{{#Wiki_filter:April 9, 2012 Mr. John Hickman Mail Stop: T-E18 Division of Waste Management  
{{#Wiki_filter:April 9, 2012 Mr. John Hickman Mail Stop: T-E18 Division of Waste Management .S. uclear Regulatory Commission 11545 Rockville Pike Rockville, N ID 20852
.S. uclear Regulatory Commission 11545 Rockville Pike Rockville, NID 20852
* 0 E OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION Managed by ORAU for the U.S. Depertment of Energy  
* 0 E OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION Managed by ORAU for the U.S. Depertment of Energy  


==SUBJECT:==
==SUBJECT:==
FINAL REPORT-CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA, HUMBOLDT BAY POWER PLANT, EUREKA, CALIFORNIA DCN: 5167-SR-01
FINAL REPORT-CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA, HUMBOLDT BAY POWER PLANT , EUREKA, CALIFORNIA DCN: 5167-SR-01
-0  
-0  


==Dear Mr. Hickman:==
==Dear Mr. Hickman:==
 
The Oak Ridge Institute for Science and Education (ORISE) performed confirmatory radiological survey activities on the former Fuel Oil Tank Area and other portions of the Humboldt Bay Power Plant as requested b y the .S. Nuclear Regulator y Commission (NRC) site representative.
The Oak Ridge Institute for Science and Education (ORISE) performed confirmatory radiological survey activities on the former Fuel Oil Tank Area and other portions of the Humboldt Bay Power Plant as requested by the .S. Nuclear Regulator y Commission (NRC) site representative.
These survey activities were conducted during the period of Febmary 14 a nd 15, 2012. Enclosed is the final report that summarizes ORISE's survey procedures and provides the results of the ORISE radiological survey activities.
These survey activities were conducted during the period of Febmary 14 and 15, 2012. Enclosed is the final report that summarizes ORISE's survey procedures and provides the results of the ORISE radiological survey activities.
T he surveys included gamma walkover scans, gamma direct measurements, and soil sa mpling. My contact information is listed below , or yo u ma y contact E rika Baile y at 865.576.6659 or T im Vitkus at 865.576.5073, s h ould yo u require any additional information.
The surveys included gamma walkover scans, gamma direct measurements, and soil sampling. My contact information is listed below, or you may contact Erika Bailey at 865.576.6659 or Tim Vitkus at 865.576.5073, should you require any additional information.
Wade C. Adams Project Manager/Health Ph ys ici st Independent Environmental Assessment a nd Verification WCA:fr Enclosure c: electronic:
Wade C. Adams Project Manager/Health Physicist Independent Environmental Assessment and Verification WCA:fr Enclosure c: electronic:
G. Schlapper, NRC Region IV T. Carter, N R C HQ S. Roberts, ORISE/I EA V E. Baile y, ORISE/IEA V R. Evans, NRC Region IV File 516 7 T. Vitkus, ORISE/IEA V A. Hood, ORISE/IEA V Telephone:
G. Schlapper, NRC Region IV T. Carter, NRC HQ S. Roberts, ORISE/IEA V E. Bailey, ORISE/IEA V R. Evans, NRC Region IV File 5167 T. Vitkus, ORISE/IEA V A. Hood, ORISE/IEA V Telephone:
865.576.0065 Fax: 865.241.3497 E-mail: Wad e.Adams@o rau.org P.O. Box 117 I Oak Ridge. TN 37831 I www.on s e.orau.gov CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA HUMBOLDTBAYPOWERPLANT EUREKA, CALIFORNIA W. C. Adams Prepared for the U.S. Nuclear Regulatory Commission Approved for public release; further dissemination unlimited.
865.576.0065 Fax: 865.241.3497 E-mail: Wade.Adams@orau.org P.O. Box 117 I Oak Ridge. TN 37831 I www.onse.orau.gov CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA HUMBOLDTBAYPOWERPLANT EUREKA, CALIFORNIA W. C. Adams Prepared for the U.S. Nuclear Regulatory Commission Approved for public release; further dissemination unlimited
The Oak Ridge Institute for Science and Education (ORISE) is a U.S. Department of Energy facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical emergencies, support national security and emergenc y preparedness, and educate the next generation of scientists.
.
The Oak Ridge Institute for Science and Education (ORISE) is a U.S. Department of Energy facility focusing on scientific initiatives to research health risks from occupational  
: hazards, assess environmental  
: cleanup, respond to radiation medical emergencies, support national security and emergency preparedness, and educate the next generation of scientists.
ORISE is managed by Oak Ridge Associated Universities.
ORISE is managed by Oak Ridge Associated Universities.
NOTICES The opinions expressed herein do not necessarily reflect the opinions of the sponsoring institutions of Oak Ridge Associated Universities.
NOTICES The opinions expressed herein do not necessarily reflect the opinions of the sponsoring institutions of Oak Ridge Associated Universities.
This report was prepared as an account of work sponsored by the United States Government.
This report was prepared as an account of work sponsored b y the United States Government.
Neither the United States Government nor the U.S. Department of Energy, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,  
Neither the United States Government nor the U.S. Department of Energy, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to an y specific commercial product, process, or service b y trade name, mark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement or recommendation, or favor by the U.S. Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof.
: product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to any specific commercial  
CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA H U MBOLDT BA Y POWER PLANT E U REKA , CALIFORNIA Prepared by W. C. A d ams OR I S E Independent E nvironmental Assessme nt and Verification Program Oak Ridge Institute for Science and Education Oak Rid ge, Tennessee 37831-0017 Prepared for the U.S. Nuclear Regulat ory Commiss ion FINAL REPORT APRIL 2012 This report is based on work performed b y the Oak Ridge In s titute for Science and E ducation u nd er contract number DE-AC0 5-060R23100 with the Department of Energy. Prepared b y the Oak Rid ge In s titute for Science and E duc atio n , under intera ge nc y agreement (NRC FIN o. F1008) between the U.S. uclear Regulat ory Commission and the U.S. Department of Energy.
: product, process, or service by trade name, mark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement or recommendation, or favor by the U.S. Government or any agency thereof.
The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof.
CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA HUMBOLDT BAY POWER PLANT EUREKA, CALIFORNIA Prepared by W. C. Adams OR ISE Independent Environmental Assessment and Verification Program Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-0017 Prepared for the U.S. Nuclear Regulatory Commission FINAL REPORT APRIL 2012 This report is based on work performed by the Oak Ridge Institute for Science and Education under contract number DE-AC05-060R23100 with the Department of Energy. Prepared by the Oak Ridge Institute for Science and Education, under interagency agreement (NRC FIN o. F1008) between the U.S. uclear Regulatory Commission and the U.S. Department of Energy.
THIS PAGE LEFT BLANK INTENTIONALLY
THIS PAGE LEFT BLANK INTENTIONALLY
* C>RISE OAK RIDGE INSTITUTE FOA 8CtENCE AND EDUCATION  
* C>RISE OAK RIDGE INSTITUTE FOA 8CtENCE AND EDUCATION  
Line 49: Line 41:
--------------
--------------
ManegedbyORAUfCM'theU
ManegedbyORAUfCM'theU
.S.oepwtmentofEnergv CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA HUMBOLDT BAY POWER PLANT Prepared by: Reviewed by: EUREKA, CALIFORNIA W. C. Adams, Health Physicist/Project Manager Independent Environmenta l Assessment and Verification Pr gram ey Operations Director Independent E nmental Assessment and Verification Program Reviewed by ft,;' rUY f. W. P. Ivey, LaborntoGroup Manager Independent Environmental Assessment and Verification Program Reviewed by i1 Bto\T;iualitYAs;urnncespecialist Approved for release by: Independent Environmental Assessment and Verification Program {), E. N. Bailey, Survey Projects Independent Environmental and Verification Program HBPP Fuel Oil Tank Area, Eureka, CA Date 'f /q (n_ Date 1/{bB-Date: .l/ J 9/J Z. 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA. 5167-SR-01-0 C>R,SE OAK fW>Oa H8Tl'TU1'E llOA 9CaNCa: AHO U>UCATlON CONTENTS FIGURES .....................................................................
.S.oepwtmentofEnergv CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA HUMBOLDT BAY POWER PLANT Prepared by: Reviewed by: EUREKA, CALIFORNIA W. C. Adams, Health Physicist/Project Manager Independent Environmenta l Assessment and Verification Pr gram ey Operations Director Independent E nmental Assessment and Verification Program Reviewed by ft,;' rUY f. W. P. Ive y, LaborntoGroup Manager Independent Environmental Assessment and Verification Program Reviewed b y i1 Bto\T;iualitYAs;urnncespecialist Approved for release by: Independent Environmental Assessment and Verification Program {), E. N. Bailey, Survey Projects Independent Environmental and Verification Program HBPP Fuel Oil Tank Area, Eureka, CA Date 'f /q (n_ Date 1/{bB-Date: .l/ J 9/J Z. 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA. 516 7-SR-01-0 C>R , SE OAK fW>Oa H8Tl'TU1'E llOA 9CaNCa: AHO U>UCATlON C O NTENTS F IG U RES .....................................................................
..........
........................................................
..............................................
............................. v TA B LES .............
............................. v TABLES .............
...................
...................
......................................................
......................................................
.........................................
.........................................
.................
.................
........... vi ACRONYMS ...........................................................................................................
........... vi AC R ONYMS ...........................................................................................................
........................................ vii 1. INTRODUCTIO A D SITE HISTORY ............................................................................................ 1 2. SITE DESCRIPTION ..........................................................................................
........................................ vii 1. I NT R O D UC TI O A D S IT E HIST O R Y ............................................................................................ 1 2. SIT E D E S C RIPTI ON ..........................................................................................
.......................................
.......................................
2 2.1 FUEL OIL TA KAREA (FOTA) ..........................
2 2.1 FUEL OIL TA KAREA (FO T A) .................................................................................................
.......................................................................
.. 2 2.2 U IT 1 AND U I T 2 CONCRETE P ADS ........................................................................................ 2 2.3 ORTHEAST L AYDO AREA ................
.. 2 2.2 U IT 1 AND U IT 2 CONCRETE PADS ........................................................................................
2 2.3 ORTHEASTLAYDO AREA ................
............
............
..................................
..................................
..............
....................................... 3 2.4 NE\V ASPf-L\LT R OADWAY ......................................................................
......................... 3 2.4 NE\V ASPf-L\LT ROADWAY ......................................................................
...................................... 3 3. O BJ ECT I VES ..............
...................................... 3 3. OBJECTIVES ..............
......................
......................
..............................
..............................
........................................
........................................
..............
..............
............
........................ 3 4. D OCUME NT RE V I EW ............................................................................................................................. 3 5. D ATA QUAL I TY O BJ ECT I VE S ..........................................................................
............ 3 4. DOCUMENT REVIEW ............................................................................................................................. 3 5. DATA QUALITY OBJECTIVES ..........................................................................
................................... 4 6. CO FIRMA T O R Y RA DI OLOG I CAL SU R VEY PR OCE D URES .................
..........................
................................
......... 4 6. CO FIRMATORY RADIOLOGICAL SURVEY PROCEDURES .................
..........
......................
5 6.1 SURVEY u IT CLASSIFICATIO  
5 6.1 SURVEY u IT CLASSIFICATIO  
................................................................................................... 5 6.2 REFERENCE SYSTEl\f  
................................................................................................... 5 6.2 REFERE NCE SYSTEl\f ..................................................................................................................... 6 6.3 SURFACE S CANS ............................................................................................................................. 6 6.4 GAMl\f.A D IRECT MEASUREl\fENTS  
..................................................................................................................... 6 6.3 SURFACE SCANS ............................................................................................................................. 6 6.4 GAMl\f.A DIRECT MEASUREl\fENTS  
............................
............................
.............................................
.............................................
.....................
.....................
6 6.5 SOIL SAl\IPLING  
6 6.5 SO I L SAl\IPLING  
.............................................................................................................................. 6 6.5.1 Systematic Sample Locations .....................
.............................................................................................................................. 6 6.5.1 S ys t e m ati c Sam pl e Lo c atio n s .....................
................................
................................
.............................................
.............................................
6 6.5.2 Judgmentally-Selected Sample Locations ..............
6 6.5.2 Jud gme nt a ll y-S el e cted Sampl e Lo c a ti o n s ..............
.............................
.............................
..................
..................
................. 7 6.6 INTERLABORATORY COMPARISON ANALYSES  
................. 7 6.6 I NTERLABORATORY COM P ARISON ANALYSES ..................
..................
.....................
.....................
...............
...............
.................... 7 7. ADDITIONAL RADIOLOGICAL SURVEY PROCEDURES ........................................................ 8 8. RADIONUCLIDES OF CONCERN .............................................
.................... 7 7. A DDI T I O N A L RADI O L O GI CAL S U R VEY PR OCE D U RE S ........................................................ 8 8. RADI O N UC LID E S OF CONCE RN ......................................................................................................
8 9.SAMPLEA ALYS IS A DD A T A I TE RP RE T A TI O ............................................................... 1 0 1 0. F I N DI GS AN D RESULTS ....................................................................................
............................. 1 0 1 0.1 D OCUl\ffi TREV I EW .................... , ......................................................
...............
......................... 10 1 0.2 S U RF ACE S CANS .............................................
.............................................................................. 10 1 0.3 GAMl\f.A D IRECT MEASUREl\ffiNTS
.........................................................
.........................................................
8 9.SAMPLEA ALYSISA DDATAI TERPRETATIO ............................................................... 10 10. FINDI GS AND RESULTS ....................................................................................
................................... 11 1 0.4 RA DIO UCLIDE Co CE TRAT I O N S IN Co F I RMATORY SOIL SAMPLES ............................ 11 HB PP F u el O il Ta nk Area, E u re k a, CA 111 51 67-S R-0 1-0 1 0.5 .RADIO N U C LIDE CO NCEN T R ATIO N S I N I N T E RL A BORATORY COMP A RISO N AN ALYS E S S O IL SAMPL E S ..................................
............................. 10 10.1 DOCUl\ffi TREVIEW .................... , ......................................................
............................................................................................. 1 2 11. COMPA RI SON OF RE SUL TS W ITH REL EA SE C RIT E RI A. ..................................................... 12 1 2. A DDITI ONA L RADI O L OG I CA L S U R VEY AC T IV IT IES ......................................................... 13 1 2.1 U N IT 1 AN D U N IT 2 -GAMMA WALKO VE R S C A N S ...................................................
...............
.............. 13 12.2 NO R THE A ST L A YDOWN AREA -GAMMA WALKOVER S C A N S ............................................... 1 3 12.3 N E W ASPHALT R OADWA Y -GAMMA WALKOV E R S C\NS ...................................................... 13 1 3. SUMMA R Y ................................................................................................................................................ 1 3 1 0. RE FE RE NCE S ...........................................................................................................................
......................... 10 10.2 SURFACE SCANS .............................................
.............. 15 A PP EN DI X A: F I GURES A PP EN D IX B: TA BL ES A PP E NDI X C: MA J O R I NS TR UMEN T A TI O N A PP EN DI X D: SU R VEY AN D ANALY TI CAL PR OCE D URES HB PP F u el Oil Ta n k Area, Eu r e k a, CA l V 5 1 6 7-S R-0 1-0 C>R , SE OAK NDOa ...-nTVTW EOUCAllON  
.............................................................................. 10 10.3 GAMl\f.A DIRECT MEASUREl\ffiNTS
..................
.......................................
...............................
.... 11 10.4 RADIO UCLIDE Co CE TRATIONS IN Co FIRMATORY SOIL SAMPLES ............................ 11 HBPP Fuel Oil Tank Area, Eureka, CA 111 5167-SR-01-0 10.5 .RADIONUCLIDE CONCENTRATIONS IN INTERLABORATORY COMPARISON ANALYSES SOIL SAMPLES ..................................
............................................................................................. 12 11. COMPARISON OF RESULTS WITH RELEASE CRITERIA. ..................................................... 12 12. ADDITIONAL RADIOLOGICAL SURVEY ACTIVITIES ......................................................... 13 12.1 UNIT 1 AND UNIT 2 -GAMMA WALKOVER SCANS ...................................................
.............. 13 12.2 NORTHEAST LAYDOWN AREA -GAMMA WALKOVER SCANS ............................................... 13 12.3 NEW ASPHALT ROADWAY -GAMMA WALKOVER SC\NS ...................................................... 13 13. SUMMARY ................................................................................................................................................ 13 10. REFERENCES ...........................................................................................................................
.............. 15 APPENDIX A: FIGURES APPENDIX B: TABLES APPENDIX C: MAJOR INSTRUMENTATION APPENDIX D: SURVEY AND ANALYTICAL PROCEDURES HBPP Fuel Oil Tank Area, Eureka, CA lV 5167-SR-01-0 C>R,SE OAK NDOa ...-nTVTW EOUCAllON  
--------------------------
--------------------------
FIGURES Fig. A-1. Site Location Map -Humboldt Bay Power Plant, Eureka, California  
FI G U R ES Fig. A-1. Site Location Map -Humboldt Ba y Power Plant, Eureka, California  
.................................
.................................
A-1 Fig. A-2. Humboldt Bay Power Plant -Site Overview of Surveyed Areas .........................................
A-1 Fig. A-2. Humboldt Ba y Power Plant -Site Overview of Surveyed Areas .........................................
A-2 Fig. A-3. HBPP Fuel Oil Tank Area -Gamma Walkover Scans ...................................................
A-2 Fig. A-3. HBPP Fuel Oil Tank Area -Gamma Walkover Scans ...................................................
....... A-3 Fig. A-4. HBPP FOTA -PG&E Systematic Soil Sample Locations  
....... A-3 Fig. A-4. HBPP FOTA -PG&E Systematic Soil Sample Locations  
Line 120: Line 100:
.......................................
.......................................
............
............
.......... A-5 Fig. A-6. HBPP Unit 1 and Unit 2 Concrete Pads -Gamma Walkover Scans .............................
.......... A-5 Fig. A-6. HBPP Unit 1 and Unit 2 Concrete Pads -Gamma Walkover Scans ................................... A-6 Fig. A-7. HBPP Northeast Lay down Area -Gamma Walkover Scans ................................................
...... A-6 Fig. A-7. HBPP Northeast Lay down Area -Gamma Walkover Scans ................................................
A-7 Fig. A-8. HBPP New Asphalt Roadway -Gamma Walkover Scans ..........
A-7 Fig. A-8. HBPP New Asphalt Roadway -Gamma Walkover Scans ..........
..................
..................
........................ A-8 Fig. A-9. HBPP Fuel Oil Tank Area -Gamma Scan Count Rate Distribution
......................
......................
.. A-8 Fig. A-9. HBPP Fuel Oil Tank Area -Gamma Scan Count Rate Distribution
............ A-9 Fig. A-10. Fuel Oil Tank A rea -Pictures of the Natural Strata La ye r that Exhibited Elevated Gamma Radiation Levels ..........................
......................
............ A-9 Fig. A-10. Fuel Oil Tank Area -Pictures of the Natural Strata Layer that Exhibited Elevated Gamma Radiation Levels .........
.................
...........
...........
..............
..............
Line 134: Line 111:
..... A-10 Fig. A-11. HBPP Units 1 & 2 Concrete Pads -Gamma Scan Count Rate Distribution  
..... A-10 Fig. A-11. HBPP Units 1 & 2 Concrete Pads -Gamma Scan Count Rate Distribution  
.................
.................
A-11 Fig. A-12. HBPP Northeast Laydown Area Asphalt Pad-Gamma Scan Count Rate Distribution  
A-11 Fig. A-12. HBPP Northeast La y down Area Asphalt Pad-Gamma Scan Count Rate Distribution  
...................
...................
....................
....................
Line 143: Line 120:
A-12 Fig. A-13. HBPP New Asphalt Roadway-Gamma Scan Count Rate Distribution  
A-12 Fig. A-13. HBPP New Asphalt Roadway-Gamma Scan Count Rate Distribution  
...................
...................
..... A-13 HBPP Fuel Oil Tank .Area, Eureka, CA v 5167-SR-01-0
..... A-13 HBPP Fuel Oil Tank .Area, Eureka, CA v 516 7-SR-01-0
* 0 RISE OAK flllOOm .-nTUlW fOft 9CCNC9: AHO U>UCAllOH  
* 0 RISE OAK flllOOm .-nTUlW fOft 9CCNC9: AHO U>UCAllOH  
---------------------------
---------------------------
TABLES Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides-of-Concern Humboldt Bay Power Plant Eureka, California  
TABLES Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides-of-Concern Humboldt Ba y Power Pl a nt E ureka , California  
.............
...........................
..............
..........................
..........................
........................
........................
9 Table 2. Radionuclide Concentrations in FOTA Soil Samples Summary Results .................................
9 Table 2. Radionuclide Concentrations in FOTA Soil Samples Summary Re s ults .................................
11 Table B-1. Radionuclide Concentration s in ORISE Soil Samples ..........................................................
11 Table B-1. Radionuclide Co ncentration s in ORISE Soil Samples ..........................................................
B-1
B-1
* Table B-2. Fuel Oil Tank Area Comparison Data ............
* Table B-2. Fuel Oil Tank Area Comparison Data ............
........................................................................
........................................................................
B-2 Table B-3. Radionuclide Concentrations in Interlaboratory Comparison Soil Samples .....................
B-2 Table B-3. Radionuclide Concentrations in Interlaboratory Comparison Soil Sample s .....................
B-4 HBPP Fuel Oil Tank Area, Eureka, CA vi 5167-SR-01-0 L C>R,SE OAK AIOGa ...-nnlTW 9CIENCE AHO EDUCATION  
B-4 HBPP Fuel Oil Tank Area, Eureka, CA vi 516 7-SR-01-0 L C>R , SE OAK AIOGa ...-nnlTW 9CIENCE AHO EDUCATION  
---------------------------
---------------------------
MenepdbyORAUforhtU.S.
MenepdbyORAUforhtU.S.
Depw1montofl!ntM"VY CPR cpm CSPW DCGL DQO ESI FOTA PSS GPS GWS HBPP HBRP IEAV MARSSIM MDC MeV MWe NORM NRC OOL ORAU ORI SE pCi/g PG&E RCA RER ROC SAFSTOR SOR SPCS SU ACRONYMS Code of Federal Regulations counts per minute Characterization Survey Planning Worksheet derived concentration guideline level data quality objectives Enercon Services, Incorporated Fuel Oil Tank Area final status survey global positioning system gamma walkover scans Humboldt Bay Power Plant Humboldt Bay Repowering Project Independent Environmental Assessment and Verification Multi-Agency Radiation Survey and Site Investigation Manual minimum detectable concentration million electron volts megawatt electric naturally occurring radioactive material U.S. Nuclear Regulatory Commission Open Outside (of RCA) Land Area Oak Ridge Associated Universities Oak Ridge Institute for Science and Education picocunes per gram Pacific Gas & Electric Company radiological control area Replicate Error Ratio radionuclide of concern cold shutdown and safe storage Sum-of-Ratios State Plane Coordinate System survey unit HBPP Fuel Oil Tank Area, Eureka, CA vu 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA viii 5167-SR-01-0 C>R,SE OAK R100a INSTITU'T9 8CENC8 AHO EDUCAT'tON  
Depw1montofl!ntM"VY CPR cpm CSPW DCGL DQO ES I FOTA PSS GPS GWS HBPP HBRP IEAV MARSSIM MDC MeV MWe NORM NRC OOL ORAU ORI S E pCi/g PG&E RC A RER ROC SAFSTOR SOR SPCS S U A CRO NYMS Code of Federal Regulations counts per minute Characterization Survey Planning Worksheet deri ve d concentration guideline le ve l data quality objectives Enercon Service s , Incorporated Fuel Oil Tank Area final status survey global positioning system gamma walkover s cans Humboldt Ba y Power Plant Humboldt Ba y Repo w ering Project Independent Environmental Ass essment a nd Verification Multi-Agency Radiation Surve y and Site In ves ti g ation Manual minimum detectable concentration million electron volts megawatt electric naturall y occurring radioactive material U.S. Nuclear Regulatory Commission Open Outside (o f RC A) Land A rea Oak Ridge Asso ciated U ni ve r s itie s Oak Ridge Institute for Science and Education picocunes per gram Pacific Gas & Electric Company radiological control area Replicate Error Ratio radionuclide of concern cold shutdown and safe storage Sum-of-Ratios State Plane Coordinate System survey unit HBPP Fuel Oil Tank Area, E ureka , CA vu 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA viii 516 7-SR-01-0 C>R , SE OAK R100a INSTITU'T9 8CENC8 AHO EDUCAT'tON  
---------------------------
---------------------------
CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA HUMBOLDT BAY POWER PLANT EUREKA, CALIFORNIA  
CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA H U MBOLDT BA Y POWER PLAN T EUREKA, CALIFORNIA  
: 1. INTRODUCTION AND SITE HISTORY The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under U.S. Atomic Energy Commission provisional license number Demonstration Power Reactor license DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures.
: 1. INTRODUCTION AND SITE HISTORY The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under U.S. Atomic Energy Commission provisional license number Demonstration Power R eactor license DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures.
Also, the pressure suppression containment design permitted below-ground construction.
Also, the pressure suppression containment design permitted below-ground construction.
Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination-zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination.
Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination-zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination.
A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details). In July 1973, Unit 3 was shut down for annual refueling and seismic modifications
A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details). In Ju l y 1973, Unit 3 was shut down for annual refueling and seismic modifications. However, by December 1980 it was concluded that completing the required upgrades and restarting Unit 3 would be cost prohibitive.
. However, by December 1980 it was concluded that completing the required upgrades and restarting Unit 3 would be cost prohibitive.
PG&E decided in June 1983 to decommission Unit 3, received a possession-only license amendment, and p l aced the unit into cold shutdown and safety storage (SAFSTOR). Unit 3 is currently undergoing decommissioning.
PG&E decided in June 1983 to decommission Unit 3, received a possession-only license amendment, and placed the unit into cold shutdown and safety storage (SAFSTOR). Unit 3 is currently undergoing decommissioning.
Decommissioning activities have also been completed on the adjacent fossil fuel Units 1 and 2, with all materials being removed to ground level. As part of the Humboldt Bay Repowering Project (HBRP), PG&E has built ten new fossil fuel units (16.3 MWe [megawatt electric]
Decommissioning activities have also been completed on the adjacent fossil fuel Units 1 and 2, with all materials being removed to ground level. As part of the Humboldt Bay Repowering Project (HBRP), PG&E has built ten new fossil fuel units (16.3 MWe [megawatt electric]
each) on the site in the vicinity of Unit 3. Currently, PG&E has demolished the Fuel Oil Tank and has performed final status surveys (FSS) on the former Fuel Oil Tank Area (FOTA) soils. Hence, the U.S. Nuclear Regulatory Commission's (NRC's) Headquarters and Region IV Offices have requested that the Independent Environmental Assessment and Verification (IEA V) Program of the Oak Ridge Institute for Science and Education (ORISE) perform confirmatory surveys of the former FOTA excavation.
each) on the site in the vicinity of Unit 3. Currently, PG&E has demolished the Fuel Oil Tank and has performed final status surveys (FSS) on the former Fuel Oil Tank Area (FOTA) soils. Hence, the U.S. Nuclear Regulatory Commission's (NRC's) Headquarters and Region IV Offices have requested that the Independent Environmental Assessment and Verification (IEA V) Program of the Oak Ridge Institute for Science and Education (ORISE) perform confirmatory surveys of the former FOTA excavation.
Due to the small footprint of the site, the licensee has found it necessary to conduct surveys of the decontaminated survey areas and then backfill and/ or pave those areas to allow for further decommissioning work. Therefore, the RC requested that ORISE perform confirmatory surveys coincident with the HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0
Due to the small footprint of the site, the licensee has found it necessary to conduct surveys of the decontaminated survey areas and then backfill and/ or pave those areas to allow for further decommissioning work. Therefore, the RC requested that ORISE perform confirmatory surveys coincident with the HBPP Fuel Oil Tank Area , Eureka, CA 516 7-SR-01-0
* C>RISE OAK NDOa ..-nT\llW H>A llCIENCe AHO EDUCATION  
* C>RISE OAK NDOa ..-nT\llW H>A llCIENCe AHO EDUCATION  
---------------------------
---------------------------
licensee' s surveys and soil sampling prior to backfilling
licensee's surveys and so il sa mpling prior to b ackfilling. During the ORISE survey activities, the NRC also requested additional radiological s urve y activities consisting of gamma walkover scans (GW S) of the newl y paved road along the north and east side of the site, the Unit 1 and Unit 2 concrete pads and the Northeast Laydown Area. 2. SITE DESCRIPTION The HBPP site, owned b y PG&E, consists of 143 acres on the southern edge of Humboldt Ba y four mile s sou thwest of the town of Eureka, in Humboldt County, in the State of California (Fig. A-1). PG&E maintains ten new operating electric generating units at the HBPP site (i n the New Generation Footprint Area) that run on fossil fuels, two non-operating fossil fuel units (Units 1 and 2) and one non-operational nuclear unit (Unit 3). Units 1 and 2, which were recentl y decommissioned to ground level, were interconnected with and west of Unit 3 (ES I 2008). The remaining property includes mostl y open areas and protected wetlands.
. During the ORISE survey activities, the NRC also requested additional radiological survey activities consisting of gamma walkover scans (GWS) of the newly paved road along the north and east side of the site, the Unit 1 and Unit 2 concrete pads and the Northeast Laydown Area. 2. SITE DESCRIPTION The HBPP site, owned by PG&E, consists of 143 acres on the southern edge of Humboldt Bay four miles southwest of the town of Eureka, in Humboldt County, in the State of California (Fig. A-1). PG&E maintains ten new operating electric generating units at the HBPP site (in the New Generation Footprint Area) that run on fossil fuels, two non-operating fossil fuel units (Units 1 and 2) and one non-operational nuclear unit (Unit 3). Units 1 and 2, which were recently decommissioned to ground level, were interconnected with and west of Unit 3 (ESI 2008). The remaining property includes mostly open areas and protected wetlands.
2.1 F UEL O IL TANK AREA (FOTA) The FOTA, pictured in Figs. A-2 and A-3, co vers approximately 6,500 square meters (m 2) and is located in the northwest section of the HBPP to the west of Units 1 and 2, north of the Intake Canal and south of the Independent Spent Fuel Storage Installation.
2.1 FUEL OIL TANK AREA (FOTA) The FOTA, pictured in Figs. A-2 and A-3, covers approximately 6,500 square meters (m2) and is located in the northwest section of the HBPP to the west of Units 1 and 2, north of the Intake Canal and south of the Independent Spent Fuel Storage Installation.
Within the FOTA is a bermed soil area that contains some asp h a l t roadway on portions of the berm and concrete pads, which are positioned between a n access ramp and metal stairs. With the exception of the areas that were remediated from under the tank and immediatel y adjacent to the tank due to h y drocarbon contamination, the soil remains at the level that existed when the fuel oil tank was present. FSS activities were performed on a section of the FOTA so that a portion of the FOTA could be used for a soil pile. ORISE did not perform any confirmatory activities of that portion of the FOTA. The FOTA is identified as an Open Outside (of the Radiological Control Area) Land Area (OOL) by PG&E. The survey unit (SU) designation is OOL10. 2.2 UNIT 1 AN D U NI T 2 CONCRE TE PAD S The Unit 1 and Unit 2 concrete pads are located east of the FOTA and west of the nit 3 (the Reactor Building). These were where the fossil fuel units once stood (Fig. A-2). Portions of these pad areas were in use for radiological waste container storage and as material la y down areas and these portions were therefore ina cc essible. HBPP Fuel Oil Tank .Area, Eureka, CA 2 5167-SR-01-0 C>R , SE ON< M>CMf ..anT\ITW POA ICIENCa AHO EDUCATION  
Within the FOTA is a bermed soil area that contains some asphalt roadway on portions of the berm and concrete pads, which are positioned between an access ramp and metal stairs. With the exception of the areas that were remediated from under the tank and immediatel y adjacent to the tank due to hydrocarbon contamination, the soil remains at the level that existed when the fuel oil tank was present.
FSS activities were performed on a section of the FOTA so that a portion of the FOTA could be used for a soil pile. ORISE did not perform any confirmatory activities of that portion of the FOTA. The FOTA is identified as an Open Outside (of the Radiological Control Area) Land Area (OOL) by PG&E. The survey unit (SU) designation is OOL10. 2.2 UNIT 1 AND UNIT 2 CONCRETE PADS The Unit 1 and Unit 2 concrete pads are located east of the FOTA and west of the nit 3 (the Reactor Building). These were where the fossil fuel units once stood (Fig. A-2). Portions of these pad areas were in use for radiological waste container storage and as material laydown areas and these portions were therefore inaccessible. HBPP Fuel Oil Tank .Area, Eureka, CA 2 5167-SR-01-0 C>R,SE ON< M>CMf ..anT\ITW POA ICIENCa AHO EDUCATION  
---------------------------
---------------------------
DeportrnentOllE.norw 2.3 NORTHEAST LAYDOWN AREA The Northeast Lay down Area is located northeast of Unit 3 and the curve of the New Asphalt Roadway and west of the Discharge Canal (Fig. A-2). The area has been repaved with asphalt and at the time of the GWS, a portion of the area was inaccessible due to radiological waste containers and other radiological waste storage bins. 2.4 NEW ASPHALT ROADWAY The New Asphalt Roadway stretches from an east/west direction at the northern portion of the site and curves to a north/ south direction along the eastern portion of the site just east of Unit 3 and west of the Discharge Canal (Fig. A-2). 3. OBJECTIVES The objective of the confirmatory side-by-side survey was to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee's radiological soil sampling results from the FOTA. Data collected by ORISE and the licensee were reviewed to assess whether classifications based on the Multi-Agenr y Radiation Surory and Site Investigation Manual (MARSSIM)  
DeportrnentOllE.norw 2.3 NO RTHEAST LAYDOWN AREA The Northeast La y down Area is located northeast of U nit 3 and the curve of the New A sphalt Roadwa y and west of the Discharge Canal (Fig. A-2). The area has been repaved with asphalt and at the time of the GWS, a portion of the area was inaccessible due to radiological waste containers and other radiological waste storage bins. 2.4 N EW A SPHALT RO ADWAY The New Asphalt Roadway stretches from an east/west direction at the northern portion of the site and curves to a north/ south direction along the eastern portion of the site just east of Unit 3 and west of the Discharge Canal (Fig. A-2). 3. OBJECTI V ES The objective of the confirmatory side-by-side surve y was to generate independent radiological data for use b y the NRC in evaluating the adequacy and accurac y of the licensee's radiological soil sampling results from the FOTA. Data collected by ORISE and the licensee were reviewed to assess whether classifications based on the Multi-Agenr y Radiation Surory and Site Investigation Manual (MARSSIM) (NRC 2000) were appropriate; whether radionuclides of concern (ROCs) were detected above historically low levels in the HBRP footprint (i.e., averaged 0.38 picocuries per gram [pCi/ g] for cesium-137  
(NRC 2000) were appropriate; whether radionuclides of concern (ROCs) were detected above historically low levels in the HBRP footprint (i.e., averaged 0.38 picocuries per gram [pCi/ g] for cesium-137  
[Cs-137] and non-detected for all other ROCs); and, whether data quality were sufficient for comparison to generic NRC screening values and FOTA-specific derived concentration guideline levels (DCGLs). During the ORISE confirmatory survey activities for the FOT A, the NRC site representative also tasked ORISE with performing GWS of three additional areas as stated in Section 1. 4. DOC U MENT REVIEW ORISE has reviewed PG&E's Characterization Surory Planning Worksheet (CSPW) (PG&E 2012). Since the FOTA was classified as Class 3 SU as described in Section 5, it was PG&E's intention to use the data as FSS data in the event that the characterization survey findings met the classification criteria for a Class 3 SU. The characterization plan worksheet was specifically reviewed for historical information and to identify the ROCs and the applicable DCGLs for the FOTA. ORISE also reviewed preliminary FSS data for the soil pile area within the FOTA. The purpose of these reviews was to ensure that regulatory requirements were being met by PG&E and to develop the HBPP Fuel Oil Tank Area , Eureka, CA 3 516 7-SR-01-0 OR , SE OAK NDQI: ...-nT'\l1W 110A ll>UCATION  
[Cs-137]
and non-detected for all other ROCs); and, whether data quality were sufficient for comparison to generic NRC screening values and FOTA-specific derived concentration guideline levels (DCGLs). During the ORISE confirmatory survey activities for the FOT A, the NRC site representative also tasked ORISE with performing GWS of three additional areas as stated in Section 1. 4. DOCUMENT REVIEW ORISE has reviewed PG&E's Characterization Surory Planning Worksheet (CSPW) (PG&E 2012). Since the FOTA was classified as Class 3 SU as described in Section 5, it was PG&E's intention to use the data as FSS data in the event that the characterization survey findings met the classification criteria for a Class 3 SU. The characterization plan worksheet was specifically reviewed for historical information and to identify the ROCs and the applicable DCGLs for the FOTA. ORISE also reviewed preliminary FSS data for the soil pile area within the FOTA. The purpose of these reviews was to ensure that regulatory requirements were being met by PG&E and to develop the HBPP Fuel Oil Tank Area, Eureka, CA 3 5167-SR-01-0 OR,SE OAK NDQI: ...-nT'\l1W 110A ll>UCATION  
---------------------------
---------------------------
confirmatory survey plan. ORISE also ensured that the current FSS activities within the area were adequate and appropriate, taking into account any supporting documentation and MARSSIM guidance (NRC 2000). 5. DATA QUALITY OBJECTIVES The ORISE independent confirmatory survey planning relies on the Data Quality Objectives (DQO) process to design and implement the confirmatory activities planned for the HBPP site. The DQO process includes the following seven steps:
confirmatory survey plan. ORISE also ensured that the current FSS activities within the area were a dequate and appropriate, taking into account any supporting documentation and MARSSIM guidance (NRC 2000). 5. DATA Q U ALI TY OBJECTIVES The ORISE independent confirmatory survey planning relies on the Data Quality Objectives (DQO) process to design and implement the confirmatory activities planned for the HBPP site. The DQO process includes the following seven steps:
* Step 1: State the problem
* Step 1: State the problem
* Step 2: Identify the decisions
* Step 2: Identify the decisions
* Step 3: Identify inputs to the decisions
* Step 3: Identify inputs to the decision s
* Step 4: Define the study boundaries
* Step 4: Define the study boundaries
* Step 5: Develop a decision rule
* Step 5: Develop a decision rule
* Step 6: Specify the decision errors
* Step 6: Specify the decision errors
* Step 7: Optimize the survey design The confirmatory DQO steps for the HBPP site were as follows:
* Step 7: Optimize the survey design The confirmatory DQO steps for the HBPP s ite were as follows:
* Step 1, problem:
* Step 1, problem: The confirmatory survey must assess the reliability and adequacy of the HBPP FSS results.
The confirmatory survey must assess the reliability and adequacy of the HBPP FSS results.
* Step 2, decisions:
* Step 2, decisions:
Are HBPP procedures sufficiently robust to identify residual material with concentrations that exceed the DCGLs for the ROCs, and are the residual concentrations of the primary ROC, Cs-137, sufficiently low (at background levels)?
Are HBPP procedures sufficiently robust to identify residual material with concentrations that exceed the DCGL s for the ROCs, and are the residual concentrations of the primary ROC, Cs-137, sufficiently low (a t background levels)?
* Step 3, decisions inputs: The decision inputs included:  
* Step 3, decisions inputs: The decision inputs included:  
: 1) gamma walkover scan results, and 2) soil sample results and comparison of ORISE and PG&E soil sample concentrations.
: 1) gamma walkover scan results, and 2) soil sample results and comparison of ORISE and PG&E soil sample concentrations.
* Step 4, study boundaries:
* Step 4, study boundaries:
The former FOTA is the study boundary.
The former FOTA is the study boundary.
* Step 5, decision rules: There were two decision rules. The first was based on the comparison of the confirmatory soil sample results to the HBPP FSS results and to the site cleanup goals. The second rule was based on surface scan and judgmental sample results to HBPP Fuel Oil Tank Area, Eureka, CA 4 5167-SR-01-0
* Step 5, decision rules: There were two decision rules. The first was ba se d on the comparison of the confirmatory soil sample results to the HBPP FSS results and to the site cleanup goals. The second rule was based on surface scan and judgmental sample results to HBPP Fuel Oil Tank Area, Eureka, CA 4 5167-SR-01-0
* 0 RI S OAK NOCMI ..-mvTW "'&deg;" 9CaNCa NIO E>lJCATIOH  
* 0 RI S OAK NOCMI ..-mvTW "'&deg;" 9CaNCa NIO E>lJCATIOH  
---------------------------
---------------------------
determine whether any residual "hot spots" were present and if the FOTA had been classified appropriately as Class 3.
determine whether any residual " hot s pots" were present and if the FOTA had been cla ssifie d appropriately as Class 3.
* Step 6, decision errors: The gamma walkover scans and side-by-side split soil sample results should be in good agreement and soil sample results for the MARSSIM Class 3 Survey nit should be at or near background levels and all ROCs below the CSPW survey design release criteria.
* Step 6, decision errors: The gamma wa lk over scans an d si de-by-side split soil sample results should be in goo d agreement and soil sa mple re s ult s for the MARSSIM Class 3 Survey nit should be at or near background le ve ls and all ROCs below the CSPW survey design release criteria.
* Step 7, survey design optimization:
* Step 7, survey design optimization:
The survey design was optimized to collect the appropriate data based on the procedures detailed below. 6. CONFIRMATORY RADIOLOGICAL SURVEY PROCEDURES To expedite the survey process, ORISE coordinated and worked with the NRC site representative as the licensee planned their survey activities.
The s urve y design was optimized to collect the appropriate data ba se d on the procedures detailed below. 6. CONFIRMATORY RADIOLOGICAL SURVEY PROCEDURES To expedite the survey process, ORISE coordinated and worked with the NRC site representative as the licensee planned their s urve y activities.
This assured that ORISE would complete side-by-side confirmatory surveys at such a time as the licensee determined the probability of satisfying the FSS DQOs was high. ORISE personnel visited the HBPP site from February 14 to 15, 2012 to perform visual inspections and independent measurements and sampling.
This assured that O RIS E would complete s ide-b y-side confirmatory surveys at such a time as the lic ensee determined the probability of satisfying the FSS DQOs was high. ORISE personnel visited the HBPP site from February 14 to 15, 2012 to perform visual inspections and independent measurements and sampling.
The radiological survey activities were conducted in accordance with a project-specific plan submitted to and approved by the RC, the ORISE Surory Procedures Manual and the Oak Ridge Associated Universities (ORAU) Q11aliry Program Manual (ORISE 2012, 2008 and ORAU 2011). 6.1 SURVEY UNIT CLASSIFICATION PG&E classifies SUs in accordance with MARSSIM guidance RC 2000) with three classification s for impacted areas, based on contamination potential-as either Class 1, 2, or 3. The FOTA has been classified by PG&E as a Class 3 SU and the historical documentation supports this classification.
The radiological survey activities were conducted in accordance with a project-s pecific plan submitted to and approve d b y the RC, the ORISE Suro ry Pro cedures Manual and the Oak Ridge Associated Universities (ORAU) Q11aliry Program Manual (ORISE 20 1 2, 2008 and ORAU 2011). 6.1 S U R VEY UNIT C LASSIF ICATION PG&E classifies SUs in accordance with MARSSIM guidance RC 2000) with three classification s for impacted areas, b ased on contamination potential-as either Class 1, 2, or 3. The FOTA ha s been classified by PG&E as a Class 3 SU and the historical documentation supports this classification.
Class 3 area are designated as any impacted areas that are not expected to contain residual contamination, or are expected to contain levels of residual contamination at a small fraction of the DCGL. Although the FOTA is a Class 3 SU, ORISE confirmatory survey activities coverage within the FOTA SU were conservative and on the same order of rigor as the PG&E CSPW (PG&E 2012). The PG&E CSPW called for 100% gamma scan coverage of the FOTA. Also, a portion of the HBPP Fuel Oil Tank Area, Eureka, CA 5 5167-SR-01-0
Class 3 area are designated as any impacted areas th at are not expected to contain residual contamination, or are expected to contain levels of residual contamination at a small fraction of the DCGL. Although the FOTA is a Class 3 SU, ORISE confirmatory survey activities coverage within the FOTA SU were conservative an d on the sa me order of rigor as the PG&E CSPW (PG&E 2012). The PG&E CSPW called for 100% gamma scan coverage of the FOTA. Also, a portion of the HBPP Fuel Oil Tank Area, E ureka , CA 5 516 7-SR-01-0
* RISE OAK NOOa ..-rmn9 110A 8CIDICa NIO EDUCATION  
* RISE OAK NOOa ..-rmn9 110A 8CIDICa NIO EDUCATION  
---------------------------
---------------------------
FOTA had already been surveyed and soil samples had been collected by the licensee. This was done so that a dirt pile could be placed in this portion of the FOTA SU. 6.2 REFERENCE SYSTEM Global positioning system (GPS) coordinates were used for referencing measurement and sampling locations
FOTA had already been s urve ye d and so il sam ples had been collected b y the licen see. This was done so that a dirt pile could be pl ace d in thi s porti o n of the FOTA SU. 6.2 RE FE RENC E S YSTEM Global p os iti o ning system (G PS) c oor dinate s were used for referencing measurement an d sam plin g locations. The s pecific reference system used by the licen see was the California State Pl ane Coordinate S ys tem (SPCS FIPS 0401 U S Surve y feet; orth American Datum 83). 6.3 S U RF A C E S CANS High-density gamma radiation surface scans were conducted over the soil, concrete, and asphalt surfaces within the FOTA, the area of intere s t for this survey report (Fig. A-3). Surface s cans were performed u si ng sodium iodide thallium-activated (Nal[Tl])
. The specific reference system used by the licensee was the California State Plane Coordinate System (SPCS FIPS 0401 US Survey feet; orth American Datum 83). 6.3 SURFACE SCANS High-density gamma radiation surface scans were conducted over the soil, concrete, and asphalt surfaces within the FOTA, the area of interest for this survey report (Fig. A-3). Surface scans were performed using sodium iodide thallium-activated (Nal[Tl])
s cintillation detector s coupled to ratemeter-scalers with audible indicators.
scintillation detectors coupled to ratemeter-scalers with audible indicators.
Detectors were also coupled to g lobal p osi ti oning systems (G PSs) that enabled real-time ga mma count rate and p os ition data capture. Field per so nnel relied on the audio output to identify and mark any locations of elevated direct gamma radiation for further investigations that mi g ht s u gges t the presence of residual contamination.
Detectors were also coupled to global positioning systems (GPSs) that enabled real-time gamma count rate and position data capture. Field personnel relied on the audio output to identify and mark any locations of elevated direct gamma radiation for further investigations that might suggest the presence of residual contamination.
6.4 G AMMA DIR ECT M EASUREMENTS A one-minute static gamma count rate mea s urement was performed at each of the twelve remaining characterization soil samp le locati o ns determined per PG&E for the FOTA (F ig. A-4). A fter each soil sample was collected , a po s t-sample one-minute static gamma count rate was performed.
6.4 GAMMA DIRECT MEASUREMENTS A one-minute static gamma count rate measurement was performed at each of the twelve remaining characterization soil sample locations determined per PG&E for the FOTA (Fig. A-4). After each soil sample was collected
Pre-and post-sample gamma direct measurements were also performed at judgmentall y-s elected locations exhibiting elevated ga mma radiation level as determined b y surface scans (Fig. A-5). 6.5 SOI L S AM P LING 6.5.1 S ys t e m a tic S a mpl e L o c a tion s Twel ve duplicate systematic s urface sa mple s, 0 to 15 cm each, were collected from the FOTA at locations predetermined in the PG&E CSPW (Fig. A-4). Although ORISE collected one of the duplicate samples in conjunction with PG&E personnel, the final number of so il samples retained for confirmatory analysis d epe nded upon the ORISE gamma direct mea s urement results and/ or the PG&E preliminary gamma s pectroscop y analyses of the ORISE samples. Ba se d on the ORISE review of the aforementioned data, four of the twelve sys tematic soil sample duplicates were HBPP Fuel Oil Tank Area, Eu rek a, CA. 6 5167-SR-01-0 C>R , SE OAK A100a ...nTUTE FOR 8C1ENCa NllO EDUCAllON  
, a post-sample one-minute static gamma count rate was performed.
Pre-and post-sample gamma direct measurements were also performed at judgmentall y-selected locations exhibiting elevated gamma radiation level as determined by surface scans (Fig. A-5). 6.5 SOIL SAMPLING 6.5.1 Systematic Sample Locations Twelve duplicate systematic surface samples, 0 to 15 cm each, were collected from the FOTA at locations predetermined in the PG&E CSPW (Fig. A-4). Although ORISE collected one of the duplicate samples in conjunction with PG&E personnel, the final number of soil samples retained for confirmatory analysis depended upon the ORISE gamma direct measurement results and/ or the PG&E preliminary gamma spectroscop y analyses of the ORISE samples.
Based on the ORISE review of the aforementioned data, four of the twelve systematic soil sample duplicates were HBPP Fuel Oil Tank Area, Eureka, CA. 6 5167-SR-01-0 C>R,SE OAK A100a ...nTUTE FOR 8C1ENCa NllO EDUCAllON  
--------------------------
--------------------------
_,.,......,ONWfo<  
_,.,......,ONWfo<  
.... U.&-of"'-vY retained for radiological analyses (PG&E samples OOL10-1, 2, 7, and 11 which corresponded to ORISE samples S001, 2, 7, and 11, respectively).
.... U.&-of"'-vY retaine d for radio l ogical analyses (PG&E samples OOL10-1, 2, 7, and 11 which corresponded to ORISE samples S001, 2, 7, and 11, respectively).
Refer to Figs. A-4 and A-5, and Table B-1. 6.5.2 Judgmentally-Selected Sample Locations Judgmental surface soil samples were collected at six locations of suspected elevated gamma radiation detected during the ORISE GWS of the FOTA surfaces (Fig. A-5). Since these were judgmental  
Refer to Figs. A-4 and A-5, and Table B-1. 6.5.2 Judgment a ll y-Selected S a mpl e Loc a ti o ns Judgmental surface so il samples were collected at six locations of suspected elevated gamma radiation detected during the ORISE GWS of the FOTA surfaces (Fig. A-5). Since these were judgmental samples, ORISE requested each of these samples for independent analyses.
: samples, ORISE requested each of these samples for independent analyses.
These were ORISE samp l es S016 to S021 (Refer to Fig. A-5 and Table B-1). 6.6 INTERLABORA T OR Y CO M PARISON AN ALY SE S Since some areas within the FOTA were covered with clean fill prior to ORISE gaining access, thus precluding direct confirmatory surveys for the soil pile area, ORISE requested that the three samp l es previously collected b y PG&E (PG&E samples OOL10-4, 9, and 15, which were ORISE samples S004, 9, and 15, respectively) be provided to ORISE for interlaboratory comparison analysis.
These were ORISE samples S016 to S021 (Refer to Fig. A-5 and Table B-1). 6.6 INTERLABORA TORY COMPARISON ANALYSES Since some areas within the FOTA were covered with clean fill prior to ORISE gaining access, thus precluding direct confirmatory surveys for the soil pile area, ORISE requested that the three samples previously collected by PG&E (PG&E samples OOL10-4, 9, and 15, which were ORISE samples S004, 9, and 15, respectively
HBPP Fuel Oil Tank A rea, Eureka, CA 7 516 7-S R-0 1-0   
) be provided to ORISE for interlaboratory comparison analysis.
: 7. ADDITIONAL RADIOLOGICAL S U R V E Y PROCED U RES At the request of the NRC site representative, ORISE also performed limited, low-density radiological GWS of three other areas: the Unit 1 and Unit 2 remaining concrete pads (Fig. A-6), the Northeast Laydown Area (Fig. A-7), and the newl y paved asphalt haul road (Fig. A-8). The additional surveys were to provide radiological scan data to ensure that radiological contamination was not being spread by continuing decommissioning activities of the Unit 3 reactor on previousl y released site surfaces as per the Cross Contamination Pre vention and Monitoring Plan (CC PMP) (PG&E 2008). 8. RADION U CLIDE S OF CONCERN The major ROC identified in the FOTA was Cs-137. A complete listing of ROCs and associated generic NRC Screening Values and FOTA-specific DCGLs are provided in Table 1. The soil DCG Ls are reported in units of picocuries per gram (pCi/ g). HBPP Fuel Oil Tank Area, Eureka, CA 8 5167-SR-01-0 C>R , SE OAK NOa8 IMST1T\ITE FOR 8CaNCtl AHO EDUCA TION ----------------------------
HBPP Fuel Oil Tank Area, Eureka, CA 7 5167-SR-01-0   
Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides of Concern Humboldt Bay Power Plant Eureka, California Nuclide NRC Screening Value DCGLs (pCi/ g)* FOT A-Specific DCGLs (pCi/ g)b Easy to Detect -Gamma Spectroscopyc Co-60 3.8 1.9 Nb-94 5.8 2.9 I-129 0.5 0.25 C s-137 11 5.5 Eu-152 8.7 4.35 Eu-154 8 4 Np-23 7 d 11 5 -Hard to Detect -Wet Chemistryc H-3 1 1 0 55 C-14 12 6 Ni-59 5,500 2,750 Ni-63 2, 1 00 1,0 5 0 Sr-90 1.7 0.85 Tc-99 1 9 9.5 Pu-238 2.5 1.2 5 Pu-239 2.3 1.1 5 Pu-240 1,240 Pu-241 72 36 A m-241 2.1 1.05 Cm-243 3.2 1.6 Cm-244 2,200 Cm-245 276 Cm-246 1 , 1 90 *Derived concentration guideline levels from UREG-1 757, Volume 1, Revision 1 Table B-2 (NRC 2003) bDCGLs a p plied under the Characterization Survry Pia1111ing Worksh e et for the HBPP FOTA correspond to the l esser of either an annual dose of 15 mrem/y (the 25 mrem/y DCGL adjusted to an assumed California Department of Toxic Substance Contro l risk-based release of 15 mrem/y) or 50% of the NRC Screening Va l ues (PG&E 2012) c Easy-to-detect radionuclide concentrations determined via gamma spectroscopy dNRC Screening Va l ue not provided <Hard-to-detect radionuclide concentrations may be determined with wet chemistry analytical procedures based on the gamma spectroscopy results and with guidance from the NRC site representative HBPP Fuel Oil Tank Area, Eureka, CA 9 5167-SR-0 1-0 C>R , SE OAK A100a ..-nTUTE FOfll llCll&#xa3;NC&
: 7. ADDITIONAL RADIOLOGICAL SURVEY PROCEDURES At the request of the NRC site representative, ORISE also performed  
: limited, low-density radiological GWS of three other areas: the Unit 1 and Unit 2 remaining concrete pads (Fig. A-6), the Northeast Laydown Area (Fig. A-7), and the newly paved asphalt haul road (Fig. A-8). The additional surveys were to provide radiological scan data to ensure that radiological contamination was not being spread by continuing decommissioning activities of the Unit 3 reactor on previousl y released site surfaces as per the Cross Contamination Prevention and Monitoring Plan (CCPMP) (PG&E 2008). 8. RADIONUCLIDES OF CONCERN The major ROC identified in the FOTA was Cs-137. A complete listing of ROCs and associated generic NRC Screening Values and FOTA-specific DCGLs are provided in Table 1. The soil DCG Ls are reported in units of picocuries per gram (pCi/ g). HBPP Fuel Oil Tank Area, Eureka, CA 8 5167-SR-01-0 C>R,SE OAK NOa8 IMST1T\ITE FOR 8CaNCtl AHO EDUCATION ----------------------------
Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides of Concern Humboldt Bay Power Plant Eureka, California Nuclide NRC Screening Value DCGLs (pCi/ g)* FOT A-Specific DCGLs (pCi/ g)b Easy to Detect -Gamma Spectroscopyc Co-60 3.8 1.9 Nb-94 5.8 2.9 I-129 0.5 0.25 Cs-137 11 5.5 Eu-152 8.7 4.35 Eu-154 8 4 Np-237 d 115 -Hard to Detect -Wet Chemistryc H-3 110 55 C-14 12 6 Ni-59 5,500 2,750 Ni-63 2,100 1,050 Sr-90 1.7 0.85 Tc-99 19 9.5 Pu-238 2.5 1.25 Pu-239 2.3 1.15 Pu-240 1,240 Pu-241 72 36 Am-241 2.1 1.05 Cm-243 3.2 1.6 Cm-244 2,200 Cm-245 276 Cm-246 1,190 *Derived concentration guideline levels from UREG-1757, Volume 1, Revision 1 Table B-2 (NRC 2003) bDCGLs applied under the Characterization Survry Pia1111ing Worksheet for the HBPP FOTA correspond to the lesser of either an annual dose of 15 mrem/y (the 25 mrem/y DCGL adjusted to an assumed California Department of Toxic Substance Control risk-based release of 15 mrem/y) or 50% of the NRC Screening Values (PG&E 2012) cEasy-to-detect radionuclide concentrations determined via gamma spectroscopy dNRC Screening Value not provided  
<Hard-to-detect radionuclide concentrations may be determined with wet chemistry analytical procedures based on the gamma spectroscopy results and with guidance from the NRC site representative HBPP Fuel Oil Tank Area, Eureka, CA 9 5167-SR-0 1-0 C>R,SE OAK A100a ..-nTUTE FOfll llCll&#xa3;NC&
NID IEDUCATtON  
NID IEDUCATtON  
---------------------------
---------------------------
: 9. SAMPLE ANALYSIS AND DATA INTERPRETATION Samples and data were returned to the ORISE laboratory in Oak Ridge, Tennessee for analysis and interpretation
: 9. SAMPLE ANALYSIS AND DATA INTERPRETATION Samples and data were returne d to the ORISE laboratory in Oak Ridge, Tennessee for anal y si s and interpretation. Sa mpl e analyses were performed i n accordance with the ORISE Laboratory Procedures Manual (ORISE 2011 ). Soil samples were anal yz ed b y gamma spectroscop y with the primary ROC being Cs-137; however, s pectra were al s o reviewed for other gamma-emitting radionuc lid es (i.e., fission and activation products) associated with the HBPP. After reviewing the ga mm a spectros c opy results, wet chemistry analyses for additiona l radionucli d es such as Ni-63, Sr-90, and transuranics were deemed not necessary. Soil samp l e results were reported in units of pCi/ g. Gamma count rate measurement re s ults were reported in units of counts per minute (cpm). The data generate d were compared with the PG&E anal y tical re s ults (specifically for Cs-137) and then with the CSPW surve y design release criteria established for t h e primary site-specific ROC for the FOT A. All sample results were compared \.vith the FOTA-specific applicab l e DCGL and MARSSIM guidance to determine if the FOTA Class 3 designation was appropriate. Additional information regarding instrumentation and procedures ma y be found in A ppendices C an d D. 10. FINDINGS AND RESULTS The results for each radiological s u rve y procedure component are discussed in the following sections.
. Sample analyses were performed in accordance with the ORISE Laboratory Procedures Manual (ORISE 2011 ). Soil samples were analyzed by gamma spectroscop y with the primary ROC being Cs-137; however, spectra were also reviewed for other gamma-emitting radionuclides (i.e., fission and activation products) associated with the HBPP. After reviewing the gamma spectroscopy results, wet chemistry analyses for additiona l radionucli des such as Ni-63, Sr-90, and transuranics were deemed not necessary
10.1 DOCUMENT REVIEW The O RI SE reviews of PG&E's CSPW and preliminary radiological data indicated that the procedures and methods implemented were appropriate for the FOT A (PG&E 2012). 10.2 SURFACE SCANS Gamma radiatio n surface scans identified six areas of elevated gamma radiation, primaril y along the excavation trenches used to drain standing water from the site, along other surfa c e water runoff areas, a nd at the asphalt entrance at the northeast corner of the b erm. The gamma scan paths and the normali z ed count rate in cpm are provided in Fig. A-3. The gamma scans ranged from less than 3,800 to 11,390 cpm. Figure A-9 is the frequency histogram of the normali z ed walkover gamma count rate data population for the FOTA; the histogram indicates a normal distribution typical of the background concentrations associated wit h those areas. O RI SE did observe slightly e l evate d HBPP Fuel Oil Tank Area , E ureka, C A 1 0 516 7-SR-0 1-0 C>R., SE OAK NDOm ll'OA 8QIENCa: AHO EDUCATION  
. Soil sample results were reported in units of pCi/ g. Gamma count rate measurement results were reported in units of counts per minute (cpm). The data generated were compared with the PG&E analytical results (specifically for Cs-137) and then with the CSPW survey design release criteria established for the primary site-specific ROC for the FOTA. All sample results were compared  
\.vith the FOTA-specific applicable DCGL and MARSSIM guidance to determine if the FOTA Class 3 designation was appropriate
. Additional information regarding instrumentation and procedures may be found in Appendices C and D. 10. FINDINGS AND RESULTS The results for each radiological survey procedure component are discussed in the following sections.
10.1 DOCUMENT REVIEW The ORISE reviews of PG&E's CSPW and preliminary radiological data indicated that the procedures and methods implemented were appropriate for the FOTA (PG&E 2012). 10.2 SURFACE SCANS Gamma radiation surface scans identified six areas of elevated gamma radiation, primarily along the excavation trenches used to drain standing water from the site, along other surface water runoff areas, and at the asphalt entrance at the northeast corner of the berm. The gamma scan paths and the normalized count rate in cpm are provided in Fig. A-3. The gamma scans ranged from less than 3,800 to 11,390 cpm. Figure A-9 is the frequency histogram of the normalized walkover gamma count rate data population for the FOTA; the histogram indicates a normal distribution typical of the background concentrations associated with those areas. ORISE did observe slightly elevated HBPP Fuel Oil Tank Area, Eureka, CA 10 5167-SR-01-0 C>R.,SE OAK NDOm ll'OA 8QIENCa:
AHO EDUCATION  
------------------
------------------
---------
---------
gamma radiation levels over the ground surface where the standing water excavation trench dirt was piled. Further investigation indicated a natural soil strata layer deposit.
gamma radiation levels over the ground surface where the standing water excavation trench dirt was piled. Further investigation indicated a natural soil strata la y er deposit. The dark lines in the trench pictures (Fig. A-10) indicate the locations where the elevated gamma radiations were in the southern portion of the FOTA near where the former fuel tank used to be located. The ORISE GWS data indicates that the low gamma radiation levels associated with the Class 3 SU is typical of background leve l s that ranged from 3 , 200 to 5,400 cpm o v er the various surfaces (soil, asphalt and concrete) within the FOTA. 10.3 GAMMA DIRECT MEAS U REMEN TS Gamma direct measurements were performed at each soil sample location.
The dark lines in the trench pictures (Fig. A-10) indicate the locations where the elevated gamma radiations were in the southern portion of the FOTA near where the former fuel tank used to be located. The ORISE GWS data indicates that the low gamma radiation levels associated with the Class 3 SU is typical of background levels that ranged from 3,200 to 5,400 cpm over the various surfaces (soil, asphalt and concrete) within the FOTA. 10.3 GAMMA DIRECT MEASUREMENTS Gamma direct measurements were performed at each soil sample location.
The results indicated that gamma radiation levels were at or near background levels (3,500 cpm). ORISE selected soil samples from locations that exhibited the highest gamma radiation levels even though those locations were slightly above background levels. 10.4 RADIO NU CLID E CONCEN T RA T ION S IN CON F I RMAT OR Y SOI L S AM P LES The summary data for the FOTA s y stematic and judgmental soil samples are presented in Table 2. The data for the radionuclide concentrations in individual samples are provided in Table B-1. All soil results for Cs-137 were less than the respective FOTA CSPW designed release criteria for each individual soil samp l e. Total uranium concentrations, as a naturall y occurring radioactive material (NORM), are provided to account for the elevated gamma radiation levels determined by the GWS in the FOTA. Table 2. Radionuclide Concentrations in FOT A Soil Samples Summary Results Soil Sample Summary Cs-137 S ys tematic 0.03 to 0.37 Mean Concentration 0.26 Judgmental  
The results indicated that gamma radiation levels were at or near background levels (3,500 cpm). ORISE selected soil samples from locations that exhibited the highest gamma radiation levels even though those locations were slightly above background levels. 10.4 RADIONUCLIDE CONCENTRATIONS IN CONFIRMATORY SOIL SAMPLES The summary data for the FOTA systematic and judgmental soil samples are presented in Table 2. The data for the radionuclide concentrations in individual samples are provided in Table B-1. All soil results for Cs-137 were less than the respective FOTA CSPW designed release criteria for each individual soil sample. Total uranium concentrations, as a naturally occurring radioactive material (NORM), are provided to account for the elevated gamma radiation levels determined by the GWS in the FOTA. Table 2. Radionuclide Concentrations in FOT A Soil Samples Summary Results Soil Sample Summary Cs-137 Systematic 0.03 to 0.37 Mean Concentration 0.26 Judgmental  
-0.01 to 0.51 Mean Concentration 0.14 *Total U = U-238
-0.01 to 0.51 Mean Concentration 0.14 *Total U = U-238
* 2 + U-235 bZero values due to rounding HBPP Fuel Oil Tank Area, Eureka, CA Radionuclide Concentrations (pCi/ g) Co-60 U-235 U-238 Total U* -0.02 to 0.01 0.04 to 0.16 0.15 to 0.69 0.34 to 1.48 0.001 0.07 0.45 0.97 -0.01 to 0.01 -0.02 to 0.08 0.28 to 1.84 0.60 to 3.75 0.00 0.04 0.82 1.69 11 5167-SR-01-0 C>R,SE OAK ..:>Oii ....-nnnw H>flll 8CCHCa AHO EOUCATIOH  
* 2 + U-235 b Zero v alues due to rounding HBPP Fuel Oil Tank Area, Eureka, CA Radionuclide Concentrations (pCi/ g) Co-60 U-235 U-238 Total U* -0.02 to 0.01 0.04 to 0.16 0.15 to 0.69 0.34 to 1.48 0.001 0.0 7 0.45 0.9 7 -0.01 to 0.01 -0.02 to 0.08 0.28 to 1.84 0.60 to 3.75 0.00 0.04 0.8 2 1.69 11 516 7-SR-01-0 C>R , SE OAK ..:>Oii ....-nnnw H>flll 8CCHCa AHO EOUCATIOH  
---------------------------
---------------------------
MenogedbyORAUforhtU
MenogedbyORAUforhtU
.&OepenmentofEnorgy ORISE also performed a comparison of the ORISE and PG&E soil samples results (Table B-2). PG&E's Cs-137 results, for those sample locations where both ORISE and PG&E provide analytical data, are in good agreement and indicate that the FOTA Cs-137 concentrations are at background levels. 10.5 RADIONUCLIDE CONCENTRATIONS IN INTERLABORATORY COMPARISON ANALYSES SOIL SAMPLES The results of the interlaboratory comparison soil samples indicate that the ORISE and PG&E radiological soil sample results are in good agreement.
.&OepenmentofEnorgy ORISE also performed a comparison of the ORISE and PG&E soil samples results (Ta ble B-2). PG&E's Cs-137 results, for those samp le l o cation s where both ORISE and PG&E provide analytical data, are in good agreement and indicate that the FOTA Cs-137 concentrations are at background levels. 10.5 RADIO NU CLID E CO N C ENTRAT IO NS IN IN TERLAB O RAT OR Y CO MPARIS O N ANALYSES SOI L S AM P LES The results of the interlaboratory comparison soil samples indicate that the ORISE and PG&E radiological so il sample results are in good agreement.
The comparison soil sample results are presented in Table B-3. 11. COMPARISON OF RESULTS WITH RELEASE CRITERIA The applicable site-specific soil DCGLs for the ROCs are provided in Table 1 and have been approved by the NRC (ESI 2007). The primary ROC for the FOTA, as designated by the CSPW, was Cs-137. To demonstrate compliance with the Table 1 FOTA-specific  
The comparison so il sample results are presented in Table B-3. 11. COMPARIS O N OF RES U LTS W ITH RELEASE CRI T ERIA The applicable site-specific soil DCGLs for the ROCs are provided in Table 1 and ha ve been approved b y the NRC (ESI 2007). The primary ROC for the FOTA, as designated b y the CSPW, was Cs-137. To demonstrate compliance with the Table 1 FOTA-specific criteria, each radionuclide concentration should be less than its respective DCGL-with consideration for small areas of elevated activity----as well as application of the unity rule (S um-of-Ratios  
: criteria, each radionuclide concentration should be less than its respective DCGL-with consideration for small areas of elevated activity----as well as application of the unity rule (Sum-of-Ratios  
[SOR]). The uni ty rule requires that the sum of the concentration of each contaminant divided by the respective guideline be less than one. Con c 1 Co nc 2 C oncn SOR = DCGL 1 + D C GL 2 + ... + DCGl n ::::; 1 Cs-137 and Co-60 were the only identified ROCs in the ORISE-analyzed soil samples. ORISE also reported the uranium concentrations to determine the natural concentrations associated with the ORM soil strata determined in the FOTA. Radionuclide concentrations in soil samples were directly compared with the Cs-137 DCGLs prov i ded in Tab l e 1. ORISE did not apply the unity rule/SOR in the activity calculations for each of the soil samples since the primary ROC, Cs-137, was well below the release criteria and a review of the gamma spectroscopy data did not indicate any other easy-to-detect ROC other than Co-60. Each of the 13 soil samples analyzed by ORISE was below the individual Cs-137 FOTA-specific release criteria.
[SOR]). The unity rule requires that the sum of the concentration of each contaminant divided by the respective guideline be less than one. Conc1 Conc2 Concn SOR = DCGL1 + DCGL2 + ... + DCGln ::::; 1 Cs-137 and Co-60 were the only identified ROCs in the ORISE-analyzed soil samples.
HBPP Fuel Oil Tank Area, Eureka, CA 12 516 7-SR-01-0 C>R , SE OAK AK>oa ....-mvTW FOA 8CCNCW AHO EOUCATlON  
ORISE also reported the uranium concentrations to determine the natural concentrations associated with the ORM soil strata determined in the FOTA. Radionuclide concentrations in soil samples were directly compared with the Cs-137 DCGLs provided in Table 1. ORISE did not apply the unity rule/SOR in the activity calculations for each of the soil samples since the primary ROC, Cs-137, was well below the release criteria and a review of the gamma spectroscopy data did not indicate any other easy-to-detect ROC other than Co-60. Each of the 13 soil samples analyzed by ORISE was below the individual Cs-137 FOTA-specific release criteria.
: 12. ADDITIONAL RADIOLOGICAL SURVEY ACTIVITIES 12.1 UNIT 1 AND UNIT 2 -GAMMA WALKOVER SCANS GWS over the Unit 1 and Unit 2 concrete pads indicated a gamma count rate range from less than 3,300 to approximately 13,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surve y or was in the proximity of radiological waste containers and the radwater waste treatment facility.
HBPP Fuel Oil Tank Area, Eureka, CA 12 5167-SR-01-0 C>R,SE OAK AK>oa ....-mvTW FOA 8CCNCW AHO EOUCATlON  
Elevated gamma radiation levels were not found on the portion of the concrete pads that were scanned. The GWS results are presented in Fig. A-6 and the GWS frequency histogram is provided in Fig. A-11. 12.2 NORTHEAST LA Y DOWN AREA -GAMMA WALKOVER SCANS G\VS over the Northeast La y down Area asphalt pad indicated a gamma count rate range from less than 3,000 to approximatel y 21,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surve y or was in the proximity of radiological waste containers and other wrapped radiological waste. The highest count rate was on a pie<:::e of equipment that had been determined to an X-bar equipment lift; this piece of equipment was determined to not be tagged wit h a radiological identification tag). Elevated gamma radiation levels were not found on the portion of the Northeast La y down A rea asphalt pad that was scanned. The GWS results and a picture of the X-bar are presented in Fig. A-7 and the GWS frequency histogram is provided in Fig. A-12. 12.3 NEW ASPHALT ROADWAY-GAMMA WALKOVER SCANS GWS over the new asphalt roadway indicated a gamma count rate range from less than 3,400 to approximatel y 11,000 cpm. The elevated gamma radiation levels were determined to be from shine w h en the surve y or was in the proximity of radiological waste containers and the radiological cleanup work associated with the reactor decommissioning.
: 12. ADDITIONAL RADIOLOGICAL SURVEY ACTIVITIES 12.1 UNIT 1 AND UNIT 2 -GAMMA WALKOVER SCANS GWS over the Unit 1 and Unit 2 concrete pads indicated a gamma count rate range from less than 3,300 to approximately 13,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surveyor was in the proximity of radiological waste containers and the radwater waste treatment facility.
E l evated gamma radiation levels were not found on the portion of the asphalt roadwa y that was scanned. The GWS results are presented in Fig. A-8 and the GWS frequency histogram is provided in Fig. A-13. 13.  
Elevated gamma radiation levels were not found on the portion of the concrete pads that were scanned.
 
The GWS results are presented in Fig. A-6 and the GWS frequency histogram is provided in Fig. A-11. 12.2 NORTHEAST LAYDOWN AREA -GAMMA WALKOVER SCANS G\VS over the Northeast Laydown Area asphalt pad indicated a gamma count rate range from less than 3,000 to approximatel y 21,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surveyor was in the proximity of radiological waste containers and other wrapped radiological waste. The highest count rate was on a pie<:::e of equipment that had been determined to an X-bar equipment lift; this piece of equipment was determined to not be tagged with a radiological identification tag). Elevated gamma radiation levels were not found on the portion of the Northeast Laydown Area asphalt pad that was scanned.
==SUMMARY==
The GWS results and a picture of the X-bar are presented in Fig. A-7 and the GWS frequency histogram is provided in Fig. A-12. 12.3 NEW ASPHALT ROADWAY-GAMMA WALKOVER SCANS GWS over the new asphalt roadway indicated a gamma count rate range from less than 3,400 to approximatel y 11,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surveyor was in the proximity of radiological waste containers and the radiological cleanup work associated with the reactor decommissioning.
During the period of February 14 to 15, 2012, ORISE performed radiological confirmatory surve y activities for the former FOTA and additiona l radiological surve y s of portions of the HBPP site in Eureka, California.
Elevated gamma radiation levels were not found on the portion of the asphalt roadway that was scanned.
The radiological survey results demonstrate that residual surface soil HBPP Fuel Oil Tank A rea, E ureka, CA 13 516 7-SR-01-0 C>R , SE OAK ..:>QA ...-nTVTa FOR 8C1ENCa: AHO IEDUCAnoN  
The GWS results are presented in Fig. A-8 and the GWS frequency histogram is provided in Fig. A-13. 13. SUMMARY During the period of February 14 to 15, 2012, ORISE performed radiological confirmatory survey activities for the former FOTA and additiona l radiological surveys of portions of the HBPP site in Eureka, California.
The radiological survey results demonstrate that residual surface soil HBPP Fuel Oil Tank Area, Eureka, CA 13 5167-SR-01-0 C>R,SE OAK ..:>QA ...-nTVTa FOR 8C1ENCa:
AHO IEDUCAnoN  
---------------------------
---------------------------
contaminati on was not present significantly above background levels within the FOTA. Therefore, it is ORISE's opinion that the radiological condition s for the FOTA surveyed by ORISE (refer to Tables 2 and B-1) are commensurate with the site release criteria for final status surveys as specified in PG&E's CharacteriZfllion Sttrory Planning Worksheet (PG&E 2012). In addition, the confirmatory results indicated that the ORISE FOTA SU Cs-137 mean concentrati ons results compared favorably with the PG&E FOTA Cs-137 mean concentration results, as determined by ORISE from the PG&E characteri zation data (refer to Table B-2). The interlaboratory comparison analyses of the three soil samples analyzed by PG&E's onsite laboratory and the ORISE laboratory indicated good agreement for the sample results and provided confidence in the PG&E analytical procedures and PSS soil sample data reporting (Table B-3). HBPP Fuel Oil Tank Area, Eureka, CA 14 5167-SR-01-0
contaminati o n was not present significantly above background le vels wit hin the FOTA. Therefore, it is ORISE's op ini on that the radiological condition s for the FOTA s u rveye d by ORISE (refer to Tables 2 and B-1) are c o mmensurate with the site release criteria for final sta tus surveys as specified in PG&E's CharacteriZfllion Sttrory Planning Worksheet (PG&E 2012). In addition, the confirmatory results indicated that the ORISE FOTA SU Cs-137 mean concentrati o n s results c o mpared favorably with the PG&E FOTA Cs-137 mean concentration results , as determined by ORISE from the PG&E characteri za tion data (refer to Table B-2). The interlaboratory comparison a nal ys es of the three soil samples analyzed b y PG&E's onsite laboratory and the ORISE laboratory indicated good agreement for the sample results and provided confidence in the PG&E analytical procedures and PSS soil sample data reporting (Table B-3). HBPP Fuel Oil Tank Area, Eureka, CA 14 5167-SR-01-0
* C>RISE OAK N008 INS1'fTU'TE FOfll 8CENC9i AHO EDUCATION  
* C>RISE OAK N008 INS1'fTU'TE FOfll 8CENC9i AHO EDUCATION  
--------------------------
--------------------------
: 10. REFERENCES Enercon Services, Inc. (ESI) 2007. Site CharacteriZfltion Plan -Humboldt Bery Power Plant. HBPP-PP-003, Rev. 0. July 16. ESI 2008. Historical Site Assessment, prepared for the Humboldt Bay Power Plant Pacific Gas & Electric Company, Eureka, California. Draft. September.
: 10. REFERENCES Enercon Services, Inc. (ESI) 2007. Site CharacteriZfltion Plan -Humboldt Bery Power Plant. HBPP-PP-003, R ev. 0. Jul y 16. ES I 2008. Historical Site Assessment, prepared for the Humboldt Ba y P ower Plant Pacific Gas & E lectric Com p a n y, E ureka, Ca lifornia. D raft. September.
Pacific Gas & Electric Company (PG&E) 2008. Cross Contamination Prevention and Monitoring Plan. Prepared for the Humboldt Bay Power Plant, Pacific Gas & Electric Company, Eureka, California.
Pacific Gas & E lectric Co mpan y (PG&E) 2008. Cross Contamination Prevention and Monitoring Plan. Prepared for the Humb o ldt Ba y Power Plant, Pacific Gas & El ectric Co mpan y, Eureka, California.
HBAP C-220. October 14. PG&E 2012. Characterization Surory Planning Worksheet.
HB A P C-220. October 14. PG&E 2012. Characterization Surory Pl anning Worksheet.
Prepared for the Humboldt Bay Power Plant, Pacific Gas & Electric Company, Eureka, California.
Prepared for the Humboldt Ba y P ower Plant , Pacific Gas & E lectric Company, E ureka, California.
Draft; Revision 3. February  
Draft; Revisi o n 3. February 9. Oak Rid ge Asso ciated U ni ve r s ities (O RA U) 20 11. Quality Pro gram Manual for the Indep endent Environmental Assessment and Verification Pro gram. Oak Rid ge, Te nne ssee. D e c e mber 1. Oak Rid ge In s titute for Science and E ducati o n (ORISE) 2008. Surory Procedures Manual for the In dependent Environmental Assessment and Verification Pro gram. Oak Rid ge, Tennessee.
: 9. Oak Ridge Associated Universities (ORA U) 2011. Quality Program Manual for the Independent Environmental Assessment and Verification Program. Oak Ridge, Tennessee. December 1. Oak Ridge Institute for Science and Education (ORISE) 2008. Surory Procedures Manual for the Independent Environmental Assessment and Verification Program. Oak Ridge, Tennessee.
May 1. ORISE 2010. Radiation Prot ection Manual. Oak Rid ge, Tennessee.
May 1. ORISE 2010. Radiation Protection Manual. Oak Ridge, Tennessee.
June 3. ORISE 2011. Laboratory Procedures Manual for the Indep endent Environmental Assessment and Verificat ion Program. Oak Ridge, Tennessee.
June 3. ORISE 2011. Laboratory Procedures Manual for the Independent Environmental Assessment and Verificat ion Program.
December 1. ORISE 2012. Final Prqj ect-S p ecific Plan far th e Indep endent Confirmatory Survry of the Former Fue l Oil Tank Area at the Humboldt B ery Po we r Plant , Eureka, California.
Oak Ridge, Tennessee.
DCN: 516 7-PL-0 1-0. Oak Rid ge, Tennessee. February 9. U.S. uclear Regul a t ory Co mmi ss ion (NRC) 2000. Multi-Agenry Radiation Surory and Site In vestigation Manual (MARSSIM), NUREG-15 75; Revision 1. Washington, DC. August. NRC 2003. Cons olidat ed NM SS D ec ommission ing Guidance:
December  
D ecomm iss ioning Process for Materials Licensees.
: 1. ORISE 2012. Final Prqject-Specific Plan far the Independent Confirmatory Survry of the Former Fuel Oil Tank Area at the Humboldt Bery Power Plant, Eureka, California.
NUREG-1 757; Volume 1 , Revision 1. Washington, D C. September.
DCN: 5167-PL-01-0. Oak Ridge, Tennessee
HBPP Fuel O il Tank .Area, Eureka, CA 1 5 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 HBPP Fuel Oil Tank Area, Eureka, CA APPENDIX A FIGURES 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 D Site Loc a tion 0 50 1 00 Mil e s Nevada Arizona ll11r1 Humboldt B ay Pl a nt E urek a, C a hforru a ORISE Crea t ed b)': A. H oo d Date: 26, 201 1 Fig. A-1. Site Loc a tion M ap -Humboldt Ba y Power Plant, Eureka, C a liforni a HBPP Fuel Oil Tank Area, Eureka, CA A-1 5167-SR-01-0 Su rveye d Ar eas "" II F uel Oil Tanlc Area t H umbo ldt B ay --U ni t 1 an d 2 C onc r ete P a d s P ower Pl ant 51 67 --Northeast Lay d own Area Eureka, C alifor ni a --N ew As ph alt R oa d ORISE 0 50 100 C rc a r c d b y: A. H ood D a r e: 27 , 20 1 2 Miles "f\IEA Fig. A-2. Humboldt Ba y Power Pl a nt -S i te Overview of Surve y ed Areas HBPP F u el Oil Ta nk .A r ea, E ur eka, CA A-2 516 7-S R-0 1-0 Normalized Gamma Count Rate (CPM) .. 10001 -11390 .. 4601 -5000 6201 -10000 .. 4201 -4600 5801 -6200 .. 3601 -4200 .. 5401 -5800 .. < 3800 .. 5001 -5400 Survey Boundary 0 20 40 Feet II Humb o ldt Ba:;;:er Pl an t 5167 Gamma Walkover Scans ORISE Cn!it.ted b y: A. 1 lo o d Date: February 2.1, 2012 Fig. A-3. H BPP F uel O il Tank Area -Gamma Walkover Scans HBPP Fuel Oil Tank A r e a, E ureka , C A -3 516 7-SR-01-0   
. February  
"' Survey B oun d ary t C oncrete R emnan t 0 25 Feet 50 Humboldt Bay Power Plant 5167 Site Sample Locations Cr e a ted b y: A. H ood D a t e: Febru a ry 8, 2012 l'\IEA Fig. A-4. HBPP FOTA -PG&E S y stematic Soil Sample Locations HBPP F uel Oil T a nk Are a, E ur e ka, CA A-4 516 7-SR-01-0   
: 9. U.S. uclear Regulatory Commission (NRC) 2000. Multi-Agenry Radiation Surory and Site Investigation Manual (MARSSIM),
NUREG-1575; Revision  
: 1. Washington, DC. August. NRC 2003. Consolidated NMSS Decommission ing Guidance:
Decommissioning Process for Materials Licensees.
NUREG-1757; Volume 1, Revision  
: 1. Washington, DC. September.
HBPP Fuel Oil Tank .Area, Eureka, CA 15 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 HBPP Fuel Oil Tank Area, Eureka, CA APPENDIX A FIGURES 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 D Site Location 0 50 100 Miles Nevada Arizona ll11r1 Humboldt Bay Plant Eureka, Cahforrua ORISE Created b)': A. Hood Date: 26, 2011 Fig. A-1. Site Location Map -Humboldt Bay Power Plant, Eureka, California HBPP Fuel Oil Tank Area, Eureka, CA A-1 5167-SR-01-0 Surveyed Areas "" II Fuel Oil Tanlc Area t Humboldt Bay --Unit 1 and 2 Concrete Pads Power Plant 5167 --Northeast Laydown Area Eureka, California --New Asphalt Road ORISE 0 50 100 Crcarcd by: A. Hood Dare: 27, 2012 Miles "f\IEA Fig. A-2. Humboldt Bay Power Plant -Site Overview of Surveyed Areas HBPP Fuel Oil Tank .Area, Eureka, CA A-2 5167-SR-01-0 Normalized Gamma Count Rate (CPM) .. 10001 -11390 .. 4601 -5000 6201 -10000 .. 4201 -4600 5801 -6200 .. 3601 -4200 .. 5401 -5800 .. < 3800 .. 5001 -5400 Survey Boundary 0 20 40 Feet II Humboldt Ba:;;:er Plant 5167 Gamma Walkover Scans ORISE Cn!it.ted by: A. 1 lood Date: February 2.1, 2012 Fig. A-3. HBPP Fuel Oil Tank Area -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA -3 5167-SR-01-0   
"' Survey Boundary t Concrete Remnant 0 25 Feet 50 Humboldt Bay Power Plant 5167 Site Sample Locations Created by: A. Hood Date: February 8, 2012 l'\IEA Fig. A-4. HBPP FOTA -PG&E Systematic Soil Sample Locations HBPP Fuel Oil Tank Area, Eureka, CA A-4 5167-SR-01-0   
-Survey Boundary Inaccessible
-Survey Boundary Inaccessible
* ORISE Judgmental Sample Location
* O RISE J udgmental Sample Location
* HBPP Systematic Sample Location 0 25 Feet A ORISE Soil Samples at HBPP Systematic Location 50 II ORISE Humboldt Bay Power Plant 5167 FOTA Soil Sample Locations Created by: A. Hood Date: Fitbrua.ry 23, 2012 'r:\JEAV\PUIJ8Cn
* H B PP Systematic Sample Location 0 25 Feet A ORI SE Soil Samples at H BPP Systematic Location 50 II ORISE Humboldt Ba y Power Plant 5167 FOTA Soil Sample Locations Created b y: A. H ood D ate: Fitbrua.ry 23, 2012 'r:\JEAV\PUIJ8Cn
\S167Humboktt\GIS\ Fig. A-5. HBPP FOTA -Confirmatory Soil Sample Locations HBPP Fuel Oil Tank Area, Eureka, CA A-5 5167-SR-01-0 Normalized Gamma Count Rate (CPM) 9301 -13332 .. 5301 -6300 8301 -9300 -4301 -5300 .. 7301 -8300 -3301 -4300 .. 6301 -7300 -< 3300 0 10 20 -=:::J Feet r II Humboldt Plant 5167 Gamma Walkover Scans ORISE Created by. A. Hood Date: February 23, 2012 Fig. A-6. HBPP Unit 1 and Unit 2 Concrete Pads -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA A-6 5167-SR-01-0 10001 -15000 3601 -3700 .. 4501 -10000 .. 3301 -3600 .. 4201 -4500 .. 3001 -3300 .. 3901-4200 .. < 3000 0 10 20 Feet Cttated by: A. Hood Dale: February 23, 2012 Fig. A-7. HBPP Northeast Laydown Area -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA -7 5167-SR-01-0 Gamma Count Rate (CPM) .. 10001 -10633 -5601-6700 1 Humboldt Bay Power Plant 5167 -4501-5600 New Road 8901 -10000 Gamma Walkover Scans .. 7801-8900  
\S167 Humboktt\GIS\ F i g. A-5. HBPP FOTA -Confirm a t ory Soil S a mple L oca ti o n s H BPP F uel Oil Tank Area, Eureka, CA A-5 516 7-S R-01-0 Normalized Gamma Count Rate (CPM) 9301 -13332 .. 5301 -6300 8301 -9300 -4301 -5300 .. 7301 -8300 -3301 -4300 .. 6301 -7300 -< 3300 0 10 20 -=:::J Feet r II Humboldt Pl ant 5167 Gamma Walkover Scans ORISE Created by. A. Hood D ate: February 23, 2012 F ig. A-6. HBPP Unit 1 and Unit 2 C oncrete P ads -G amma Wa l kover Scans HBPP F uel Oil Tank Area, Eureka, CA A-6 5167-SR-01-0 10001 -15000 3601 -3700 .. 4501 -10000 .. 3301 -3600 .. 4201 -4500 .. 3001 -3300 .. 3901-4200 .. < 3000 0 10 20 Feet Ctt a ted b y: A. H ood D a le: Februar y 23, 2012 Fig. A-7. HBPP Northeast Laydown Area -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA -7 516 7-SR-01-0 Gamma Count Rat e (CPM) .. 10001 -10633 -5601-6700 1 Humboldt B ay P ower Plant 5167 -4501-5600 New R oa d 8901 -10000 Gamm a Walkover Scans .. 7801-8900  
-3401-4500 ORISE 0 25 50 .. 6701-7800  
-3401-4500 ORISE 0 25 50 .. 6701-7800  
-<3400 Feet Created by: A. Hood Da1c: February 23, 2012 'l"'IL.A\"*_Pft'lllflC'9\Slrll..-boldt(J.I" Fig. A-8. HBPP New Asphalt Roadway -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA A-8 5167-SR-01-0 Humboldt Bay Power Plant -Fuel Oil Tank Area Normalized Count Rate Histogram 900 800 700 600 Q. 500 0 c 400 r:T ... 300 200 100 3000 3500 4000 BKG = background Median BKG = 5051 CPM 4500 5000 5500 6000 6500 7000 Normalized Counts Per Minute (CPM) Maximum Count Rate= 11,390 CPM \ 7500 8000 8500 More Fig. A-9. HBPP Fuel Oil Tank Area -Gamma Scan Count Rate Distribution Fig. A-10. Fuel Oil Tank Area -Pictures of the Natural Strata Layer that Exhibited Elevated Gamma Radiation Levels HBPP Fuel Oil Tank Area, Eureka, C A-10 5167-SR-01-0   
-<3400 Feet Created by: A. Hood Da1c: Febr u ary 23, 2012 'l"'IL.A\"*_Pft'lllflC'9\Slrll..-boldt(J.I" Fig. A-8. HBPP New Asphalt R oadway -Gamma Walkover Sc ans HBPP Fuel Oil Tank Area, E urek a , CA A-8 516 7-SR-01-0 Humboldt Bay Power Plant -Fuel Oil Tank Area Normalized Count Rate Histogram 900 800 700 600 Q. 500 0 c 400 r:T ... 300 200 100 3000 3500 4000 BKG = background Median BKG = 5051 CPM 4500 5000 5500 6000 6500 7000 Normal i zed Count s Per M i nute (CPM) Maximum Count Rate= 11 , 390 CPM \ 7500 8000 8500 More Fig. A-9. HBPP Fuel O il Tank Area -Gamma Scan Count Rate Distribution Fig. A-10. Fuel Oil Tank Area -Pictures of the Natural Strata La y er that Exhibited Elevated Gamma Radiation Levels HBPP Fue l Oil Tank Area, Eureka, C A-10 516 7-S R-0 1-0   
: 0. u -0 c .. :I Cl" ... 1200 1000 800 600 400 200 Humboldt Bay Power Plant -Units 1 & 2 Concrete Pads Normalized Count Rate Histogram Median BKG = 6,436 CPM Maximum Count Rate = 13,332 CPM 0 3000 3800 4600 5400 6200 7000 7800 8600 9400 10200 11000 11800 12600 More Normalized Counts Per Minute (CPM) BJ.;:G = background Fig. A-11. HBPP Units 1 & 2 Concrete Pads -Gamma Scan Count Rate Distribution  
: 0. u -0 c .. :I Cl" ... 1 200 1 000 800 600 400 200 Humboldt Bay Power Plant -Units 1 & 2 Concrete Pads Normalized Count Rate Histogram Median BKG = 6,436 CPM Maximum Count Rate = 13,33 2 C P M 0 3000 3800 4600 54 00 6200 7 0 00 7800 8600 9400 10200 11000 11800 12600 More Normalized Counts Per Minute (CPM) BJ.;:G = backgr ound Fig. A-11. HBP P U nits 1 & 2 Concrete P a d s -G a mm a Sc a n C ount R a te D is tr i bution  
"' 200 180 160 140 120 0 100 c Qj :I 80 ... 60 40 20 Humboldt Bay Power Plant -Northeast Laydown Area Count Rate Histogram Median BKG = 3,674 CPM These outliers represent the elevated gamma activity around the rad waste containers . 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 More Counts Per Minute (CPM) BJ.;:G = backgrow1d  
"' 200 180 160 140 120 0 100 c Qj :I 80 ... 60 40 20 Humboldt Bay Power Plant -Northeast Laydown Area Count Rate Histogram Median BKG = 3 , 674 CPM These outliers represent the elevated gamma activity around the rad waste conta i ners . 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 More Counts P er Minute (C P M) BJ.;:G = backgrow1d  
/.r, Fig. A-12. HBPP Northeast Laydown Area Asphalt Pad -Gamma Scan Count Rate Distribution 6   
/.r, F i g. A-12. HBPP Northe a st L ay down Ar ea Asph a lt P ad -G a mm a Sc a n Count R a te Distribution 6   
*-* c 8 If n > 250 200 ,; e; 150 0 c Cll 5-100 "" so 0 Humboldt Bay Power Plant -New Asphalt Roadway Count Rate Histogram Median BKG = 6,672 CPM 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 10000 More Counts Per Minute (CPM) BKG = background Fig. A-13. HBPP New Asphalt Roadway -Gamma Scan Count Rate Distribution THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank .Area, Eureka, CA 5167-SR-01-0 HBPP Fuel Oil Tank Area, Eureka, CA APPENDIX B TABLES 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 I c;;; 0 ""I1 &sect;. 2 ..., " ;:: ,,. " ? ::i !:; " F n > '? &deg;' _. "' "' s 6 Table B-1. Radionuclide Concentrations in ORISE Soil Samples Confirmatory Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California Cs-137 *** U-235 U-238 Humboldt Bay Systematically-Selected Soil Sample Locations SOOl 5949071 2160777 003 +/- 0.02< -0.01 +/- 0.04 O.Q7 +/- 0.06 0.26 +/- S002 5948982 2160894 0.30 +/- 0.04 0.01 +/- 0.04 0.05 +/- 0.14 0.52 +/- S004 5948902 2160738 0.25 +/- 0.04 OO()d +/- 0.04 0.04 +/- 0.08 0.24 +/- S007 5949124 2160907 0.37 +/- 0.04 0.00 +/- O.Q3 0.06 +/- 0.11 0.67 +/- S009 5948880 2160868 0.20 +/- 0.02 O.Ql +/- O.Q3 0.16 +/- 0.11 0.59 +/- SOll 5949146 2160803 0.34 +/- 0.04 0.00 +/- 0.04 0.10 +/- 0.08 0.69 +/- S015 5948869 2160764 0.35 +/- 0.04 -0.02 +/- 0.04 0.04 +/- 0.11 0.15 +/- FOTAAvr:rage 0.26 0.00 0.07 0.45 FOT A Standard Deviation 0.12 0.01 0.04 0.22 ORISE Judgmental Soil Sample Locations S016 5948965 2160774 0.02 +/- 0.01 0.00 +/- 0.03 0.08 +/- 0.06 0.72 +/- S017 5948969 2160768 0.00 +/- 0.03 0.00 +/- O.Q4 0.08 +/- 0.06 1.11 +/- 5018 5948967 2160766 -0.01 +/- 0.03 O.Ql +/- 0.05 0.07 +/- 0.09 1.84 +/- 5019 5949108 2160832 0.29 +/- O.Q3 -0.01 +/- 0.03 -0.02 +/- 0.13 0.58 +/- S020 5949061 2160958 0.01 +/- 0.02 0.00 +/- 0.03 0.04 +/- 0.09 0.28 +/- S021 5949062 2160970 0.51 +/- 0.05 0.00 +/- 0.04 -0.01 +/- 0.12 0.41 +/- Judgmental Average 0.27 0.00 0.04 0.82 *Refer to Figs. A-4 and A-5 bTotal Uranium calculations for natural uranium were 2*U-238 + U-235 <Uncertainties represent d1e 95&deg;'o confidence Je,-el, based on total propagated uncertaintie s dZero ,-alues a.re due to row1ding Total Ub 0.28 0.59 +/- 0.56 0.32 1.09 +/- 0.66 0.33 0.52 +/- 0.66 0.33 1.40 +/- 0.67 0.21 1.34 +/- 0.43 0.32 1.48 +/- 0.64 0.36 0.34 +/- 0.73 0.97 0.47 0.30 1.52 +/- 0.60 0.34 2.30 +/- 0.68 0.42 3.75 +/- 0.84 0.24 1.14 +/- 0.50 0.23 0.60 +/- 0.47 0.27 0.81 +/- 0.55 1.69   
*-* c 8 If n > 250 200 ,; e; 150 0 c Cll 5-100 "" so 0 Humboldt Bay Power Plant -New Asphalt Roadway Count Rate Histogram M e d ian B KG = 6,672 CPM 5000 5500 6000 6500 7000 7500 8000 8500 9000 95 0 0 10000 More Counts Per M i nute (CPM) BK G = b a ck gr oun d Fig. A-13. H B PP Ne w A s ph a lt R oa d way -G a mm a Sc a n C ount R a te D i s t ri but i on THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank .Area, E ureka , CA 516 7-SR-01-0 HBPP F uel Oil Ta nk Area, E ur eka, CA APPENDIX B TABLES 516 7-S R-0 1-0 THIS P AGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 I c;;; 0 ""I1 &sect;. 2 ..., " ;:: ,,. " ? ::i !:; " F n > '? &deg;' _. "' "' s 6 Table B-1. Radionuclide Concentrations in ORISE Soil Samples Confirmatory Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California Cs-137 *** U-235 U-238 Humboldt B ay Systematically-Selected Soil Sample Location s SOO l 594907 1 2160777 003 +/- 0.02< -0.0 1 +/- 0.04 O.Q7 +/- 0.06 0.26 +/- S002 5948982 2160894 0.30 +/- 0.04 0.0 1 +/- 0.04 0.05 +/- 0.1 4 0.52 +/- S004 5948902 2160738 0.25 +/- 0.04 OO()d +/- 0.04 0.04 +/- 0.08 0.24 +/- S007 5949124 2 1 60907 0.37 +/- 0.04 0.00 +/- O.Q3 0.06 +/- 0.11 0.67 +/- S009 5948880 2 1 60868 0.20 +/- 0.02 O.Ql +/- O.Q3 0.1 6 +/- 0.1 1 0.59 +/- SO ll 5949 146 2160803 0.34 +/- 0.04 0.00 +/- 0.04 0.10 +/- 0.08 0.69 +/- S015 5948869 2160764 0.3 5 +/- 0.04 -0.02 +/- 0.04 0.04 +/- 0.11 0.15 +/- FOTAAvr:rage 0.26 0.00 0.07 0.45 FOT A Standard Deviati on 0.12 0.01 0.04 0.22 ORISE Jud gmental Soil S a mple Locati o ns S016 5948965 2 1 60774 0.02 +/- 0.0 1 0.00 +/- 0.03 0.08 +/- 0.06 0.72 +/- S017 5948969 2160768 0.00 +/- 0.03 0.00 +/- O.Q4 0.08 +/- 0.06 1.11 +/- 5018 5948967 2 16 0766 -0.0 1 +/- 0.03 O.Ql +/- 0.05 0.07 +/- 0.09 1.84 +/- 5019 5949108 2 16 0832 0.29 +/- O.Q3 -0.01 +/- 0.03 -0.0 2 +/- 0.13 0.58 +/- S020 5949061 2 16 0958 0.01 +/- 0.02 0.00 +/- 0.03 0.04 +/- 0.09 0.28 +/- S02 1 5949062 2160970 0.51 +/- 0.05 0.00 +/- 0.04 -0.01 +/- 0.12 0.4 1 +/- Judgmental Average 0.2 7 0.00 0.04 0.82 *Refer to Figs. A-4 and A-5 bTot al Uranium calculations for natural uranium were 2*U-238 + U-235 <Uncertainties repre s ent d1e 95&deg;'o confidence Je,-el, ba se d on total propagated uncertaintie s d Zero ,-alues a.re due to row1ding Total Ub 0.28 0.59 +/- 0.56 0.32 1.09 +/- 0.66 0.33 0.52 +/- 0.66 0.33 1.4 0 +/- 0.67 0.2 1 1.34 +/- 0.43 0.32 1.4 8 +/- 0.64 0.36 0.34 +/- 0.73 0.97 0.4 7 0.30 1.52 +/- 0.60 0.34 2.30 +/- 0.68 0.42 3.75 +/- 0.84 0.24 1.14 +/- 0.50 0.23 0.60 +/- 0.47 0.27 0.8 1 +/- 0.55 1.69   
> ;; ? " ? () > ORISE Sample ID* SOOl S002 S003 S004 SOOS S006 S007 SOOS S009 S010 SOll S012 S013 S014 S015 Table B-2. Fuel Oil Tank Arca Comparison Data Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California PG&E Sample East (ft) Nonh (ft) Cs-137 Concentrations (pCi/g) I Db ORISE PG&Ec Humboldt Bay Systematically-Selected Soil Sample Locations OOLl0-1 5949071 2160777 0.03 +/- 0.02< <0.120 OOLl0-2 5948982 2160894 0.30 +/- 0.04 0.322 +/- OOLl0-3 5948991 2160933 -+/- -0.353 +/- OOLl0-4 5948902 2160738 0.25 +/- 0.04 0.193 +/- OOLl0-5 5949079 2160855 -+/- -<0.099 OOLl0-6 5948946 2160790 -+/- -<0.094 OOLl0-7 5949124 2160907 0.37 +/- 0.04 0.313 +/- OOLl0-8 5949013 2160829 -+/- -<0.106 OOLl0-9 5948880 2160868 0.20 +/- 0.02 0.195 +/- OOLl0-10 5948969 2160686 -+/- -<0.179 OOLl0-11 5949146 2160803 0.34 +/- 0.04 0.317 +/- OOLl0-12 5949002 2160725 -+/- -0.350 +/- OOLl0-13 5948913 2160842 -+/- -<0.088 OOLl0-14 5949087 2160957 -+/- -<0.129 OOLl0-15 5948869 2160764 0.35 +/- 0.04 0.345 +/- FOTAAverage 0.26 0.30 FOT A Standard Deviation 0.12 0.07 Relative Error Ratio (RER)d _J 0.080 0.25 0.096 -0.053 0.86 --0.082 0.62 -0.057 0.08 -0.088 0.24 0.076 ---0.083 0.05 0.30 0.32 n >
> ;; ? " ? () > ORISE Sample ID* SOOl S002 S003 S004 SOOS S006 S007 SOOS S009 S010 SOll S012 S013 S014 S015 Table B-2. Fuel Oil Tank Arca Comparison Data Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California PG&E Sample East (ft) Nonh (ft) Cs-137 Concentrations (pCi/g) I Db ORISE PG&E c Humboldt B ay S ys t e m a ticall y-Selected Soil Sampl e Loc a tions OOLl0-1 5949071 2160777 0.03 +/- 0.02< <0.120 OOLl0-2 5948982 2 1 60894 0.30 +/- 0.04 0.322 +/- OO Ll0-3 5948991 2160933 -+/- -0.353 +/- OOLl0-4 5948902 2 1 60738 0.25 +/- 0.04 0.1 93 +/- OOLl0-5 5949079 2 1 60855 -+/- -<0.099 OOLl0-6 5948946 2 1 60790 -+/- -<0.094 OO Ll 0-7 5949 1 2 4 2 1 6090 7 0.37 +/- 0.04 0.313 +/- OOLl0-8 5949013 2160829 -+/- -<0.106 OOLl0-9 5948880 2160868 0.20 +/- 0.02 0.195 +/- OOLl0-10 5948969 2 1 606 86 -+/- -<0.179 OOLl0-11 5949 1 46 2160 803 0.3 4 +/- 0.04 0.317 +/- OOLl0-1 2 5949002 2 1 60725 -+/- -0.350 +/- OO Ll 0-1 3 59489 1 3 2160842 -+/- -<0.088 OOLl0-14 5949087 2160957 -+/- -<0.129 OO Ll 0-1 5 5948869 2 1 60 7 64 0.35 +/- 0.0 4 0.345 +/- FOTAAverage 0.26 0.30 FOT A Standard Deviation 0.12 0.0 7 Relative Error Ratio (RER)d _J 0.080 0.25 0.096 -0.053 0.86 --0.082 0.62 -0.057 0.08 -0.088 0.24 0.076 ---0.083 0.05 0.30 0.32 n >
Table B-2. Fuel Oil Tank Arca Comparison Data Confirmatory Stlr\'C} ActiYitics for the Fuel Oil Tank Arca Humboldt Ba} Power Plant Eureka, California ORISE PG&E Cs-137 Concentrations (pCi/g) Relative Error Ratio Sample ID* Sample East (ft) Nonh (ft) ORISE PG&Ec (RER)* I Db ORISE Judgmental Soil Sample Locations S016 OOLl0-20 5948965 2160774 0.02 +/- 0.01 <0.084 -S017 OOLl0-21 5948969 2160768 0.00g +/- 0.03 <0.082 -S018 OOLl0-22 5948967 2160766 -0.01 +/- 0.03 <0.108 -S019 OOLl0-23 5949108 2160832 0.29 +/- 0.03 0.318 +/- 0.074 0.35 S020 OOLl0-24 5949061 2160958 O.Dl +/- 0.02 <0.077 -S021 OOLl0-25 5949062 2160970 0.51 +/- 0.05 0.621 +/- 0.096 1.03 Judgmental Averagd' 0.40 0.47 0.69 *Refer to Figs. A-4 and A-5 bPG&E Sample ID prm;ded by PG&E <PG&E Cs-137 concentration s from PG&E-prm;ded gamma spectroscopy reports *Re!atiYe Error Ratio (RER) was calculated based on the formula in the DO E's Quality Systems for Analytical Services and provides a way to detenni.ne if analytical results of duplicates (in this case, split samples) a.re in agreement. A RER < 3 means the samples a.re in agreement at the 99% confidence le,*el. *Uncertainties represent the 95&deg; o confidence 1e,-e1, based on total propagated uncertainties  
Table B-2. Fuel Oil Tank Arca Comparison Data Confirmatory Stlr\'C} ActiYitics for the Fuel Oil Tank Arca Humboldt Ba} Power Plant Eureka, California ORISE PG&E Cs-137 Concentrations (pCi/g) Relative Error Ratio S a mple ID* Sample East (ft) Nonh (ft) ORISE PG&E c (RER)* I Db ORI SE Judgm e nt a l S oi l S a mpl e Loc a tion s S016 OOLl0-20 5948965 2160774 0.02 +/- 0.0 1 <0.08 4 -S017 OOLl0-2 1 5948969 2160768 0.00 g +/- 0.03 <0.082 -S018 OOLl0-22 5948967 2 1 60766 -0.01 +/- 0.03 <0.1 08 -S0 19 OOLl0-23 5949 1 08 2160832 0.29 +/- 0.03 0.318 +/- 0.074 0.35 S020 OOLl0-24 5949061 2160958 O.Dl +/- 0.02 <0.077 -S02 1 OOLl0-25 5949062 2 1 60970 0.51 +/- 0.05 0.62 1 +/- 0.096 1.03 Judgmental Averag d' 0.4 0 0.4 7 0.69 *Refer to F i gs. A-4 and A-5 b PG&E Sample ID prm;ded b y PG&E <PG&E Cs-1 37 co ncentration s from PG&E-prm;ded gamma s pectroscopy report s *Re!atiYe Error Ratio (RER) was calcu l ated based on the formula in th e DO E's Q u a li ty Systems for Analy tica l Se rvic es a nd provides a wa y to d e ten ni.n e if a nal y tical results of duplicat es (in thi s case , s plit samp l es) a.re in agree ment. A RER < 3 means th e samp l es a.re in agree m e nt at the 99% confidence l e ,*el. *Un c ertainties r e pr esent the 95&deg; o confidence 1e,-e1, ba se d on total propagated uncertainties  
&#xa3;Measurement or analysis not performed
&#xa3;Meas urem ent or anal ys is not p erformed *Zero ,*al ues a r e due to rounding "Calc ul ated u s in g co nc e ntr a tion s that were greater than t h e minimum detectabl e co n ce n tratio n (M DC); ORISE s ample s used were 50 1 9 and S021   
*Zero ,*alues are due to rounding "Calculated using concentrations that were greater than the minimum detectabl e concentration (MDC); ORISE samples used were 5019 and S021   
;: ,,,. :;--" J' ;:i =; " ? ORISE Sample ID* S004 S009 S015 --------Table B-3. Radionuclide Concentrations in lnterlaboratory Comparison Soil Samples Confirmatory Sur.'e) Activities for the Fuel Oil Tank Arca Humboldt Ba) P<mer Plant Eureka, California PG&E Sample IDb Cs-137 Concentrations (pCi/g) Relative Error Ratio (RER)< ORISE PG&E< OOLl0-4 0.25 +/- 0.04' 0.1 9 +/- 0.05 0.9 OOLl0-9 0.20 +/- 0.02 0.20 +/- 0.06 0.1 OOLl0-15 0.35 +/- 0.04 0.35 +/- 0.08 0.1 *Refer to Figs. 1\-4 and A-5 b PG&E s ample identification and samp l e Cs-137 concentrations provided b y PG&E 'Relati,-e Error Ratio (RER) wa s calculated based on the formula in the DOE's Quality S y stem s for A nal y tical Sen-ice s and prmide s a wa y to determin e if anal y tica l re s ults of duplicates (in thi s ca s e, s plit s ample s) ar e in agreement.
;: ,,,. :;--" J' ;:i =; " ? ORISE Sample ID* S004 S009 S015 --------Table B-3. Radionuclide Concentrations in lnterlaboratory Comparison Soil Samples Confirmatory Sur.'e) Activities for the Fuel Oil Tank Arca Humboldt Ba) P<mer Plant Eureka, California PG&E Sample IDb Cs-137 Concentrations (pCi/g) Relative Error Ratio (RER)< ORISE PG&E< OOLl0-4 0.25 +/- 0.04' 0.19 +/- 0.05 0.9 OOLl0-9 0.20 +/- 0.02 0.20 +/- 0.06 0.1 OOLl0-15 0.35 +/- 0.04 0.35 +/- 0.08 0.1 *Refer to Figs. 1\-4 and A-5 bPG&E sample identification and sample Cs-137 concentrations provided by PG&E 'Relati,-e Error Ratio (RER) was calculated based on the formula in the DOE's Quality Systems for Analytical Sen-ices and prmides a way to determine if analytical results of duplicates (in this case, split samples) are in agreement.
A RER < 3 means t h e s ample s are in agre e m e nt a t the 9 9&deg;'o confidence l evel. d QRJSE uncertainties represent the 95&deg; o confidence le,*el , ba s ed on total propagated uncertainties THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, E ureka, CA 5167-SR-01-0 APPENDIX C MAJOR INSTRUMENTATION HBPP Fuel Oil Tank Area, E urek a, CA 5167-SR-0 1-0 THIS PAGE LEFT BLANK INTENTIO ALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 The displa y of a specific product is not to be construed a s an endorsement of the product or its manufacturer*b y the author or his emplo y er. C.1 SCANNIN G AND M EASUREMENT I NST R UMENT /D ETECT O R C OMBINAT IO NS C.1.1 G am m a Ludlum NaI Scintillation Detector Model 44-10, C ry stal:2 in x 2 in coupled to: Ludlum Ratemeter-scaler M o del 2221 (Ludlum Measurements , Inc., Sweetwater, TX) coupled to: Trimble GeoXH Recei v er and Data Logger (Trimble Navigation Limited, Sunnyvale, C A) C.1.2 L a b oratory An a l ytica l In s tru m en ta t io n High Purity E x tended Range Intrinsic Detector CA BERRA/Tennelec M o del No: ERVDS30-25195 (Canberra, Meriden, CT) U sed in conjunction with: Lead Shield Model G-11 (Nuclear Lead, Oak Rid g e , TN) and Multichannel Analyzer Canberra's A pe x Gamma Software Dell Workstation (Canberra , Meriden, CT) High Purity Extended Range Intrinsic Detector Model o. GMX-45200-5 (AMETEK/ORTEC, Oak Ridge, TN) used in conjunction with: Lead Shield Model SPG-16-K8 (Nuclear Data) Multichannel Anal yz er Canberra's A pex Gamma Software Dell W o rk s tation (Canberra, Meriden, CT) High-Puri ty Germanium Detector Model GMX-30-P4, 30% Eff. (AMETEK/ORTEC, Oak Ridge, TN) Used in conjunction with: Lead Shield Model G-16 (Gamma Products, Palos Hills, IL) and Multichannel Anal yz er Canberra's A pex Gamma Software Dell Workstation (Canberra, Meriden, CT) HBPP Fu e l Oil Tank Are a , E ureka, CA C-1 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 APPENDIXD SURVEY AND ANALYTICAL PR O CEDURES HBPP Fue l Oil Tank Area, Eu reka , CA 516 7-SR-01-0 THIS PAGE LEFT BLA K INTENTIONALLY HBPP Fuel Oil Tank Area, E ureka, CA 5167-SR-01
A RER < 3 means the samples are in agreement at the 99&deg;'o confidence level. dQRJSE uncertainties represent the 95&deg; o confidence le,*el, based on total propagated uncertainties THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 APPENDIX C MAJOR INSTRUMENTATION HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-0 1-0 THIS PAGE LEFT BLANK INTENTIO ALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 The display of a specific product is not to be construed as an endorsement of the product or its manufacturer*b y the author or his employer. C.1 SCANNING AND MEASUREMENT INSTRUMENT /DETECTOR COMBINATIONS C.1.1 Gamma Ludlum NaI Scintillation Detector Model 44-10, Crystal:2 in x 2 in coupled to: Ludlum Ratemeter-scaler Model 2221 (Ludlum Measurements
-0 D.1 PROJ E C T HE A L T H AND SAFETY The propo s ed s urve y and s ampling procedures were evaluated to ensure that any ha z ards inherent to the procedures themselves were addressed in current Job Hazard Analyses GHA). All survey and laboratory activities were conducted in accordance with ORISE health and safety and radiation protection procedures (ORISE 2008 and 2010). Pre-survey activities included the evaluation and identification of potential health and safety issues. Survey work was performed per the ORISE generic health and safety plans and a site-specific Integrated Safety Management (ISM) pre-job hazard checklist.
, Inc., Sweetwater, TX) coupled to: Trimble GeoXH Receiver and Data Logger (Trimble Navigation  
: Limited, Sunnyvale, CA) C.1.2 Laboratory Analytical Instrumentation High Purity Extended Range Intrinsic Detector CA BERRA/Tennelec Model No: ERVDS30-25195 (Canberra,  
: Meriden, CT) Used in conjunction with: Lead Shield Model G-11 (Nuclear Lead, Oak Ridge, TN) and Multichannel Analyzer Canberra's Apex Gamma Software Dell Workstation (Canberra, Meriden, CT) High Purity Extended Range Intrinsic Detector Model o. GMX-45200
-5 (AMETEK/ORTEC, Oak Ridge, TN) used in conjunction with: Lead Shield Model SPG-16-K8 (Nuclear Data) Multichannel Analyzer Canberra's Apex Gamma Software Dell Workstation (Canberra,  
: Meriden, CT) High-Puri ty Germanium Detector Model GMX-30-P4, 30% Eff. (AMETEK/ORTEC, Oak Ridge, TN) Used in conjunction with: Lead Shield Model G-16 (Gamma Products, Palos Hills, IL) and Multichannel Analyzer Canberra's Apex Gamma Software Dell Workstation (Canberra,  
: Meriden, CT) HBPP Fuel Oil Tank Area, Eureka, CA C-1 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 APPENDIXD SURVEY AND ANALYTICAL PROCEDURES HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 THIS PAGE LEFT BLA K INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01
-0 D.1 PROJECT HEALTH AND SAFETY The proposed survey and sampling procedures were evaluated to ensure that any hazards inherent to the procedures themselves were addressed in current Job Hazard Analyses GHA). All survey and laboratory activities were conducted in accordance with ORISE health and safety and radiation protection procedures (ORISE 2008 and 2010). Pre-survey activities included the evaluation and identification of potential health and safety issues. Survey work was performed per the ORISE generic health and safety plans and a site-specific Integrated Safety Management (ISM) pre-job hazard checklist.
PG&E personnel also provided site-specific safety awareness training.
PG&E personnel also provided site-specific safety awareness training.
An ORISE safety walkdown of the site indicated that the land clearing activities and restoration activities by PG&E personnel left uneven terrain in some areas typical for outdoor survey activities, steep inclines on the berms, and standing water and thick mud in a portion of the FOTA. D.2 CALIBRATION AND QUALITY ASSURANCE Calibration of all field and laboratory instrumentation was based on sources/ standards, traceable to the ational Institute of Standards and Technology (NIST). Analytical and field survey activities were conducted in accordance with procedures from the following ORAU and ORISE documents:
An ORISE safety walkdown of the site indicated that the land clearing activities and restoration activities by PG&E personnel left uneven terrain in some areas typical for outdoor surve y activities, steep inclines on the berms, and standing water and thick mud in a portion of the FOTA. D.2 CALIBRATION AND Q U ALI TY ASS U RANCE Calibration of all field and laboratory instrumentation was based on sources/ standards, traceable to the ational Institute of Standards and Technology (NIST). Analytical and field survey activities were conducted in accordance with procedures from the following ORAU and ORISE documents:
* Survey Procedures Manual (May 2008)
* Survey Procedures Manual (May 2008)
* Laboratory Procedures Manual (December 2011)
* Laboratory Procedures Manual (December 2011)
* Quality Program Manual (December 2011) The procedures contained in these manuals were developed to meet the requirements of 10 Code of Federal Regulations (CFR) 830 Subpart A,QualityAss11rance Requirements, Department of Energy Order 414.1 C Quality Assurance, and the U.S. uclear Regulatory Commission Quality Assurance Manual for the Office of Nuclear Material Sefety and Sefeguards and contain measures to assess processes during their performance.
* Quality Program Manual (December 2011) The procedures contained in these manuals were developed to meet the requirements of 10 Code of Federal Regulations (CFR) 830 Subpart A,QualityAss11rance Requirem e nts, Department of Energy Order 414.1 C Quality Assurance, and the U.S. uclear Regulatory Commission Quality Assurance Manual for the Office of Nuclear Material Sefety and Sefeguards and contain measures to assess processes during their performance.
HBPP Fuel Oil Tank Area, Eureka, CA D-1 5167-SR-01-0 Quality control procedures include:
HBPP Fuel Oil Tank Area, Eureka , CA D-1 516 7-SR-01-0 Quality control procedures include:
* Daily instrument background and check-source measurements to confirm that equipment Operation is within acceptable statistical fluctuations.
* Daily instrument background and check-source measurements to confirm that equipment Operation is within acceptable statistical fluctuations.
* Participation in Mi.."Xed-Anal yte Performance Evaluation Program (MAPEP), !ST Radiochemistry Intercomparison Testing Program (NRIP), and Intercomparison Testing Program (ITP) Laboratory Quality Assurance Programs.
* Participation in Mi.."Xed-Anal y te Performance Evaluation Program (MAPEP), !ST Radiochemistry Intercomparison Testing Program (NRIP), and Intercomparison Testing Program (ITP) Laboratory Quality Assurance Programs.
* Training and certification of all individuals performing procedures.
* Training and certification of all individuals performing procedures.
* Periodic internal and external audits. D.3 SURVEY PROCEDURES D.3.1 SURFACE SCANS A Nal(Tl) scintillation detector was used to scan for elevated gamma radiation.
* Periodic internal and external audits. D.3 S U RVEY PROCED U RES D.3.1 S U R FA C E S CANS A Nal(Tl) scintillation detector was used to scan for elevated gamma radiation.
Identification of elevated radiation levels was based on increases in the audible signal from the recording and/ or indicating instrument.
Identification of elevated radiation levels was based on increases in the audible signal from the recording and/ or indicating instrument.
Additionally, the detectors were coupled to GPS units with data loggers enabling real-time recording in one-second intervals of both geographic position and the gamma count rate. Positioning data files were downloaded from field data loggers for plotting using commerciall y available software (http://trl.trimble.com
Additionally, the detectors were coupled to GPS units with data loggers enabling real-time recording in one-second intervals of both geographic position and the gamma count rate. Positioning data files were downloaded from field data loggers for plotting using commerciall y available software (http://trl.trimble.com
/ docushare
/ docushare/ dsweb/ Get/Document-261826/GeoExpl2005_100A_GSG_E G.pdD. Position and gamma count rate data files were transferred to a computer system, positions were differentially corrected, and the results were plotted on geo-referenced aerial photographs.
/ dsweb/ Get/Document-261826/GeoExpl2005_100A_GSG_E G.pdD. Position and gamma count rate data files were transferred to a computer system, positions were differentially corrected, and the results were plotted on geo-referenced aerial photographs.
Positional accuracy was within 0.5 meters at the 95m percentile.
Positional accuracy was within 0.5 meters at the 95m percentile.
ORISE Survey Procedures (ORISE 2008) require a minimum scan speed of 0.5 to 1 meter per second (m/s) based on the site contaminant and the DCGL for the primary contaminant of concern.
ORISE Survey Procedures (ORISE 2008) require a minimum scan speed of 0.5 to 1 meter per second (m/s) based on the site contaminant and the DCGL for the primary contaminant of concern. A review of the gamma walkover scan data points relative to the scan area coverage indicate that the scan speed was less than 0.5 m/s. The scan minimum detectable concentrations for the Nal scintillation detectors was 6.6 pCi/g for Cs-137, the primary radionuclide of concern as provided in NUREG-1507 (Table 6.4). An y audible increa s e in radiation levels were investigated by HBPP Fuel Oil Tank Area, Eureka, CA D-2 516 7-SR-01-0 ORISE. It is standard procedure for the ORISE staff to pause and investigate any locations where gamma radiation is distinguishable from background levels. D.3.2 SOI L S AM P LIN G A pproximatel y 0.5 to 1 kg of soil was collected at each sample location.
A review of the gamma walkover scan data points relative to the scan area coverage indicate that the scan speed was less than 0.5 m/s. The scan minimum detectable concentrations for the Nal scintillation detectors was 6.6 pCi/g for Cs-137, the primary radionuclide of concern as provided in NUREG-1507 (Table 6.4). Any audible increase in radiation levels were investigated by HBPP Fuel Oil Tank Area, Eureka, CA D-2 5167-SR-01-0 ORISE. It is standard procedure for the ORISE staff to pause and investigate any locations where gamma radiation is distinguishable from background levels. D.3.2 SOIL SAMPLING Approximatel y 0.5 to 1 kg of soil was collected at each sample location.
Collected sa mple s were placed in a Marinelli jar, sea led, and labeled in accordance w ith ORISE s urve y procedure s. The systematic so il samples were collected as split soil samples with PG&E personnel from the systematically-selected soil sample locations as determined b y PG&E. The judgmental samples were collected as split sa mples with PG&E per sonne l from location s of elevated gamma radiation levels as determined by the ORISE gamma walkover scans. D.4 RADIOLOGICAL A NAL Y SIS D.4.1 G AMMA SP ECT RO SC O PY Samples of soil were dried, mixed, crushed, and/or homogenized as necessary, and a portion sealed in a 0.5-liter Marinelli beaker or other appropriate container.
Collected samples were placed in a Marinelli jar, sealed, and labeled in accordance with ORISE survey procedure
: s. The systematic soil samples were collected as split soil samples with PG&E personnel from the systematically-selected soil sample locations as determined by PG&E. The judgmental samples were collected as split samples with PG&E personnel from locations of elevated gamma radiation levels as determined by the ORISE gamma walkover scans. D.4 RADIOLOGICAL ANALYSIS D.4.1 GAMMA SPECTROSCOPY Samples of soil were dried, mixed, crushed, and/or homogenized as necessary, and a portion sealed in a 0.5-liter Marinelli beaker or other appropriate container.
The quantity placed in the beaker was chosen to reproduce the calibrated counting geometry.
The quantity placed in the beaker was chosen to reproduce the calibrated counting geometry.
Net material weights and volumes were determined and the samples counted using intrinsic germanium detectors coupled to a pulse height analyzer system. Background and Compton stripping, peak search, peak identification, and concentration calculations were performed using the computer capabilities inherent in the analyzer system. All total absorption peaks (TAP) associated with the radionuclides of concern (ROCs) were reviewed for consistency of activity.
Net material weights and vo lumes were determined and the samples counted using intrinsic germanium detectors coupled to a pulse height analyzer syste m. Background and Compton stripping, peak sea rch, peak identification, and concentration calculations were performed using the computer capabilities inherent in the analyzer system. All total absorption peaks (TA P) associated with the radionuclides of concern (ROCs) were reviewed for consistency of activity.
TAPs used for determining the activities of ROCs and the typical associated minimum detectable concentration (MDCs) for a one-hour count time were: ------Radionuclide TAP*' (MeV) MDC (pCi/g) -----------Co-60 1.173 0.06 Cs-137 0.661 0.05 U-235 0.143 0.24 U-238 by Th-234 0.063 0.75 *Spectra were also reviewed for other identifiable easy-to-detect TAPs that would not be expected at this site. HBPP Fuel Oil Tank Area, Eureka, C D-3 5167-SR-01-0 D.4.2 UNCERTAINTIES The uncertainties associated with the analytical data presented in the tables of this report represent the total propagated uncertainties for that data. These uncertainties were calculated based on both the gross sample count levels and the associated background count levels. D.4.3 DETECTION LIMITS Detection limits, referred to as minimum detectable concentrations, were based on 3 plus 4.65 times the standard deviation of the background count [3 + ( 4.65 (BKG) 112)]. Because of variations in background levels, measurement efficiencies, and contributions from other radionuclides in samples, the detection limits differ from sample to sample and instrument to instrument.
TAPs used for determining the activities of ROCs and the typical associated minimum detectable concentration (MDCs) for a one-hour count time were: ------Radionuclide TAP*' (MeV) MDC (pCi/g) -----------Co-60 1.173 0.06 Cs-137 0.661 0.05 U-235 0.143 0.24 U-238 b y Th-234 0.063 0.75 *Spectra were also reviewed for other identifiable easy-to-detect TAPs that would not be expected at this site. HBPP Fuel Oil Tank Area, Eureka, C D-3 516 7-SR-01-0 D.4.2 UNCERTAINTIES The uncertainties associated with the analytical data presented in the tables of this report represent the total propagated uncertainties for that data. These uncertainties were calculated based on both the gross sample count levels a nd the associated background count levels. D.4.3 DETECTION LIMITS Detection limits, referred to as minimum detectable concentrations, were based on 3 plus 4.65 times the standard deviation of the background count [3 + ( 4.65 (BKG) 1 1 2)]. Because of variations in background levels, measurement efficiencies, and contributions from other radionuclides in samp l es, the detection limits differ from sample to sample and instrument to instrument.
HBPP Fuel Oil Tank Area, Eureka, CA D-4 5167-SR-01-0}}
HBPP Fuel Oil Tank Area, Eureka, CA D-4 516 7-SR-01-0}}

Revision as of 05:12, 8 July 2018

Humboldt Bay Power Plant - Final Report - Confirmatory Survey of the Fuel Oil Tank Area
ML16250A432
Person / Time
Site: Humboldt Bay
Issue date: 04/09/2012
From: Adams W C
Oak Ridge Institute for Science & Education
To: John Hickman
NRC/NMSS/DWM
References
5167-SR-01-0
Download: ML16250A432 (62)


Text

April 9, 2012 Mr. John Hickman Mail Stop: T-E18 Division of Waste Management .S. uclear Regulatory Commission 11545 Rockville Pike Rockville, N ID 20852

  • 0 E OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION Managed by ORAU for the U.S. Depertment of Energy

SUBJECT:

FINAL REPORT-CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA, HUMBOLDT BAY POWER PLANT , EUREKA, CALIFORNIA DCN: 5167-SR-01

-0

Dear Mr. Hickman:

The Oak Ridge Institute for Science and Education (ORISE) performed confirmatory radiological survey activities on the former Fuel Oil Tank Area and other portions of the Humboldt Bay Power Plant as requested b y the .S. Nuclear Regulator y Commission (NRC) site representative.

These survey activities were conducted during the period of Febmary 14 a nd 15, 2012. Enclosed is the final report that summarizes ORISE's survey procedures and provides the results of the ORISE radiological survey activities.

T he surveys included gamma walkover scans, gamma direct measurements, and soil sa mpling. My contact information is listed below , or yo u ma y contact E rika Baile y at 865.576.6659 or T im Vitkus at 865.576.5073, s h ould yo u require any additional information.

Wade C. Adams Project Manager/Health Ph ys ici st Independent Environmental Assessment a nd Verification WCA:fr Enclosure c: electronic:

G. Schlapper, NRC Region IV T. Carter, N R C HQ S. Roberts, ORISE/I EA V E. Baile y, ORISE/IEA V R. Evans, NRC Region IV File 516 7 T. Vitkus, ORISE/IEA V A. Hood, ORISE/IEA V Telephone:

865.576.0065 Fax: 865.241.3497 E-mail: Wad e.Adams@o rau.org P.O. Box 117 I Oak Ridge. TN 37831 I www.on s e.orau.gov CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA HUMBOLDTBAYPOWERPLANT EUREKA, CALIFORNIA W. C. Adams Prepared for the U.S. Nuclear Regulatory Commission Approved for public release; further dissemination unlimited.

The Oak Ridge Institute for Science and Education (ORISE) is a U.S. Department of Energy facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical emergencies, support national security and emergenc y preparedness, and educate the next generation of scientists.

ORISE is managed by Oak Ridge Associated Universities.

NOTICES The opinions expressed herein do not necessarily reflect the opinions of the sponsoring institutions of Oak Ridge Associated Universities.

This report was prepared as an account of work sponsored b y the United States Government.

Neither the United States Government nor the U.S. Department of Energy, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to an y specific commercial product, process, or service b y trade name, mark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement or recommendation, or favor by the U.S. Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof.

CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA H U MBOLDT BA Y POWER PLANT E U REKA , CALIFORNIA Prepared by W. C. A d ams OR I S E Independent E nvironmental Assessme nt and Verification Program Oak Ridge Institute for Science and Education Oak Rid ge, Tennessee 37831-0017 Prepared for the U.S. Nuclear Regulat ory Commiss ion FINAL REPORT APRIL 2012 This report is based on work performed b y the Oak Ridge In s titute for Science and E ducation u nd er contract number DE-AC0 5-060R23100 with the Department of Energy. Prepared b y the Oak Rid ge In s titute for Science and E duc atio n , under intera ge nc y agreement (NRC FIN o. F1008) between the U.S. uclear Regulat ory Commission and the U.S. Department of Energy.

THIS PAGE LEFT BLANK INTENTIONALLY

  • C>RISE OAK RIDGE INSTITUTE FOA 8CtENCE AND EDUCATION


ManegedbyORAUfCM'theU

.S.oepwtmentofEnergv CONFIRMATORY SURVEY OF THE FUEL OIL TANKAREA HUMBOLDT BAY POWER PLANT Prepared by: Reviewed by: EUREKA, CALIFORNIA W. C. Adams, Health Physicist/Project Manager Independent Environmenta l Assessment and Verification Pr gram ey Operations Director Independent E nmental Assessment and Verification Program Reviewed by ft,;' rUY f. W. P. Ive y, LaborntoGroup Manager Independent Environmental Assessment and Verification Program Reviewed b y i1 Bto\T;iualitYAs;urnncespecialist Approved for release by: Independent Environmental Assessment and Verification Program {), E. N. Bailey, Survey Projects Independent Environmental and Verification Program HBPP Fuel Oil Tank Area, Eureka, CA Date 'f /q (n_ Date 1/{bB-Date: .l/ J 9/J Z. 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA. 516 7-SR-01-0 C>R , SE OAK fW>Oa H8Tl'TU1'E llOA 9CaNCa: AHO U>UCATlON C O NTENTS F IG U RES .....................................................................

........................................................

............................. v TA B LES .............

...................

......................................................

.........................................

.................

........... vi AC R ONYMS ...........................................................................................................

........................................ vii 1. I NT R O D UC TI O A D S IT E HIST O R Y ............................................................................................ 1 2. SIT E D E S C RIPTI ON ..........................................................................................

.......................................

2 2.1 FUEL OIL TA KAREA (FO T A) .................................................................................................

.. 2 2.2 U IT 1 AND U I T 2 CONCRETE P ADS ........................................................................................ 2 2.3 ORTHEAST L AYDO AREA ................

............

..................................

....................................... 3 2.4 NE\V ASPf-L\LT R OADWAY ......................................................................

...................................... 3 3. O BJ ECT I VES ..............

......................

..............................

........................................

..............

........................ 3 4. D OCUME NT RE V I EW ............................................................................................................................. 3 5. D ATA QUAL I TY O BJ ECT I VE S ..........................................................................

................................... 4 6. CO FIRMA T O R Y RA DI OLOG I CAL SU R VEY PR OCE D URES .................

................................

5 6.1 SURVEY u IT CLASSIFICATIO

................................................................................................... 5 6.2 REFERE NCE SYSTEl\f ..................................................................................................................... 6 6.3 SURFACE S CANS ............................................................................................................................. 6 6.4 GAMl\f.A D IRECT MEASUREl\fENTS

............................

.............................................

.....................

6 6.5 SO I L SAl\IPLING

.............................................................................................................................. 6 6.5.1 S ys t e m ati c Sam pl e Lo c atio n s .....................

................................

.............................................

6 6.5.2 Jud gme nt a ll y-S el e cted Sampl e Lo c a ti o n s ..............

.............................

..................

................. 7 6.6 I NTERLABORATORY COM P ARISON ANALYSES ..................

.....................

...............

.................... 7 7. A DDI T I O N A L RADI O L O GI CAL S U R VEY PR OCE D U RE S ........................................................ 8 8. RADI O N UC LID E S OF CONCE RN ......................................................................................................

8 9.SAMPLEA ALYS IS A DD A T A I TE RP RE T A TI O ............................................................... 1 0 1 0. F I N DI GS AN D RESULTS ....................................................................................

............................. 1 0 1 0.1 D OCUl\ffi TREV I EW .................... , ......................................................

...............

......................... 10 1 0.2 S U RF ACE S CANS .............................................

.............................................................................. 10 1 0.3 GAMl\f.A D IRECT MEASUREl\ffiNTS

.........................................................

................................... 11 1 0.4 RA DIO UCLIDE Co CE TRAT I O N S IN Co F I RMATORY SOIL SAMPLES ............................ 11 HB PP F u el O il Ta nk Area, E u re k a, CA 111 51 67-S R-0 1-0 1 0.5 .RADIO N U C LIDE CO NCEN T R ATIO N S I N I N T E RL A BORATORY COMP A RISO N AN ALYS E S S O IL SAMPL E S ..................................

............................................................................................. 1 2 11. COMPA RI SON OF RE SUL TS W ITH REL EA SE C RIT E RI A. ..................................................... 12 1 2. A DDITI ONA L RADI O L OG I CA L S U R VEY AC T IV IT IES ......................................................... 13 1 2.1 U N IT 1 AN D U N IT 2 -GAMMA WALKO VE R S C A N S ...................................................

.............. 13 12.2 NO R THE A ST L A YDOWN AREA -GAMMA WALKOVER S C A N S ............................................... 1 3 12.3 N E W ASPHALT R OADWA Y -GAMMA WALKOV E R S C\NS ...................................................... 13 1 3. SUMMA R Y ................................................................................................................................................ 1 3 1 0. RE FE RE NCE S ...........................................................................................................................

.............. 15 A PP EN DI X A: F I GURES A PP EN D IX B: TA BL ES A PP E NDI X C: MA J O R I NS TR UMEN T A TI O N A PP EN DI X D: SU R VEY AN D ANALY TI CAL PR OCE D URES HB PP F u el Oil Ta n k Area, Eu r e k a, CA l V 5 1 6 7-S R-0 1-0 C>R , SE OAK NDOa ...-nTVTW EOUCAllON


FI G U R ES Fig. A-1. Site Location Map -Humboldt Ba y Power Plant, Eureka, California

.................................

A-1 Fig. A-2. Humboldt Ba y Power Plant -Site Overview of Surveyed Areas .........................................

A-2 Fig. A-3. HBPP Fuel Oil Tank Area -Gamma Walkover Scans ...................................................

....... A-3 Fig. A-4. HBPP FOTA -PG&E Systematic Soil Sample Locations

....................................................

A-4 Fig. A-5. HBPP FOTA -Confirmatory Soil Sample Locations

.......................................

............

.......... A-5 Fig. A-6. HBPP Unit 1 and Unit 2 Concrete Pads -Gamma Walkover Scans ................................... A-6 Fig. A-7. HBPP Northeast Lay down Area -Gamma Walkover Scans ................................................

A-7 Fig. A-8. HBPP New Asphalt Roadway -Gamma Walkover Scans ..........

..................

........................ A-8 Fig. A-9. HBPP Fuel Oil Tank Area -Gamma Scan Count Rate Distribution

......................

............ A-9 Fig. A-10. Fuel Oil Tank A rea -Pictures of the Natural Strata La ye r that Exhibited Elevated Gamma Radiation Levels ..........................

...........

..............

...................................................

..... A-10 Fig. A-11. HBPP Units 1 & 2 Concrete Pads -Gamma Scan Count Rate Distribution

.................

A-11 Fig. A-12. HBPP Northeast La y down Area Asphalt Pad-Gamma Scan Count Rate Distribution

...................

....................

........................

...................

.................

..........

A-12 Fig. A-13. HBPP New Asphalt Roadway-Gamma Scan Count Rate Distribution

...................

..... A-13 HBPP Fuel Oil Tank .Area, Eureka, CA v 516 7-SR-01-0

  • 0 RISE OAK flllOOm .-nTUlW fOft 9CCNC9: AHO U>UCAllOH

TABLES Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides-of-Concern Humboldt Ba y Power Pl a nt E ureka , California

...........................

..........................

........................

9 Table 2. Radionuclide Concentrations in FOTA Soil Samples Summary Re s ults .................................

11 Table B-1. Radionuclide Co ncentration s in ORISE Soil Samples ..........................................................

B-1

  • Table B-2. Fuel Oil Tank Area Comparison Data ............

........................................................................

B-2 Table B-3. Radionuclide Concentrations in Interlaboratory Comparison Soil Sample s .....................

B-4 HBPP Fuel Oil Tank Area, Eureka, CA vi 516 7-SR-01-0 L C>R , SE OAK AIOGa ...-nnlTW 9CIENCE AHO EDUCATION


MenepdbyORAUforhtU.S.

Depw1montofl!ntM"VY CPR cpm CSPW DCGL DQO ES I FOTA PSS GPS GWS HBPP HBRP IEAV MARSSIM MDC MeV MWe NORM NRC OOL ORAU ORI S E pCi/g PG&E RC A RER ROC SAFSTOR SOR SPCS S U A CRO NYMS Code of Federal Regulations counts per minute Characterization Survey Planning Worksheet deri ve d concentration guideline le ve l data quality objectives Enercon Service s , Incorporated Fuel Oil Tank Area final status survey global positioning system gamma walkover s cans Humboldt Ba y Power Plant Humboldt Ba y Repo w ering Project Independent Environmental Ass essment a nd Verification Multi-Agency Radiation Surve y and Site In ves ti g ation Manual minimum detectable concentration million electron volts megawatt electric naturall y occurring radioactive material U.S. Nuclear Regulatory Commission Open Outside (o f RC A) Land A rea Oak Ridge Asso ciated U ni ve r s itie s Oak Ridge Institute for Science and Education picocunes per gram Pacific Gas & Electric Company radiological control area Replicate Error Ratio radionuclide of concern cold shutdown and safe storage Sum-of-Ratios State Plane Coordinate System survey unit HBPP Fuel Oil Tank Area, E ureka , CA vu 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA viii 516 7-SR-01-0 C>R , SE OAK R100a INSTITU'T9 8CENC8 AHO EDUCAT'tON


CONFIRMATORY SURVEY OF THE FUEL OIL TANK AREA H U MBOLDT BA Y POWER PLAN T EUREKA, CALIFORNIA

1. INTRODUCTION AND SITE HISTORY The Pacific Gas & Electric Company (PG&E) operated the Humboldt Bay Power Plant (HBPP) Unit 3 nuclear reactor near Eureka, California under U.S. Atomic Energy Commission provisional license number Demonstration Power R eactor license DPR-7. HBPP Unit 3 achieved initial criticality in February 1963 and began commercial operations in August 1963. Unit 3 was a natural circulation boiling water reactor with a direct-cycle design. This design eliminated the need for heat transfer loops and large containment structures.

Also, the pressure suppression containment design permitted below-ground construction.

Stainless steel fuel claddings were used from startup until cladding failures resulted in plant system contamination-zircaloy-clad fuel was used exclusively starting in 1965 eliminating cladding-related contamination.

A number of spills and gaseous releases were reported during operations resulting in a range of mitigative activities (see ESI 2008 for details). In Ju l y 1973, Unit 3 was shut down for annual refueling and seismic modifications. However, by December 1980 it was concluded that completing the required upgrades and restarting Unit 3 would be cost prohibitive.

PG&E decided in June 1983 to decommission Unit 3, received a possession-only license amendment, and p l aced the unit into cold shutdown and safety storage (SAFSTOR). Unit 3 is currently undergoing decommissioning.

Decommissioning activities have also been completed on the adjacent fossil fuel Units 1 and 2, with all materials being removed to ground level. As part of the Humboldt Bay Repowering Project (HBRP), PG&E has built ten new fossil fuel units (16.3 MWe [megawatt electric]

each) on the site in the vicinity of Unit 3. Currently, PG&E has demolished the Fuel Oil Tank and has performed final status surveys (FSS) on the former Fuel Oil Tank Area (FOTA) soils. Hence, the U.S. Nuclear Regulatory Commission's (NRC's) Headquarters and Region IV Offices have requested that the Independent Environmental Assessment and Verification (IEA V) Program of the Oak Ridge Institute for Science and Education (ORISE) perform confirmatory surveys of the former FOTA excavation.

Due to the small footprint of the site, the licensee has found it necessary to conduct surveys of the decontaminated survey areas and then backfill and/ or pave those areas to allow for further decommissioning work. Therefore, the RC requested that ORISE perform confirmatory surveys coincident with the HBPP Fuel Oil Tank Area , Eureka, CA 516 7-SR-01-0

  • C>RISE OAK NDOa ..-nT\llW H>A llCIENCe AHO EDUCATION

licensee's surveys and so il sa mpling prior to b ackfilling. During the ORISE survey activities, the NRC also requested additional radiological s urve y activities consisting of gamma walkover scans (GW S) of the newl y paved road along the north and east side of the site, the Unit 1 and Unit 2 concrete pads and the Northeast Laydown Area. 2. SITE DESCRIPTION The HBPP site, owned b y PG&E, consists of 143 acres on the southern edge of Humboldt Ba y four mile s sou thwest of the town of Eureka, in Humboldt County, in the State of California (Fig. A-1). PG&E maintains ten new operating electric generating units at the HBPP site (i n the New Generation Footprint Area) that run on fossil fuels, two non-operating fossil fuel units (Units 1 and 2) and one non-operational nuclear unit (Unit 3). Units 1 and 2, which were recentl y decommissioned to ground level, were interconnected with and west of Unit 3 (ES I 2008). The remaining property includes mostl y open areas and protected wetlands.

2.1 F UEL O IL TANK AREA (FOTA) The FOTA, pictured in Figs. A-2 and A-3, co vers approximately 6,500 square meters (m 2) and is located in the northwest section of the HBPP to the west of Units 1 and 2, north of the Intake Canal and south of the Independent Spent Fuel Storage Installation.

Within the FOTA is a bermed soil area that contains some asp h a l t roadway on portions of the berm and concrete pads, which are positioned between a n access ramp and metal stairs. With the exception of the areas that were remediated from under the tank and immediatel y adjacent to the tank due to h y drocarbon contamination, the soil remains at the level that existed when the fuel oil tank was present. FSS activities were performed on a section of the FOTA so that a portion of the FOTA could be used for a soil pile. ORISE did not perform any confirmatory activities of that portion of the FOTA. The FOTA is identified as an Open Outside (of the Radiological Control Area) Land Area (OOL) by PG&E. The survey unit (SU) designation is OOL10. 2.2 UNIT 1 AN D U NI T 2 CONCRE TE PAD S The Unit 1 and Unit 2 concrete pads are located east of the FOTA and west of the nit 3 (the Reactor Building). These were where the fossil fuel units once stood (Fig. A-2). Portions of these pad areas were in use for radiological waste container storage and as material la y down areas and these portions were therefore ina cc essible. HBPP Fuel Oil Tank .Area, Eureka, CA 2 5167-SR-01-0 C>R , SE ON< M>CMf ..anT\ITW POA ICIENCa AHO EDUCATION


DeportrnentOllE.norw 2.3 NO RTHEAST LAYDOWN AREA The Northeast La y down Area is located northeast of U nit 3 and the curve of the New A sphalt Roadwa y and west of the Discharge Canal (Fig. A-2). The area has been repaved with asphalt and at the time of the GWS, a portion of the area was inaccessible due to radiological waste containers and other radiological waste storage bins. 2.4 N EW A SPHALT RO ADWAY The New Asphalt Roadway stretches from an east/west direction at the northern portion of the site and curves to a north/ south direction along the eastern portion of the site just east of Unit 3 and west of the Discharge Canal (Fig. A-2). 3. OBJECTI V ES The objective of the confirmatory side-by-side surve y was to generate independent radiological data for use b y the NRC in evaluating the adequacy and accurac y of the licensee's radiological soil sampling results from the FOTA. Data collected by ORISE and the licensee were reviewed to assess whether classifications based on the Multi-Agenr y Radiation Surory and Site Investigation Manual (MARSSIM) (NRC 2000) were appropriate; whether radionuclides of concern (ROCs) were detected above historically low levels in the HBRP footprint (i.e., averaged 0.38 picocuries per gram [pCi/ g] for cesium-137

[Cs-137] and non-detected for all other ROCs); and, whether data quality were sufficient for comparison to generic NRC screening values and FOTA-specific derived concentration guideline levels (DCGLs). During the ORISE confirmatory survey activities for the FOT A, the NRC site representative also tasked ORISE with performing GWS of three additional areas as stated in Section 1. 4. DOC U MENT REVIEW ORISE has reviewed PG&E's Characterization Surory Planning Worksheet (CSPW) (PG&E 2012). Since the FOTA was classified as Class 3 SU as described in Section 5, it was PG&E's intention to use the data as FSS data in the event that the characterization survey findings met the classification criteria for a Class 3 SU. The characterization plan worksheet was specifically reviewed for historical information and to identify the ROCs and the applicable DCGLs for the FOTA. ORISE also reviewed preliminary FSS data for the soil pile area within the FOTA. The purpose of these reviews was to ensure that regulatory requirements were being met by PG&E and to develop the HBPP Fuel Oil Tank Area , Eureka, CA 3 516 7-SR-01-0 OR , SE OAK NDQI: ...-nT'\l1W 110A ll>UCATION


confirmatory survey plan. ORISE also ensured that the current FSS activities within the area were a dequate and appropriate, taking into account any supporting documentation and MARSSIM guidance (NRC 2000). 5. DATA Q U ALI TY OBJECTIVES The ORISE independent confirmatory survey planning relies on the Data Quality Objectives (DQO) process to design and implement the confirmatory activities planned for the HBPP site. The DQO process includes the following seven steps:

  • Step 1: State the problem
  • Step 2: Identify the decisions
  • Step 3: Identify inputs to the decision s
  • Step 4: Define the study boundaries
  • Step 5: Develop a decision rule
  • Step 6: Specify the decision errors
  • Step 7: Optimize the survey design The confirmatory DQO steps for the HBPP s ite were as follows:
  • Step 1, problem: The confirmatory survey must assess the reliability and adequacy of the HBPP FSS results.
  • Step 2, decisions:

Are HBPP procedures sufficiently robust to identify residual material with concentrations that exceed the DCGL s for the ROCs, and are the residual concentrations of the primary ROC, Cs-137, sufficiently low (a t background levels)?

  • Step 3, decisions inputs: The decision inputs included:
1) gamma walkover scan results, and 2) soil sample results and comparison of ORISE and PG&E soil sample concentrations.
  • Step 4, study boundaries:

The former FOTA is the study boundary.

  • Step 5, decision rules: There were two decision rules. The first was ba se d on the comparison of the confirmatory soil sample results to the HBPP FSS results and to the site cleanup goals. The second rule was based on surface scan and judgmental sample results to HBPP Fuel Oil Tank Area, Eureka, CA 4 5167-SR-01-0
  • 0 RI S OAK NOCMI ..-mvTW "'°" 9CaNCa NIO E>lJCATIOH

determine whether any residual " hot s pots" were present and if the FOTA had been cla ssifie d appropriately as Class 3.

  • Step 6, decision errors: The gamma wa lk over scans an d si de-by-side split soil sample results should be in goo d agreement and soil sa mple re s ult s for the MARSSIM Class 3 Survey nit should be at or near background le ve ls and all ROCs below the CSPW survey design release criteria.
  • Step 7, survey design optimization:

The s urve y design was optimized to collect the appropriate data ba se d on the procedures detailed below. 6. CONFIRMATORY RADIOLOGICAL SURVEY PROCEDURES To expedite the survey process, ORISE coordinated and worked with the NRC site representative as the licensee planned their s urve y activities.

This assured that O RIS E would complete s ide-b y-side confirmatory surveys at such a time as the lic ensee determined the probability of satisfying the FSS DQOs was high. ORISE personnel visited the HBPP site from February 14 to 15, 2012 to perform visual inspections and independent measurements and sampling.

The radiological survey activities were conducted in accordance with a project-s pecific plan submitted to and approve d b y the RC, the ORISE Suro ry Pro cedures Manual and the Oak Ridge Associated Universities (ORAU) Q11aliry Program Manual (ORISE 20 1 2, 2008 and ORAU 2011). 6.1 S U R VEY UNIT C LASSIF ICATION PG&E classifies SUs in accordance with MARSSIM guidance RC 2000) with three classification s for impacted areas, b ased on contamination potential-as either Class 1, 2, or 3. The FOTA ha s been classified by PG&E as a Class 3 SU and the historical documentation supports this classification.

Class 3 area are designated as any impacted areas th at are not expected to contain residual contamination, or are expected to contain levels of residual contamination at a small fraction of the DCGL. Although the FOTA is a Class 3 SU, ORISE confirmatory survey activities coverage within the FOTA SU were conservative an d on the sa me order of rigor as the PG&E CSPW (PG&E 2012). The PG&E CSPW called for 100% gamma scan coverage of the FOTA. Also, a portion of the HBPP Fuel Oil Tank Area, E ureka , CA 5 516 7-SR-01-0

  • RISE OAK NOOa ..-rmn9 110A 8CIDICa NIO EDUCATION

FOTA had already been s urve ye d and so il sam ples had been collected b y the licen see. This was done so that a dirt pile could be pl ace d in thi s porti o n of the FOTA SU. 6.2 RE FE RENC E S YSTEM Global p os iti o ning system (G PS) c oor dinate s were used for referencing measurement an d sam plin g locations. The s pecific reference system used by the licen see was the California State Pl ane Coordinate S ys tem (SPCS FIPS 0401 U S Surve y feet; orth American Datum 83). 6.3 S U RF A C E S CANS High-density gamma radiation surface scans were conducted over the soil, concrete, and asphalt surfaces within the FOTA, the area of intere s t for this survey report (Fig. A-3). Surface s cans were performed u si ng sodium iodide thallium-activated (Nal[Tl])

s cintillation detector s coupled to ratemeter-scalers with audible indicators.

Detectors were also coupled to g lobal p osi ti oning systems (G PSs) that enabled real-time ga mma count rate and p os ition data capture. Field per so nnel relied on the audio output to identify and mark any locations of elevated direct gamma radiation for further investigations that mi g ht s u gges t the presence of residual contamination.

6.4 G AMMA DIR ECT M EASUREMENTS A one-minute static gamma count rate mea s urement was performed at each of the twelve remaining characterization soil samp le locati o ns determined per PG&E for the FOTA (F ig. A-4). A fter each soil sample was collected , a po s t-sample one-minute static gamma count rate was performed.

Pre-and post-sample gamma direct measurements were also performed at judgmentall y-s elected locations exhibiting elevated ga mma radiation level as determined b y surface scans (Fig. A-5). 6.5 SOI L S AM P LING 6.5.1 S ys t e m a tic S a mpl e L o c a tion s Twel ve duplicate systematic s urface sa mple s, 0 to 15 cm each, were collected from the FOTA at locations predetermined in the PG&E CSPW (Fig. A-4). Although ORISE collected one of the duplicate samples in conjunction with PG&E personnel, the final number of so il samples retained for confirmatory analysis d epe nded upon the ORISE gamma direct mea s urement results and/ or the PG&E preliminary gamma s pectroscop y analyses of the ORISE samples. Ba se d on the ORISE review of the aforementioned data, four of the twelve sys tematic soil sample duplicates were HBPP Fuel Oil Tank Area, Eu rek a, CA. 6 5167-SR-01-0 C>R , SE OAK A100a ...nTUTE FOR 8C1ENCa NllO EDUCAllON


_,.,......,ONWfo<

.... U.&-of"'-vY retaine d for radio l ogical analyses (PG&E samples OOL10-1, 2, 7, and 11 which corresponded to ORISE samples S001, 2, 7, and 11, respectively).

Refer to Figs. A-4 and A-5, and Table B-1. 6.5.2 Judgment a ll y-Selected S a mpl e Loc a ti o ns Judgmental surface so il samples were collected at six locations of suspected elevated gamma radiation detected during the ORISE GWS of the FOTA surfaces (Fig. A-5). Since these were judgmental samples, ORISE requested each of these samples for independent analyses.

These were ORISE samp l es S016 to S021 (Refer to Fig. A-5 and Table B-1). 6.6 INTERLABORA T OR Y CO M PARISON AN ALY SE S Since some areas within the FOTA were covered with clean fill prior to ORISE gaining access, thus precluding direct confirmatory surveys for the soil pile area, ORISE requested that the three samp l es previously collected b y PG&E (PG&E samples OOL10-4, 9, and 15, which were ORISE samples S004, 9, and 15, respectively) be provided to ORISE for interlaboratory comparison analysis.

HBPP Fuel Oil Tank A rea, Eureka, CA 7 516 7-S R-0 1-0

7. ADDITIONAL RADIOLOGICAL S U R V E Y PROCED U RES At the request of the NRC site representative, ORISE also performed limited, low-density radiological GWS of three other areas: the Unit 1 and Unit 2 remaining concrete pads (Fig. A-6), the Northeast Laydown Area (Fig. A-7), and the newl y paved asphalt haul road (Fig. A-8). The additional surveys were to provide radiological scan data to ensure that radiological contamination was not being spread by continuing decommissioning activities of the Unit 3 reactor on previousl y released site surfaces as per the Cross Contamination Pre vention and Monitoring Plan (CC PMP) (PG&E 2008). 8. RADION U CLIDE S OF CONCERN The major ROC identified in the FOTA was Cs-137. A complete listing of ROCs and associated generic NRC Screening Values and FOTA-specific DCGLs are provided in Table 1. The soil DCG Ls are reported in units of picocuries per gram (pCi/ g). HBPP Fuel Oil Tank Area, Eureka, CA 8 5167-SR-01-0 C>R , SE OAK NOa8 IMST1T\ITE FOR 8CaNCtl AHO EDUCA TION ----------------------------

Table 1. Derived Concentration Guideline Levels for Surface Soil Radionuclides of Concern Humboldt Bay Power Plant Eureka, California Nuclide NRC Screening Value DCGLs (pCi/ g)* FOT A-Specific DCGLs (pCi/ g)b Easy to Detect -Gamma Spectroscopyc Co-60 3.8 1.9 Nb-94 5.8 2.9 I-129 0.5 0.25 C s-137 11 5.5 Eu-152 8.7 4.35 Eu-154 8 4 Np-23 7 d 11 5 -Hard to Detect -Wet Chemistryc H-3 1 1 0 55 C-14 12 6 Ni-59 5,500 2,750 Ni-63 2, 1 00 1,0 5 0 Sr-90 1.7 0.85 Tc-99 1 9 9.5 Pu-238 2.5 1.2 5 Pu-239 2.3 1.1 5 Pu-240 1,240 Pu-241 72 36 A m-241 2.1 1.05 Cm-243 3.2 1.6 Cm-244 2,200 Cm-245 276 Cm-246 1 , 1 90 *Derived concentration guideline levels from UREG-1 757, Volume 1, Revision 1 Table B-2 (NRC 2003) bDCGLs a p plied under the Characterization Survry Pia1111ing Worksh e et for the HBPP FOTA correspond to the l esser of either an annual dose of 15 mrem/y (the 25 mrem/y DCGL adjusted to an assumed California Department of Toxic Substance Contro l risk-based release of 15 mrem/y) or 50% of the NRC Screening Va l ues (PG&E 2012) c Easy-to-detect radionuclide concentrations determined via gamma spectroscopy dNRC Screening Va l ue not provided <Hard-to-detect radionuclide concentrations may be determined with wet chemistry analytical procedures based on the gamma spectroscopy results and with guidance from the NRC site representative HBPP Fuel Oil Tank Area, Eureka, CA 9 5167-SR-0 1-0 C>R , SE OAK A100a ..-nTUTE FOfll llCll£NC&

NID IEDUCATtON


9. SAMPLE ANALYSIS AND DATA INTERPRETATION Samples and data were returne d to the ORISE laboratory in Oak Ridge, Tennessee for anal y si s and interpretation. Sa mpl e analyses were performed i n accordance with the ORISE Laboratory Procedures Manual (ORISE 2011 ). Soil samples were anal yz ed b y gamma spectroscop y with the primary ROC being Cs-137; however, s pectra were al s o reviewed for other gamma-emitting radionuc lid es (i.e., fission and activation products) associated with the HBPP. After reviewing the ga mm a spectros c opy results, wet chemistry analyses for additiona l radionucli d es such as Ni-63, Sr-90, and transuranics were deemed not necessary. Soil samp l e results were reported in units of pCi/ g. Gamma count rate measurement re s ults were reported in units of counts per minute (cpm). The data generate d were compared with the PG&E anal y tical re s ults (specifically for Cs-137) and then with the CSPW surve y design release criteria established for t h e primary site-specific ROC for the FOT A. All sample results were compared \.vith the FOTA-specific applicab l e DCGL and MARSSIM guidance to determine if the FOTA Class 3 designation was appropriate. Additional information regarding instrumentation and procedures ma y be found in A ppendices C an d D. 10. FINDINGS AND RESULTS The results for each radiological s u rve y procedure component are discussed in the following sections.

10.1 DOCUMENT REVIEW The O RI SE reviews of PG&E's CSPW and preliminary radiological data indicated that the procedures and methods implemented were appropriate for the FOT A (PG&E 2012). 10.2 SURFACE SCANS Gamma radiatio n surface scans identified six areas of elevated gamma radiation, primaril y along the excavation trenches used to drain standing water from the site, along other surfa c e water runoff areas, a nd at the asphalt entrance at the northeast corner of the b erm. The gamma scan paths and the normali z ed count rate in cpm are provided in Fig. A-3. The gamma scans ranged from less than 3,800 to 11,390 cpm. Figure A-9 is the frequency histogram of the normali z ed walkover gamma count rate data population for the FOTA; the histogram indicates a normal distribution typical of the background concentrations associated wit h those areas. O RI SE did observe slightly e l evate d HBPP Fuel Oil Tank Area , E ureka, C A 1 0 516 7-SR-0 1-0 C>R., SE OAK NDOm ll'OA 8QIENCa: AHO EDUCATION



gamma radiation levels over the ground surface where the standing water excavation trench dirt was piled. Further investigation indicated a natural soil strata la y er deposit. The dark lines in the trench pictures (Fig. A-10) indicate the locations where the elevated gamma radiations were in the southern portion of the FOTA near where the former fuel tank used to be located. The ORISE GWS data indicates that the low gamma radiation levels associated with the Class 3 SU is typical of background leve l s that ranged from 3 , 200 to 5,400 cpm o v er the various surfaces (soil, asphalt and concrete) within the FOTA. 10.3 GAMMA DIRECT MEAS U REMEN TS Gamma direct measurements were performed at each soil sample location.

The results indicated that gamma radiation levels were at or near background levels (3,500 cpm). ORISE selected soil samples from locations that exhibited the highest gamma radiation levels even though those locations were slightly above background levels. 10.4 RADIO NU CLID E CONCEN T RA T ION S IN CON F I RMAT OR Y SOI L S AM P LES The summary data for the FOTA s y stematic and judgmental soil samples are presented in Table 2. The data for the radionuclide concentrations in individual samples are provided in Table B-1. All soil results for Cs-137 were less than the respective FOTA CSPW designed release criteria for each individual soil samp l e. Total uranium concentrations, as a naturall y occurring radioactive material (NORM), are provided to account for the elevated gamma radiation levels determined by the GWS in the FOTA. Table 2. Radionuclide Concentrations in FOT A Soil Samples Summary Results Soil Sample Summary Cs-137 S ys tematic 0.03 to 0.37 Mean Concentration 0.26 Judgmental

-0.01 to 0.51 Mean Concentration 0.14 *Total U = U-238

  • 2 + U-235 b Zero v alues due to rounding HBPP Fuel Oil Tank Area, Eureka, CA Radionuclide Concentrations (pCi/ g) Co-60 U-235 U-238 Total U* -0.02 to 0.01 0.04 to 0.16 0.15 to 0.69 0.34 to 1.48 0.001 0.0 7 0.45 0.9 7 -0.01 to 0.01 -0.02 to 0.08 0.28 to 1.84 0.60 to 3.75 0.00 0.04 0.8 2 1.69 11 516 7-SR-01-0 C>R , SE OAK ..:>Oii ....-nnnw H>flll 8CCHCa AHO EOUCATIOH

MenogedbyORAUforhtU

.&OepenmentofEnorgy ORISE also performed a comparison of the ORISE and PG&E soil samples results (Ta ble B-2). PG&E's Cs-137 results, for those samp le l o cation s where both ORISE and PG&E provide analytical data, are in good agreement and indicate that the FOTA Cs-137 concentrations are at background levels. 10.5 RADIO NU CLID E CO N C ENTRAT IO NS IN IN TERLAB O RAT OR Y CO MPARIS O N ANALYSES SOI L S AM P LES The results of the interlaboratory comparison soil samples indicate that the ORISE and PG&E radiological so il sample results are in good agreement.

The comparison so il sample results are presented in Table B-3. 11. COMPARIS O N OF RES U LTS W ITH RELEASE CRI T ERIA The applicable site-specific soil DCGLs for the ROCs are provided in Table 1 and ha ve been approved b y the NRC (ESI 2007). The primary ROC for the FOTA, as designated b y the CSPW, was Cs-137. To demonstrate compliance with the Table 1 FOTA-specific criteria, each radionuclide concentration should be less than its respective DCGL-with consideration for small areas of elevated activity----as well as application of the unity rule (S um-of-Ratios

[SOR]). The uni ty rule requires that the sum of the concentration of each contaminant divided by the respective guideline be less than one. Con c 1 Co nc 2 C oncn SOR = DCGL 1 + D C GL 2 + ... + DCGl n ::::; 1 Cs-137 and Co-60 were the only identified ROCs in the ORISE-analyzed soil samples. ORISE also reported the uranium concentrations to determine the natural concentrations associated with the ORM soil strata determined in the FOTA. Radionuclide concentrations in soil samples were directly compared with the Cs-137 DCGLs prov i ded in Tab l e 1. ORISE did not apply the unity rule/SOR in the activity calculations for each of the soil samples since the primary ROC, Cs-137, was well below the release criteria and a review of the gamma spectroscopy data did not indicate any other easy-to-detect ROC other than Co-60. Each of the 13 soil samples analyzed by ORISE was below the individual Cs-137 FOTA-specific release criteria.

HBPP Fuel Oil Tank Area, Eureka, CA 12 516 7-SR-01-0 C>R , SE OAK AK>oa ....-mvTW FOA 8CCNCW AHO EOUCATlON

12. ADDITIONAL RADIOLOGICAL SURVEY ACTIVITIES 12.1 UNIT 1 AND UNIT 2 -GAMMA WALKOVER SCANS GWS over the Unit 1 and Unit 2 concrete pads indicated a gamma count rate range from less than 3,300 to approximately 13,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surve y or was in the proximity of radiological waste containers and the radwater waste treatment facility.

Elevated gamma radiation levels were not found on the portion of the concrete pads that were scanned. The GWS results are presented in Fig. A-6 and the GWS frequency histogram is provided in Fig. A-11. 12.2 NORTHEAST LA Y DOWN AREA -GAMMA WALKOVER SCANS G\VS over the Northeast La y down Area asphalt pad indicated a gamma count rate range from less than 3,000 to approximatel y 21,000 cpm. The elevated gamma radiation levels were determined to be from shine when the surve y or was in the proximity of radiological waste containers and other wrapped radiological waste. The highest count rate was on a pie<:::e of equipment that had been determined to an X-bar equipment lift; this piece of equipment was determined to not be tagged wit h a radiological identification tag). Elevated gamma radiation levels were not found on the portion of the Northeast La y down A rea asphalt pad that was scanned. The GWS results and a picture of the X-bar are presented in Fig. A-7 and the GWS frequency histogram is provided in Fig. A-12. 12.3 NEW ASPHALT ROADWAY-GAMMA WALKOVER SCANS GWS over the new asphalt roadway indicated a gamma count rate range from less than 3,400 to approximatel y 11,000 cpm. The elevated gamma radiation levels were determined to be from shine w h en the surve y or was in the proximity of radiological waste containers and the radiological cleanup work associated with the reactor decommissioning.

E l evated gamma radiation levels were not found on the portion of the asphalt roadwa y that was scanned. The GWS results are presented in Fig. A-8 and the GWS frequency histogram is provided in Fig. A-13. 13.

SUMMARY

During the period of February 14 to 15, 2012, ORISE performed radiological confirmatory surve y activities for the former FOTA and additiona l radiological surve y s of portions of the HBPP site in Eureka, California.

The radiological survey results demonstrate that residual surface soil HBPP Fuel Oil Tank A rea, E ureka, CA 13 516 7-SR-01-0 C>R , SE OAK ..:>QA ...-nTVTa FOR 8C1ENCa: AHO IEDUCAnoN


contaminati o n was not present significantly above background le vels wit hin the FOTA. Therefore, it is ORISE's op ini on that the radiological condition s for the FOTA s u rveye d by ORISE (refer to Tables 2 and B-1) are c o mmensurate with the site release criteria for final sta tus surveys as specified in PG&E's CharacteriZfllion Sttrory Planning Worksheet (PG&E 2012). In addition, the confirmatory results indicated that the ORISE FOTA SU Cs-137 mean concentrati o n s results c o mpared favorably with the PG&E FOTA Cs-137 mean concentration results , as determined by ORISE from the PG&E characteri za tion data (refer to Table B-2). The interlaboratory comparison a nal ys es of the three soil samples analyzed b y PG&E's onsite laboratory and the ORISE laboratory indicated good agreement for the sample results and provided confidence in the PG&E analytical procedures and PSS soil sample data reporting (Table B-3). HBPP Fuel Oil Tank Area, Eureka, CA 14 5167-SR-01-0

  • C>RISE OAK N008 INS1'fTU'TE FOfll 8CENC9i AHO EDUCATION

10. REFERENCES Enercon Services, Inc. (ESI) 2007. Site CharacteriZfltion Plan -Humboldt Bery Power Plant. HBPP-PP-003, R ev. 0. Jul y 16. ES I 2008. Historical Site Assessment, prepared for the Humboldt Ba y P ower Plant Pacific Gas & E lectric Com p a n y, E ureka, Ca lifornia. D raft. September.

Pacific Gas & E lectric Co mpan y (PG&E) 2008. Cross Contamination Prevention and Monitoring Plan. Prepared for the Humb o ldt Ba y Power Plant, Pacific Gas & El ectric Co mpan y, Eureka, California.

HB A P C-220. October 14. PG&E 2012. Characterization Surory Pl anning Worksheet.

Prepared for the Humboldt Ba y P ower Plant , Pacific Gas & E lectric Company, E ureka, California.

Draft; Revisi o n 3. February 9. Oak Rid ge Asso ciated U ni ve r s ities (O RA U) 20 11. Quality Pro gram Manual for the Indep endent Environmental Assessment and Verification Pro gram. Oak Rid ge, Te nne ssee. D e c e mber 1. Oak Rid ge In s titute for Science and E ducati o n (ORISE) 2008. Surory Procedures Manual for the In dependent Environmental Assessment and Verification Pro gram. Oak Rid ge, Tennessee.

May 1. ORISE 2010. Radiation Prot ection Manual. Oak Rid ge, Tennessee.

June 3. ORISE 2011. Laboratory Procedures Manual for the Indep endent Environmental Assessment and Verificat ion Program. Oak Ridge, Tennessee.

December 1. ORISE 2012. Final Prqj ect-S p ecific Plan far th e Indep endent Confirmatory Survry of the Former Fue l Oil Tank Area at the Humboldt B ery Po we r Plant , Eureka, California.

DCN: 516 7-PL-0 1-0. Oak Rid ge, Tennessee. February 9. U.S. uclear Regul a t ory Co mmi ss ion (NRC) 2000. Multi-Agenry Radiation Surory and Site In vestigation Manual (MARSSIM), NUREG-15 75; Revision 1. Washington, DC. August. NRC 2003. Cons olidat ed NM SS D ec ommission ing Guidance:

D ecomm iss ioning Process for Materials Licensees.

NUREG-1 757; Volume 1 , Revision 1. Washington, D C. September.

HBPP Fuel O il Tank .Area, Eureka, CA 1 5 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 HBPP Fuel Oil Tank Area, Eureka, CA APPENDIX A FIGURES 5167-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 D Site Loc a tion 0 50 1 00 Mil e s Nevada Arizona ll11r1 Humboldt B ay Pl a nt E urek a, C a hforru a ORISE Crea t ed b)': A. H oo d Date: 26, 201 1 Fig. A-1. Site Loc a tion M ap -Humboldt Ba y Power Plant, Eureka, C a liforni a HBPP Fuel Oil Tank Area, Eureka, CA A-1 5167-SR-01-0 Su rveye d Ar eas "" II F uel Oil Tanlc Area t H umbo ldt B ay --U ni t 1 an d 2 C onc r ete P a d s P ower Pl ant 51 67 --Northeast Lay d own Area Eureka, C alifor ni a --N ew As ph alt R oa d ORISE 0 50 100 C rc a r c d b y: A. H ood D a r e: 27 , 20 1 2 Miles "f\IEA Fig. A-2. Humboldt Ba y Power Pl a nt -S i te Overview of Surve y ed Areas HBPP F u el Oil Ta nk .A r ea, E ur eka, CA A-2 516 7-S R-0 1-0 Normalized Gamma Count Rate (CPM) .. 10001 -11390 .. 4601 -5000 6201 -10000 .. 4201 -4600 5801 -6200 .. 3601 -4200 .. 5401 -5800 .. < 3800 .. 5001 -5400 Survey Boundary 0 20 40 Feet II Humb o ldt Ba:;;:er Pl an t 5167 Gamma Walkover Scans ORISE Cn!it.ted b y: A. 1 lo o d Date: February 2.1, 2012 Fig. A-3. H BPP F uel O il Tank Area -Gamma Walkover Scans HBPP Fuel Oil Tank A r e a, E ureka , C A -3 516 7-SR-01-0

"' Survey B oun d ary t C oncrete R emnan t 0 25 Feet 50 Humboldt Bay Power Plant 5167 Site Sample Locations Cr e a ted b y: A. H ood D a t e: Febru a ry 8, 2012 l'\IEA Fig. A-4. HBPP FOTA -PG&E S y stematic Soil Sample Locations HBPP F uel Oil T a nk Are a, E ur e ka, CA A-4 516 7-SR-01-0

-Survey Boundary Inaccessible

  • O RISE J udgmental Sample Location
  • H B PP Systematic Sample Location 0 25 Feet A ORI SE Soil Samples at H BPP Systematic Location 50 II ORISE Humboldt Ba y Power Plant 5167 FOTA Soil Sample Locations Created b y: A. H ood D ate: Fitbrua.ry 23, 2012 'r:\JEAV\PUIJ8Cn

\S167 Humboktt\GIS\ F i g. A-5. HBPP FOTA -Confirm a t ory Soil S a mple L oca ti o n s H BPP F uel Oil Tank Area, Eureka, CA A-5 516 7-S R-01-0 Normalized Gamma Count Rate (CPM) 9301 -13332 .. 5301 -6300 8301 -9300 -4301 -5300 .. 7301 -8300 -3301 -4300 .. 6301 -7300 -< 3300 0 10 20 -=:::J Feet r II Humboldt Pl ant 5167 Gamma Walkover Scans ORISE Created by. A. Hood D ate: February 23, 2012 F ig. A-6. HBPP Unit 1 and Unit 2 C oncrete P ads -G amma Wa l kover Scans HBPP F uel Oil Tank Area, Eureka, CA A-6 5167-SR-01-0 10001 -15000 3601 -3700 .. 4501 -10000 .. 3301 -3600 .. 4201 -4500 .. 3001 -3300 .. 3901-4200 .. < 3000 0 10 20 Feet Ctt a ted b y: A. H ood D a le: Februar y 23, 2012 Fig. A-7. HBPP Northeast Laydown Area -Gamma Walkover Scans HBPP Fuel Oil Tank Area, Eureka, CA -7 516 7-SR-01-0 Gamma Count Rat e (CPM) .. 10001 -10633 -5601-6700 1 Humboldt B ay P ower Plant 5167 -4501-5600 New R oa d 8901 -10000 Gamm a Walkover Scans .. 7801-8900

-3401-4500 ORISE 0 25 50 .. 6701-7800

-<3400 Feet Created by: A. Hood Da1c: Febr u ary 23, 2012 'l"'IL.A\"*_Pft'lllflC'9\Slrll..-boldt(J.I" Fig. A-8. HBPP New Asphalt R oadway -Gamma Walkover Sc ans HBPP Fuel Oil Tank Area, E urek a , CA A-8 516 7-SR-01-0 Humboldt Bay Power Plant -Fuel Oil Tank Area Normalized Count Rate Histogram 900 800 700 600 Q. 500 0 c 400 r:T ... 300 200 100 3000 3500 4000 BKG = background Median BKG = 5051 CPM 4500 5000 5500 6000 6500 7000 Normal i zed Count s Per M i nute (CPM) Maximum Count Rate= 11 , 390 CPM \ 7500 8000 8500 More Fig. A-9. HBPP Fuel O il Tank Area -Gamma Scan Count Rate Distribution Fig. A-10. Fuel Oil Tank Area -Pictures of the Natural Strata La y er that Exhibited Elevated Gamma Radiation Levels HBPP Fue l Oil Tank Area, Eureka, C A-10 516 7-S R-0 1-0

0. u -0 c .. :I Cl" ... 1 200 1 000 800 600 400 200 Humboldt Bay Power Plant -Units 1 & 2 Concrete Pads Normalized Count Rate Histogram Median BKG = 6,436 CPM Maximum Count Rate = 13,33 2 C P M 0 3000 3800 4600 54 00 6200 7 0 00 7800 8600 9400 10200 11000 11800 12600 More Normalized Counts Per Minute (CPM) BJ.;:G = backgr ound Fig. A-11. HBP P U nits 1 & 2 Concrete P a d s -G a mm a Sc a n C ount R a te D is tr i bution

"' 200 180 160 140 120 0 100 c Qj :I 80 ... 60 40 20 Humboldt Bay Power Plant -Northeast Laydown Area Count Rate Histogram Median BKG = 3 , 674 CPM These outliers represent the elevated gamma activity around the rad waste conta i ners . 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 More Counts P er Minute (C P M) BJ.;:G = backgrow1d

/.r, F i g. A-12. HBPP Northe a st L ay down Ar ea Asph a lt P ad -G a mm a Sc a n Count R a te Distribution 6

  • -* c 8 If n > 250 200 ,; e; 150 0 c Cll 5-100 "" so 0 Humboldt Bay Power Plant -New Asphalt Roadway Count Rate Histogram M e d ian B KG = 6,672 CPM 5000 5500 6000 6500 7000 7500 8000 8500 9000 95 0 0 10000 More Counts Per M i nute (CPM) BK G = b a ck gr oun d Fig. A-13. H B PP Ne w A s ph a lt R oa d way -G a mm a Sc a n C ount R a te D i s t ri but i on THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank .Area, E ureka , CA 516 7-SR-01-0 HBPP F uel Oil Ta nk Area, E ur eka, CA APPENDIX B TABLES 516 7-S R-0 1-0 THIS P AGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 I c;;; 0 ""I1 §. 2 ..., " ;:: ,,. " ? ::i !:; " F n > '? °' _. "' "' s 6 Table B-1. Radionuclide Concentrations in ORISE Soil Samples Confirmatory Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California Cs-137 *** U-235 U-238 Humboldt B ay Systematically-Selected Soil Sample Location s SOO l 594907 1 2160777 003 +/- 0.02< -0.0 1 +/- 0.04 O.Q7 +/- 0.06 0.26 +/- S002 5948982 2160894 0.30 +/- 0.04 0.0 1 +/- 0.04 0.05 +/- 0.1 4 0.52 +/- S004 5948902 2160738 0.25 +/- 0.04 OO()d +/- 0.04 0.04 +/- 0.08 0.24 +/- S007 5949124 2 1 60907 0.37 +/- 0.04 0.00 +/- O.Q3 0.06 +/- 0.11 0.67 +/- S009 5948880 2 1 60868 0.20 +/- 0.02 O.Ql +/- O.Q3 0.1 6 +/- 0.1 1 0.59 +/- SO ll 5949 146 2160803 0.34 +/- 0.04 0.00 +/- 0.04 0.10 +/- 0.08 0.69 +/- S015 5948869 2160764 0.3 5 +/- 0.04 -0.02 +/- 0.04 0.04 +/- 0.11 0.15 +/- FOTAAvr:rage 0.26 0.00 0.07 0.45 FOT A Standard Deviati on 0.12 0.01 0.04 0.22 ORISE Jud gmental Soil S a mple Locati o ns S016 5948965 2 1 60774 0.02 +/- 0.0 1 0.00 +/- 0.03 0.08 +/- 0.06 0.72 +/- S017 5948969 2160768 0.00 +/- 0.03 0.00 +/- O.Q4 0.08 +/- 0.06 1.11 +/- 5018 5948967 2 16 0766 -0.0 1 +/- 0.03 O.Ql +/- 0.05 0.07 +/- 0.09 1.84 +/- 5019 5949108 2 16 0832 0.29 +/- O.Q3 -0.01 +/- 0.03 -0.0 2 +/- 0.13 0.58 +/- S020 5949061 2 16 0958 0.01 +/- 0.02 0.00 +/- 0.03 0.04 +/- 0.09 0.28 +/- S02 1 5949062 2160970 0.51 +/- 0.05 0.00 +/- 0.04 -0.01 +/- 0.12 0.4 1 +/- Judgmental Average 0.2 7 0.00 0.04 0.82 *Refer to Figs. A-4 and A-5 bTot al Uranium calculations for natural uranium were 2*U-238 + U-235 <Uncertainties repre s ent d1e 95°'o confidence Je,-el, ba se d on total propagated uncertaintie s d Zero ,-alues a.re due to row1ding Total Ub 0.28 0.59 +/- 0.56 0.32 1.09 +/- 0.66 0.33 0.52 +/- 0.66 0.33 1.4 0 +/- 0.67 0.2 1 1.34 +/- 0.43 0.32 1.4 8 +/- 0.64 0.36 0.34 +/- 0.73 0.97 0.4 7 0.30 1.52 +/- 0.60 0.34 2.30 +/- 0.68 0.42 3.75 +/- 0.84 0.24 1.14 +/- 0.50 0.23 0.60 +/- 0.47 0.27 0.8 1 +/- 0.55 1.69

> ;; ? " ? () > ORISE Sample ID* SOOl S002 S003 S004 SOOS S006 S007 SOOS S009 S010 SOll S012 S013 S014 S015 Table B-2. Fuel Oil Tank Arca Comparison Data Survey Activities for the Fuel Oil Tank Arca Humboldt Bay Power Plant Eureka, California PG&E Sample East (ft) Nonh (ft) Cs-137 Concentrations (pCi/g) I Db ORISE PG&E c Humboldt B ay S ys t e m a ticall y-Selected Soil Sampl e Loc a tions OOLl0-1 5949071 2160777 0.03 +/- 0.02< <0.120 OOLl0-2 5948982 2 1 60894 0.30 +/- 0.04 0.322 +/- OO Ll0-3 5948991 2160933 -+/- -0.353 +/- OOLl0-4 5948902 2 1 60738 0.25 +/- 0.04 0.1 93 +/- OOLl0-5 5949079 2 1 60855 -+/- -<0.099 OOLl0-6 5948946 2 1 60790 -+/- -<0.094 OO Ll 0-7 5949 1 2 4 2 1 6090 7 0.37 +/- 0.04 0.313 +/- OOLl0-8 5949013 2160829 -+/- -<0.106 OOLl0-9 5948880 2160868 0.20 +/- 0.02 0.195 +/- OOLl0-10 5948969 2 1 606 86 -+/- -<0.179 OOLl0-11 5949 1 46 2160 803 0.3 4 +/- 0.04 0.317 +/- OOLl0-1 2 5949002 2 1 60725 -+/- -0.350 +/- OO Ll 0-1 3 59489 1 3 2160842 -+/- -<0.088 OOLl0-14 5949087 2160957 -+/- -<0.129 OO Ll 0-1 5 5948869 2 1 60 7 64 0.35 +/- 0.0 4 0.345 +/- FOTAAverage 0.26 0.30 FOT A Standard Deviation 0.12 0.0 7 Relative Error Ratio (RER)d _J 0.080 0.25 0.096 -0.053 0.86 --0.082 0.62 -0.057 0.08 -0.088 0.24 0.076 ---0.083 0.05 0.30 0.32 n >

Table B-2. Fuel Oil Tank Arca Comparison Data Confirmatory Stlr\'C} ActiYitics for the Fuel Oil Tank Arca Humboldt Ba} Power Plant Eureka, California ORISE PG&E Cs-137 Concentrations (pCi/g) Relative Error Ratio S a mple ID* Sample East (ft) Nonh (ft) ORISE PG&E c (RER)* I Db ORI SE Judgm e nt a l S oi l S a mpl e Loc a tion s S016 OOLl0-20 5948965 2160774 0.02 +/- 0.0 1 <0.08 4 -S017 OOLl0-2 1 5948969 2160768 0.00 g +/- 0.03 <0.082 -S018 OOLl0-22 5948967 2 1 60766 -0.01 +/- 0.03 <0.1 08 -S0 19 OOLl0-23 5949 1 08 2160832 0.29 +/- 0.03 0.318 +/- 0.074 0.35 S020 OOLl0-24 5949061 2160958 O.Dl +/- 0.02 <0.077 -S02 1 OOLl0-25 5949062 2 1 60970 0.51 +/- 0.05 0.62 1 +/- 0.096 1.03 Judgmental Averag d' 0.4 0 0.4 7 0.69 *Refer to F i gs. A-4 and A-5 b PG&E Sample ID prm;ded b y PG&E <PG&E Cs-1 37 co ncentration s from PG&E-prm;ded gamma s pectroscopy report s *Re!atiYe Error Ratio (RER) was calcu l ated based on the formula in th e DO E's Q u a li ty Systems for Analy tica l Se rvic es a nd provides a wa y to d e ten ni.n e if a nal y tical results of duplicat es (in thi s case , s plit samp l es) a.re in agree ment. A RER < 3 means th e samp l es a.re in agree m e nt at the 99% confidence l e ,*el. *Un c ertainties r e pr esent the 95° o confidence 1e,-e1, ba se d on total propagated uncertainties

£Meas urem ent or anal ys is not p erformed *Zero ,*al ues a r e due to rounding "Calc ul ated u s in g co nc e ntr a tion s that were greater than t h e minimum detectabl e co n ce n tratio n (M DC); ORISE s ample s used were 50 1 9 and S021

,,,.
;--" J' ;:i =; " ? ORISE Sample ID* S004 S009 S015 --------Table B-3. Radionuclide Concentrations in lnterlaboratory Comparison Soil Samples Confirmatory Sur.'e) Activities for the Fuel Oil Tank Arca Humboldt Ba) P<mer Plant Eureka, California PG&E Sample IDb Cs-137 Concentrations (pCi/g) Relative Error Ratio (RER)< ORISE PG&E< OOLl0-4 0.25 +/- 0.04' 0.1 9 +/- 0.05 0.9 OOLl0-9 0.20 +/- 0.02 0.20 +/- 0.06 0.1 OOLl0-15 0.35 +/- 0.04 0.35 +/- 0.08 0.1 *Refer to Figs. 1\-4 and A-5 b PG&E s ample identification and samp l e Cs-137 concentrations provided b y PG&E 'Relati,-e Error Ratio (RER) wa s calculated based on the formula in the DOE's Quality S y stem s for A nal y tical Sen-ice s and prmide s a wa y to determin e if anal y tica l re s ults of duplicates (in thi s ca s e, s plit s ample s) ar e in agreement.

A RER < 3 means t h e s ample s are in agre e m e nt a t the 9 9°'o confidence l evel. d QRJSE uncertainties represent the 95° o confidence le,*el , ba s ed on total propagated uncertainties THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, E ureka, CA 5167-SR-01-0 APPENDIX C MAJOR INSTRUMENTATION HBPP Fuel Oil Tank Area, E urek a, CA 5167-SR-0 1-0 THIS PAGE LEFT BLANK INTENTIO ALLY HBPP Fuel Oil Tank Area, Eureka, CA 5167-SR-01-0 The displa y of a specific product is not to be construed a s an endorsement of the product or its manufacturer*b y the author or his emplo y er. C.1 SCANNIN G AND M EASUREMENT I NST R UMENT /D ETECT O R C OMBINAT IO NS C.1.1 G am m a Ludlum NaI Scintillation Detector Model 44-10, C ry stal:2 in x 2 in coupled to: Ludlum Ratemeter-scaler M o del 2221 (Ludlum Measurements , Inc., Sweetwater, TX) coupled to: Trimble GeoXH Recei v er and Data Logger (Trimble Navigation Limited, Sunnyvale, C A) C.1.2 L a b oratory An a l ytica l In s tru m en ta t io n High Purity E x tended Range Intrinsic Detector CA BERRA/Tennelec M o del No: ERVDS30-25195 (Canberra, Meriden, CT) U sed in conjunction with: Lead Shield Model G-11 (Nuclear Lead, Oak Rid g e , TN) and Multichannel Analyzer Canberra's A pe x Gamma Software Dell Workstation (Canberra , Meriden, CT) High Purity Extended Range Intrinsic Detector Model o. GMX-45200-5 (AMETEK/ORTEC, Oak Ridge, TN) used in conjunction with: Lead Shield Model SPG-16-K8 (Nuclear Data) Multichannel Anal yz er Canberra's A pex Gamma Software Dell W o rk s tation (Canberra, Meriden, CT) High-Puri ty Germanium Detector Model GMX-30-P4, 30% Eff. (AMETEK/ORTEC, Oak Ridge, TN) Used in conjunction with: Lead Shield Model G-16 (Gamma Products, Palos Hills, IL) and Multichannel Anal yz er Canberra's A pex Gamma Software Dell Workstation (Canberra, Meriden, CT) HBPP Fu e l Oil Tank Are a , E ureka, CA C-1 516 7-SR-01-0 THIS PAGE LEFT BLANK INTENTIONALLY HBPP Fuel Oil Tank Area, Eureka, CA 516 7-SR-01-0 APPENDIXD SURVEY AND ANALYTICAL PR O CEDURES HBPP Fue l Oil Tank Area, Eu reka , CA 516 7-SR-01-0 THIS PAGE LEFT BLA K INTENTIONALLY HBPP Fuel Oil Tank Area, E ureka, CA 5167-SR-01

-0 D.1 PROJ E C T HE A L T H AND SAFETY The propo s ed s urve y and s ampling procedures were evaluated to ensure that any ha z ards inherent to the procedures themselves were addressed in current Job Hazard Analyses GHA). All survey and laboratory activities were conducted in accordance with ORISE health and safety and radiation protection procedures (ORISE 2008 and 2010). Pre-survey activities included the evaluation and identification of potential health and safety issues. Survey work was performed per the ORISE generic health and safety plans and a site-specific Integrated Safety Management (ISM) pre-job hazard checklist.

PG&E personnel also provided site-specific safety awareness training.

An ORISE safety walkdown of the site indicated that the land clearing activities and restoration activities by PG&E personnel left uneven terrain in some areas typical for outdoor surve y activities, steep inclines on the berms, and standing water and thick mud in a portion of the FOTA. D.2 CALIBRATION AND Q U ALI TY ASS U RANCE Calibration of all field and laboratory instrumentation was based on sources/ standards, traceable to the ational Institute of Standards and Technology (NIST). Analytical and field survey activities were conducted in accordance with procedures from the following ORAU and ORISE documents:

  • Survey Procedures Manual (May 2008)
  • Laboratory Procedures Manual (December 2011)
  • Quality Program Manual (December 2011) The procedures contained in these manuals were developed to meet the requirements of 10 Code of Federal Regulations (CFR) 830 Subpart A,QualityAss11rance Requirem e nts, Department of Energy Order 414.1 C Quality Assurance, and the U.S. uclear Regulatory Commission Quality Assurance Manual for the Office of Nuclear Material Sefety and Sefeguards and contain measures to assess processes during their performance.

HBPP Fuel Oil Tank Area, Eureka , CA D-1 516 7-SR-01-0 Quality control procedures include:

  • Daily instrument background and check-source measurements to confirm that equipment Operation is within acceptable statistical fluctuations.
  • Participation in Mi.."Xed-Anal y te Performance Evaluation Program (MAPEP), !ST Radiochemistry Intercomparison Testing Program (NRIP), and Intercomparison Testing Program (ITP) Laboratory Quality Assurance Programs.
  • Training and certification of all individuals performing procedures.
  • Periodic internal and external audits. D.3 S U RVEY PROCED U RES D.3.1 S U R FA C E S CANS A Nal(Tl) scintillation detector was used to scan for elevated gamma radiation.

Identification of elevated radiation levels was based on increases in the audible signal from the recording and/ or indicating instrument.

Additionally, the detectors were coupled to GPS units with data loggers enabling real-time recording in one-second intervals of both geographic position and the gamma count rate. Positioning data files were downloaded from field data loggers for plotting using commerciall y available software (http://trl.trimble.com

/ docushare/ dsweb/ Get/Document-261826/GeoExpl2005_100A_GSG_E G.pdD. Position and gamma count rate data files were transferred to a computer system, positions were differentially corrected, and the results were plotted on geo-referenced aerial photographs.

Positional accuracy was within 0.5 meters at the 95m percentile.

ORISE Survey Procedures (ORISE 2008) require a minimum scan speed of 0.5 to 1 meter per second (m/s) based on the site contaminant and the DCGL for the primary contaminant of concern. A review of the gamma walkover scan data points relative to the scan area coverage indicate that the scan speed was less than 0.5 m/s. The scan minimum detectable concentrations for the Nal scintillation detectors was 6.6 pCi/g for Cs-137, the primary radionuclide of concern as provided in NUREG-1507 (Table 6.4). An y audible increa s e in radiation levels were investigated by HBPP Fuel Oil Tank Area, Eureka, CA D-2 516 7-SR-01-0 ORISE. It is standard procedure for the ORISE staff to pause and investigate any locations where gamma radiation is distinguishable from background levels. D.3.2 SOI L S AM P LIN G A pproximatel y 0.5 to 1 kg of soil was collected at each sample location.

Collected sa mple s were placed in a Marinelli jar, sea led, and labeled in accordance w ith ORISE s urve y procedure s. The systematic so il samples were collected as split soil samples with PG&E personnel from the systematically-selected soil sample locations as determined b y PG&E. The judgmental samples were collected as split sa mples with PG&E per sonne l from location s of elevated gamma radiation levels as determined by the ORISE gamma walkover scans. D.4 RADIOLOGICAL A NAL Y SIS D.4.1 G AMMA SP ECT RO SC O PY Samples of soil were dried, mixed, crushed, and/or homogenized as necessary, and a portion sealed in a 0.5-liter Marinelli beaker or other appropriate container.

The quantity placed in the beaker was chosen to reproduce the calibrated counting geometry.

Net material weights and vo lumes were determined and the samples counted using intrinsic germanium detectors coupled to a pulse height analyzer syste m. Background and Compton stripping, peak sea rch, peak identification, and concentration calculations were performed using the computer capabilities inherent in the analyzer system. All total absorption peaks (TA P) associated with the radionuclides of concern (ROCs) were reviewed for consistency of activity.

TAPs used for determining the activities of ROCs and the typical associated minimum detectable concentration (MDCs) for a one-hour count time were: ------Radionuclide TAP*' (MeV) MDC (pCi/g) -----------Co-60 1.173 0.06 Cs-137 0.661 0.05 U-235 0.143 0.24 U-238 b y Th-234 0.063 0.75 *Spectra were also reviewed for other identifiable easy-to-detect TAPs that would not be expected at this site. HBPP Fuel Oil Tank Area, Eureka, C D-3 516 7-SR-01-0 D.4.2 UNCERTAINTIES The uncertainties associated with the analytical data presented in the tables of this report represent the total propagated uncertainties for that data. These uncertainties were calculated based on both the gross sample count levels a nd the associated background count levels. D.4.3 DETECTION LIMITS Detection limits, referred to as minimum detectable concentrations, were based on 3 plus 4.65 times the standard deviation of the background count [3 + ( 4.65 (BKG) 1 1 2)]. Because of variations in background levels, measurement efficiencies, and contributions from other radionuclides in samp l es, the detection limits differ from sample to sample and instrument to instrument.

HBPP Fuel Oil Tank Area, Eureka, CA D-4 516 7-SR-01-0