{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 17, 2017  
[[Issue date::November 17, 2017]]


Mr. Steven Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
Mr. Steven Site Vice President  
 
Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road  
 
Huntersville, NC 28078


SUBJECT: NOTIFICATION OF MCGUIRE DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000369/2018007 AND 05000370/2018007
SUBJECT: NOTIFICATION OF MCGUIRE DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000369/2018007 AND 05000370/2018007


==Dear Mr. Capps:==
==Dear Mr. Capps:==
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your plant McGuire during the weeks of February 12, 2018 and February 26, 2018. Mr. Geoffrey Ottenberg, a Senior Reactor Inspector from the NRC's Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, "Design Bases Assurance Inspection (Teams)," dated December 8, 2016 (ADAMS ML16238A320). The inspection will evaluate the capability of components that have been modified and risk-
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your plant McGuire during the weeks of February 12, 2018 and February 26, 2018. Mr. Geoffrey Ottenberg, a Senior Reactor Inspector from the NRC's Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, "Design Bases Assurance Inspection (Teams)," dated December 8, 2016 (ADAMS ML16238A320).
significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications. During a telephone conversation on November 14, 2017, with Mr. Brian Richards, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:  
 
  * Information-gathering visit: Week of January 22, 2018 * Onsite weeks: Weeks of February 12 and February 26, 2018 The purpose of the information-gathering visit is to meet with members of your staff to identify components that have been modified, risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Geoffrey Ottenberg during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. The enclosure lists documents that will be needed prior to the information-gathering visit. Please provide the referenced information to the Region II Office by January 12, 2018.
The inspection will evaluate the capability of components that have been modified and risk-
significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
 
During a telephone conversation on November 14, 2017, with Mr. Brian Richards, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:  
 
  * Information-gathering visit: Week of January 22, 2018  
* Onsite weeks: Weeks of February 12 and February 26, 2018 The purpose of the information-gathering visit is to meet with members of your staff to identify  
 
components that have been modified, risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Geoffrey Ottenberg during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. The enclosure lists documents that will be needed prior to the information-gathering visit. Please provide the referenced information to the Region II Office by January 12, 2018.


Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by February 2, 2018, to support the inspection team's preparation week. During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5) arrangements for site access; and (6) other applicable information.
Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by February 2, 2018, to support the inspection team's preparation week. During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5) arrangements for site access; and (6) other applicable information.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter, its enclosure, and your response (if any) will be made available for public inspection  
 
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or contact me at 404-997-4639.
Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or contact me at 404-997-4639.


Sincerely,/RA/ Shakur A. Walker, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17  
Sincerely,/RA/
Shakur A. Walker, Chief Engineering Branch 1 Division of Reactor Safety  
 
Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17  


===Enclosure:===
===Enclosure:===
Notification of McGuire, Design Bases Assurance Inspection (Teams) cc: Distribution via Listserv  
Notification of McGuire, Design Bases Assurance Inspection (Teams)
cc: Distribution via Listserv  
:______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE GKO EMAIL SAW4 NAME GOTTENBERG SWALKER DATE 11/17/2017 11/17/2017 E-MAIL COPY? YES NO YES NO Enclosure INFORMATION REQUEST FOR MCQUIRE DESIGN BASES ASSURANCE INSPECTION (TEAMS)
Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),
should have a date range from February 1, 2015, until present
.
1. *List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification.
 
2. From your most recent probabilistic safety analysis (PSA)
excluding external events and fires: a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
 
b. A list of the top 500 cut-sets c. A list of the top 500 LERF contributors
 
3. From your most recent PSA including external events and fires:
a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance b. A list of the top 500 cut-sets 4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items 5. List of time-critical operator actions with a brief description of each action
 
6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations 7. *List and brief description of Root Cause Evaluations performed 8. *List and brief description of common-cause component failures that have occurred
 
9. List and brief description of equipment currently in degraded or nonconforming status as described in NRC Inspection Manual Chapter 0326, issued December 3, 2015 10. *List and brief description of Operability Determinations and Functionality Assessments
 
2 11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status 12. *List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list 13. List of current "operator work arounds/burdens" 14. Copy of Updated Final Safety Analysis Report
 
15. Copy of Technical Specification(s)
 
16. Copy of Technical Specifications Bases


______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE GKO EMAIL SAW4 NAME GOTTENBERG SWALKER DATE 11/17/2017 11/17/2017 E-MAIL COPY? YES NO YES NO Enclosure INFORMATION REQUEST FOR MCQUIRE DESIGN BASES ASSURANCE INSPECTION (TEAMS) Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),
17. Copy of Technical Requirements Manual(s)
should have a date range from February 1, 2015, until present.
18. Copy of the Quality Assurance Program Manual


1. *List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification. 2. From your most recent probabilistic safety analysis (PSA) excluding external events and fires: a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance b. A list of the top 500 cut-sets c. A list of the top 500 LERF contributors 3. From your most recent PSA including external events and fires: a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance b. A list of the top 500 cut-sets 4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items 5. List of time-critical operator actions with a brief description of each action
19. Copy of Corrective Action Program Procedure(s)  


6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations 7. *List and brief description of Root Cause Evaluations performed 8. *List and brief description of common-cause component failures that have occurred 9. List and brief description of equipment currently in degraded or nonconforming status as described in NRC Inspection Manual Chapter 0326, issued December 3, 2015 10. *List and brief description of Operability Determinations and Functionality Assessments 2 11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status 12. *List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list 13. List of current "operator work arounds/burdens" 14. Copy of Updated Final Safety Analysis Report 15. Copy of Technical Specification(s)  
20. Copy of Operability Determination Procedure(s)
21. Copy of procedures addressing the following: Modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59 screenings and evaluations, and UFSAR updates.
 
22. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking 23. Primary AC and DC calculations for safety-related buses 24. One-line diagram of electrical plant (Electronic only)  


16. Copy of Technical Specifications Bases 17. Copy of Technical Requirements Manual(s) 18. Copy of the Quality Assurance Program Manual 19. Copy of Corrective Action Program Procedure(s)
20. Copy of Operability Determination Procedure(s) 21. Copy of procedures addressing the following: Modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59 screenings and evaluations, and UFSAR updates. 22. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking 23. Primary AC and DC calculations for safety-related buses 24. One-line diagram of electrical plant (Electronic only)
25. Index and legend for electrical plant one-line diagrams  
25. Index and legend for electrical plant one-line diagrams  


26. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic) 27. Index and legend for P&IDs 28. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures 29. Copies of corrective action documents generated from previous CDBI 30. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI 31. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)
26. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
27. Index and legend for P&IDs  
 
28. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures  
 
29. Copies of corrective action documents generated from previous CDBI 30. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI  
 
31. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)
}}
}}

Revision as of 08:31, 29 June 2018

Notification of McGuire Design Bases Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000369/2018007 and 05000370/2018007
ML17324B359
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/17/2017
From: Walker S A
NRC/RGN-II/DRS/EB1
To: Capps S D
Duke Energy Carolinas
References
IR 2018007
Download: ML17324B359 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 17, 2017

Mr. Steven Site Vice President

Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road

Huntersville, NC 28078

SUBJECT: NOTIFICATION OF MCGUIRE DESIGN BASES ASSURANCE INSPECTION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000369/2018007 AND 05000370/2018007

Dear Mr. Capps:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your plant McGuire during the weeks of February 12, 2018 and February 26, 2018. Mr. Geoffrey Ottenberg, a Senior Reactor Inspector from the NRC's Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, "Design Bases Assurance Inspection (Teams)," dated December 8, 2016 (ADAMS ML16238A320).

The inspection will evaluate the capability of components that have been modified and risk-

significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.

During a telephone conversation on November 14, 2017, with Mr. Brian Richards, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of January 22, 2018
  • Onsite weeks: Weeks of February 12 and February 26, 2018 The purpose of the information-gathering visit is to meet with members of your staff to identify

components that have been modified, risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. George MacDonald, a Region II Senior Risk Analyst, will support Mr. Geoffrey Ottenberg during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. The enclosure lists documents that will be needed prior to the information-gathering visit. Please provide the referenced information to the Region II Office by January 12, 2018.

Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by February 2, 2018, to support the inspection team's preparation week. During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5) arrangements for site access; and (6) other applicable information.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or contact me at 404-997-4639.

Sincerely,/RA/

Shakur A. Walker, Chief Engineering Branch 1 Division of Reactor Safety

Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17

Enclosure:

Notification of McGuire, Design Bases Assurance Inspection (Teams)

cc: Distribution via Listserv

______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE GKO EMAIL SAW4 NAME GOTTENBERG SWALKER DATE 11/17/2017 11/17/2017 E-MAIL COPY? YES NO YES NO Enclosure INFORMATION REQUEST FOR MCQUIRE DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),

should have a date range from February 1, 2015, until present

.

1. *List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification.

2. From your most recent probabilistic safety analysis (PSA)

excluding external events and fires: a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets c. A list of the top 500 LERF contributors

3. From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance b. A list of the top 500 cut-sets 4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items 5. List of time-critical operator actions with a brief description of each action

6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations 7. *List and brief description of Root Cause Evaluations performed 8. *List and brief description of common-cause component failures that have occurred

9. List and brief description of equipment currently in degraded or nonconforming status as described in NRC Inspection Manual Chapter 0326, issued December 3, 2015 10. *List and brief description of Operability Determinations and Functionality Assessments

2 11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status 12. *List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list 13. List of current "operator work arounds/burdens" 14. Copy of Updated Final Safety Analysis Report 15. Copy of Technical Specification(s)

16. Copy of Technical Specifications Bases

17. Copy of Technical Requirements Manual(s)

18. Copy of the Quality Assurance Program Manual

19. Copy of Corrective Action Program Procedure(s)

20. Copy of Operability Determination Procedure(s)

21. Copy of procedures addressing the following: Modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modifications testing, 10 CFR 50.59 screenings and evaluations, and UFSAR updates.

22. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking 23. Primary AC and DC calculations for safety-related buses 24. One-line diagram of electrical plant (Electronic only)

25. Index and legend for electrical plant one-line diagrams

26. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)

27. Index and legend for P&IDs

28. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

29. Copies of corrective action documents generated from previous CDBI 30. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI

31. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)