{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 25, 2012 Mr. William R. Gideon Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550 | |||
==SUBJECT:== | |||
H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION | |||
==Dear Mr. Gideon:== | |||
On July 16, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities at the Robinson Nuclear Plant in accordance with Temporary Instruction (TI) 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." This on-site inspection is scheduled to be performed from July 16 to July 19, 2012, and will address the inspection requirements for Phase 1 of this TI. In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection. We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mr. Scott Connelly of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Louis Lake at 404-997-4683 or Louis.Lake@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide W. Gideon 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room). | |||
Sincerely, /RA/ Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-261 License No. DPR-23 | |||
==Enclosure:== | |||
Temporary Instruction (TI 2515-182) Inspection Document Request | |||
cc w/encl: (See page 3) | |||
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 RII:DRS/EB3 SIGNATURE RA RA RA NAME LAKE FLETCHER VIAS DATE 6/ 25 /2012 6/ 25 /2012 6/25 /2012 E-MAIL COPY YES NO YES NO YES NO W. Gideon 3 cc w/encl: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 | |||
Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution | |||
Robert J. Duncan II Vice President Nuclear Operations Progress Energy Electronic Mail Distribution | |||
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution | |||
Scott D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution | |||
David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution | |||
John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 | |||
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution | |||
Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution | |||
Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) | |||
Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution (cc w/encl cont'd - See page 4) | |||
W. Gideon 4 (cc w/encl cont'd) Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution | |||
Mark Yeager Division of Radioactive Waste Mgmt. S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 | |||
Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution | |||
Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 | |||
Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution | |||
Enclosure TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: July 16 - 19, 2012 Inspection Procedures: TI 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" Inspector: Louis Lake, Senior Reactor Inspector A. Information Requested for the In-Office Preparation Week 1. The following documents listed below are requested (electronic copy or CD ROM if possible) by July 6, 2012, to facilitate the preparation for the on-site inspection week. a. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and b. Schedule for completion of the following NEI 09-14, "Guideline For The Management of Underground Piping and Tank Integrity," Revision 1, attributes: Buried Piping | |||
* Procedures and Oversight | |||
* Risk Ranking | |||
* Inspection Plan | |||
* Plan Implementation | |||
* Asset Management Plan Underground Piping and Tanks | |||
* Procedures and Oversight | |||
* Prioritization | |||
* Condition Assessment Plan | |||
* Plan Implementation | |||
* Asset Management Plan | |||
2 Enclosure B. Information to Be Provided On-Site to the Inspector at the Entrance Meeting 1. Copy of EPRI document "Recommendations for an Effective Program to Control the Degradation of Buried Pipe." | |||
: 2. Copy of Site Underground Piping and Tanks Program. 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed). 4. For any of the NEI 09-14, Revision 1, or subsequent revision attributes identified below which have been completed prior to the NRC's on-site inspection, provide written records that demonstrate that the program attribute is complete. Buried Piping | |||
* Procedures and Oversight | |||
* Risk Ranking | |||
* Inspection Plan | |||
* Plan Implementation | |||
* Asset Management Plan Underground Piping and Tanks | |||
* Procedures and Oversight | |||
* Prioritization | |||
* Condition Assessment Plan | |||
* Plan Implementation | |||
* Asset Management Plan}} |
Revision as of 23:53, 1 August 2018
ML12178A035 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 06/25/2012 |
From: | Vias S J NRC/RGN-II/DRS/EB3 |
To: | Gideon W R Progress Energy Co |
References | |
Download: ML12178A035 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 25, 2012 Mr. William R. Gideon Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Gideon:
On July 16, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities at the Robinson Nuclear Plant in accordance with Temporary Instruction (TI) 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." This on-site inspection is scheduled to be performed from July 16 to July 19, 2012, and will address the inspection requirements for Phase 1 of this TI. In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection. We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mr. Scott Connelly of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Louis Lake at 404-997-4683 or Louis.Lake@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide W. Gideon 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-261 License No. DPR-23
Enclosure:
Temporary Instruction (TI 2515-182) Inspection Document Request
cc w/encl: (See page 3)
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 RII:DRS/EB3 SIGNATURE RA RA RA NAME LAKE FLETCHER VIAS DATE 6/ 25 /2012 6/ 25 /2012 6/25 /2012 E-MAIL COPY YES NO YES NO YES NO W. Gideon 3 cc w/encl: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
Robert J. Duncan II Vice President Nuclear Operations Progress Energy Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution
Scott D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution
John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution
Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution (cc w/encl cont'd - See page 4)
W. Gideon 4 (cc w/encl cont'd) Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
Mark Yeager Division of Radioactive Waste Mgmt. S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211
Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550
Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution
Enclosure TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: July 16 - 19, 2012 Inspection Procedures: TI 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" Inspector: Louis Lake, Senior Reactor Inspector A. Information Requested for the In-Office Preparation Week 1. The following documents listed below are requested (electronic copy or CD ROM if possible) by July 6, 2012, to facilitate the preparation for the on-site inspection week. a. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and b. Schedule for completion of the following NEI 09-14, "Guideline For The Management of Underground Piping and Tank Integrity," Revision 1, attributes: Buried Piping
- Procedures and Oversight
- Risk Ranking
- Inspection Plan
- Plan Implementation
- Asset Management Plan Underground Piping and Tanks
- Procedures and Oversight
- Prioritization
- Condition Assessment Plan
- Plan Implementation
- Asset Management Plan
2 Enclosure B. Information to Be Provided On-Site to the Inspector at the Entrance Meeting 1. Copy of EPRI document "Recommendations for an Effective Program to Control the Degradation of Buried Pipe."
- 2. Copy of Site Underground Piping and Tanks Program. 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed). 4. For any of the NEI 09-14, Revision 1, or subsequent revision attributes identified below which have been completed prior to the NRC's on-site inspection, provide written records that demonstrate that the program attribute is complete. Buried Piping
- Procedures and Oversight
- Risk Ranking
- Inspection Plan
- Plan Implementation
- Asset Management Plan Underground Piping and Tanks
- Procedures and Oversight
- Prioritization
- Condition Assessment Plan
- Plan Implementation
- Asset Management Plan