DCL-21-030, 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant

From kanterella
Jump to navigation Jump to search
2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant
ML21091A111
Person / Time
Site: Diablo Canyon, Humboldt Bay  Pacific Gas & Electric icon.png
Issue date: 04/01/2021
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-21-030, HBL-21-005
Download: ML21091A111 (2)


Text

mPacHic Gas and Electric Company*

James M. Welsch Senior Vice President Generation and Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Chief Nuclear Officer 805.801.6385 E-Mail: James.Welsch@pge.com April 1, 2021 PG&E Letter DCL-21-030 PG&E Letter HBL-21-005 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2021 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP) and European Mutual Association for Nuclear Insurance (EMANI) for DCPP:

Insurer(s)/Type of Policy Policy Number Policy Plant Coverage Limits Period DCPP NEIL & EMANI /Primary $1,500,000,000 P21-027 04/01/21 to A14/1006/2021/1 04/01/22 NEIL Blanket Excess $1,250,000,000 BX21-007 04/01/21 to

_____________ 04/01/22 TOTAL $2,750,000,000 HBPP NEIL Primary $ 50,000,000 P21-028 04/01/21 to 04/01/22 Pacific Gas and Electric Company (PG&E) procures from EMANI an additional

$200,000,000 of Property Damage coverage in excess of the stated NEIL limits for DCPP. The Policy Number is A14/1006/2021/0 for the Policy Period from April 1, 2021, to April 1, 2022.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-21-030 April 1, 2021 PG&E Letter HBL-21-005 Page 2 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this information, please contact Mr. Brian Pelham at (415) 973-2745.

Sincerely, on behalf of James M. Welsch James M. Welsch Senior Vice President, Generation and Chief Nuclear Officer cc: Stephen J. Cairns, Vice President and Chief Audit Officer Donald R. Krause, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager Scott A. Morris, NRC Region IV Administrator Brian W. Pelham, PG&E Insurance Department Jennifer K. Post, PG&E Legal Department Amy Snyder, NRC Reactor Decommissioning Branch Project Manager Diablo Distribution Humboldt Distribution A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek