ML24002A738 | 2 January 2024 | NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2 | |
ML23235A055 | 23 August 2023 | Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request COVID-19 Fire Protection Program |
ML23151A348 | 30 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23142A273 | 22 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23047A451 | 21 February 2023 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 | Cyber Security |
ML23011A015 | 11 January 2023 | NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b | Anticipated operational occurrence |
ML22222A108 | 10 August 2022 | NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 | |
ML22115A141 | 25 April 2022 | NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information | Health Physics Network High winds |
ML22112A148 | 22 April 2022 | Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 | |
ML22080A004 | 18 March 2022 | Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | |
ML21049A263 | 4 February 2021 | NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan | FLEX |
ML20353A131 | 18 December 2020 | 2021 Hbr 50.59 Info Request | |
ML20323A407 | 18 November 2020 | NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) | Exemption Request Pandemic Coronavirus Grace period |
ML20191A212 | 9 July 2020 | 012 FPTI Notification Letter | Safe Shutdown Fitness for Duty Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Emergency Lighting Aging Management Job Performance Measure Thermoset Operability Determination Exemption Request Maintenance Rule Program COVID-19 Fire Protection Program |
ML20063L456 | 4 February 2020 | NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 | |
ML20022A194 | 22 January 2020 | Emergency Preparedness Program Inspection Request for Information | |
ML19365A046 | 18 December 2019 | Audit Documents Needed for the Robinson SPRA Review | Probabilistic Risk Assessment |
ML19288A294 | 15 October 2019 | NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule | |
ML19288A246 | 26 September 2019 | Request for Additional Information Regarding Change to Surveillance Requirement 3.8.2.1 H.B. Robinson Unit No. 2 | Offsite Circuit |
ML19283A037 | 26 September 2019 | Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1 | |
ML19072A029 | 13 March 2019 | 50.69 LAR RAIs | Probabilistic Risk Assessment Large early release frequency |
ML19011A137 | 10 January 2019 | NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) | |
ML19007A342 | 21 December 2018 | NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) | |
ML18291A644 | 17 October 2018 | NRR E-mail Capture - Robinson RAIs - Duke Energy 10 CFR 50.46 Annual Report | |
ML18288A019 | 12 October 2018 | NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 | Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Very Early Warning Fire Detection |
ML18274A263 | 28 September 2018 | NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 | Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Very Early Warning Fire Detection |
ML18211A604 | 30 July 2018 | NRR E-mail Capture - Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L-2017-LLA-0308) | Qualified Offsite Circuit |
ML18206B061 | 25 July 2018 | NRR E-mail Capture - Draft Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) | Qualified Offsite Circuit |
ML18116A105 | 25 April 2018 | NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) | Shutdown Margin Anticipated operational occurrence |
ML18108A760 | 18 April 2018 | NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) | Shutdown Margin Anticipated operational occurrence |
ML18108A759 | 18 April 2018 | NRR E-mail Capture - Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) | Qualified Offsite Circuit |
ML18102B081 | 12 April 2018 | NRR E-mail Capture - Draft Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) | Qualified Offsite Circuit |
ML18074A005 | 15 March 2018 | Heat Sink Emailed Heat Sink RFI Request 2018 | Ultimate heat sink Through-Wall Leak Flow Induced Vibration |
ML17345A877 | 11 December 2017 | NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) | Operator Manual Action |
ML17339A072 | 4 December 2017 | NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) | Operator Manual Action |
ML17248A018 | 31 August 2017 | NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) | Post Accident Monitoring |
ML17235A261 | 22 August 2017 | NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) | Post Accident Monitoring |
ML17192A484 | 11 July 2017 | NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) | |
ML17114A046 | 21 April 2017 | Notification of Inspection and Request for Information | |
ML16288A078 | 26 October 2016 | Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) | |
ML16130A598 | 5 May 2016 | Notification of Inspection and Request for Information | High Radiation Area Locked High Radiation Area Process Control Program |
ML16048A349 | 2 March 2016 | RAI Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants | Probabilistic Risk Assessment Large early release frequency Very Early Warning Fire Detection |
ML16019A053 | 8 February 2016 | Request for Additional Information Related to the Pressurized Water Reactors Internals Program Plan for Aging Management of Reactor Internals | Aging Management |
ML16026A051 | 25 January 2016 | Robinson EP RFI 2016-001 | |
ML15344A030 | 17 December 2015 | Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) | |
ML15215A651 | 10 August 2015 | Duke Energy Progress, Inc., for H. B. Robinson, Unit 2 and Shearon Harris, Unit 1, Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (TAC Nos. MF5872 | Anticipated operational occurrence |
ML15009A335 | 8 January 2015 | Requalification Program Inspection - H.B. Robinson Nuclear Plant | Job Performance Measure |
RNP-RA/14-0118, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes | 12 November 2014 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes | Safe Shutdown Earthquake Earthquake |
ML14268A516 | 23 October 2014 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog Changes | Fukushima Dai-Ichi Earthquake |
ML14057A650 | 26 February 2014 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |