ML17223A359: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:DOCKET05000335
{{#Wiki_filter:DOCKET 05000335


==SUBJECT:==
==SUBJECT:==
NPDESnoncompliance notification:on 890803604,plantdischarge canaltempexceeded113Flimit.Utildown-powered.
NPDES noncompliance notification:on 890803 6 04,plant discharge canal temp exceeded 113 F limit.Util down-powered.
DISTRIBUTION CODE:IE25DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:Environmental Monitoring Rept(perTechSpecs)NOTES:ACCELERATED DIBUTIONDEMONSTRATION SYSI'EMREGULATINFORMATION DISTRIBUTION STEM(RIDS)ACCESSION NBR:8910240217 DOC.DATE:
DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Environmental Monitoring Rept (per Tech Specs)NOTES: ACCELERATED DI BUTION DEMONSTRATION SYSI'EM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:8910240217 DOC.DATE: 89/10/16 NOTARIZED:
89/10/16NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION SAGER,D.A.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME PD2-2 LA NORRISiJ, INTERNAL: ACRS IRM TECH ADV~REP RPB 10 RE XT 01 LE 02 COPIES L'gTR ENCL 3 3 1'1 1 1 1 2 2 1 1 1 1 RECIPIENT.ID.CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR ROTHMANgR NUDOCS-ABSTRACT RGN2 DRSS/RPB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 h EXTERNAL EGSG S IMPSON i F NRC PDR 2 2 1 1 LPDR 1 1 h TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19 P.O.Box14000, Juno Beach, FL 33408-0420 oCTOBHR i 6 19B9 L-89-368 U.S.'uclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)RECIPIENT IDCODE/NAME PD2-2LANORRISiJ, INTERNAL:
Re: St.Lucie Unit 1 Docket No.50-335 Environmental Protection Plan Report-National Pollutant Dischar e Elimination S stem NPDES Re ortable Event In accordance with Section 3.2.1.of the St.Lucie Unit 1 Environmental Protection Plan, attached is a copy of the Discharge Monitoring Report (DMR)required by the St.Lucie Plant NPDES Permit with respect to a reportable event.Additionally, a description of the event is provided.Very truly yours,<ad D.A.ger Vice sident St.Lucie Plant DAS/MSD/gp Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant I se>02O02>7 S9iOib PDR ADOCK 05000335'q g PNu an FPL Group company f t PERMITTEE NAMEIADDRESS llnklnch Fnrirlrie lenrkk/Lorn r ion ff djffkrknrl NAME Q~t~rl~~~-~ol e L!L n ADDREss~~tati lre~i~t A+I-A+I?S ail~eM t"~cj.i FACILITY LOCATION'TTN: To Ro FAIR PARAMETER (32-3T)NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTF M (NPDES J DISCHARGE MONITORING REPORT(DER)
ACRSIRMTECHADV~REPRPB10REXT01LE02COPIESL'gTRENCL331'1111221111RECIPIENT
(2-)6J ((7-)9)FL0002200 001 1 PERMIT NUMBER DISCHARGE NUMBER Form Apptovrd F-FINAL CONU t;AUX COOLING'yf'A~V~.FL, 334 0d MAJOR (SU&i?JA)NOTE: Read Instructions before completing this form.(26.27)(2(f-29)(3M(J (20.2!)(22-23J (2C-25)(C Crrrd Only)(3(f45)(3 Card OrtlTJ QUANTITY OR LOADING (C6.53J (jdidl J OUALITY OR CONCENTRATION (Cd 53)(5C4)J FREQUENCY OF ANALYSIS (dd J58J NO.EX SAMPLE TYPE MAXIMUM AVERAGE UNITS AVERAGE MAXIMUM MINIMUM UNITS 6MB (69.Tft)MONITORING PERIOD YEAR MO DAY Y 0 D Y FROM y u v TO TEMP ERATURL'-v>>A1 f-.t,~L(FAH,'?Eidlii.1 1'30011 1 0 0 UENT GR(ISu VALUE.I LHP~DIFF~ULI I(ELif~AN o t UP iT ILf'i UE--~f-uoV13 1)0 L FF ULeN1 dict)SS V ALUI.SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT Ar AA hr rrV~Y P~OOPVVA A A A A A Y Y'Y Y V A r A VtpffteXhtv h A A vvh v rv r'ip p A J 4 P'Ir AAAA vvv r AA vv rvvv rpv AA A 4'P YYYV'P Yv r INST,HX DEAF INST'X DLGoF./(Hc 3I?ON 9 TIJTAI (AS:)..I 1022 2 4'Ni I V.nL Jtr SAMPLE MEASUREMENT PERMIT REQUIREMENT AA AAAA r Y rv.r~hAAJ'PPVP~e JttetA J y A A h A r Vh'rff AAAAAA vvvv rff~0 INST, MX HG/L BATCH VX IL',EINTS s TOTAL.Ai=SIDUAL 94044 P 0 U)CIDENlst Tt)TAL ftt.SI DUAL I4t)44 Q 0 0 I'i~SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENl'ERMIT REQUIREMENT AA AA YVV YVV 4 AJ A hA lf'pep e 4A A A VV Per P P AAA~ff h AA AAA er ff VVY~J 4 A'Y V'V A A vrr A AA rvv Y A J AAAA r Yvv YC POOha AAAA J A YVAV P P'P qietrh JeA A A A rvff vfr r AA AA 4 Vfft p per<, o 0~3 INST'HX XG/L Onl INST MX.HG/L Q 1A.OM UOUS Ol IN VOUS 0 0 OX10ENTSv FRE'-s\VAI LAUL-34045 I?0 0 f3XI t)FI4TS v FRI:=AVAILAt)L~
.ID.CODE/NAME PD2-2PDAEOD/DSP/TPAB NRRROTHMANgR NUDOCS-ABSTRACT RGN2DRSS/RPBCOPIESLTTRENCL1111111111hEXTERNALEGSGSIMPSONiFNRCPDR2211LPDR11hTOTALNUMBEROFCOPIESREQUIRED:
)4045 S 0 0 SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMEN'r PERMIT REQUIREMENT r AAA erff 4~p AA JIA 4A AAA VYMYVY J A JeAAA~ff'ff P'P Y AA AA A VrVVeff AAA AA A v p r"p lk'l v p p~AA A A Ie lr YV VVYff Vh t V'AA rvv r A AAA ff'vvv e v A J AAA N ht II OY~P ,o%0~2 DAILY AV ,p4 Oo2 DAILY AV Oe'5 INST HX HG/L Oe5;INST-(AX.XG/L EEKL EEKL DATE NAMBTITLE PRINCIPALEXECUTIVEOFFICER TELEPHONE I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel propedy gslher and evafuate the information submitted.
LTTR19ENCL19 P.O.Box14000, JunoBeach,FL33408-0420 oCTOBHRi619B9L-89-368U.S.'uclear Regulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Gentlemen:
Based on my inquiry of the perSOn Or persons who manage the system.or those persons directly responsible for gathering the information, the Intorrnatfon submined Is.to the best ol my knowledge and belief.true.sccursle.snd complete.I sm aware thai there are signiticant penalilies lor submitting false information.
Re:St.LucieUnit1DocketNo.50-335Environmental Protection PlanReport-NationalPollutant DischareElimination SstemNPDESReortableEventInaccordance withSection3.2.1.oftheSt.LucieUnit1Environmental Protection Plan,attachedisacopyoftheDischarge Monitoring Report(DMR)requiredbytheSt.LuciePlantNPDESPermitwithrespecttoareportable event.Additionally, adescription oftheeventisprovided.
including the possibility of fine and Imprisonment for knowing violations.
Verytrulyyours,<adD.A.gerVicesidentSt.LuciePlantDAS/MSD/gp Attachments cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantIse>02O02>7 S9iOibPDRADOCK05000335'q gPNuanFPLGroupcompany ft PERMITTEE NAMEIADDRESS llnklnchFnrirlrie lenrkk/Lorn rionffdjffkrknrl NAMEQ~t~rl~~~-~oleL!LnADDREss~~tatilre~i~tA+I-A+I?Sail~eMt"~cj.iFACILITYLOCATION'TTN:ToRoFAIRPARAMETER (32-3T)NATIONALPOLLUTANT DISCHARGE ELIMINATION SYSTFM(NPDESJDISCHARGE MONITORING REPORT(DER)
SIGNA REOF PRINCIPAL CUTIVE OFFICER OR AUTHORIZED AGENT DAY Mo YEAR NUMBER TYPED OR PRINTED COMMENT AND EXPLANATION OF ANY VIOLATION:
(2-)6J((7-)9)FL0002200 0011PERMITNUMBERDISCHARGE NUMBERFormApptovrdF-FINALCONUt;AUXCOOLING'yf'A~V~.
AUX IL I Alv Y e r'i)ill)iliS tth Ik;)I-"Cti.'al.:.~
FL,3340dMAJOR(SU&i?JA)NOTE:ReadInstructions beforecompleting thisform.(26.27)(2(f-29)(3M(J(20.2!)(22-23J(2C-25)(CCrrrdOnly)(3(f45)(3CardOrtlTJQUANTITYORLOADING(C6.53J(jdidlJOUALITYORCONCENTRATION (Cd53)(5C4)JFREQUENCY OFANALYSIS(ddJ58JNO.EXSAMPLETYPEMAXIMUMAVERAGEUNITSAVERAGEMAXIMUMMINIMUMUNITS6MB(69.Tft)MONITORING PERIODYEARMODAYY0DYFROMyuvTOTEMPERATURL'-v>>A1 f-.t,~L(FAH,'?Eidlii.11'30011100UENTGR(ISuVALUE.ILHP~DIFF~ULII(ELif~ANotUPiTILf'iUE--~f-uoV131)0LFFULeN1dict)SSVALUI.SAMPLEMEASUREMENT PERMITREQUIREMENT SAMPLEMEASUREMENT PERMITREQUIREMENT ArAAhrrrV~YP~OOPVVAAAAAAYY'YYVArAVtpffteXhtv hAAvvhvrvr'ippAJ4P'IrAAAAvvvrAAvvrvvvrpvAAA4'PYYYV'PYvrINST,HXDEAFINST'XDLGoF./(Hc3I?ON9TIJTAI(AS:)..I102224'NiIV.nLJtrSAMPLEMEASUREMENT PERMITREQUIREMENT AAAAAArYrv.r~hAAJ'PPVP~eJttetAJyAAhArVh'rffAAAAAAvvvvrff~0INST,MXHG/LBATCHVXIL',EINTS sTOTAL.Ai=SIDUAL 94044P0U)CIDENlst Tt)TALftt.SIDUALI4t)44Q00I'i~SAMPLEMEASUREMENT PERMITREQUIREMENT SAMPLEMEASUREMENl'ERMIT REQUIREMENT AAAAYVVYVV4AJAhAlf'pepe4AAAVVPerPPAAA~ffhAAAAAerffVVY~J4A'YV'VAAvrrAAArvvYAJAAAArYvvYCPOOhaAAAAJAYVAVPP'PqietrhJeAAAArvffvfrrAAAA4Vfftpper<,o0~3INST'HXXG/LOnlINSTMX.HG/LQ1A.OMUOUSOlINVOUS00OX10ENTSv FRE'-s\VAILAUL-34045I?00f3XIt)FI4TSvFRI:=AVAILAt)L~
I'"t.i'-'"0 tr I FU,'+SE.V 4't'ItiCW~'L VCt c C-.UISCHA?Gt 9 H.=UN I f 1s S=UD IT 2 BORON HUNITORINb R'i='LJUIREO;v'HL:N I'ICTUS 44'HATLf?S TUr?A~'Ail'i~r ISO NOi'f Ai RATEi)Iv AT<:I HULO I Nio TANK~.p)r hr-t>ay$g...r r EPA Form 3320.1 (Rev.10-79)
)4045S00SAMPLEMEASUREMENT PERMITREQUIREMENT SAMPLEMEASUREMEN'r PERMITREQUIREMENT rAAAerff4~pAAJIA4AAAAVYMYVYJAJeAAA~ff'ffP'PYAAAAAVrVVeffAAAAAAvpr"plk'lvpp~AAAAIelrYVVVYffVhtV'AArvvrAAAAff'vvvevAJAAANhtIIOY~P,o%0~2DAILYAV,p4Oo2DAILYAVOe'5INSTHXHG/LOe5;INST-(AX.XG/LEEKLEEKLDATENAMBTITLE PRINCIPALEXECUTIVEOFFICER TELEPHONE Icertifyunderpenaltyoflawthatthisdocumentandallattachments werepreparedundermydirection orsupervision inaccordance withasystemdesignedtoassurethatqualified personnel propedygslherandevafuatetheinformation submitted.
PREvtous EDITloN Yo BEUsED IREPLACES EPA FORM T ao WHICH MAY NOT BE USED.)UNTIL SUPPLY IS EXHAUSIED.
BasedonmyinquiryoftheperSOnOrpersonswhomanagethesystem.orthosepersonsdirectlyresponsible forgathering theinformation, theIntorrnatfon subminedIs.tothebestolmyknowledge andbelief.true.sccursle.snd complete.
01135/061409-045't PAGE 1 OF 4'V rQ DESCRIPTION OF THE EVENT The following is a description of an event which occurred at the St.Lucie Plant on August 3 and 4, 1989.This information was reported to Steve Scholfield of EPA by Ron Hix of FPL Environmental Affairs on August 7, 1989.Mr.Scholfield requested that this written report be submitted with the appropriate DMR.On the dates and times listed below, the St.Lucie Unit 1 discharge canal temperature exceeded the 113'F limit allowed for normal operation.
Ismawarethaitherearesigniticant penalilies lorsubmitting falseinformation.
Au ust 3 1989 Au ust 4 1989 Time 1300 hrs 1400 1500 1600 1700 1800 1900~Tem 114'F 114 114 115 115 114 115 Time 1400 hrs 1500 1600 1700~Tem 115'F 114 114 114 During these periods, St.Lucie Unit 1 was experiencing severe condenser fouling.The St.Lucie Plant.NPDES Permit allows 117'F at the discharge terminus under these conditions.
including thepossibility offineandImprisonment forknowingviolations.
Unit 1 was down-powered the evenings of August 4, 1989 and August 5, 1989 to clean condenser water-boxes.
SIGNAREOFPRINCIPAL CUTIVEOFFICERORAUTHORIZED AGENTDAYMoYEARNUMBERTYPEDORPRINTEDCOMMENTANDEXPLANATION OFANYVIOLATION:
Since that time discharge canal temperatures have returned to below 113'F.
AUXILIAlvYer'i)ill)iliS tthIk;)I-"Cti.'al.:.~
I t df s}}
I'"t.i'-'"0 trIFU,'+SE.V4't'ItiCW~'L VCtcC-.UISCHA?Gt 9H.=UNIf1sS=UDIT2BORONHUNITORINb R'i='LJUIREO;v'HL:N I'ICTUS44'HATLf?STUr?A~'Ail'i~rISONOi'fAiRATEi)IvAT<:IHULOINioTANK~.p)rhr-t>ay$g...rrEPAForm3320.1(Rev.10-79)
PREvtousEDITloNYoBEUsEDIREPLACES EPAFORMTaoWHICHMAYNOTBEUSED.)UNTILSUPPLYISEXHAUSIED.
01135/061409-045't PAGE1OF 4'VrQ DESCRIPTION OFTHEEVENTThefollowing isadescription ofaneventwhichoccurredattheSt.LuciePlantonAugust3and4,1989.Thisinformation wasreportedtoSteveScholfield ofEPAbyRonHixofFPLEnvironmental AffairsonAugust7,1989.Mr.Scholfield requested thatthiswrittenreportbesubmitted withtheappropriate DMR.Onthedatesandtimeslistedbelow,theSt.LucieUnit1discharge canaltemperature exceededthe113'Flimitallowedfornormaloperation.
Auust31989Auust41989Time1300hrs140015001600170018001900~Tem114'F114114115115114115Time1400hrs150016001700~Tem115'F114114114Duringtheseperiods,St.LucieUnit1wasexperiencing severecondenser fouling.TheSt.LuciePlant.NPDESPermitallows117'Fatthedischarge terminusundertheseconditions.
Unit1wasdown-poweredtheeveningsofAugust4,1989andAugust5,1989tocleancondenser water-boxes.
Sincethattimedischarge canaltemperatures havereturnedtobelow113'F.
Itdfs}}

Revision as of 16:38, 7 July 2018

NPDES Noncompliance Notification:On 890803 & 04,plant Discharge Canal Temp Exceeded 113 F Limit.Unit 1 down- Powered to Clean Condenser Water Boxes
ML17223A359
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/16/1989
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-368, NUDOCS 8910240217
Download: ML17223A359 (7)


Text

DOCKET 05000335

SUBJECT:

NPDES noncompliance notification:on 890803 6 04,plant discharge canal temp exceeded 113 F limit.Util down-powered.

DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Environmental Monitoring Rept (per Tech Specs)NOTES: ACCELERATED DI BUTION DEMONSTRATION SYSI'EM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:8910240217 DOC.DATE: 89/10/16 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME PD2-2 LA NORRISiJ, INTERNAL: ACRS IRM TECH ADV~REP RPB 10 RE XT 01 LE 02 COPIES L'gTR ENCL 3 3 1'1 1 1 1 2 2 1 1 1 1 RECIPIENT.ID.CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR ROTHMANgR NUDOCS-ABSTRACT RGN2 DRSS/RPB COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 h EXTERNAL EGSG S IMPSON i F NRC PDR 2 2 1 1 LPDR 1 1 h TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19 P.O.Box14000, Juno Beach, FL 33408-0420 oCTOBHR i 6 19B9 L-89-368 U.S.'uclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: St.Lucie Unit 1 Docket No.50-335 Environmental Protection Plan Report-National Pollutant Dischar e Elimination S stem NPDES Re ortable Event In accordance with Section 3.2.1.of the St.Lucie Unit 1 Environmental Protection Plan, attached is a copy of the Discharge Monitoring Report (DMR)required by the St.Lucie Plant NPDES Permit with respect to a reportable event.Additionally, a description of the event is provided.Very truly yours,<ad D.A.ger Vice sident St.Lucie Plant DAS/MSD/gp Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant I se>02O02>7 S9iOib PDR ADOCK 05000335'q g PNu an FPL Group company f t PERMITTEE NAMEIADDRESS llnklnch Fnrirlrie lenrkk/Lorn r ion ff djffkrknrl NAME Q~t~rl~~~-~ol e L!L n ADDREss~~tati lre~i~t A+I-A+I?S ail~eM t"~cj.i FACILITY LOCATION'TTN: To Ro FAIR PARAMETER (32-3T)NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTF M (NPDES J DISCHARGE MONITORING REPORT(DER)

(2-)6J ((7-)9)FL0002200 001 1 PERMIT NUMBER DISCHARGE NUMBER Form Apptovrd F-FINAL CONU t;AUX COOLING'yf'A~V~.FL, 334 0d MAJOR (SU&i?JA)NOTE: Read Instructions before completing this form.(26.27)(2(f-29)(3M(J (20.2!)(22-23J (2C-25)(C Crrrd Only)(3(f45)(3 Card OrtlTJ QUANTITY OR LOADING (C6.53J (jdidl J OUALITY OR CONCENTRATION (Cd 53)(5C4)J FREQUENCY OF ANALYSIS (dd J58J NO.EX SAMPLE TYPE MAXIMUM AVERAGE UNITS AVERAGE MAXIMUM MINIMUM UNITS 6MB (69.Tft)MONITORING PERIOD YEAR MO DAY Y 0 D Y FROM y u v TO TEMP ERATURL'-v>>A1 f-.t,~L(FAH,'?Eidlii.1 1'30011 1 0 0 UENT GR(ISu VALUE.I LHP~DIFF~ULI I(ELif~AN o t UP iT ILf'i UE--~f-uoV13 1)0 L FF ULeN1 dict)SS V ALUI.SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT Ar AA hr rrV~Y P~OOPVVA A A A A A Y Y'Y Y V A r A VtpffteXhtv h A A vvh v rv r'ip p A J 4 P'Ir AAAA vvv r AA vv rvvv rpv AA A 4'P YYYV'P Yv r INST,HX DEAF INST'X DLGoF./(Hc 3I?ON 9 TIJTAI (AS:)..I 1022 2 4'Ni I V.nL Jtr SAMPLE MEASUREMENT PERMIT REQUIREMENT AA AAAA r Y rv.r~hAAJ'PPVP~e JttetA J y A A h A r Vh'rff AAAAAA vvvv rff~0 INST, MX HG/L BATCH VX IL',EINTS s TOTAL.Ai=SIDUAL 94044 P 0 U)CIDENlst Tt)TAL ftt.SI DUAL I4t)44 Q 0 0 I'i~SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENl'ERMIT REQUIREMENT AA AA YVV YVV 4 AJ A hA lf'pep e 4A A A VV Per P P AAA~ff h AA AAA er ff VVY~J 4 A'Y V'V A A vrr A AA rvv Y A J AAAA r Yvv YC POOha AAAA J A YVAV P P'P qietrh JeA A A A rvff vfr r AA AA 4 Vfft p per<, o 0~3 INST'HX XG/L Onl INST MX.HG/L Q 1A.OM UOUS Ol IN VOUS 0 0 OX10ENTSv FRE'-s\VAI LAUL-34045 I?0 0 f3XI t)FI4TS v FRI:=AVAILAt)L~

)4045 S 0 0 SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMEN'r PERMIT REQUIREMENT r AAA erff 4~p AA JIA 4A AAA VYMYVY J A JeAAA~ff'ff P'P Y AA AA A VrVVeff AAA AA A v p r"p lk'l v p p~AA A A Ie lr YV VVYff Vh t V'AA rvv r A AAA ff'vvv e v A J AAA N ht II OY~P ,o%0~2 DAILY AV ,p4 Oo2 DAILY AV Oe'5 INST HX HG/L Oe5;INST-(AX.XG/L EEKL EEKL DATE NAMBTITLE PRINCIPALEXECUTIVEOFFICER TELEPHONE I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel propedy gslher and evafuate the information submitted.

Based on my inquiry of the perSOn Or persons who manage the system.or those persons directly responsible for gathering the information, the Intorrnatfon submined Is.to the best ol my knowledge and belief.true.sccursle.snd complete.I sm aware thai there are signiticant penalilies lor submitting false information.

including the possibility of fine and Imprisonment for knowing violations.

SIGNA REOF PRINCIPAL CUTIVE OFFICER OR AUTHORIZED AGENT DAY Mo YEAR NUMBER TYPED OR PRINTED COMMENT AND EXPLANATION OF ANY VIOLATION:

AUX IL I Alv Y e r'i)ill)iliS tth Ik;)I-"Cti.'al.:.~

I'"t.i'-'"0 tr I FU,'+SE.V 4't'ItiCW~'L VCt c C-.UISCHA?Gt 9 H.=UN I f 1s S=UD IT 2 BORON HUNITORINb R'i='LJUIREO;v'HL:N I'ICTUS 44'HATLf?S TUr?A~'Ail'i~r ISO NOi'f Ai RATEi)Iv AT<:I HULO I Nio TANK~.p)r hr-t>ay$g...r r EPA Form 3320.1 (Rev.10-79)

PREvtous EDITloN Yo BEUsED IREPLACES EPA FORM T ao WHICH MAY NOT BE USED.)UNTIL SUPPLY IS EXHAUSIED.

01135/061409-045't PAGE 1 OF 4'V rQ DESCRIPTION OF THE EVENT The following is a description of an event which occurred at the St.Lucie Plant on August 3 and 4, 1989.This information was reported to Steve Scholfield of EPA by Ron Hix of FPL Environmental Affairs on August 7, 1989.Mr.Scholfield requested that this written report be submitted with the appropriate DMR.On the dates and times listed below, the St.Lucie Unit 1 discharge canal temperature exceeded the 113'F limit allowed for normal operation.

Au ust 3 1989 Au ust 4 1989 Time 1300 hrs 1400 1500 1600 1700 1800 1900~Tem 114'F 114 114 115 115 114 115 Time 1400 hrs 1500 1600 1700~Tem 115'F 114 114 114 During these periods, St.Lucie Unit 1 was experiencing severe condenser fouling.The St.Lucie Plant.NPDES Permit allows 117'F at the discharge terminus under these conditions.

Unit 1 was down-powered the evenings of August 4, 1989 and August 5, 1989 to clean condenser water-boxes.

Since that time discharge canal temperatures have returned to below 113'F.

I t df s