Text

  • .'

Andy T. Barbee Director, Nuclear Training 803.345.4034 July 15, 2016 A SCANA COMPANY U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE

SUMMARY

, RIS 2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.

As previously discussed with Region II, V. C. Summer Units 2 and 3 plan two examinations for calendar year 2017. The proposed dates are 01/17/17 (alternate 01/30/17) and 12/04/17 (alternate 12/11/17).

Should you have any questions concerning Unit 1 exams, please call Mr. Neil E. Constance at (803) 345-4028. For questions concerning Units 2 and 3 exams, please call Mr. Paul A Mathena at (803) 345-4642.

TS/ATB/wm Attachments (2) c: K. B. Marsh S. A Williams S. A Byrne N. E. Constance J.B. Archie P. A Mathena N. S. Carns NRC Resident Inspector J. H. Hamilton K. M. Sutton J. W. Williams NSRC W. M. Cherry RTS (CR-16-03121)

C. Haney File (814. 04, RR 1150)

G. J. McCoy PRSF (RC-16-0114)

E. F. Guthrie DCRM V. C. Summer Nuclear Station* P. 0. Box 88

  • Jenkinsville, SC* 29065
  • F(803) 941-9776

f.'

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) rJP" R<G"<., Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

+~- >'\ information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regardin~ burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 c

t; ,.~" EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

. lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

\, . 0# NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means "1 ..... f.*"' used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 .1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS -

B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER

  • NUMBER OF REACTOR OPERATORS 3 3 3 0

, NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 3 0 NUMBER OF SENIOR REACTOR' OPERATORS-UPGRADE 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 c

PROPOSED DATES PRIMARY DATE 05/28/2018 10/28/2019. 10/26/2020 ALTERNATE DATE 06/04/2018 11/04/2019 11/02/2020

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 0 6 0 CANDIDATES NRC FORM 536 (05-2016)

4 v

  • NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~*

+~*

...",.~-

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send ti

~

ll OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~.  ; EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~..'>~ .-~o~ NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

'*"'**°'. used to impose an information collection does not display a currenijy valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION Virgil C. Summer Nuclear Station, Units 2 and 3 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS

. CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 24 24 24 24 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2018 09116/2019 09/14/2020 09/13/2021 ALTERNATE DATE 10/22/2018 09/30/2019 09/28/2020 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 2017 PROPOSED NUMBER MARCH CY

-- SEPTEMBER MARCH CY

-2018 SEPTEMBER ESTIMATED NUMBER OF 0 24 0 24 CANDIDATES NRG FORM 536 (05-2016)