| {{#Wiki_filter:NOC-AE-1 4003103Attachment 1Enclosure 1Enclosure 1 to Attachment 1Alion report supporting resolution of APLAB, CASA Grande -LOCA Frequencies: | | {{#Wiki_filter:NOC-AE-1 4003103 Attachment 1 Enclosure 1 Enclosure 1 to Attachment 1 Alion report supporting resolution of APLAB, CASA Grande -LOCA Frequencies: |
| RAI 4(ALION-REP-STP-8998-02, Rev. 0, "STP CASA Grande Analysis and LAR Enclosure 4-3RAI Response") | | RAI 4 (ALION-REP-STP-8998-02, Rev. 0, "STP CASA Grande Analysis and LAR Enclosure 4-3 RAI Response") |
| NOC-AE-1 4003103Attachment 1Enclosure 1Page 1 of 5SCLIONSCIENCE AND TECHNOLOGY TECHNICAL DOCUMENT COVER PAGEDocument No: ALION-REP-STP-8998-02 Revision:0 Page 1 of 5Document Title: STP CASA Grande Analysis and LAR Enclosure 4-3 RAI 1Response Project No: STP-8898Project Name: STP Risk Informed GSI-191 SupportClient: STP Nuclear Operating CompanyDocument Purpose/Summary: | | NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 1 of 5 SCLION SCIENCE AND TECHNOLOGY TECHNICAL DOCUMENT COVER PAGE Document No: ALION-REP-STP-8998-02 Revision:0 Page 1 of 5 Document Title: STP CASA Grande Analysis and LAR Enclosure 4-3 RAI 1Response Project No: STP-8898 Project Name: STP Risk Informed GSI-191 Support Client: STP Nuclear Operating Company Document Purpose/Summary: |
| Request for additional information 1 (RAI 1) inquired about reference | | Request for additional information 1 (RAI 1) inquired about reference specific, pertinent weld break frequency information that was used in the STP CASA Grande analysis documentation (LAR Enclosure 4-3).This document cross references LAR Enclosure 4-3 with references of interest and their contents, and provides high-level clarification of their usage.This document is not considered safety related. However, it has been prepared, reviewed, and approved.Design Verification Method: X Design Review Alternative Calculation |
| : specific, pertinent weld break frequency information that was used in the STP CASA Grande analysis documentation (LAR Enclosure 4-3).This document cross references LAR Enclosure 4-3 with references of interest and their contents, and provides high-level clarification of their usage.This document is not considered safety related.
| | ___ Qualification Testing Professional Engineer (if required) |
| : However, it has been prepared,
| |
| : reviewed, and approved.
| |
| Design Verification Method:X Design ReviewAlternative Calculation | |
| ___ Qualification TestingProfessional Engineer (if required) | |
| Approval: | | Approval: |
| N/A Date N/ADominic Muhioz/ Ernie Kee* 2/14/2014 Prepared By:Printed/Typed Name Signature DateBruce Letellier 2/14/2014 Reviewed By:Printed/Typed Name Signature DateMegan Stachowiak 2/14/2014 Approved By:Printed/Typed Name Signature Date NOC-AE-1 4003103Attachment 1Enclosure 1Page 2 of 5ALION-REP-STP-8998-02 Revision: | | N/A Date N/A Dominic Muhioz/ Ernie Kee* 2/14/2014 Prepared By: Printed/Typed Name Signature Date Bruce Letellier 2/14/2014 Reviewed By: Printed/Typed Name Signature Date Megan Stachowiak 2/14/2014 Approved By: Printed/Typed Name Signature Date NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 2 of 5 ALION-REP-STP-8998-02 Revision: |
| 0STP CASA Grande Analvsis and LAR 4-3 RAI I Document Number:Document Title:STP CASA Grande Analvsis and LAR Enclosure 4-3 RAI I Resrionse REVISION DATE Description 0 See Cover Initial release.Page*Denotes a preparer from outside of the ALION organization.
| | 0 STP CASA Grande Analvsis and LAR 4-3 RAI I Document Number: Document Title: STP CASA Grande Analvsis and LAR Enclosure 4-3 RAI I Resrionse REVISION DATE Description 0 See Cover Initial release.Page*Denotes a preparer from outside of the ALION organization. |
| All technical information provided and its correctness are solely theresponsibilities of internal staff. | | All technical information provided and its correctness are solely the responsibilities of internal staff. |
| NOC-AE-1 4003103Attachment 1Enclosure 1Page 3 of 5Table of ContentsTable of Contents | | NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 3 of 5 Table of Contents Table of Contents ....................................................................................................................... |
| ....................................................................................................................... | | 3 RA I #1 PRA Licensing Branch (A PLA) ............................................................................. |
| 3RA I #1 PRA Licensing Branch (A PLA) .............................................................................
| | 4 R e sp o n se ....................................................................................................................................... |
| 4R e sp o n se .......................................................................................................................................
| | 4 Availability of Reference 8 for Review ........................................................................... |
| 4Availability of Reference 8 for Review ...........................................................................
| | 4 Confirm ation of References |
| 4Confirm ation of References
| |
| ............................................................................................. | | ............................................................................................. |
| 4Specific Aspects of References used in the LA R .........................................................
| | 4 Specific Aspects of References used in the LA R ......................................................... |
| 5Cross Reference Sum m ary ...........................................................................................
| | 5 Cross Reference Sum m ary ........................................................................................... |
| 5Clarification Details ......................................................................................................
| | 5 Clarification Details ...................................................................................................... |
| 5 NOC-AE-1 4003103Attachment 1Enclosure 1Page 4 of 5RAI #1 PRA Licensing Branch (APLA)Volume 3 of the license amendment request (LAR) describes the process used to assign break frequencies to welds in containment and cites two documents listed as references 7 & 8:7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCAInitiating Event Frequencies for South Texas Project GSI-191 Final Reportfor 2011 Work Scope.September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STPGSI-191 Resolution. | | 5 NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 4 of 5 RAI #1 PRA Licensing Branch (APLA)Volume 3 of the license amendment request (LAR) describes the process used to assign break frequencies to welds in containment and cites two documents listed as references 7 & 8: 7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Reportfor 2011 Work Scope.September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution. |
| September 2012.The staff notes that several versions of these documents are publically available in the NRC's Agency-wide Documents Access and Management System (ADAMS). | | September 2012.The staff notes that several versions of these documents are publically available in the NRC's Agency-wide Documents Access and Management System (ADAMS). A brief comparison of the fitted Johnson parameters in the above version of Reference 8 to Table 2.2.2 revealed differences between the LAR and the referenced document. |
| A brief comparison of the fitted Johnsonparameters in the above version of Reference 8 to Table 2.2.2 revealed differences between the LAR andthe referenced document. | | Please confirm that Volume 3 contains the correct information from these reports and cites the correct versions of the aforementioned references. |
| Please confirm that Volume 3 contains the correct information from thesereports and cites the correct versions of the aforementioned references. | | Please clarify exactly which aspects of the aforementioned references (e.g., by providing specific section or equation numbers) are used in the STP pilot application. |
| Please clarify exactly whichaspects of the aforementioned references (e.g., by providing specific section or equation numbers) areused in the STP pilot application. | | Response Availability of Reference 8 for Review LAR Enclosure 4-3 Reference 8 has been sent for publication in the NRC PDR with STP transmittal letter NOC-AE-13003070 (Letter, dated December 23, 2013, M.D. Meier to the NRC Document Control Desk) in order to make it publically available for review.Confirmation of References The two referenced documents number (7), and (8) in STP's GSI-191 submittal are shown below as listed in LAR Enclosure 4-3.7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Report for 2011 Work Scope. September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution. |
| ResponseAvailability of Reference 8 for ReviewLAR Enclosure 4-3 Reference 8 has been sent for publication in the NRC PDR with STP transmittal letterNOC-AE-13003070 (Letter, dated December 23, 2013, M.D. Meier to the NRC Document Control Desk) inorder to make it publically available for review.Confirmation of References The two referenced documents number (7), and (8) in STP's GSI-191 submittal are shown below as listedin LAR Enclosure 4-3.7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development ofLOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Report for 2011Work Scope. September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size forSTP GSI-191 Resolution.
| | September 2012.The revision number and date of LAR Enclosure 4-3 Reference 7 as written has been confirmed to be correct.The revision number and date of LAR Enclosure 4-3 Reference 8 as written has been confirmed to be correct. |
| September 2012.The revision number and date of LAR Enclosure 4-3 Reference 7 as written has been confirmed to becorrect.The revision number and date of LAR Enclosure 4-3 Reference 8 as written has been confirmed to becorrect. | | NOC-AE-1 4003103.Attachment 1 Enclosure 1 Page 5 of 5 Specific Aspects of References used in the LAR Cross Reference Summary Table 1: LAR End 4-3 Cross Reference Matrix Cross Reference Enclosure 4-3 (Table)CrsRernc LAR Encl. 4-3 Ref. No. Ref. Section Ref. Page Ref. Table (37) 7.8 7-55 7.19 Table 2.2.2 (8) 5 44 31 (8) 2.1 7 (8) 5 44 32 Tables 2.2.3-2.2.10 (7) 5 , 5-1 to5-4 "2 Clarification Details Weld break frequencies are estimated in NUREG 1829 (Ref. 37 of LAR Encl. 4-3). The values from this elicitation are titled "NUREG-1829 Quantiles" in Table 2.2.2 of LAR Encl. 4-3, and are identical to the values given in Table 7.19 (Pg. 7-55) of NUREG-1829 for current-day break frequencies with the exception of two additional break sizes. These two additional break sizes (in LAR Encl. 4-3, Table 2.2.2)were linearly interpolated between NUREG-1829 frequencies to be consistent with the STP probabilistic risk assessment (PRA) SBLOCA and MBLOCA bounding break sizes of 2 inches (SBLOCA-MBLOCA) and 6 inches (MBLOCA-LBLOCA). |
| NOC-AE-1 4003103.Attachment 1Enclosure 1Page 5 of 5Specific Aspects of References used in the LARCross Reference SummaryTable 1: LAR End 4-3 Cross Reference MatrixCross Reference Enclosure 4-3 (Table)CrsRernc LAR Encl. 4-3 Ref. No. Ref. Section Ref. Page Ref. Table(37) 7.8 7-55 7.19Table 2.2.2 (8) 5 44 31(8) 2.1 7(8) 5 44 32Tables 2.2.3-2.2.10 (7) 5 , 5-1 to5-4 "2Clarification DetailsWeld break frequencies are estimated in NUREG 1829 (Ref. 37 of LAR Encl. 4-3). The values from thiselicitation are titled "NUREG-1829 Quantiles" in Table 2.2.2 of LAR Encl. 4-3, and are identical to thevalues given in Table 7.19 (Pg. 7-55) of NUREG-1829 for current-day break frequencies with theexception of two additional break sizes. These two additional break sizes (in LAR Encl. 4-3, Table 2.2.2)were linearly interpolated between NUREG-1829 frequencies to be consistent with the STP probabilistic risk assessment (PRA) SBLOCA and MBLOCA bounding break sizes of 2 inches (SBLOCA-MBLOCA) and 6inches (MBLOCA-LBLOCA). | | Interpolation was performed for the 5 th percentile, median, mean, and 9 5 th quantiles of the NUREG-1829 distributions as described in Section 5 of Encl. 4-3 Reference 8, and the interpolated values are shown in Encl. 4-3 Reference 8, Table 31.The quantiles of current-day break frequencies in NUREG-1829 Table 7.19 were fit to a parametric (Bounded Johnson) distribution as described in Section 2 of LAR Encl. 4-3 Reference |
| Interpolation was performed for the 5th percentile, median, mean, and 95thquantiles of the NUREG-1829 distributions as described in Section 5 of Encl. 4-3 Reference 8, and theinterpolated values are shown in Encl. 4-3 Reference 8, Table 31.The quantiles of current-day break frequencies in NUREG-1829 Table 7.19 were fit to a parametric (Bounded Johnson) distribution as described in Section 2 of LAR Encl. 4-3 Reference | | : 8. The Johnson parameters from Table 2.2.2 of LAR Encl. 4-3 are also described in LAR Encl. 4-3 Reference |
| : 8. The Johnsonparameters from Table 2.2.2 of LAR Encl. 4-3 are also described in LAR Encl. 4-3 Reference | | : 8. As described, the parameters of the Johnson distributions closely fit the 5 th percentile, median, and 9 5 th percentile of the NUREG-1829 distribution values (Section 2.1, Table 3 of LAR Encl. 4-3 Reference |
| : 8. Asdescribed, the parameters of the Johnson distributions closely fit the 5th percentile, median, and 95thpercentile of the NUREG-1829 distribution values (Section 2.1, Table 3 of LAR Encl. 4-3 Reference | | : 8) with explicitly listed parameter values in LAR Encl. 4-3 Reference 8 Table 2. The parametric fit for a Johnson distribution at the two additional break sizes at the interpolated values of 2 and 6 inches (described above) are given in LAR Encl. 4-3 Reference 8 Table 32. Estimates of the mean break frequency reported in NUREG-1829 Table 7.19 were not used in this analysis.Reference 7 Tables 5-1 through 5-4 are the source for the values in LAR Encl. 4-3 Tables 2.2.3-2.2.10. |
| : 8) withexplicitly listed parameter values in LAR Encl. 4-3 Reference 8 Table 2. The parametric fit for a Johnsondistribution at the two additional break sizes at the interpolated values of 2 and 6 inches (described above) are given in LAR Encl. 4-3 Reference 8 Table 32. Estimates of the mean break frequency reportedin NUREG-1829 Table 7.19 were not used in this analysis. | | The values from tables 5-1 through 5-4 were used as weighting factors to distribute NUREG-1829 total break frequencies across weld types and to containment locations by matching weld types with containment weld data. In LAR Encl. 4-3, conservation of NUREG-1829 total break frequency is referred to as the"top-down" portion of the "hybrid" break frequency approach. |
| Reference 7 Tables 5-1 through 5-4 are the source for the values in LAR Encl. 4-3 Tables 2.2.3-2.2.10. | | Tables 5-1 through 5-4 from reference 7 represent the product of "bottom-up" aggregation of cross-industry data on observed flaws or degradation that may lead to breaks.}} |
| Thevalues from tables 5-1 through 5-4 were used as weighting factors to distribute NUREG-1829 total breakfrequencies across weld types and to containment locations by matching weld types with containment weld data. In LAR Encl. 4-3, conservation of NUREG-1829 total break frequency is referred to as the"top-down" portion of the "hybrid" break frequency approach.
| |
| Tables 5-1 through 5-4 from reference 7represent the product of "bottom-up" aggregation of cross-industry data on observed flaws ordegradation that may lead to breaks.}} | |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML14015A045, ML14052A053, ML14072A076, ML14086A386, ML14149A089, ML14149A434, ML14149A435, ML14178A481, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14349A790, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A128, ML15246A129, ML15265A601, ML16230A232, NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI), NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test., NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-1, NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3, NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application, NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1, NOC-AE-14003104, Revised Affidavit for Withholding for Casa Grande Analyses for Risk-Informed GSI-191 Licensing Application, NOC-AE-14003105, Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application, NOC-AE-14003106, Second Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI- 191 Licensing Application, NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application, NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application, NOC-AE-15003220, Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. Project stage: Other NOC-AE-13002954, Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-1912013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Project, Units 1 & 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1832013-11-13013 November 2013 Project Units 1 and 2 - Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Supplement NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - Rai'S Regarding South Texas Project'S Submittal for Risk-Informed Resolution of GS-191 Project stage: Other NOC-AE-14003081, STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT42014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Project Units 1 & 2, Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Project, Units 1 and 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML14072A2112014-03-0606 March 2014 NRR E-mail Capture - STP Sensitivity Report and Presentation for Proposed Meeting Project stage: Request NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 Project stage: Other ML14086A3862014-03-17017 March 2014 STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2 Project stage: Other ML14086A3852014-03-17017 March 2014 Project, Units 1 & 2 - Response to NRC Accident Dose Branch Request for Additional Information Regarding STP Risk-Informed GSI-191 Application Project stage: Request NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application2014-03-18018 March 2014 Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. Project stage: Request ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests Project stage: Withholding Request Acceptance ML14087A0752014-04-15015 April 2014 Request for Additional Information, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: RAI NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 Project stage: Other 2013-12-05
[Table View] |
|
---|
Category:Report
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End 2023-08-31
[Table view] Category:Technical
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary ML13175A2402013-06-0606 June 2013 Project, Units 1 and 2, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 1 of 260 Through Page 160 of 260 NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End NOC-AE-13002975, Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-462013-03-31031 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-46 ML13079A8082013-03-11011 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML12335A1842012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML12335A1902012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML13025A1382012-10-31031 October 2012 STP GSI-191 Bypass Sensitivity Report - Water Conductivity Added ML12243A4742012-08-30030 August 2012 Email - Risk-Informed Approach to GSI-191, STP Cfd Data Analysis Report - Bypass Test Protocol ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1206100682012-02-28028 February 2012 Southtexas Project, Units 1 and 2 - Test Plan for STP High Temperature Vertical Loops Testing ML1205408162012-02-23023 February 2012 Experimental Setup for Chle Test Equipment ML1205406672012-02-22022 February 2012 Casa Grande Summary ML1205407272012-02-0909 February 2012 Actions Taken to Resolved Pirt Items 2023-08-17
[Table view] |
Text
NOC-AE-1 4003103 Attachment 1 Enclosure 1 Enclosure 1 to Attachment 1 Alion report supporting resolution of APLAB, CASA Grande -LOCA Frequencies:
RAI 4 (ALION-REP-STP-8998-02, Rev. 0, "STP CASA Grande Analysis and LAR Enclosure 4-3 RAI Response")
NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 1 of 5 SCLION SCIENCE AND TECHNOLOGY TECHNICAL DOCUMENT COVER PAGE Document No: ALION-REP-STP-8998-02 Revision:0 Page 1 of 5 Document Title: STP CASA Grande Analysis and LAR Enclosure 4-3 RAI 1Response Project No: STP-8898 Project Name: STP Risk Informed GSI-191 Support Client: STP Nuclear Operating Company Document Purpose/Summary:
Request for additional information 1 (RAI 1) inquired about reference specific, pertinent weld break frequency information that was used in the STP CASA Grande analysis documentation (LAR Enclosure 4-3).This document cross references LAR Enclosure 4-3 with references of interest and their contents, and provides high-level clarification of their usage.This document is not considered safety related. However, it has been prepared, reviewed, and approved.Design Verification Method: X Design Review Alternative Calculation
___ Qualification Testing Professional Engineer (if required)
Approval:
N/A Date N/A Dominic Muhioz/ Ernie Kee* 2/14/2014 Prepared By: Printed/Typed Name Signature Date Bruce Letellier 2/14/2014 Reviewed By: Printed/Typed Name Signature Date Megan Stachowiak 2/14/2014 Approved By: Printed/Typed Name Signature Date NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 2 of 5 ALION-REP-STP-8998-02 Revision:
0 STP CASA Grande Analvsis and LAR 4-3 RAI I Document Number: Document Title: STP CASA Grande Analvsis and LAR Enclosure 4-3 RAI I Resrionse REVISION DATE Description 0 See Cover Initial release.Page*Denotes a preparer from outside of the ALION organization.
All technical information provided and its correctness are solely the responsibilities of internal staff.
NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 3 of 5 Table of Contents Table of Contents .......................................................................................................................
3 RA I #1 PRA Licensing Branch (A PLA) .............................................................................
4 R e sp o n se .......................................................................................................................................
4 Availability of Reference 8 for Review ...........................................................................
4 Confirm ation of References
.............................................................................................
4 Specific Aspects of References used in the LA R .........................................................
5 Cross Reference Sum m ary ...........................................................................................
5 Clarification Details ......................................................................................................
5 NOC-AE-1 4003103 Attachment 1 Enclosure 1 Page 4 of 5 RAI #1 PRA Licensing Branch (APLA)Volume 3 of the license amendment request (LAR) describes the process used to assign break frequencies to welds in containment and cites two documents listed as references 7 & 8: 7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Reportfor 2011 Work Scope.September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution.
September 2012.The staff notes that several versions of these documents are publically available in the NRC's Agency-wide Documents Access and Management System (ADAMS). A brief comparison of the fitted Johnson parameters in the above version of Reference 8 to Table 2.2.2 revealed differences between the LAR and the referenced document.
Please confirm that Volume 3 contains the correct information from these reports and cites the correct versions of the aforementioned references.
Please clarify exactly which aspects of the aforementioned references (e.g., by providing specific section or equation numbers) are used in the STP pilot application.
Response Availability of Reference 8 for Review LAR Enclosure 4-3 Reference 8 has been sent for publication in the NRC PDR with STP transmittal letter NOC-AE-13003070 (Letter, dated December 23, 2013, M.D. Meier to the NRC Document Control Desk) in order to make it publically available for review.Confirmation of References The two referenced documents number (7), and (8) in STP's GSI-191 submittal are shown below as listed in LAR Enclosure 4-3.7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Report for 2011 Work Scope. September 2011.8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution.
September 2012.The revision number and date of LAR Enclosure 4-3 Reference 7 as written has been confirmed to be correct.The revision number and date of LAR Enclosure 4-3 Reference 8 as written has been confirmed to be correct.
NOC-AE-1 4003103.Attachment 1 Enclosure 1 Page 5 of 5 Specific Aspects of References used in the LAR Cross Reference Summary Table 1: LAR End 4-3 Cross Reference Matrix Cross Reference Enclosure 4-3 (Table)CrsRernc LAR Encl. 4-3 Ref. No. Ref. Section Ref. Page Ref. Table (37) 7.8 7-55 7.19 Table 2.2.2 (8) 5 44 31 (8) 2.1 7 (8) 5 44 32 Tables 2.2.3-2.2.10 (7) 5 , 5-1 to5-4 "2 Clarification Details Weld break frequencies are estimated in NUREG 1829 (Ref. 37 of LAR Encl. 4-3). The values from this elicitation are titled "NUREG-1829 Quantiles" in Table 2.2.2 of LAR Encl. 4-3, and are identical to the values given in Table 7.19 (Pg. 7-55) of NUREG-1829 for current-day break frequencies with the exception of two additional break sizes. These two additional break sizes (in LAR Encl. 4-3, Table 2.2.2)were linearly interpolated between NUREG-1829 frequencies to be consistent with the STP probabilistic risk assessment (PRA) SBLOCA and MBLOCA bounding break sizes of 2 inches (SBLOCA-MBLOCA) and 6 inches (MBLOCA-LBLOCA).
Interpolation was performed for the 5 th percentile, median, mean, and 9 5 th quantiles of the NUREG-1829 distributions as described in Section 5 of Encl. 4-3 Reference 8, and the interpolated values are shown in Encl. 4-3 Reference 8, Table 31.The quantiles of current-day break frequencies in NUREG-1829 Table 7.19 were fit to a parametric (Bounded Johnson) distribution as described in Section 2 of LAR Encl. 4-3 Reference
- 8. The Johnson parameters from Table 2.2.2 of LAR Encl. 4-3 are also described in LAR Encl. 4-3 Reference
- 8. As described, the parameters of the Johnson distributions closely fit the 5 th percentile, median, and 9 5 th percentile of the NUREG-1829 distribution values (Section 2.1, Table 3 of LAR Encl. 4-3 Reference
- 8) with explicitly listed parameter values in LAR Encl. 4-3 Reference 8 Table 2. The parametric fit for a Johnson distribution at the two additional break sizes at the interpolated values of 2 and 6 inches (described above) are given in LAR Encl. 4-3 Reference 8 Table 32. Estimates of the mean break frequency reported in NUREG-1829 Table 7.19 were not used in this analysis.Reference 7 Tables 5-1 through 5-4 are the source for the values in LAR Encl. 4-3 Tables 2.2.3-2.2.10.
The values from tables 5-1 through 5-4 were used as weighting factors to distribute NUREG-1829 total break frequencies across weld types and to containment locations by matching weld types with containment weld data. In LAR Encl. 4-3, conservation of NUREG-1829 total break frequency is referred to as the"top-down" portion of the "hybrid" break frequency approach.
Tables 5-1 through 5-4 from reference 7 represent the product of "bottom-up" aggregation of cross-industry data on observed flaws or degradation that may lead to breaks.