ML121290633: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/29/2012
| issue date = 05/29/2012
| title = Letter, Withdrawal of Requested Licensing Action License Amendment Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program
| title = Letter, Withdrawal of Requested Licensing Action License Amendment Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program
| author name = Kim J S
| author name = Kim J
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| addressee affiliation = Dominion Nuclear Connecticut, Inc
| docket = 05000423
| docket = 05000423
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 MILLSTONE POWER STATION, UNIT 3 -WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE-425, REVISION 3 (TAC NO. ME6695)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
 
==SUBJECT:==
MILLSTONE POWER STATION, UNIT 3 - WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE-425, REVISION 3 (TAC NO. ME6695)


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
By letter dated July 5,2011, as supplemented by letter dated September 12, 2011, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) applied for an amendment to the Millstone Power Station, Unit 3 (MPS3), Facility Operating License No. NPF-49. The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control -Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425.
Subsequently, by letter dated May 8,2012, DNC requested to withdraw the amendment request. The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely, James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
Notice of cc w/encl: Distribution via 


UNITED STATES NUCLEAR REGULATORY DOMINION NUCLEAR CONNECTICUT. DOCKET NO. MILLSTONE POWER STATION. UNIT NOTICE OF WITHDRAWAL OF APPLICATION AMENDMENT TO FACILITY OPERATING The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Dominion Nuclear Connecticut, Inc. (DNC or the licensee) to withdraw its July 5, 2011, application for proposed amendment to Facility Operating License No. NPF-49 for the Millstone Power Station, Unit 3 (MPS3), located in town of Waterford, CT. The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425.
By letter dated July 5,2011, as supplemented by letter dated September 12, 2011, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) applied for an amendment to the Millstone Power Station, Unit 3 (MPS3), Facility Operating License No. NPF-49. The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control - Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 15, 2011 (76 FR 70771). However, by letter dated May 8, 2012, the licensee withdrew the proposed change. For further details with respect to this action, see the application for amendment dated July 5, 2011, as supplemented by letter dated September 12, 2011, and the licensee's letter dated May 8,2012, which withdrew the application for license amendment.
Subsequently, by letter dated May 8,2012, DNC requested to withdraw the amendment request.
Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at 
The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
-2 One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Sincerely, James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
Publicly available documents created or received at the NRC are accessible electronically through the Agencywide Documents Access and Management System (ADAMS) in the NRC Library at http://www.nrc.gov/reading-rm/adams.html.
 
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.
==Enclosure:==
Dated at Rockville, Maryland, this 29 th day of May 2012. FOR THE NUCLEAR REGULATORY COMMISSION James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE DORULPL 1-1/PM DORULPL 1-1/LA DRAlAPL NAME JKim KGoldstein DHarrison RElliott DATE 5/21/12 5/21112 5/21/12 5/23/12 DORULPL 1-lIBC GWilson 5/29/12 May 29,2012 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 MILLSTONE POWER STATION, UNIT 3 -WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE-425, REVISION 3 (TAC NO. ME6695)
 
Notice of Withdrawal cc w/encl: Distribution via Listserv


==Dear Mr. Heacock:==
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION DOMINION NUCLEAR CONNECTICUT. INC.
By letter dated July 5, 2011, as supplemented by letter dated September 12, 2011, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) applied for an amendment to the Millstone Power Station, Unit 3 (MPS3), Facility Operating License No. NPF-49. The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control-Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425.
DOCKET NO. 50-423 MILLSTONE POWER STATION. UNIT 3 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Dominion Nuclear Connecticut, Inc. (DNC or the licensee) to withdraw its July 5, 2011, application for proposed amendment to Facility Operating License No. NPF-49 for the Millstone Power Station, Unit 3 (MPS3), located in town of Waterford, CT.
Subsequently, by letter dated May 8,2012, DNC requested to withdraw the amendment request. The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 15, 2011 (76 FR 70771). However, by letter dated May 8, 2012, the licensee withdrew the proposed change.
Sincerely, IRA! James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
For further details with respect to this action, see the application for amendment dated July 5, 2011, as supplemented by letter dated September 12, 2011, and the licensee's letter dated May 8,2012, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at


==Enclosure:==
                                                -2 One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available documents created or received at the NRC are accessible electronically through the Agencywide Documents Access and Management System (ADAMS) in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 29th day of May 2012.
FOR THE NUCLEAR REGULATORY COMMISSION James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION:
PKG ML121360312                              FRN ML121360326 OFFICE DORULPL 1-1/PM DORULPL1-1/LA DRAlAPL                              DORULPL 1-lIBC NAME      JKim              KGoldstein      DHarrison      RElliott    GWilson DATE      5/21/12          5/21112        5/21/12        5/23/12      5/29/12}}
PUBLIC Branch Reading File RidsAcrsAcnw_MailCTR Resource RidsNrrDraApla Resource RidsNrrDorl Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-1 Resource RidsNrrLAABaxter Resource RidsNrrPMMilistone Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDssStsb Resource ADAMS Accession Nos.: PKG ML 121360312 FRN ML 121360326 OFFICIAL RECORD COPY}}

Latest revision as of 03:53, 12 November 2019

Letter, Withdrawal of Requested Licensing Action License Amendment Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program
ML121290633
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/29/2012
From: James Kim
Plant Licensing Branch 1
To: Heacock D
Dominion Nuclear Connecticut
kim J, NRR/ADRO/DORL, 415-4125
References
TAC ME6695
Download: ML121290633 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT 3 - WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE-425, REVISION 3 (TAC NO. ME6695)

Dear Mr. Heacock:

By letter dated July 5,2011, as supplemented by letter dated September 12, 2011, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) applied for an amendment to the Millstone Power Station, Unit 3 (MPS3), Facility Operating License No. NPF-49. The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control - Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425.

Subsequently, by letter dated May 8,2012, DNC requested to withdraw the amendment request.

The Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION DOMINION NUCLEAR CONNECTICUT. INC.

DOCKET NO. 50-423 MILLSTONE POWER STATION. UNIT 3 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Dominion Nuclear Connecticut, Inc. (DNC or the licensee) to withdraw its July 5, 2011, application for proposed amendment to Facility Operating License No. NPF-49 for the Millstone Power Station, Unit 3 (MPS3), located in town of Waterford, CT.

The proposed amendment would relocate certain Technical Specification (TS) surveillance frequencies to a licensee-controlled program by adopting Technical Specification Task Force (TSTF)-425, Revision 3, "Relocate Surveillance Frequencies of Licensee Control Risk-Informed Technical Specification Task Force Initiative 5b." The proposed change would also add a new program, the Surveillance Frequency Control Program, to the TSs, in accordance with TSTF-425. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on November 15, 2011 (76 FR 70771). However, by letter dated May 8, 2012, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated July 5, 2011, as supplemented by letter dated September 12, 2011, and the licensee's letter dated May 8,2012, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at

-2 One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available documents created or received at the NRC are accessible electronically through the Agencywide Documents Access and Management System (ADAMS) in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.

Dated at Rockville, Maryland, this 29th day of May 2012.

FOR THE NUCLEAR REGULATORY COMMISSION James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

PKG ML121360312 FRN ML121360326 OFFICE DORULPL 1-1/PM DORULPL1-1/LA DRAlAPL DORULPL 1-lIBC NAME JKim KGoldstein DHarrison RElliott GWilson DATE 5/21/12 5/21112 5/21/12 5/23/12 5/29/12