RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments
From kanterella
Jump to navigation
Jump to search
ML15173A440 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 06/26/2015 |
From: | McCoy G J Division of Reactor Safety II |
To: | Constance N E South Carolina Electric & Gas Co |
References | |
50-395/15-301, CR-14-01708, RC-15-0076 | |
Download: ML15173A440 (16) | |
Similar Documents at Summer | |
---|---|
Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022
[Table view](Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14 Category:License-Operator MONTHYEARML22125A1762022-05-0505 May 2022
[Table view]Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17263B2132017-09-14014 September 2017 V. C. Summer Nuclear Power Plant - Operator Licensing Examination Approval 05000395/2017301 ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML15280A3802015-10-0505 October 2015 September 2015 - NRC Generic Fundamentals Examination Results ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 2022-05-05 Category:Part 55 Examination Related Material MONTHYEARML22125A1762022-05-0505 May 2022
[Table view]Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 ML13301A7412013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Administrative JPMs ML13301A7172013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Draft SRO Written Exam ML13301A7392013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Sim IN-Plant Jpmss ML13301A7432013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Post Exam Comments ML13301A7362013-10-23023 October 2013 VC Summer Initial Exam 2013-301 Final Simulator Scenarios 2022-05-05 |