Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Dukes Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Dukes Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20353A1312020-12-18018 December 2020 2021 Hbr 50.59 Info Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20191A2122020-07-0909 July 2020 012 FPTI Notification Letter ML20063L4562020-02-0404 February 2020 NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 ML20022A1942020-01-22022 January 2020 Emergency Preparedness Program Inspection Request for Information ML19365A0462019-12-18018 December 2019 Audit Documents Needed for the Robinson SPRA Review ML19288A2942019-10-15015 October 2019 NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule ML19288A2462019-09-26026 September 2019 Request for Additional Information Regarding Change to Surveillance Requirement 3.8.2.1 H.B. Robinson Unit No. 2 ML19283A0372019-09-26026 September 2019 Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1 ML19072A0292019-03-13013 March 2019 50.69 LAR RAIs ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18291A6442018-10-17017 October 2018 NRR E-mail Capture - Robinson RAIs - Duke Energy 10 CFR 50.46 Annual Report ML18288A0192018-10-12012 October 2018 NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18274A2632018-09-28028 September 2018 NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18211A6042018-07-30030 July 2018 NRR E-mail Capture - Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L-2017-LLA-0308) ML18206B0612018-07-25025 July 2018 NRR E-mail Capture - Draft Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18116A1052018-04-25025 April 2018 NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7602018-04-18018 April 2018 NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7592018-04-18018 April 2018 NRR E-mail Capture - Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18102B0812018-04-12012 April 2018 NRR E-mail Capture - Draft Robinson RAIs - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) ML18074A0052018-03-15015 March 2018 Heat Sink Emailed Heat Sink RFI Request 2018 ML17345A8772017-12-11011 December 2017 NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17339A0722017-12-0404 December 2017 NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17248A0182017-08-31031 August 2017 NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) ML17235A2612017-08-22022 August 2017 NRR E-mail Capture - Robinson RAIs - Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17114A0462017-04-21021 April 2017 Notification of Inspection and Request for Information ML16288A0782016-10-26026 October 2016 Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) ML16130A5982016-05-0505 May 2016 Notification of Inspection and Request for Information ML16048A3492016-03-0202 March 2016 RAI Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML16019A0532016-02-0808 February 2016 Request for Additional Information Related to the Pressurized Water Reactors Internals Program Plan for Aging Management of Reactor Internals ML16026A0512016-01-25025 January 2016 Robinson EP RFI 2016-001 ML15344A0302015-12-17017 December 2015 Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) ML15215A6512015-08-10010 August 2015 Duke Energy Progress, Inc., for H. B. Robinson, Unit 2 and Shearon Harris, Unit 1, Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (TAC Nos. MF5872 ML15009A3352015-01-0808 January 2015 Requalification Program Inspection - H.B. Robinson Nuclear Plant RNP-RA/14-0118, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes2014-11-12012 November 2014 Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-Evaluations Related to Southeastern Catalog Changes ML14268A5162014-10-23023 October 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog Changes 2024-06-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 25, 2012 Mr. William R. Gideon Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Gideon:
On July 16, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities at the Robinson Nuclear Plant in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This on-site inspection is scheduled to be performed from July 16 to July 19, 2012, and will address the inspection requirements for Phase 1 of this TI.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection.
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mr. Scott Connelly of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Louis Lake at 404-997-4683 or Louis.Lake@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
W. Gideon 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-261 License No. DPR-23
Enclosure:
Temporary Instruction (TI 2515-182) Inspection Document Request cc w/encl: (See page 3)
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 RII:DRS/EB3 SIGNATURE RA RA RA NAME LAKE FLETCHER VIAS DATE 6/ 25 /2012 6/ 25 /2012 6/25 /2012 E-MAIL COPY YES NO YES NO YES NO W. Gideon 3 cc w/encl: David T. Conley Division of Radiological Health Senior Counsel TN Dept. of Environment & Conservation Legal Department 401 Church Street Progress Energy Nashville, TN 37243-1532 Electronic Mail Distribution Donald W. Barker John H. O'Neill, Jr.
Manager, Nuclear Oversight Shaw, Pittman, Potts & Trowbridge H. B. Robinson Steam Electric Plant, Unit 2 2300 N. Street, NW Progress Energy Washington, DC 20037-1128 Electronic Mail Distribution Richard Haynes Robert J. Duncan II Director, Division of Waste Management Vice President Bureau of Land and Waste Management Nuclear Operations S.C. Department of Health and Progress Energy Environmental Control Electronic Mail Distribution Electronic Mail Distribution Sandra Threatt, Manager Kelvin Henderson Nuclear Response and Emergency General Manager Environmental Surveillance Nuclear Fleet Operations Bureau of Land and Waste Management Progress Energy Department of Health and Environmental Electronic Mail Distribution Control Electronic Mail Distribution Thomas Cosgrove Plant General Manager Brian C. McCabe H.B. Robinson Steam Electric Plant, Unit 2 Manager, Nuclear Oversight Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs Richard Hightower (interim)
Supervisor Progress Energy Licensing/Regulatory Programs Electronic Mail Distribution Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Scott D. West Public Staff - NCUC Superintendent Security 4326 Mail Service Center H. B. Robinson Steam Electric Plant Raleigh, NC 27699-4326 Progress Energy Electronic Mail Distribution W. Lee Cox, III Section Chief Joseph W. Donahue Radiation Protection Section Vice President N.C. Department of Environmental Nuclear Oversight Commerce & Natural Resources Progress Energy Electronic Mail Distribution Electronic Mail Distribution (cc w/encl contd - See page 4)
W. Gideon 4 (cc w/encl contd)
Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution
TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: July 16 - 19, 2012 Inspection Procedures: TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector: Louis Lake, Senior Reactor Inspector A. Information Requested for the In-Office Preparation Week
- 1. The following documents listed below are requested (electronic copy or CD ROM if possible) by July 6, 2012, to facilitate the preparation for the on-site inspection week.
- a. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and
- b. Schedule for completion of the following NEI 09-14, Guideline For The Management of Underground Piping and Tank Integrity, Revision 1, attributes:
Buried Piping
- Asset Management Plan Underground Piping and Tanks
- Condition Assessment Plan
- Asset Management Plan Enclosure
2 B. Information to Be Provided On-Site to the Inspector at the Entrance Meeting
- 1. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
- 2. Copy of Site Underground Piping and Tanks Program.
- 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
- 4. For any of the NEI 09-14, Revision 1, or subsequent revision attributes identified below which have been completed prior to the NRCs on-site inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping
- Asset Management Plan Underground Piping and Tanks
- Condition Assessment Plan
- Asset Management Plan Enclosure