ML18226A344

From kanterella
Jump to navigation Jump to search
VC Summer U2 2017-302 Exam Administrative Items
ML18226A344
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/14/2018
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
References
50-395/17-02 50-395/OL-17-02
Download: ML18226A344 (10)


Text

?cIfl-3L JP1 (2--.ke ex ES-201 Examination Preparation Checklist Form ES-201-f Facility: V.C. 5v*r Date ofExamination:

Developed by: Written:)aciIity D NRC II Operating Facility NRC

. Chief Target Task Description (Reference) Examiners a e Initials

-180 1. Examination administration date confirmed (Cia; C.2.a and b)

(9,

-150 2. NRC examiners and facility contact assigned (0.1 .d; C.2.e)

-150 3. Facility contact briefed on security and other requirements (C.2.c)

-150 4. Corporate notification letter sent (C.2.d)

[-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3)

{-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1.

ES-301-2, ES-301-5, ES-D-1, ES-401-112, ES-401N-l12, ES-401-3. ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d)

{-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)

{-60) 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-45 9. Written exam and operating test reviews completed. (0.3.0 (9

-30 10. Preliminary license applications (NRC Form 398s) due (0.1.1: C.2.g; ES-202) CD

-21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h: 0.3.0

-21 12. Examinations reviewed with facility licensee (Cli: C.2.f and h: C.3.g)

-14 13. Final license applications due and Form ES-201-4 prepared (CII; C.2.i; ES-202)

-14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)

-7 15. Facility licensee management queried regarding the licensees views on the examination. (0.2 j)

-7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility: and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7 17. Proctoringlwritten exam administration guidelines reviewed with facility licensee (0.3k) ft1

-7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply) to examinations prepared by the NRC.

ES-201, Page 25 of 28

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility: Vc. jirt c- a 3 Date of Examhiation: S- t ?-

Initials tern Tjk Description h

a 1 a. Jrrrfy that the outtiwfs) fit(s) the apnrrrpnrite model in accni dance with E$-4ti I or ES401 N.

W b. Assess whether the outline was systemiifcollv end r5ndnrnlv prepared in at:cordance with fr; R lion U I of ES 401 or S 401N ft vheth r all HA ar gores ate rrrprmf ty1mpli ii

a. /ssnss whehret the outline overemph;wDes any systems, evolutions, or generic topics.
d. Assess whetner the justifications for desalectccl or rejected K/A statements are appromiato.

2, a, Using Form ES 3015. verify that the proposed Scenario sets cover the required number of entoil ail3ons ii rstror nent and componet it failures, technical specifications and major S transients.

h. Assess whether there are enough scenario sets (and spares) to test the projected number and u mix of applicants in accordance with the expected crew composition arid rotation setredule without compromising exam integrity, and enstire that each applicant can be tested using at L

A least one new or significantly modified scenario, that no suenat los are duplicated from the T applicants etrdit test(s), am) that scenarios will not be repeated on subsedtuont days.

c. To the extent possible, assess whether the outline(s) conforms with the qualitative and connotative criteha specified on Form ES 301 4 and aescribad in Appendix D anti In Section D.5, Specitic Instructions for the Simulator Operating Test, of tS30i (inclutting overlap).
3. a. Verify that the systems waikthrough outline meets the criteria specified on Fnrnr ES30l2:

( I) lire outline(s) contains the required number of control mom and in plant tasks distributed W among the safety functions as specified on the form.

A (21 r,lsk repetition from the last two NRC examinafiaris is within the imits specited on the form.

L (3) No tasks are duplicated from the applicants audit test(s).

K 14) Tim irrjirrher ci ow or mnodifled tasks meets or exceeds th reinirrrurns specified on the iomi.

1 (5) The number of alternate-path, lowpower, emerooncy, and radiologically controlled area ft Siaks meets tfie criteria an the form.

R

1) b. Verify that the adm:nisrratrve eutlino meets the critriu specified on Form ES30 I U (1) tue tasks are distribtrted among the topics as specfied on the form.

(2) At least one task is raw or significantly mcdified.

H (3) No more their one task is repeated born the last two NRC licensing examinations.

c. Deter mine whether there are enough rtiltoment outlines tr) test the projected numnrber arid nix of urplicants and ensure that no items are duplicated on subsequent days,

%Q 4, a Assess whether plarrtsç.mcific priorities (itrctudirrq probabilistic risk assessment and individual plant examination Insights) are coverer) In the appropriate extort sections. rW\ ,

b. Assess whether the tO CFR 55,41, 55,43, antI 55.4b sampling is appropriate.

e.. Lmtrrure that K/A importance ratings (excntrt Inn plarrt-specific Pt iorities) are at east 2.5. 3 (.

Pt d. Check for duplication and overlap among exam sectrons amid ffre test two NRC exams. 1 L e. Check the entire exam for balance of covemqe.

[Aur;nsa whether trio exmrr rita tfro eppmcnirrte jot) level (NO or CRC).

Pr kited Nnme!Signatu e [fate

a. Arrttrar ..-.____

I 3J_jj;17 c(.,(lr rxtr ion l#l & t ri. NRC Supervisor JA; tYhrJ r VV*Vb\

3/3/i7 Not aoriIicablo for NRC-proper ort extiiiririten out tines.

  1. the ir .riepeo:tent NRC reviewer initials items in colr mn c: tire atSet nxtnri.rers concur once is r rrnruirect ES-201 Page 30 of 32

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: \/ *5 yq Date of Examination: s3 j1 Operating Test Number: CC.4s ,S .

1.

General Cnteria Initials b c/f

a. The operating test conforms with the previously approved outline; changes are consistent with sampling reqiarements (e.g., 10 CFR 55.45, operational importance, satety function distribution).
b. There is no day-to-day repetition between this and other operating tesLs to be admirsstered during this examination. -
c. The operating test shall not Utiplicate items from the applicants audit test(s). (see Section D.1.a.)
d. Overlap with the written examination and between different parts of the operating test is within X acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. Walk-Through Criteria
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initialing cues
  • references and toots, including associated procedures
  • reasonable and validated time limits (average lime allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
  • operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature

-- system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and theii associated performance standards restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-l and 2) have not caused the test to deviate from any of the acceptance umiteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specifled on those forms and Form FS-201-2.
3. SImulator Criteria -- ..-

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form W ES-301-4 and a copy is attached. =

Printed Name I Signature Date

a. Author CQ C. tQQL ii. j I). raclity Reviewer() . flAR-LS / .

9 l i7 c.

d.

NRC Chief Fxaminer (4)

NRC Supervisur 7 if .

Cdw*

/ PI I5/i NOTE: the facility signature is not applicable for NRC-developed tests.

  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence reqtnred.

ES-30l Page 24 of 27

Paul A. Mothena Manajoc Nuclear Traming ScE&G. ASCANA COMPANY arc NND-1 7-0175 Mr. Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. NE., Suite 1200 Atlanta, GA 30303-1 257

Subject:

Virgil C. Summer Nuclear Station Unit 2 Docket No.52-027 Operating License No. NPF-93 Senior Reactor Operator Initial Examination Outlines

Dear Mr. Guthtie:

Based on the guidelines in NUREG1D21, Operator Licensing Examination Standards for Power Reactors, Revision 10, in particular ES-201 Initial Operator Licensing Examination Process and ES-301, Preparing Initial Operating Tests, South Carolina Electric & Gas Company (SCE&G) has enclosed the following information for your consideration:

  • Enclosure 1 ES-201-2, Examination Outline Quality Checklist Enclosure 2 ES-201-3, Examination Security Agreement
  • Enclosure 3 ES-301-1, Administrative Topics Outline
  • Enclosure 4 ES-301-2, Control Room/In-Plant Systems Outline The enclosed examination materials have been independently reviewed by Mr. Albert C. Harris, NND Nuclear Operations Manager.

In accordance with NUREG-1 021, this material must be withheld from public disclosure until the examinations are complete.

Should there be any questions, please contact Mr. Scott C. Dimeler at (803) 931-5409.

Respectfully, e t6 Paul A. Mothena Manager, Nuclear Training BR/PAM/kb Enclosures c: (Without Enclosures unless noted)

G. J. McCoy M. A. Bates S. C. Dimeler NRC Resident Inspector DCRM V. C. Smmr Nu lM Stition . R t). Box 8B JonkhiwilI, Sotilh Carolina . 90 F (803) Q41-9776 . www.ccg.com

POR OtflCIAL USE ONLY-Paul A. Mothena Manager, Nuclear Training 803.345.4642 A SCANA COMPANY April 10, 2016 NND-1 7-0197 Mr. Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety U. S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave. N.E., Suite 1200 Atlanta, GA 30303-1257

Subject:

VIRGIL C. SUMMER NUCLEAR STATION UNIT 2 DOCKET NO.52-027 OPERATING LICENSE NO. NPF-93 SENIOR REACTOR OPERATIONAL EXAMINATION AND SUPPORTING REFERENCE MATERIAL

Dear Mr. Guthrie,

Based on the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10, in particular ES-301, Preparing Initial Operating Tests, South Carolina Electric & Gas Company is providing the following information for your consideration:

  • Enclosure 1 ES-201-2, Examination Outline Quality Checklist
  • Enclosure 2 ES-201-3, Examination Security Agreement
  • Enclosure 3 ES-301-1, Administrative Topics Outline
  • Enclosure 4 ES-301-2, Control Room/In-Plant Systems Outline
  • Enclosure 5 ES-301-3, Operating Test Quality Checklist
  • Enclosure 6 Reference Material For JPMs
  • Enclosure 7 Actual JPMs The enclosed examination materials have been independently reviewed by Mr. Albert C. Harris, NND Nuclear Operations Manager. In accordance with NUREG-1 021, this material must be withheld from public disclosure until the examinations are complete.

V. C. Summer Nudear Station . P.O. Box 88. Jenkinsville, 5outh Carolina .29065.1(803) 941-9776. www.sceg.com

NND-17-0197 Page 2 of 2 Should there be any questions, please contact Mr. Scott C. Dimeler at (803) 931-5409.

Very truly yours, b

Paul A. Mothena Manager, Nuclear Training BR/PAM/kb Enclosures C: (Without Enclosures unless noted)

G. J. McCoy M. A. Bates S. C. Dimeler NRC Resident Inspector DORM CR-NND-1 7-0197