Line 22: Line 22:
Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc.
Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc.


River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
River Bend Station  
 
5485 US Highway 61N St. Francisville, LA 70775


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401)
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401)
Line 28: Line 30:
==Dear Mr. Olson:==
==Dear Mr. Olson:==
On February 18, 2015, the NRC completed its end-of-cycle performance review of River Bend Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-
On February 18, 2015, the NRC completed its end-of-cycle performance review of River Bend Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-
related inspections at your facility. The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
related inspections at your facility.
 
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will co ntact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Line 35: Line 39:


Sincerely,/RA/
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-458 License Nos. NPF-47  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket Nos. 50-458  
 
License Nos. NPF-47  


===Enclosure:===
===Enclosure:===
Inspection Plan  
Inspection Plan  


ML15057A652 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE C:PSB1 AC:DRP/C C:PSB1 NAME MHaire/dch JGroom MHaire SIGNATURE /RA/ /RA/ /RA/ DATE 2/25/15 2/25/15 3/2/15 Letter to Eric from Mark S. Haire, dated March 4, 2015
ML15057A652 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl:
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE C:PSB1 AC:DRP/C C:PSB1 NAME MHaire/dch JGroom MHaire SIGNATURE /RA/ /RA/ /RA/ DATE 2/25/15 2/25/15 3/2/15  
 
OFFICIAL USE ONLY Letter to Eric from Mark S. Haire, dated March 4, 2015


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401) Electronic distribution by RIV w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401)
Electronic distribution by RIV w/enclosure
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov
Electronic distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov)
) Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)  
 
Electronic distribution by RIV w/o enclosure
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Line 56: Line 72:
Senior Project Engineer (Ray.Azua@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Project Engineer, DRP (Paul.Nizov@nrc.gov) Project Engineer (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP (Paul.Nizov@nrc.gov) Project Engineer (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Alan.Wang@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

Revision as of 04:45, 1 July 2018

Non-Public Security Inspection Plan for River Bend, (NRC Physical Security Inspection Report 05000458/2014401)
ML15057A652
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/04/2015
From: Haire M S
Plant Support Branch-1
To: Olson E W
Entergy Operations
References
IR 2014401
Download: ML15057A652 (4)


Text

" " March 4, 2015

Mr. Eric W. Olson, Site Vice President Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N St. Francisville, LA 70775

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401)

Dear Mr. Olson:

On February 18, 2015, the NRC completed its end-of-cycle performance review of River Bend Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-

related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will co ntact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-458

License Nos. NPF-47

Enclosure:

Inspection Plan

ML15057A652 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl:

SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE C:PSB1 AC:DRP/C C:PSB1 NAME MHaire/dch JGroom MHaire SIGNATURE /RA/ /RA/ /RA/ DATE 2/25/15 2/25/15 3/2/15

OFFICIAL USE ONLY Letter to Eric from Mark S. Haire, dated March 4, 2015

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR RIVER BEND STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000458/2014401)

Electronic distribution by RIV w/enclosure

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov

) Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Electronic distribution by RIV w/o enclosure

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov) Resident Inspector (Brian.Parks@nrc.gov) RBS Administrative Assistant (Lisa.Day@nrc.gov)

Acting Branch Chief, DRP (Greg.Warnick@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer, DRP (Paul.Nizov@nrc.gov) Project Engineer (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov) ROPreports