|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 03/31/2006 | | | issue date = 03/31/2006 |
| | title = Inspection of Initial License and Licensed Operator Requalification Training Programs at V. C. Summer 05000395/2006010 | | | title = Inspection of Initial License and Licensed Operator Requalification Training Programs at V. C. Summer 05000395/2006010 |
| | author name = Moorman J H | | | author name = Moorman J |
| | author affiliation = NRC/RGN-II/DRS/OLB | | | author affiliation = NRC/RGN-II/DRS/OLB |
| | addressee name = Archie J B | | | addressee name = Archie J |
| | addressee affiliation = South Carolina Electric & Gas Co | | | addressee affiliation = South Carolina Electric & Gas Co |
| | docket = 05000395 | | | docket = 05000395 |
Line 14: |
Line 14: |
| | page count = 5 | | | page count = 5 |
| }} | | }} |
| See also: [[followed by::IR 05000395/2006010]] | | See also: [[see also::IR 05000395/2006010]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 31, 2006South Carolina Electric & Gas CompanyATTN:Mr. Jeffrey B. ArchieVice President, Nuclear OperationsVirgil C. Summer Nuclear Station | | {{#Wiki_filter:March 31, 2006 |
| | |
| P. O. Box 88
| |
| Jenkinsville, SC
| |
| 29065SUBJECT:INSPECTION OF INITIAL LICENSE AND LICENSED OPERATORREQUALIFICATION TRAINING PROGRAMS AT VIRGIL C. SUMMER
| |
| NUCLEAR STATION REPORT NO.
| |
| 05000395/2006010 Dear Mr. Archie:
| |
| This is to inform you that the Nuclear Regulatory Commission (NRC) will perform an inspectionof licensed operator training programs at your V. C. Summer Nuclear Station. The inspection
| |
| is scheduled for the week of May 1, 2006. This inspection is being initiated as a result of the
| |
| poor performance of licensed operator applicants on the January 10, 2006 written examination.The inspection team will verify that your licensed operator applicants met all of the eligibilityrequirements in 10 CFR 55.31, "How to apply," as attested to on NRC Form 398 submitted forthese applicants. The inspection will also determine if your licensed operator initial training andlicensed operator requalification programs have been developed and implemented using a
| |
| systems approach to training (SAT). NUREG-1220, Rev 1, "Training Review Criteria and Procedures," and NRC Staff InspectionProcedure 41500, "Training and Qualification Effectiveness," provide guidance on the purpose
| |
| and content of the inspection. These documents are available on the NRC's public web site.In order for the NRC to prepare for the inspection, we request that you provide the materialslisted in the Enclosure to the NRC Region II office by April 21, 2006. The Enclosure provides ageneral list of the types of information and resources we expect to have available at the site to
| |
| perform our inspection of your training programs.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component of
| |
| 2SCE&GNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site athttp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/James H. Moorman, III, ChiefOperations Branch
| |
| Division of Reactor SafetyDocket No.: 50-395License No.: NPF-12Enclosure: As stated
| |
| cc w/encl:R. J. White
| |
| Nuclear Coordinator Mail Code 802
| |
| S.C. Public Service Authority
| |
| Virgil C. Summer Nuclear Station
| |
| Electronic Mail DistributionKathryn M. Sutton, Esq.Morgan, Lewis & Bockius LLP
| |
| Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.
| |
| Dept. of Health and Environmental
| |
| Control
| |
| Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.
| |
| S. C. Department of Health and
| |
| Environmental Control
| |
| Electronic Mail DistributionRobert G. Sweet, ManagerNuclear Licensing (Mail Code 830)
| |
| South Carolina Electric & Gas Company | | South Carolina Electric & Gas Company |
| | ATTN: Mr. Jeffrey B. Archie |
| | Vice President, Nuclear Operations |
| Virgil C. Summer Nuclear Station | | Virgil C. Summer Nuclear Station |
| Electronic Mail DistributionRobert M. Fowlkes, General ManagerEngineering Services | | P. O. Box 88 |
| | Jenkinsville, SC 29065 |
| | SUBJECT: INSPECTION OF INITIAL LICENSE AND LICENSED OPERATOR |
| | REQUALIFICATION TRAINING PROGRAMS AT VIRGIL C. SUMMER |
| | NUCLEAR STATION REPORT NO. 05000395/2006010 |
| | Dear Mr. Archie: |
| | This is to inform you that the Nuclear Regulatory Commission (NRC) will perform an inspection |
| | of licensed operator training programs at your V. C. Summer Nuclear Station. The inspection |
| | is scheduled for the week of May 1, 2006. This inspection is being initiated as a result of the |
| | poor performance of licensed operator applicants on the January 10, 2006 written examination. |
| | The inspection team will verify that your licensed operator applicants met all of the eligibility |
| | requirements in 10 CFR 55.31, How to apply, as attested to on NRC Form 398 submitted for |
| | these applicants. The inspection will also determine if your licensed operator initial training and |
| | licensed operator requalification programs have been developed and implemented using a |
| | systems approach to training (SAT). |
| | NUREG-1220, Rev 1, Training Review Criteria and Procedures, and NRC Staff Inspection |
| | Procedure 41500, Training and Qualification Effectiveness, provide guidance on the purpose |
| | and content of the inspection. These documents are available on the NRCs public web site. |
| | In order for the NRC to prepare for the inspection, we request that you provide the materials |
| | listed in the Enclosure to the NRC Region II office by April 21, 2006. The Enclosure provides a |
| | general list of the types of information and resources we expect to have available at the site to |
| | perform our inspection of your training programs. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its |
| | enclosure, and your response (if any) will be available electronically for public inspection in the |
| | NRC Public Document Room or from the Publicly Available Records (PARS) component of |
| | |
| | SCE&G 2 |
| | NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at |
| | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | James H. Moorman, III, Chief |
| | Operations Branch |
| | Division of Reactor Safety |
| | Docket No.: 50-395 |
| | License No.: NPF-12 |
| | Enclosure: As stated |
| | cc w/encl: |
| | R. J. White Robert M. Fowlkes, General Manager |
| | Nuclear Coordinator Mail Code 802 Engineering Services |
| | S.C. Public Service Authority South Carolina Electric & Gas Company |
| | Virgil C. Summer Nuclear Station Virgil C. Summer Nuclear Station |
| | Electronic Mail Distribution Electronic Mail Distribution |
| | Kathryn M. Sutton, Esq. Thomas D. Gatlin, General Manager |
| | Morgan, Lewis & Bockius LLP Nuclear Plant Operations (Mail Code 303) |
| | Electronic Mail Distribution South Carolina Electric & Gas Company |
| | Virgil C. Summer Nuclear Station |
| | Henry J. Porter, Director Electronic Mail Distribution |
| | Div. of Radioactive Waste Mgmt. |
| | Dept. of Health and Environmental David A. Lavigne, General Manager |
| | Control Organization Development |
| | Electronic Mail Distribution South Carolina Electric & Gas Company |
| | Vigil C. Summer Nuclear Station |
| | R. Mike Gandy Electronic Mail Distribution |
| | Division of Radioactive Waste Mgmt. |
| | S. C. Department of Health and Gary Moffatt |
| | Environmental Control Training Manager |
| | Electronic Mail Distribution Virgil C. Summer Nuclear Station |
| | P. O. Box 88 (Mail Code P-40) |
| | Robert G. Sweet, Manager Jenkinsville, SC 29065 |
| | Nuclear Licensing (Mail Code 830) |
| South Carolina Electric & Gas Company | | South Carolina Electric & Gas Company |
| Virgil C. Summer Nuclear Station
| |
| Electronic Mail DistributionThomas D. Gatlin, General ManagerNuclear Plant Operations (Mail Code 303)
| |
| South Carolina Electric & Gas Company
| |
| Virgil C. Summer Nuclear Station
| |
| Electronic Mail DistributionDavid A. Lavigne, General ManagerOrganization Development
| |
| South Carolina Electric & Gas Company
| |
| Vigil C. Summer Nuclear Station
| |
| Electronic Mail DistributionGary Moffatt Training Manager
| |
| Virgil C. Summer Nuclear Station | | Virgil C. Summer Nuclear Station |
| P. O. Box 88 (Mail Code P-40)
| | Electronic Mail Distribution |
| Jenkinsville, SC
| |
| 29065
| |
|
| |
|
|
| |
|
| _________________________OFFICERII:DRSSIGNATURE/RA/NAMEJMoormanDATE3/31/06
| | _________________________ |
| E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO | | OFFICE RII:DRS |
| EnclosureManagement of Training ItemsOperations Training Self Assessments completed in the last two years, including any ConditionEvaluation Reports (CERs).Senior Management Training Review Board meeting minutes for the last two years
| | SIGNATURE /RA/ |
| | NAME JMoorman |
| | DATE 3/31/06 |
| | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| | |
| | Management of Training Items |
| | Operations Training Self Assessments completed in the last two years, including any Condition |
| | Evaluation Reports (CERs). |
| | Senior Management Training Review Board meeting minutes for the last two years |
| Training Advisory Committee (TAC) meeting minutes for the last two years | | Training Advisory Committee (TAC) meeting minutes for the last two years |
| Simulator unavailability time in the past two yearsKeyword searches of CERs (last two years) related to "lack of knowledge", "training", "lack ofunderstanding", and similar searches based on your knowledge of the type of issue. (not | | Simulator unavailability time in the past two years |
| limited to operations personnel)Nuclear Training Manual, including procedures related to the following items. (Please includethe current revision and the revision that was in force during the training of the most recentclass of operator applicants)*Analysis, Design, Development, Implementation, & Evaluation Processes*Instructor Qualification Requirements (SRO) | | Keyword searches of CERs (last two years) related to lack of knowledge, training, lack of |
| *Training Documentation Requirements | | understanding, and similar searches based on your knowledge of the type of issue. (not |
| *RO Initial Training | | limited to operations personnel) |
| *SRO Initial Training | | Nuclear Training Manual, including procedures related to the following items. (Please include |
| *Instant SRO Initial Training | | the current revision and the revision that was in force during the training of the most recent |
| *STA Initial & Continuing Training | | class of operator applicants) |
| *Shift Manager Initial Training | | * Analysis, Design, Development, Implementation, & Evaluation Processes |
| *Licensed Operator Requalification Training | | * Instructor Qualification Requirements (SRO) |
| *Requalification Examination Administration | | * Training Documentation Requirements |
| *Exam Security | | * RO Initial Training |
| *Written Exam, Scenario, and JPM Development | | * SRO Initial Training |
| *Conduct of classroom, simulator, and On-the-Job training | | * Instant SRO Initial Training |
| *Training Advisory Committees | | * STA Initial & Continuing Training |
| *Training Review Boards | | * Shift Manager Initial Training |
| *Training Program EvaluationsAll plant management and training management observations of Initial and Requalificationtraining for the last two yearsA copy of all revisions of Root Cause Analysis 06-0171 | | * Licensed Operator Requalification Training |
| Operations Training Staff ItemsTechnical skills qualification completion dates for all instructors certified to teach initial andrequalification training, including when instructors became active and inactive (last three years)Daily Training Schedules for the last 3 Initial License classes (RO and SRO) | | * Requalification Examination Administration |
| Daily Training Schedules for the last 2 years of LOR training cycles, including attendancerosters | | * Exam Security |
| 2All Requal and Initial Licensed Operator student feedback (last 2 years)Curriculum list of required lesson plans, simulator demos, scenarios, and JPMs for Initial RO,SRO upgrade, and SRO instant. (Include the training material numerical designators)Curriculum list of required topics, lesson plans, and scenarios for biennial LOR classroom andsimulator trainingAll examinations, answer keys, and answer key changes for the ROs and SROs license class inquestion. (Include all candidate grades, evaluations, and the audit exam (written & operating)
| | * Written Exam, Scenario, and JPM Development |
| results.)All qualification cards (OJT) for the license class in question, including all significant reactivitymanipulationsAll licensed operator exam scores and evaluations for the last two years | | * Conduct of classroom, simulator, and On-the-Job training |
| | * Training Advisory Committees |
| | * Training Review Boards |
| | * Training Program Evaluations |
| | All plant management and training management observations of Initial and Requalification |
| | training for the last two years |
| | A copy of all revisions of Root Cause Analysis 06-0171 |
| | Operations Training Staff Items |
| | Technical skills qualification completion dates for all instructors certified to teach initial and |
| | requalification training, including when instructors became active and inactive (last three years) |
| | Daily Training Schedules for the last 3 Initial License classes (RO and SRO) |
| | Daily Training Schedules for the last 2 years of LOR training cycles, including attendance |
| | rosters |
| | Enclosure |
| | |
| | 2 |
| | All Requal and Initial Licensed Operator student feedback (last 2 years) |
| | Curriculum list of required lesson plans, simulator demos, scenarios, and JPMs for Initial RO, |
| | SRO upgrade, and SRO instant. (Include the training material numerical designators) |
| | Curriculum list of required topics, lesson plans, and scenarios for biennial LOR classroom and |
| | simulator training |
| | All examinations, answer keys, and answer key changes for the ROs and SROs license class in |
| | question. (Include all candidate grades, evaluations, and the audit exam (written & operating) |
| | results.) |
| | All qualification cards (OJT) for the license class in question, including all significant reactivity |
| | manipulations |
| | All licensed operator exam scores and evaluations for the last two years |
| Electronic version of the Task-to-Training matrix, including task lists for ROs and SROs | | Electronic version of the Task-to-Training matrix, including task lists for ROs and SROs |
| List of recent (last 3 years) plant equipment modifications and associated training needsanalysisPost Training Effectiveness Evaluations for Initial License Operator Training Programsconducted in the last 5 years | | List of recent (last 3 years) plant equipment modifications and associated training needs |
| | analysis |
| | Post Training Effectiveness Evaluations for Initial License Operator Training Programs |
| | conducted in the last 5 years |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:License-Operator
MONTHYEARML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17263B2132017-09-14014 September 2017 V. C. Summer Nuclear Power Plant - Operator Licensing Examination Approval 05000395/2017301 ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML15280A3802015-10-0505 October 2015 September 2015 - NRC Generic Fundamentals Examination Results ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 2022-05-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 ML13301A7412013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Administrative JPMs ML13301A7172013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Draft SRO Written Exam ML13301A7392013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Sim IN-Plant Jpmss ML13301A7432013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Post Exam Comments ML13301A7362013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Simulator Scenarios 2022-05-05
[Table view] |
See also: IR 05000395/2006010
Text
March 31, 2006
South Carolina Electric & Gas Company
ATTN: Mr. Jeffrey B. Archie
Vice President, Nuclear Operations
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville, SC 29065
SUBJECT: INSPECTION OF INITIAL LICENSE AND LICENSED OPERATOR
REQUALIFICATION TRAINING PROGRAMS AT VIRGIL C. SUMMER
NUCLEAR STATION REPORT NO. 05000395/2006010
Dear Mr. Archie:
This is to inform you that the Nuclear Regulatory Commission (NRC) will perform an inspection
of licensed operator training programs at your V. C. Summer Nuclear Station. The inspection
is scheduled for the week of May 1, 2006. This inspection is being initiated as a result of the
poor performance of licensed operator applicants on the January 10, 2006 written examination.
The inspection team will verify that your licensed operator applicants met all of the eligibility
requirements in 10 CFR 55.31, How to apply, as attested to on NRC Form 398 submitted for
these applicants. The inspection will also determine if your licensed operator initial training and
licensed operator requalification programs have been developed and implemented using a
systems approach to training (SAT).
NUREG-1220, Rev 1, Training Review Criteria and Procedures, and NRC Staff Inspection
Procedure 41500, Training and Qualification Effectiveness, provide guidance on the purpose
and content of the inspection. These documents are available on the NRCs public web site.
In order for the NRC to prepare for the inspection, we request that you provide the materials
listed in the Enclosure to the NRC Region II office by April 21, 2006. The Enclosure provides a
general list of the types of information and resources we expect to have available at the site to
perform our inspection of your training programs.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
SCE&G 2
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James H. Moorman, III, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-395
License No.: NPF-12
Enclosure: As stated
cc w/encl:
R. J. White Robert M. Fowlkes, General Manager
Nuclear Coordinator Mail Code 802 Engineering Services
S.C. Public Service Authority South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station Virgil C. Summer Nuclear Station
Electronic Mail Distribution Electronic Mail Distribution
Kathryn M. Sutton, Esq. Thomas D. Gatlin, General Manager
Morgan, Lewis & Bockius LLP Nuclear Plant Operations (Mail Code 303)
Electronic Mail Distribution South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station
Henry J. Porter, Director Electronic Mail Distribution
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental David A. Lavigne, General Manager
Control Organization Development
Electronic Mail Distribution South Carolina Electric & Gas Company
Vigil C. Summer Nuclear Station
R. Mike Gandy Electronic Mail Distribution
Division of Radioactive Waste Mgmt.
S. C. Department of Health and Gary Moffatt
Environmental Control Training Manager
Electronic Mail Distribution Virgil C. Summer Nuclear Station
P. O. Box 88 (Mail Code P-40)
Robert G. Sweet, Manager Jenkinsville, SC 29065
Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station
Electronic Mail Distribution
_________________________
OFFICE RII:DRS
SIGNATURE /RA/
NAME JMoorman
DATE 3/31/06
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Management of Training Items
Operations Training Self Assessments completed in the last two years, including any Condition
Evaluation Reports (CERs).
Senior Management Training Review Board meeting minutes for the last two years
Training Advisory Committee (TAC) meeting minutes for the last two years
Simulator unavailability time in the past two years
Keyword searches of CERs (last two years) related to lack of knowledge, training, lack of
understanding, and similar searches based on your knowledge of the type of issue. (not
limited to operations personnel)
Nuclear Training Manual, including procedures related to the following items. (Please include
the current revision and the revision that was in force during the training of the most recent
class of operator applicants)
- Analysis, Design, Development, Implementation, & Evaluation Processes
- Instructor Qualification Requirements (SRO)
- Training Documentation Requirements
- Instant SRO Initial Training
- STA Initial & Continuing Training
- Shift Manager Initial Training
- Licensed Operator Requalification Training
- Requalification Examination Administration
- Written Exam, Scenario, and JPM Development
- Conduct of classroom, simulator, and On-the-Job training
- Training Advisory Committees
- Training Program Evaluations
All plant management and training management observations of Initial and Requalification
training for the last two years
A copy of all revisions of Root Cause Analysis 06-0171
Operations Training Staff Items
Technical skills qualification completion dates for all instructors certified to teach initial and
requalification training, including when instructors became active and inactive (last three years)
Daily Training Schedules for the last 3 Initial License classes (RO and SRO)
Daily Training Schedules for the last 2 years of LOR training cycles, including attendance
rosters
Enclosure
2
All Requal and Initial Licensed Operator student feedback (last 2 years)
Curriculum list of required lesson plans, simulator demos, scenarios, and JPMs for Initial RO,
SRO upgrade, and SRO instant. (Include the training material numerical designators)
Curriculum list of required topics, lesson plans, and scenarios for biennial LOR classroom and
simulator training
All examinations, answer keys, and answer key changes for the ROs and SROs license class in
question. (Include all candidate grades, evaluations, and the audit exam (written & operating)
results.)
All qualification cards (OJT) for the license class in question, including all significant reactivity
manipulations
All licensed operator exam scores and evaluations for the last two years
Electronic version of the Task-to-Training matrix, including task lists for ROs and SROs
List of recent (last 3 years) plant equipment modifications and associated training needs
analysis
Post Training Effectiveness Evaluations for Initial License Operator Training Programs
conducted in the last 5 years