ML072430311: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2007
| issue date = 08/31/2007
| title = 8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan
| title = 8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan
| author name = Burgess B L
| author name = Burgess B
| author affiliation = NRC/RGN-III/DRP/RPB6
| author affiliation = NRC/RGN-III/DRP/RPB6
| addressee name = Bezilla M B
| addressee name = Bezilla M
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000346
| docket = 05000346
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:August 31, 2007 Mr. Mark B. Bezilla Site Vice President
{{#Wiki_filter:August 31, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
 
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station
 
5501 North State Route 2
 
Oak Harbor, OH 43449-9760


==SUBJECT:==
==SUBJECT:==
Line 29: Line 23:
==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==


On August 14, 2007, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff
On August 14, 2007, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.
reviewed performance indicators (PIs) for the most recent quarter and inspection results over
Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections as noted below.
 
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. In addition to the program defined inspection activities, additional oversight activities will be conducted to follow up on the independent assessments in the areas of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The plan includes a component design bases inspection and a biennial PI&R inspection. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
the previous 12 months. The purpose of this lette r is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will
 
include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified
 
as having very low safety significance (Green) and all PIs indicating performance at a level
 
requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight
 
process (ROP) baseline inspections at your facility. We also plan on conducting several
 
non-ROP inspections as noted below.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. In addition to the program defined inspection activities, additional
 
oversight activities will be conducted to follow up on the independent assessments in the areas
 
of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The
 
inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel
 
availability issues well in advance of inspector arrival onsite. Routine resident inspections are
 
not listed due to their ongoing and continuous nature. The plan includes a component design
 
bases inspection and a biennial PI&R inspection. The inspections scheduled within the last
 
nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
M. Bezilla In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC


Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Bezilla                                      In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
the inspection plan, we will contact you to discuss the change as soon as possible. Please
                                              /RA/
 
Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
contact me at (630) 829-9629 with any questions you may have regarding this letter or the
 
inspection plan.
Sincerely,/RA/Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3


==Enclosure:==
==Enclosure:==


Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:
Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:
See next page M. Bezilla In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
See next page
 
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
 
the inspection plan, we will contact you to discuss the change as soon as possible. Please
 
contact me at (630) 829-9629 with any questions you may have regarding this letter or the


inspection plan.
M. Bezilla                                                                  In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                                                          /RA/
Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3


==Enclosure:==
==Enclosure:==


Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:
Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:
See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Davis Besse\Davis Besse 2007 MOC ltr.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMEPZurawski:dtpBBurgessDATE08/22/0708/22/07 OFFICIAL RECORD COPY Letter to M. Bezilla from B. Burgess dated August 31, 2007
See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Davis Besse\Davis Besse 2007 MOC ltr.wpd X Publicly Available                       G Non-Publicly Available                 G Sensitive              X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII NAME                PZurawski:dtp                      BBurgess DATE                08/22/07                            08/22/07 OFFICIAL RECORD COPY
 
Letter to M. Bezilla from B. Burgess dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DAVIS-BESSE NUCLEAR POWER STATIONcc w/encl:The Honorable Dennis Kucinich J. Hagan, President and Chief
DAVIS-BESSE NUCLEAR POWER STATION cc w/encl:     The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Richard Anderson, Vice President, Nuclear Support - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
 
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO
Nuclear Officer - FENOC
 
J. Lash, Senior Vice President of
 
Operations and Chief Operating Officer - FENOC
 
Richard Anderson, Vice President, Nuclear Support - FENOC
 
Manager - Site Regulatory Compliance - FENOC
 
D. Pace, Senior Vice President of
 
Fleet Engineering - FENOC
 
J. Rinckel, Vice President, Fleet Oversight - FENOC
 
D. Jenkins, Attorney, FirstEnergy Corp.
 
Director, Fleet Regulatory Affairs - FENOC
 
Manager - Fleet Licensing - FENOC
 
Ohio State Liaison Officer
 
R. Owen, Administrator, Ohio Department of Health
 
Public Utilities Commission of Ohio
 
President, Lucas County Board of Commissioners
 
President, Ottawa County Board of Commissioners
 
Ottawa County Sheriff
 
Director, Ottawa County EMA
 
Lucas County Sheriff
 
Director, Lucas County EMA
 
Genoa Village Administrator
 
Mayor of Clay Center
 
Mayor of Elmore
 
Mayor of Genoa
 
Mayor of Oak Harbor
 
Mayor of Toledo
 
Mayor of Port Clinton
 
Mayor of Marblehead
 
Mayor of Rocky Ridge
 
Village Administrator of Oak Harbor
 
Mayor of Put-in-Bay


INPO Letter to M. Bezilla from B. Burgess dated August 31, 2007
Letter to M. Bezilla from B. Burgess dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION
DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:
: TEB RAG1 SPS1 TJW2 RidsNrrDirslpab
TEB RAG1 SPS1 TJW2 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Davis-Besse DRPIII DRSIII PLB1 TXN


JLC1 MAS KGO JKH3 RML2 SAM9 SRI Davis-Besse
Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff    Planned Dates          Inspection Inspection Activity                                                Title                                          on Site        Start    End              Type HD REPL      - RPV HEAD DROP CALCULATIONS                                                                              1 IP 7111120          Refueling and Other Outage Activities                                                                  07/09/2007 11/18/2007 Baseline Inspections 95003        - 07 INDP ENG ASSESSMENT OBS                                                                              1 IP 95003            Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              09/17/2007 09/21/2007 Supplemental Program 95003        - 07 INDP CAP RPT REVIEW                                                                                  1 IP 95003            Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              10/01/2007 10/05/2007 Supplemental Program BI ENG        - COMPONENT DESIGN BASES INSPECTION                                                                        6 IP 7111121          Component Design Bases Inspection                                                                      10/22/2007 11/30/2007 Baseline Inspections 95003        - 07 INDP SC/SCWE OBSERVATION                                                                              1 IP 95003            Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              10/29/2007 11/02/2007 Supplemental Program BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                2 IP 7112201          Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                              12/10/2007 12/14/2007 Baseline Inspections IP 7112202          Radioactive Material Processing and Transportation                                                    12/10/2007 12/14/2007 Baseline Inspections BI ENG        - ENGINEERING INSERVICE INSPECTION/ TI-150                                                                1 IP 2515/150          Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA                    01/01/2008 01/28/2008 Safety Issues IP 7111108P          Inservice Inspection Activities - PWR                                                                  01/01/2008 01/28/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                2 IP 7112101          Access Control to Radiologically Significant Areas                                                    01/07/2008 01/11/2008 Baseline Inspections IP 7112102          ALARA Planning and Controls                                                                            01/07/2008 01/11/2008 Baseline Inspections ORDER        - 07 SC/SCWE REPORT REVIEW                                                                                1 IP 95003            Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              02/04/2008 02/08/2008 Supplemental Program OL EXAM      - DAVIS-BESSE INIT PREP 08/2007                                                                            3 W90159            OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007                                                        01/28/2008 02/01/2008 Not Applicable BI EP        - EP ROUTINE INSPECTION / PI VERIFICATION                                                                  1 IP 7111402          Alert and Notification System Testing                                                                  02/25/2008 03/01/2008 Baseline Inspections IP 7111403          Emergency Response Organization Augmentation Testing                                                  02/25/2008 03/01/2008 Baseline Inspections IP 7111405          Correction of Emergency Preparedness Weaknesses and Deficiencies                                      02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP01        Drill/Exercise Performance                                                                            02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP02        ERO Drill Participation                                                                                02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP03        Alert & Notification System                                                                            02/25/2008 03/01/2008 Baseline Inspections OL EXAM      - DAVIS-BESSE INIT EXAM 09/2007                                                                            3 W90159            OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007                                                        02/18/2008 02/29/2008 Not Applicable BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                1 IP 7112103          Radiation Monitoring Instrumentation and Protective Equipment                                          03/03/2008 03/07/2008 Baseline Inspections


DRPIII DRSIII PLB1 TXN Davis-Besse Inspection / Activity Plan 09/01/2007
Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff   Planned Dates        Inspection Inspection Activity                                              Title                                          on Site       Start     End            Type 95003         - INDEP OPS ASSESSMENT F/U                                                                                2 IP 95003           Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple             04/01/2008 09/30/2008 Supplemental Program 95003         - INDP ENGR ASSESS. F/U                                                                                   1 IP 95003           Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              04/01/2008 09/30/2008 Supplemental Program BI PI&R       - BIENNIAL PI&R INSPECTION                                                                               3 IP 71152B          Identification and Resolution of Problems                                                              04/21/2008 05/09/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                               1 IP 7112203         Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P               05/26/2008 05/30/2008 Baseline Inspections IP 71151-PR01       RETS/ODCM Radiological Effluent                                                                       05/26/2008 05/30/2008 Baseline Inspections BI ENG       - ENGINEERING MODIFICATIONS / 50.59 INSP.                                                                 2 IP 7111102         Evaluation of Changes, Tests, or Experiments                                                           06/02/2008 06/20/2008 Baseline Inspections IP 7111117B         Permanent Plant Modifications                                                                         06/02/2008 06/20/2008 Baseline Inspections 95003         - INDEP CAP ASSESS. F/U                                                                                   1 IP 95003           Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              07/01/2008 12/31/2008 Supplemental Program 95003         - INDP SC/SCWE ASSESS. F/U                                                                               1 IP 95003           Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              07/01/2008 12/31/2008 Supplemental Program BI ENG       - BIENNIAL HEAT SINK INSPECTION                                                                           1 IP 7111107B        Heat Sink Performance                                                                                  08/25/2008 08/29/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                               1 IP 7112101         Access Control to Radiologically Significant Areas                                                     09/01/2008 09/05/2008 Baseline Inspections IP 7112102         ALARA Planning and Controls                                                                           09/01/2008 09/05/2008 Baseline Inspections IP 71151-BI01       Reactor Coolant System Activity                                                                       09/01/2008 09/05/2008 Baseline Inspections IP 71151-OR01       Occupational Exposure Control Effectiveness                                                           09/01/2008 09/05/2008 Baseline Inspections BI OL         - BIENNIAL REQUAL. PROGRAM INSPECTION                                                                     2 IP 7111111B        Licensed Operator Requalification Program                                                              11/10/2008 11/14/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                               1 IP 7112201         Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                               11/24/2008 11/28/2008 Baseline Inspections}}
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 1 HD REPL-RPV HEAD DROP CALCULATIONS Baseline Inspections 07/09/2007 11/18/2007 1     7111120 IP Refueling and Other Outage Activities 1 95003-07 INDP ENG ASSESSMENT OBS Supplemental Progra m 09/17/2007 09/21/2007 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 1 95003-07 INDP CAP RPT REVIEW Supplemental Progra m 10/01/2007 10/05/2007 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 6 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/22/2007 11/30/2007 1    7111121 IP Component Design Bases Inspection 1 95003-07 INDP SC/SCWE OBSERVATION Supplemental Progra m 10/29/2007 11/02/2007 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1    7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/10/2007 12/14/2007 1    7112202 IP Radioactive Material Processing and Transportation 1 BI ENG-ENGINEERING INSERVICE INSPECTION/ TI-150 Safety Issues 01/01/2008 01/28/2008 1    2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA Baseline Inspections 01/01/2008 01/28/2008 1    7111108P IP Inservice Inspection Activities - PWR 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 01/07/2008 01/11/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 01/07/2008 01/11/2008 1    7112102 IP A LARA Planning and Controls 1 ORDER-07 SC/SCWE REPORT REVIEW Supplemental Progra m 02/04/2008 02/08/2008 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 3 OL EXAM-DAVIS-BESSE INIT PREP 08/2007 Not Applicable 01/28/2008 02/01/2008 1    W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP  2007 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 02/25/2008 03/01/2008 1    7111402 IP A lert and Notification System Testing Baseline Inspections 02/25/2008 03/01/2008 1    7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/25/2008 03/01/2008 1    7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/25/2008 03/01/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/25/2008 03/01/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 02/25/2008 03/01/2008 1    71151-EP03 IP A lert & Notification System 3 OL EXAM-DAVIS-BESSE INIT EXAM 09/2007 Not Applicable 02/18/2008 02/29/2008 1    W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP  2007 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/03/2008 03/07/2008 1    7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Davis-Besse Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 2 95003-INDEP OPS ASSESSMENT F/U Supplemental Progra m 04/01/2008 09/30/2008 1     95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 1 95003-INDP ENGR ASSESS. F/U Supplemental Progra m 04/01/2008 09/30/2008 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 3 BI PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections 04/21/2008 05/09/2008 1    71152B IP Identification and Resolution of Problems 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 05/26/2008 05/30/2008 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 05/26/2008 05/30/2008 1    71151-PR01 IP RETS/ODCM Radiological Effluent 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 06/02/2008 06/20/2008 1    7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/02/2008 06/20/2008 1    7111117B IP Permanent Plant Modifications 1 95003-INDEP CAP ASSESS. F/U Supplemental Progra m 07/01/2008 12/31/2008 1     95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 1 95003-INDP SC/SCWE ASSESS. F/U Supplemental Progra m 07/01/2008 12/31/2008 1     95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 1 BI ENG-BIENNIAL HEAT SINK INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1    7111107B IP Heat Sink Performance 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/01/2008 09/05/2008 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/01/2008 09/05/2008 1    7112102 IP A LARA Planning and Controls Baseline Inspections 09/01/2008 09/05/2008 1    71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 09/01/2008 09/05/2008 1    71151-OR01 IP Occupational Exposure Control Effectiveness 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/10/2008 11/14/2008 1    7111111B IP Licensed Operator Requalification Program 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/24/2008 11/28/2008 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 04:04, 23 November 2019

8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan
ML072430311
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/2007
From: Burgess B
NRC/RGN-III/DRP/RPB6
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML072430311 (7)


Text

August 31, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Bezilla:

On August 14, 2007, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections as noted below.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. In addition to the program defined inspection activities, additional oversight activities will be conducted to follow up on the independent assessments in the areas of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The plan includes a component design bases inspection and a biennial PI&R inspection. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Davis Besse\Davis Besse 2007 MOC ltr.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PZurawski:dtp BBurgess DATE 08/22/07 08/22/07 OFFICIAL RECORD COPY

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Richard Anderson, Vice President, Nuclear Support - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:

TEB RAG1 SPS1 TJW2 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Davis-Besse DRPIII DRSIII PLB1 TXN

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type HD REPL - RPV HEAD DROP CALCULATIONS 1 IP 7111120 Refueling and Other Outage Activities 07/09/2007 11/18/2007 Baseline Inspections 95003 - 07 INDP ENG ASSESSMENT OBS 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 09/17/2007 09/21/2007 Supplemental Program 95003 - 07 INDP CAP RPT REVIEW 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/01/2007 10/05/2007 Supplemental Program BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 10/22/2007 11/30/2007 Baseline Inspections 95003 - 07 INDP SC/SCWE OBSERVATION 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/29/2007 11/02/2007 Supplemental Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/10/2007 12/14/2007 Baseline Inspections IP 7112202 Radioactive Material Processing and Transportation 12/10/2007 12/14/2007 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION/ TI-150 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 01/01/2008 01/28/2008 Safety Issues IP 7111108P Inservice Inspection Activities - PWR 01/01/2008 01/28/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112101 Access Control to Radiologically Significant Areas 01/07/2008 01/11/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 01/07/2008 01/11/2008 Baseline Inspections ORDER - 07 SC/SCWE REPORT REVIEW 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 02/04/2008 02/08/2008 Supplemental Program OL EXAM - DAVIS-BESSE INIT PREP 08/2007 3 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 01/28/2008 02/01/2008 Not Applicable BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 IP 7111402 Alert and Notification System Testing 02/25/2008 03/01/2008 Baseline Inspections IP 7111403 Emergency Response Organization Augmentation Testing 02/25/2008 03/01/2008 Baseline Inspections IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 02/25/2008 03/01/2008 Baseline Inspections OL EXAM - DAVIS-BESSE INIT EXAM 09/2007 3 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 02/18/2008 02/29/2008 Not Applicable BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/03/2008 03/07/2008 Baseline Inspections

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type 95003 - INDEP OPS ASSESSMENT F/U 2 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 04/01/2008 09/30/2008 Supplemental Program 95003 - INDP ENGR ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 04/01/2008 09/30/2008 Supplemental Program BI PI&R - BIENNIAL PI&R INSPECTION 3 IP 71152B Identification and Resolution of Problems 04/21/2008 05/09/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 05/26/2008 05/30/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 05/26/2008 05/30/2008 Baseline Inspections BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/02/2008 06/20/2008 Baseline Inspections IP 7111117B Permanent Plant Modifications 06/02/2008 06/20/2008 Baseline Inspections 95003 - INDEP CAP ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 07/01/2008 12/31/2008 Supplemental Program 95003 - INDP SC/SCWE ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 07/01/2008 12/31/2008 Supplemental Program BI ENG - BIENNIAL HEAT SINK INSPECTION 1 IP 7111107B Heat Sink Performance 08/25/2008 08/29/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 09/01/2008 09/05/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 09/01/2008 09/05/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 09/01/2008 09/05/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/01/2008 09/05/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 11/10/2008 11/14/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/24/2008 11/28/2008 Baseline Inspections