September 9, 2019 Site Vice President Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID L-2018-LLA-0112)

Dear Sir or Madam:

By letter dated July 11, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19192A332), Entergy Operations, Inc. (the licensee) submitted an affidavit dated July 3, 2019, executed by Camille T. Zozula, Manager, Infrastructure and Facilities Licensing, Westinghouse Electric Company, LLC, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:

Westinghouse Letter LTR-CDMP-19-31 P-Attachment, Rev. 0, Responses to Round 2 Request for Additional Information Regarding Waterford 3 [Waterford Steam Electric Station, Unit 3] Amendment Request for Revision of UFSAR

[Updated Final Safety Analysis Report] Section 3.9 to Incorporate TRANFLOW Computer Code (Proprietary)

A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the NRC Library in ADAMS at the above-referenced Accession No. ML19192A332.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(5) Westinghouse has policies in place to identify proprietary information. Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process ( or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process ( or component, structure, tool, method, etc.), the application of which data secures a

competitive economic advantage ( e.g., by optimization or improved marketability).

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at 301-415-1390 or via e-mail at April.Pulvirenti@nrc.gov.

Sincerely,

/RA/

April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc: Camille T. Zozula Manager Infrastructure and Facilities Licensing, Westinghouse Electric Company, LLC 1000 Westinghouse Drive Cranberry Township, PA 16066 Listserv

ML19234A017 *by email dated OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SRXB/BC(A)

NAME APulvirenti PBlechman JBorromeo*

DATE 8/30/2019 8/30/2019 9/3/2019 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli APulvirenti DATE 9/6/2019 9/9/2019