| | number = ML18323A421 | | | number = ML18323A421 |
| | issue date = 11/26/2018 | | | issue date = 11/26/2018 |
| | title = 11/15/2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components (EPID L-2018-LLA-0112) | | | title = Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components |
| | author name = Pulvirenti A L | | | author name = Pulvirenti A |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000382 | | | docket = 05000382 |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = Pulvirenti A L, 415-1390 | | | contact person = Pulvirenti A, 415-1390 |
| | case reference number = EPID L-2018-LLA-0112 | | | case reference number = EPID L-2018-LLA-0112 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 November 26, 2018 LICENSEE: Entergy Operations, Inc. |
| UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 November 26, 2018 Entergy Operations, Inc. FACILITY: | | FACILITY: Waterford Steam Electric Station, Unit 3 |
| Waterford Steam Electric Station, Unit 3 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 27: |
Line 26: |
| OF NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS, INC. REGARDING LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS (EPID L-2018-LLA-0112) | | OF NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS, INC. REGARDING LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS (EPID L-2018-LLA-0112) |
| On November 15, 2018, a Category 1 partially closed public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Waterford Steam Electric Station (Waterford), Unit 3; Entergy Operations, Inc.; and Westinghouse (the licensee). | | On November 15, 2018, a Category 1 partially closed public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Waterford Steam Electric Station (Waterford), Unit 3; Entergy Operations, Inc.; and Westinghouse (the licensee). |
| The teleconference notice and agenda, dated November 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 18311A306. | | The teleconference notice and agenda, dated November 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18311A306. A list of attendees is enclosed with this summary. |
| A list of attendees is enclosed with this summary. The NRC staff provided a list of draft requests for additional information (RAI) (ADAMS Accession No. ML 18299A086) for discussion. | | The NRC staff provided a list of draft requests for additional information (RAI) (ADAMS Accession No. ML18299A086) for discussion. The purpose of the teleconference was to discuss details of, and potential responses to, the draft RAls. While the draft RAls were made publicly available, the detailed discussion of the responses was expected to contain proprietary information, such as trade secrets as referenced in Title 10 of the Code of Federal Regulations Section 2.390(a)(4). Therefore, the teleconference was partially closed to the public. |
| The purpose of the teleconference was to discuss details of, and potential responses to, the draft RAls. While the draft RAls were made publicly available, the detailed discussion of the responses was expected to contain proprietary information, such as trade secrets as referenced in Title 10 of the Code of Federal Regulations Section 2.390(a)(4). | | During the public portion of the teleconference, the licensee requested a 60-day time period to provide a response to the final RAI. The licensee stated that extra time would be needed to provide responses because a large amount of research was necessary to provide an adequate response to the questions. In addition, Waterford, Unit 3, is diverting resources to prepare for a refueling outage scheduled to begin in January 2019; therefore, fewer licensees were available to prepare the response. The NRC staff tentatively agreed to a 60-day response time. The teleconference was then opened to public comment. No members of the public provided comments. |
| Therefore, the teleconference was partially closed to the public. During the public portion of the teleconference, the licensee requested a 60-day time period to provide a response to the final RAI. The licensee stated that extra time would be needed to provide responses because a large amount of research was necessary to provide an adequate response to the questions. | | The teleconference was then closed to the public. During the closed portion of the teleconference, the NRC staff explained the nature of the RAls in more detail. The licensee, including Westinghouse staff, verbally responded with potential answers. The NRC staff and the licensee then discussed technical aspects of the responses and whether the intent of the answers provided appropriately pertained to the intent of the question. No regulatory decisions were made regarding the technical adequacy of the licensee's responses. |
| In addition, Waterford, Unit 3, is diverting resources to prepare for a refueling outage scheduled to begin in January 2019; therefore, fewer licensees were available to prepare the response. | | No members of the public called in to listen or provide comments to the staff after the business portion of the teleconeference. |
| The NRC staff tentatively agreed to a 60-day response time. The teleconference was then opened to public comment. No members of the public provided comments. | | |
| The teleconference was then closed to the public. During the closed portion of the teleconference, the NRC staff explained the nature of the RAls in more detail. The licensee, including Westinghouse staff, verbally responded with potential answers. The NRC staff and the licensee then discussed technical aspects of the responses and whether the intent of the answers provided appropriately pertained to the intent of the question. | | Please direct any inquiries to me at 301-415-1390 or April.Pulvirenti@nrc.gov. |
| No regulatory decisions were made regarding the technical adequacy of the licensee's responses. | | April Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 |
| No members of the public called in to listen or provide comments to the staff after the business portion of the teleconeference. Please direct any inquiries to me at 301-415-1390 or April.Pulvirenti@nrc.gov. | |
| Docket No. 50-382 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| List of Attendees cc: Listserv April Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS. | | List of Attendees cc: Listserv |
| INC. AND WESTINGHOUSE RE: WATERFORD STEAM ELECTRIC STATION. UNIT 3. LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERA TOR SECONDARY SIDE INTERNAL COMPONENTS Name Affiliation James Hoss Enterav Operations, Inc Nicholas Petit Enterav Operations, Inc William Steelman Entergv Operations, Inc Maria Zamber Enterav Operations, Inc Steven Arcaya Westinghouse Michael Bradley Westinghouse David Rubolino Westinghouse Kevin Spencer Westinghouse Creed Taylor Westinghouse Jivan Thakker Westinghouse Nicole Vitale Westinghouse Gary Whiteman Westinghouse April Pulvirenti U.S. Nuclear Regulatory Commission (NRC) Robert Pascarelli NRC Reed Anzalone NRC Michael Breach NRC Stewart Bailey NRC None Public Enclosure
| |
|
| |
|
| ==SUBJECT:==
| | LIST OF ATTENDEES NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS. INC. |
| | AND WESTINGHOUSE RE: WATERFORD STEAM ELECTRIC STATION. UNIT 3. LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS Name Affiliation James Hoss Enterav Operations, Inc Nicholas Petit Enterav Operations, Inc William Steelman Entergv Operations, Inc Maria Zamber Enterav Operations, Inc Steven Arcaya Westinghouse Michael Bradley Westinghouse David Rubolino Westinghouse Kevin Spencer Westinghouse Creed Taylor Westinghouse Jivan Thakker Westinghouse Nicole Vitale Westinghouse Gary Whiteman Westinghouse April Pulvirenti U.S. Nuclear Regulatory Commission (NRC) |
| | Robert Pascarelli NRC Reed Anzalone NRC Michael Breach NRC Stewart Bailey NRC None Public Enclosure |
|
| |
|
| ==SUMMARY==
| | ML18323A421 OFFICE DORL/LPL4/PM DORL/LPL4/LA DORL/LPL4/BC DORL/LPL4/PM NAME APuvirenti PTalukdar/LRonewicz RPascarelli APulvirenti DATE 11/20/2018 11/20/2018 11/26/2018 11/26/2018}} |
| OF NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS, INC. REGARDING LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS (EPID L-2018-LLA-0112)
| |
| DATED NOVEMBER 26, 2018 DISTRIBUTION:
| |
| PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource RidsNrrPMWaterford Resource CCook, OEDO ADAMS Accession No.: ML 18323A421 OFFICE DORL/LPL4/PM DORL/LPL4/LA RidsNrrLAPBlechman Resource RAnzalone, NRR MBreach, NRR SBailey, NRR RidsNrrDssSrxb Resource JBowen, OEDO LBurkhart, OEDO DORL/LPL4/BC DORL/LPL4/PM NAME APuvirenti PTalukdar/LRonewicz RPascarelli APulvirenti DATE 11/20/2018 11/20/2018 11/26/2018 11/26/2018 OFFICIAL RECORD COPY}}
| |
Letter Sequence Meeting |
---|
EPID:L-2018-LLA-0112, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components (Approved, Closed) |
|
MONTHYEARW3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Request ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components Project stage: Acceptance Review W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Supplement ML18178A2932018-06-28028 June 2018 Acceptance of Requested Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Internal Components Project stage: Acceptance Review ML18212A1672018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 2/26/18, Affidavit Executed by James Gresham, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18212A1602018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 6/13/18 Affidavit Executed by Paul A. Russ, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 Project stage: Draft RAI ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Meeting ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across2019-01-19019 January 2019 (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across Project stage: Request ML19046A1552019-02-19019 February 2019 Request for Withholding Information from Public Disclosure, 1/8/19 Affidavit Executed by Korey L. Hosack, Westinghouse Electric Company Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0040, Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side2019-07-11011 July 2019 Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Intern Project stage: Request ML19234A0172019-09-0909 September 2019 Request for Withholding Information from Public Disclosure, 7/3/19 Affidavit Executed by Camille T. Zozula, Westinghouse Electric Company, LLC, Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Approval 2018-08-15
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 ML19247C3882019-09-10010 September 2019 Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18120A3112018-05-10010 May 2018 Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18059A0152018-03-0505 March 2018 Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17331A0882017-12-0606 December 2017 Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 ML17174B2262017-06-28028 June 2017 Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) ML16364A2902017-01-24024 January 2017 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit ML16323A2292017-01-24024 January 2017 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application ML16125A0832016-05-0404 May 2016 Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15117A5032015-05-0606 May 2015 April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report ML15099A5632015-04-0909 April 2015 Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3 2023-03-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 November 26, 2018 LICENSEE: Entergy Operations, Inc.
FACILITY: Waterford Steam Electric Station, Unit 3
SUBJECT:
SUMMARY
OF NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS, INC. REGARDING LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS (EPID L-2018-LLA-0112)
On November 15, 2018, a Category 1 partially closed public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Waterford Steam Electric Station (Waterford), Unit 3; Entergy Operations, Inc.; and Westinghouse (the licensee).
The teleconference notice and agenda, dated November 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18311A306. A list of attendees is enclosed with this summary.
The NRC staff provided a list of draft requests for additional information (RAI) (ADAMS Accession No. ML18299A086) for discussion. The purpose of the teleconference was to discuss details of, and potential responses to, the draft RAls. While the draft RAls were made publicly available, the detailed discussion of the responses was expected to contain proprietary information, such as trade secrets as referenced in Title 10 of the Code of Federal Regulations Section 2.390(a)(4). Therefore, the teleconference was partially closed to the public.
During the public portion of the teleconference, the licensee requested a 60-day time period to provide a response to the final RAI. The licensee stated that extra time would be needed to provide responses because a large amount of research was necessary to provide an adequate response to the questions. In addition, Waterford, Unit 3, is diverting resources to prepare for a refueling outage scheduled to begin in January 2019; therefore, fewer licensees were available to prepare the response. The NRC staff tentatively agreed to a 60-day response time. The teleconference was then opened to public comment. No members of the public provided comments.
The teleconference was then closed to the public. During the closed portion of the teleconference, the NRC staff explained the nature of the RAls in more detail. The licensee, including Westinghouse staff, verbally responded with potential answers. The NRC staff and the licensee then discussed technical aspects of the responses and whether the intent of the answers provided appropriately pertained to the intent of the question. No regulatory decisions were made regarding the technical adequacy of the licensee's responses.
No members of the public called in to listen or provide comments to the staff after the business portion of the teleconeference.
Please direct any inquiries to me at 301-415-1390 or April.Pulvirenti@nrc.gov.
April Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES NOVEMBER 15, 2018, TELECONFERENCE WITH ENTERGY OPERATIONS. INC.
AND WESTINGHOUSE RE: WATERFORD STEAM ELECTRIC STATION. UNIT 3. LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS Name Affiliation James Hoss Enterav Operations, Inc Nicholas Petit Enterav Operations, Inc William Steelman Entergv Operations, Inc Maria Zamber Enterav Operations, Inc Steven Arcaya Westinghouse Michael Bradley Westinghouse David Rubolino Westinghouse Kevin Spencer Westinghouse Creed Taylor Westinghouse Jivan Thakker Westinghouse Nicole Vitale Westinghouse Gary Whiteman Westinghouse April Pulvirenti U.S. Nuclear Regulatory Commission (NRC)
Robert Pascarelli NRC Reed Anzalone NRC Michael Breach NRC Stewart Bailey NRC None Public Enclosure
ML18323A421 OFFICE DORL/LPL4/PM DORL/LPL4/LA DORL/LPL4/BC DORL/LPL4/PM NAME APuvirenti PTalukdar/LRonewicz RPascarelli APulvirenti DATE 11/20/2018 11/20/2018 11/26/2018 11/26/2018