{{#Wiki_filter:ROCHESTER GASANDELECTRICCORPORATION, R.E.GINNANUCLEARPOWERPLANTRevision17to:'ualityAssurance ProgramforStationOperation DOCKETNO.50-244December, 1991'2201070130 5'i1.220PDRADOCK05000244p.PDi~
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION, R.E.GINNA NUCLEAR POWER PLANT Revision 17 to: 'uality Assurance Program for Station Operation DOCKET NO.50-244 December, 1991'2201070130 5'i1.220 PDR ADOCK 05000244 p.PDi~
TABLEOFCONTENTSSectionTitlePacae2.3~4~6.QUALITYASSURANCE PROGRAMFORSTATIONOPERATION QualityAssurance Program.Organization DesignControlProcurement DocumentControl.Instructions, Procedures andDrawingsDocumentControl1013167.ControlofPurchased
TABLE OF CONTENTS Section Title Pacae 2.3~4~6.QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program.Organization Design Control Procurement Document Control.Instructions, Procedures and Drawings Document Control 10 13 16 7.Control of Purchased Material, Equipment and Services 18 8.Identification and Control of Materials, Parts and Components Control of Special Processes 22 23 12.13.14.16.17.18..Inspection.
: Material, Equipment andServices188.Identification andControlofMaterials, PartsandComponents ControlofSpecialProcesses 222312.13.14.16.17.18..Inspection.
Test Control I'I Control of Measuring and Test Equipment Handling, Storage and Shipping Inspection, Test and Operating Status Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 24 26 28 29 30 31 33 34 Revision 17 December 1991
TestControlI'IControlofMeasuring andTestEquipment
~'IST OF TABLES Table Number Title 1 Quality Assurance Program Procedures Subject L'isting Procurement Document Requirements Audit List Pacae 37 51 52 LIST OF FIGURES Fi ure Number Title Pacae I 2-1 2-2 I 2-3 Management Organization 56 Ginna Station Organization 58 Electric Transmission and Distribution 59 Organization Quality Performance Organization 57 2-5 2-6 Engineering Division Organization Ginna Station Review and Audits Functions 60 61 Revision 17 December 1991 UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R.E.Ginna'uclear Power Plant.This program applies to all activities affecting the safety'elated functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection.
: Handling, StorageandShippingInspection, TestandOperating StatusNonconforming Materials, PartsandComponents Corrective ActionQualityAssurance RecordsAudits2426282930313334Revision17December1991
In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71 excluding fabrication and design of.shipping casks.The basic Rochester Gas=and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer.This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering, through the Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station;Division Manager, Technical Services;and Chief Engineer, and heads of other supporting departments.
~'ISTOFTABLESTableNumberTitle1QualityAssurance ProgramProcedures SubjectL'istingProcurement DocumentRequirements AuditListPacae375152LISTOFFIGURESFiureNumberTitlePacaeI2-12-2I2-3Management Organization 56GinnaStationOrganization 58ElectricTransmission andDistribution 59Organization QualityPerformance Organization 572-52-6Engineering DivisionOrganization GinnaStationReviewandAuditsFunctions 6061Revision17December1991 UALITYASSURANCE PROGRAMFORSTATIONOPERATION ualitAssurance ProramTheQualityAssurance Programhasbeendeveloped bytheRochester GasandElectricCorporation toassuresafeandreliableoperation oftheR.E.Ginna'uclear PowerPlant.Thisprogramappliestoallactivities affecting thesafety'elatedfunctions ofthestructures, systems,andcomponents thatpreventormitigatetheconsequences ofpostulated accidents thatcouldcauseunduerisktothehealthandsafetyofthepublic.Thesequalityaffecting activities includeoperation, maintenance, repair,inservice inspection, procurement, refueling, modification, testandinspection.
The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program.The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
Inaddition, theQualityAssurance Programappliestotheactivities associated withthepackaging oflicensedradioactive materials tobeshippedinaccordance with10CFRPart71excluding fabrication anddesignof.shipping casks.ThebasicRochester Gas=andElectricCorporation qualityassurance policyisestablished bytheChairmanoftheBoard,President andChiefExecutive Officer.Thispolicyisimplemented undertheoveralldirection oftheSeniorVicePresident, Production andEngineering, throughtheDepartment Manager,QualityPerformance; VicePresident-GinnaNuclearProduction; thePlantManager-Ginna Station;DivisionManager,Technical Services; andChiefEngineer, andheadsofothersupporting departments.
The program is implemented through Quality Assurance/Quality Control, Ginna Station, Engineering, Production Division Training, Materials Engineering and Inspection Services, Electric Transmission and Distribution, and Purchasing procedures.
TheprogramisgovernedbyaGinnaStationQualityAssurance Manualwhichcontainstherequirements andassignment ofresponsibilities forimplementation oftheprogram.Themanualisprepared,
These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Performance.
: reviewed, andmaintained byQualityPerformance andapprovedbytheSeniorVicePresident, Production andEngineering.
The procedures are contained in separate manuals maintained by the responsible organization.
Theprogramisimplemented throughQualityAssurance/Quality Control,GinnaStation,Engineering, Production DivisionTraining, Materials Engineering andInspection
These procedures are reviewed for adequacy at least once every two years by the responsible organization.
: Services, ElectricTransmission andDistribution, andPurchasing procedures.
Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in the procedures.
Theseprocedures arepreparedandapprovedbytheresponsible organization andreviewedandconcurred withbyQualityPerformance.
Revision 17 December, 1991 Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.Organizational responsibilities are described in Section 2.The Quality Assurance Program covers all existing-Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports.Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance.
Theprocedures arecontained inseparatemanualsmaintained bytheresponsible organization.
A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in the Ginna Master Equipment Database.Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings.The listing of structures, systems,'and components covered by the Quality Assurance Program are prepared and maintained by Nuclear Engineering Services.Modifications or additions to existing structures, systems, and components are designated the same'eismic classifica-tion as the existing system..New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced.Personnel responsible for performing activities affecting quality.are trained and indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures.
Theseprocedures arereviewedforadequacyatleastonceeverytwoyearsbytheresponsible organization.
Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure.
Tablel-lprovidesalistingofthesubjectsandashortdescription ofthesubjectmatterwhichiscontained intheprocedures.
Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality.Quality Performance assists in establishing training requirements and assures that personnel are trained by a'uditing training.In addition to training in quality assurance, each depart-ment conducts training, including on-the-job training, to Revision 17 December, 1991  
Revision17December, 1991 Organizational interfaces aredefinedandcontrolled bysectionsoftheQualityAssurance Manual.Organizational responsibilities aredescribed inSection2.TheQualityAssurance Programcoversallexisting-SeismicCategoryIandClass1Estructures, systems,andcomponents, including theirfoundations andsupports.
Activities affecting thequalityofthesestructures, systems,andcomponents arecontrolled toanextentconsistent withtheirsafetysignificance.
Adetailedlistingofthestructures, systemsandcomponents coveredbytheQualityAssurance ProgramandbasedonSection3.2oftheUpdatedFinalSafetyAnalysisReport,iscontained intheGinnaMasterEquipment Database.
Detailsofthesystemboundaries andthequalityclassi-ficationofwater-and-steam-containing components arecon-tainedonsystemflowdrawings.
Thelistingofstructures, systems,'and components coveredbytheQualityAssurance Programarepreparedandmaintained byNuclearEngineering Services.
Modifications oradditions toexistingstructures, systems,andcomponents aredesignated thesame'eismic classifica-tionastheexistingsystem..Newstructures, systems,andcomponents aredesignated aseismicclassification inaccordance withtheguidelines inUSNRCRegulatory Guide1.29,Revision3.Supervisory personnel areindoctrinated inqualityassurance
: policies, manuals,andprocedures toassuretheyunderstand thatthesearemandatory requirements whichmustbeimple-mentedandenforced.
Personnel responsible forperforming activities affecting quality.aretrainedandindoctrinated intherequirements, purpose,scope,andimplementation ofqualityrelatedmanualsandprocedures.
Refresher sessionsareheldperiodically andretraining isrequiredwheneveranewprocedure isissuedoramajorrevisionismadetoanexistingprocedure.
Trainingofpersonnel notintheQualityPerformance organization istheresponsibility ofeachdepartment performing anactivityaffecting quality.QualityPerformance assistsinestablishing trainingrequirements andassuresthatpersonnel aretrainedbya'uditing training.
Inadditiontotraininginqualityassurance, eachdepart-mentconductstraining, including on-the-job
: training, toRevision17December, 1991  


theextentnecessary toassurethatpersonnel arequalified fortheirprimaryworkassignments.
the extent necessary to assure that personnel are qualified for their primary work assignments.
TheVice-President, GinnaNuclearProduction isresponsible fortheformaltraining, qualification, licensing, andre-qualification ofoperators, asnecessary.
The Vice-President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary.
Wherenecessary, personnel aretrainedinradiation protection, plantsafetyandsecurity.-
Where necessary, personnel are trained in radiation protection, plant safety and security.-
TheNuclearSafetyAuditandReviewBoardisrequiredtoreviewthestatusandadequacyoftheQualityAssurance Programatleastonceeverytwoyearstoassurethatitismeaningful andiseffectively complying withcorporate
The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate.policy and 10CFR50, Appendix B.This review consists of-audits or a review equivalent to an audit performed by company personnel or outside organizations..The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
.policyand10CFR50,AppendixB.Thisreviewconsistsof-auditsorareviewequivalent toanauditperformed bycompanypersonnel oroutsideorganizations.
a~b.c~NRC Regulatory Guide 1.8, Revision 1,"Personnel Selec-tion and Training." NRC Regulatory Guide 1.28', Revision 2,"Quality Assur-ance Program Requirements (Design and Construction)." AEC Regulatory Guide 1.30, Revision 0,"Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment." d.AEC Regulatory Guide 1.33, Revision 0,"Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled"Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0)e.AEC Regulatory Guide 1.37, Revision 0,"Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants." Revision 17 December, 1991  
.TheQualityAssurance Programisdesignedtomeettherequirements ofTitle10oftheCodeofFederalRegulations, Part50,AppendixB,"QualityAssurance CriteriaforNuclearPowerPlants."Theprogramconformstothefollowing NRCRegulatory GuidesandANSIStandards:
a~b.c~NRCRegulatory Guide1.8,Revision1,"Personnel Selec-tionandTraining."
NRCRegulatory Guide1.28',Revision2,"QualityAssur-anceProgramRequirements (DesignandConstruction)."
AECRegulatory Guide1.30,Revision0,"QualityAssurance Requirements fortheInstallation, Inspection, andTestingofInstrumentation andElectricEquipment."
d.AECRegulatory Guide1.33,Revision0,"QualityAssurance ProgramRequirements (Operation),"
andregulatory staffcommentsandsupplementary guidancecontained inthedocumententitled"Guidance onQualityAssurance Requirements DuringtheOperations PhaseofNuclearPowerPlants,"Revision0datedOctober1973(OrangeBook-Revision0)e.AECRegulatory Guide1.37,Revision0,"QualityAssurance Requirements forCleaningofFluidSystemsandAssociated Components ofWater-Cooled NuclearPowerPlants."Revision17December, 1991  


NRCRegulatory Guide1~38,Revision2,"QualityAssurance Requirements forPackaging,
NRC Regulatory Guide 1~38, Revision 2,"Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants." g.NRC Regulatory Guide 1.39, Revision 2,"Housekeeping Requirements for Water-Cooled Nuclear Power Plants." h.NRC Regulatory Guide 1.58, Revision 1,"Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel." NRC Regulatory Guide 1.64, Revision 1,"Quality Assurance Requirements for the Design of Nuclear Power Plants." NRC Regulatory Guide 1.74, Revision 0,"Quality Assurance Terms and Definitions".
: Shipping, Receiving, Storage,andHandlingofItemsforWater-CooledNuclearPowerPlants."g.NRCRegulatory Guide1.39,Revision2,"Housekeeping Requirements forWater-Cooled NuclearPowerPlants."h.NRCRegulatory Guide1.58,Revision1,"Qualification ofNuclearPowerPlantInspection, Examination andTestingPersonnel."
k..NRC Regulatory Guide 1.88, Revision 2,"Collection, Storage and Maintenance of Nuclear Power Plant Records." Note: When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.mo NRC Regulatory Guide l.ll6, Revision O-R,"Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems." NRC Regulatory Guide 1.123, Revision 1,"Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants." n.0~NRC Regulatory Guide 1.144, Revision 1,"Auditing of Quality Assurance Programs for Nuclear Power Plants" NRC Regulatory Guide 1.146, Revision 0,"Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants." Revision 17 December, 1991 2.Or anization The major organizations participating in the Quality Assur-ance Program are Purchasing, Technical Services, Ginna Nuclear Production, Electric Transmission and Distribution, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board.Figure 2-1 is an organizational chart showing these organizations and'their relationship to the corporate organization.
NRCRegulatory Guide1.64,Revision1,"QualityAssurance Requirements fortheDesignofNuclearPowerPlants."NRCRegulatory Guide1.74,Revision0,"QualityAssurance TermsandDefinitions".
Positions responsible for the principal elements of the quality assurance program are:<Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna'uclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manger, Quality Performance Manager, Quality Assurance Department Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials-Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Manager, Nuclear Assurance Department Superintendent, Electric Substations Department Department Superintendent, Electric Laboratory and Telecommunications Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.
k..NRCRegulatory Guide1.88,Revision2,"Collection, StorageandMaintenance ofNuclearPowerPlantRecords."
These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering.
Note:Whenrecordstoragefacilities arenotdesignedinaccordance withtherequirements ofRegulatory Guide1.88,duplicate recordsarekeptintwoseparatestoragelocations inseparatebuildings whicharephysically isolatedfromeachother.moNRCRegulatory Guidel.ll6,RevisionO-R,"QualityAssurance Requirements forInstallation, Inspection, andTestingofMechanical Equipment andSystems."
The qualifications of members and the responsibilities of=these organizations are described in Section 6.0, Technical Specifications, Appendix A to Provisional Operating License No.DPR-l8.Revision 17 December, 1991 The Cha'irman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporat'ion directed the establishment of the Quality Assurance Program and i'ssued the governing policy statement..
NRCRegulatory Guide1.123,Revision1,"QualityAssurance Requirements forControlofProcurement ofItemsandServicesforNuclearPowerPlants."n.0~NRCRegulatory Guide1.144,Revision1,"Auditing ofQualityAssurance ProgramsforNuclearPowerPlants"NRCRegulatory Guide1.146,Revision0,"Qualification ofQualityAssurance ProgramAuditPersonnel forNuclearPowerPlants."Revision17December, 1991 2.Oranization Themajororganizations participating intheQualityAssur-anceProgramarePurchasing, Technical
He has established the Nuclear Safety Audit and Review Board to'review and audit plant operati;ons.
: Services, GinnaNuclearProduction, ElectricTransmission andDistribution, QualityPerformance, thePlantOperations ReviewCommittee, andtheNuclearSafetyAuditandReviewBoard.Figure2-1isanorganizational chartshowingtheseorganizations and'theirrelationship tothecorporate organization.
.The Chairman of the Nuclear Safety Audit and Review Board is'esponsible to the Chairman of the Board, President and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.
Positions responsible fortheprincipal elementsofthequalityassurance programare:<ChairmanoftheBoard,President andChiefExecutive OfficerSeniorVicePresident, Production andEngineering VicePresident, Ginna'uclear Production DivisionManager,Technical ServicesandChiefEngineerDepartment Manager,NuclearEngineering ServicesDepartment Manger,QualityPerformance Manager,QualityAssurance Department Manager,Production andEngineering SystemsDepartment ManagerandPurchasing Agent,Materials-Management PlantManager,GinnaStationSuperintendent, GinnaSupportServicesSuperintendent, GinnaProduction Department Manager,Production DivisionTrainingManager,NuclearAssurance Department Superintendent, ElectricSubstations Department Department Superintendent, ElectricLaboratory andTelecommunications Manager,Materials Engineering andInspection ServicesInadditiontotheaboveindividuals, twoadvisorygroupsareutilizedtoreviewandauditplantoperations.
In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual.He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station.He is also responsible for those items delineated in Section 6.0, Technical Specifications.
ThesegroupsarethePlantOperations ReviewCommittee andtheNuclearSafetyAuditandReviewBoard.ThePlantOperations ReviewCommittee actsinanadvisorycapacitytothePlantManager,GinnaStationandtheNuclearSafetyAuditandReviewBoardadvisestheSeniorVicePresident, Production andEngineering.
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna nuclear production activities and those support activities'ssociated with Nuclear Engineering Services,'roduction Systems and Services, Production Division Training,'nd Corporate Radiation Protection.
Thequalifications ofmembersandtheresponsibilities of=theseorganizations aredescribed inSection6.0,Technical Specifications, AppendixAtoProvisional Operating LicenseNo.DPR-l8.Revision17December, 1991 TheCha'irman oftheBoard,President andChiefExecutive OfficeroftheRochester GasandElectricCorporat'ion directedtheestablishment oftheQualityAssurance Programandi'ssuedthegoverning policystatement..
The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station.He is responsible for the performance of all Ginna Station quality affecting activities in accordance with the requirements of the quality assurance program.He is responsible for providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures.
Hehasestablished theNuclearSafetyAuditandReviewBoardto'reviewandauditplantoperati;ons.
He is also responsible for those items delineated in Section 6.0, Technical Specifications.
.TheChairmanoftheNuclearSafetyAuditandReviewBoardis'esponsible totheChairmanoftheBoard,President andChiefExecutive Officeronallactivities oftheNuclearSafetyAuditandReviewBoard.TheSeniorVicePresident, Production andEngineering reportstotheChairmanoftheBoard,President andChiefExecutive Officerandhascorporate responsibility foroperation ofGinnaStationinaccordance withapplicable regulatory requirements.
The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of modification, plant maintenance, and fire.protection'activities in accordance with the'requirements of the Quality Assurance Program.Revision 17 December, 1991 The Superintendent, Ginna Production reports to the Plant Manager, Ginna Station, and is responsible for operations, health physics and chemistry, refueling, results and tests, Ginna Computer Systems technical engineering, surveillance testing and operational assessment in accordance with the requirements of the quality assurance'program.
Inaddition, hehasoverallresponsibility andauthority fordirecting theQualityAssurance Programandshallberesponsible fortheapprovaloftheQualityAssurance Manual.Heisresponsible forestablishing thepoliciesandrequirements necessary toassuresafeandreliableoperation ofGinnaStation.Heisalsoresponsible forthoseitemsdelineated inSection6.0,Technical Specifications.
The Plant Manager, Ginna Station and Superintendents are assisted by other designated staff members, Figure 2;3,'in the implementation of certain Quality Assurance Program requirements at the plant.These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, maintenance of material handling equipment, and control of all activities involving operation,'aintenance, repair,~refueling and modification.
TheVicePresident, GinnaNuclearProduction isresponsible totheSeniorVicePresident, Production andEngineering fordirecting Ginnanuclearproduction activities andthosesupportactivities'ssociated withNuclearEngineering Services,'roduction SystemsandServices, Production DivisionTraining,'nd Corporate Radiation Protection.
The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an INPO accredited training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities." The Department Manager, Nuclear, Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management'.
ThePlantManager,GinnaStationisresponsible totheVicePresident, GinnaNuclearProduction fortheoverallon-sitesafeoperation ofGinnaStation.Heisresponsible fortheperformance ofallGinnaStationqualityaffecting activities inaccordance withtherequirements ofthequalityassurance program.Heisresponsible forproviding qualified personnel toperformtheseactivities inaccordance withapproveddrawings, specifications, andprocedures.
As requested by Ginna Station, he is also responsible for reviewing unique maintenance and repair procedures for major equipment.
Heisalsoresponsible forthoseitemsdelineated inSection6.0,Technical Specifications.
The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station.These activities include long range planning for life extension and low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support.In addition, he provides support to Nuclear Engineering Services to assist in administration and training associated with procedure changes and to provide coordination for generating responses to audits and inspections.
TheSuperintendent, SupportServicesreportstothePlantManager,GinnaStationandisprimarily responsible fortheperformance ofmodification, plantmaintenance, andfire.protection'activities inaccordance withthe'requirements oftheQualityAssurance Program.Revision17December, 1991 TheSuperintendent, GinnaProduction reportstothePlantManager,GinnaStation,andisresponsible foroperations, healthphysicsandchemistry, refueling, resultsandtests,GinnaComputerSystemstechnical engineering, surveillance testingandoperational assessment inaccordance withtherequirements ofthequalityassurance'program.
Revision 17 December, 1991 The Department Manager, Production and Engineering Systems is responsible to the Division Manager,, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.
ThePlantManager,GinnaStationandSuperintendents areassistedbyotherdesignated staffmembers,Figure2;3,'intheimplementation ofcertainQualityAssurance Programrequirements attheplant.Thesestaffmembersareassignedresponsibility fortesting,procurement, storageofmaterialandequipment, operation andteststatuscontrol,calibration andcontrolofmeasuring andtestequipment, maintenance ofmaterialhandlingequipment, andcontrolofallactivities involving operation,'aintenance, repair,~refueling andmodification.
The Department Managery Quality Performance is responsible for establishing the overall Quality Assurance Program.He is responsible for assuring that all planned and systematic-actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed.He'rovides management with'objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.He has the authority and organizational freedom to assure all necessary quality activities are performed.
TheDepartment Manager,Production DivisionTrainingisresponsible totheVicePresident, GinnaNuclearProduction formaintaining andimplementing anINPOaccredited trainingprogramand,inconjunction withMaterials Engineering andInspection
In addition, he is responsible for special processes and the'nservice inspection program.He is responsible for.maintaini'ng a staff, Figure 2-2, for the conduct of staff training and for directing its activities.
: Services, forproviding trainedandqualified welders,riggersandcraneoperators tosupportnuclearrelatedactivities."
The staff assists in the preparation and maintenance of the Quality Assurance Manual.The Manager, Quality Assurance reports to the Department Manager, Quality Performance.
TheDepartment Manager,Nuclear,Engineering Servicesisresponsible totheVicePresident, GinnaNuclearProduction fordesigning andconstructing majormodifications inaccordance withapplicable designbases,regulatory requirements, codesandstandards andfornuclearfuelmanagement'.
He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation.
Asrequested byGinnaStation,heisalsoresponsible forreviewing uniquemaintenance andrepairprocedures formajorequipment.
This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of 10CFR50, Appendix B, and for maintaining the total program up to date..The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program.The staff is also responsible for auditing and surveillance of aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected.
TheDivisionManager,Technical ServicesandChiefEngineerisresponsible totheSeniorVicePresident, Production andEngineering fordirecting activities insupportofGinnaStation.Theseactivities includelongrangeplanningforlifeextension andlowlevelradwastedisposalstrategies, personnel supportforGinnaStationmaintenance activities, recordsretention, documentcontrol,chemistry andenvironmental requirements support.Inaddition, heprovidessupporttoNuclearEngineering Servicestoassistinadministration andtrainingassociated withprocedure changesandtoprovidecoordination forgenerating responses toauditsandinspections.
They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.
Revision17December, 1991 TheDepartment Manager,Production andEngineering Systemsisresponsible totheDivisionManager,,
They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveillances at these supplier's facilities.
Technical ServicesandChiefEngineerforproviding recordsmanagement anddocumentcontrolsupportservicesfornuclearrelatedactivities.
In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule, audit status reports and applicable corrective action report summaries.
TheDepartment ManageryQualityPerformance isresponsible forestablishing theoverallQualityAssurance Program.Heisresponsible forassuringthatallplannedandsystematic
Revision 17 December, 1991  
-actionsnecessary toprovideadequateconfidence thatGinnaStationwilloperatesafelyandreliablyareestablished andfollowed.
He'rovides management with'objective information concerning quality,independent oftheindividual orgroupdirectlyresponsible forperforming thespecificactivity.
Hehastheauthority andorganizational freedomtoassureallnecessary qualityactivities areperformed.
Inaddition, heisresponsible forspecialprocesses andthe'nservice inspection program.Heisresponsible for.maintaini'ng astaff,Figure2-2,fortheconductofstafftrainingandfordirecting itsactivities.
Thestaffassistsinthepreparation andmaintenance oftheQualityAssurance Manual.TheManager,QualityAssurance reportstotheDepartment Manager,QualityPerformance.
HeandtheQualityAssurance Staffareresponsible forformulating corporate qualityassurance policyandforassuringitsimplementation.
ThisincludeswritingQualityAssurance
: policies, assuringthattheprogramsatisfies therequirements of10CFR50,AppendixB,andformaintaining thetotalprogramuptodate..TheManager,QualityAssurance isalsoresponsible forestablishing andimplementing acomprehensive auditandsurveillance program,aswellasreviewing administrative procedures oftheorganizations participating intheQualityAssurance Program.Thestaffisalsoresponsible forauditingandsurveillance ofaspectsoftheQualityAssurance Programandforensuringsignificant conditions adversetoqualityarecorrected.
Theyareresponsible forassuringthatpropercodes,standards, andqualityrequirements arespecified indesign,procurement andinstallation documents.
Theyareresponsible forassuringthatthesuppliers ofsafety-related
: material, equipment andservicesareproperlyqualified, andtheyareresponsible forconducting auditsandsurveillances atthesesupplier's facilities.
Inaddition, thestaffassiststheManager,QualityAssurance, inthepreparation oftheauditschedule, auditstatusreportsandapplicable corrective actionreportsummaries.
Revision17December, 1991  


TheManager,QualityAssurance isagraduateengineerwithatleastsixyearsofresponsible experience, ofwhichtwoyearsareinqualityassurance andthreeyearsinthedesignoroperation ofnuclearpowerplants.TheManager,Materials Engineering andInspection Servicesisresponsible forsupervising anddirecting astaffwhichisresponsible forthedevelopment andqualification ofprocedures utilizedforspecialprocesses.
The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years are in quality assurance and three years in the design or operation of nuclear power plants.The Manager, Materials Engineering and Inspection Services is responsible for supervising and directing a staff which is responsible for the development and qualification of procedures utilized for special processes.
Heisresponsible forproviding functional guidanceanddirection forthosemethods.Heisresponsible forestablishing theInservice Inspection Programandforcoordinating changesthereto.Heisalsoresponsible fortheroutinemaintenance ofliftingand'andling equipment andforthetestingandevaluation ofGinnaStationmaterials.
He is responsible for providing functional guidance and direction for those methods.He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto.He is also responsible for the routine maintenance of lifting and'andling equipment and for the testing and evaluation of Ginna Station materials.
TheManager,NuclearAssurance reportstotheDepartment Manager,QualityPerformance andisresponsible forassuringthatstationactivities affecting qualityareprescribed andcarriedoutinaccordance withapproveddrawings, specifica-tions,andprocedures.
The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifica-tions, and procedures.
HeisamemberofthePlantOperations ReviewCommittee anddelegates thedaytodayqualityassurance andcontrolplanningandworkmonitoring responsibilities tohisstaffofQualityContxolEngineers andQC,Inspectors.
He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and control planning and work monitoring responsibilities to his staff of Quality Contxol Engineers and QC,Inspectors.
TheQualityControlEngineers areresponsible forthereviewofdesignandinstallation documents andforthereviewofplantprocedures whichinvolvemaintenance, repair,refueling, modification, andtesting.NuclearAssurance isresponsible forthecoordination ofinspection activities andtheassurance thatinspection requirements areincludedinapprovedprocedures-andworkpackages.
The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing.Nuclear Assurance is responsible for the coordination of inspection activities and the assurance that inspection requirements are included in approved procedures-and work packages.This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear related activities.
Thisincludesthereceiptinspection ofincomingmaterials, partsandcomponents andtheprocessing ofnonconformance reports.TheNuclearAssurance QualityControlInspectors alsoperformcompliance orientedsurveillance ofnuclearrelatedactivities.
The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.
TheDepartment ManagerandPurchasing Agent,Materials Management isresponsible fortheprocurement ofmaterials,
He'aintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Nuclear Engineering Services, Quality Assurance and the other involved departments as appropriate.
: services, andcomponents, fromqualified suppliers, inaccordance withapplicable commercial, technical, andqualityrequirements.
The Department Superintendent, Electric Laboratory and Telecommunications is responsible for providing a staff, Revision 17 December, 1991 Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters.He is also responsible for providing laboratory testing of some electrical equipment and devices.The Department Superintendent, Electric Substations Department is responsible for providing a staff, Figure 2-4, to perform relay engineering, maintenance and testing services.He is also responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Electric Transmission and Distribution Division.3~Desi n Control Design activities are performed by, Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or-components.
He'aintains alistingofqualified suppliers determined throughanevaluation madebyPurchasing, NuclearEngineering
Augmenting.this effort is the design and technical support provided by the Electric Substations Department for the systems and equipment, for which Electric Transmission and Distribution is responsible for maintaining.
: Services, QualityAssurance andtheotherinvolveddepartments asappropriate.
In this regard they support Nuclear Engineering Services for design of safety related modifications.
TheDepartment Superintendent, ElectricLaboratory andTelecommunications isresponsible forproviding astaff,Revision17December, 1991 Figure2-4,toperformroutinemaintenance andtestingservicesforGinnaStationmeters.Heisalsoresponsible forproviding laboratory testingofsomeelectrical equipment anddevices.TheDepartment Superintendent, ElectricSubstations Department isresponsible forproviding astaff,Figure2-4,toperformrelayengineering, maintenance andtestingservices.
Ginna Station is responsible for the design and control of design activities for Minor m'odifications of structures, systems, or components.
Heisalsoresponsible fordesign,modification andconstruction activities atStation13Aandforsupporting theNuclearEngineering Servicesdesignandconstruction activities atGinna.Heisalsoresponsible forcoordinating andforproviding supportdocumentation foranydesignmodifications initiated withintheElectricTransmission andDistribution Division.
Ginna Station is also responsible for classifying station originated modifications as either Major or Minor.Nuclear Engineering Services reviews and concurs with modifications being classified as Minor.Minor modifications typically involve (1)component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements, ,(2)additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component-10-Revision 17 December, 1991 required for safe shutdown of the plant to an unacceptable
3~DesinControlDesignactivities areperformed by,Rochester GasandElectricCorporation personnel oraresubcontracted toorganizations providing servicestoRochester GasandElectric.
'evel, (3)changes to a safety related system determined not ,to be major (e.g., vents, drains, alarms, indicating lights, etc.).Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval,'istribution, control, and revision requirements; and corrective action.'esign con-siderations include, as appropriate:
NuclearEngineering Servicesisresponsible forthedesignandcontrolofdesignactivities (including designinterfaces) formajormodifications ofstructures, systemsor-components.
physics, stress, materials, thermal, hydraulic, radiation and accident analyses;appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair;acceptance and rejection criteria;and quality standards and other quality assurance requirements.
Augmenting
Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.The design of plant modifications is verified by an engineer other than the one who performed the original design.For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.
.thiseffortisthedesignandtechnical supportprovidedbytheElectricSubstations Department forthesystemsandequipment, forwhichElectricTransmission andDistribution isresponsible formaintaining.
For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting engineers, as appropriate.
InthisregardtheysupportNuclearEngineering Servicesfordesignofsafetyrelatedmodifications.
Spare or replacement parts must at least meet the original equipment's technical and quality requirements.
GinnaStationisresponsible forthedesignandcontrolofdesignactivities forMinorm'odifications ofstructures, systems,orcomponents.
For plant modifications, standard,"off-the-shelf", commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design.Supplemental procedures are established for the review and approval of field changes..In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.Where this.is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are com-petent in the specific design area.-11-Revision 17 December, 1991 Design verification and field change systems are methods ut'ilized to detect, document and correct design process errors and deficiencies.
GinnaStationisalsoresponsible forclassifying stationoriginated modifications aseitherMajororMinor.NuclearEngineering Servicesreviewsandconcurswithmodifications beingclassified asMinor.Minormodifications typically involve(1)component changeswhichinvolvevendordesignandarelimitedtotheextentthatthechangedoesnotimpactexistingperformance requirements,
In addition, the corrective action'ystem, described in Section 16,, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adv'erse to quality.Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks,=and reviews.Design control procedures are reviewed to assure that an independent verification is performed.
,(2)additions withinSeismicCategoryIbuildings whichperformnosafetyfunctions andwhichneitherinterface withSeismicCategoryIorClass1Eitemsnorwhosefailurecouldreducethefunctioning ofanysafetyrelatedcomponent Revision17December, 1991 requiredforsafeshutdownoftheplanttoanunacceptable
Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information.
'evel,(3)changestoasafetyrelatedsystemdetermined not,tobemajor(e.g.,vents,drains,alarms,indicating lights,etc.).Designcontrolisimplemented bymeansofprocedures whichinclude:designconsiderations, designreviewrequirements; internalandexternalinterface controlconsiderations; designdocumentreview,approval,'istribution, control,andrevisionrequirements; andcorrective action.'esigncon-siderations include,asappropriate:
The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate.
physics,stress,materials, thermal,hydraulic, radiation andaccidentanalyses; appropriate designbases,codes,standards andregulations; acceptability foroperation, maintenance andrepair;acceptance andrejection criteria; andqualitystandards andotherqualityassurance requirements.
Design'documents include des'ign criteria, analyses, specifications, drawings, design review records, and changes thereto.Quality Performance, through preparation assistance and/or review, assure the proper inclusion.
Designverification utilizesvariousmethodssuchasformaldesignreviews,alternate calculations, ortests,asappropriate, toassuretheadequacyofthedesign.Thedesignofplantmodifications isverifiedbyanengineerotherthantheonewhoperformed theoriginaldesign.ForMajormodification design,thismaybedonebyNuclearEngineering Servicesdesignengineers orconsulting engineers asrequested.
of quality standards in the design of major and minor modifications.
ForMinormodification stationdesign,thismaybedonebyGinnaStation,NuclearEngineering Servicesdesignengineers orconsulting engineers, asappropriate.
Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications.
Spareorreplacement partsmustatleastmeettheoriginalequipment's technical andqualityrequirements.
The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.Plant modifications are controlled by means of applicable Ginna Station, Engineering, Electric Transmission and Distribution, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures.
Forplantmodifications,
These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures.
: standard, "off-the-shelf",
Plant~Revision 17 December, 1991 modifications are reviewed by the Plant Operations Review'ommittee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.
commercial orpre-viouslyapprovedmaterials, parts,andequipment areselectedandreviewedforsuitability ofapplication byadesignengineer.
4~Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.
Changestoamodification designarenormallyreviewedandapprovedinaccordance withthesameprocedures astheoriginalmodification design.Supplemental procedures areestablished forthereviewandapprovaloffieldchanges..Ingeneral,designchangesincluding fieldchanges,arereviewedandapprovedbytheorganizations orindividuals thatperformed, reviewedandapprovedtheoriginaldesign.Wherethis.isnotpractical, otherresponsible designorganizations orindividuals aredesignated, providedtheyhaveaccesstopertinent background information andarecom-petentinthespecificdesignarea.-11-Revision17December, 1991 Designverification andfieldchangesystemsaremethodsut'ilized todetect,documentandcorrectdesignprocesserrorsanddeficiencies.
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.Procurement of materials, parts, components, and services is initiated by department staff per'sonnel.
Inaddition, thecorrective action'ystem, described inSection16,,isutilizedtocontrolanddocumentcorrective actiontoprecluderecurrence ofthosedesignprocesserrorsanddeficiencies whichareconsidered tobeasignificant condition adv'ersetoquality.QualityAssurance isresponsible forassuringthatdesigncontrolprocedures, whethertheworkisdonebyRochester GasandElectricorbyotherorganizations, arepreparedandimplemented andincorporate appropriate designcontrolpractices, checks,=andreviews.Designcontrolprocedures arereviewedtoassurethatanindependent verification isperformed.
Procurement proce-dures'require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-l.t Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision.
Engineering andGinnaStationareresponsible forestablishing measuresforthepropercontrolofdesigndocuments andrevisions there-to, toassurethatdistribution istoresponsible individuals andinatimelymannertopreventinadvertent useofsuperseded designinformation.
Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution and Quality Assurance/Quality Control are reviewed by Quality Performance and approved by designated departmental
Themeasuresincludetheuseofdocumentrevisionlevels,documenttransmittals, releasestamps,fieldchangerequestformsanddistribution lists.Designdocuments arecollected, stored,andmaintained inaccordance withSection6and17,asappropriate.
Design'documents includedes'igncriteria,
: analyses, specifications,
: drawings, designreviewrecords,andchangesthereto.QualityPerformance, throughpreparation assistance and/orreview,assuretheproperinclusion.
ofqualitystandards inthedesignofmajorandminormodifications.
QualityPerformance isalsoresponsible forassuringthatadequatetest,examination andinspection requirements areincludedinspecifications.
TheManager,QualityAssurance reviewsandapprovesanydeviations fromqualitystandards whentheyoccur.Plantmodifications arecontrolled bymeansofapplicable GinnaStation,Engineering, ElectricTransmission andDistribution, Materials Engineering andInspection
: Services, Production DivisionTrainingandQualityAssurance/Quality Controlprocedures.
Theseprocedures provideforthepreparation, review,andapprovalofdesigndocuments, safetyanalyses, andplantmodification procedures.
Plant~Revision17December, 1991 modifications arereviewedbythePlantOperations Review'ommittee andNuclearSafetyAuditandReviewBoardasrequiredbySection6.0,Technical Specifications.
4~Procurement DocumentControlProcurement documentcontrolappliestothecontrolofprocurement documents formaterials, parts,components, andservicesrequiredtoperformqualityaffecting activities.
Suchdocuments maybepreparedbyRochester GasandElectricorbyacontractor andincludepurchaserequisitions, purchaseorders,serviceagreements, contracts, specifications, anddrawings.
Procurement ofmaterials, parts,components, andservicesisinitiated bydepartment staffper'sonnel.
Procurement proce-dures'requirethatorganizations preparing procurement documents considerandinclude,asappropriate, theitemslistedinTable4-l.tProcurement documents, including thoserequesting spareorreplacement parts,initiated atGinnaStationarereviewedbyQualityPerformance andapprovedbythedesignated GinnaStationsupervision.
Procurement documents initiated inNuclearEngineering
: Services, Materials Engineering andInspection
: Services, ElectricTransmission andDistribution andQualityAssurance/Quality ControlarereviewedbyQualityPerformance andapprovedbydesignated departmental
'supervision.
'supervision.
Evidenceofreviewandapprovalofprocurement documents isrecordedonthe.documents andidentifies toPurchasing aprocurement methodwhichwillensurethattheselectedsupplieriscapableofproviding theitemorserviceinaccordance withtherequirements oftheprocurement documents.
Evidence of review and approval of procurement documents is recorded on the.documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents.
Considerations usedinselecting asupplierandfordetermining thecorresponding procurement methodaredescribed inSection7.Afterpurchaserequisitions, serviceagreements, contracts, specifications, and,drawings havereceivedtherequiredre-viewsandapprovals, apurchaseorderisissued'yPurchasing totheselectedsupplierandcontrolled asdescribed inSection7.Thesedocuments aremaintained byPurchasing, bytheoriginating department, and/orbythereceiving locations, asappropriate, untilprocurement iscompleted.
Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.After purchase requisitions, service agreements, contracts, specifications, and,drawings have received the required re-views and approvals, a purchase order is issued'y Purchasing to the selected supplier and controlled as described in Section 7.These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
Revision17December, 1991 Under.nocircumstances arepurchasing requirements altered.(exceptforquantityorpricing)during-orderplacement unlessreviewandconcurrence isobtainedfromthosewhowererequiredtoreview,concurwith,andapprovetheoriginaldocuments asdescribed above.Changesorrevisions toprocurement documents aresubjecttothesamereviewandapprovalrequirements astheoriginaldocuments.
Revision 17 December, 1991 Under.no circumstances are purchasing requirements altered.(except for quantity or pricing)during-order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above.Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.
Originating department technical reviewofprocurement documents includesverification ofapplicable regulatory, codeanddesignrequirements.
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.
QualityPerformance reviewoftheaboveincludes-checkstoverifyproperinclusion ofthequalitystandards, qualityassurance programrequirements, methodofprocurement andtheapplicable acceptance criteria.
Quality Performance review of the above includes-checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable acceptance criteria.Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compati-'ility, and acceptance criteria of the original design.Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.
GinnaStationreviewsprocurement documents forspareorreplacement partstodetermine similarity, compati-'ility, andacceptance criteriaoftheoriginaldesign.QualityPerformance alsoreviewsprocurement documents forspareorreplacement partsforadequacyofthequalityrequirements.
Instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing
Instructions Procedures andDrawinsEachRochester GasandElectriccompanyorganization, involvedinqualityrelatedactivities, isresponsible fordeveloping, reviewing, approving, andimplementing
.procedures as required to implement the Quality Assurance Program.These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel.
.procedures asrequiredtoimplement theQualityAssurance Program.Theseprocedures coveractivities suchasdocumentcontrol,trainingofpersonnel, andresponsibilities anddutiesofpersonnel.
Quality Performance reviews and concurs with=these procedures.
QualityPerformance reviewsandconcurswith=these procedures.
Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing.This includes instructions and procedures listed in USAEC Regulatory Guide.1.33 for administrative control;general plant operation; startup, operation, and shutdown of safety related systems;correction of abnormal, off normal, or alarm conditions; response to emergencies and other significant events;radioactivity control;control of measuring and test equipment; chemical and radiochemical Revision 17 December, 1991 control;and fuel handling and refueling.
Table1-1providesasummaryofthesubjectmattercontained intheprocedures whichareusedtoimplement thequalityassurance program.Procurement documents requiresuppliers andcontractors tohaveappropriate instructions, procedures, specifications, anddrawings.
Ginna Station is responsible for-appropriate changes to such documents upon receipt of regulatory directives; instructions from Roches-ter Gas and Electric management, or the completion of plant modxfzcata.ons.
GinnaStationisresponsible forproviding andimplementing instructions andprocedures associated withoperation, maintenance, repair,in-service inspection, refueling, procurement, modification andtesting.Thisincludesinstructions andprocedures listedinUSAECRegulatory Guide.1.33foradministrative control;generalplantoperation; startup,operation, andshutdownofsafetyrelatedsystems;correction ofabnormal, offnormal,oralarmconditions; responsetoemergencies andothersignificant events;radioactivity control;controlofmeasuring andtestequipment; chemicalandradiochemical Revision17December, 1991 control;andfuelhandlingandrefueling.
Gonna Station xs also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.Electric Transmission and Distribution is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspec-tions and testing activities for which they ar'e responsible.
GinnaStationisresponsible for-appropriate changestosuchdocuments uponreceiptofregulatory directives; instructions fromRoches-terGasandElectricmanagement, orthecompletion ofplantmodxfzcata.ons.
Electric Transmission and Distribution also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.Nuclear Engineering Services is responsible for providing approved specifications, and drawings associated with major modifications and when minor modifications necessitate drawings oh specifications.
GonnaStationxsalsoresponsible forthepreparation andissuanceofthoseminormodification designdocuments notprovidedbyNuclearEngineering Servicesortheequipment supplier.
These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.Engineering has established procedures for revising drawings and specifications.
ElectricTransmission andDistribution isresponsible forthepreparation andimplementation ofrelayinspection andtestingprocedures asrequiredtodirectdetailedinspec-tionsandtestingactivities forwhichtheyar'eresponsible.
These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
ElectricTransmission andDistribution alsoassistsinthepreparation ofroutinerelaymaintenance andtestingprocedures usedbytheirpersonnel intheannualGinnaStationprotective relaysurveillance program.NuclearEngineering Servicesisresponsible forproviding approvedspecifications, anddrawingsassociated withmajormodifications andwhenminormodifications necessitate drawingsohspecifications.
Quality Performance is responsible for the preparation and implementation of inspection procedures utilized for detailed inspection activities for Ginna Station.This organization is responsible for providing and for implementing procedures for audit and surveillance related activiti'es.
Thesedocuments requirethoseperforming theworktoobtain,understand, andcomplywithappropriate procedures, specifications anddrawings.
In addition, it is responsible for providing and for implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.
Engineering hasestablished procedures forrevisingdrawingsandspecifications.
Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.Indoctrination and training of personnel is provided by the-15-Revision 17 December, 1991 responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents.
Theseprocedures coverupdatingofas-builtdrawingsafterplantmodifications andtherevision,
In addition, Quality Performance department surveillance and audit as described in Section 10 and Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.Document Control Procedures are established to control the issuance of pro-cedures, instructions, drawings, and specifications.
: approval, distribution, andcontrolofalldrawingsandspecifications.
Standard document control requirements are contained in the Quality Assurance Manual.The Plant Manager, Ginna Station is responsible for the control of all documents issued at Ginna Station.='lectric Transmission and Distribution and Production Division Training are responsible for the control of documents issued by their respective organizations.
QualityPerformance isresponsible forthepreparation andimplementation ofinspection procedures utilizedfordetailedinspection activities forGinnaStation.Thisorganization isresponsible forproviding andforimplementing procedures forauditandsurveillance relatedactiviti'es.
Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1).Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.The Quality Assurance Manual designates responsibilities and'defines requirements for the preparation, review and approval of documents.
Inaddition, itisresponsible forproviding andforimplementing instructions andprocedures associated withspecialprocesses, routinemaintenance andinspection ofcranesandhandlingequipment aswellasmaterials testingandinservice inspection.
Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements.
Personspreparing andapproving documents areresponsible forassuringthatspecifications, instructions, procedures, anddrawingsincludeappropriate quantitative orqualitative acceptance criteriafordetermining thatimportant activities havebeensatisfactorily accomplished andassuringthatthedocuments arekeptcurrent.Indoctrination andtrainingofpersonnel isprovidedbythe-15-Revision17December, 1991 responsible organizations toensurethatqualityaffecting activities areconducted inaccordance withestablished documents.
Nuclear Assurance Quality'Control representatives, assigned to support departmental maintenance, repair, refueling and modification activities, review governing procedures, prior to use, to assure quality assurance requirements'are included.The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications.
Inaddition, QualityPerformance department surveillance andauditasdescribed inSection10andSection18areusedtoverifythatqualityaffecting activities arebeingperformed inaccordance withapprovedinstructions, procedures anddrawings.
Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with.that activity.Ginna Station, Engineering, Material Engineering and Inspection Services, Purchasing, Production Division Training and Electric Transmission and Distribution quality assurance implementing procedures Revision 17 December, 1991 (Table 1-1)require the review and concurrence of Quality'erformance and the approval of the appropriate department supervisor.
DocumentControlProcedures areestablished tocontroltheissuanceofpro-cedures,instructions,
Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.Zt specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document;includes the method for identifying holders of controlled copies;requires that only controlled copies of a document be used for official purposes;requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
: drawings, andspecifications.
Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifications and drawings.Suppliers of materials, equipment, and services are required in procure-ment documents to provide for control of documents, including manufacturing, inspection and testing instructions.
Standarddocumentcontrolrequirements arecontained intheQualityAssurance Manual.ThePlantManager,GinnaStationisresponsible forthecontrolofalldocuments issuedatGinnaStation.=
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required;to pro-perly review and approve documents such as procedures, instructions, specifications, arid drawings;to provide the same reviews and approvals for changes to documents as was required of the original document;to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent;to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.Quality Performance is responsible for review and concurrence of procurement documents for all procuring-17-Revision 17=December, 1991 organizations and, therefore, procurement document control requirements.
'lectricTransmission andDistribution andProduction DivisionTrainingareresponsible forthecontrolofdocuments issuedbytheirrespective organizations.
Quality Performance is responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.
Production andEngineering Systemscontrolsthedistribution ofcontrolled manualsissuedfortheotherorganizations performing activities whichimplement thisQualityAssurance Program(Table1-1).Eachorganization controlling documents hasaseparateprocedure tocontroldocuments inaccordance withtherequirements oftheQualityAssurance Manual.TheQualityAssurance Manualdesignates responsibilities and'definesrequirements forthepreparation, reviewandapprovalofdocuments.
Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.All procurement is conducted in accordance with procurement documents as stated in Section 4;All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the control of the supplier performance.
Eachdepartment responsible foranactivityisresponsible forproviding thenecessary reviewandapprovalofinstructions, procedures ordrawingstoassurethattheyareadequate, andincludeappropriate qualitative andquantitative requirements.
Source inspection (surveillance)., certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items.In.lieu of these methods, acceptance of services is based.on either or a combination of: (1)surveillance of the activity and (2)review of objective evidence for conformance to the procure-ment document requirements (i.e.certifications, stress reports etc.).The extent of the acceptance methods and as-sociated verification activities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.
NuclearAssurance Quality'Control representatives, assignedtosupportdepartmental maintenance, repair,refueling andmodification activities, reviewgoverning procedures, priortouse,toassurequalityassurance requirements'are included.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.
ThePlantOperations ReviewCommittee hastheresponsibility forreviewing GinnaStationprocedures priortotheirapprovalasrequiredbySection6.0,Technical Specifications.
Results of the planning are incorporated in the procurement documents.
Detailedinspection, testandexamination procedures usedbyqualified personnel requirethereviewandconcurrence oftheresponsible technical personassociated with.thatactivity.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.
GinnaStation,Engineering, MaterialEngineering andInspection
The evaluation which is accomplished during the procurement Revision 17 December, 1991 planning, determines the necessity for the supplier selection to be from the approved suppliers list maintained by Purchasing.
: Services, Purchasing, Production DivisionTrainingandElectricTransmission andDistribution qualityassurance implementing procedures Revision17December, 1991 (Table1-1)requirethereviewandconcurrence ofQuality'erformance andtheapprovaloftheappropriate department supervisor.
Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program.The evaluation guidelines for source selection considers the.item complexity, method(s)of acceptance and for a replacement item, if the source is to be restricted to the original supplier.For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction.
QualityAssurance/Quality Controlprocedures areapprovedbytheDepartment Manager,QualityPerformance ordesignee.
Items or services which meet industry standards and are typically utilized in applications other than nuclear may be purchased from suppliers not listed on the approved suppliers list provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection.
TheQualityAssurance Manualrequiresthatdocuments becontrolled asappropriate, considering thetypeofdocumentinvolved, itsimportance tosafety,andtheintendeduseofthedocument.
Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed, on the approved suppliers list provided that verification of nuclear quality can be accomplished by method's such as source surveillance, pre-'r post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.
Ztspecifies thetypesofdocuments whichmustbecontrolled; identifies thedifference betweencon-trolledanduncontrolled copiesofthesamedocument; includesthemethodforidentifying holdersofcontrolled copies;requiresthatonlycontrolled copiesofadocumentbeusedforofficialpurposes; requiresthatlistsofeffective revisions beissuedperiodically; requireslistsofdocumentholderstobemaintained bythedistributors; andrequiresthatdistributors transmitcontrolled documents usingapprovedformsinternally andexternally.
Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method.The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments, as appropriate.
Typesofdocuments whicharecontrolled includeTechnical Specifications, UFSAR,QualityAssurance Manual,procedures (suchasengineering, purchasing, repair,maintenance, test,calibration, fuelhandling, modification, andadministrative),
For engineered items, Nuclear Engineering Services is responsible for evaluating the overall design or manufacturing.
specifications anddrawings.
capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents.
Suppliers ofmaterials, equipment, andservicesarerequiredinprocure-mentdocuments toprovideforcontrolofdocuments, including manufacturing, inspection andtestinginstructions.
'19-Revision 17 December, 1991 As part of this review, the supplier s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.Quality Assurance i's responsible, for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of lOCFR50 Appendix B, and Rochester Gas and Electric Corporation requirements.
TheQualityAssurance Manualfurtherrequiresthateachorganization provideinitsprocedures formeasures:
The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records'and their retention, and quality assurance requirements and controls'mposed by the supplier on his subcontractors.
toassurethatdocuments areavailable whenrequired; topro-perlyreviewandapprovedocuments suchasprocedures, instructions, specifications, ariddrawings; toprovidethesamereviewsandapprovals forchangestodocuments aswasrequiredoftheoriginaldocument; torequirethatorganiza-tionswhichreviewandapprovedocuments haveaccesstopertinent information andadequateknowledge oftheoriginaldocumentintent;toassurethatapprovedchangesarepromptlytransmitted forincorporation intodocuments; andtoassurethatobsoleteorsuperseded documents areeliminated fromthesystemandnotused.QualityPerformance isresponsible forreviewandconcurrence ofprocurement documents forallprocuring Revision17=December, 1991 organizations and,therefore, procurement documentcontrolrequirements.
Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance.requirements.
QualityPerformance isresponsible forreview,inspection, surveillance, andaudit,asappropriate, ofdocumentcontrolsystemstoassureadequatesystemsareimplemented.
Ginna Station, Quality Performance and Electric Transmission and Distribution evaluate the suppliers of inspection, test, and calibration services which they intend to use.The departments responsible for performing supplier evalu-ations shall document'their results in reports which discuss areas investigated, findings, and conclusions.
ControlofPurchased MaterialEuimentandServicesProcurement documents, supplierselection, planningforitemorserviceacceptance, controlofsupplierperformance andacceptance ofitemsandservicesarefivemajormeansusedincontrolling purchased
As applicable, concurrence of Purchasing, Nuclear'ngineering Services, Quality Performance, Ginna Station and Electric~Transmission and Distribution is required to place a supplier on the qualified suppliers'ist.
: material, equipment andservices.
One organization can remove a supplier from the list without concurrence of: the others.Measures are established by Nuclear Engineering Services and Quality Assurance to control supplier performance for engineered items.These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier.'n addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.
Allprocurement isconducted inaccordance withprocurement documents asstatedinSection4;Allreviews,inspections, surveillances, andauditsareconducted bypersonnel whoarecompetent inestablishing whetherornotasupplieriscapableofproviding acceptable, qualityproducts.
With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.-20-Revision 17 December, 1991 Quality Assurance is re'sponsible for determining and documenting the degree of supplier surveillance (including review, inspection, or audit)required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance.
Procurement planningisutilizedbytheprocuring organiza-tionsfordetermining themethodstobeusedforacceptance oftheitemorserviceaswellasrequirements forthecontrolofthesupplierperformance.
The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.
Sourceinspection (surveillance).,
For complex engineered items, Quality.Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement.
certificate ofconformance, receiptinspec-tionandpostinstallation testaremethodswhichareconsidered foritemacceptance withreceiptinspection utilizedintheacceptance ofallitems.In.lieuofthesemethods,acceptance ofservicesisbased.oneitheroracombination of:(1)surveillance oftheactivityand(2)reviewofobjective evidenceforconformance totheprocure-mentdocumentrequirements (i.e.certifications, stressreportsetc.).Theextentoftheacceptance methodsandas-sociatedverification activities willvaryandbeafunctionoftherelativeimportance andcomplexity ofthepurchased itemorserviceandthesuppliers pastperformance.
When a deviation from purchase order requirements is noted, the Quality Assurance represen-tative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.
Consideration forthecontrolofsupplierperformance includesthenecessity fordocumentsubmittals orsurveillance, andunderwhatsituation thesupplieristoreportnonconformances.
Quality Performance is responsible for.surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements.
Resultsoftheplanningareincorporated intheprocurement documents.
The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
Selection ofasupplierisbasedontheevaluation ofitscapability toprovidetheitemorservicesinaccordance withtherequirements oftheprocurement documents.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
Theevaluation whichisaccomplished duringtheprocurement Revision17December, 1991  
Department supervision is responsible for receiving and storing items pending their acceptance.
: planning, determines thenecessity forthesupplierselection tobefromtheapprovedsuppliers listmaintained byPurchasing.
Upon receipt, the department stockkeeper logs the item, places a"hold" tag on'he item, and notifies Quality Performance that the item has arrived;Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling.
Purchasing utilizestheapprovedsuppliers listastheselection sourceforthosesuppliers foundtohaveasatisfactory qualityassurance program.Theevaluation guidelines forsourceselection considers the.itemcomplexity, method(s) ofacceptance andforareplacement item,ifthesourceistoberestricted totheoriginalsupplier.
This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use.Documentary evidence sufficient to identify the-21-Revision 17 December, 1991 codes, standards or specifications met by the purchased material, equipment, and services is retained.In the'vent a final source inspection for'the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a'ocument check to assure that the required documentation has been reviewed and is complete.A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.If the item and documentation are adequate, Quality Performance labels the item as"Accepted", files the documentation and receipt inspection results, and releases the item for storage or use.If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section 15.All items iss'ued must bear an acceptance tag and have docu-mentation to support the acceptability of the item;In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.Identification and Control of Materials Parts and The identification and control of materials, parts, and components is accomplished in accordance with written requirements and appli.es to material, parts, or components in'ny stage of fabrication, storage, or installation.
Forengineered andoff-the-shelf itemsprocuredfromsuppliers requiredtohaveaqualityassurance program,supplierselection isfromtheapprovedsuppliers listsoronewhoisintheprocessofbeingaddedtoalist,afterhavingitscapability evaluated topurchaser satisfaction.
Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project.The identification and control requirements cover items such as: traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test'eports;specification of the degree of identification to preclude a degradation of the item's functional capability or quality;and the proper identification of materialsg parts, and components prior to release for manufacturing, shipping, construction, and installation.
Itemsorserviceswhichmeetindustrystandards andaretypically utilizedinapplications otherthannuclearmaybepurchased fromsuppliers notlistedontheapprovedsuppliers listprovidedthatitemacceptance canbebasedonacceptance ofstandardcommercial qualitywhichissupplemented, asnecessary, withsourcesurveillance, pre-orpost-installation tests,receipttests,commercial suppliertestreports,commercial suppliercertificates, orreceiptinspection.
Nuclear Engineering Services and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and-22-Revision 17 December, 1991 control of materials, parts, or components, as appropriate; Suppliers are required to assure that all required documentation for an item is properly identified and related to the item.Each item is'equired to be physically identified, either by marking on the item or by tags.Physical identification by purchase order number is used to the maximum extent possible for relating an, item at any time to applicable documentation.
Itemsorserviceswhichhavenuclearqualityrequirements whichnormallyrequirethesuppliertoimplement aqualityassurance programbutforwhichnosuchsuppliercanbepracticably utilizedmayalsobepurchased fromsuppliers notlisted,ontheapprovedsuppliers listprovidedthatverification ofnuclearqualitycanbeaccomplished bymethod'ssuchassourcesurveillance, pre-'rpost-installation tests,receipttests,suppliertestreports,suppliercertificates, orreceiptinspection asapprovedbyQualityAssurance.
Identification is either on the item or records traceable to the item.Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.The Plant Manager, Ginna Station is responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant.Procedures covering the identification and control of materials, parts, and components at the plant are approved by the Plant Manager, Ginna Station.The responsible supervision of other departments which receive material which is to be stored away from the-plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of.responsibility.
Departmental procedures establish guidelines forsourceselection evaluations andfordocumenting theresultsthroughindication ofthecorresponding procurement method.Thepurchaserequisition willalsoidentifythesourcewhenreplacement partsaretobeprocuredfromtheoriginalequipment supplier.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.
Additionofasuppliertotheapprovedsuppliers listisbasedonsatisfactory evaluation ofthesupplier's capability byQualityAssurance, Purchasing andotherdepartments, asappropriate.
Qualification of , personnel and special process procedures complies with the requirements of applicable codes and standards.
Forengineered items,NuclearEngineering Servicesisresponsible forevaluating theoveralldesignormanufacturing.
When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the.special process qualification requirements.
capability ofthesupplierincluding hisparticular technical abilitytoproducethedesign,service,item,orcomponent delineated intheprocurement documents.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements. Revision 17 December, 1991  
'19-Revision17December, 1991 Aspartofthisreview,thesuppliersdesigncapabilities, machinery capabilities, handlingcapabilities, testingfacilities, servicecapabilities, andexperience arereviewed.
QualityAssurance i'sresponsible, forevaluating thesupplier's overallqualityassurance organization andprograminaccordance withapplicable codes,standards, applicable partsoflOCFR50AppendixB,andRochester GasandElectricCorporation requirements.
Thereviewincludesconsideration of:companyorganization, qualityassurance personnel qualifications, reviewandcontrolofdesigndocuments, manufacturing procedures, qualityassurance procedures, calibration practices, acceptance
: criteria, requiredqualityassurance records'and theirretention, andqualityassurance requirements andcontrols'mposed bythesupplieronhissubcontractors.
Supplierevaluation isconducted bymeansofprocedures orchecklists whichidentifyapplicable regulatory orcodequalityassurance
.requirements.
GinnaStation,QualityPerformance andElectricTransmission andDistribution evaluatethesuppliers ofinspection, test,andcalibration serviceswhichtheyintendtouse.Thedepartments responsible forperforming supplierevalu-ationsshalldocument'theirresultsinreportswhichdiscussareasinvestigated,
: findings, andconclusions.
Asapplicable, concurrence ofPurchasing, Nuclear'ngineering
: Services, QualityPerformance, GinnaStationandElectric~Transmission andDistribution isrequiredtoplaceasupplieronthequalified suppliers'ist.
Oneorganization canremoveasupplierfromthelistwithoutconcurrence of:theothers.Measuresareestablished byNuclearEngineering ServicesandQualityAssurance tocontrolsupplierperformance forengineered items.Thesemeasurestypically includetheprocessing ofchangeinformation, surveillance ofsupplieractivities andthecontrolofdocuments exchanged withthesupplier.
'naddition, eachdepartment procuring off-the-shelfitemsorservicesestablishes similarmeasuresforthecontrolofsupplierperformance.
Withtheexception ofprocessing changeinformation, theneedforandapplicable extentofpurchaser controlsofthesupplieraredetermined duringprocurement planning. Revision17December, 1991 QualityAssurance isre'sponsible fordetermining anddocumenting thedegreeofsuppliersurveillance (including review,inspection, oraudit)requiredduringdesign,fabrication, inspection, testing,andshipping, andforproviding therequiredsurveillance.
Theobjective ofsuppliersurveillance istoprovideasamplingreviewofthesupplier's qualityassurance programimplementation andofproductconformance withrespecttothepurchaseorderrequirements.
Forcomplexengineered items,Quality.Assurance andNuclearEngineering Servicesareresponsible forjointdevelopment ofsurveillance plansinadvanceofsurveillance tripstoidentifyareastobereviewed.
Theresultsofthesurveillance triparedocumented bymeansofinspection sheetsortripreportswhicharedistributed totheManager,QualityAssurance, andthedepartment whichinitiated theprocurement.
Whenadeviation frompurchaseorderrequirements isnoted,theQualityAssurance represen-tativehastheauthority toinformthevendorthataparticular itemisunacceptable, toissueanonconformance report,ortostopwork,ifnecessary.
QualityPerformance isresponsible for.surveillance ofGinnaStationsitecontractors toassurethattheymeetalltechnical andqualityrequirements.
Thereporting anddocumenting ofcontractor surveillance ismanagedinamannersimilartosuppliersurveillance.
Theverification methodsfortheacceptance ofitemsandservicesarespecified ontheattachedprocurement controlformduringprocurement planningandthepurchaserequisition preparation.
Department supervision isresponsible forreceiving andstoringitemspendingtheiracceptance.
Uponreceipt,thedepartment stockkeeper logstheitem,placesa"hold"tagon'heitem,andnotifiesQualityPerformance thattheitemhasarrived;QualityPerformance isresponsible forreceiptinspection atGinnaStationupondeliveryofitemsandassociated servicesformaintenance, repair,modification, andrefueling.
Thisinspection includestheuseofwrittenprocedures orchecklists toverifythattheitemsandservicesconformtotheprocurement documents (ifthishasnotbeenperformed bysourceinspections) andthatdocumentary evidenceofconformance isavailable attheplantpriortoinstallation oruse.Documentary evidencesufficient toidentifythe-21-Revision17December, 1991 codes,standards orspecifications metbythepurchased
: material, equipment, andservicesisretained.
Inthe'ventafinalsourceinspection for'theacceptance isconducted priortoreceiptbyRG&E,QualityPerformance performsaninspection forshippingdamageorlostpartsanda'ocument checktoassurethattherequireddocumentation hasbeenreviewedandiscomplete.
Areceiving inspection checklist iscompleted forallitemsreceivedtodocumenttheextentoftheinspection performed, including thedocuments checked,andtheinspection results.Iftheitemanddocumentation areadequate, QualityPerformance labelstheitemas"Accepted",
filesthedocumentation andreceiptinspection results,andreleasestheitemforstorageoruse.Iftheitemisnonconforming orthedocumentation isunsatisfactory, QualityPerformance initiates controlsontheiteminaccordance withSection15.Allitemsiss'uedmustbearanacceptance tagandhavedocu-mentation tosupporttheacceptability oftheitem;Intheeventthetraceability islostorthedocumentation reviewisunsatisfactory, theitembecomesnonconforming andmaynotbereleasedforuse.Identification andControlofMaterials PartsandTheidentification andcontrolofmaterials, parts,andcomponents isaccomplished inaccordance withwrittenrequirements andappli.estomaterial, parts,orcomponents in'nystageoffabrication, storage,orinstallation.
Identification andcontrolrequirements areestablished byeitheranexistingprocedure orrequirements documents whicharepreparedduringtheplanningstagesofaproject.Theidentification andcontrolrequirements coveritemssuchas:traceability toassociated documents suchasdrawings, specifications, purchaseorders,manufacturing testdataandinspection documents, andphysicalandchemicalmilltest'eports;specification ofthedegreeofidentification toprecludeadegradation oftheitem'sfunctional capability orquality;andtheproperidentification ofmaterialsg parts,andcomponents priortoreleaseformanufacturing,
: shipping, construction, andinstallation.
NuclearEngineering ServicesandQualityPerformance areresponsible forassuringthatdrawingsandspecifications containappropriate requirements fortheidentification and-22-Revision17December, 1991 controlofmaterials, parts,orcomponents, asappropriate; Suppliers arerequiredtoassurethatallrequireddocumentation foranitemisproperlyidentified andrelatedtotheitem.Eachitemis'equired tobephysically identified, eitherbymarkingontheitemorbytags.Physicalidentification bypurchaseordernumberisusedtothemaximumextentpossibleforrelatingan,itematanytimetoapplicable documentation.
Identification iseitherontheitemorrecordstraceable totheitem.Wherephysicalidentification isimpractical, physicalseparation, procedural control,orotherappropriate meansareemployed.
ThePlantManager,GinnaStationisresponsible formain-tainingidentification andcontrolofmaterials, parts,orcomponents
: received, stored,installed, andusedattheplant.Procedures coveringtheidentification andcontrolofmaterials, parts,andcomponents attheplantareapprovedbythePlantManager,GinnaStation.Theresponsible supervision ofotherdepartments whichreceivematerialwhichistobestoredawayfromthe-plant areresponsible forestablishing procedures foridentification andcontrolandformaintaining identification andcontrolofmaterial, parts,orcomponents, storedorusedintheirareaof.responsibility.
Intheeventthattraceability islostforaspecificitem,itishandledasnonconforming materialanddeviations andwaiversarecontrolled anddocumented inaccordance withSection15.ControlofSecialProcesses Writtenprocedures areestablished tocontrolspecialpro-cesses,suchaswelding,heattreating, andnondestructive examination toassurecompliance withapplicable codes,standards, anddesignspecifications.
Qualification of,personnel andspecialprocessprocedures complieswiththerequirements ofapplicable codesandstandards.
Whenspecialprocessqualification requirements arenotincludedinexistingcodesandstandards, theyaredescribed inprocedures whichgivedetailsofthespecialprocess,thepersonnel qualification requirements, theequipment necessary, andthe.specialprocessqualification requirements.
Initiators ofprocurement activities areresponsible forrequiring suppliers, inprocurement documents, tocontrolspecialprocesses inaccordance withtheaboverequirements. Revision17December, 1991  


QualityPerformance personnel areresponsible forreviewing procurement documents toensurethatrequirements forcontrolofspecialprocesses areincluded.
Quality Performance personnel are responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved'y Materials Engineering and Inspection Services.Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards.
Rochester GasandElectricprocedures forspecialprocesses areprepared,
Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for'the'ualification of NDE personnel and procedures.
: reviewed, andapproved'y Materials Engineering andInspection Services.
The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures and the training and qualification of welders.Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.-Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.
Specialprocessprocedures submitted bysuppliers andcontractors arereviewedandconcurred withbyMaterials Engineering andInspection Services.
Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-cations, codes, standards, or regulatory requirements.
TheManager,NuclearAssurance andGinnaStationMaintenance Managersareresponsible forassuringthatpersonnel per-formingspecialprocesses undertheircognizance arequali-fiedandareusingqualified procedures inaccordance withapplicable codes,specifications, andstandards.
For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections.
WithintheQualityPerformance Department, theManager,Materials Engineering andInspection Servicesisresponsible for'the'ualification ofNDEpersonnel andprocedures.
Instructions for conducting detailed verification inspections are contained in inspection procedures.
TheManager,Materials Engineering andInspection Servicesisresponsible forthequalification ofweldingprocedures andthetrainingandqualification ofwelders.Recordsforpersonnel andprocedures todemonstrate thatrequiredqualifications havebeenobtainedandkeptcurrentaremaintained byProduction andEngineering Systems.-
These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.
QualityPerformance performssurveillance, inspections, andauditsofspecialprocesses performed byRochester GasandElectricorcontractors toassureeffective compliance withprocedures.
Inspection requirements and hold points are utilized to verify conformance of activities to the documented instructions, specifications, and drawings for-24-Revision 17 December, 1991 accomplishing the activity.Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for per-forming the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.Verification inspections are performed by qualified inspec-tion personnel who are independent of the personnel performing the work.Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.
InsectionProcedures preparedforthecontrolofactivities includeinspection requirements andholdpointsasrequiredbydrawings, instructions, requirements documents, specifi-cations,codes,standards, orregulatory requirements.
Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
Forclarification andtodistinguish frompreventive maintenance inspections, thefollowing controlsareassociated withthequalityassurance functioninspections andreferredtoasverification inspections.
Quality Performance personnel are responsible for performing verification inspections, as required, during'plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel.
Instructions forconducting detailedverification inspections arecontained ininspection procedures.
When the work is performed by.outside contractors, Quality Performance is responsible for surveillance of the subcontractor's inspection activities.
Theseinspection procedures andallsupporting specifications anddrawingsareprovidedtoinspection personnel forusepriortoperforming theinspection.
Inspection equipment is calibrated and controlled in accordance with Section 12.Calibration status is verified by inspection personnel prior to performing an inspection operation.
Inspection requirements andholdpointsareutilizedtoverifyconformance ofactivities tothedocumented instructions, specifications, anddrawingsfor-24-Revision17December, 1991 accomplishing theactivity.
In the event an inspection of processed material or products is impossible or impractical, indirect control, by monitoring processing methods, equipment, and personnel is provided.Both inspection and process monitoring are required when control is inadequate without both.Quality Performance is responsible for the verifying adequate inclusion of inspection requirements in specifications.
Inspection procedures includetheidentification ofqualitycharacteristics tobeinspected, adescription ofthemethodofinspection tobeused,theidentification ofthegroupresponsible forper-formingtheinspection, theacceptance andrejection
The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures.
: criteria, therequirements fortherecording ofinspection results,andtherequirements forproviding evidenceofcompletion andcertification oftheinspection activity.
He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.
Verification inspections areperformed byqualified inspec-tionpersonnel whoareindependent ofthepersonnel performing thework.Outsidecontractors arerequiredbyprocurement documents tohaveandfollowsimilarprocedures andtouseindependent inspectors.
The Manager, Nuclear Assurance is also responsible for assuring that adequate inspection requirements are included-25-Revision 17 December, 1991  
Inspectors aresufficiently trainedtoadequately evaluatetheactivitytheyareinspecting.
QualityPerformance personnel areresponsible forperforming verification inspections, asrequired, during'plant operation, maintenance, repair,in-service inspection, refueling, modification, andtestingwhentheworkisperformed byRochester GasandElectricpersonnel.
Whentheworkisperformed by.outsidecontractors, QualityPerformance isresponsible forsurveillance ofthesubcontractor's inspection activities.
Inspection equipment iscalibrated andcontrolled inaccordance withSection12.Calibration statusisverifiedbyinspection personnel priortoperforming aninspection operation.
Intheeventaninspection ofprocessed materialorproductsisimpossible orimpractical, indirectcontrol,bymonitoring processing methods,equipment, andpersonnel isprovided.
Bothinspection andprocessmonitoring arerequiredwhencontrolisinadequate withoutboth.QualityPerformance isresponsible fortheverifying adequateinclusion ofinspection requirements inspecifications.
TheManager,NuclearAssurance isresponsible forassuringthatadequateinspection requirements andholdpointsareincludedinmaintenance, repair,refueling, modification andtestinginstructions andprocedures.
Heisalsoresponsible fortheassignment ofqualified personnel requiredfortheperformance ofverification inspections andqualitycontrolsurveillances ofqualityaffecting activities.
TheManager,NuclearAssurance isalsoresponsible forassuringthatadequateinspection requirements areincluded-25-Revision17December, 1991  


inprocedures, instructions and/orchecklists controlling maintenance, modification andrepairactivities andrelatedfabrication processes forGinnaStation.Withtheexception ofthatwhichpertainstoPumpandValveTesting,theManager,Materials Engineering andInspection Servicesisresponsible forestablishing therequirements fortheInservice Inspection Program.NuclearEngineering Servicesisresponsible forestablishing therequirements fortheInservice PumpandValveTestingProgram.Theprogramforinservice inspection ofthereactorcoolantsystemandothersafetyrelatedsystemsiscontained inSection4.2,Technical Specifications.
in procedures, instructions and/or checklists controlling maintenance, modification and repair activities and related fabrication processes for Ginna Station.With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements for the Inservice Inspection Program.Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
TestControl'Checksortestingperformed toverify'he adequacyofcorrective orpreventive maintenance shallbeperformed toapprovedinstructions, procedures, ordrawings.
Test Control'Checks or testing performed to verify'he adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.Whenever testing is required to demonstrate that a material, part, component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements.
Whenevertestingisrequiredtodemonstrate thatamaterial, part,component, orsystemwillperformsatisfactorily inservice,atestprogramisinstituted employing writtenandapprovedprocedures whichareinaccordance withbasicrequirements established inTechnical Specifications, draw-ings,instructions, procurement documents, specifications, codes,standards, andregulatory requirements.
The test program requires the identification,'ontrol, and documen-tation of all tests, and-the preparation of written proce-dures required for satisfactory accomplishment of the testing.Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria;instruc-t tions for disposition of deviations; data collection requirements; and test result approval.The Plant Manager, Ginna Station is responsible for the statio'n test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.
Thetestprogramrequirestheidentification,'ontrol, anddocumen-tationofalltests,and-thepreparation ofwrittenproce-duresrequiredforsatisfactory accomplishment ofthetesting.Togetherthewrittenprocedures andchecklists forthetestingprograminclude:necessary testequipment andcalibration requirements; materialrequirements; testpersonnel requirements; prerequisite plantandequipment conditions; limitingconditions; detailedperformance instructions forthetestingmethodandtestequipment instrumentation; acceptance andrejection criteria; instruc-ttionsfordisposition ofdeviations; datacollection requirements; andtestresultapproval.
Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station.The Plant Manager, Ginna Station is responsible Revision 17 December, 1991 for the correct and timely'performance of the required tests utilizing written and approved procedures.
ThePlantManager,GinnaStationisresponsible forthestatio'ntestprogram,whichincludesthesurveillance testprogramrequiredbySection4.0,Technical Specifications andtestingassociated withmodifications.
When contractors are employed for tests, the contractor is required to perform testing in accordance with.its quality assurance program requirements.
Testprocedures arepreparedbytheplantstaff,reviewedbythePlantOperations ReviewCommittee andQualityPerformance, andapprovedbythePlantManager,GinnaStation.ThePlantManager,GinnaStationisresponsible Revision17December, 1991 forthecorrectandtimely'performance oftherequiredtestsutilizing writtenandapprovedprocedures.
All test results are required to be documented, reviewed, and approved by those responsible for performing the test.When requested by Ginna Station, Electric Transmission and Distribution performs test activities to determine the cause of protective relay malfunctions.
Whencontractors areemployedfortests,thecontractor isrequiredtoperformtestinginaccordance with.itsqualityassurance programrequirements.
These test activities are performed in accordance with approved procedures by qualified personnel..
Alltestresultsarerequiredtobedocumented,
Nuclear Engineering Services and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications.
: reviewed, andapprovedbythoseresponsible forperforming thetest.Whenrequested byGinnaStation,ElectricTransmission andDistribution performstestactivities todetermine thecauseofprotective relaymalfunctions.
Nuclear Engineering Services and Electric Transmission and Distribution assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff.The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.
Thesetestactivities areperformed inaccordance withapprovedprocedures byqualified personnel..
Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requi'rements.
NuclearEngineering ServicesandQualityPerformance areresponsible forassuringthatrequiredtestsformajormodifications areincludedinspecifications.
Control of Measurin and Test E ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.
NuclearEngineering ServicesandElectricTransmission andDistribution assistance inthepreparation ofmodification-relatedtestprocedures maybeprovidedtotheGinnaStationstaff.TheGinnaStationTechnical Managerisresponsible fortheadequateinclusion oftestrequirements inminormodification designdocuments andforreviewing modification-related testresultsforacceptability todesignrequirements.
Calibra-tion procedures include step-by-step methods for calibration and requirements for instrument accuracy.Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.
Reviewsofminormodification designbyQualityPerformance verifiesadequateinclusion oftestrequi'rements.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next-27-Revision 17 December, 1991  
ControlofMeasurinandTestEuimentThecalibration andcontrolsystemformeasuring andtestequipment includescalibration procedures, establishment ofcalibration frequencies, andmaintenance andcontrolrequirements ofmeasuring andtestinstruments, tools,gauges,shopstandards, andnondestructive testequipment whicharetobeusedinthemeasurement, inspection, andmonitoring ofcomponents, systems,andstructures.
Calibra-tionprocedures includestep-by-step methodsforcalibration andrequirements forinstrument accuracy.
Calibration frequency isbasedonrequiredaccuracy, degreeofusage,stability characteristics, manufacturer's recommendations, experience, andotherconditions affecting measurement capability.
Controlofmeasuring andtestequipment requires:
arecallsystemassuringtimelycalibration ofequipment; asystemproviding uniqueidentification ofequipment, traceability tocalibration testdata,andidentification ofthenext-27-Revision17December, 1991  


calibration dateontheequipment; asystemproviding trace-abilityof=shopstandards tonationally recognized standards (wherenationalstandards donotexist,procedures containinstructions todocumentthebasisforcalibration) andperiodicrevalidation ofshopstandards; asystemproviding forrecordstobemaintained whichindicatethecompletestatusofallitems,underthecalibration systemincluding themaintenance, calibration results,abnormalities, andlastandfuturecalibration dates;andasystemcontrolling thepurchaserequirements ofnewequipment tobeenteredintothecalibration andcontrolsystemincluding require-mentsforaccuracy, stability, andrepeatability undernormaluseconditions.
calibration date on the equipment; a system providing trace-ability of=shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items, under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates;and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability under normal use conditions.
Intheeventameasuring instrument (i.e.shoporfieldstandard) isfoundoutofcalibration, aninvestigation isconducted, todetermine thevalidityofpreviousmeasurements.
In the event a measuring instrument (i.e.shop or field standard)is found out of calibration, an investigation is conducted, to determine the validity of previous measurements.
ThePlantManager,GinnaStationisresponsible fortheprocedures andprogramrequiredtoassurecontrolandcali-brationofmeasuring andtestequipment atGinna"Stationinaccordance withtheaboverequirements.
The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and cali-bration of measuring and test equipment at Ginna" Station in accordance with the above requirements.
Instruments specified inSection4.l,Technical Specifications, areincludedintheprogram.Tools,gauges,andinstruments necessary formaintenance, inspection, andtestarecali-bratedandcontrolled inaccordance withstationprocedures.
Instruments specified in Section 4.l, Technical Specifications, are included in the program.Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.
Measuring, testorinspection equipment usedbyNuclearAssurance QualityControlisincludedintheprogram.TheManager,Materials Engineering andInspection Servicesand,Department Superintendent, Electrical Laboratory andTelecommunicati'ons areresponsible forestablishing aprogramandthepreparation ofprocedures forthecontrolandcalibration ofmeasuring andtestequipment usedbytheirrespective organizations.
Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.The Manager, Materials Engineering and Inspection Services and, Department Superintendent, Electrical Laboratory and Telecommunicati'ons are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.
HandlinStoraeandShiinGinnaStationSupervision isresponsible fordeveloping andimplementing procedures forthehandling, storage,shipping, preservation, andcleaningofmaterialandequipment delivered toorlocatedatGinnaStation.ElectricTransmission andDistribution, andMaterials Engineering andInspection Servicesareresponsible forpreparing andimplementing procedures forthehandling, storage,shipping, preservation, and.cleaning ofmaterialandequipment delivered toorlocatedintheirworkareas.Inaddition, theManager,Materials Engineering andInspection Servicesisresponsible forpreparing andimplementing procedures fortheroutinemaintenance andinspection ofliftingand-28-Revision17December, 1991 handlingequipment.
Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.Electric Transmission and Distribution, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and.cleaning of material and equipment delivered to or located in their work areas.In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and-28-Revision 17 December, 1991 handling equipment.
Undernormalcircumstances, manufac-turer'sspecificwritteninstructions andrecomme'ndations andpurchasespecification requirements areinvokedforcleanliness, preservation, specialha'ndling, andstoragewithrespecttoenvironmental requirements.
Under normal circumstances, manufac-turer's specific written instructions and recomme'ndations and purchase specification requirements are invoked for cleanliness, preservation, special ha'ndling, and storage with respect to environmental requirements.
Intheabsenceof,orinadditionto,specificmanufacturer requirements, themanagement mayinvokeadditional requirements in'accordance withdepartment procedures.
In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in'accordance with department procedures.
The,Department Manager,NuclearEngineering Servicesisresponsible forspecifying inprocurement documents andinengineering specifications thatwrittenprocedures beused,asappropriate, forthehandling,
The, Department Manager, Nuclear Engineering Services is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, clean-ing, and preservation of materials and equipment procured for major modifications.
: shipping, storage,clean-ing,andpreservation ofmaterials andequipment procuredformajormodifications.
These.procedures are prepared by contractors, by the station staff, or by staff members of.Electric Transmission and Distribution as appropriate.
These.procedures arepreparedbycontractors, bythestationstaff,orbystaffmembersof.ElectricTransmission andDistribution asappropriate.
Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages'of manufacturing and installation prior to operational acceptance.
Rochester GasandElectricprocedures arereviewedandapprovedasdescribed inSection6.Inthepreparation ofprocurement documents, department procedures, andcontractor procedures, consideration ofhandling,
P Quality Performance is responsible for review of engineering speci'fications to assure that proper handling, storing, and shipping requirements have been specified.
: shipping, storage,cleanliness, andpreservation isgiventoallmaterialandequipment throughout variousstages'of manufacturing andinstallation priortooperational acceptance.
Quality Performance is responsible for examination of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
PQualityPerformance isresponsible forreviewofengineering speci'fications toassurethatproperhandling, storing,andshippingrequirements havebeenspecified.
Ins ection'est and 0 eratin Status Equipment or systems not ready for normal service are'clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.The.Plant Manager, Ginna Station is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance, repair, or modifica-tion in accordance with the approved Electric System Operating Rules.The Plant Manager designates personnel who have station holding authority. Revision 17 December, 1991 Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
QualityPerformance isresponsible forexamination ofhandling, storage,andshippingactivities bysuppliers, Rochester GasandElectricpersonnel, andcontractors.
System status is indicated through the use of hold tags, block tags and corresponding control logs.Equipment or system inspection and test status are indicated by use of test tags,.labels, or work inspection and test status sheets.Written procedures control the use of hold tags, test tags, and labels.I Systems, components," and equipment which are found to be unacceptable during or after testing are clearly identified.
Insection'estand0eratinStatusEquipment orsystemsnotreadyfornormalserviceare'clearlyidentified byuseoftags,controllogs,andothersuitablemeanstoindicatethestatusinapositivemanner.Theidentification issufficient topositively indicatethestatusoftheparticular equipment orsystembeingisolated.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and,controlled by the use of tags, stamps, or other suitable means.Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejec-tion for a particular component, system, or structure.
The.PlantManager,GinnaStationisresponsible forindicat-ingthestatusofoperating equipment orsystemstoberemovedfromserviceformaintenance, repair,ormodifica-tioninaccordance withtheapprovedElectricSystemOperating Rules.ThePlantManagerdesignates personnel whohavestationholdingauthority. Revision17December, 1991 Personnel whohavestationholdingauthority areresponsible fordirecting thestatuschangeofequipment andsystemsinaccordance withtheapprovedstationholdingprocedures.
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented.
Systemstatusisindicated throughtheuseofholdtags,blocktagsandcorresponding controllogs.Equipment orsysteminspection andteststatusareindicated byuseoftesttags,.labels,orworkinspection andteststatussheets.Writtenprocedures controltheuseofholdtags,testtags,andlabels.ISystems,components,"
Material Engineering and Inspection Services establishes the procedures for implementing the inspection, status sheets utilized during inservice inspection.
andequipment whicharefoundtobeunacceptable duringoraftertestingareclearlyidentified.
Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.
Fuelhandlingoperations involving fuelassemblies orotherradioactive sourcesareidentified and,controlled bytheuseoftags,stamps,orothersuitablemeans.Maintenance, repair,ormodification ofcomponents, systems,orstructures utilizesprocedures, travelers, datasheets,instructions orchecklists toindicatestatusofthework,inspections ortestsandcorresponding acceptance orrejec-tionforaparticular component, system,orstructure.
Materials, parts, or components which do not conform to the drawing or specification requirements are identified and reported.RG&E personnel are responsible for initiating nonconformance reports and initiating dispositions.
Thesejobcontrolformsarepreparedbythejobsupervisor andreviewedbyNuclearAssurance QualityControlpersonnel andmaintained atadesignated controllocationtoindicatethestatusandthecompletion ofrequiredinspections andtests.QualityPerformance monitorsthestatuschangeofGinnaStationactivities fortheirimplementation ofapprovedprocedures andassuresthatinspection resultsareproperlydocumented.
Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance reports.-30-Revision 17 December, 1991 Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented.
MaterialEngineering andInspection Servicesestablishes theprocedures forimplementing theinspection, statussheetsutilizedduringinservice inspection.
Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to'revent inadvertent use prior to implementing the nonconformance-,disposition.
Nonconformin Materials PartsandComonentsProcedures areestablished forthecontrol,evaluation anddisposition ofdeficient
After installation or use, nonconforming items.are identified and controlled until approved disposition has been implemented.
: material, parts,andcomponents.
Nonconformances identified at a supplier's facility and reported to RG6E, which have supplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.
Materials, parts,orcomponents whichdonotconformtothedrawingorspecification requirements areidentified andreported.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
RG&Epersonnel areresponsible forinitiating nonconformance reportsandinitiating dispositions.
Items are repaired and reworked in accordance with approved procedures and current drawings.The repair or rework must be verified as acceptable by an inspection of the affected item or process which is at least equal to the original inspection method.Items which are accepted"use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance.
NuclearAssurance QualityControlpersonnel areresponsible forinspecting andapproving closeoutofnonconformance reports.-30-Revision17December, 1991 Priortoinstallation oruse,nonconforming itemsgenerally remaininaholdareauntilanapproveddisposition hasbeenimplemented.
All such items are approved prior to use by the cognizant organization having responsi-bility for the requirement.
Nonconforming itemsmaybereleasedforinstallation tomeetcriticalfabrication schedules providedcontrolsareestablished to'revent inadvertent usepriortoimplementing thenonconformance-,disposition.
In addition, those"use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.
Afterinstallation oruse,nonconforming items.areidentified andcontrolled untilapproveddisposition hasbeenimplemented.
Nuclear Assurance Quality Control personnel provide nonconformance status information periodically.
Nonconformances identified atasupplier's facilityandreportedtoRG6E,whichhavesupplierrecommended dispositions ofuse-as-is, orrepair,arenormallyprocessed bythedepartment originating theprocurement.
Quality Performance and other organizations analyze nonconformance r'eport data for adverse'trends and process periodic reports to management.
Organizations whichspecifytherequirement beingdispositioned areresponsible forreviewing andapproving thesupplierrecommended disposition.
Adverse trends form a basis for supplier re-., evaluation or for other corrective action.16.Corrective Action Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are reported and documented.
Itemsarerepairedandreworkedinaccordance withapprovedprocedures andcurrentdrawings.
Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies.
Therepairorreworkmustbeverifiedasacceptable byaninspection oftheaffecteditemorprocesswhichisatleastequaltotheoriginalinspection method.Itemswhichareaccepted"use-as-is" arefullydocumented withthedrawingorspecification requirement andtechnical justification foracceptance.
Once identified, the-31-Revision 17 December, 1991  
Allsuchitemsareapprovedpriortousebythecognizant organization havingresponsi-bilityfortherequirement.
Inaddition, those"use-as-is" nonconformances whichalsodeviatefromaDesignCriteriarequirement shallrequireadditional approvaloftheSeniorVicePresident, Production andEngineering.
NuclearAssurance QualityControlpersonnel providenonconformance statusinformation periodically.
QualityPerformance andotherorganizations analyzenonconformance r'eportdataforadverse'trendsandprocessperiodicreportstomanagement.
Adversetrendsformabasisforsupplierre-.,evaluation orforothercorrective action.16.Corrective ActionSignificant conditions adversetoqualitysuchasfailures, malfunctions, deficiencies, deviations, defective materialandequipment, andnonconformances arereportedanddocumented.
Significant conditions adversetoqualityincludeconditions affecting safety,conditions whichcouldresultinplantshutdown, highmaintenance items,andoperating procedure deficiencies.
Onceidentified, the-31-Revision17December, 1991  


condition, thecauseofthecondition, andthecorrective actiontakenshallbedocumented.
condition, the cause of the condition, and the corrective action taken shall be documented.
Significant conditions adversetoqualitymaybeidentified byanyonenotingthecondition andreportedtoGinnaStation'forreviewand,ifappropriate, theinitiation ofanappropriate corrective actionreport.Whenasignificant condition adversetoqualityatGinnaStationisidentified, QualityPerformance,evaluates theeffectofcontinuing theactivity.
Significant conditions adverse to quality may be identified by anyone noting the condition and reported to Ginna Station'for review and, if appropriate, the initiation of an appropriate corrective action report.When a significant condition adverse to quality at Ginna Station is identified, Quality Performance,evaluates the effect of continuing the activity.If continuing the activity would obscure or preclude-identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.Quality Performance Supervision has authority to stop work on, maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations.
Ifcontinuing theactivitywouldobscureorpreclude-identification andcorrection ofthedeficiency, continuing theactivitywouldincreasetheextentofthedeficiency orleadtoanunsafecondition, stopworkactionistaken.QualityPerformance Supervision hasauthority tostopworkon,maintenance, repair,inservice inspection, refueling, modification, testingorinspection deficiencies atGinnaStation,aswellasotherlocations.
Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
QualityPerformance mayrecommend stopworkactiontothePlantManager,GinnaStationonoperating deficiencies.
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engine'ering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution or cognizant suppl'ier associations.
TheManager,QualityAssurance hastheauthority tostopworkforconditions identified inPurchasing, NuclearEngine'ering
The Plant Operations Review Committee reviews all Corrective Action Reports initiated at Ginna Station and may recommend additional corrective action if the action does not result in adequate resolution.
: Services, Materials Engineering andInspection
Corrective action report committees of aff'ected RG&E management, review initiated reports to determine cause and to develop a corrective action plans, resolve the identified concern and to preclude recurrence.
: Services, ElectricTransmission andDistribution orcognizant suppl'ier associations.
Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable.
ThePlantOperations ReviewCommittee reviewsallCorrective ActionReportsinitiated atGinnaStationandmayrecommend additional corrective actioniftheactiondoesnotresultinadequateresolution.
The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.
Corrective actionreportcommittees ofaff'ected RG&Emanagement, reviewinitiated reportstodetermine causeandtodevelopacorrective actionplans,resolvetheidentified concernandtoprecluderecurrence.
Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.-32-Revision 17 December, 1991  
Conditions adversetoqualitywhichinvolvedesigndefi-cienciesorarecommended corrective actionwhichinvolvesadesignchangearereviewedbyGinnaStationorEngineering asapplicable.
Thecognizant organization determines thecauseofthecondition andrecommends corrective actiontoprecluderepetition.
QualityAssurance reviewsallcorrective actionreportstoassurethatthecauseofthecondition hasbeendetermined andthatcorrective actionhasbeentakentoprecluderepe-tition.-32-Revision17December, 1991  


Corrective actionsummaryreportsaresubmitted todepartmental supervision tokeepthemawareofsignificant
Corrective action summary reports are submitted to departmental supervision to keep them aware of significant
~conditions adversetoquality,relatedcausesandcorrective actionbeingtaken.SeniorManagement isadvisedofthecausesandactionsofthemoresignificant Corrective ActionReports.17.ualitAssurance RecordsQualityAssurance isresponsible forestablishing thebasicrequirements forqualityassurance recordretention andmaintenance.
~conditions adverse to quality, related causes and corrective action being taken.Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.17.ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance.
Production andEngineering Systems,asdirectedbytheDivisionManager,Technical ServicesandChiefEngineer, isresponsible fortheretention andmaintenance ofrecords.QualityPerformance, Purchasing, ResearchandScience,andElectricTransmission andDistribution departments areresponsible forassuringthemaintenance andretention ofrecordswhichtheyoriginate.
Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records.Quality Performance, Purchasing, Research and Science, and Electric Transmission and Distribution departments are responsible for assuring the maintenance and retention of records which they originate.
Thismaybeaccomplished eitherbyretaining therecordsintheirdepartment, orbyforwarding.
This may be accomplished either by retaining the records in their department, or by forwarding.
themtotheappropriate Production andEngineering Systemsrecordretention locations.
them to the appropriate Production and Engineering Systems record retention locations.
Eachorganization retaining recordsisresponsible for'preparation, review,app'roval, andimplementation ofspecificqualityassurance recordprocedures fortheirareasofresponsibility inaccordance
Each organization retaining records is responsible for'preparation, review, app'roval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance
'withtheserequirements.
'with these requirements.
Therecordswhichfallwithinqualityassurance recordrequirements includethoserecordsrequiredbySection6.10oftheTechnical Specifications andtheQualityAssurance Program.Allrecordsassociated withtheoperation, maintenance, repair,inservice inspection, refueling, modification, inspection andtestingofstructures, systems,andcomponents covered-bythequalityassurance programareincluded.
The records which fall within quality assurance record requirements include those records required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered-by the quality assurance program are included.Records, initiated at Ginna Station include operating logs;the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses;calibration procedures and reports;and Nonconformance and Corrective Action Reports.Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering, Systems record retention location.Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data-33-Revision 17 December, 1991 recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
Records,initiated atGinnaStationincludeoperating logs;theresultsofinspections, tests,andthemonitoring ofplantactivities;
The requirements and responsibilities for record accessibility and,transmittal are described in the Quality Assurance Manual sections as appropriate.
: drawings, procurement documents andmaterialanalyses; calibration procedures andreports;andNonconformance andCorrective ActionReports.Recordsofthequalification ofpersonnel, procedures, andequipment forspecialprocesses andtheresultsofreviewsaremaintained attheappropriate Production andEngineering, Systemsrecordretention location.
Requirements,and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention'f quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents.
Inspection andtestrecordscontainadescription ofthetypeoftestorinspection
~Records are available to authorized personnel.-Removal of records from storage is documented and accountability is maintained by, the responsible record control activity.Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.
: activity, evidenceofcompletion oftheactivity, results,thenameoftheinspector ordata-33-Revision17December, 1991  
Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentationI quality assurance records, such as audit reports and surveillance reports;purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities.
: recorder, theacceptance orrejection oftheactivity, andarecordofanynonconformances.
Quality Assurance is responsible for-34-Revision 17 December, 1991 conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis.Audit intervals are based on the status and safety importance of activities being performed, as well as group performance.
Therequirements andresponsibilities forrecordaccessibility and,transmittal aredescribed intheQualityAssurance Manualsectionsasappropriate.
and related management concerns.Table 18-1 is a list of the activities to be examined by audit in each of the audits.Frequencies are based.on the level of activity in each area.Audit schedules are estab-lished to assure that each of the activities are audited at the frequency specified in Section 6.0.Technical Speci-fications.
Requirements,and responsibilities forpreparation, inspection, identification, review,storage,retrieval, maintenance, andtheretention'f qualityassurance recordsareinaccordance withapplicable qualityassurance recordprocedures, codes,standards, andprocurement documents.
Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.Each audit.requires the development of an audit plan to provide information about the audit;such as the functional areas to be audited, the names, of those who will perform, the audit, the scheduling arrangements, and the method of reporting findings and recommendations.
~Recordsareavailable toauthorized personnel.
Audit planning and performance utilize performance based techniques that will facilitate effectivenes's assessments as well as compliance verification.
-Removalofrecordsfromstorageisdocumented andaccountability ismaintained by,theresponsible recordcontrolactivity.
The audits are performed in accor'dance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.Audit, results are documented and reported to the supervisor'nd division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board.Within a specified period of time, the person having supervisory responsibi'lity in the area audited is required to review the audit results, take necessary action to correct the" deficiencies identified by the audit, and document and report the'orrective action.Quality Assurance is responsible for developing audit plans and audit checklists, designating and,training audit personnel, and conducting audits.Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Recordsareeitherstoredinrecordstoragefacilities whicharedesignedtopreventdestruction ofrecordsduetofire,flooding, theft,anddeterioration bytemperature orhumidityconditions; or,duplicate recordsarekeptintwoseparatestoragelocations inseparatebuildings whicharephysically isolatedfromeachother.Recordkeepingprocedures provideforreceiving, classifying,
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procure-ment, as required, to evaluate their quality assurance-35-Revision 17 December, 1991 pxogram for compliance with all aspects of the procurement documents.
: indexing, labeling, andpreparing recordsforstorage.Theprocedures establish retention requirements, accessibility, controlofobsoleterecorddestruction, andcontrolforissuanceandreturnofallrecords.Production andEngineering Systemsisresponsible formaintaining plantoperating recordsasrequiredinSection6.10,Technical Specifications.
Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.
Production andEngineering Systemsisalsoresponsible formaintaining off-siteprepareddesignrecords,suchasspecifications,
During the additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-mented in accordance with procurement documents.
: drawings, designreviewreports,anddesigncontroldocumentationI qualityassurance records,suchasauditreportsandsurveillance reports;purchasing records,suchassupplierqualifications, bidevaluations, andpurchaseorders.AuditsCompliance withallaspectsoftheQualityAssurance Programandtheeffectiveness oftheprogramisdetermined byauditsandsurveillances ofallorganizations performing qualityaffecting activities.
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends.Results of these analyses are provided to management for their regular review.-36-Revision 17 December, 1991  
QualityAssurance isresponsible for-34-Revision17December, 1991 conducting auditsofthoseorganizations andactivities involvedinthequalityassurance programonaplanned,periodicbasis.Auditintervals arebasedonthestatusandsafetyimportance ofactivities beingperformed, aswellasgroupperformance.
andrelatedmanagement concerns.
Table18-1isalistoftheactivities tobeexaminedbyauditineachoftheaudits.Frequencies arebased.onthelevelofactivityineacharea.Auditschedules areestab-lishedtoassurethateachoftheactivities areauditedatthefrequency specified inSection6.0.Technical Speci-fications.
Additional auditsorsurveillances areconducted asrequiredbyspecialconditions, circumstances ortoaddressmanagement concerns.
Eachaudit.requires thedevelopment ofanauditplantoprovideinformation abouttheaudit;suchasthefunctional areastobeaudited,thenames,ofthosewhowillperform,theaudit,thescheduling arrangements, andthemethodofreporting findingsandrecommendations.
Auditplanningandperformance utilizeperformance basedtechniques thatwillfacilitate effectivenes's assessments aswellascompliance verification.
Theauditsareperformed inaccor'dance withwrittenprocedures orchecklists byappropriately trainedpersonnel nothavingdirectresponsibilities intheareasbeingaudited.Audit,resultsaredocumented andreportedtothesupervisor'nd divisionheadhavingresponsibility intheareaauditedandtheNuclearSafetyAuditandReviewBoard.Withinaspecified periodoftime,thepersonhavingsupervisory responsibi'lity intheareaauditedisrequiredtoreviewtheauditresults,takenecessary actiontocorrectthe"deficiencies identified bytheaudit,anddocumentandreportthe'orrective action.QualityAssurance isresponsible fordeveloping auditplansandauditchecklists, designating and,training auditpersonnel, andconducting audits.Auditsmaybeconducted byQualityAssurance engineers orotherqualified personnel, suchastechnical specialists fromothercompanydepartments andoutsideconsultants.
Auditsofmajorcontractors, subcontractors, andsuppliers areconducted duringtheearlystagesofdesignandprocure-ment,asrequired, toevaluatetheirqualityassurance Revision17December, 1991 pxogramforcompliance withallaspectsoftheprocurement documents.
Auditsareconducted, asrequired, toassurethatmajorcontractors, subcontractors, andsuppliers areauditingtheirsuppliers'uality assurance programsinaccordance withprocurement documents.
Duringtheadditional auditsareperformed, asrequired, toassureallqualityassurance programrequirements areproperlyimple-mentedinaccordance withprocurement documents.
QualityPerformance performsregularanalysesofauditandQualityAssurance surveillance resultstoevaluatequalitytrends.Resultsoftheseanalysesareprovidedtomanagement fortheirregularreview.-36-Revision17December, 1991  


Table1-1QualityAssurance ProgramProcedures SubjectListingAppendixBCriteriaualitAssurance ualitControlProcedures Indoctrination ofQualityAssurance/Quality ControlandSupervisory Personnel Management ReviewoftheQualityAssurance ProgramPeriodicReviewofQualityAssurance/Quality ControlProcedures TrainingofQualityAssurance/Quality ControlPersonnel QualityAssurance/Qu'ality ControlGroupOrganization andResponsibilities QualityAssurance ReviewofRochester GasandElectricDesignCriteriaQualityAssurance ReviewofRochester GasandElectricEngineering Specifications QualityAssurance ReviewofArchitect/Engineer's DesignDocuments
Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix B Criteria ualit Assurance ualit Control Procedures Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Training of Quality Assurance/Quality Control Personnel Quality Assurance/Qu'ality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's Design Documents~~~~~~~~~~Preparation, Review and Approval of Computer Software Production Evaluations IIX.XIX Requisitioning Quality Assurance/Quality Control Services XV Quality Review of Rochester Gas and Electric Procurement Documents IV Preparation, Review and Approval of Rochester Gas and Electric Q.A.Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation,, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision 17 December, 1991  
~~~~~~~~~~Preparation, ReviewandApprovalofComputerSoftwareProduction Evaluations IIX.XIXRequisitioning QualityAssurance/Quality ControlServicesXVQualityReviewofRochester GasandElectricProcurement Documents IVPreparation, ReviewandApprovalofRochester GasandElectricQ.A.Specifications Preparation, ReviewandApprovalofGinnaStationQualityAssurance ManualPreparation,,
ReviewandApprovalofQualityAssurance/Quality ControlProcedures Preparation, ReviewandApprovaloftheQualityControlgroupVerification Inspection ProgramProcedures Revision17December, 1991  


Table1-1(cont'd)ualitAssurance ualitControlProcedures AppendixBCriteria=
Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria=Review of Departmental Procedures Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance/Quality Control Evaluation
ReviewofDepartmental Procedures Preparation, ReviewandApprovalofProcedure Deviation RequestsbyQualityAssurance/Quality ControlEvaluation
'of Suppliers by Quality Assurance Supplier Surveillance Control of Supplier Performance Quality Assurance Evaluation of Bids!Conducting Commercial Grade Supplier Surveys Document Deficiency Reports Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel Quality Assurance Review of Nonconformance Reports Preparation, Review and Processing of Corrective Action Reports by Quality Assurance VI'.VII VII VII VII VII Qualification of Auditing Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit.Findings Conduct of Quality Assurance During and in Follow-Up of USNRC and Management Audits Response to Audits and Surveillances Qualifications of Surveillance Personnel XVIII XVIII XVIII XVIII XVIII XVIII XVIII-38-Revision 17 December, 1991 Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria , Quality Performance Surveillance Program XVIII Qualification of Commercial Grade Supplier Survey Personnel XVIII-39-Revision 17 December, 1991  
'ofSuppliers byQualityAssurance SupplierSurveillance ControlofSupplierPerformance QualityAssurance Evaluation ofBids!Conducting Commercial GradeSupplierSurveysDocumentDeficiency ReportsInspection andSurveillance Activities Qualification ofSurveillance andInspection Personnel QualityAssurance ReviewofNonconformance ReportsPreparation, ReviewandProcessing ofCorrective ActionReportsbyQualityAssurance VI'.VIIVIIVIIVIIVIIQualification ofAuditingPersonnel AuditScheduling andPlanningPerformance ofQualityAssurance AuditsReporting andFollow-Up ofAudit.FindingsConductofQualityAssurance DuringandinFollow-Up ofUSNRCandManagement AuditsResponsetoAuditsandSurveillances Qualifications ofSurveillance Personnel XVIIIXVIIIXVIIIXVIIIXVIIIXVIIIXVIII-38-Revision17December, 1991 Table1-1(cont'd)ualitAssurance ualitControlProcedures AppendixBCriteria,QualityPerformance Surveillance ProgramXVIIIQualification ofCommercial GradeSupplierSurveyPersonnel XVIII-39-Revision17December, 1991  


Table1-1(cont'd)Materials EnineerinInsectionServicesAppendixBCriteriaIndoctrination andTrainingMaterials Engineering andInspection ServicesOrganization andResponsibilities Preparation, ReviewandApprovalofPurchaseRequisitions andRelatedProcurement Documents QualityMaterials Engineering andInspection ServicesProcedures IVQualityMaterials'ngineering andInspection ServicesProcedure Deviation RequestPreparation, ReviewandApprovalofMaterialHandlingEquipment Instructions ControlandDistribution ofDocuments Regulating SafetyRelatedActivities
Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures IV Quality Materials'ngineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Control and Distribution of Documents Regulating Safety Related Activities
~~~~~\ReceiptandAcceptance ofPurchased Materials Preparation, ReviewandApprovalofSupplierEvaluation VIVIIVIIWeldingProcedure Preparation ReviewandApprovalWeldingProcedure Qualification HeatTreatingProcedures WelderQualification andCurrencyNondestructive Examination Procedures Nondestructive Examination Procedures ManualNondestructive Examination Personnel Qualification Inservice Inspection ProgramandPlansIX~IXIXIXIXIXIXX-40-Revision17December, 1991 0
~~~~~\Receipt and Acceptance of Purchased Materials Preparation, Review and Approval of Supplier Evaluation VI VII VII Welding Procedure Preparation Review and Approval Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency Nondestructive Examination Procedures Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Qualification Inservice Inspection Program and Plans IX~IX IX IX IX IX IX X-40-Revision 17 December, 1991 0
Table1-1(cont'd)Materials EnineerinandInsectionServicesAppendixBCriteriaIncorporating, GinnaModificat'ions intoInservice Inspection ProgramXTestControlXITestPersonnel Qualifications XICalibration andControlofNondestructive Examination Instruments
Table 1-1 (cont'd)Materials En ineerin and Ins ection Services Appendix B Criteria Incorporating, Ginna Modificat'ions into Inservice Inspection Program X Test Control XI Test Personnel Qualifications XI Calibration and Control of Nondestructive Examination Instruments
,XIIInspection andMaintenance ofMaterialHandlingEquipment XIIIOverheadandGantryCranesInspection andMaintenance ofPortableLiftingandHandlingEquipment Underhung Cranes,JibCranesandMonorailSystemsSlingsand-Related Apparatus Classification andTrainingofMaterialHandlingEquipment Personnel MobileHydraulic CranesInspection andMaintenance ofJacksForkliftLoadingForksXIIIXIIIXIIIXIII.XIIIXIIIXIIIXIIITrainingandQualification-ofCraneOperators LiftingDevicesintheContainment VesselControlandDisposition ofNonconforming
, XII Inspection and Maintenance of Material Handling Equipment XIIIOverhead and Gantry Cranes Inspection and Maintenance of Portable Lifting and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems Slings and-Related Apparatus Classification and Training of Material Handling Equipment Personnel Mobile Hydraulic Cranes Inspection and Maintenance of Jacks Forklift Loading Forks XIII XIII XIII XIII.XIII XIII XIII XIII Training and Qualification-of Crane Operators Lifting Devices in the Containment Vessel Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at Materials Engineering and Inspection Services Quality Materials Engineering and Inspection Services Records XIII XIII XVI XVI I-4 1-Revision 17 December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Materials Engineering and Inspection Services Response to Internal Audits Ginna Quality Assurance Program Implementation, Trainingof Ginna Personnel Ginna Administrative and Engineering Staff Responsibilities Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Control of Station Modification XVIII Station Modification Installation Acceptance and Completion Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased Materials, Parts, Components and Services Requisition Services from General Maintenance IV IV Plant Procedures Plant-Procedure Control and Distribution Control of Engineering Documents VI VI Vendor Manual Control Receipt and Acceptance of Purchased Materials Supplier Qualification Technical Evaluation Control of Purchased Services Control of Accepted Material, Parts and Components VI VII VII VII'III-42-Revision 17 December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Identification and Marking of Material Control of Welding, Heat Treating and Nondestructive Examination VIII IX Welding Equipment Performance Verification Nondestructive Examination IX IX Preventive Maintenance Programs for Electrical, Mechanical and Valves Inservice Inspection.
: Material, PartsandComponents Corrective ActionatMaterials Engineering andInspection ServicesQualityMaterials Engineering andInspection ServicesRecordsXIIIXIIIXVIXVII-41-Revision17December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaMaterials Engineering andInspection ServicesResponsetoInternalAuditsGinnaQualityAssurance ProgramImplementation, TrainingofGinnaPersonnel GinnaAdministrative andEngineering StaffResponsibilities GinnaModification ProjectOrganization PlantOperations ReviewCommittee Operating Procedure ControlofStationModification XVIIIStationModification Installation Acceptance andCompletion Preparation, ReviewandApprovalofDesignDocuments Preparation, ReviewandApprovalofMinorModification SafetyAnalysisControlofProcurement Documents forPurchased Materials, Parts,Components andServicesRequisition ServicesfromGeneralMaintenance IVIVPlantProcedures Plant-Procedure ControlandDistribution ControlofEngineering Documents VIVIVendorManualControlReceiptandAcceptance ofPurchased Materials SupplierQualification Technical Evaluation ControlofPurchased ServicesControlofAcceptedMaterial, PartsandComponents VIVIIVIIVII'III-42-Revision17December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaIdentification andMarkingofMaterialControlofWelding,HeatTreatingandNondestructive Examination VIIIIXWeldingEquipment Performance Verification Nondestructive Examination IXIXPreventive Maintenance ProgramsforElectrical, Mechanical andValvesInservice Inspection.
Environmentally Qualified Equipment Maintenance Program X, XIV X Performance of Tests Qualification of Test Personnel XI XI Test, Status Control~~Calibration and Control of Measuring and Test Equipmentg Installed Plant Instruments and Equipment Maintenance and Inspection of Material Handling Equipment Control of Material Handling and Handling Equipment Storage and Preservation of Materials Control of Heavy Loads at Ginna Electric System Operating Rules Bypass of Safety Function or Jumper'Control Control of Temporary Modifications Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports XIV XII XIII XIII XIII XIII XIV XIV XIV Revision 17-.December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Conditions Adverse to Quality)Work Control System Ginna Records XVII Record Storage Facility and Equipment I Maintenance and.History Program Ginna Station Response to Internal Audits XVII XVI I XVIIIRevision 17 December, 1991 Table 1-1 (cont'd)En ineerin Procedures Appendix B Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation, Review and Approval of Engineering'rawings III Preparati'on, Review and Approval of Specifications.
Environmentally Qualified Equipment Maintenance ProgramX,XIVXPerformance ofTestsQualification ofTestPersonnel XIXITest,StatusControl~~Calibration andControlofMeasuring andTestEquipmentg Installed PlantInstruments andEquipment Maintenance andInspection ofMaterialHandlingEquipment ControlofMaterialHandlingandHandlingEquipment StorageandPreservation ofMaterials ControlofHeavyLoadsatGinnaElectricSystemOperating RulesBypassofSafetyFunctionorJumper'Control ControlofTemporary Modifications ControlandDisposition ofNonconforming Materials IssueofNonconformance ReportsXIVXIIXIIIXIIIXIIIXIIIXIVXIVXIVRevision17-.December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaConditions AdversetoQuality)WorkControlSystemGinnaRecordsXVIIRecordStorageFacilityandEquipment IMaintenance and.History ProgramGinnaStationResponsetoInternalAuditsXVIIXVIIXVIIIRevision17December, 1991 Table1-1(cont'd)EnineerinProcedures AppendixBCriteriaIndoctrination andTrainingEngineering Department Organization andResponsibilities Preparation, ReviewandApprovalofDesignInputDocuments Preparation, ReviewandApprovalofDesignAnalysesPreparation, ReviewandApprovalofEngineering'rawings IIIPreparati'on, ReviewandApprovalofSpecifications.
Design Verification Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition Engineering Procedures Engineering Procedure Deviation Request Distribution and Control o'f Documents by the Control Number Method IV VX Control of Documents by the List of Current Revisions Method VX Distribution of Documents by the List of Correspondence Procedures Receipt, Control and Distribution of Drawings and Aperture Cards Supplier Evaluation VI VX VXI-45-Revision 17 December, 1991 Table 1-1 (cont'd)En ineerin Procedures Appendix B Criteria Preparation, Reviev and Approval of Bid Requests, Bid Evaluations and Recommendations for Avard VXI Engineering Reviev of Nonconforming Materials, Parts or Components Initiating and Responding to Corrective Action Reports Records Engineering Response to Audits XVIX XVIII-46-Revision 17 December, 1991 Table 1-1 (cont'd)Purchasin Procedures Appendix B CriteriaPeriodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation Establishment and Maintenance of Qualified Suppliers List Supplier, Nonconformance Report Processing Purchasing Department Response to Corrective Action Reports and Corrective Action Reporting Purchasing Records Purchasing Response to Audits IV IV VII VII XVI XVII XVIII-47-Revision 17 December, 1991 Table 1-1 (cont'd)Appendix B Production Division Trainin Procedures Criteria The Production Division Training Procedures Manual is currently under development.
DesignVerification Preparation, ReviewandApprovalofSafetyAnalysesReviewandApprovalofArchitect EngineerorConsultant DesignDocuments Preparation, ReviewandApprovalofFieldChangeRequestsPurchaseRequisition Engineering Procedures Engineering Procedure Deviation RequestDistribution andControlo'fDocuments bytheControlNumberMethodIVVXControlofDocuments bytheListofCurrentRevisions MethodVXDistribution ofDocuments bytheListofCorrespondence Procedures Receipt,ControlandDistribution ofDrawingsandApertureCardsSupplierEvaluation VIVXVXI-45-Revision17December, 1991 Table1-1(cont'd)EnineerinProcedures AppendixBCriteriaPreparation, RevievandApprovalofBidRequests, BidEvaluations andRecommendations forAvardVXIEngineering RevievofNonconforming Materials, PartsorComponents Initiating andResponding toCorrective ActionReportsRecordsEngineering ResponsetoAuditsXVIXXVIII-46-Revision17December, 1991 Table1-1(cont'd)Purchasin Procedures AppendixBCriteriaPeriodicReviewofPurchasing Procedures Indoctrination andTrainingofPurchasing Personnel Purchasing Department Organization andResponsibilities Preparation, Review,ApprovalandIssuanceofPurchaseOrdersandChangestoPurchaseOrdersRequestsforBidsandBidEvaluation Purchasing Procedures Purchasing Procedure Deviation RequestSupplierEvaluation Establishment andMaintenance ofQualified Suppliers ListSupplier, Nonconformance ReportProcessing Purchasing Department ResponsetoCorrective ActionReportsandCorrective ActionReporting Purchasing RecordsPurchasing ResponsetoAuditsIVIVVIIVIIXVIXVIIXVIII-47-Revision17December, 1991 Table1-1(cont'd)AppendixBProduction DivisionTraininProcedures CriteriaTheProduction DivisionTrainingProcedures Manualiscurrently underdevelopment.
In the interim they are using.appropriate Ginna Station Procedures.
Intheinterimtheyareusing.appropriate GinnaStationProcedures.
The Ginna Station Procedures will be replaced by Production Division Training Procedures as these procedures are approved and issued.QA Program sections applying to Production Division Training are 1~2~5g 6/8~13'6~17'8'48-Revision 17 December, 1991 Table 1-1 (cont'd)Electric Transmission Procedures and Distribution Appendix B Procedures Criteria Quality Assurance Program Implementation for I Electric Transmission and Distribution Department Training of Electric Transmission and Distribution Personnel Electric Transmission and Distribution Organization Design/Modification Activities Control Control of Procurement Documents for Purchased Parts, Components and Services Preparation, Review, and Approval of Electric Transmission and Distribution and Laboratory Procedures V Control of Electric Transmission and Distribution Procedures, Schedules and Test Form Books Supplier Qualification Technical Evaluation Receipt and Acceptance of Instrumentation and Standards Equipment IU VI..VII VII Control of Purchased Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and Components Performance of Tests at Ginna Station Performance of Tests at the Electrical Laboratory Qualification of Test Personnel VIII XI XI XI Calibration and Control of test Instruments XII.Handling, Storage and Shipping I Inspection and Test Status at Electric Meter and Laboratory XIII XIV-49-Revision 17 December, 1991  
TheGinnaStationProcedures willbereplacedbyProduction DivisionTrainingProcedures astheseprocedures areapprovedandissued.QAProgramsectionsapplyingtoProduction DivisionTrainingare1~2~5g6/8~13'6~17'8'48-Revision17December, 1991 Table1-1(cont'd)ElectricTransmission Procedures andDistribution AppendixBProcedures CriteriaQualityAssurance ProgramImplementation forIElectricTransmission andDistribution Department TrainingofElectricTransmission andDistribution Personnel ElectricTransmission andDistribution Organization Design/Modification Activities ControlControlofProcurement Documents forPurchased Parts,Components andServicesPreparation, Review,andApprovalofElectricTransmission andDistribution andLaboratory Procedures VControlofElectricTransmission andDistribution Procedures, Schedules andTestFormBooksSupplierQualification Technical Evaluation ReceiptandAcceptance ofInstrumentation andStandards Equipment IUVI..VIIVIIControlofPurchased ServicesforElectricMeterandLabVIIIdentification andControlofMaterials, PartsandComponents Performance ofTestsatGinnaStationPerformance ofTestsattheElectrical Laboratory Qualification ofTestPersonnel VIIIXIXIXICalibration andControloftestInstruments XII.Handling, StorageandShippingIInspection andTestStatusatElectricMeterandLaboratory XIIIXIV-49-Revision17December, 1991  


Table1-1(cont'd)ElectricTransmission andDistribution Procedures AppendixBCriteriaControlandDisposition ofNonconforming PartsandComponents Initiating andProcessing ofCorrective ActionReportsControlofQualityAssurance RecordsResponsetoAuditsXVXVIIXVIII-50-Revision17December, 1991  
Table 1-1 (cont'd)Electric Transmission and Distribution Procedures Appendix B Criteria Control and Disposition of Nonconforming Parts and Components Initiating and Processing of Corrective Action Reports Control of Quality Assurance Records Response to Audits XV XVII XVIII-50-Revision 17 December, 1991  


TABLE4-1Procurement DocumentReuirements Itemstobeconsidered forinclusion inprocurement documents include:1.ScoeofWork-Detailedstatement oftheworktobeperformed.
TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include: 1.Sco e of Work-Detailed statement of the work to be performed.
2~"Technical Reuirements
2~" Technical Re uirements-by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished.
-byreference tospecificdrawings, specifications, codes,regulations, procedures orinstructions, including revisions, thatdescribetheitemsorservicestobefurnished.
Also identified.
Alsoidentified.
shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.ualit Assurance Pro ram Re uirements-which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards.
shallbetest,inspection andacceptance requirements, andanyspecialrequirements forsuchactivities asdesigning, identification, fabrication,
Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier procurement documents.
: cleaning, erecting, packaging,
Ri ht of Access-to include the facilities and records of the supplier.for source inspection and audit by the Purchaser or parties designated by the purchaser.
: handling, shipping, extendedstorageandshelflife.ualitAssurance ProramReuirements
Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.*5.Documentation Re uirements-Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.*6.Nonconformance
-whichrequirethesuppliertohaveadocumented qualityassurance programthatimplements portionsorallof10CFR50AppendixBaswellasapplicable qualityassurance programrequirements ofothernationally recognized codesandstandards.
-Requirements for reporting and disposition of nonconformance to procurement requirements.
Alsoincludedshallbetherequirement thatthesupplierincorporate appropriate qualityassurance programrequirements insubtierprocurement documents.
I'-Items reviewed by Quality Assurance or Quality Control.-51-Revision 17 December, 1991 0
RihtofAccess-toincludethefacilities andrecordsofthesupplier.
Table 18-1 Audit List Audit Title Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods.of operation.
forsourceinspection andauditbythePurchaser orpartiesdesignated bythepurchaser.
Operational Assessment Nonconformance Control*Outage Activities Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA*Health Physics, Chemistry and~~Radwaste*Fire and Safety r Radwaste Shipping and Process Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program-52-Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit List Audit To ic Areas Instructions, Procedures, and, Document Control Independent Inspecti'ons and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Drawing Control Vendor Manual Control Procedure Control Records Control Security*Operations Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and Inspection
Alsoincludedshallbeprovisions fortheidentification ofwitnessandholdpointsandtheminimumtimeofadvancenotice.*5.Documentation Reuirements
'Services ISX Program NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls*Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment-53-Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit List Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Training/performance and.qualifications ofthe operating and technical staff Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Licensed Operator Auxiliary Operator Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician
-Submittal approvalandretention requirements fordocuments suchasqualityassurance manuals,specialprocessandtestprocedures, materials records,calculations andanalyses.
-QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement Configuration Control Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Pr'ogram Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit To ic Areas Electric Transmission and Distribution Electric Mater and Laboratory Electric Substations
*6.Nonconformance
*Noted audits will also address relevant activities to verify'onformance of facility operation to all provisions contained in Technical Specifications and applicable license conditions. Revision 17 December, 1991 I
-Requirements forreporting anddisposition ofnonconformance toprocurement requirements.
R.E.GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART LINES OF SUPKRVISIOM AND ASllNISTRATION LINES Of'OJddJNICATIOM CHAIRNAN OF THE BOARD, PRESIDENT AND CHIEF EXECUTIVE OFFICER SENIOR VICE PRESIDENT CAS d ELEC'fRIC DISTRIBUTION AND CUSTOMER SERVICES SENIOR VICE PRESIDENT PRODUCTION d ENGINEERING SOII OR VICE PRESIDENT>
I'-ItemsreviewedbyQualityAssurance orQualityControl.-51-Revision17December, 1991 0
CONTROLLER d CHIEF FINANCIAL OFFICER VICE PRESIDENT KJPLOYEE RELATIONS, PUBLIC AFFAIRS AND MATERIAL WNAGIKNT VICE PRESIDENT CINMA NUCLEAR PRODUCTION VICE PRESIDENT~SECRETARY AJC TREASURER DKPAR TITAN t MANAGER AND PI%CHASING AGENT MATERIALS WMAGKJKNT DIVISION WJIAGER ELECTRIC TRANSMISSION d DISTRIBUTION OEPARtEENT MANAGER OJALITY PERFORMANCE DIVISION HANACER TECHNICAL SERVICES ANO CHIEF ENGINEER~~~I C~~DEPARAKNt MANAGER RISK WNAGEJM:Nt DIRECtOR OF SECURITY DEPARTJKNT SXKR INTENOENT ELECTRIC LAB JJC TELE-COJ4ANJ I CAT I ONS DEPARTIKNT QUEER INTENDENT ELKCTRIC QSSTAT TONS DIVISION IlANAGKR~DUALITY ASSURANCE MANAGER MATERIALS ENGINEERING d INSPECTION SERVICES DEPARTJCITT MANAGER RESEARCH d SCIKNCE DEPARTIKNT IlANAGER PRODUCTION d ENGINEERING SYSTEMS DEPARTlCNT WJJACER NUCLEAR EIJG I NEER INC SERVICES DEPARllCNT MANAGER PROJNM:T I ON DIVISION TRAINING nW W~..~PORC CINMA S'fATfON U Q ftf ftf 0 4 ftf V.fff O'.ftf 0'LO LKJ PROC JWOKNT SERVICES EWLOYEK RELATIONS%TER CAI.I BRAT ION d MAINTENANCE AJN KLECTRIC LAB SERVICKS DESIGN.TECH 5&PNT, ROTATING KOUIPSKNT HAINTKNANCK
Table18-1AuditListAuditTitleCorrective ActionAuditToicAreasCorrective Actionassociated withdeficiencies occurring infacility, equipment, structures, systemsormethods.ofoperation.
~RELAY TEST d CONSTRUC'f ION SERVICES MATERIALS KNGI JlECR INC, NOE, ISI d ldlK INSP SERVICES MANAGER NUCLEAR ASSJJRANCE QUALITY CONTROL AND DUALITY ENGINKR INC SERVICES DUALITY ASSURANCE PROC&#xc3;KJKNT, AIRJIT d QNJVE ILLANCK SERVICES KNVIROSCNTJL SCIENCE d LABORATORY CHEMISTRY SERVICES, RESEARCH d DEVKLOPJKNT SUPERVISOR
Operational Assessment Nonconformance Control*OutageActivities Refueling andSpecialNuclearMaterialISIImplementation ISTProgramandImplementation Surveillance TestandLCOsMaintenance Modification Installation SafetySecurityRadiation Protection andALARA*HealthPhysics,Chemistry and~~Radwaste*FireandSafetyrRadwasteShippingandProcessControlProgramandimplementing procedures Radioactive Effluents andOffsiteDoseCalculation Manualandimplementing procedures Radiation Protection andALARAHP/Chemistry Measuring andTextEquipment Chemistry ProgramRadiological Environmental Monitoring ProgramFireProtection Programandimplementing procedures FireProtection andLossPrevention Program-52-Revision17December, 1991 AuditTitleTable18-1(con't)AuditListAuditToicAreasInstructions, Procedures, and,DocumentControlIndependent Inspecti'ons andAuditsFireSystemsFireSurveillance FireBrigadeTrainingFireBrigadeEquipment SafetyProgramHousekeeping DrawingControlVendorManualControlProcedure ControlRecordsControlSecurity*Operations SecurityPlanandImplementing procedures GuardTrainingandQualification FitnessforDutyProgramLimitingConditions forOperation Surveillance TestingOperatorPerformance Operations Administration PORCActivities NSARBActivities Materials Engineering andInspection
~PRO%ET WNAGDEMT SERVICES DUALITY SERVICES, PRJLMCT WMAGGKNT SERVICES.AINJIN.SERV., BUDGET d COST RECORDS HAMACEJKMT, TECNICAL INFORMATION CENTER.CHIS.IMFORllATION SERVICES, DIVISION SYSTDlS DEPARTMENT SUPERINTENDENT GENERAL HAINTEMANCK FIELD d SHOP FABRICATION SERVICES DESIGN, CONSTRUCTION, L I CDJS INC, FlKL AMAAGKJENT d TECHNICAL SUPPORt SKRVICES TRAINING SERVICES DIRECTOR CORPORATE RADIATION PROTECTION CORPORATE WC.TH PHYSICS AJNI NUCLEAR DKRGKNCY PLANNING STATION OPERATIONS.
'Services ISXProgramNDEQualifications WeldingQualifications MHEProgramMiscellaneous QAControls*Maintenance andTestingPreventive Maintenance ProgramPlanningandScheduling WorkOrderImplementation Post-Maintenance TestingWorkOrderCloseoutandEquipment HistoryControlofMeasuring andTestEquipment Revision17December, 1991 AuditTitleTable18-1(con't)AuditListAuditToicAreasTechnical Specification Surveillance NuclearEmergency ResponsePlanTraining/performance and.qualifications oftheoperating andtechnical staffNuclearEmergency ResponsePlanandProcedures OffsiteAgencyInterface ResponsePersonnel TrainingEmergency Information PlanLicensedOperatorAuxiliary OperatorChemistry Technician Maintenance Radiation Protection Technician ResultsandTestTechnician
MAINTENANCE, HP d CJMMSTRY CONTROL, TECHNICAL IVOR(, TESTING, MATERIAL CONTROL, PROCUREJENT, LIASON ENCI NEER INC, FIRE PROTEC'tIOJI a SAFETY.OPERATIONAL ASSESQKNT, COINER SYSTEMS SKKRVI SOR NUCLEAR SECURITY SECIWITY SERVICES Figure 2-1 QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE I I MANAGER QUALITY ASSURANCE MANAGER NUCLEAR ASSURANCE MANAGER MATERIALS ENGINEERIHG CI IHSPECTIOH SERVICES SENIOR ANALYST QUALITY PERFORMANCE ANALYSES AHD PROGRAM SUPPORT am ID ID 0 4 ID I~5 DI mr.ID 0 I QUALITY ASSURANCE ENGINEERS STAFF QUALITY CONTROL ENGINEERS QUALITY CONTROL FOREMAN TECHNICIANS
-QCInspector ShiftTechnical AdvisorTechnical StaffandManagersEngineering Department TrainingGeneralEmployeeTrainingProcurement Configuration ControlProcurement Evaluations Procurement DocumentControlControlofPurchased ItemsandServicesHandling, Storage,andShippingHazardous MaterialControlPr'ogramMajorModification DesignMinorModification DesignInstallation PlanningControlofAs-BuiltConfiguration Licensing Activities Temporary Modifications Revision17December, 1991 AuditTitleTable18-1(con't)AuditToicAreasElectricTransmission andDistribution ElectricMaterandLaboratory ElectricSubstations
&INSPECTORS MATERIAL 5 MATERIAL HAHDLING ENGINEERS 5 FOREMEN STAFF STAFF Figure 2-2 GINNA NUCLEAR PRODUCTION ORGANIZATION VICE PRESIDENT GINNA NUCLEAR PRODUCTIOH PLANT MANAGER GINNA STATION DEPARTMENT MANAGER PRODUCTION DIVISION TRAINING DEPARTMENT MANAGER NUCLEAR ENGINEERING SERVICES UQ ID ID 0 (6 v.I Vl (0 I DIRECTOR CORPORATE RADIATION PROTECTION CORPORATE HEALTH PHYSICS NUCLEAR EMERGENCY PLANNING SUPERINTENDENT GINHA PRODUCTION OPERATIONS*
*Notedauditswillalsoaddressrelevantactivities toverify'onformance offacilityoperation toallprovisions contained inTechnical Specifications andapplicable licenseconditions. Revision17December, 1991 I
HEALTH PHYSICS 8 CHEMISTRY TECHNICAL ENGINEERING~
R.E.GINNANUCLEARPOWERPLANTMANAGEMENT ORGANIZATION CHARTLINESOFSUPKRVISIOM ANDASllNISTRATION LINESOf'OJddJNICATIOM CHAIRNANOFTHEBOARD,PRESIDENT ANDCHIEFEXECUTIVE OFFICERSENIORVICEPRESIDENT CASdELEC'fRIC DISTRIBUTION ANDCUSTOMERSERVICESSENIORVICEPRESIDENT PRODUCTION dENGINEERING SOIIORVICEPRESIDENT>
OPERATIONAL ASSESSMENT COMPUTER SYSTEMS CORRECTIVE ACTION SAFETY OUTAGE PLANNIHG MATERIALS&PROCUREMENT 0 SUPERINTENDENT GINNA SUPPORT SERVICES MECHANICAL MAINTENANCE ELECTRICAL AND l&C MAINTENAHCE MAINTENANCE PLANNING&SCHEDULIHG FIRE PROTECTION MOOI F I CATION SUPPORT*HNEH RCS AVERAGE TEMPERATURE
CONTROLLER dCHIEFFINANCIAL OFFICERVICEPRESIDENT KJPLOYEERELATIONS, PUBLICAFFAIRSANDMATERIALWNAGIKNTVICEPRESIDENT CINMANUCLEARPRODUCTION VICEPRESIDENT
>200 F AN STA AND COHTROL ROOM FOREMAN ARE ADDED'O THE REQUIRED COHTROL ROOM SHIFT COMPLEMENT INITIAL LICENSED OPERATOR OPERATOR REQUAL AUX OPERATOR STA INITIAL STA REQUAL CHEMISTRY TECH RAD PROTECTIOH TECHNICIAN COHTRACT, RADIAT ION TECH ELECTRICAL MAINT.MECHANICAL MAINT.I&C TECHNICIAN R&T TECHNICIAN TECH STAFF AHD MANAGERS TRAINING COURSES DESIGH CONSTRUCTION LICENSIKG FUEL MANAGEMENT TECHHI CAL SUPPORT SERVICES ELECTRIC, TRANSMISSION AND DISTRIBUTION DIVISION D I VIS IOH HAHAGER ELECTRIC TRANSHISSIOH 5 DISTRIBUTION I Ul I DEPARTHENT SUPERINTENDENT ELECTRIC LABORATORY 8 TELECOHHUNI CAT IOHS GAS 8 ELECTRIC HETER OPERATIONS DEPARTHENT SUPERINTENDEHT ELECTRIC SUBSTATIOHS LABORATORY SERVICES QUALITY SERVICES COORDINATOR CONSTRUCTION RELAY TEST HAHAGER ENGINEER IHG HAHAGER SUBSTATION HAIHTENANCE ax TD (D 0 4 ID r-5 ID TD 0 LO NOTE: Chart is abbreviated to show only key positions involved in implementing QA program and therfore, does not show all positions in the division.ENGINEERING QUALITY SERVICES HAIHTEHAHCE AND TEST TRAVELING OPERATORS Figure 2-4 TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MAHAGER TECHNICAL SERVICES AHD CHIEF ENGINEER I O I DEPARTMENT SUPERINTENDENT GENERAL MAINTEHANCE DEPARTMENT MANAGER PRODUCTION AHD ENGINEERING SYSTEMS DEPARTMENT MANAGER RESEARCH 4 SCIENCE DEPARTMENT MANAGER GEHERAL ENGINEERING SERVICES SUPERVISOR PROJECT MANAGEMEHT SERVICES Ug ID ID ne ID I~5 IJI 5'~ID 0 I Manager Shop Operations Manager Field Service Operat i ons Manager Achinistrative Services and Project Planning Manager Inspection/Lend Survey and Building Services Division Systems Records Management Fossil/Hydro systems Technical Information Center Manager Environmental Science Manager Chemistry Services Supervisor Enviroanental Laboratory Senior Envirormental Analyst Research&, Development Program Fossil Engineering Hydro Engineering Facility Engineering Real Estate Management Budget and Cost Project Management Services Docwent Preparation R Secretarial Services Duality Services Figure 2-5 GZNNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PERFORMANCE PORC~~0~~~~~~~~~0 0~~~~~~~~~~~~~~~~~t~~~~~~~~~~~~~~~~~~~~~~~~~~~0~~~~~MATERIALS ELECTRIC ENGINEERING TRANSMISSION AND INSPECTION AND SERVICES DISTRIBUTION PURCHASING PRODUCTION DIVISION TRAINING ENGINEERING GINNA STATION REVIEW o~~~~~~~~~~AUDITS Figure 2-6.}}
~SECRETARY AJCTREASURER DKPARTITANtMANAGERANDPI%CHASING AGENTMATERIALS WMAGKJKNT DIVISIONWJIAGERELECTRICTRANSMISSION dDISTRIBUTION OEPARtEENT MANAGEROJALITYPERFORMANCE DIVISIONHANACERTECHNICAL SERVICESANOCHIEFENGINEER~~~IC~~DEPARAKNt MANAGERRISKWNAGEJM:Nt DIRECtOROFSECURITYDEPARTJKNT SXKRINTENOENT ELECTRICLABJJCTELE-COJ4ANJICATIONSDEPARTIKNT QUEERINTENDENT ELKCTRICQSSTATTONSDIVISIONIlANAGKR~DUALITYASSURANCE MANAGERMATERIALS ENGINEERING dINSPECTION SERVICESDEPARTJCITT MANAGERRESEARCHdSCIKNCEDEPARTIKNT IlANAGERPRODUCTION dENGINEERING SYSTEMSDEPARTlCNT WJJACERNUCLEAREIJGINEERINCSERVICESDEPARllCNT MANAGERPROJNM:TIONDIVISIONTRAININGnWW~..~PORCCINMAS'fATfONUQftfftf04ftfV.fffO'.ftf0'LOLKJPROCJWOKNTSERVICESEWLOYEKRELATIONS
%TERCAI.IBRATIONdMAINTENANCE AJNKLECTRICLABSERVICKSDESIGN.TECH5&PNT,ROTATINGKOUIPSKNT HAINTKNANCK
~RELAYTESTdCONSTRUC'f IONSERVICESMATERIALS KNGIJlECRINC,NOE,ISIdldlKINSPSERVICESMANAGERNUCLEARASSJJRANCE QUALITYCONTROLANDDUALITYENGINKRINCSERVICESDUALITYASSURANCE PROC&#xc3;KJKNT, AIRJITdQNJVEILLANCKSERVICESKNVIROSCNTJL SCIENCEdLABORATORY CHEMISTRY
: SERVICES, RESEARCHdDEVKLOPJKNT SUPERVISOR
~PRO%ETWNAGDEMTSERVICESDUALITYSERVICES, PRJLMCTWMAGGKNTSERVICES.
AINJIN.SERV.,BUDGETdCOSTRECORDSHAMACEJKMT, TECNICALINFORMATION CENTER.CHIS.IMFORllATION
: SERVICES, DIVISIONSYSTDlSDEPARTMENT SUPERINTENDENT GENERALHAINTEMANCK FIELDdSHOPFABRICATION SERVICESDESIGN,CONSTRUCTION, LICDJSINC,FlKLAMAAGKJENT dTECHNICAL SUPPORtSKRVICESTRAININGSERVICESDIRECTORCORPORATE RADIATION PROTECTION CORPORATE WC.THPHYSICSAJNINUCLEARDKRGKNCYPLANNINGSTATIONOPERATIONS.
MAINTENANCE, HPdCJMMSTRYCONTROL,TECHNICAL IVOR(,TESTING,MATERIALCONTROL,PROCUREJENT, LIASONENCINEERINC,FIREPROTEC'tIOJI aSAFETY.OPERATIONAL ASSESQKNT, COINERSYSTEMSSKKRVISORNUCLEARSECURITYSECIWITYSERVICESFigure2-1 QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGERQUALITYPERFORMANCE IIMANAGERQUALITYASSURANCE MANAGERNUCLEARASSURANCE MANAGERMATERIALS ENGINEERIHG CIIHSPECTIOH SERVICESSENIORANALYSTQUALITYPERFORMANCE ANALYSESAHDPROGRAMSUPPORTamIDID04IDI~5DImr.ID0IQUALITYASSURANCE ENGINEERS STAFFQUALITYCONTROLENGINEERS QUALITYCONTROLFOREMANTECHNICIANS
&INSPECTORS MATERIAL5MATERIALHAHDLINGENGINEERS 5FOREMENSTAFFSTAFFFigure2-2 GINNANUCLEARPRODUCTION ORGANIZATION VICEPRESIDENT GINNANUCLEARPRODUCTIOH PLANTMANAGERGINNASTATIONDEPARTMENT MANAGERPRODUCTION DIVISIONTRAININGDEPARTMENT MANAGERNUCLEARENGINEERING SERVICESUQIDID0(6v.IVl(0IDIRECTORCORPORATE RADIATION PROTECTION CORPORATE HEALTHPHYSICSNUCLEAREMERGENCY PLANNINGSUPERINTENDENT GINHAPRODUCTION OPERATIONS*
HEALTHPHYSICS8CHEMISTRY TECHNICAL ENGINEERING~
OPERATIONAL ASSESSMENT COMPUTERSYSTEMSCORRECTIVE ACTIONSAFETYOUTAGEPLANNIHGMATERIALS
&PROCUREMENT 0SUPERINTENDENT GINNASUPPORTSERVICESMECHANICAL MAINTENANCE ELECTRICAL ANDl&CMAINTENAHCE MAINTENANCE PLANNING&SCHEDULIHG FIREPROTECTION MOOIFICATIONSUPPORT*HNEHRCSAVERAGETEMPERATURE
>200FANSTAANDCOHTROLROOMFOREMANAREADDED'OTHEREQUIREDCOHTROLROOMSHIFTCOMPLEMENT INITIALLICENSEDOPERATOROPERATORREQUALAUXOPERATORSTAINITIALSTAREQUALCHEMISTRY TECHRADPROTECTIOH TECHNICIAN
: COHTRACT, RADIATIONTECHELECTRICAL MAINT.MECHANICAL MAINT.I&CTECHNICIAN R&TTECHNICIAN TECHSTAFFAHDMANAGERSTRAININGCOURSESDESIGHCONSTRUCTION LICENSIKG FUELMANAGEMENT TECHHICALSUPPORTSERVICES
: ELECTRIC, TRANSMISSION ANDDISTRIBUTION DIVISIONDIVISIOHHAHAGERELECTRICTRANSHISSIOH 5DISTRIBUTION IUlIDEPARTHENT SUPERINTENDENT ELECTRICLABORATORY 8TELECOHHUNI CATIOHSGAS8ELECTRICHETEROPERATIONS DEPARTHENT SUPERINTENDEHT ELECTRICSUBSTATIOHS LABORATORY SERVICESQUALITYSERVICESCOORDINATOR CONSTRUCTION RELAYTESTHAHAGERENGINEERIHGHAHAGERSUBSTATION HAIHTENANCE axTD(D04IDr-5IDTD0LONOTE:Chartisabbreviated toshowonlykeypositions involvedinimplementing QAprogramandtherfore, doesnotshowallpositions inthedivision.
ENGINEERING QUALITYSERVICESHAIHTEHAHCE ANDTESTTRAVELING OPERATORS Figure2-4 TECHNICAL SERVICESDIVISIONORGANIZATION DIVISIONMAHAGERTECHNICAL SERVICESAHDCHIEFENGINEERIOIDEPARTMENT SUPERINTENDENT GENERALMAINTEHANCE DEPARTMENT MANAGERPRODUCTION AHDENGINEERING SYSTEMSDEPARTMENT MANAGERRESEARCH4SCIENCEDEPARTMENT MANAGERGEHERALENGINEERING SERVICESSUPERVISOR PROJECTMANAGEMEHT SERVICESUgIDIDneIDI~5IJI5'~ID0IManagerShopOperations ManagerFieldServiceOperationsManagerAchinistrative ServicesandProjectPlanningManagerInspection/Lend SurveyandBuildingServicesDivisionSystemsRecordsManagement Fossil/Hydro systemsTechnical Information CenterManagerEnvironmental ScienceManagerChemistry ServicesSupervisor Enviroanental Laboratory SeniorEnvirormental AnalystResearch&,Development ProgramFossilEngineering HydroEngineering FacilityEngineering RealEstateManagement BudgetandCostProjectManagement ServicesDocwentPreparation RSecretarial ServicesDualityServicesFigure2-5 GZNNASTATIONREVIEWANDAUDITFUNCTIONS NSARBQUALITYPERFORMANCE PORC~~0~~~~~~~~~00~~~~~~~~~~~~~~~~~t~~~~~~~~~~~~~~~~~~~~~~~~~~~0~~~~~MATERIALS ELECTRICENGINEERING TRANSMISSION ANDINSPECTION ANDSERVICESDISTRIBUTION PURCHASING PRODUCTION DIVISIONTRAININGENGINEERING GINNASTATIONREVIEWo~~~~~~~~~~AUDITSFigure2-6.}}

Revision as of 13:17, 7 July 2018

Rev 17 to QA Program for Station Operation.
ML17262A720
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1991
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A719 List:
References
NUDOCS 9201070130
Download: ML17262A720 (80)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION, R.E.GINNA NUCLEAR POWER PLANT Revision 17 to: 'uality Assurance Program for Station Operation DOCKET NO.50-244 December, 1991'2201070130 5'i1.220 PDR ADOCK 05000244 p.PDi~

TABLE OF CONTENTS Section Title Pacae 2.3~4~6.QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program.Organization Design Control Procurement Document Control.Instructions, Procedures and Drawings Document Control 10 13 16 7.Control of Purchased Material, Equipment and Services 18 8.Identification and Control of Materials, Parts and Components Control of Special Processes 22 23 12.13.14.16.17.18..Inspection.

Test Control I'I Control of Measuring and Test Equipment Handling, Storage and Shipping Inspection, Test and Operating Status Nonconforming Materials, Parts and Components Corrective Action Quality Assurance Records Audits 24 26 28 29 30 31 33 34 Revision 17 December 1991

~'IST OF TABLES Table Number Title 1 Quality Assurance Program Procedures Subject L'isting Procurement Document Requirements Audit List Pacae 37 51 52 LIST OF FIGURES Fi ure Number Title Pacae I 2-1 2-2 I 2-3 Management Organization 56 Ginna Station Organization 58 Electric Transmission and Distribution 59 Organization Quality Performance Organization 57 2-5 2-6 Engineering Division Organization Ginna Station Review and Audits Functions 60 61 Revision 17 December 1991 UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R.E.Ginna'uclear Power Plant.This program applies to all activities affecting the safety'elated functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection.

In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71 excluding fabrication and design of.shipping casks.The basic Rochester Gas=and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer.This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering, through the Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station;Division Manager, Technical Services;and Chief Engineer, and heads of other supporting departments.

The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program.The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.

The program is implemented through Quality Assurance/Quality Control, Ginna Station, Engineering, Production Division Training, Materials Engineering and Inspection Services, Electric Transmission and Distribution, and Purchasing procedures.

These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Performance.

The procedures are contained in separate manuals maintained by the responsible organization.

These procedures are reviewed for adequacy at least once every two years by the responsible organization.

Table l-l provides a listing of the subjects and a short description of the subject matter which is contained in the procedures.

Revision 17 December, 1991 Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual.Organizational responsibilities are described in Section 2.The Quality Assurance Program covers all existing-Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports.Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance.

A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in the Ginna Master Equipment Database.Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings.The listing of structures, systems,'and components covered by the Quality Assurance Program are prepared and maintained by Nuclear Engineering Services.Modifications or additions to existing structures, systems, and components are designated the same'eismic classifica-tion as the existing system..New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced.Personnel responsible for performing activities affecting quality.are trained and indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures.

Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure.

Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality.Quality Performance assists in establishing training requirements and assures that personnel are trained by a'uditing training.In addition to training in quality assurance, each depart-ment conducts training, including on-the-job training, to Revision 17 December, 1991

the extent necessary to assure that personnel are qualified for their primary work assignments.

The Vice-President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary.

Where necessary, personnel are trained in radiation protection, plant safety and security.-

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that it is meaningful and is effectively complying with corporate.policy and 10CFR50, Appendix B.This review consists of-audits or a review equivalent to an audit performed by company personnel or outside organizations..The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B,"Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:

a~b.c~NRC Regulatory Guide 1.8, Revision 1,"Personnel Selec-tion and Training." NRC Regulatory Guide 1.28', Revision 2,"Quality Assur-ance Program Requirements (Design and Construction)." AEC Regulatory Guide 1.30, Revision 0,"Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment." d.AEC Regulatory Guide 1.33, Revision 0,"Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled"Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0)e.AEC Regulatory Guide 1.37, Revision 0,"Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants." Revision 17 December, 1991

NRC Regulatory Guide 1~38, Revision 2,"Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants." g.NRC Regulatory Guide 1.39, Revision 2,"Housekeeping Requirements for Water-Cooled Nuclear Power Plants." h.NRC Regulatory Guide 1.58, Revision 1,"Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel." NRC Regulatory Guide 1.64, Revision 1,"Quality Assurance Requirements for the Design of Nuclear Power Plants." NRC Regulatory Guide 1.74, Revision 0,"Quality Assurance Terms and Definitions".

k..NRC Regulatory Guide 1.88, Revision 2,"Collection, Storage and Maintenance of Nuclear Power Plant Records." Note: When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.mo NRC Regulatory Guide l.ll6, Revision O-R,"Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems." NRC Regulatory Guide 1.123, Revision 1,"Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants." n.0~NRC Regulatory Guide 1.144, Revision 1,"Auditing of Quality Assurance Programs for Nuclear Power Plants" NRC Regulatory Guide 1.146, Revision 0,"Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants." Revision 17 December, 1991 2.Or anization The major organizations participating in the Quality Assur-ance Program are Purchasing, Technical Services, Ginna Nuclear Production, Electric Transmission and Distribution, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board.Figure 2-1 is an organizational chart showing these organizations and'their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:<Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna'uclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manger, Quality Performance Manager, Quality Assurance Department Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials-Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production Department Manager, Production Division Training Manager, Nuclear Assurance Department Superintendent, Electric Substations Department Department Superintendent, Electric Laboratory and Telecommunications Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations.

These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board.The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering.

The qualifications of members and the responsibilities of=these organizations are described in Section 6.0, Technical Specifications, Appendix A to Provisional Operating License No.DPR-l8.Revision 17 December, 1991 The Cha'irman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporat'ion directed the establishment of the Quality Assurance Program and i'ssued the governing policy statement..

He has established the Nuclear Safety Audit and Review Board to'review and audit plant operati;ons.

.The Chairman of the Nuclear Safety Audit and Review Board is'esponsible to the Chairman of the Board, President and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements.

In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual.He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station.He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna nuclear production activities and those support activities'ssociated with Nuclear Engineering Services,'roduction Systems and Services, Production Division Training,'nd Corporate Radiation Protection.

The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station.He is responsible for the performance of all Ginna Station quality affecting activities in accordance with the requirements of the quality assurance program.He is responsible for providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures.

He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of modification, plant maintenance, and fire.protection'activities in accordance with the'requirements of the Quality Assurance Program.Revision 17 December, 1991 The Superintendent, Ginna Production reports to the Plant Manager, Ginna Station, and is responsible for operations, health physics and chemistry, refueling, results and tests, Ginna Computer Systems technical engineering, surveillance testing and operational assessment in accordance with the requirements of the quality assurance'program.

The Plant Manager, Ginna Station and Superintendents are assisted by other designated staff members, Figure 2;3,'in the implementation of certain Quality Assurance Program requirements at the plant.These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, maintenance of material handling equipment, and control of all activities involving operation,'aintenance, repair,~refueling and modification.

The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an INPO accredited training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities." The Department Manager, Nuclear, Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management'.

As requested by Ginna Station, he is also responsible for reviewing unique maintenance and repair procedures for major equipment.

The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station.These activities include long range planning for life extension and low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support.In addition, he provides support to Nuclear Engineering Services to assist in administration and training associated with procedure changes and to provide coordination for generating responses to audits and inspections.

Revision 17 December, 1991 The Department Manager, Production and Engineering Systems is responsible to the Division Manager,, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.

The Department Managery Quality Performance is responsible for establishing the overall Quality Assurance Program.He is responsible for assuring that all planned and systematic-actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed.He'rovides management with'objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.He has the authority and organizational freedom to assure all necessary quality activities are performed.

In addition, he is responsible for special processes and the'nservice inspection program.He is responsible for.maintaini'ng a staff, Figure 2-2, for the conduct of staff training and for directing its activities.

The staff assists in the preparation and maintenance of the Quality Assurance Manual.The Manager, Quality Assurance reports to the Department Manager, Quality Performance.

He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation.

This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of 10CFR50, Appendix B, and for maintaining the total program up to date..The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program.The staff is also responsible for auditing and surveillance of aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected.

They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents.

They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveillances at these supplier's facilities.

In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule, audit status reports and applicable corrective action report summaries.

Revision 17 December, 1991

The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years are in quality assurance and three years in the design or operation of nuclear power plants.The Manager, Materials Engineering and Inspection Services is responsible for supervising and directing a staff which is responsible for the development and qualification of procedures utilized for special processes.

He is responsible for providing functional guidance and direction for those methods.He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto.He is also responsible for the routine maintenance of lifting and'andling equipment and for the testing and evaluation of Ginna Station materials.

The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifica-tions, and procedures.

He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and control planning and work monitoring responsibilities to his staff of Quality Contxol Engineers and QC,Inspectors.

The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing.Nuclear Assurance is responsible for the coordination of inspection activities and the assurance that inspection requirements are included in approved procedures-and work packages.This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports.The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear related activities.

The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements.

He'aintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Nuclear Engineering Services, Quality Assurance and the other involved departments as appropriate.

The Department Superintendent, Electric Laboratory and Telecommunications is responsible for providing a staff, Revision 17 December, 1991 Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters.He is also responsible for providing laboratory testing of some electrical equipment and devices.The Department Superintendent, Electric Substations Department is responsible for providing a staff, Figure 2-4, to perform relay engineering, maintenance and testing services.He is also responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna.He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Electric Transmission and Distribution Division.3~Desi n Control Design activities are performed by, Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or-components.

Augmenting.this effort is the design and technical support provided by the Electric Substations Department for the systems and equipment, for which Electric Transmission and Distribution is responsible for maintaining.

In this regard they support Nuclear Engineering Services for design of safety related modifications.

Ginna Station is responsible for the design and control of design activities for Minor m'odifications of structures, systems, or components.

Ginna Station is also responsible for classifying station originated modifications as either Major or Minor.Nuclear Engineering Services reviews and concurs with modifications being classified as Minor.Minor modifications typically involve (1)component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements, ,(2)additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component-10-Revision 17 December, 1991 required for safe shutdown of the plant to an unacceptable

'evel, (3)changes to a safety related system determined not ,to be major (e.g., vents, drains, alarms, indicating lights, etc.).Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval,'istribution, control, and revision requirements; and corrective action.'esign con-siderations include, as appropriate:

physics, stress, materials, thermal, hydraulic, radiation and accident analyses;appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair;acceptance and rejection criteria;and quality standards and other quality assurance requirements.

Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.The design of plant modifications is verified by an engineer other than the one who performed the original design.For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested.

For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting engineers, as appropriate.

Spare or replacement parts must at least meet the original equipment's technical and quality requirements.

For plant modifications, standard,"off-the-shelf", commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design.Supplemental procedures are established for the review and approval of field changes..In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.Where this.is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are com-petent in the specific design area.-11-Revision 17 December, 1991 Design verification and field change systems are methods ut'ilized to detect, document and correct design process errors and deficiencies.

In addition, the corrective action'ystem, described in Section 16,, is utilized to control and document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adv'erse to quality.Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks,=and reviews.Design control procedures are reviewed to assure that an independent verification is performed.

Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information.

The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate.

Design'documents include des'ign criteria, analyses, specifications, drawings, design review records, and changes thereto.Quality Performance, through preparation assistance and/or review, assure the proper inclusion.

of quality standards in the design of major and minor modifications.

Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications.

The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.Plant modifications are controlled by means of applicable Ginna Station, Engineering, Electric Transmission and Distribution, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures.

These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures.

Plant~Revision 17 December, 1991 modifications are reviewed by the Plant Operations Review'ommittee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifications.

4~Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.

Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.Procurement of materials, parts, components, and services is initiated by department staff per'sonnel.

Procurement proce-dures'require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-l.t Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision.

Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution and Quality Assurance/Quality Control are reviewed by Quality Performance and approved by designated departmental

'supervision.

Evidence of review and approval of procurement documents is recorded on the.documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents.

Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.After purchase requisitions, service agreements, contracts, specifications, and,drawings have received the required re-views and approvals, a purchase order is issued'y Purchasing to the selected supplier and controlled as described in Section 7.These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.

Revision 17 December, 1991 Under.no circumstances are purchasing requirements altered.(except for quantity or pricing)during-order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above.Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.

Quality Performance review of the above includes-checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable acceptance criteria.Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, compati-'ility, and acceptance criteria of the original design.Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.

Instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing

.procedures as required to implement the Quality Assurance Program.These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel.

Quality Performance reviews and concurs with=these procedures.

Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing.This includes instructions and procedures listed in USAEC Regulatory Guide.1.33 for administrative control;general plant operation; startup, operation, and shutdown of safety related systems;correction of abnormal, off normal, or alarm conditions; response to emergencies and other significant events;radioactivity control;control of measuring and test equipment; chemical and radiochemical Revision 17 December, 1991 control;and fuel handling and refueling.

Ginna Station is responsible for-appropriate changes to such documents upon receipt of regulatory directives; instructions from Roches-ter Gas and Electric management, or the completion of plant modxfzcata.ons.

Gonna Station xs also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.Electric Transmission and Distribution is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspec-tions and testing activities for which they ar'e responsible.

Electric Transmission and Distribution also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.Nuclear Engineering Services is responsible for providing approved specifications, and drawings associated with major modifications and when minor modifications necessitate drawings oh specifications.

These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.Engineering has established procedures for revising drawings and specifications.

These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.

Quality Performance is responsible for the preparation and implementation of inspection procedures utilized for detailed inspection activities for Ginna Station.This organization is responsible for providing and for implementing procedures for audit and surveillance related activiti'es.

In addition, it is responsible for providing and for implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.

Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.Indoctrination and training of personnel is provided by the-15-Revision 17 December, 1991 responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents.

In addition, Quality Performance department surveillance and audit as described in Section 10 and Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.Document Control Procedures are established to control the issuance of pro-cedures, instructions, drawings, and specifications.

Standard document control requirements are contained in the Quality Assurance Manual.The Plant Manager, Ginna Station is responsible for the control of all documents issued at Ginna Station.='lectric Transmission and Distribution and Production Division Training are responsible for the control of documents issued by their respective organizations.

Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1).Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.The Quality Assurance Manual designates responsibilities and'defines requirements for the preparation, review and approval of documents.

Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements.

Nuclear Assurance Quality'Control representatives, assigned to support departmental maintenance, repair, refueling and modification activities, review governing procedures, prior to use, to assure quality assurance requirements'are included.The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications.

Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with.that activity.Ginna Station, Engineering, Material Engineering and Inspection Services, Purchasing, Production Division Training and Electric Transmission and Distribution quality assurance implementing procedures Revision 17 December, 1991 (Table 1-1)require the review and concurrence of Quality'erformance and the approval of the appropriate department supervisor.

Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document.Zt specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document;includes the method for identifying holders of controlled copies;requires that only controlled copies of a document be used for official purposes;requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.

Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifications and drawings.Suppliers of materials, equipment, and services are required in procure-ment documents to provide for control of documents, including manufacturing, inspection and testing instructions.

The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required;to pro-perly review and approve documents such as procedures, instructions, specifications, arid drawings;to provide the same reviews and approvals for changes to documents as was required of the original document;to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent;to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.Quality Performance is responsible for review and concurrence of procurement documents for all procuring-17-Revision 17=December, 1991 organizations and, therefore, procurement document control requirements.

Quality Performance is responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.

Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.All procurement is conducted in accordance with procurement documents as stated in Section 4;All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the control of the supplier performance.

Source inspection (surveillance)., certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items.In.lieu of these methods, acceptance of services is based.on either or a combination of: (1)surveillance of the activity and (2)review of objective evidence for conformance to the procure-ment document requirements (i.e.certifications, stress reports etc.).The extent of the acceptance methods and as-sociated verification activities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.

Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.

Results of the planning are incorporated in the procurement documents.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents.

The evaluation which is accomplished during the procurement Revision 17 December, 1991 planning, determines the necessity for the supplier selection to be from the approved suppliers list maintained by Purchasing.

Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program.The evaluation guidelines for source selection considers the.item complexity, method(s)of acceptance and for a replacement item, if the source is to be restricted to the original supplier.For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction.

Items or services which meet industry standards and are typically utilized in applications other than nuclear may be purchased from suppliers not listed on the approved suppliers list provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre-or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection.

Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed, on the approved suppliers list provided that verification of nuclear quality can be accomplished by method's such as source surveillance, pre-'r post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.

Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method.The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments, as appropriate.

For engineered items, Nuclear Engineering Services is responsible for evaluating the overall design or manufacturing.

capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents.

'19-Revision 17 December, 1991 As part of this review, the supplier s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.Quality Assurance i's responsible, for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of lOCFR50 Appendix B, and Rochester Gas and Electric Corporation requirements.

The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records'and their retention, and quality assurance requirements and controls'mposed by the supplier on his subcontractors.

Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance.requirements.

Ginna Station, Quality Performance and Electric Transmission and Distribution evaluate the suppliers of inspection, test, and calibration services which they intend to use.The departments responsible for performing supplier evalu-ations shall document'their results in reports which discuss areas investigated, findings, and conclusions.

As applicable, concurrence of Purchasing, Nuclear'ngineering Services, Quality Performance, Ginna Station and Electric~Transmission and Distribution is required to place a supplier on the qualified suppliers'ist.

One organization can remove a supplier from the list without concurrence of: the others.Measures are established by Nuclear Engineering Services and Quality Assurance to control supplier performance for engineered items.These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the supplier.'n addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance.

With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.-20-Revision 17 December, 1991 Quality Assurance is re'sponsible for determining and documenting the degree of supplier surveillance (including review, inspection, or audit)required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance.

The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.

For complex engineered items, Quality.Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement.

When a deviation from purchase order requirements is noted, the Quality Assurance represen-tative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.

Quality Performance is responsible for.surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements.

The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.

Department supervision is responsible for receiving and storing items pending their acceptance.

Upon receipt, the department stockkeeper logs the item, places a"hold" tag on'he item, and notifies Quality Performance that the item has arrived;Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling.

This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use.Documentary evidence sufficient to identify the-21-Revision 17 December, 1991 codes, standards or specifications met by the purchased material, equipment, and services is retained.In the'vent a final source inspection for'the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a'ocument check to assure that the required documentation has been reviewed and is complete.A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.If the item and documentation are adequate, Quality Performance labels the item as"Accepted", files the documentation and receipt inspection results, and releases the item for storage or use.If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section 15.All items iss'ued must bear an acceptance tag and have docu-mentation to support the acceptability of the item;In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.Identification and Control of Materials Parts and The identification and control of materials, parts, and components is accomplished in accordance with written requirements and appli.es to material, parts, or components in'ny stage of fabrication, storage, or installation.

Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project.The identification and control requirements cover items such as: traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test'eports;specification of the degree of identification to preclude a degradation of the item's functional capability or quality;and the proper identification of materialsg parts, and components prior to release for manufacturing, shipping, construction, and installation.

Nuclear Engineering Services and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and-22-Revision 17 December, 1991 control of materials, parts, or components, as appropriate; Suppliers are required to assure that all required documentation for an item is properly identified and related to the item.Each item is'equired to be physically identified, either by marking on the item or by tags.Physical identification by purchase order number is used to the maximum extent possible for relating an, item at any time to applicable documentation.

Identification is either on the item or records traceable to the item.Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.The Plant Manager, Ginna Station is responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant.Procedures covering the identification and control of materials, parts, and components at the plant are approved by the Plant Manager, Ginna Station.The responsible supervision of other departments which receive material which is to be stored away from the-plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of.responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications.

Qualification of , personnel and special process procedures complies with the requirements of applicable codes and standards.

When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the.special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements. Revision 17 December, 1991

Quality Performance personnel are responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved'y Materials Engineering and Inspection Services.Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards.

Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for'the'ualification of NDE personnel and procedures.

The Manager, Materials Engineering and Inspection Services is responsible for the qualification of welding procedures and the training and qualification of welders.Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.-Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.

Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-cations, codes, standards, or regulatory requirements.

For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections.

Instructions for conducting detailed verification inspections are contained in inspection procedures.

These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.

Inspection requirements and hold points are utilized to verify conformance of activities to the documented instructions, specifications, and drawings for-24-Revision 17 December, 1991 accomplishing the activity.Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for per-forming the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.Verification inspections are performed by qualified inspec-tion personnel who are independent of the personnel performing the work.Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors.

Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.

Quality Performance personnel are responsible for performing verification inspections, as required, during'plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel.

When the work is performed by.outside contractors, Quality Performance is responsible for surveillance of the subcontractor's inspection activities.

Inspection equipment is calibrated and controlled in accordance with Section 12.Calibration status is verified by inspection personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control, by monitoring processing methods, equipment, and personnel is provided.Both inspection and process monitoring are required when control is inadequate without both.Quality Performance is responsible for the verifying adequate inclusion of inspection requirements in specifications.

The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures.

He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.

The Manager, Nuclear Assurance is also responsible for assuring that adequate inspection requirements are included-25-Revision 17 December, 1991

in procedures, instructions and/or checklists controlling maintenance, modification and repair activities and related fabrication processes for Ginna Station.With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements for the Inservice Inspection Program.Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program.The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.

Test Control'Checks or testing performed to verify'he adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.Whenever testing is required to demonstrate that a material, part, component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements.

The test program requires the identification,'ontrol, and documen-tation of all tests, and-the preparation of written proce-dures required for satisfactory accomplishment of the testing.Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria;instruc-t tions for disposition of deviations; data collection requirements; and test result approval.The Plant Manager, Ginna Station is responsible for the statio'n test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.

Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station.The Plant Manager, Ginna Station is responsible Revision 17 December, 1991 for the correct and timely'performance of the required tests utilizing written and approved procedures.

When contractors are employed for tests, the contractor is required to perform testing in accordance with.its quality assurance program requirements.

All test results are required to be documented, reviewed, and approved by those responsible for performing the test.When requested by Ginna Station, Electric Transmission and Distribution performs test activities to determine the cause of protective relay malfunctions.

These test activities are performed in accordance with approved procedures by qualified personnel..

Nuclear Engineering Services and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications.

Nuclear Engineering Services and Electric Transmission and Distribution assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff.The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.

Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requi'rements.

Control of Measurin and Test E ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures.

Calibra-tion procedures include step-by-step methods for calibration and requirements for instrument accuracy.Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.

Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next-27-Revision 17 December, 1991

calibration date on the equipment; a system providing trace-ability of=shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items, under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates;and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability under normal use conditions.

In the event a measuring instrument (i.e.shop or field standard)is found out of calibration, an investigation is conducted, to determine the validity of previous measurements.

The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and cali-bration of measuring and test equipment at Ginna" Station in accordance with the above requirements.

Instruments specified in Section 4.l, Technical Specifications, are included in the program.Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.

Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.The Manager, Materials Engineering and Inspection Services and, Department Superintendent, Electrical Laboratory and Telecommunicati'ons are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.

Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station.Electric Transmission and Distribution, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and.cleaning of material and equipment delivered to or located in their work areas.In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and-28-Revision 17 December, 1991 handling equipment.

Under normal circumstances, manufac-turer's specific written instructions and recomme'ndations and purchase specification requirements are invoked for cleanliness, preservation, special ha'ndling, and storage with respect to environmental requirements.

In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in'accordance with department procedures.

The, Department Manager, Nuclear Engineering Services is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, clean-ing, and preservation of materials and equipment procured for major modifications.

These.procedures are prepared by contractors, by the station staff, or by staff members of.Electric Transmission and Distribution as appropriate.

Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages'of manufacturing and installation prior to operational acceptance.

P Quality Performance is responsible for review of engineering speci'fications to assure that proper handling, storing, and shipping requirements have been specified.

Quality Performance is responsible for examination of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.

Ins ection'est and 0 eratin Status Equipment or systems not ready for normal service are'clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.The.Plant Manager, Ginna Station is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance, repair, or modifica-tion in accordance with the approved Electric System Operating Rules.The Plant Manager designates personnel who have station holding authority. Revision 17 December, 1991 Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.

System status is indicated through the use of hold tags, block tags and corresponding control logs.Equipment or system inspection and test status are indicated by use of test tags,.labels, or work inspection and test status sheets.Written procedures control the use of hold tags, test tags, and labels.I Systems, components," and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving fuel assemblies or other radioactive sources are identified and,controlled by the use of tags, stamps, or other suitable means.Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejec-tion for a particular component, system, or structure.

These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented.

Material Engineering and Inspection Services establishes the procedures for implementing the inspection, status sheets utilized during inservice inspection.

Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.

Materials, parts, or components which do not conform to the drawing or specification requirements are identified and reported.RG&E personnel are responsible for initiating nonconformance reports and initiating dispositions.

Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance reports.-30-Revision 17 December, 1991 Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented.

Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to'revent inadvertent use prior to implementing the nonconformance-,disposition.

After installation or use, nonconforming items.are identified and controlled until approved disposition has been implemented.

Nonconformances identified at a supplier's facility and reported to RG6E, which have supplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.

Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.

Items are repaired and reworked in accordance with approved procedures and current drawings.The repair or rework must be verified as acceptable by an inspection of the affected item or process which is at least equal to the original inspection method.Items which are accepted"use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance.

All such items are approved prior to use by the cognizant organization having responsi-bility for the requirement.

In addition, those"use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.

Nuclear Assurance Quality Control personnel provide nonconformance status information periodically.

Quality Performance and other organizations analyze nonconformance r'eport data for adverse'trends and process periodic reports to management.

Adverse trends form a basis for supplier re-., evaluation or for other corrective action.16.Corrective Action Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are reported and documented.

Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies.

Once identified, the-31-Revision 17 December, 1991

condition, the cause of the condition, and the corrective action taken shall be documented.

Significant conditions adverse to quality may be identified by anyone noting the condition and reported to Ginna Station'for review and, if appropriate, the initiation of an appropriate corrective action report.When a significant condition adverse to quality at Ginna Station is identified, Quality Performance,evaluates the effect of continuing the activity.If continuing the activity would obscure or preclude-identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken.Quality Performance Supervision has authority to stop work on, maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations.

Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.

The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engine'ering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution or cognizant suppl'ier associations.

The Plant Operations Review Committee reviews all Corrective Action Reports initiated at Ginna Station and may recommend additional corrective action if the action does not result in adequate resolution.

Corrective action report committees of aff'ected RG&E management, review initiated reports to determine cause and to develop a corrective action plans, resolve the identified concern and to preclude recurrence.

Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable.

The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.

Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.-32-Revision 17 December, 1991

Corrective action summary reports are submitted to departmental supervision to keep them aware of significant

~conditions adverse to quality, related causes and corrective action being taken.Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.17.ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance.

Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records.Quality Performance, Purchasing, Research and Science, and Electric Transmission and Distribution departments are responsible for assuring the maintenance and retention of records which they originate.

This may be accomplished either by retaining the records in their department, or by forwarding.

them to the appropriate Production and Engineering Systems record retention locations.

Each organization retaining records is responsible for'preparation, review, app'roval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance

'with these requirements.

The records which fall within quality assurance record requirements include those records required by Section 6.10 of the Technical Specifications and the Quality Assurance Program.All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered-by the quality assurance program are included.Records, initiated at Ginna Station include operating logs;the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses;calibration procedures and reports;and Nonconformance and Corrective Action Reports.Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering, Systems record retention location.Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data-33-Revision 17 December, 1991 recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

The requirements and responsibilities for record accessibility and,transmittal are described in the Quality Assurance Manual sections as appropriate.

Requirements,and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention'f quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents.

~Records are available to authorized personnel.-Removal of records from storage is documented and accountability is maintained by, the responsible record control activity.Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage.The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.

Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentationI quality assurance records, such as audit reports and surveillance reports;purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities.

Quality Assurance is responsible for-34-Revision 17 December, 1991 conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis.Audit intervals are based on the status and safety importance of activities being performed, as well as group performance.

and related management concerns.Table 18-1 is a list of the activities to be examined by audit in each of the audits.Frequencies are based.on the level of activity in each area.Audit schedules are estab-lished to assure that each of the activities are audited at the frequency specified in Section 6.0.Technical Speci-fications.

Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.Each audit.requires the development of an audit plan to provide information about the audit;such as the functional areas to be audited, the names, of those who will perform, the audit, the scheduling arrangements, and the method of reporting findings and recommendations.

Audit planning and performance utilize performance based techniques that will facilitate effectivenes's assessments as well as compliance verification.

The audits are performed in accor'dance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.Audit, results are documented and reported to the supervisor'nd division head having responsibility in the area audited and the Nuclear Safety Audit and Review Board.Within a specified period of time, the person having supervisory responsibi'lity in the area audited is required to review the audit results, take necessary action to correct the" deficiencies identified by the audit, and document and report the'orrective action.Quality Assurance is responsible for developing audit plans and audit checklists, designating and,training audit personnel, and conducting audits.Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procure-ment, as required, to evaluate their quality assurance-35-Revision 17 December, 1991 pxogram for compliance with all aspects of the procurement documents.

Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents.

During the additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-mented in accordance with procurement documents.

Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends.Results of these analyses are provided to management for their regular review.-36-Revision 17 December, 1991

Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix B Criteria ualit Assurance ualit Control Procedures Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Training of Quality Assurance/Quality Control Personnel Quality Assurance/Qu'ality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's Design Documents~~~~~~~~~~Preparation, Review and Approval of Computer Software Production Evaluations IIX.XIX Requisitioning Quality Assurance/Quality Control Services XV Quality Review of Rochester Gas and Electric Procurement Documents IV Preparation, Review and Approval of Rochester Gas and Electric Q.A.Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation,, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision 17 December, 1991

Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria=Review of Departmental Procedures Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance/Quality Control Evaluation

'of Suppliers by Quality Assurance Supplier Surveillance Control of Supplier Performance Quality Assurance Evaluation of Bids!Conducting Commercial Grade Supplier Surveys Document Deficiency Reports Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel Quality Assurance Review of Nonconformance Reports Preparation, Review and Processing of Corrective Action Reports by Quality Assurance VI'.VII VII VII VII VII Qualification of Auditing Personnel Audit Scheduling and Planning Performance of Quality Assurance Audits Reporting and Follow-Up of Audit.Findings Conduct of Quality Assurance During and in Follow-Up of USNRC and Management Audits Response to Audits and Surveillances Qualifications of Surveillance Personnel XVIII XVIII XVIII XVIII XVIII XVIII XVIII-38-Revision 17 December, 1991 Table 1-1 (cont'd)ualit Assurance ualit Control Procedures Appendix B Criteria , Quality Performance Surveillance Program XVIII Qualification of Commercial Grade Supplier Survey Personnel XVIII-39-Revision 17 December, 1991

Table 1-1 (cont'd)Materials En ineerin Ins ection Services Appendix B Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures IV Quality Materials'ngineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Control and Distribution of Documents Regulating Safety Related Activities

~~~~~\Receipt and Acceptance of Purchased Materials Preparation, Review and Approval of Supplier Evaluation VI VII VII Welding Procedure Preparation Review and Approval Welding Procedure Qualification Heat Treating Procedures Welder Qualification and Currency Nondestructive Examination Procedures Nondestructive Examination Procedures Manual Nondestructive Examination Personnel Qualification Inservice Inspection Program and Plans IX~IX IX IX IX IX IX X-40-Revision 17 December, 1991 0

Table 1-1 (cont'd)Materials En ineerin and Ins ection Services Appendix B Criteria Incorporating, Ginna Modificat'ions into Inservice Inspection Program X Test Control XI Test Personnel Qualifications XI Calibration and Control of Nondestructive Examination Instruments

, XII Inspection and Maintenance of Material Handling Equipment XIIIOverhead and Gantry Cranes Inspection and Maintenance of Portable Lifting and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems Slings and-Related Apparatus Classification and Training of Material Handling Equipment Personnel Mobile Hydraulic Cranes Inspection and Maintenance of Jacks Forklift Loading Forks XIII XIII XIII XIII.XIII XIII XIII XIII Training and Qualification-of Crane Operators Lifting Devices in the Containment Vessel Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at Materials Engineering and Inspection Services Quality Materials Engineering and Inspection Services Records XIII XIII XVI XVI I-4 1-Revision 17 December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Materials Engineering and Inspection Services Response to Internal Audits Ginna Quality Assurance Program Implementation, Trainingof Ginna Personnel Ginna Administrative and Engineering Staff Responsibilities Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Control of Station Modification XVIII Station Modification Installation Acceptance and Completion Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased Materials, Parts, Components and Services Requisition Services from General Maintenance IV IV Plant Procedures Plant-Procedure Control and Distribution Control of Engineering Documents VI VI Vendor Manual Control Receipt and Acceptance of Purchased Materials Supplier Qualification Technical Evaluation Control of Purchased Services Control of Accepted Material, Parts and Components VI VII VII VII'III-42-Revision 17 December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Identification and Marking of Material Control of Welding, Heat Treating and Nondestructive Examination VIII IX Welding Equipment Performance Verification Nondestructive Examination IX IX Preventive Maintenance Programs for Electrical, Mechanical and Valves Inservice Inspection.

Environmentally Qualified Equipment Maintenance Program X, XIV X Performance of Tests Qualification of Test Personnel XI XI Test, Status Control~~Calibration and Control of Measuring and Test Equipmentg Installed Plant Instruments and Equipment Maintenance and Inspection of Material Handling Equipment Control of Material Handling and Handling Equipment Storage and Preservation of Materials Control of Heavy Loads at Ginna Electric System Operating Rules Bypass of Safety Function or Jumper'Control Control of Temporary Modifications Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports XIV XII XIII XIII XIII XIII XIV XIV XIV Revision 17-.December, 1991 Ginna Procedures Table 1-1 (cont'd)Appendix B Criteria Conditions Adverse to Quality)Work Control System Ginna Records XVII Record Storage Facility and Equipment I Maintenance and.History Program Ginna Station Response to Internal Audits XVII XVI I XVIIIRevision 17 December, 1991 Table 1-1 (cont'd)En ineerin Procedures Appendix B Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation, Review and Approval of Engineering'rawings III Preparati'on, Review and Approval of Specifications.

Design Verification Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition Engineering Procedures Engineering Procedure Deviation Request Distribution and Control o'f Documents by the Control Number Method IV VX Control of Documents by the List of Current Revisions Method VX Distribution of Documents by the List of Correspondence Procedures Receipt, Control and Distribution of Drawings and Aperture Cards Supplier Evaluation VI VX VXI-45-Revision 17 December, 1991 Table 1-1 (cont'd)En ineerin Procedures Appendix B Criteria Preparation, Reviev and Approval of Bid Requests, Bid Evaluations and Recommendations for Avard VXI Engineering Reviev of Nonconforming Materials, Parts or Components Initiating and Responding to Corrective Action Reports Records Engineering Response to Audits XVIX XVIII-46-Revision 17 December, 1991 Table 1-1 (cont'd)Purchasin Procedures Appendix B CriteriaPeriodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation Establishment and Maintenance of Qualified Suppliers List Supplier, Nonconformance Report Processing Purchasing Department Response to Corrective Action Reports and Corrective Action Reporting Purchasing Records Purchasing Response to Audits IV IV VII VII XVI XVII XVIII-47-Revision 17 December, 1991 Table 1-1 (cont'd)Appendix B Production Division Trainin Procedures Criteria The Production Division Training Procedures Manual is currently under development.

In the interim they are using.appropriate Ginna Station Procedures.

The Ginna Station Procedures will be replaced by Production Division Training Procedures as these procedures are approved and issued.QA Program sections applying to Production Division Training are 1~2~5g 6/8~13'6~17'8'48-Revision 17 December, 1991 Table 1-1 (cont'd)Electric Transmission Procedures and Distribution Appendix B Procedures Criteria Quality Assurance Program Implementation for I Electric Transmission and Distribution Department Training of Electric Transmission and Distribution Personnel Electric Transmission and Distribution Organization Design/Modification Activities Control Control of Procurement Documents for Purchased Parts, Components and Services Preparation, Review, and Approval of Electric Transmission and Distribution and Laboratory Procedures V Control of Electric Transmission and Distribution Procedures, Schedules and Test Form Books Supplier Qualification Technical Evaluation Receipt and Acceptance of Instrumentation and Standards Equipment IU VI..VII VII Control of Purchased Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and Components Performance of Tests at Ginna Station Performance of Tests at the Electrical Laboratory Qualification of Test Personnel VIII XI XI XI Calibration and Control of test Instruments XII.Handling, Storage and Shipping I Inspection and Test Status at Electric Meter and Laboratory XIII XIV-49-Revision 17 December, 1991

Table 1-1 (cont'd)Electric Transmission and Distribution Procedures Appendix B Criteria Control and Disposition of Nonconforming Parts and Components Initiating and Processing of Corrective Action Reports Control of Quality Assurance Records Response to Audits XV XVII XVIII-50-Revision 17 December, 1991

TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include: 1.Sco e of Work-Detailed statement of the work to be performed.

2~" Technical Re uirements-by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished.

Also identified.

shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.ualit Assurance Pro ram Re uirements-which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards.

Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier procurement documents.

Ri ht of Access-to include the facilities and records of the supplier.for source inspection and audit by the Purchaser or parties designated by the purchaser.

Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.*5.Documentation Re uirements-Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.*6.Nonconformance

-Requirements for reporting and disposition of nonconformance to procurement requirements.

I'-Items reviewed by Quality Assurance or Quality Control.-51-Revision 17 December, 1991 0

Table 18-1 Audit List Audit Title Corrective Action Audit To ic Areas Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods.of operation.

Operational Assessment Nonconformance Control*Outage Activities Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA*Health Physics, Chemistry and~~Radwaste*Fire and Safety r Radwaste Shipping and Process Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program Fire Protection Program and implementing procedures Fire Protection and Loss Prevention Program-52-Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit List Audit To ic Areas Instructions, Procedures, and, Document Control Independent Inspecti'ons and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Drawing Control Vendor Manual Control Procedure Control Records Control Security*Operations Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and Inspection

'Services ISX Program NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls*Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment-53-Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit List Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Training/performance and.qualifications ofthe operating and technical staff Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Licensed Operator Auxiliary Operator Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician

-QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement Configuration Control Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Pr'ogram Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 17 December, 1991 Audit Title Table 18-1 (con't)Audit To ic Areas Electric Transmission and Distribution Electric Mater and Laboratory Electric Substations

  • Noted audits will also address relevant activities to verify'onformance of facility operation to all provisions contained in Technical Specifications and applicable license conditions. Revision 17 December, 1991 I

R.E.GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART LINES OF SUPKRVISIOM AND ASllNISTRATION LINES Of'OJddJNICATIOM CHAIRNAN OF THE BOARD, PRESIDENT AND CHIEF EXECUTIVE OFFICER SENIOR VICE PRESIDENT CAS d ELEC'fRIC DISTRIBUTION AND CUSTOMER SERVICES SENIOR VICE PRESIDENT PRODUCTION d ENGINEERING SOII OR VICE PRESIDENT>

CONTROLLER d CHIEF FINANCIAL OFFICER VICE PRESIDENT KJPLOYEE RELATIONS, PUBLIC AFFAIRS AND MATERIAL WNAGIKNT VICE PRESIDENT CINMA NUCLEAR PRODUCTION VICE PRESIDENT~SECRETARY AJC TREASURER DKPAR TITAN t MANAGER AND PI%CHASING AGENT MATERIALS WMAGKJKNT DIVISION WJIAGER ELECTRIC TRANSMISSION d DISTRIBUTION OEPARtEENT MANAGER OJALITY PERFORMANCE DIVISION HANACER TECHNICAL SERVICES ANO CHIEF ENGINEER~~~I C~~DEPARAKNt MANAGER RISK WNAGEJM:Nt DIRECtOR OF SECURITY DEPARTJKNT SXKR INTENOENT ELECTRIC LAB JJC TELE-COJ4ANJ I CAT I ONS DEPARTIKNT QUEER INTENDENT ELKCTRIC QSSTAT TONS DIVISION IlANAGKR~DUALITY ASSURANCE MANAGER MATERIALS ENGINEERING d INSPECTION SERVICES DEPARTJCITT MANAGER RESEARCH d SCIKNCE DEPARTIKNT IlANAGER PRODUCTION d ENGINEERING SYSTEMS DEPARTlCNT WJJACER NUCLEAR EIJG I NEER INC SERVICES DEPARllCNT MANAGER PROJNM:T I ON DIVISION TRAINING nW W~..~PORC CINMA S'fATfON U Q ftf ftf 0 4 ftf V.fff O'.ftf 0'LO LKJ PROC JWOKNT SERVICES EWLOYEK RELATIONS%TER CAI.I BRAT ION d MAINTENANCE AJN KLECTRIC LAB SERVICKS DESIGN.TECH 5&PNT, ROTATING KOUIPSKNT HAINTKNANCK

~RELAY TEST d CONSTRUC'f ION SERVICES MATERIALS KNGI JlECR INC, NOE, ISI d ldlK INSP SERVICES MANAGER NUCLEAR ASSJJRANCE QUALITY CONTROL AND DUALITY ENGINKR INC SERVICES DUALITY ASSURANCE PROCÃKJKNT, AIRJIT d QNJVE ILLANCK SERVICES KNVIROSCNTJL SCIENCE d LABORATORY CHEMISTRY SERVICES, RESEARCH d DEVKLOPJKNT SUPERVISOR

~PRO%ET WNAGDEMT SERVICES DUALITY SERVICES, PRJLMCT WMAGGKNT SERVICES.AINJIN.SERV., BUDGET d COST RECORDS HAMACEJKMT, TECNICAL INFORMATION CENTER.CHIS.IMFORllATION SERVICES, DIVISION SYSTDlS DEPARTMENT SUPERINTENDENT GENERAL HAINTEMANCK FIELD d SHOP FABRICATION SERVICES DESIGN, CONSTRUCTION, L I CDJS INC, FlKL AMAAGKJENT d TECHNICAL SUPPORt SKRVICES TRAINING SERVICES DIRECTOR CORPORATE RADIATION PROTECTION CORPORATE WC.TH PHYSICS AJNI NUCLEAR DKRGKNCY PLANNING STATION OPERATIONS.

MAINTENANCE, HP d CJMMSTRY CONTROL, TECHNICAL IVOR(, TESTING, MATERIAL CONTROL, PROCUREJENT, LIASON ENCI NEER INC, FIRE PROTEC'tIOJI a SAFETY.OPERATIONAL ASSESQKNT, COINER SYSTEMS SKKRVI SOR NUCLEAR SECURITY SECIWITY SERVICES Figure 2-1 QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE I I MANAGER QUALITY ASSURANCE MANAGER NUCLEAR ASSURANCE MANAGER MATERIALS ENGINEERIHG CI IHSPECTIOH SERVICES SENIOR ANALYST QUALITY PERFORMANCE ANALYSES AHD PROGRAM SUPPORT am ID ID 0 4 ID I~5 DI mr.ID 0 I QUALITY ASSURANCE ENGINEERS STAFF QUALITY CONTROL ENGINEERS QUALITY CONTROL FOREMAN TECHNICIANS

&INSPECTORS MATERIAL 5 MATERIAL HAHDLING ENGINEERS 5 FOREMEN STAFF STAFF Figure 2-2 GINNA NUCLEAR PRODUCTION ORGANIZATION VICE PRESIDENT GINNA NUCLEAR PRODUCTIOH PLANT MANAGER GINNA STATION DEPARTMENT MANAGER PRODUCTION DIVISION TRAINING DEPARTMENT MANAGER NUCLEAR ENGINEERING SERVICES UQ ID ID 0 (6 v.I Vl (0 I DIRECTOR CORPORATE RADIATION PROTECTION CORPORATE HEALTH PHYSICS NUCLEAR EMERGENCY PLANNING SUPERINTENDENT GINHA PRODUCTION OPERATIONS*

HEALTH PHYSICS 8 CHEMISTRY TECHNICAL ENGINEERING~

OPERATIONAL ASSESSMENT COMPUTER SYSTEMS CORRECTIVE ACTION SAFETY OUTAGE PLANNIHG MATERIALS&PROCUREMENT 0 SUPERINTENDENT GINNA SUPPORT SERVICES MECHANICAL MAINTENANCE ELECTRICAL AND l&C MAINTENAHCE MAINTENANCE PLANNING&SCHEDULIHG FIRE PROTECTION MOOI F I CATION SUPPORT*HNEH RCS AVERAGE TEMPERATURE

>200 F AN STA AND COHTROL ROOM FOREMAN ARE ADDED'O THE REQUIRED COHTROL ROOM SHIFT COMPLEMENT INITIAL LICENSED OPERATOR OPERATOR REQUAL AUX OPERATOR STA INITIAL STA REQUAL CHEMISTRY TECH RAD PROTECTIOH TECHNICIAN COHTRACT, RADIAT ION TECH ELECTRICAL MAINT.MECHANICAL MAINT.I&C TECHNICIAN R&T TECHNICIAN TECH STAFF AHD MANAGERS TRAINING COURSES DESIGH CONSTRUCTION LICENSIKG FUEL MANAGEMENT TECHHI CAL SUPPORT SERVICES ELECTRIC, TRANSMISSION AND DISTRIBUTION DIVISION D I VIS IOH HAHAGER ELECTRIC TRANSHISSIOH 5 DISTRIBUTION I Ul I DEPARTHENT SUPERINTENDENT ELECTRIC LABORATORY 8 TELECOHHUNI CAT IOHS GAS 8 ELECTRIC HETER OPERATIONS DEPARTHENT SUPERINTENDEHT ELECTRIC SUBSTATIOHS LABORATORY SERVICES QUALITY SERVICES COORDINATOR CONSTRUCTION RELAY TEST HAHAGER ENGINEER IHG HAHAGER SUBSTATION HAIHTENANCE ax TD (D 0 4 ID r-5 ID TD 0 LO NOTE: Chart is abbreviated to show only key positions involved in implementing QA program and therfore, does not show all positions in the division.ENGINEERING QUALITY SERVICES HAIHTEHAHCE AND TEST TRAVELING OPERATORS Figure 2-4 TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MAHAGER TECHNICAL SERVICES AHD CHIEF ENGINEER I O I DEPARTMENT SUPERINTENDENT GENERAL MAINTEHANCE DEPARTMENT MANAGER PRODUCTION AHD ENGINEERING SYSTEMS DEPARTMENT MANAGER RESEARCH 4 SCIENCE DEPARTMENT MANAGER GEHERAL ENGINEERING SERVICES SUPERVISOR PROJECT MANAGEMEHT SERVICES Ug ID ID ne ID I~5 IJI 5'~ID 0 I Manager Shop Operations Manager Field Service Operat i ons Manager Achinistrative Services and Project Planning Manager Inspection/Lend Survey and Building Services Division Systems Records Management Fossil/Hydro systems Technical Information Center Manager Environmental Science Manager Chemistry Services Supervisor Enviroanental Laboratory Senior Envirormental Analyst Research&, Development Program Fossil Engineering Hydro Engineering Facility Engineering Real Estate Management Budget and Cost Project Management Services Docwent Preparation R Secretarial Services Duality Services Figure 2-5 GZNNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PERFORMANCE PORC~~0~~~~~~~~~0 0~~~~~~~~~~~~~~~~~t~~~~~~~~~~~~~~~~~~~~~~~~~~~0~~~~~MATERIALS ELECTRIC ENGINEERING TRANSMISSION AND INSPECTION AND SERVICES DISTRIBUTION PURCHASING PRODUCTION DIVISION TRAINING ENGINEERING GINNA STATION REVIEW o~~~~~~~~~~AUDITS Figure 2-6.