ML24002A7382 January 2024NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2
ML23235A05523 August 2023Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI)Safe Shutdown
Fitness for Duty
Exemption Request
COVID-19
Fire Protection Program
ML23151A34830 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23142A27322 May 2023Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Incorporated by reference
ML23047A45121 February 2023Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402Cyber Security
ML23011A01511 January 2023NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.bAnticipated operational occurrence
ML22222A10810 August 2022NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16
ML22115A14125 April 2022NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition InformationHealth Physics Network
High winds
ML22112A14822 April 2022Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02
ML22080A00418 March 2022Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections
ML21049A2634 February 2021NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency PlanFLEX
ML20353A13118 December 20202021 Hbr 50.59 Info Request
ML20323A40718 November 2020NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180)Exemption Request
Pandemic
Coronavirus
Grace period
ML20191A2129 July 2020012 FPTI Notification LetterSafe Shutdown
Fitness for Duty
Commercial Grade Dedication
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Aging Management
Job Performance Measure
Thermoset
Operability Determination
Exemption Request
Maintenance Rule Program
COVID-19
Fire Protection Program
ML20063L4564 February 2020NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072
ML20022A19422 January 2020Emergency Preparedness Program Inspection Request for Information
ML19365A04618 December 2019Audit Documents Needed for the Robinson SPRA ReviewProbabilistic Risk Assessment
ML19288A29415 October 2019NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule
ML19288A24626 September 2019Request for Additional Information Regarding Change to Surveillance Requirement 3.8.2.1 H.B. Robinson Unit No. 2Offsite Circuit
ML19283A03726 September 2019Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1
ML19072A02913 March 201950.69 LAR RAIsProbabilistic Risk Assessment
Large early release frequency
ML19011A13710 January 2019NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117)
ML19007A34221 December 2018NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117)
ML18291A64417 October 2018NRR E-mail Capture - Robinson RAIs - Duke Energy 10 CFR 50.46 Annual Report
ML18288A01912 October 2018NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Very Early Warning Fire Detection
ML18274A26328 September 2018NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Very Early Warning Fire Detection
ML18211A60430 July 2018NRR E-mail Capture - Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L-2017-LLA-0308)Qualified Offsite Circuit
ML18206B06125 July 2018NRR E-mail Capture - Draft Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308)Qualified Offsite Circuit
ML18116A10525 April 2018NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356)Shutdown Margin
Anticipated operational occurrence
ML18108A76018 April 2018NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356)Shutdown Margin
Anticipated operational occurrence
ML18108A75918 April 2018NRR E-mail Capture - Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308)Qualified Offsite Circuit
ML18102B08112 April 2018NRR E-mail Capture - Draft Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308)Qualified Offsite Circuit
ML18074A00515 March 2018Heat Sink Emailed Heat Sink RFI Request 2018Ultimate heat sink
Through-Wall Leak
Flow Induced Vibration
ML17345A87711 December 2017NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012)Operator Manual Action
ML17339A0724 December 2017NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012)Operator Manual Action
ML17248A01831 August 2017NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)Post Accident Monitoring
ML17235A26122 August 2017NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)Post Accident Monitoring
ML17192A48411 July 2017NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521)
ML17114A04621 April 2017Notification of Inspection and Request for Information
ML16288A07826 October 2016Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694)
ML16130A5985 May 2016Notification of Inspection and Request for InformationHigh Radiation Area
Locked High Radiation Area
Process Control Program
ML16048A3492 March 2016RAI Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating PlantsProbabilistic Risk Assessment
Large early release frequency
Very Early Warning Fire Detection
ML16019A0538 February 2016Request for Additional Information Related to the Pressurized Water Reactors Internals Program Plan for Aging Management of Reactor InternalsAging Management
ML16026A05125 January 2016Robinson EP RFI 2016-001
ML15344A03017 December 2015Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873)
ML15215A65110 August 2015Duke Energy Progress, Inc., for H. B. Robinson, Unit 2 and Shearon Harris, Unit 1, Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (TAC Nos. MF5872Anticipated operational occurrence
ML15009A3358 January 2015Requalification Program Inspection - H.B. Robinson Nuclear PlantJob Performance Measure
RNP-RA/14-0118, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes12 November 2014Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog ChangesSafe Shutdown Earthquake
Earthquake
ML14268A51623 October 2014Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog ChangesFukushima Dai-Ichi
Earthquake
ML14057A65026 February 2014Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program