October 21, 2021

SUBJECT:

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION -

INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200027/2021401

Dear Mr. Welsch:

On September 22, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Humboldt Bay Independent Spent Fuel Storage Installation. On September 22, 2021, the NRC inspectors discussed the results of this inspection with Mr. Robert Zimkowski, Manager DCPP Security Strategy, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Kellar, Ray on 10/21/21 Ray L. Kellar, P.E. Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 07200027 Enclosure:

As stated

ML21292A046 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RLK Yes No Publicly Available Sensitive NRC-002 OFFICE PSI: PSB1 C:PSB1 C:FCDB C:PSB1 NAME RLanfear RKellar GWarnick RKellar SIGNATURE /RA/ /RA/ /RA L. Brookhart for/ /RA/

DATE 10/19/2021 10/19/2021 10/21/2021 10/21/2021

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 07200027 License Number: SNM-2514 Report Number: 07200027/2021401 Enterprise Identifier: I-2021-401-0128 Licensee: Pacific Gas and Electric Company Facility: Humboldt Bay Independent Spent Fuel Storage Installation.

Location: Eureka, CA Inspection Dates: September 20, 2021 to September 22, 2021 Inspectors: R. Lanfear, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

This report covers a two-day period of an announced routine baseline inspection on security conducted by one physical security inspector from the NRCs Region IV office. There were no findings identified during this inspection.

This inspection consisted of a review and evaluation of the physical security program for the independent spent fuel storage installation at the Humboldt Bay Power Plant. The inspection consisted of observations of the independent spent fuel storage installation physical security-related activities, interviews with personnel, and an examination of procedures and security records. The inspector used Inspection Procedure (IP) 81311 "Physical Security Requirements for Independent Spent Fuel Storage Installations" to conduct the inspection.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

REPORT DETAILS

IP 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations (ISFSI)

Inspection Scope 02.02 Review of Specific License Requirements a.

The inspector verified that spent nuclear fuel (SNF) and power reactor-related greater than class C waste is stored only within a protected area (PA) required by 10 CFR 73.51(b)(2)(i) and (10 CFR 73.51(d)(1).

b.

The inspector verified that only individuals who are authorized to enter the PA are granted access to the PA required by 10 CFR 73.51(b)(2)(ii).

c.

The inspector verified that the licensee is in compliance with site specific security orders (e.g., additional security measures) for access authorization and fingerprinting; also, that a log of authorized individuals is required pursuant to 10 CFR 73.51(d)(13)(i).

d.

The inspector verified the licensee can detect and assess penetrations through the isolation zone required by 10 CFR 73.51(d)(3).

e.

The inspector verified the licensee can provide timely communication to the designated response force whenever necessary required by 10 CFR 73.51(b)(2)(iv).

f.

The inspector verified that the physical protection system is designed to protect against loss of control of the facility that could be sufficient to cause a radiation exposure exceeding the dose as described in 10 CFR 72.106(b) and 10 CFR 73.51(b)(3).

g.

The inspector verified that the licensee has retained a copy of the physical protection plan for a period of 3 years or until termination of the license required by 10 CFR 73.51(c).

h.

The inspector verified that the licensee complies with the provisions for physical protection systems, components, and procedures that meet the performance objectives of 10 CFR 73.51(b)(1), 10 CFR 73.51(b)(2), and 10 CFR 73.51(d).

i.

The inspector verified the licensee provides illumination sufficient to permit adequate assessment of unauthorized penetrations of or activities within the PA required by 10 CFR 73.51(d)(2).

j.

The inspector verified the licensees perimeter of the PA allows for continual surveillance and is protected by an active intrusion alarm system that is capable of detecting penetrations through the isolation zone; and that it is monitored in a continually staffed primary alarm station and in one additional continually staffed location required by 10 CFR 73.51(d)(3).

k.

The inspector verified that the primary alarm station is located within the PA; that it has bullet-resisting walls, doors, ceiling and floor; that the interior of the station is not visible from outside the PA; that a timely means for assessment of alarms is provided regarding alarm monitoring; and that the redundant location provided a summary indication that an alarm has been generated required by 10 CFR 73.51(d)(3).

l.

The inspector verified the licensees PA is monitored by daily random patrols pursuant to 10 CFR 73.51(d)(4); and a log of all patrols is required in accordance with 10 CFR 73.51(d)(13)(iii).

m. The inspector verified the licensees security organization has written procedures that provides for sufficient personnel per shift to ensure the monitoring of detection systems and the conduct of surveillance, assessment, access control, and communications to assure adequate response; that members of the security organization are trained, equipped, qualified, and requalified to perform assigned job duties in accordance with Appendix B to Part 73, sections I.A, (1)(a) and (b), B(1)(a), and the applicable portions of section II pursuant to 10 CFR 73.51(d)(5).

n.

The inspector verified the licensee has a documented liaison with a designated response force or local law enforcement agency (LLEA) to permit a timely response to unauthorized penetration or activities required by 10 CFR 73.51(d)(6).

o.

The inspector verified the licensee has a personnel identification system and a controlled lock system that limits access to only authorized individuals required by 10 CFR 73.51(d)(7).

p.

The inspector verified the licensee has redundant communications capability between onsite security force members and designated response force or LLEA required by 10 CFR 73.51(d)(8).

q.

The inspector verified that all individuals, vehicles, and hand-carried packages entering the PA are checked for proper authorization and visually searched for explosives before entry in accordance with 10 CFR 73.51(d)(9).

r.

The inspector verified the licensees written response procedures have been established and maintained for addressing unauthorized penetration of, or activities within, the PA required by 10 CFR 73.51(d)(10).

s.

The inspector verified that all the licensees detection systems and supporting subsystems include a tamper indicating system with line supervision; that the system, as well as surveillance/assessment and illumination systems, is maintained in an operable condition required by 10 CFR 73.51(d)(11).

t. The inspector verified the licensee protects safeguards information against unauthorized disclosure required by (10 CFR 73.21 and 10 CFR 73.22).

u. The inspector verified the licensees physical protection program is reviewed once every 24 months by individuals independent of both physical protection program management and personnel who have direct responsibility for implementation of the physical protection program; that the physical protection program review includes an evaluation of the effectiveness of the physical protection system and a verification of the liaison established with the designated response force or LLEA pursuant to 10 CFR 73.51(d)(12).

v. The inspector verified the licensee has retained the following documentation as a record for 3 years after the record is made or until termination of the license: a log of individuals granted access to the PA; screening records of members of the security organization; a log of all patrols; a record of each alarm received, identifying the type of alarm, location, date, and time when received, and disposition of the alarm; and the physical protection program review reports pursuant to 10 CFR 73.51(d)(13)(i)(ii)(iii)(iv)and (v).

w. The inspector verified in accordance with any applicable security requirements and/or security orders that the licensee has implemented measures and processes for vehicle control measures into protected areas.

x. The inspector verified in accordance with any applicable security requirements and/or security orders, that the licensee has implemented an insider mitigation program.

y. The inspector verified that the licensee has developed offsite response coordination with LLEA as applicable to physical security requirements and/or security orders.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On September 22, 2021, the inspectors presented the independent spent fuel storage installation security inspection results to Robert Zimkowski, Manager DCPP Security Strategy, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

81311 Corrective Action 121590987,

Documents 120690685,

20234600;

Drawings HB3-EC-641 Modular Building Plans 0

Miscellaneous 190630032 2019 Humboldt Bay Independent Spent Fuel Storage 06/11/2019

Installation Audit Report

HB9-EE-693 Design Change Notice Security Electronic System 1

Procedures HB-137 ISFSI Searching Personnel, Vehicles, Cargo and Packages 4

HBI 342 HB ISFSI Compensatory Measures for Degraded Security 10

Barriers or Equipment

HBI-130 ISFSI Access Authorization 5

HBI-262 ISFSI Response and Actions 7

HBI-301 ISFSI Physical Security Plan 9

HBI-402 ISFSI Lock and Key Control 15

HBI-452 Protected Area Lighting Inspection 4.1

HBI-L5 HB ISFSI Training and Qualification Plan 2

Self-Assessments 2021 HB ISFSI Self-Assessment - Physical Protection 05/11/2021

Program Review

6