bus lockout relays reset.
7. Determines 3A EDG locked out. Attempts unsuccessfully unsuccessfully to reset 3A EDG lockout then relays report from NSO of EDG failure. Determines 3B EDG not locked out.
8. Determines 3A EDG can not be manually started
9. Determines 3B EDG running, but output breaker not closed due to failure of 3AB1 3AB111 to open.

US Determines neither 3A or 38 3B 4kV bus energized.

Critical Directs BOP80P work to restore power to 3A or 3B 38 4kV buses

. 3A 4kV bus from SBO S80 tie bkr per 3-ONOP-004 3-0NOP-004.2 .2

.* 3B 38 4kV bus from 3B 38 EDG when 3ABI 3A811I opens Directs RO continue performing 3-EOP-ECA 3-EOP-ECA-O.O -O.O RO Continues performing actions per per 3-EOP-ECA 3-EOP-ECA-O.O -O.O as directed by by US:

US:

Critical 6.

6. Places Places non-running non-running equipmentequipment switches switches to to pull-to-lock pull-to-Iock or or Critical off (U3 HHSIPs, off (U3 HHSIPs, CSPs,CSPs, ECCs,ECCs, ECFs, ECFs, RHRPs RHRPs & & CCWPs)

CCWPs)

/-"

7.

7. Determines Determines from from U4 U4 RORO that that U4 U4 HHSI HHSI aligned aligned to to U4 U4 CCW CCW 8.
8. Determines Determines PZR PZR level level cannot cannot be be maintained>

maintained> 17% 17%

9.

9. Directs NSO locally Directs NSO open MOV-3-843A locally open MOV-3-843A or or BB 10.
10. StartsaU4HH Starts a U4 HHSIP SlP
1. Directs 111. NSO locally Directs NSO locally close 3-297 AlBIC,, MOV-3-381 close 3-297A1B/C MO\t-3-381 && MOV MOV 626 626 12 12

Appendix D Appen D Operattor Opera or Action Actionss Form ES-D- 2 Op-Test No.:

Op-Te 2007-301 Scenarrio Scena io No.: _S_

5 Event No.:

Event No.: _6_ Pag Page e~o

..... of fL Event

Description:

The crew transitions to 3-EOP-ECA- 0.0. MOV-3

-ECA- 0.0. MO V-3-1 405 fails to oQen

-140S open and with 8B AFWP OOS with an oil leak reguire requiress C AFWP to sUQQly supply both units.

Manual bus striQQi stripping is Qerfor perform ed with the exceQ med excepttion ion of 38 3B TPCW TPCWP breaker 3A811 3AB1 1 which has a blown control Qower power fuse and can not be opened oQene d from VPA. 3A 4kV bus is reQow repowe red via the S80 ered SBO tie from unit 4.

3AB1 I is locally oQene Then 3A811 opened allowing d allowin 3B EDG to reener g 38 reenerg ize 38 gize 3B & 3D 4kV bus.Tr ansitio n is made to 3-EOP-ECA- -ECA- 0.2 due to the effects of the steam leak.

Time Positio n Applicant's Applic ants Action Actionss or 8ehav Behavior RO NOTE: How many steps are actual actuallly y perfor performmed ed by the RO depen depend dss on when power is restored across the SBO x-tie by the BOP.

Continue Contin perform uess perfor ing action ming actions s per 3-EOP-ECA-

-ECA-O O.O

.O as direct directeded by US:

12. Determines MSIVs & bypas bypass es closed, main FW & bypass ses control valves closed and SG blowdo blowdown wn isolation valves closed
13. Determ ines leak on 3C SG (thru CV-3-1 CV-3-i 608)
14. Verifie s SI reset Critical Isolates
15. Isolate s AFW to 3C SG.
16. Directs NSO open AFSS- 3-007 to restore A AFWP . Once this is done, increa increas es AFW flow to ~ 34S ses 345 gpm to 3A & 38 3B SG.
17. Directs NSO open breaker for MOV-3 MOV-3-1405

-140S

18. Verifies SG samplsamplee lines isolated
19. Determ ines CV-3-1CV-3-1 608 failed open & local isolation valve closed but leaks by.
20. Controls AFW flow to 3A & 3B 38 SGs 345~34S gpm until either SG level level> > 6[32]%
21. Determ ines no SG tubes ruptured (R-3-1S, 5, R-3-19 & DAM-DAM-1i). ).

Directs HP confirm by local surveys on MS lines.

NOTE: 3A 4kV bus can only be powere power ed d from the SBO x-tie using 3-ONOP-004.2. 3B 4kV bus can be restored by opening 3B TPCWP breakerr 3ABI 3AB111 which will allow reenerg reenergizatio izationn from 38 3B EDG. This will occur after the crew has repowe repoweredred 3A 4kV bus from the SBO x-tie.

13 13

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-30 1 2007-301 Scenario No.:

Scenario No.: _5_ 5 Event No.: _6_

Event No.: 6 Page -.1.

Page 4 ofof ~ 5 Event

Description:

Event

Description:

The crew The crew transitions transitions toto 3-EOP-ECA-0.0.

3-EOP-ECA-0.0. MOV-3-1405 MOV-3-1405 fails fails to to ol2en open and and with with BB AFWP AFWP OOS OOS withwith an oil leak an oil leak reguires requires CC AFWP AFWP to to SUl2l2ly supply both both units. Manual units. Manual busbus stril2l2ing stripping isis l2erformed performed with with the exception of the excel2tion of 3B 3B TPCWP breaker TPCWP breaker 3AB11 3AB1 I which which has has aa blown blown controll2owerfuse control power fuse and and can can not be not be ol2ened opened fromfrom VPA.

VPA. 3A 3A 4kV 4kV busbus isis rel20wered repowered via via the the SBO SBO tietie from from unit 4.

unit 4. Then Then 3AB11 3AB1 1 isis locally locally ol2ened opened allowing allowing 3B 3B EDG EDG toto reenergize reenergize 3B 3B 3D 4kV

&& 3D 4kV bus.Transition bus.Transjtion isis made made to 3-EDP-ECA-0.2 due to 3-EOP-ECA-0.2 due toto the the effects effects ofof the steam the steam leak.

leak.

Time

~.

lillie Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP Performs actions from 3-0NOP-004.2 Performs 3-ONOP-004.2 when directed by by US:

1. Determines 3A 4kV bus stripped but not yet energized energized
2. Determines 3A 4kV bus lockout reset
3. Verifies SI reset
4. Determines 3A 4kV bus lockout has tripped and can not be reset
5. Determines U3 SUT potential white light on VPA is OFF
6. Determines U4 SUT potential white light on VPA is OFF
7. Determines 3B 4kV bus deenergized. Determines Determines from U4 U4 RO both 4A & 4B 4kV buses energized.
8. Determines Determines 3D 4kV 4kV bus lockout reset Critical Critical 9.
9. Realigns Realigns 3D 3D 4kV 4kV busbus to to 3A 3A 4kV 4kV bus.

bus.

.* Opens Opens 3AB19 3AB19 & & 3AD06 3AD06

.* Closes Closes 3ADOI 3AD01 & & 3AA17 3AA17 10.

10. Determines Determines 3AD073AD07 blue blue light light onon 11.
11. Determines Determines from from U4 U4 RO RO that that 4D4D 4kV 4kV bus bus energized energized from from 4B 4B 4kV 4kV bus bus which which is on the is on the 4B4B EDG.

EDG.

12.

12. Directs Directs U4 RO place U4 RO place non-running non-running safeguards safeguards equipment equipment in in P-T-L P-T-L oror OFF OFF onon 4B4B 4kV 4kV busbus 13.
13. Closes Closes 3AD07 3AD07 thenthen directs directs U4 U4 RO RO close close 4AD07.

4AD07.

14.

14. Determines Determines 3A 3A 4kV 4kV bus bus energized energized && SI SI reset reset us US Directs Directs transition transition to to 3-EOP-ECA 3-EOP-ECA-O.O step 32.

-0.0 step 32.

Directs Directs BOP BOP restore restore 3B 3B 4kV 4kV busbus using using 3-ONOP-004 3-0NOP-004.3 .3 14 14

Appendi Appen dixx DD Operator Opera Actions tor Action s Form Form ES-D-ES-D-2 2 Op-Test Op-Te No.:

st No.: 2007-301 2007-3 01 Scenario Scena No.: _5_

rio No.: 5 Event No.:

Event No.: _6_ 6 Pag Page e~o 5 of. f~ ..

Event Descri Event Descripti on:

ption: The crew The crew transit transitionionss to to 3-EOP 3-EOP-EC -ECA- A-0.

0.0.0. MOV-3 MOV-3-1 -1405 405 fails fails to to oQen open and and with BB AFWP with AFWP OOS OOS withwith anan oil oil leak leak reguire requires sC C AFWP AFWP to to sUQQly supply both both units. Manua units. Manuall bus bus striQQi strippingng isis Qerfor performed med withwith the the exceQ exceptiontion ofof 3B 3B TPCWP TPCW breakerr 3AB11 P breake 3AB1 1 which which has has aa blown blown contro controll Qower power fusefuse and and can can not be not be oQene opened from VPA.

d from VPA. 3A 3A 4kV 4kV busbus isis reQow repowere eredd via via the the SBO SBO tie tie from from unit 4.

unit 4. Then Then 3AB 3AB1111 is is locally locally oQene opened d allowin allowing g 3B3B EDGEDG to to reener gizee 3B reenergiz 3B

&& 3D 3D 4kV4kV bus.Tr bus.Transi tion ansitio is made n is made to to 3-EOP 3-EOP-EC -ECA- A-0.

0.22 due due toto the the effects effec ts of of the steam the steam leak.

leak.

Time Time Position Positio n Applican Applic ts Action ant's Actions s or Behav Behavior ior RO Performs Perfor actions ms action s of 3-EOP 3-EOP-EC -ECA-OA-O.O as directdirected ed by US:

Determin

1. Determ es CET < 1200°F ines 1200°F
2. Determin Determ es 3A 4kV bus power ines powered ed from U4 via SBO x-tie and both 4A & 4B 4kV buses buses power powered ed from respec respective tive EDGs EDGs
3. Determin Determ ineses 3A & 3B SG ADVs ADVs contro controlli lling ng in auto at 1000 psig with 3C SG SC ADV failed failed open with leaking leaking isolatio isolationn valve.

valve.

4. Closes breake Closes breakers 3AA08 & 3M rs 3AA08 3AA14 to energienergize ze 3A & 3C 480V LC.

Verifiess 3H 480V LC energi Verifie energizedzed.. If 3B 4kV bus energi energized zed,, verifie verifiess 3B & 3D 380V LC energi energized zed..

5. Directs U4 RO perform Directs perform steps 35b-e. 35b-e.
6. Veri fiess one aux bldg exha Verifie exhau ust st fan & SEP SFP exhau exhaust st fan runn runnin g.

ing.

7. Dire cts NSO start SEP Directs SFP cool cooling ing wate waterr pum pump p
8. Dire cts Chem Directs Chemiistrystry verif verifyy U3 SFPSFP,, plan plantt vent & SJA SJAE SPING E SPIN Gss runn runniningg BOP BOP Perfo Perforrms ms actio action nss of 3-ON 3-0NO OP-0 P-004 04.3.3 when when direcdirecte tedd by by US:

US:

1.

1. ReceReceiv ives/ relayys es/rela s repo reportrt that 3AB1 3AB 11I beinbeingg open opene edd
2. Dete
2. Determ rmin es 3B ines 3B 4kV 4kV busbus strip strippi ping ng com compl plete ete 3.
3. Dete Determrmin es 3B ines 3B 4kV 4kV busbus lock lockououtt relay relay reset reset 4.
4. Veri fiess SI Verifie SI reset reset 5.
5. Dete Determ rmin es 3B ines 3B EDG EDG lock lockououtt reset reset & & 3B 3B EDG EDG runn runniningg 6.
6. DeteDeterm rmin es 3B ines 3B sequ seque ence ncer r oper operabablele 7.
7. Man Manua uallylly sync synchr hron izes 3B onizes 3B EDGEDG to to 3B 3B 4kV 4kV busbus 8.
8. RepoRepor rtsts 3B 3B 4kV4kV bus bus now now enerenergigized zed US US Dete Determ rmin es PZR ines PZR level level << 17%

17%. Direct

. Dire ctss trans transi tion to ition to 3-EO 3-EOP -ECA-P-EC A-O O.2.

.2.

15 15

Appendix DD Appendix OperatorActions Operator Actions Form Form ES-D-2 ES-D-2 Op-Test No.:

Op-Test No.: 2007-301 2007-301 Scenario No.:

Scenario No.: _5_ 5 No.: ~

Event No.:

Event 6a Page Page _1_ iofof _2_ 2 Event

Description:

Event

Description:

The crew The crew stabilizes stabilizes the plant using the plant using 3-EOP-ECA-O.2 3-EOP-ECA-0.2 since since PZR PZR level level <<

171501% or 17[501% or SSII actuated actuated duedue to to the the effects effects ofof the steam leak.

the steam leak.

Time_j__Pos Time ition Position Applicants Actions Applicant's Actions or or Behavior Behavior US US Directs performance Directs performance of of actions actions per per 3-EOP-ECA-O.2 3-EOP-ECA-O.2 NOTE: Starting NOTE: Starting loads loads onon 3A130 3A/3D 4kV 4kV busbus && 3A13C13H 3A/3C/3H 480V 480V LC LC requires coordination requires coordination with with the the U4 U4 ROHO for 48 for 4B EDG load EOG load management. Loads management. Loads started started on on 38 3B 4kV 4kV bus bus && 38130 3B/3D 480V 480V LC requires one operator LC requires one operator to watch 38 to watch 3B EOG EDG load load while while the the other operates the the load's loadá control switch.

RO 3-EOP-ECA-0.2 actions as directed by Performs 3-EOP-ECA-O.2 by US:

1. Verifies SI reset
2. Determines RWST level> 155,000 gal Critical Critical 3. Manually aligns ECCS valves for proper SI alignment (SI valve amber lights all bright)
3. Determines no CCWP running
4. Determines 3 CCWHX in service
5. Starts 2 CCWPs 6.
6. Determines COW CCW headers headers tied together together
7. Starts 3A & 3B
7. 38 HHSIP.

HHSIP. Stops the running U4 U4 HHSIP.

HHSIP.

8.

8. Starts Starts 3A 3A & & 3B 3B RHRP.

9.

9. Starts2ECCs Starts 2 ECCs &2 & 2 ECFs ECFs
10. Manually
10. Manually actuates actuates containment containment isolation isolation phase phase A A && verifies verifies associated white associated white lightslights onon VPB VPB allall bright.

bright.

11.

11. Determines Determines containment containment purge purge exhaust exhaust && supply supply fans fans OFF OFF
12. Verifies
12. Verifies CRCR ventilation ventilation inin proper proper emergency emergency recircrecirc alignment alignment 13.
13. Determines Determines containment containment spray spray notnot required required (pressure (pressure << 2020 psig) psig) 14.
14. Determines Determines RWST RWST level>level> 155,000 155,000 gal gal
15. Places
15. Places both both CSP5 CSPs inin standby standby 16.
16. Determines Determines RCP RCP sealseal injection injection isolated isolated 1616

AppendixDD Appendix OperatorActions Operator Actions Form FormES-D-2 ES-D-2 Op-TestNo.:

Op-Test No.: 2007-301 2007-30 1 ScenarioNo.:

Scenario No.: 55 EventNo.:

Event No.:~ 6a Page2of2 Page 2 of 2 EventDescription:

Event

Description:

Thecrewcrewstabilizes stabilizesthe thegiant plantusing using3-EOP-ECA-0.2 The 3-EOP-ECA-0.2 since since PZR level<<

PZRlevel I 7[501% or SI actuate 17[50]% or SI actuatedddue duetotothe theeffects effectsofofthe thesteam steamleak.

leak.

i Time Time Position Position Applicants Actions Applicant's Actions or or Behavior Behavior BOP BOP Performs 3-EOP-ECA-O.2 Performs 3-EOP-ECA-O.2 actions actions as as directed directed by by US:

US:

Critical Critical 1. Determines

1. Determines no no ICWPs ICWPs running.

running. Starts Starts 22 ICWPs.

ICWPs.

2. Verifies
2. Verifies POV-3-4882 POV-3-4882 && 4883 4883 closed.

closed.

3.

3. Determines ICW Determines ICW headers headers tied tied together together 4.
4. Directs NSO Directs NSO place place PAHMs PAHMs in in service service per per 3-0P-094 3-OP-094 5.
5. Controls AFW Controls AFW flow flow to to 3A 3A && 3B 3B SGsSGs ~345 345 gpm gpm until until either either SG SG level level 6[32]%. Then

>> 6[32]%. Then maintains maintains 3A3A && 3B SG levels 15-50%.

3B SG levels 15-50%.

US US Directs transition Directs transition to and performance performance of 3-EOP-E-1 3-EOP-E-1 TERMINATING Scenario is terminated TERMINATING CUE Scenario terminated upon completion completion of 3-EOP-ECA-O.2 3-EOP-ECA-O.2 CUE 17 17

Appendix0D Appendix ScenarioOutline Scenario Outine Form FormES-O-1 ES-D-1 Facility:

Facility: TurkeyPoint Turkey Point ScenarioNo.:

Scenario No.: 55 Op OpTestTestNo.:

No.: 2007-301 2007-301 Examiners:

Examiners: Candidates:

Candidates: USUS RO RO 80P BOP InitialConditions:

Initial Conditions: Mode2,2, 4% 4% power, power, MOL. MOL.Turbine Turbinerolling rollingatat18001800RPM RPMreadyreadytotosync Mode syncgenerator generatortotogrid. grid. Increase Increase load, place load, placethethefeed feed regulating regulatingvalves valvesinin automatic automaticand and hold hold power poweratat20% 20%for foraaflux fluxmap.

map.

Turnover:

Turnover: EquipmentOOS:

Equipment OOS: NoneNone significant significant Place unit Place unit on on line line and and increase increase powerpowerper per3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3 5.52.3 Event Event Event Type*

Event Type* Event Description Event Description No.

No.

11 (N) ALL (N) ALL Place unit Place unit on on line line per per 3-GOP-301 3-GOP-301 beginning beginning with with step step 5.52.3.

5.52.3. Increase Increase load, load, place the place the feed feed regulating regulating valvesvalves in in automatic automatic and and hold hold power power at at 20%

20% for for aa flux flux map.

map.

1a1a (TS) SRO (TS) SRO Once feed Once feed regulating regulating valves are are placed placed in in automatic, TFFXOLB =T TFFXOILB = 1 automatic, an an NSO NSO callscalls in in that that thethe 8B AFWP AFWP governor governor has has an an oil oil leak.

leak.

22 vK0001X TVKD001 x == 1.0 1.o I (C) SRO/80P (C) SRO/BOP 3A (running) TPCWP bearing failure. Failure of 38 3B (standby)

(standby) TPCWP TPCWP to to mm ramp 22 min ramp automatically start following trip of running pump. The crew crew responds responds per per 3 TFK3B11S=

TFK3B11S = T T ONOP-008 and manually starts the 38 3B TPCWP.

3 3 (I) 80P (I) BOP 3B slg 38 s/g controlling feed flow transmitter FT-3-487 fails high TFF1M86H=

high causing causing 38 3B FRVFRV TFF1M86H = T T (FCV-3-488t (FCV-3-488 to o fail closed). Manual operator action is required to control3B control 38 lTS (I,TS)

SRO SRO required to

/ s/g level and avoid a slg a reactor trip. The crew responds per per 3-0NOP-049.1.

3-ONOP-049.1.

44 (R)

(R) SRO/BOP SRO/80P PT-3-1 PT-3-1608 608 fails high. CV-3-1608 fails open and increases steam steam flow flow 3-4%.

3-4%.

The The crew crew responds responds per per 0-ADM-200 0-ADM-200 for aa secondary secondary plant transient.transient. Manual Manual TFS1MREH = T ((C)) RRO turbine load

3::- load reduction is is required to return reactor power power to to 30%.

30%. Once Once power power TFSW13A=T is is stabilized stabilized at at 30%,

30%, the the CV-3-1608 CV-3-1608 isolation isolation valve valve is is closed, closed, but but some some ADV ADV steam steam leakage leakage still still exists.

exists.

55 (C)

(C) ALL ALL Main Main generator generator exciterexciter air air coolers coolers TPCW TPCW flow flow isis partially partially blocked blocked resulting resulting in in TVuJNF=O. 95 (M aa high high air air temperature temperature condition.

condition. The The crew crew responds responds per per 3-ARP-097.C 3-ARP-097.CR for R for TVUJINF = 0.95 (M) ALLALL annunciator TVUJINFB= O.95 TVUJINFB=0.95

/

annunciator E-9f4. E-9/4. The The crewcrew manually manually tripstrips the the reactor reactor when when exciter exciter hothot gas gas TVUJINFC= 0 95 temperature temperature exceeds exceeds 90C 90°C andand performs performs the the actions actions of of 3-EOP-E-0.

3-EOP-E-0. Once Once the the TVUJINFC=0.95 TVUJINFD=

reactor reactor isis tripped, tripped, the the switchyard switchyard relaysrelays out. 38 EDG out. 3B EDG starts starts butbut fails fails to to TVUJINFD=0.950.95 automatically automatically load load 3B 38 4kv 4kv busbus due due toto aa bus bus stripping stripping failure.

failure. 3A 3A EDGEDG fails fails toto start start and and can can notnot bebe manually manually started.

started.

66 TFP8SWYD T TFP8SWYD=T (C)ALL (C) ALL The The crew crewtransitions transitions to to 3-EOP-ECA 3-EOP-ECA-0.0. MOV-3-1405 fails

-00. MOV-3-1405 fails to to open open and and with with B8 TFQ5GAFS= T AFWP TFQ5GAFS =T AFWP OOS OOS withwith an an oiloil leak leak requires requires CCAFWP AFWP to to supply supply bothboth units.

units. Manual Manual TFQSXABF TFQ6XABF==T T bus bus stripping stripping isis performed performed with with the the exception exception of of3B38 TPCWP TPCWP breaker breaker 3AB1 3A811 1 TFK3811S=

TFK3B11S =TT which which has hasaablown blown control control power powerfuse fuse and and cancan notnotbebeopened openedfrom from VPA.

VPA. 3A 3A TFFXMOS 4kV 4kV busbusisis repowered repowered via via the the SBO S80tie tiefrom from unit unit4.4. Then Then 3AB1 3A811 1 isis locally locally TFFXM05==1T K3OP11BG=

opened opened allowing allowing3B 38 EDG EDGtoto reenergize reenergize3B 38&&3D 3D4kV 4kVbus.bus.Transition Transition isismade made K30P11BG =FF toto 3-EOP-ECA 3-EOP-ECA-0.2 -0.2 due duetotothe theeffects effectsof ofthe thesteam steamleak.leak.

K3OP11BR K30P11BR= =F F 6a 6a The Thecrewcrewstabilizes stabilizesthe theplant plantusing using3-EOP-ECA 3-EOP-ECA-0.2 -O.2 sincesincePZR PZRlevel level<<

17[50j%

17[50]%ororSISIactuated actuateddue duetotothetheeffects effectsofofthe thesteam steamleak. leak.

(Normal, ..

(N)ormal, (R)eactivity, (R)eactlvlty, (l)nstrument, (I)nstrument, (C)omponen (C)omponent. t, (M)ajor (M)aJor 11

TP-2007-301 Scenario TP-2007-301 Scenario#5 #5Event EventDescription Description Turkey Point Turkey Point2007*301 2007-301 Scenario Scenario#5 #5 Event 11 - Place Event - Place unitunit on on line line per per 3-GOP-301 3-GOP-301 beginning beginning withwith step step 5.52.3.

5.52.3. Increase Increase load,load, place place the the feed regulating valves in automatic feed regulating valves in automatic and hold and hold power poweratat 20%

20% for foraa flux flux map.

map.

Event 1la Event a - Once

- Once feedfeed regulating regulating valves valves areare placed placed inin automatic, automatic, an an NSO calls inin that NSO calls that the the BB AFWP governor has AFWP governor has anan oil oil leak.

leak.

Event 22 - 3A Event - (running) TPCWP 3A (running) TPCWP bearingbearing failure.

failure. Failure Failure of of 3B 3B (standby)

(standby) TPCWP TPCWP to to automatically automatically start following trip of running start following trip of running pump. The pump. The crewcrew responds responds per per 3-0NOP-008 3-ONOP-008 and and manually manually starts starts the 3B the 3B TPCWP.

TPCWP.

Event 33 - 3B Event - 3B slg sfg controlling controlling feedfeed flow flow transmitter transmitter FT-3-487 FT-3-487 fails fails high high causing causing 3B3B FRVFRV (FCV (FCV 488 to 488 fail closed).

to fail closed). Manual Manual operator operator action action isis required required to control 3B slg to control 3B s/g level and avoid level and avoid aa reactor reactor trip. The trip. The crewcrew responds responds per per 3-0NOP-049.1.

3-ONOP-049.1.

Event 44 - PT-3-1608 Event - PT-3-1 608 fails fails high.

high. CV-3-1608 CV-3-1608 fails fails open open and and increases increases steam steam flow flow 3-4%.

3-4%. The The crew crew responds per 0-ADM-200 responds per 0-ADM-200 for for aa secondary secondary plant plant transient.

transient. Manual Manual turbine turbine load load reduction reduction is is required to required to return return reactor reactor power to 30%. Once power is is stabilized at 30%, the CV-3-1608 CV-3-1 608 isolation valve isolation valve is is closed, closed, but some ADV steam leakage leakage still exists.

Event 55 - Main Event - Main generator generator exciter air coolers TPCW flow is partially blocked resulting in in aa high high air air temperature condition.

temperature condition. The crew responds per 3-ARP-097.CR 3-ARP-097.CR for annunciator E-9/4. The The crew crew manually trips manually trips the the reactor reactor when exciter hot gas temperature exceeds 90°C and performs performs the the actions actions of of 3-EOP-E-0.

3-EOP-E-0. Once Once the reactor is tripped, the switchyard relays out. 3B EDG EDG starts but starts but fails to automatically fails to automatically load 3B 4kv bus due to a bus stripping failure. 3A EDG fails to to start start and and can can notnot be be manually manually started.

Event Event 66 - The The crewcrew transitions to 3-EOP-ECA 3-EOP-ECA-0.0. -0.0. MOV-3-1 MOV-3-1405 405 fails to open and with BB AFWP AFWP OOS with an OOS with an oil leak oil leak requires C C AFWP to supply supply both units.

units. Manual Manual busbus stripping is is performed performed with with the the exception exception of of 3B 3B TPCWP breaker 3AB1 3AB111 which has has aa blown control power power fuse fuse andand can can not not bebe opened opened from from VPA.

VPA. 3A 3A 4kV 4kV busbus is is repowered repowered via via the the SBO SBO tietie from from unit unit 4.

4. Then Then 3AB1 3AB111 is is locally locally opened opened allowing allowing 3B 3B EDG EDG to to reenergize reenergize 3B 3B & & 3D 3D 4kV 4kV bus.

bus. Transition Transition isis made made to to 3-EOP-3-EOP-ECA-0.2 ECA-0.2 due due to to the the effects effects of of the the steam steam leak.

leak.

Event Event 6a 6a - The The crew crew stabilizes stabilizes thethe plant plant using using 3-EOP-ECA 3-EOP-ECA-0.2 -0.2 since since PZR level << 17[50]%

PZR level 17[50]% or or SI SI actuated actuated due due to to the the effects effects of of the the steam steam leak.

leak.

22

TP-2007-301 Scenario TP-2007-301 Scenario#5 #5Event EventDescription Description Scenario XXIII Scenario XXIII NRC NRC 55 SimulatorOperating Simulator OperatingInstructions Instructions Setup Setup IC-20 (4%

IC-20 (4% MOL, MOL, ReadyReadytoto syncsync generator generatortoto grid)grid) oror Ic-i 15 (7%

IC-115 (7% MOL with MOL with atmospheric atmospheric dump dump valves valves CV-3-1606 CV-3-1 606 inin auto auto @ @ 30%,

30%, CV-3-1607 CV-3-1 607 inin auto auto closed closed & & CV-3-1608 CV-3-i 608 inin manual manual @ @ 50%,

50%, ready ready to to sync sync generatorto generator to grid) grid)

Place simulator

, Place simulator inin run run Trigger lesson Trigger lesson steps:steps:

SETU P - 3B SETUP - 3B TPCWPP AUTO TPCW AUTO STARTSTART FAIL FAIL (actuatesTFK3B11S (actuates TFK3B11S =Tthen=Tthen Fwhen F when IMK3RB11)

IMK3RB11 SETUP - 3A SETUP - 3A EDG EDG START START FAIL FAIL (actuates (actuates TFQ5GAFS TFQ5GAFS = T) T)

SETUP - 3B SETUP - 3B 4KV4KV BUS BUS STRIPPING STRIPPING FAIL FAIL (actuates (actuates TFQ6XABF TFQ6XABF == T) T)

SETUP - BB AFWP SETUP - AFWP GOV GOV OIL OIL LEAK LEAK (actuates (actuates TFFXOILB TFFXOILB = T) T)

SETUP - MOV-3-1405 SETUP - MOV-3-1 405 FAILS FAILS TO TO OPEN OPEN (actuates (actuates TFFXM05 TFFXMO5 == T) T)

Ensure ADV Ensure ADV setup setup per per 3-GOP-301 3-GOP-301 Enclosure Enclosure 22 with reactor power &

reactor power & Tavg Tavg stable, stable. Start Start train A chilled train A chilled water and secure train secure train B B chilled chilled water (CR (CR HVAC HVAC panel).panel).

Acknowledge any Acknowledge any alarms and place simulatorsimulator in freeze.

Provide shift Provide shift turnover turnover checklists checklists & & copy of 3-GOP-301 3-GOP-301 completed completed thru step 5.52.2. 5.52.2. The The crew is crew is to to place place the unit on line and increase increase power to 30% for a flux map.

Select 3A Select 3A QSPDSQSPDS to page 211 (SAT) and 3B QSPDS QSPDS to page 212 (RVL). (RVL). Set ERDADS ERDADS on VPA on VPA to Tavg/T to Tavg/Tref ref (TAV) and at the RCO desk to ENVR ENVRN N (ED3).

Fill in blende Fill in blenderr & shutdo shutdownwn boron additioaddition n placard placards console s at consol blenderr station e blende station.. Data Data forfor each each IC IC maymay be be found in the ECC & & Shutdo Shutdown wn Guidel Guidelines Book ines Book in in the simulator IIF.

simulator I/F.

Event Event lila 1/1a - Place Place unitunit on line I1B on line B AFWP AFWP out out of of service service Initiate Initiated d by by crew crew based based on on shift shift turnov turnover. er.

The The crew crew perform performs s 3-GOP 3-GOP-301 -301 beginn beginning ing at at step 5.52.3 to step 5.52.3 to synchr synchronize generator onize genera tor toto grid grid, in crease power increase power andand swap swap s/gs/g level level contro controll toto main main feedfeed reg reg valves valves contro controlling lling inin automa tic. Note that a surrog automatic. Note that a surrogate operator ate operato r will will be be require required d toto mainta maintain level.

SG level.

in SG Respon Respond d ifif asked asked as as SM SM that that auto auto synchr onization isis to synchronization to bebe used used for for placing placing the the main main genera tor generatoron on line.

line. (Step (Step 5.54 5.54 isis n/a) n/a)

Respon Respond d as as System System ifif notifie notifiedd of of placing placing Unit Unit 33 on on the the grid grid and and increas increasing powerto ing power to 20%

20%

(135 (135 MWe)

MWe). . IfIfasked asked about aboutVARSVARS, , reques request t 100 100 MVAR MVARout out at at 100%

100% power.power.

Respon Respond d as as Chemi Chemistrystry when when notifie d toto sample notified samplefor for 15%

15%powerpowerchangechange (TS (TS 3.4.8) 3.4.8) 33

TP-2007-301 Scena Scenarrio io #5 Event Event Descri Description Once feed regul regulatin ating valves g valve s are placed in autom automati c, call in as a turbin atic, turbinee bldg. NSO and repor reportt that the B AFWP gover governor nor has an oil leak (oil leak entere enteredd at setup) setup)..

Respond Respo nd as NSO if direct directed ed to mechanicaanicalllyly trip B AFWP. Click on Sche Schemma~a>

FEEDWATE FEED WATE R>A R~AU UX X FIW STEA STEAM>L M~LOOA-->

A~TC F5MT TCF5M TBB - LOA AFW TURB B MECH TRIP

~*TR TRUEUE then INSERT. Repor Reportt when compl complete ete..

Respond Respo nd as NSO if directdirecteded to verify GCM filter free of oil & set H2 gas flow at 16. After mm., report compl 2-4 min., completeete..

Respond Respo nd as NSO if directdirecteded to comp complete 3-OP-072 lete 3-0P- 072 sectio sectionn 5.0 to place steam traps in service.

servic e. After 7-10 min.mm. report compl complete ete..

Respond Respo nd as NSO if directdirected perform ed to perfor m local action actions s to initiate MSR tube bundl bundle e purge purge 3-OP-072 per 3-0P- 072.1.1..

Respond Respo nd as NSO if direct directeded to check check Bently Bently-Neva-Nevad daa for turbin turbine vibratiion e vibrat on alarm alarm.. Reset Reset expected expec turbine ted turbin eccenttricity e eccen ricity alarm alarm.. Click on Sche Schemma~a>T TURBINES URBIN ES-->T

~ TURB URBO VISOR OVIS ORYY

>LOA->TC

~LOA ~ TCUFUFRS RST T - TURBINE BENTLY-NEVADA VADA ALARM RESE RESETT*TR~ TRUE UE then INSERT.

Respond Respo nd as SM if askedasked about about transf transferri erring ng main turbin turbinee load from the govergovernor nor to the load limit. Direct crew to wait until after power power reaches 30% powe powerr before before doing this.

Respond Respo nd as NSO if directdirected ed to check check PSS voltm voltmeter eter inside the voltag voltage regulator e regula tor cabinet.

cabine Reportt back that meter

t. Repor meter reads reads zero volts.

Respond Respo asked as Chemistry to verify SGs nd if asked SG5 are within 0-NC 0-NCO OP-0 P-002 02 limits. As chemistry reque request power be held at or below 30% until SG chemistry verified within st power limits.

As React Reactor Engine or Engin ering,, reque eering request st power be held at 30% until flux map compl complete ete..

Respond Respo nd as SM/FS SM/ES if askedasked to verify 3-0SP 3-OSP-08 -0899 step 7.1.2 compcomplete letedd during turbine turbine startup.

startu Reportt that this surv

p. Repor surve eilla illance requirem nce requir emen entt met satisfa satisfactorily ctorily.

Respond Respo nd as FS/NSO if aske asked d abou aboutt statu status s of hydro hydrogen gen gas dryer. Repo Reporrtt that it is in servi servicce.

e.

Respond Respo nd as FS/N FS/NS SOO if aske asked d to begin placin placingg MSR5MSRs in servi serviccee per 3-OP 3-0P--072 072.1

.1..

Powe Pow err shou shoulldd be stabi stabili lized zed at 30%, Tavg =554.5

= 554.5°F turbine load ==225 MWe.

of & turbine 4

TP-200 TP-20 7-301Scena 07-301 Scenar rioio#5#5Event EventDescriDescrip ption tion Event Even t 22 - 3A 3ATPCW TPCWPP bear bearin ingg failur failuree Oncesteam Once steam dump dumps havebeen s have beenrealigrealign ned edfor fornormnormal al at atpowepower r opera operati tionon (or (oras directed direc by lead ted by lead examiner), exa min er),trigge trigger as lessonstep r lesson step EVENEV EN TT 22 - 3A 3A TPCW TPC WP P BEAR BE ING FA ILU RE FAILURE (actuate (actu ates TVKDOO 1X==1.0 AR ING s TVKD0 01X 1.0onon22minmm ramp).

ramp).

Annunc Annun iators ciator 1-5/1 , 5/2 s 1-5/1, 5/2 && 5/4 5/4allallalarm alarmwhen when 3A 3A TPCW TPCWP P trips.

trips. The The crew crewrespo ndssper ONOP-008.

ONOP -008. The The 80P BOP will willneed needtotostart start38 respond per3- 3-3B TPCWTPCWP P manu man ally uall y since sinc e the the auto auto start star fun ctio functionn was was failed failedat atstartu startup t p..

Respon Respo ndd as as NSONSO ififdirect directeded to to locally locaNy check check 3A 3A TPCW TPCWP P.. Repor Reportt back back that that the the inboar mo tor bea ring motor bearing is smoki is smo kin inboardd ngg and and veryvery hot.hot. IfIf direct directed ed to to do do post-s pos t-sttart art check che s on 3B TPCWP cks on 3B TPCW P,, report report backback thatthat thethe pump pump isis runnin runningg normanormallly. ly.

Respon Respo ndd as as NSO NSO when when directdirected to locally locally check ed to check TPCW TPCW suppl supply y temp temp (TI (Tl-3-11432)

<11 0°F and

<110° F and stable stab le/d ecreasing. 432)

/decre asing. Click Click on on Sche Schemama~C *COOMMO MM ONN SERV ICES SER VICES*TURBINE ~ TURB INE PLANT PLAN COOLING T COOL lNG~ >TPCWTPCW HEAT HEAT EXCH EXCHANGE ANGERS. RS. ~repo r epo rtrt TPCW TPC W supply sup heade ply header r temperrature tempe ature at at top top ofof page.

page.

Respon Respo ndd asas NSO NSO when when direct directed ed to to locally locally verify verify TPCW TPCW baske baskett strainstrainer er ~p.

LIp. From From TPCW HEAT EXCH HEAT EXCHANGE ANGERS RS system system mimic TPCW mimic page,page, clickclick on on FROM FRO M ICW ICW PUM PS. ~repo rt on baskebaskett strain strainer PU MP S. *report ~p's LIps on erss downs downstr eam of POV-tream POV-4 882 & 4883.

4882 4883.

Respon Respo ndd asas NSO NSO when when direct directed check tempe ed to check temperrature ature of comp compon onent entss cooled cooled by by TPCW TPCW..

Aft er After 8-10 8-10 min.,

mm., report report all tempetemperrature aturess stable stable..

When reque When requessted ted as OCC, 0CC, afte afterr 8-1 0 min mm rack out bre 8-10 break akeerr 3AA3AA1II1 by trig triggegerring less on step EV lesson step EVENT 22 - RACK EN RACK OU ing OUT T BKBKR R 3AA 3AA1I 1I (actu(actuate atess TAK3A1 TAK3A11P = RAC RACKO KOU UT(3)).

T(3)).

If If itit is is des desireiredd to skip eve event ntss 1&1& 22 and beg begin in the sce scenanarrio here, io her e, resreset et to IC- IC-121255 Ev Even entt 33 - FT-FT 48 4877 fai ls hig fails high h Aft After er CVCV-3--3-11608 608 isolisolatateded,, trig triggegerr less lessonon stepstep EV EVEN ENTT 33 - FT- FT 3-448787 FAFAILSILS HIG HIGH (actu (actuate atess TEl TF1 M87 M87H H == T).

T).

H Thi This s cau cause sess FT-FT-3-3-448787 toto fail fail hig highh whiwhichch cau cause sess FCV FCV-3 4-488 88 to to fail fail clos closeded.. To To avo avoid id auto autom mat ic reac tor trip atic reacto r trip on on 3B38 s/g slg low low leve level,I the the opeopera ratotor r must mu st take take manu man ual al contro control ofl of FCV FCV-3 4 88 and

-488 and rest restor oree feed feed flowflow and and retu rn s/g return slg leve level l back bac k to to progra program. Them. The crewcrew resp respo ondndss per per 3-O3-0NO NOP-0 P-049 49..11andand taketakes s FT-FT 3-448787 outout ofofserv servic ice.e. 38 3B s/g s/g level leve contro l con trol l isis retu return rneedd to to auto autom mat ic usin atic using g FT-FT-3-3-448686 forfor con controtrol.l.

Res Respo ponnd d as as WCWCC C ififdire directcteded toto init iate aa PW initiate PWO O andand con contatactct l&C I&C. . AlsAlso respo o resp ondnd asasWC WCC C ifif dire direct cted ed toto gen genereratatee an EC an ECOfor O forthethe bist ableles bistab s trip trippepedd perper3-O3-0NO NOP-0 P-049 49.1 .1.

Res Respo ponnd d as as FS/ NSOO ififdire FS/NS cted direct edtoto rese reset t the theAM AMSA SACCTR TROU OUBL BLE E alaralarm m (D- (D-7/6 7/6) )atatthethe AM AMSA SACC pan el in the panel in the Cable Cab le Spr Spreaeadding ing Roo Roomm. .Aft After er 2-42-4 mmmin.,., trigge trig ger r lesson less on step EVEN step EVENTT 33 - RE RESE SETTAM AMSASACCTR OUBL TROU E (actu BLE atessTCL (actuate 4RSTT==T).

TCL4RS T). Rep Repor ort twhewhen n com compl ete.

plete.

55

TP-2007-TP-20 07-301301 ScenaScenariorio #5 #5 Event EventDescri Descripti ption on Event Even t 44 - PT-3 PT-3-1 -1608 608 failsfails high high II CV-3 CV-3-1 -1608 608 fails After FT -

fails open open After FT-3-487 487 bistabbistable less trippe tripped d && 3B 3B SG SG level level contr control ol return returne edd to to autom automat atic,ic, trig ger less trigge r lesson step on step EVEN EVENT T 44- PT-3-1

- PT 608 1608 FAlL (actuates FAILS S HIG HIGH H II CV CV- 1608 3-16 08 FAILS FAIL OPEN S OPEN (actuate TFS1MREH s TFS1M REH = T & TFSVV49D=0

= T & TFSVV49D=0.1 .1 then thenTFSW1 TFSW13 3A A == TT55 sec sec later).

later).

CV-3-16 CV 1608 08 fails falls open open and and increa increas seses steam steam flow. flow. Witho Without ut opera operato torr action action,, powe power r will will even tuall y stabi eventually stabilize at lize at 34-35 34-35%. Consiste

%. Consi stent nt with with 0-ADM 0-ADM-2 -200 00 sect.

sect. 5.4.3 5.4.3 for for a secon a second dary ary plant transie plant transient, manual nt, manu turb The al turbin load is e load is reduc reduce edd to to return return reacto reactor r powe powerr to to 30%.

30%.

IfIf crew crew isis slow slow to to take take action action,, call call as as reacto reactorr enginengineer eering ing and and ask over the the 30% ask whywhy powepowerr isis so so far far over 30% hold hold which which was was suppo suppos seded to to be be in in progre progress. ss.

Respond Respo nd as as NSO NSO ifif direct directed ed toto close close the the airair isolati isolation on valve valve and and bleedbleed airair off off the the CV CV 1608 oper 160B operaator. tor. ThisThis willwill have have no no effect.

effect. ReporReportt steamsteam contincont uess to inue to come com e out out of of the the silencer silenc with the er with the greate greates noise/vib stt noisel vibratratio ionn onon eV CV-3-1 160B.

608.

Once powe Once powerr is is stabil stabiliz izeded atat 30%,

30%, CV-3-CV-3-11608 608 can be be locall locally y isolat isolated ed.. When When directdirected ed as NSO , wai as NSO, wait 2-4 min t 2-4 mm then trigge triggerr lesson lesson step EVEN EVENT T 44-- LOCA LOC ALL LLY Y ISOLA ISOL TE ATE CV-3-CV 1608 (actuate 1608 (actuates TASBVOO3 s TASBV 003 = 0.0 on 11 min mm ramp). When compl ramp). When complete ete,, report repo rt that with the valve valv e closed closed,,

although althou much less than before gh much before,, some some steam steam flow is still visible Respond visib le out the silenc silen er.

cer.

Respo called as the wee nd if called WCC to get Mech Mechani cal assist anical assistan ance ce in isolati isolatingng 3e3C SG ADV. ADV.

Event 5 Even Exciter t 5 - Exciter air cool cooler TPCW block er TPCW blocka age ge I Reac Afte Reactor tor trip Afterr FT FT-3-487 487 failurfailuree crew brief, brief, trig trigge gerr lesson lesson step EVEN EVENT T 5 - EXCIT

- EXCITER ER AIR COOLER TPC COOL ER TPCW W BLOC BLOCKA KAGE GE (actuate (actuatess TVUJI TVUJIN NFF = 0.98, TVUJI TVUJIN FB == 0.98, TVUJI NFB TVUJINNFCFC = 0.98 &

TVUJI NFD = 0.98 0.98 &

TVUJIN FD = 0.98 allall on on 11 mm min ramp ramp).).

This will cau cause se excit excite err air temp tempe eratu rature re to incre increaase. se. The crew resp respo ondndss per 3-AR3-ARP P--

097.

097.CR CR for ann annun uncciator iator E-9/E-9/4. 4. Whe When n excit excite err hot gas tem tempe per rature atur e reach reac es hes CC, 90"C, 90 the crew man manu ually ally trips the reac reacto torr and 3-EO3-EOP P-E-

-E-0 0 imm immeediat diate e actio action nss perfo perforrmed med..

Eve Even nts ts 66 - Los

- Loss s of all AC AC pow powe err Afte After r the the imm imme edia diatete acti action onss of of 3-EO 3-EOP P-E-

-E-0 0 are are comcomp plet lete, e, trig trigge lesson gerr lesso steps n step s EVE NT EVEN T 6- 6 - 3AB3AB1II1 STU STUC CK K CLO CLOS SEDED (actu atesT (actuate s TFK3B1 FK3BllS = T), then 1S =T), then EVE EVEN NTT 6 6- - LOSS LOS S OFOF SWI SWIT TCH CHYA YAR RD D (actu atess TFP8S (actuate TFP8SW WYDYD == T, T, K3OP1 K30P111 BG BG == F, F, K3OP1 K30P111 BR BR == F, F, TCE2E TCE2E on = TT && TCE2E OIT TCE2EO7T This 07T = T).

T).

This cau cause sess aa loss loss of ofAC AC pow powe err from from the the start startuupp trans transfform ormer er.. 3B38 EDGEDG star starts but falls ts but fails to to auto autom mati callyy load aticall load 3B 38 4kv 4kv busbus duedue to to aa busbus strip stripp ping ing failu failure re.. 3A 3A EDG EDG failsfails to to start star t and and can can not not bebe manmanu ually ally start starte ed.d. The The crew crew trans transiition tions s toto 3-EO 3-EOP -ECA-P-EC A-0.0.0.

0.

MOV MOV--3-14 3-140 055 failu failurere to to open (en open (enter tereedd atat setup setup) ) with with B8 AFW AFWP OOS (from P OOS (from eveevent 1) nt 1) req requir uirees s CC AFWAFWP P toto supp suppl lyy both both units units..

Man Manu ual al bus bus stripstripp ping ing is is perfo perfor rmed med withwith the the exce excep ption tion of of3B 38 TPC TPCW WPP bre break akeer 3A811 r 3AB 11 whic h has which has aa blow blown n bre break akeer r trip trip circu circuitit cont contro rollpowpowe err fuse fuse and and can can notnot bebe opene opened fromd from VPA VPA.. Prio Prior r toto closu closur ree ofofthethe SBO S80 tie tie from from unitunit 4,4, 3AB3A8I11 I isis local locally opene ly ope neddallow allowiing ng 3B 38 66

TP-200 TP-20 7-301Scena 07-301 Scenar rioio#5

  1. 5Event EventDescri Descrip ption tion EDGtotoreene EDG reenerg rgizeize38 3B&&3D 3D4kV 4kVbus. bus. Trans Transit ionisismade ition madetoto3-EOP 3-EOP-ECA- O. .10r ECA -O. 2 dep end ECA-O.2 depending on plant ing on plantcondit conditi

-ECA-O br3-EOP3-EOP--

onsatatthat ions thattime.

time.

Respon Respo nddas asNSO NSOififdirectdirecteded totolocally locallytrip trip3B13B1 &&3B2 3B2CWP CWPbreak breake ersrs3AB1 6 &&3AB18 .

Trig ger Trigger lesson less onstepstep EVEN EVENTT66- TRIP 3AB16 3AB18.

- TRIP3A81 3AB16 6 ANDAND 3A813AB 8 18 (actuate s (actuatesTCK4C C = FFthen

==FF 11min mm later). Report later). Repor whencompl complet TCK4CC thenTCKTCK4DC 4DC t when ete.e.

IfIfcalled called as as NSONSOtoto investinvesti gate break igate breake err3AB11 3AB1 1, reportthat

, report thatthe blu e & whi te ligh the break breake errisis closed closed, , the the blue & white lights are ts are on on while while the the redred && green green lights ligh circ uit fuse ts are are off off (indica (ind icattive ive of of aa blown blo wn trip trip circuit fuse - refere- referen nce ce PTN PTN EWD EWD 5613- 5613-E E-27-27 sheet sheet 1IB) B)..

Respon Respo ndd asas NSO NSO ifif askedasked to to locally locally reset reset 3A 3A EDGEDG start start failure failure relay relay by by press ingg alarm rese t pus hbu tton reset pushbutton. Repor t back . Rep ort back that pressin alarm that thethe 3A 3A EDGEDG turboc turb ochharge arg err suffer suff ed ered catast rophic fail ure wit h failure with consid conside rable dama damage cata stro phi c erable ge to to EDG EDG exhau exhaus stt piping piping..

Respon Respo ndd as as NSO NSQ ifif asked asked to to check check whichwhich unit unit CCW CCW isis supply supplying ing U4 U4 HHSIP HHSIPs. s. Repor that that U4 U4 CCWCOW isis supplysupplying U4 U4 HHSIP HHSIPs. Reportt s.

Respon Respo ndd asas NSO NSO ifif askedasked to to locally locally openopen MOV- MOV-3 3-843

-843A A or or B.

B. After After 2-4 min., mm., trigge eith er less on either lesson step EVEN step EVENT 66 - LOCA LOCALLY OPEN triggerr OPEN MOV- MO V-8843A 43A (actuate EVENT EVEN T 66 - LOCA LOCALLY OPEN MOV-(actu s TFMVV ates TFMVVO1O == T) 010 T) or or LLY OPEN MOV-8 43B (actuate 8438 (actuatess TFMVV TFMVVO 2O == T). Repor 020 Reportt when when compl complet ete.e.

Respon Respo ndd as as NSONSO ifif asked asked to locallylocally isolate isolate RCP RCP seals seals by closin closing g 3-297 3-297AAlBIC 381 & MO V-3 381 & MOV- 3-626 . Trigg-62 6. Trig ger lesson step EVEN 1B/C,, MOV-MOV-33--

er lesson EV EN T 6 6- - LOCA LO CA LLY ISOLA ISO TE RCP (actu (actuateatess TAHN9 TAHN97A = 0.0, TAHN97B =

7A =0.0, TAHN978 =0.0 after 1 LA RCP SEAL SEALS S mm 1 min mm delay, delay, TAH TAHN9N97 C ==0.0 after 2 mm 7C min delay delay,, TFB TF8VCVC660 O =TT after after 33 min delay delay & & TFK TFKV62V626C6C = T after 4 mmn T after min delay delay).). Rep Repor ortt whe when n com

=

compl plet ete.

e.

Res Respo ponnd d as as NS NSO O if dire direct cted ed to ope n AF open AFSS SS--3-007 3-007 to rest restororee trai train n 22 stea steam flow to m flow to C C AF WP .

AFWP . After Aft er 1-3 1-3 mm min., ., trig gerr less trigge on lesson step step EV EVENENTT 6- 6 - OP OPEN EN AFSS 007 AFSS-3-007 (actu (actuate

= 1.0 atess TAF TAFF07 1.0 on on 30 30 sec sec ramp ramp).). Rep Repor ortt whe when n com compl plete.

ete.

FO7 Res Respo ponnd d as as NS NSO O ifif dire directcted ed to to dee nerrgize gize and deene and closclosee MOMOV- V-33-140

-1405. 5. Aft After 1-3 mm er 1-3 min.,

trig ger less on trigger lesson step EV step EVEN ENTT 66 - DE .,

- DEEN E NE RG ERGI IZE ZE MO MOV-V-11405405 (actu (actuate atess TCF TCF5M A27 5MA27 F). = F).

Res Respo ponnd d asas NS NSO O ifif ask askeded aboabout ut stat us of status of stea steam m from from the the 3C3C SG SG AD AOV V CV CV 11608.

Rep ort that Repor t that stea m isis still 608.

steam still com ing comin g out out of of the the sile nceer silenc r on on the the uni unit 3 main t 3 main stea steam platfor m plat form m..

Res pon d Respo nd as U4 as U4 RORO whe when n stat us of status of U4 U4 4kV4kV bus buseses isis req requeuessted.

ted. Rep Reporortt that that 4A4A && 4B 4B 4kV 4kV bus buses es are bot h on are both on their thei r resp respe ecti ve ED ctive EDGsG5 and and 4D 40 4kV4kV busbus isis aligaligne nedd toto 4B 4B 4kV4kV bus bus. .

Res Respo ponnd d as as U4U4 RO ROwhe when n req requeuessted ted toto plac place e 4B4B4kV4kVbus bus non non-ru

-runnning ning ESF ESF loadloads s mnin PP-T-L or OF F. Trig T-L or OFF. Triggerless ger on step lesson step EV EVEN ENTT66 -4B - 484KV 4KVESF ESF LO LOAD AD SS PTL PTL (actuate s TCE2E (actuates TCE2E24 24T

=T,T,TCE 2E2O20T TCE2E T =TT&&TCE TCE2E2E27 T). IfIf4B T ==T).

27T 4B HH SIP isisnot HHSIP notrun T

runnin nin g, g, trigge trig ger r lesson less on step EVEN T

-4B 48 HH HHSIPSIP PTL PTL(actu atessTFM (actuate 2D448SBS ==TT&&V80 step EV EN T 66 TFM2D H30 ==T).

V80H30 T).Aft After er 1-3 1-3mm min.,., repreport ort com compl ete.

plete.

77

TP-20 TP- 20007-7-3301 01 Sce Scenar narioio #5

  1. 5 EveEvent nt DesDescrip cription tion Respo Re spond nd as as U4 U4 RORO wh whenen req reques uested ted toto clo close se 4AD 4AD0 7. Tri
07. Trigg gge CLOS CL OSEE 4A 4AD0 D077 (act (actuate uatess TCE err les lesson son ste stepp EVEVEN ENTT 6- 6 TCE2E 2E333C =T).

3C = T). -

Respo Re spond nd asas U4U4 RORO wh whenen ask askeded abo aboutut 4B 4B ED EDG G loa loadin ding.

g. Clic Click POWE PO WER R && SYSYNC~E k onon ScSchheemma a~S *STANDBY BY

->EMEMERG RGENENCYCY DIEDIES SE EL L LO rep ort report MW MW rea LO GI GIC C &

& PRO PR OT T ~E>EDDG G 4A 4A && 4B 4B

  • readin dingg und underer bre breake akerr 4AB 4AB2 1.
  • and and 21.

After Aft 3A 4kV er 3A 4kV bus bus ene energiz rgized from the ed from the SBSBO x-ti x-tie, betwe e, bet weenen ste 0.0 cal 0.0 calll as as NSNSO andand tell tell cre steps 32 32 & 35 35 of of 3-E 3-EOP -ECA-crew thathat 3AB 3ABI 11 I is is bei bei ng ng ope ope EV EN T EVEN 66 - LO LOCALLY OP ned loc loc ally . Tri Trigg ggeerr lesson step les OPEN 3A 3AB1BI1I (act (actuate uates TFKTFK 3B11S 3B1 1S == FF follo followe wedd by byTTCK cK33B1 Bllc 1C = = F F 55 sec sec late later).

Respo Re spond as as U4 U4 RC RCO ifif dire direct cteed to per d to perform form ste steps 35b-e of 3-EOP-ECA- A-00.0

.0..

Respo nd as NS Re NSO wh when en dire direct cteedd to start SF SEP coolin ling g wa water pump. Tell RO just before starting, then trig trigg er ger leslesson step EV EVEN T 6 - START SFPCWP (actuate (act uates TCC TCC4C4CL 15 =

L15 = T).

Even Ev ent 6a - Lo - Lossss of all AC power recovery Th Thiis s event entered wh when en 3-EOP-ECA- A-00.0.0 completed. Transition tion is made to 3-EOP-EC 0.2 since SI is require uired (based on PZR level <17 d (ba -ECA A 3-1608. <1 7%%) ) due to the leak on 3C SG AD V CV-Respond as NSO if dire directcteedd to check if MOV-3-1 report that the se valves are clo -14426 26 & 1427 are clo closed. Af Aftter er 1-3 min closed. Note that it is not requir mm.,

sin ce MOV-3 V-3-3-3881 uireed d to clo clo se MO MO V-3 V- -63386 3-6 86 closed in the same lin 1 is clo linee..

Respond as NSO when dire direct edd to place PAHMS in ser cte minut min utees, s, tri triggg servic vice on unit 3. Af Aftter er 8-12 gerer lesson step EVENT 6 - PLAC TA TACC2V 2V002A

- E U3 PA HM S IN SE SE RVICE (actuates RV 2A == 1.0, TAC2VO 2V0 2B == 1.0, 1.0, TAAAV21 == 1.0, 1.0, TAAAV22 == 1.0 1.0 && TAC TACAOOA0055 == 0.0). Reportt when complete.

88

J NR NRC-5 C-5 OP OPE ER RAT ATI IOONS NS SH SHIFT IFT TU TURN RNOV OVER ER RE PO REP ORT RT ONCO ON COMIMIN NG G CR CREW EW AS ASSIG Shift Shi ft MgMgr:r: SIGN NM MEN ENTS TS Fie ld Field Sup Supv.

v.:: Insi Insidede SNP SNPO O::

Admi Adm n RC in RCOO: Out Outsidsidee SNP SNPO O::

ANANPO: PO:

Uni Un itt 33 Unitt Sup Uni Supv.

v.:: Un Uniitt 44 RC RCO O:: Uni Unitt Sup v.::

Supv.

NP NPO: O: RCO RCO::

NPO NPO::

Plan Pla ntt Sta Stattusus Uniitt 33 Un Mode:

Mod e: Un Uniitt 44 Po we 22 Pow r:

er: Mo Mode: de:

MW 44 1 MW e: e: 549 Pow Powe er:

r:

Gross 549 .5 100 100 Gro Leakr ss Lea kratatee:: 0.03 MW MWe:

RC 759 S Bo ron RCS Bor on Connc: Co e: 124 Gro Gross ss Lea Leakr krat e::

ate 124 4 0.04 RCS RCS Bor Boron on ConConc:e: 600 Op)f:a

Ope era tio ti() na.l na.(Jo l Coll.cnc

~ii:ern l1S:s:

',') ,'1l;:::{:t;,\:\ ;',\}i"J

  • ~,\;~{i~,~t

-'TTr ain rai nA A isis pro protect tecteded Turbi Tur bin nee roll rollining g at 1800 RPM ready aut omatic to sync generator to grid grid.. Increase load, place the feed autom atic and and hol holdd power at 30% for a flu feed regulatin ting x flux ma mapp.. g valves in Pla ce uni t Place unit on lin on linee and increase power per 3-GOP-301 beginning with ste step p 5.52.3 U3 An U3 An tici ticipa patted ed LCLCO Ac Acttio ion nss:: I, Cu rre Current:nt: No None ne An Antici ticipat pated:ed: No None ne Tra Trainin AA is is pro protectectteded.. OLRM RM is is green en (CD (CDFF = 11.4 .422E-E-66;; LE LERRFF == 9.2 9.28E 8E--8) 8).. U4 U4 AnAntic ticiipa patteded LC LCO O AcActtioion ns: s: Cu rre Current: nt: No None ne An Antici ticipat pated:ed: No None ne Tra Trainin AA isis pro protectectted ed.. OL OLRM RM isis gre green en (CD (CDFF == 1.4 1.42E 2E--6; 6; LELER RFF == 9.2 9.28E 8E-

                                                                                                                               -8)8)..

Re Ressuults lts of ofOfOff fgogoi mg Foocu cuss Ar ngF Are eaa:  : See See g:\ g:\OOpps\C s\Com mo ommon\0 n\0900 900

UnUniitt 33 St Sta atu tuss Rea Re acct tororOp Ope era ratortor Mode: Mod e: Po 22 RCS Lea RCS Leakr Powwe er:r: 44 kraatete Acc Accum umula MWe:e: Gross Gro ss:: ulator torRef RefLev Level elss MW 0.03gpm 0.03 gpm Ta 00 Unden Uni identi fiedd tifie AA 661 66155 Tavvg: g: 549.5.5 549 Charg 002gp 0.0 2 gpm m BB RCS Pre Cha rginingg PpsPps: : 664 66400 RCS Press ssuure re:: 22355 0.01 0.01 gpm gpm CC RC 223 662 66255 S RCS Boron ConBo ron Conc: 124 e: 12444 i:;;}\Ah

            ,fi'finnrm          1 Ann lal **;",,'l **~~~

un .n\f[ citn;,,:: rc;(**I:.;t.\I;~j)}~;~

                                                                               ?i*;..i~;.?lU':'v:;:~;::***C(\Y'*{\:i*i;*l01'~~i?ii~i::/\*<1~:

Annun uncicia tor:: ;I;;\~:;.;:t~*~'~)r1;:i~\i:~~fl~(~*~,':::~%1]:l)*~:1~;~'?;~i':' Ann ator None Non abnorm e abn ormalal i;.'fiifr1l'i.iR,;;;,,*.liV. Comp Com Ac p Actions:tio ns: An nun Annunciator: cia tor  : Comp Com p ActiActio ns: ons: An nun Annunciator: cia tor  : Comp Com Actio p Acti ns: ons: An nun Annunciator cia tor:: Comp Com p ActiActio ns: ons: Annun Ann unci cia tor:: ator Comp Com Actio p Acti ns: ons: An Annnun unci cia tor ator:  : Comp Com Actio p Acti ns: ons: Annun Ann unci cia tor:: ator Co mp Comp Actitio Ac ns: ~ ons: An nun Annunciato cia torr:: Comp Com Ac tio p Actions: ns: Annun Ann unci ciaator tor:: Co mp Comp Actiion Act s: ons: An Ann nun unci ciaator tor:: Co mp Comp Actiion Act s: ons: Cu Curre rrent nt Te Tec chh Sp ecc Ac Spe Acttio ionn St Staate meent tem ntss:: (D (Do oes es Nott Inc Includ T.S .A. S / T.S.A.S ! Component:Co mp one nt: ludee F "Fo orr Tr Tra acckikinm! g On Only ly Ite Item No Nonene mss" Re Rea aso n: son: En Entr tryy Dat Date e:: T.S .A. T.S.A.S ! CoS / mppon oneent: nt: Com Rea Reason:son  : En Entr tryy Dat Date e:: T.S .A. S T.S.A.S ! Co / mppon oneent: nt: Com Re Rea aso n: son: En Entrtryy Dat Date e:: T.S T.S.A. S

        .A.S ! Co
                /    Com mppon oneent:

nt: Re Reaaso n: son: En tryyDat Entr Date e:: TS T.S..A. S A.S !Co/ Com mppon oneent: nt: Rea Reason son: : En tryyDat Entr Date e: : T.S T.S..A. S A.S !Co/ Com mppon oneent: nt: Re aso Rea n: son: En tryyDat Entr Date e: :

Chang Cha ngees to Ris s to Riskk Sig Signifi nifcan Uniitt 33 St Un Statuatus s

 /~

icant Equip t Equ ipm me nt: ent : Unit 3 Riskk isis GR Uni t 3 Ris GREENEEN.. Upcom Upc ominging Rea React iviity ctiv ty Man Managageem meent Activ nt Act itie iviti s: es: Syncc gen Syn genera erator tor toto grid grid.. Incr Increa easse load,, plac e load placee the the feed feed regu regulat ing latin valves g valv es inin auto automat matic ic and and hold hol d pow power er at at 30% 30% for for aa flux flux map map.. Upcom Upc ominging Maj Major POD Act or POD Activ itie iviti es:s: Syncc gen Syn generaerator tor toto grid grid.. Incr Increa easse load, plac e load placee the the feed feed regu regulat ing latin valves g valv es in auto in automat ic and and hold hold pow power er at at 30% 30% for aa flux map map.. Upcom Upc ominging ECO ECOs s to HanHang and lor for Rel Releaeasse: e: ,- Nonee Non Evolu Evo tio luti ns or Com ons Comp enssatatoory pen ry AcActtioionnss in Progress: Tur bine rolli Tur bine rolling ng at 18000 RPM rea readdy y to sync genera erator tor to grid. Pla beg beginn inniing ng wit withh ste step p 5.52.3. Inc Plac cee uni unitt on line line and inc incrrea eassee power per 3-GOP Incrrea eassee load, place the feed reg OP--30 301 1 map map.. ulat regu ingg valves in latin in auto automat matic ic and and hol hold d power atat 30% 30% for for aa flux Ge Genner all Inf era Infoorm rma atio tionn,, Re maark Rem rkss,, and and Op Ope era torr Wo rato Work rk Ar Arooun See evo See evoluti ons d Sta und Statustus:: lutio ns && com compensat ory sato ry actions ons abo abo ve. Tra in A is pro ve. Tra in A is prottect ecte ed. d.}}