ML22340A536
| ML22340A536 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay, 07100969 |
| Issue date: | 12/19/2022 |
| From: | Aida Rivera-Varona NRC/NMSS/DFM/IOB |
| To: | Gerfen P Pacific Gas & Electric Co |
| Shared Package | |
| ML22340A535 | List: |
| References | |
| Download: ML22340A536 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Paula Gerfen Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424
SUBJECT:
HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) REVISION 1 TO HUMBOLD BAY ISFSI QUALITY ASSURANCE PLAN
Dear Paula Gerfen:
By letter dated July 19, 2022, Pacific Gas and Electric Company submitted Revision 1 to HBI-L6, Humboldt Bay ISFSI Quality Assurance Plan, for U.S. Nuclear Regulatory Commission (NRC) review and approval under Title 10, Code of Federal Regulations (10 CFR) Part 72.
(Agencywide Documents Access and Management System {ADAMS} Accession No. ML22200A242).
In connection with the staffs review, the NRC needs the information identified in the enclosure to this letter. We request that you provide this information by November 18th, 2022. Inform us at your earliest convenience, if you are not able to provide the information by that date. To assist us in rescheduling your review, you should include a new proposed submittal date and the reasons for the delay.
Please reference Docket No. 72-0027 in future correspondence related to this request. The staff is available to clarify these questions, and if necessary, to meet and discuss your proposed responses.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this communication will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html the Public Electronic Reading Room.
December 16, 2022
P. Gerfen 2
If you have any questions regarding this matter, please contact Aaron Thomlinson at Aaron.Thomlinson@nrc.gov.
Sincerely, Aida E. Rivera-Varona, Chief Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
Enclosure:
1.
Request for Additional Information Signed by Rivera-Varona, Aida on 12/16/22
ML22340A535; Ltr ML22340A536 OFFICE NMSS/DFM/IOB NMSS/DFM/STLB NMSS/DFM/IOB NAME AThomlinson SFigueroa ARivera-Varona DATE Dec 6, 2022 Dec 6, 2022 Dec 16, 2022