Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2020
ML21099A119
Person / Time
Site: Humboldt Bay
Issue date: 04/08/2021
From: Zawalick M
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Regulatory Research
References
HIL-21-002
Download: ML21099A119 (1)


Text

Maureen R. Zawalick Vice President Generation Business and Technical Services Diablo Canyon Power Plant Mail code 104/6/608 P.O. Box 56 Avila Beach, CA 93424 805.545.4242 Internal: 691.4242 10 CFR 20.2206 April 8, 2021 PG&E Letter HIL-21-002 REIRS Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation Annual Report of Occupational Radiation Exposure for 2020 REIRS Project Manager:

In accordance with 10 CFR 20.1502, Pacific Gas and Electric Company (PG&E) performed an a priori dose assessment of Humboldt Bay Power Plant Independent Spent Fuel Storage Installation (ISFSI). Individual monitoring at Humboldt Bay Power Plant ISFSI during calendar year 2020 was not required since no work activities were conducted that required inspection beyond the cask lid.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have questions about the report, please contact Mr. Craig Sutton, Nuclear Radiation Protection Manager, at 805-545-4208.

Sincerely, Maureen Zawalick armb/4743/50947986-04 cc:

William C. Allen, NRC Project Manager Scott A. Morris, NRC Region IV Administrator NRC Document Control Desk HBPP Humboldt Distribution Pacitic Gas and Eler:mc Company*