IR 05000424/2008501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams|number = ML083660013}}
{{Adams
| number = ML083660013
| issue date = 12/31/2008
| title = IR 05000424-08-501 and 05000425-08-501; 06/06/2008 - 12/05/2008; Vogtle Electric Generating Plant, Units 1 and 2; Emergency Preparedness
| author name = Bonser B R
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Tynan T E
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| license number = NPF-068, NPF-081
| contact person =
| document report number = IR-08-501
| document type = Inspection Report, Letter
| page count = 10
}}


{{IR-Nav| site = 05000424 | year = 2008 | report number = 501 }}
{{IR-Nav| site = 05000424 | year = 2008 | report number = 501 }}
Line 7: Line 21:
[[Issue date::December 31, 2008]]
[[Issue date::December 31, 2008]]


Mr. TomVice President Southern Nuclear Operating Company, Inc.
Mr. Tom Vice President Southern Nuclear Operating Company, Inc.


Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830


SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000424/2008-501 AND 05000425/2008-501
SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000424/2008-501 AND 05000425/2008-501


==Dear Mr. Tynan:==
==Dear Mr. Tynan:==
Line 24: Line 38:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,Ruben Hamilton /RA/ for Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.(s): 50-424, 50-425 License No.(s): NPF-68, NPF-81  
Sincerely,Ruben Hamilton /RA/ for Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No.(s): 50-424, 50-425 License No.(s): NPF-68, NPF-81  


===Enclosure:===
===Enclosure:===
Line 30: Line 46:


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl.: (See page 2)
Supplemental Information  
SNC 2 cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution N. J. Stringfellow Manager Licensing Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL  35201-1295 David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.
 
cc w/encl.: (See page 2)
SNC 2 cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
 
N. J. Stringfellow Manager Licensing Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
 
Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  


Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution SNC 3 cc:w/encl Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA   30334-4600 Senior Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA   30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution SNC 4 Letter to Tom
Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295
 
David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.
 
Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
 
Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution  
 
Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution  
 
Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution  
 
Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution  
 
Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution  
 
Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution  
 
Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution  
 
Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution SNC 3 cc:w/encl Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution  
 
SNC 4 Letter to Tom from Brian Bonser dated December 31, 2008
 
SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000424/2008-501 AND 05000425/2008-501 Distribution w/encl:
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)
 
_________________________ X G SUNSI REVIEW COMPLETE Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II
 
Docket Nos.: 05000424, 05000425
 
License Nos.: NPF-68, NPF-81
 
Report No.: 05000424/2008-501 and 05000425/2008-501
 
Licensee: Southern Nuclear Operating Company, Inc.
 
Facility: Vogtle Electric Generating Plant, Units 1 and 2
 
Location: Waynesboro, GA
 
Dates: June 23 - 27, 2008 and December 1 - 5, 2008
 
Inspectors: Lee Miller, Senior Emergency Preparedness Inspector Bob Holbrook, Emergency Preparedness Inspector Rick Baldwin, Senior Operations Engineer Eddie Morris, Senior Resident Inspector (Acting)
Tim Chandler, Resident Inspector
 
Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
 
Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
Line 40: Line 110:
Generating Plant, Units 1 and 2; Emergency Preparedness  
Generating Plant, Units 1 and 2; Emergency Preparedness  


The report covered an announced inspection by two emergency preparedness inspectors, a reactor operations engineer, and two resident inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor
The report covered an announced inspection by two emergency preparedness inspectors, a reactor operations engineer, and two resident inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."
Oversight Process."


===A. NRC-Identified and Self-Revealing Findings===
===A. NRC-Identified and Self-Revealing Findings===
No findings of significance were identified.
No findings of significance were identified.


===B. Licensee-Identified Violations===
===B. Licensee-Identified Violations===
None
None


Line 54: Line 125:


===Cornerstone:===
===Cornerstone:===
Emergency Preparedness 1EP1 Exercise Evaluation
Emergency Preparedness 1EP1 Exercise Evaluation


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle. The onsite inspection consisted of the following review and assessment:
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
 
The onsite inspection consisted of the following review and assessment:
* The adequacy of the licensee's performance in the biennial exercise conducted on December 2, 2008, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The adequacy of the licensee's performance in the biennial exercise conducted on December 2, 2008, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
* The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities" and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and  Emergency Operations Facility (EOF).
* The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities" and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and  Emergency Operations Facility (EOF).
Line 67: Line 140:


====b. Findings====
====b. Findings====
No findings of significance were identified. 1EP4  Emergency Action Level and Emergency Plan Changes
No findings of significance were identified.
 
1EP4  Emergency Action Level and Emergency Plan Changes


====a. Inspection Scope====
====a. Inspection Scope====
Since the last NRC inspection of this program area, Revisions 45, 46, 48, 49, and 50 of the Radiological Emergency Response Plan was implemented based on the licensee's determination, in accordance with 10 CFR 50.54(q), that the changes resulted in no decrease in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The inspectors conducted a sampling review of the Plan changes and implementing procedure changes made between September 30, 2007 and October 31, 2008 to evaluate for potential decreases in effectiveness of the Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. The inspection was conducted in accordance with NRC Inspection Procedure 71114, Attachment 04, AEmergency Action Level and Emergency Plan Changes.@  The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
Since the last NRC inspection of this program area, Revisions 45, 46, 48, 49, and 50 of the Radiological Emergency Response Plan was implemented based on the licensee's determination, in accordance with 10 CFR 50.54(q), that the changes resulted in no decrease in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The inspectors conducted a sampling review of the Plan changes and implementing procedure changes made between September 30, 2007 and October 31, 2008 to evaluate for potential decreases in effectiveness of the Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
 
The inspection was conducted in accordance with NRC Inspection Procedure 71114, Attachment 04, AEmergency Action Level and Emergency Plan Changes.
 
@  The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.


The inspectors reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
The inspectors reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
Line 82: Line 161:


====a. Inspection Scope====
====a. Inspection Scope====
Cornerstone: Emergency Preparedness The inspectors sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspectors reviewed the period from January 1, 2007 through March 31, 2008.
===Cornerstone:===
Emergency Preparedness The inspectors sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspectors reviewed the period from January 1, 2007 through March 31, 2008.


To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.
To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.


  $ Emergency Response Organization Drill/Exercise Performance (DEP) $ Emergency Response Organization Readiness (ERO) $ Alert and Notification System Reliability (ANS)   The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for compiling and reporting the PIs with cognizant emergency preparedness personnel. The inspectors also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluations. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.
  $ Emergency Response Organization Drill/Exercise Performance (DEP)  
$ Emergency Response Organization Readiness (ERO)  
$ Alert and Notification System Reliability (ANS)
The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for compiling and reporting the PIs with cognizant emergency preparedness personnel. The inspectors also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluations. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.


Reviewed documents are listed in the Attachment to this report.
Reviewed documents are listed in the Attachment to this report.


====b. Findings====
====b. Findings====
No findings of significance were identified.  
No findings of significance were identified.
 
{{a|4OA5}}
{{a|4OA5}}
==4OA5 Other Activities==
==4OA5 Other Activities==


===.1 (Closed) NRC Temporary Instruction (TI) 2525/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review===
===.1 (Closed) NRC Temporary Instruction (TI) 2525/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review===
The inspectors completed Temporary Instruction TI 2515/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review. Appropriate documentation of the results was provided to NRC, HQ, as required by the TI.
The inspectors completed Temporary Instruction TI 2515/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review. Appropriate documentation of the results was provided to NRC, HQ, as required by the TI.


Line 102: Line 187:
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, including Exit==
==4OA6 Meetings, including Exit==
On December 5, 2008, the lead inspector presented the inspection results to Mr. R. Dedrickson and other members of his staff. The inspectors confirmed that proprietary information was not provided during the inspection.
On December 5, 2008, the lead inspector presented the inspection results to Mr. R. Dedrickson and other members of his staff. The inspectors confirmed that proprietary information was not provided during the inspection.


Line 108: Line 194:
=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
===Licensee personnel===
: [[contact::T. Tynan]], Site Vice President
: [[contact::R. Dedrickson]], Plant Manager
: [[contact::J. Williamson]], Site Support Manager
: [[contact::D. Vineyard]], Operations Manager
: [[contact::B. Brown]], Training Manager
: [[contact::R. Anderson]], Emergency Preparedness Supervisor
: [[contact::C. Boone]], Emergency Preparedness Coordinator
==LIST OF DOCUMENTS REVIEWED==
1EP1 Exercise Evaluation
===Procedures===
: 17100-1, Annunciator Response Procedure for the Process and Effluent Radiation Monitoring System (RMS), Rev. 23
: 91001-C, Emergency Classification and Implementing Instructions, Rev. 26, 27, 28, 29, 30, 31 91002-C, Emergency Notifications, Rev. 52 91101-C, Emergency Response Organization, Rev. 24.1 91103-C, Duties of the TSC Manager, Rev. 20 91104-C, Duties of the Operations Support Center Manager, Rev. 23
: 202-C, Activation and Operation of the Operations Support Center, Rev. 18 91401-C, Assembly and Accountability, Rev. 18 91303-C, Field Sampling and Surveys, Rev. 24 91304-C, Estimating Offsite Dose, Rev. 22 91301-C, Emergency Exposure Guidelines, Rev. 9.1
: Records and Data Documentation packages completed in the Control Room, Technical Support Center, Operations Support Center, Emergency Operations Facility, Joint Information Center.
: The packages included, but not limited to the following: logs, event notification forms, Protective Action Recommendations, Media releases, Radiological Dose Assessments, and Core Damage calculations.
: Corrective Action - Problem Evaluation Report
: 2008112703, Event classification evaluated as UNSAT.
: Remediation will be conducted.
: 2008112751, The GE notification had the wrong wind direction which resulted in an inaccurate
: PAR 2008112750, Four Drill/Exercise Performance successes out of ten opportunities for 2008 exercise - knowledge gap for both development and notification of PARs
: 2008112758, Alert and SAE Classification not timely, knowledge gap in Operations as quickest method for determining RCS DEI Iodine-131 >300 ci/gram 
: 1EP4 Emergency Action Level and Emergency Plan Changes Plans and Changes packages Change package for Vogtle Emergency Plan, Rev. 45, 46, 48, 49, and 50
: Change package for 91001-C, Emergency Classification and Implementing Instructions, Rev. 26, 27, 28, 29, 30, and 31 Change package for 91002-C, Emergency Notifications, Rev. 48, 49, 51, and 52 Change package for 91103-C, Duties of the TSC Manager, Rev. 20 Change package for 91202-C, Activation and Operation of the Operations Support Center, Rev.
: Change package for 91204-C, Emergency Response Communications, Rev. 32
: 4OA1 Performance Indicator Verification Records and Data
: Documentation of Performance Indicator data January 1, 2007 to March 31, 2008 for DEP, ANS, and ERO
==LIST OF ACRONYMS==
: [[ANS]] [[Alert and Notification System]]
: [[EOF]] [[Emergency Operations Facility]]
: [[DEP]] [[Drill/Exercise Performance]]
: [[DHS]] [[Department of Homeland Security]]
: [[ERO]] [[Emergency Response Organization]]
: [[FEMA]] [[Federal Emergency Management Agency]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[OSC]] [[Operations Support Center]]
: [[PI]] [[Performance Indicator]]
: [[PS]] [[Planning Standard]]
: [[RSPS]] [[Risk Significant Planning Standards]]
: [[TI]] [[Temporary Instruction TSC  Technical Support Center]]
}}
}}

Revision as of 22:26, 27 August 2018

IR 05000424-08-501 and 05000425-08-501; 06/06/2008 - 12/05/2008; Vogtle Electric Generating Plant, Units 1 and 2; Emergency Preparedness
ML083660013
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/2008
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Tynan T E
Southern Nuclear Operating Co
References
IR-08-501
Download: ML083660013 (10)


Text

December 31, 2008

Mr. Tom Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000424/2008-501 AND 05000425/2008-501

Dear Mr. Tynan:

On December 5, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Vogtle, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on December 5, 2008, with Mr. R. Dedrickson and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,Ruben Hamilton /RA/ for Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No.(s): 50-424, 50-425 License No.(s): NPF-68, NPF-81

Enclosure:

Inspection Report 05000424/2008-501 and 05000425/2008-501

w/Attachment:

Supplemental Information

cc w/encl.: (See page 2)

SNC 2 cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

N. J. Stringfellow Manager Licensing Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295

David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution

Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution

Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution

Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution

Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution

Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution

Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution

Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution SNC 3 cc:w/encl Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution

SNC 4 Letter to Tom from Brian Bonser dated December 31, 2008

SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000424/2008-501 AND 05000425/2008-501 Distribution w/encl:

RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)

_________________________ X G SUNSI REVIEW COMPLETE Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II

Docket Nos.: 05000424, 05000425

License Nos.: NPF-68, NPF-81

Report No.: 05000424/2008-501 and 05000425/2008-501

Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Electric Generating Plant, Units 1 and 2

Location: Waynesboro, GA

Dates: June 23 - 27, 2008 and December 1 - 5, 2008

Inspectors: Lee Miller, Senior Emergency Preparedness Inspector Bob Holbrook, Emergency Preparedness Inspector Rick Baldwin, Senior Operations Engineer Eddie Morris, Senior Resident Inspector (Acting)

Tim Chandler, Resident Inspector

Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000424/2008-501 and 05000425/2008-501; 06/06/2008 - 12/05/2008; Vogtle Electric

Generating Plant, Units 1 and 2; Emergency Preparedness

The report covered an announced inspection by two emergency preparedness inspectors, a reactor operations engineer, and two resident inspectors. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

A. NRC-Identified and Self-Revealing Findings

No findings of significance were identified.

B. Licensee-Identified Violations

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness 1EP1 Exercise Evaluation

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensee's performance in the biennial exercise conducted on December 2, 2008, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities" and Emergency Plan commitments. The facilities assessed were the Control Room simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).
  • Other performance areas besides the RSPS, such as the emergency response organization's (ERO) recognition of abnormal plant conditions, command and control, intra- and inter-facility communications, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on December 4, 2008, to evaluate the licensee's self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50 Appendix E.IV.F.2.g.

The inspectors reviewed various documents which are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, Revisions 45, 46, 48, 49, and 50 of the Radiological Emergency Response Plan was implemented based on the licensee's determination, in accordance with 10 CFR 50.54(q), that the changes resulted in no decrease in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The inspectors conducted a sampling review of the Plan changes and implementing procedure changes made between September 30, 2007 and October 31, 2008 to evaluate for potential decreases in effectiveness of the Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, Attachment 04, AEmergency Action Level and Emergency Plan Changes.

@ The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspectors reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

Cornerstone:

Emergency Preparedness The inspectors sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspectors reviewed the period from January 1, 2007 through March 31, 2008.

To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.

$ Emergency Response Organization Drill/Exercise Performance (DEP)

$ Emergency Response Organization Readiness (ERO)

$ Alert and Notification System Reliability (ANS)

The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for compiling and reporting the PIs with cognizant emergency preparedness personnel. The inspectors also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluations. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.

Reviewed documents are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

4OA5 Other Activities

.1 (Closed) NRC Temporary Instruction (TI) 2525/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review

The inspectors completed Temporary Instruction TI 2515/175, Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review. Appropriate documentation of the results was provided to NRC, HQ, as required by the TI.

This completes the Region II inspection requirements for this TI for Vogtle Electric Generating Plant.

4OA6 Meetings, including Exit

On December 5, 2008, the lead inspector presented the inspection results to Mr. R. Dedrickson and other members of his staff. The inspectors confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

T. Tynan, Site Vice President
R. Dedrickson, Plant Manager
J. Williamson, Site Support Manager
D. Vineyard, Operations Manager
B. Brown, Training Manager
R. Anderson, Emergency Preparedness Supervisor
C. Boone, Emergency Preparedness Coordinator

LIST OF DOCUMENTS REVIEWED

1EP1 Exercise Evaluation

Procedures

17100-1, Annunciator Response Procedure for the Process and Effluent Radiation Monitoring System (RMS), Rev. 23
91001-C, Emergency Classification and Implementing Instructions, Rev. 26, 27, 28, 29, 30, 31 91002-C, Emergency Notifications, Rev. 52 91101-C, Emergency Response Organization, Rev. 24.1 91103-C, Duties of the TSC Manager, Rev. 20 91104-C, Duties of the Operations Support Center Manager, Rev. 23
202-C, Activation and Operation of the Operations Support Center, Rev. 18 91401-C, Assembly and Accountability, Rev. 18 91303-C, Field Sampling and Surveys, Rev. 24 91304-C, Estimating Offsite Dose, Rev. 22 91301-C, Emergency Exposure Guidelines, Rev. 9.1
Records and Data Documentation packages completed in the Control Room, Technical Support Center, Operations Support Center, Emergency Operations Facility, Joint Information Center.
The packages included, but not limited to the following: logs, event notification forms, Protective Action Recommendations, Media releases, Radiological Dose Assessments, and Core Damage calculations.
Corrective Action - Problem Evaluation Report
2008112703, Event classification evaluated as UNSAT.
Remediation will be conducted.
2008112751, The GE notification had the wrong wind direction which resulted in an inaccurate
PAR 2008112750, Four Drill/Exercise Performance successes out of ten opportunities for 2008 exercise - knowledge gap for both development and notification of PARs
2008112758, Alert and SAE Classification not timely, knowledge gap in Operations as quickest method for determining RCS DEI Iodine-131 >300 ci/gram
1EP4 Emergency Action Level and Emergency Plan Changes Plans and Changes packages Change package for Vogtle Emergency Plan, Rev. 45, 46, 48, 49, and 50
Change package for 91001-C, Emergency Classification and Implementing Instructions, Rev. 26, 27, 28, 29, 30, and 31 Change package for 91002-C, Emergency Notifications, Rev. 48, 49, 51, and 52 Change package for 91103-C, Duties of the TSC Manager, Rev. 20 Change package for 91202-C, Activation and Operation of the Operations Support Center, Rev.
Change package for 91204-C, Emergency Response Communications, Rev. 32
4OA1 Performance Indicator Verification Records and Data
Documentation of Performance Indicator data January 1, 2007 to March 31, 2008 for DEP, ANS, and ERO

LIST OF ACRONYMS

ANS Alert and Notification System
EOF Emergency Operations Facility
DEP Drill/Exercise Performance
DHS Department of Homeland Security
ERO Emergency Response Organization
FEMA Federal Emergency Management Agency
NEI Nuclear Energy Institute
OSC Operations Support Center
PI Performance Indicator
PS Planning Standard
RSPS Risk Significant Planning Standards
TI Temporary Instruction TSC Technical Support Center