DRESDEN NUCLEAR PLANT, UNIT 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION - BASELINE INSPECTION Dear Mr. Hanson
DRESDEN NUCLEAR PLANT, UNIT 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION - BASELINE INSPECTION Dear Mr. Hanson
: On November 2, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection Procedure 71111.08
: On November 2, 201 5 , the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection Procedure 71111.08. This on-site inspection is scheduled to be performed November 2
. This on-site inspection is scheduled to be performed November 2
  - 6, 2015. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on
  - 6, 2015. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on
-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups.
-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups.
Line 30: Line 29:
-829-9744, or via e
-829-9744, or via e
-mail at Tom.Bilik@nrc.gov
-mail at Tom.Bilik@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 , "Public Inspections, Exemptions, Requests for Withholding,"
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC
of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC
's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document s Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely, /RA/
  /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50
-237, 50-249 License Nos. DPR
-237, 50-249 License Nos. DPR
Line 48: Line 45:


Enclosure Inspection Report
Enclosure Inspection Report
: 05000237/2015004; 05000249/2015004 Inspection Dates
: 05000 237/201 5 00 4; 05000 249/201 5 00 4 Inspection Dates
: November 2
: November 2
  - 6, 2015 Inspection Procedures
  - 6, 201 5 Inspection Procedures
: Inspection Procedure 71111- 08, "Inservice Inspection
: Inspection Procedure 71111- 08 , "Inservice Inspection
" Lead Inspector
" Lead Inspector
: Tom Bilik, DRS (630) 829
: Tom Bilik, DRS (630) 829-9744 Tom.Bilik.@nrc.gov A. Information for the In-Office Preparation Wee k The following information (electronic copy CD ROM if possible) is requested by October 19, 201 5 , to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on
-9744 Tom.Bilik.@nrc.gov A. Information for the In-Office Preparation Wee k The following information (electronic copy CD ROM if possible) is requested by October 19, 2015, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on
-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection.
-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection.
The following information is applicable to Unit 2 unless otherwise indicated.
The following information is applicable to Unit 2 unless otherwise indicated.
If you have any questions regarding this information, please call the inspector as soon as possible.
If you have any questions regarding this information, please call the inspector as soon as possible.
: 1. For the upcoming outage, a detailed schedule and description of:
: 1. For the upcoming outage, a detailed schedule and description of:
: a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems and containment, performed as part of your American Society of Mechanical Engineers (ASME) Code Inservice Inspection (IS I) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk
: a. Non-Destructive Examinations (NDE s) planned for Class 1 and 2 Systems and containment, performed as part of your American Society of Mechanical Engineers (ASME) Code Inservice Inspection (IS I) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk
-Informed (RI)
-Informed (RI)
-ISI Program, or other augmented inspection programs commitments
-ISI Program, or other augmented inspection programs commitments
Line 65: Line 61:
: b. Welding on Code Class 1, 2, or 3 components.
: b. Welding on Code Class 1, 2, or 3 components.
: 2. A copy of the NDE procedures and welding procedures used to perform the activities identified in A.1 (including NDE calibration and flaw characterization/
: 2. A copy of the NDE procedures and welding procedures used to perform the activities identified in A.1 (including NDE calibration and flaw characterization/
sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI
sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI , of the ASME Code, provide documentation supporting the procedure qualification (e.g., the Electric Power Research Institute performance demonstration qualification summary sheets).
, of the ASME Code, provide documentation supporting the procedure qualification (e.g., the Electric Power Research Institute performance demonstration qualification summary sheets).
: 3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A
: 3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A
.1.A copy of the 10
.1.A copy of the 10
Line 75: Line 70:
: 6. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examinatio
: 6. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examinatio
: n. 7. List with description of ISI
: n. 7. List with description of ISI
-related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors identified in piping examinations that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage. 8. Copy of any Title 10, Code of Federal Regulations, Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
-related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors identified in piping examinations that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage. 8. Copy of any Title 10 , Code of Federal Regulations, Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
B. On-site Information to be Provided to the Inspector on the First Day of the Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies (e.g., Paper Records) of the Following Documents
B. On-site Information to be Provided to the Inspector on the First Day of the Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies (e.g., Paper Records) of the Following Documents
. 1. For welds selected by the inspector from A.1.
. 1. For welds selected by the inspector from A.1.
Line 101: Line 96:
-destructive examinations selected by the inspector for observation.
-destructive examinations selected by the inspector for observation.
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC
of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC
's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document s Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely, /RA/
  /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50
-237, 50-249 License Nos. D PR-19; DPR-25  
-237, 50-249 License Nos. D PR-19; DPR-25  
Line 114: Line 108:


Inservice Inspection Document Request cc w/encl:  Distribution via LISTSERV DISTRIBUTION w/encl: Janelle Jessie RidsNrrDorlLpl3
Inservice Inspection Document Request cc w/encl:  Distribution via LISTSERV DISTRIBUTION w/encl: Janelle Jessie RidsNrrDorlLpl3
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15261A391 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII      NAME DHills for TBilik:cl DHills  DATE 09/17/15 09/17/15  OFFICIAL RECORD COPY}}
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15261A391 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII      NAME DHills for TBilik: cl DHills  DATE 09/17/1 5 09/17/15  OFFICIAL RECORD COPY}}

Revision as of 23:32, 8 July 2018

Ltr. 09/17/2015 Dresden Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information - Baseline Inspection (Txb)
ML15261A391
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/17/2015
From: Hills D E
NRC/RGN-III/DRS/EB1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
Download: ML15261A391 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 September 17, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR PLANT, UNIT 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION - BASELINE INSPECTION Dear Mr. Hanson

On November 2, 201 5 , the U.S. Nuclear Regulatory Commission (NRC) will begin the baseline Inservice Inspection Procedure 71111.08. This on-site inspection is scheduled to be performed November 2

- 6, 2015. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your on

-site resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up

-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr.

D. Walker, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at 630

-829-9744, or via e

-mail at Tom.Bilik@nrc.gov

. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 , "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC

's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document s Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50

-237, 50-249 License Nos. DPR

-19; DPR-25

Enclosure:

Inservice Inspection Document Request cc w/encl: Distribution via LISTSERV

Enclosure Inspection Report

05000 237/201 5 00 4; 05000 249/201 5 00 4 Inspection Dates
November 2

- 6, 201 5 Inspection Procedures

Inspection Procedure 71111- 08 , "Inservice Inspection

" Lead Inspector

Tom Bilik, DRS (630) 829-9744 Tom.Bilik.@nrc.gov A. Information for the In-Office Preparation Wee k The following information (electronic copy CD ROM if possible) is requested by October 19, 201 5 , to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on

-site to your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection.

The following information is applicable to Unit 2 unless otherwise indicated.

If you have any questions regarding this information, please call the inspector as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:
a. Non-Destructive Examinations (NDE s) planned for Class 1 and 2 Systems and containment, performed as part of your American Society of Mechanical Engineers (ASME) Code Inservice Inspection (IS I) Program (include edition and addenda of Code committed to), and NDE examinations planned for other systems performed as part of a Risk

-Informed (RI)

-ISI Program, or other augmented inspection programs commitments

, as part of an industry initiative. For each weld examination, include the weld identification number, description of weld (component name), category, class, type of exam and procedure number, and date of examination; and

b. Welding on Code Class 1, 2, or 3 components.
2. A copy of the NDE procedures and welding procedures used to perform the activities identified in A.1 (including NDE calibration and flaw characterization/

sizing procedures and Welding Procedure Qualification Records). For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI , of the ASME Code, provide documentation supporting the procedure qualification (e.g., the Electric Power Research Institute performance demonstration qualification summary sheets).

3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A

.1.A copy of the 10

-year ISI Program showing those required exams scheduled to be performed this outage, and those which have been completed.

2 4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye penetrant), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.

5. List with short description of the welds in Code Class 1 and 2 Systems, which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation (e.g., NIS

-2 forms with definitions of system and component acronyms).

6. If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the inspection period, provide a detailed description of the welds to be examined, and the extent of the planned examinatio
n. 7. List with description of ISI

-related issues such as piping degradation or damage (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors identified in piping examinations that have been entered into your corrective action system since the beginning of the last refueling outage. Also, include a list of corrective action records associated with foreign material introduced/identified in the reactor vessel or reactor coolant system since the beginning of the last refueling outage. 8. Copy of any Title 10 , Code of Federal Regulations, Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

B. On-site Information to be Provided to the Inspector on the First Day of the Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies (e.g., Paper Records) of the Following Documents

. 1. For welds selected by the inspector from A.1.

b and A.6 above, provide copies of the following documents:

a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing); c. Applicable Code Edition and Addenda for construction of the weldment (e.g., B31.1 or ASME Section III)
d. Applicable Code Edition and Addenda for weld procedure qualification
e. Applicable welding procedures (WP s) used to fabricate the welds;
f. Copies of procedure qualification records (PQRs) supporting the WP s; g. Copies of welders' performance qualification records;
h. Copies of mechanical test reports identified in the PQRs above;
i. Copies of the non

-conformance reports for the selected welds;

3 j. Access to radiographs and equipment to view radiographs of the selected welds; and k. Copies of the pre

-service examination records for the selected welds.

2. For the ISI

-related corrective action issues selected by the inspector from A.8 above, provide a copy of the corrective actions and supporting documentation.

3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector from Item A.5 above, provide a copy of the examination records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency repair plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined during the outage. Also provide any drawings used by NDE vendor s to locate these welds. 6. Provide copies of the following standards at the on

-site NRC inspection location for the duration of the inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to the ISI Program and the Repair/Replacement Program; and b. Copy of the performance demonstration initiative (PDI) generic procedures with the latest applicable Revisions that support site qualified ultrasonic examination of piping welds and components (e.g.

, PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-10 etc.). 7. Provide training (e.g., Scaffolding, Fall Protection, foreign material exclusion

) if required to access the non

-destructive examinations selected by the inspector for observation.

If you have questions regarding the information requested, please contact the lead inspector.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC

's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document s Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50

-237, 50-249 License Nos. D PR-19; DPR-25

Enclosure:

Inservice Inspection Document Request cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl: Janelle Jessie RidsNrrDorlLpl3

-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML15261A391 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DHills for TBilik: cl DHills DATE 09/17/1 5 09/17/15 OFFICIAL RECORD COPY