Emergency Preparedness Program Inspection Request for Information
ML20022A194
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/22/2020
From: Eugene Guthrie
NRC/RGN-II/DRS/EB2
To: Kapopoulos E
Duke Energy Progress
J. Walker RGN-II/DRS
References
Download: ML20022A194 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 22, 2020 Ernest J. Kapopoulos, Jr.

Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - EMERGENCY PREPAREDNESS PROGRAM INSPECTION REQUEST FOR INFORMATION

Dear Mr. Kapopoulos:

From April 27 - May 1, 2020, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness program inspection at the H.B. Robinson Steam Electric Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.02, Alert and Notification System Testing; 71114.03, Emergency Response Organization Staffing and Augmentation System; 71114.04, Emergency Action Level and Emergency Plan Changes; 71114.05, Maintenance of Emergency Preparedness; and Emergency Preparedness sections of 71151 Performance Indicator Verification.

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up-to-date, and complete, to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Dave Pitsley (843-951-1763) of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (Steven.Sanchez@nrc.gov), or the Chief, Operations Branch 2, Eugene Guthrie at 404-997-4662 (Eugene.Guthrie@nrc.gov).

E. Kapopoulos 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-261 License Nos.: DPR-23

Enclosure:

Document Request List cc: Distribution via Listserv

ML20022A194 OFFICE RII:DRS/OB2 RII:DRS/OB2 RII:DRS/OB2 NAME JWalker SSanchez EGuthrie DATE 01/16/2020 01/21/2020 01/22/2020 Document Request List Inspection Dates: April 27 - May 1, 2020 Inspection Procedures (IPs): 71114.02 Alert and Notification System Testing 71114.03 Emergency Response Organization Staffing and Augmentation System 71114.04 Emergency Action Level and Emergency Plan Changes 71114.05 Maintenance of Emergency Preparedness 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors. The current version of these documents is expected unless specified otherwise. About 3 weeks prior to the inspection, provide, as a minimum, an electronic version of the Emergency Plan (E-Plan),

10 CFR 50.54(q) evaluation/screening packages of changed Emergency Action Level (EAL), E-Plan, and EP implementing procedures, and Corrective Action Program (CAP) entries relating to EP, for the 2-year inspection period (including those written by Corporate). The preferred file format is Word or searchable .pdf files on CDROM or CERTREC. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled 71114.02 ANS, or Miscellaneous, etc.). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (ATTN: Steven Sanchez), 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

71114.02 Alert and Notification System Evaluation Federal Emergency Management Agency (FEMA) approved Alert and Notification System (ANS) report and any current associated correspondence ANS testing procedure ANS equipment technical manual ANS equipment testing results (raw data) for the 2-year inspection period ANS equipment maintenance records for the 2-year inspection period Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting FEMA approval letters for the past 2 years Information provided to the public inside the 10-mile plume exposure pathway 71114.03 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO Duty Roster in-effect during the week of the inspection (can be provided upon arrival)

ERO and augmentation implementing procedures and changes made over the past 2 years NUREG 0654 Table B1 site equivalent and On-shift Staffing Analysis ERO training program procedure Emergency Preparedness (EP) staff training program and qualification records ERO augmentation testing results for the 2-year inspection period Enclosure

71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records 10 CFR 50.54(q) screening/evaluation packages of changed Emergency Action Level (EAL),

E-Plan, and EP implementing procedures (including corporate procedures); signed and dated documents Current and immediately previous revisions of EAL, E-Plan, and EP procedures (electronic version of current E-Plan requested about 3 weeks before inspection) 71114.05 Maintenance of Emergency Preparedness Governing documents for the assessment process All EP program assessments, not including INPO performed assessments, for the 2-year inspection period 10 CFR 50.54(t) audits, audit checklists, and subsequent State/local correspondence for the 2-year inspection period Drill and exercise critiques for the 2-year inspection period Critiques of actual events resulting in implementation of the E-Plan over the past 2 years Governing documents for 10 CFR 50.54(q) evaluation process Current Letters of Agreement with offsite agencies Emergency Response Facility (ERF) activation procedures, including backup and alternate facilities Completed maintenance records and availability-tracking information for equipment important to EP (e.g., Heating and Ventilation system in ERFs and Radiation Monitors called out in EALs, etc.) for the 2-year inspection period Last Evacuation Time Estimates Analysis and annual review documentation CAP governing procedures 71151 Performance Indicator Verification Governing document for the performance indicator (PI) process Drill and Exercise Performance (DEP), ERO, and ANS PI data submitted since the last NRC EP inspection (hard copies can be provided upon arrival)

DEP documentation and evaluations since the last NRC EP inspection CAP entries related to PIs, that is DEP, ERO training and participation, and ANS since the last NRC EP inspection (including those written by Corporate)

Miscellaneous Procedures and Records Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Matrix of Drill Types performed and accounted for during the 8-year cycle Lead Inspector Contact Information:

Steven Sanchez 404-997-4418 Steven.Sanchez@nrc.gov 2