| number = ML102950324
| number = ML102950324
| issue date = 10/21/2010
| issue date = 10/21/2010
| title = Diablo Canyon - Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005
| title = Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Conway J T
| addressee name = Conway J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 13: Line 13:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000275/2010005]]
See also: [[see also::IR 05000275/2010005]]


=Text=
=Text=
{{#Wiki_filter:October 21, 2010  
{{#Wiki_filter:UNITED STATES
  John T. Conway Senior Vice President-Energy &  
                            NU C LE AR RE G UL AT O RY C O M M I S S I O N
Supply and Chief Nuclear Officer  
                                              R E GI ON I V
Pacific Gas and Electric Company  
                                  612 EAST LAMAR BLVD , SU I TE 400
Diablo Canyon Power Plant  
                                    AR LI N GTON , TEXAS 76011-4125
77 Beale Street, Mail Code B32  
                                      October 21, 2010
San Francisco, CA 94105  
John T. Conway
Senior Vice President-Energy &
Supply and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
77 Beale Street, Mail Code B32
San Francisco, CA 94105
SUBJECT: DIABLO CANYON- NOTIFICATION OF NRC TRIENNIAL HEAT
            EXCHANGER INSPECTION 05000275/2010005;O5000323/2010005
Dear Mr. Conway:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission
(NRC) Region IV staff will conduct a triennial heat sink inspection at your facility. The
inspection will be comprised of one reactor inspector from the NRC Region IV office.
The inspection will be conducted in accordance with Inspection Procedure 71111.07T,
"Heat Sink Performance."
The schedule for the inspection is as follows:
      Onsite inspection: December 6, 2010 - December 10, 2010
Experience has shown that this inspection is resource intensive for your staff. In order
to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents needed for this inspection. Please note that
the documents are requested to be provided by November 15, 2010. We request that
during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger
program are available. Of specific interest are those documents that establish that your
heat exchanger program satisfies NRC regulatory requirements and conforms to
applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related
heat exchangers should be available to support the inspector at the site during the
inspection.
We have discussed the schedule for this inspection activity with your staff and
understand that our regulatory contact for this inspection will be Michael McCoy of your
licensing organization. If there are any questions about this inspection or the material
requested, please contact the inspector, Paula Goldberg, at 817-860-8168 or by


Pacific Gas and Electric Company          -2-
SUBJECT: DIABLO CANYON- NOTIFICATION OF NRC TRIENNIAL HEAT EXCHANGER INSPECTION 05000275/2010005;O5000323/2010005
email, paula.goldberg@nrc.gov. In accordance with 10 CFR 2.390 of the NRCs Rules
of Practice, a copy of this letter and its enclosure will be available electronically for
Dear Mr. Conway:
public inspection in the NRC Public Document Room or from the Publicly Available
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission
Records (PARS) component of NRC's document system (ADAMS). ADAMS is
(NRC) Region IV staff will conduct a triennial heat sink inspection at your facility. The inspection will be comprised of one reactor inspector from the NRC Region IV office.
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
The inspection will be conducted in accordance with Inspection Procedure 71111.07T, "Heat Sink Performance."
Public Electronic Reading Room).
   
                                            Sincerely,
The schedule for the inspection is as follows:  
                                            /RA/
                                            Thomas R. Farnholtz, Chief
                                            Engineering Branch 1
                                            Division of Reactor Safety
Docket: 50-275; 50-323
License: DPR-80; DPR-82
Enclosure: Heat Exchanger/Heat Sink
  Inspection Documentation Request
cc w/enclosure:
Sierra Club Santa Lucia Chapter
ATTN: Andrew Christie
P.O. Box 15755
San Luis Obispo, CA 93406
Jane Swanson
San Luis Obispo
  Mothers for Peace
P.O. Box 3608
San Luis Obispo, CA 93403
James Grant, County Administrative Officer
San Luis Obispo County Board of
  Supervisors
1055 Monterey Street, Suite D430
San Luis Obispo, CA 93408
Truman Burns\Robert Kinosian
California Public Utilities Commission
505 Van Ness Ave., Rm. 4102
San Francisco, CA 94102


Onsite inspection: December 6, 2010 - December 10, 2010
Pacific Gas and Electric Company        -3-
Experience has shown that this inspection is resource intensive for your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection,  
Jennifer Post, Esq.
we have enclosed a request for documents needed for this inspection.  Please note that
Pacific Gas & Electric Co.
the documents are requested to be provided by November 15, 2010.  We request that
77 Beale Street, Room 2496
during the onsite inspection week, you ensure that copies of analyses, evaluations, or
Mail Code B30A
documentation regarding the implementation and maintenance of your heat exchanger
San Francisco, CA 94120
program are available. Of specific interest are those documents that establish that your
Gary Butner
heat exchanger program satisfies NRC regulatory requirements and conforms to
Chief, Radiologic Health Branch
applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be available to support the inspector at the site during the
California Department of Public Health 3
inspection.
P.O. Box 997414 (MS 7610)
We have discussed the schedule for this inspection activity with your staff and
Sacramento, CA 95899-7414
understand that our regulatory contact for this inspection will be Michael McCoy of your
The City Editor of The Tribune
licensing organization. If there are any questions about this inspection or the material
3825 South Higuera Street
requested, please contact the inspector, Paula Goldberg, at 817-860-8168 or by UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
P.O. Box 112
Pacific Gas and Electric Company - 2 -
San Luis Obispo, CA 93406-0112
  email, paula.goldberg@nrc.gov.  In accordance with 10 CFR 2.390 of the NRC's "Rules
James D. Boyd, Commissioner
of Practice," a copy of this letter and its enclosure will be available electronically for
California Energy Commission
public inspection in the NRC Public Document Room or from the Publicly Available
1516 Ninth Street (MS 31)
Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Sacramento, CA 95814
Public Electronic Reading Room).
James R. Becker, Site Vice President
Pacific Gas and Electric Company
Sincerely,  
Diablo Canyon Nuclear Plant
P.O. Box 56, Mail Station 104/6/601
/RA/
Avila Beach, CA 93424
Jennifer Tang
Field Representative
Thomas R. Farnholtz, Chief  
United States Senator Barbara Boxer
Engineering Branch 1
1700 Montgomery Street, Suite 240
Division of Reactor Safety
San Francisco, CA 94111
Chief, Technological Hazards Branch
Docket:  50-275; 50-323
FEMA Region IX
License: DPR-80; DPR-82
1111 Broadway, Suite 1200
Oakland, CA 94607-4052


   
Pacific Gas and Electric Company          -4-
Enclosure: Heat Exchanger/Heat Sink
Electronic distribution by RIV:
     Inspection Documentation Request
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov)
DC Administrative Assistant (Agnes.Chan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Acting Regional Counsel (David.Roth@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)
File located:_R:/Reactors/2010/DC2010005 RFI-PAG                                      ML
  SUNSI Rev Compl. X Yes No ADAMS                  X Yes No      Reviewer Initials
Publicly Avail          X Yes No Sensitive          Yes X No    Sens. Type Initials
RIV: DRS/EB1/RI          C: EB1
PGoldberg TRF for        TFarnholtz
/RA/ by email            /RA/
10/21/2010              10/21/2010
OFFICIAL RECORD COPY                                  T=Telephone      E=E-mail     F=Fax


      Heat Exchanger/Heat Sink Inspection Documentation Request
cc w/enclosure: Sierra Club Santa Lucia Chapter ATTN:  Andrew Christie  P.O. Box 15755
The following heat exchangers/heat sinks have been selected for inspection:
San Luis Obispo, CA  93406
    *   Component cooling water heat exchangers
Jane Swanson San Luis Obispo  Mothers for Peace
    *   Containment fan coolers
P.O. Box 3608 San Luis Obispo, CA 93403
    *   Ultimate heat sink
James Grant, County Administrative Officer San Luis Obispo County Board of
Please provide the following documentation prior to the onsite inspection week,
  Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA  93408
preferably no later than November 22, 2010 .
Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102
Test Documents
San Francisco, CA  94102 
Copies of the last two heat exchanger tests for the selected heat exchangers (original
Pacific Gas and Electric Company - 3 -
test data in work orders or filled in test procedures) and copies of condition reports
  Jennifer Post, Esq. Pacific Gas & Electric Co. 77 Beale Street, Room 2496 Mail Code B30A
associated with the heat exchanger testing
San Francisco, CA  94120
List of condition reports, with descriptions, associated with heat exchanger testing for
Gary Butner Chief, Radiologic Health Branch California Department of Public Health 3
the past 3 years (all safety-related heat exchangers)
P.O. Box 997414 (MS 7610) Sacramento, CA  95899-7414
Copies of applicable heat exchanger test procedures for the selected heat exchangers
The City Editor of The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA  93406-0112
including test conditions and acceptance criteria
 
Copies of chemistry control procedures and results of chemistry sampling and a list of
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31) Sacramento, CA  95814
condition reports concerning service water chemistry problems for the past 3 years
 
Documents that show the as-found results are recorded, evaluated, and appropriately
James R. Becker, Site Vice President Pacific Gas and Electric Company Diablo Canyon Nuclear Plant P.O. Box 56, Mail Station 104/6/601
dispositioned such that the as-left condition is acceptable
Avila Beach, CA  93424
Jennifer Tang Field Representative United States Senator Barbara Boxer
1700 Montgomery Street, Suite 240 San Francisco, CA  94111
Chief, Technological Hazards Branch FEMA Region IX
1111 Broadway, Suite 1200 Oakland, CA  94607-4052 
Pacific Gas and Electric Company - 4 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Resident Inspector (Tony.Brown@nrc.gov) Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Project Engineer, DRP/B (Greg.Tutak@nrc.gov) Project Engineer, DRP/B (Nestor.Makris@nrc.gov) Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov) DC Administrative Assistant (Agnes.Chan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Acting Regional Counsel (David.Roth@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)
 
  File located:_R:/Reactors/2010/DC2010005 RFI-PAG    ML      SUNSI Rev Compl.
X Yes  No ADAMS X Yes  No Reviewer Initials  Publicly Avail
X Yes  No Sensitive  Yes X No Sens. Type Initials  RIV: DRS/EB1/RI C: EB1    PGoldberg  TRF for TFarnholtz   
/RA/ by email
/RA/  10/21/2010 10/21/2010    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
 
  - 1 - Enclosure
Heat Exchanger/Heat Sink Inspection Documentation Request
  The following heat exchangers/heat sinks have been selected for inspection:  
* Component cooling water heat exchangers  
* Containment fan coolers  
* Ultimate heat sink  
Please provide the following documentation prior to the onsite inspection week,  
preferably no later than November 22, 2010 .  
 
Test Documents
  Copies of the last two heat exchanger tests for the selected heat exchangers (original test data in work orders or filled in test procedures) and copies of condition reports  
associated with the heat exchanger testing  
 
List of condition reports, with descriptions, associated with heat exchanger testing for  
the past 3 years (all safety-related heat exchangers)  
 
Copies of applicable heat exchanger test procedures for the selected heat exchangers  
including test conditions and acceptance criteria  
 
Copies of chemistry control procedures and results of chemistry sampling and a list of  
condition reports concerning service water chemistry problems for the past 3 years  
 
Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable  
Cleaning Documents
Cleaning Documents
 
Copies of the last two heat exchanger cleaning results for the selected heat
Copies of the last two heat exchanger cleaning results for the selected heat  
exchangers, original data (found in filled test procedures or work orders) and condition
exchangers, original data (found in filled test procedures or work orders) and condition reports associated with heat exchanger cleaning  
reports associated with heat exchanger cleaning
 
Cleaning procedures with acceptance criteria for the selected heat exchangers
List of condition reports, with descriptions, associated with heat exchanger cleaning for
Cleaning procedures with acceptance criteria for the selected heat exchangers  
the past 3 years (all safety-related heat exchangers)
 
Show that as-found results are recorded, evaluated, and appropriately dispositioned
such that the as-left condition is acceptable
List of condition reports, with descriptions, associated with heat exchanger cleaning for  
                                          -1-                             Enclosure
the past 3 years (all safety-related heat exchangers)  
 
Show that as-found results are recorded, evaluated, and appropriately dispositioned  
such that the as-left condition is acceptable  
 
 
  - 2 - Enclosure  
Design Documents
 
Copies of vendor data sheets and design basis data for the selected heat exchangers
 
The design margin of the heat exchangers (the maximum heat transfer rate achievable
at design basis conditions compared to the vendor's design heat transfer rate)
 
Copies of calculations which show the heat exchangers will meet their design basis requirements under worst case conditions.  Calculation for the maximum allowable
number of tubes plugged and how many tubes are currently plugged
 
For room coolers, calculations of the maximum room temperature under accident
conditions and determination that the coolers can maintain less than the maximum
temperature under design conditions
 
Documents that show that the heat exchangers have been evaluated for potential water
hammer
Instrument uncertainties of the instruments used during testing


Design Documents
Corrective action reports concerning cavitation noise in any heat exchanger system  
Copies of vendor data sheets and design basis data for the selected heat exchangers
The design margin of the heat exchangers (the maximum heat transfer rate achievable
at design basis conditions compared to the vendors design heat transfer rate)
Copies of calculations which show the heat exchangers will meet their design basis
requirements under worst case conditions. Calculation for the maximum allowable
number of tubes plugged and how many tubes are currently plugged
For room coolers, calculations of the maximum room temperature under accident
conditions and determination that the coolers can maintain less than the maximum
temperature under design conditions
Documents that show that the heat exchangers have been evaluated for potential water
hammer
Instrument uncertainties of the instruments used during testing
Corrective action reports concerning cavitation noise in any heat exchanger system
The most recent audit report of heat exchanger testing and cleaning
The most recent service water flow balance test results, both as-found and as-left
Documents for the Ultimate Heat Sink
Testing documents or other equivalent methods that verify the performance of the
ultimate heat sink and its components
Calculations which shows there is sufficient water capacity for the required 30-day
supply
Procedure or work order that show there is monitoring and trending of sediment build-up
Procedure for periodic performance monitoring of heat transfer capability
Procedures for the periodic performance of the ultimate heat sink structural integrity
Document that verifies adequate chemistry monitoring to ensure adequate pH, calcium,
etc. are maintained
Documents that explains the operation of the ultimate heat sink
                                      -2-                                Enclosure


A description of the clean up system between the water supply and the ultimate heat
The most recent audit report of heat exchanger testing and cleaning
sink
 
If elements of the ultimate heat sink can freeze during cold weather, documentation or
calculations to show that there will still be sufficient water to meet design conditions
The most recent service water flow balance test results, both as-found and as-left
under the worst case freeze conditions
 
A description of the sump pump that circulates the water in the ultimate heat sink during
freeze conditions, and documentation which show that the sump pump and valves are
Documents for the Ultimate Heat Sink
safety-related
 
Calculations of the maximum allowable amount of silt that can be in the ultimate heat
sink, and any condition reports written in the past three years about problems with silt
Testing documents or other equivalent methods that verify the performance of the
List of condition reports, with descriptions, of problems with the ultimate heat sink for the
ultimate heat sink and its components
past three years
 
Calculations which shows there is sufficient water capacity for the required 30-day
supply
Procedure or work order that show there is monitoring and trending of sediment build-up
 
Procedure for periodic performance monitoring of heat transfer capability
 
Procedures for the periodic performance of the ultimate heat sink structural integrity
 
Document that verifies adequate chemistry monitoring to ensure adequate pH, calcium,
etc. are maintained
 
Documents that explains the operation of the ultimate heat sink
 
 
  - 3 - Enclosure A description of the clean up system between the water supply and the ultimate heat  
sink  
If elements of the ultimate heat sink can freeze during cold weather, documentation or  
calculations to show that there will still be sufficient water to meet design conditions under the worst case freeze conditions  
 
A description of the sump pump that circulates the water in the ultimate heat sink during  
freeze conditions, and documentation which show that the sump pump and valves are  
safety-related  
 
Calculations of the maximum allowable amount of silt that can be in the ultimate heat  
sink, and any condition reports written in the past three years about problems with silt  
 
List of condition reports, with descriptions, of problems with the ultimate heat sink for the  
past three years  
 
Corrective Action Documents
Corrective Action Documents
 
List of corrective action documents, with descriptions, for the past 3 years for all
List of corrective action documents, with descriptions, for the past 3 years for all  
safety-related heat exchangers
safety-related heat exchangers  
Inspector Contact Information:
 
Paula Goldberg
Reactor Inspector
817-860-8168
paula.goldberg@nrc.gov
Inspector Contact Information:  
Mailing Address:
 
US NRC Region IV
Attn: Paula Goldberg
Paula Goldberg  
612 East Lamar Blvd., Suite 400
Reactor Inspector  
817-860-8168  
paula.goldberg@nrc.gov
 
Mailing Address:  
US NRC Region IV  
Attn: Paula Goldberg  
612 East Lamar Blvd., Suite 400  
Arlington, TX 76011-4125
Arlington, TX 76011-4125
                                          -3-                              Enclosure
}}
}}

Latest revision as of 14:35, 11 March 2020

Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005
ML102950324
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/21/2010
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Conway J
Pacific Gas & Electric Co
References
Download: ML102950324 (7)


See also: IR 05000275/2010005

Text

UNITED STATES

NU C LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

October 21, 2010

John T. Conway

Senior Vice President-Energy &

Supply and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

77 Beale Street, Mail Code B32

San Francisco, CA 94105

SUBJECT: DIABLO CANYON- NOTIFICATION OF NRC TRIENNIAL HEAT

EXCHANGER INSPECTION 05000275/2010005;O5000323/2010005

Dear Mr. Conway:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission

(NRC) Region IV staff will conduct a triennial heat sink inspection at your facility. The

inspection will be comprised of one reactor inspector from the NRC Region IV office.

The inspection will be conducted in accordance with Inspection Procedure 71111.07T,

"Heat Sink Performance."

The schedule for the inspection is as follows:

Onsite inspection: December 6, 2010 - December 10, 2010

Experience has shown that this inspection is resource intensive for your staff. In order

to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. Please note that

the documents are requested to be provided by November 15, 2010. We request that

during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and maintenance of your heat exchanger

program are available. Of specific interest are those documents that establish that your

heat exchanger program satisfies NRC regulatory requirements and conforms to

applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related

heat exchangers should be available to support the inspector at the site during the

inspection.

We have discussed the schedule for this inspection activity with your staff and

understand that our regulatory contact for this inspection will be Michael McCoy of your

licensing organization. If there are any questions about this inspection or the material

requested, please contact the inspector, Paula Goldberg, at 817-860-8168 or by

Pacific Gas and Electric Company -2-

email, paula.goldberg@nrc.gov. In accordance with 10 CFR 2.390 of the NRCs Rules

of Practice, a copy of this letter and its enclosure will be available electronically for

public inspection in the NRC Public Document Room or from the Publicly Available

Records (PARS) component of NRC's document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-275; 50-323

License: DPR-80; DPR-82

Enclosure: Heat Exchanger/Heat Sink

Inspection Documentation Request

cc w/enclosure:

Sierra Club Santa Lucia Chapter

ATTN: Andrew Christie

P.O. Box 15755

San Luis Obispo, CA 93406

Jane Swanson

San Luis Obispo

Mothers for Peace

P.O. Box 3608

San Luis Obispo, CA 93403

James Grant, County Administrative Officer

San Luis Obispo County Board of

Supervisors

1055 Monterey Street, Suite D430

San Luis Obispo, CA 93408

Truman Burns\Robert Kinosian

California Public Utilities Commission

505 Van Ness Ave., Rm. 4102

San Francisco, CA 94102

Pacific Gas and Electric Company -3-

Jennifer Post, Esq.

Pacific Gas & Electric Co.

77 Beale Street, Room 2496

Mail Code B30A

San Francisco, CA 94120

Gary Butner

Chief, Radiologic Health Branch

California Department of Public Health 3

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

The City Editor of The Tribune

3825 South Higuera Street

P.O. Box 112

San Luis Obispo, CA 93406-0112

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 31)

Sacramento, CA 95814

James R. Becker, Site Vice President

Pacific Gas and Electric Company

Diablo Canyon Nuclear Plant

P.O. Box 56, Mail Station 104/6/601

Avila Beach, CA 93424

Jennifer Tang

Field Representative

United States Senator Barbara Boxer

1700 Montgomery Street, Suite 240

San Francisco, CA 94111

Chief, Technological Hazards Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Pacific Gas and Electric Company -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov)

DC Administrative Assistant (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Acting Regional Counsel (David.Roth@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)

File located:_R:/Reactors/2010/DC2010005 RFI-PAG ML

SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials

Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials

RIV: DRS/EB1/RI C: EB1

PGoldberg TRF for TFarnholtz

/RA/ by email /RA/

10/21/2010 10/21/2010

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Heat Exchanger/Heat Sink Inspection Documentation Request

The following heat exchangers/heat sinks have been selected for inspection:

  • Component cooling water heat exchangers
  • Containment fan coolers

Please provide the following documentation prior to the onsite inspection week,

preferably no later than November 22, 2010 .

Test Documents

Copies of the last two heat exchanger tests for the selected heat exchangers (original

test data in work orders or filled in test procedures) and copies of condition reports

associated with the heat exchanger testing

List of condition reports, with descriptions, associated with heat exchanger testing for

the past 3 years (all safety-related heat exchangers)

Copies of applicable heat exchanger test procedures for the selected heat exchangers

including test conditions and acceptance criteria

Copies of chemistry control procedures and results of chemistry sampling and a list of

condition reports concerning service water chemistry problems for the past 3 years

Documents that show the as-found results are recorded, evaluated, and appropriately

dispositioned such that the as-left condition is acceptable

Cleaning Documents

Copies of the last two heat exchanger cleaning results for the selected heat

exchangers, original data (found in filled test procedures or work orders) and condition

reports associated with heat exchanger cleaning

Cleaning procedures with acceptance criteria for the selected heat exchangers

List of condition reports, with descriptions, associated with heat exchanger cleaning for

the past 3 years (all safety-related heat exchangers)

Show that as-found results are recorded, evaluated, and appropriately dispositioned

such that the as-left condition is acceptable

-1- Enclosure

Design Documents

Copies of vendor data sheets and design basis data for the selected heat exchangers

The design margin of the heat exchangers (the maximum heat transfer rate achievable

at design basis conditions compared to the vendors design heat transfer rate)

Copies of calculations which show the heat exchangers will meet their design basis

requirements under worst case conditions. Calculation for the maximum allowable

number of tubes plugged and how many tubes are currently plugged

For room coolers, calculations of the maximum room temperature under accident

conditions and determination that the coolers can maintain less than the maximum

temperature under design conditions

Documents that show that the heat exchangers have been evaluated for potential water

hammer

Instrument uncertainties of the instruments used during testing

Corrective action reports concerning cavitation noise in any heat exchanger system

The most recent audit report of heat exchanger testing and cleaning

The most recent service water flow balance test results, both as-found and as-left

Documents for the Ultimate Heat Sink

Testing documents or other equivalent methods that verify the performance of the

ultimate heat sink and its components

Calculations which shows there is sufficient water capacity for the required 30-day

supply

Procedure or work order that show there is monitoring and trending of sediment build-up

Procedure for periodic performance monitoring of heat transfer capability

Procedures for the periodic performance of the ultimate heat sink structural integrity

Document that verifies adequate chemistry monitoring to ensure adequate pH, calcium,

etc. are maintained

Documents that explains the operation of the ultimate heat sink

-2- Enclosure

A description of the clean up system between the water supply and the ultimate heat

sink

If elements of the ultimate heat sink can freeze during cold weather, documentation or

calculations to show that there will still be sufficient water to meet design conditions

under the worst case freeze conditions

A description of the sump pump that circulates the water in the ultimate heat sink during

freeze conditions, and documentation which show that the sump pump and valves are

safety-related

Calculations of the maximum allowable amount of silt that can be in the ultimate heat

sink, and any condition reports written in the past three years about problems with silt

List of condition reports, with descriptions, of problems with the ultimate heat sink for the

past three years

Corrective Action Documents

List of corrective action documents, with descriptions, for the past 3 years for all

safety-related heat exchangers

Inspector Contact Information:

Paula Goldberg

Reactor Inspector

817-860-8168

paula.goldberg@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Paula Goldberg

612 East Lamar Blvd., Suite 400

Arlington, TX 76011-4125