Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Duke'S August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20353A1312020-12-18018 December 2020 2021 Hbr 50.59 Info Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20191A2122020-07-0909 July 2020 012 FPTI Notification Letter ML20063L4562020-02-0404 February 2020 NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 ML20022A1942020-01-22022 January 2020 Emergency Preparedness Program Inspection Request for Information ML19365A0462019-12-18018 December 2019 Audit Documents Needed for the Robinson SPRA Review ML19288A2942019-10-15015 October 2019 NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule ML19288A2462019-09-26026 September 2019 Request for Additional Information Regarding Change to Surveillance Requirement 3.8.2.1 H.B. Robinson Unit No. 2 ML19283A0372019-09-26026 September 2019 Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1 ML19072A0292019-03-13013 March 2019 50.69 LAR RAIs ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18291A6442018-10-17017 October 2018 NRR E-mail Capture - Robinson RAIs - Duke Energy 10 CFR 50.46 Annual Report ML18288A0192018-10-12012 October 2018 NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18274A2632018-09-28028 September 2018 NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18211A6042018-07-30030 July 2018 NRR E-mail Capture - Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L-2017-LLA-0308) ML18206B0612018-07-25025 July 2018 NRR E-mail Capture - Draft Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18116A1052018-04-25025 April 2018 NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7602018-04-18018 April 2018 NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7592018-04-18018 April 2018 NRR E-mail Capture - Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18102B0812018-04-12012 April 2018 NRR E-mail Capture - Draft Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18074A0052018-03-15015 March 2018 Heat Sink Emailed Heat Sink RFI Request 2018 ML17345A8772017-12-11011 December 2017 NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17339A0722017-12-0404 December 2017 NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17248A0182017-08-31031 August 2017 NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) ML17235A2612017-08-22022 August 2017 NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17114A0462017-04-21021 April 2017 Notification of Inspection and Request for Information ML16288A0782016-10-26026 October 2016 Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) ML16130A5982016-05-0505 May 2016 Notification of Inspection and Request for Information ML16048A3492016-03-0202 March 2016 RAI Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML16019A0532016-02-0808 February 2016 Request for Additional Information Related to the Pressurized Water Reactors Internals Program Plan for Aging Management of Reactor Internals ML16026A0512016-01-25025 January 2016 Robinson EP RFI 2016-001 ML15344A0302015-12-17017 December 2015 Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) ML15215A6512015-08-10010 August 2015 Duke Energy Progress, Inc., for H. B. Robinson, Unit 2 and Shearon Harris, Unit 1, Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (TAC Nos. MF5872 ML15009A3352015-01-0808 January 2015 Requalification Program Inspection - H.B. Robinson Nuclear Plant RNP-RA/14-0118, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes2014-11-12012 November 2014 Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes ML14268A5162014-10-23023 October 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog Changes ML14057A6502014-02-26026 February 2014 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection 2024-01-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 21, 2017 Ernie Kapopoulos Site Vice President H.B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
SUBJECT:
H.B. ROBINSON NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Kapopoulos:
During the week of June 19 - 23, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the Robinson Nuclear Plant (NRC Inspection Procedures 71124.02, 71124.03, 71124.04, 71124.05, and Radiation Safety sections of 71151)
In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than June 1, 2017.
We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Ms. Christine Caudell (843) 857-1395 of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Wade Loo at (404) 997-4727, or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.
This letter, and its enclosure, will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Request for Withholding.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers,
E. Kapopoulos 2 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Sincerely,
/RA: Steven P. Sanchez for/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-261 License No. DPR-23
Enclosure:
Pre-Inspection Document Request cc: Distribution via Listserv
E. Kapopoulos 3
SUBJECT:
H.B. ROBINSON NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
S. Rose, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE J. Zeiler, RII, SRI A. Beasten, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE WTL SPS FOR BRB1 NAME WLOO BBONSER DATE 4/21/2017 4/21/2017http:/ 4/ /2017 4/ /2017 4/ /2017 4/ /2017 4/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\RFI INFORMATION REQUEST LETTERS\ROBINSON\2017\ROB_2017002_PSB1_RP_DOC REQUEST_LTR_DRAFT.DOCX
Pre-Inspection Document Request Occupational and Public Radiation Safety Cornerstone Inspection Dates: June 19 - 23, 2017 Documents Due to Region II by: June 1, 2017 Licensee: H.B. Robinson Nuclear Plant Docket Number: 05000261 Inspection Procedure: 71124.02 Occupational ALARA Planning and Controls 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.04 Occupational Dose Assessment 71124.05 Radiation Monitoring Instrumentation 71151 Performance Indicator Verification (Radiation Safety cornerstones only)
Lead Inspector: Wade Loo, Senior Health Physicist Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection, and places additional burden on licensee staff.
Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date of June 1, 2017, please do not hesitate to contact the lead inspector, Wade Loo at (404) 997-4727.
Miscellaneous
- 1. List of primary contacts for each inspection area including names and telephone numbers
- 2. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers.
- 3. List of radiation protection procedures, including title and number.
- 4. Most recent DAW 10 CFR Part 61 analytical results.
- 5. Schedule of major activities (Gantt chart if available), including work activities to be conducted during the week of the inspection (i.e., Any work activities that would incur any significant dose, calibrations of plant fixed radiation monitors)
- 6. Corrective action program (CAP) procedures 71124.02 - ALARA Planning and Controls (Last inspected May 2015)
- 1. Site and corporate procedures associated with maintaining exposure ALARA, including those involving ALARA work activities. These procedures should include ALARA program Enclosure
2 implementation, RWP preparation and worker compliance, estimating and tracking specific exposures for work activities, making changes to dose estimates during task performance, work controls, engineering controls, temporary shielding, exposure mitigation requirements, and source term reduction.
- 2. List of top five dose jobs for the last refueling outage and associated ALARA planning packages (including dose estimates, work-hour estimates, special HP controls, and dose reduction initiatives).
- 3. Annual ALARA and refueling outage reports since May 2015.
- 4. Annual ALARA goals for 2016 and 2017, and the methodology utilized to make the projections.
- 5. Current status/characterization of plant source term, as well as any relevant plans or actions to reduce it (e.g., Source Term Reduction Strategic Plan).
- 6. Summaries of the last four ALARA Committee Meetings (e.g., meeting minutes).
- 7. Completed ALARA packages (including post-job reviews) for the five work activities that had the greatest collective dose and were completed during the last refueling outage.
- 8. List of shielding packages for the last refueling outage.
- 9. Shutdown survey results for the last two outages.
- 10. Self-assessments or audits of ALARA program since May 2015..
- 11. List of NCRs, ARs, CRs, etc. related to the ALARA program issued since May 2015. This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last inspected May 2015)
- 1. Site and corporate procedures related to airborne monitoring and control. These procedures should include operation, calibration, maintenance, and set-point determination of air sampling equipment; issuance, use, training, fit-testing, storage, maintenance, and quality assurance (QA) of respiratory protective equipment, including Self-Contained Breathing Apparatus (SCBA) and air-supplied respirators; SCBA maintenance of vital components (i.e., regulators); determination and verification of Grade D air for SCBAs; use of containment purge; use of portable High Efficiency Particulate Air (HEPA) / charcoal units; Total Effective Dose Equivalent (TEDE)-ALARA determinations; and alpha air sampling.
- 2. Two most recent HEPA filter Dioctyl phthalate (DOP) and charcoal test results for the following ventilation systems:
- Radwaste Processing Building Ventilation
- Auxiliary Building Ventilation
- 3. All records of grade D air quality certification for breathing air supply systems for SCBAs and air-supplied respirators filling equipment since May 2015.
- 4. Last two surveillances performed on SCBAs stored for emergency use.
- 5. SCBA qualification records:
- a. Vendor training certificates for all individuals qualified to repair SCBA vital components.
- b. List of all licensed operators, maintenance/I&C personnel, and HP personnel qualified to use SCBAs.
- c. Inventory, inspection, and maintenance records for SCBA equipment.
- 6. Audits or self-assessments covering airborne controls and respiratory protection since May 2015.
3
- 7. List of NCRs, ARs, CRs, etc. related to airborne controls and respiratory protection since May 2015. This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.
71124.04 Occupational Dose Assessment (Last inspected May 2015)
- 1. Site and corporate procedures related to internal and external dose monitoring (i.e., dosimetry issuance and use). These procedures should include guidance for multi-badging; monitoring in steep/highly variable dose rate gradients; personnel contamination events; storage/care of personal dosimeters; use of electronic dosimeters (EDs) including evaluation of any biases identified relative to TLD monitoring; internal dose assessment (i.e.,
both in-vivo and in-vitro bioassay and air sampling capabilities); guidance for calibration, QC, and use of whole body counter (WBC); release of contaminated individuals; use of passive monitoring as screening method for evaluations; special in-vitro sample collection and analysis; and actions for declared pregnant workers (DPW).
- 2. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by the site.
- 3. List of all positive WBCs results, in-vitro or air sampling analyses that resulted in an assigned committed effective dose equivalent (CEDE) equal to or exceeding 10 millirem since May 2015. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
- 4. List of all personnel contamination events identified since May 2015. [Note: Only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
- 5. A list of personnel who have received approved dose extensions since May 2015.
- 6. Audits or self-assessments covering the dosimetry program since May 2015.
- 7. List of NCRs, ARs, CRs, etc. related to internal and external dosimetry since May 2015.
This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.
71124.05 Radiation Monitoring Instrumentation (Last inspected May 2015)
- 1. Site and corporate procedures related to radiation monitoring instrumentation. These procedures should include use of portable instrument calibrators (e.g., Shepherd/Hopewell calibrators); calibration and functional test/source checks of portable radiation detection instrumentation; calibration and functional tests of small article monitors (SAMs), personnel contamination monitors (PCMs), portal monitor (PMs), WBC equipment, and continuous air monitors (CAMs); determination of set-points for Area Radiation Monitors (ARMs), CAMs, PCMs, PMs and SAMs; QA program for count room instruments (e.g., laboratory inter-comparison data); and collection and analysis of high-range post-accident effluent samples.
- 2. Last two calibration records for the containment high-range post-LOCA radiation monitors.
- 3. List of the following monitors currently in service (including serial number, location, and model information): (Specific calibration records will be selected for review during the onsite inspection)
- All SAMs at radiological controlled area (RCA) exit points
- All PMs at RCA exit points and the protected area (PA) exit
4
- All count room High-Purity Germanium and Liquid Scintillation counters
- All in service portable radiation survey instruments available for use (including air samplers, friskers, telepoles/teletectors, and dose rate measuring instruments)
- 4. Documentation for the sources used to calibrate the above requested monitors showing traceability to the National Institute of Standards & Technology/National Bureau of Standards (NIST/NBS), and to the primary calibration, as applicable.
- 5. Last two calibration records of the portable instrument calibrator (e.g., Shepherd/Hopewell validation testing/dose rate curves).
- 6. Last two calibration records for the WBC (and PM if passive monitoring used)
- 7. List of any Emergency Action Level (EAL) value(s) associated with installed or portable radiation monitoring instrument indication(s). Last two system health reports for the Radiation Monitoring systems.
- 8. Any modification(s), upgrade(s), or replacement(s) performed on installed radiation monitoring instrumentation (e.g., area radiation monitors, CAMs, RCA release point monitors, WBCs, and count room instruments) since May 2015.
- 9. Audits or self-assessments covering HP instruments (portables, RCA exit point, WBC, count room) since May 2015. Include any reviews conducted of vendor facilities, as applicable.
- 10. List of NCRs, ARs, CRs, etc. related to radiation monitoring instrumentation since May 2015.
This should be a list of corrective action documents containing NCR, AR, CR, etc. numbers and brief descriptions, not full documents.
71151 - Performance Indicator Verification (Last inspected January 2016)
- 1. Site and corporate procedures for gathering and reporting performance indicator (PI) data.
- 2. Monthly/Quarterly PI reports since January 2016, and copies of associated corrective action reports for any Occupational Exposure or Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent PI events occurrences.
- 3. Most recent gaseous and liquid effluent release permits showing year-to-date curies released by isotope and associated public dose assessments, and the last calendar year (CY) 2016 gaseous and liquid effluent release permits showing year-to-date curies released by isotope and associated public dose assessments
- 4. List of all corrective action documents since January 2016, using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked LHRA door, etc.
- 5. List of all corrective action documents since January 2016, using keywords such as:
abnormal/ unmonitored effluent release, etc.
- 6. List of all ED dose and dose rate alarms (including setpoints and the dose / dose rate received), since January 2016.
Assistance Requested During On-Site Inspection
- Identification of work activities available during the inspection for inspector observations, including notification of pre-job briefings, notification of risk significant work activities, audio/visual surveillance for remote job coverage, and calibration of plant fixed radiation monitors.
5 Inspector Contact Information: Mailing Address:
Wade Loo U.S. Nuclear Regulatory Commission Senior Health Physicist Region II US NRC Region II ATTN: Mr. Wade Loo (404) 997-4727 245 Peachtree Center Ave., N.E Wade.Loo@nrc.gov Suite 1200 Atlanta, GA 30303