Mr. James M. Welsch Senior Vice President Generation and Chief Nuclear Officer P.O. Box 56 Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
HUMBOLDT BAY POWER PLANT, UNIT 3 - APPROVAL OF FINAL STATUS SURVEY REPORTS FOR REMAINING FACILITY SURVEY UNITS
Dear Mr. Welsch:
By letters dated June 8 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML21160A224), July 13 (ADAMS Accession No. ML21194A441), and August 9, 2021 (ADAMS Accession No. ML21221A135), Pacific Gas and Electric Company (PG&E) submitted the Humboldt Bay Power Plant (HBPP), Unit 3, Final Status Survey Reports (FSSRs) for the survey areas identified in the table below.
Table, Survey Units for HBPP, Unit 3 Submitted and Reviewed FSSR License Termination Plan Table 5-2, Survey Area Designator, pages 5-17 and 5-18 PG&E Submittal 9
OOL03-01, OOL03-02, OOL04-01, OOL08-01, OOL08-02, OOL08-03, OOL10-18, OOL10-25, OOL02-02, OOL08-04, OOL08-05, OOL08-06, OOL02-01, OOL06-01, OOL11-01, OOL01-01, OOL01-02, OOL01-03, OOL07-01, OOL07-02, OOL07-03, OOL07-04, and OOL05-01 PG&E Letter HBL-21-010, Final Status Survey Reports for the Humboldt Bay Power Plant (Intake structure final grade, Open land area north of Units 1 and 2 encompassing the north yard and embankment to the west of the reactor building, A narrow strip of open land area traveling from Unit 3 to the discharge canal, Open land area bordering the western side of the Class 1 Survey Area NOL01, and A major portion of the open land area), dated June 8, 2021 (ADAMS Accession No. ML21160A224) 10 OOL10-01, OOL10-13, OOL10-17, OOL10-20, OOL10-22, OOL10-24, and OOL10-26 PG&E Letter HBL-21-011, Final Status Survey Report for the Humboldt Bay Power Plant (Remainder of Land Area), dated July 13, 2021 (ADAMS Accession No. ML21194A441) 11 NOL01-01, NOL01-02, NOL01-03, NOL01-04, NOL01-05, NOL01-06, NOL01-07, and NOL01-08 PG&E Letter HBL-21-014, Final Status Survey Report for the Humboldt Bay Power Plant (Remainder of Survey Units), dated August 9, 2021(ADAMS Accession No. ML21221A135)
November 2, 2021
J. Welsch 2
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the remaining FSSRs for the facility, identified above, and the results presented are less than the applicable Derived Concentration Guideline Limits. The scanning survey coverage described in the reports was adequate. The survey and analyses for these survey units provided reasonable demonstration of compliance with the unrestricted release criteria in Title 10 of the Code of Federal Regulations (10 CFR) 20.1402, Radiological criteria for unrestricted use. Based on our review of the survey results, the survey units identified in the above table are acceptable to support release of those areas for unrestricted use.
Further details on our review are provided in the enclosed safety evaluation.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.
Should you have any questions regarding this action, please contact me at 301-415-6822 or via e-mail at Amy.Snyder@nrc.gov.
Sincerely, Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No.: 50-133
Enclosure:
As stated cc w/
Enclosure:
Humboldt Bay ListServ Signed by Snyder, Amy on 11/02/21