| {{#Wiki_filter:NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate the TS Unit Staff Qualification ANSI Requirements to the Exelon QATRFebruary 27, 2018 Purpose for Discussion*Discuss evolution of current proposed Fleet License Amendment Request (LAR)*Provide overview of current LAR | | {{#Wiki_filter:NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate the TS Unit Staff Qualification ANSI Requirements to the Exelon QATR February 27, 2018 Purpose for Discussion*Discuss evolution of current proposed Fleet License Amendment Request (LAR)*Provide overview of current LAR |
| *Discuss 6-month turnaround request | | *Discuss 6-month turnaround request |
| *Discuss the QATR proposed Mark-ups | | *Discuss the QATR proposed Mark-ups |
| *Adoption of ANSI/ANS 3.1-2014 via RG 1.8 Rev 4 QATR revision2 Opening Remarks*Executive Sponsor for LAR-Julie Sickle*Chair of the ANS working level committee that developed ANSI/ANS-3.1-20143 Evolution*11/14ANSI/ANS-3.1-2014 approved*3/22/16Initial Exelon Pre-submittal meeting | | *Adoption of ANSI/ANS 3.1-2014 via RG 1.8 Rev 4 QATR revision 2 |
| | Opening Remarks*Executive Sponsor for LAR-Julie Sickle*Chair of the ANS working level committee that developed ANSI/ANS-3.1-2014 3 |
| | Evolution*11/14ANSI/ANS-3.1-2014 approved*3/22/16Initial Exelon Pre-submittal meeting |
| *4/6/16Pre-Submittal NRC meeting summary | | *4/6/16Pre-Submittal NRC meeting summary |
| *3/27/17NRC approves TVA LAR to relocate TS ANSI requirements to TVA QAP*Fall/17Exelon decides to change original LAR scope to: Relocate the TS ANSI requirements to the Exelon Quality Assurance Topical Report*Feb/18Fleet LAR internally reviewed and approved | | *3/27/17NRC approves TVA LAR to relocate TS ANSI requirements to TVA QAP*Fall/17Exelon decides to change original LAR scope to: Relocate the TS ANSI requirements to the |
| | |
| | Exelon Quality Assurance Topical Report*Feb/18Fleet LAR internally reviewed and approved |
| *2/27/18Pre-submittal meeting | | *2/27/18Pre-submittal meeting |
| *3/1/18Submit Fleet LAR to NRC 4 LAR Overview*Current Technical Specification Requirements for TS 5/6.3.1(Unit/Plant/Facility Staff Qualifications):ANS-3.1/N18.1-1971*Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad Cities ANSI/ANS-3.1-1978*Clinton, Limerick, FitzPatrick, Nine Mile Point Unit 2, Three Mile Island Unit 1*Proposed Technical Specification Requirements:"Each member of the unit [facility or plant] staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality Assurance Topical Report"5 LAR Overview*TS verbatim wording relocated to QATR*Minor exceptions for FitzPatrick | | *3/1/18Submit Fleet LAR to NRC 4 |
| | LAR Overview |
| | *Current Technical Specification Requirements for TS 5/6.3.1(Unit/Plant/Facility Staff Qualifications):ANS-3.1/N18.1-1971*Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad |
| | |
| | Cities ANSI/ANS-3.1-1978*Clinton, Limerick, FitzPatrick, Nine Mile Point Unit 2, Three Mile Island Unit 1 |
| | *Proposed Technical Specification Requirements:"Each member of the unit [facility or plant] staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality |
| | |
| | Assurance Topical Report" 5 |
| | LAR Overview*TS verbatim wording relocated to QATR*Minor exceptions for FitzPatrick |
| *Oyster Creek not included in Fleet Submittal | | *Oyster Creek not included in Fleet Submittal |
| *Complies with the requirements of AL 95-06 (Relocation of Technical Specification Administrative Controls Related to Quality Assurance)*These ANSI Standards are considered quality assurance controls*Consistent with TVA precedence for Browns Ferry and Sequoyah (ML16105A287)6 6-Month Turnaround*The 6-month turnaround will position Exelon to more efficiently adopt and implement the ANSI-2014 standard upon issuance of RG 1.8 Rev 4Prevents an additional year delay in Exelon achieving a common fleet standard and alignment for staff qualifications if no LAR is needed at the time RG 1.8 Rev 4 is issued*In 3/22/16 pre-submittal meeting NRC advised not to submit until NRC vetted the ANSI-2014 standard via the RG 1.8 Rev 4 process*In 3/22/16 meeting NRC had anticipated that the draft RG 1.8 Rev 4 would be noticed for public comments by end of May 2016*Draft RG 1.8 Rev 4 was noticed for public comments on 2/12/18 | | *Complies with the requirements of AL 95-06 (Relocation of Technical Specification Administrative Controls Related to |
| | |
| | Quality Assurance)*These ANSI Standards are considered quality assurance controls*Consistent with TVA precedence for Browns Ferry and Sequoyah (ML16105A287) 6 6-Month Turnaround*The 6-month turnaround will position Exelon to more efficiently adopt and implement the ANSI-2014 standard upon issuance of |
| | |
| | RG 1.8 Rev 4Prevents an additional year delay in Exelon achieving a common fleet standard and alignment for staff qualifications if no LAR is needed at the time RG 1.8 Rev 4 is issued*In 3/22/16 pre-submittal meeting NRC advised not to submit until NRC vetted the ANSI-2014 standard via the RG 1.8 Rev 4 process*In 3/22/16 meeting NRC had anticipated that the draft RG 1.8 Rev 4 would be noticed for public comments by end of May 2016*Draft RG 1.8 Rev 4 was noticed for public comments on 2/12/18 |
| *Exelon has had a project in place for 3 years to adopt the ANSI-2014 standard 7 | | *Exelon has had a project in place for 3 years to adopt the ANSI-2014 standard 7 |
| *TS wording relocated verbatim to QATR*FitzPatrick minor exceptions:Referenced "Entergy" QAP exceptionsTS 5.3.1 is already in most recent QATR revisionTS 5.2.2.f requires STAs at FitzPatrickto comply to the ANSI 1993 standard*Mark-ups throughout QATR Appendix C (Codes, Standards and Guides)*Proposed revisions are consistent with existing format for taking exceptions to RG compliance on a station by station basis8QATR-Mark-ups RG 1.8 Rev 4 QATR revision*Exelon will implement the approved TS amendments within 60 days*No training standards are changed; only change management is to issue revised TS and revise the QATR as proposed*After ANSI/ANS-3.1-2014 is endorsed via approved RG 1.8 Rev 4, Exelon will again revise the QATR via 10 CFR 50.54(a) evaluation process to adopt it*NRC exceptions to the ANSI/ANS-3.1-2014 that will be in the approved RG 1.8 Rev 4 will be carefully reviewed*It is expected that the subsequent 10 CFR 50.54(a) evaluation will not be a reduction in commitment9}} | | *TS wording relocated verbatim to QATR*FitzPatrick minor exceptions:Referenced "Entergy" QAP exceptionsTS 5.3.1 is already in most recent QATR revisionTS 5.2.2.f requires STAs at FitzPatrickto comply to the ANSI 1993 standard*Mark-ups throughout QATR Appendix C (Codes, Standards and Guides)*Proposed revisions are consistent with existing format for taking exceptions to RG compliance on a station by station |
| | |
| | basis8QATR-Mark-ups RG 1.8 Rev 4 QATR revision*Exelon will implement the approved TS amendments within 60 days*No training standards are changed; only change management is to issue revised TS and revise the QATR |
| | |
| | as proposed*After ANSI/ANS-3.1-2014 is endorsed via approved RG 1.8 Rev 4, Exelon will again revise the QATR via 10 CFR 50.54(a) evaluation process to adopt it*NRC exceptions to the ANSI/ANS-3.1-2014 that will be in the approved RG 1.8 Rev 4 will be carefully reviewed*It is expected that the subsequent 10 CFR 50.54(a) evaluation will not be a reduction in commitment 9}} |
Exelon Generation Company, LLC - Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the Qatr, February 27, 2018, Profile Info: Submitted by Frank MascitelliML18054B359 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07201036, 07000650 |
---|
Issue date: |
02/27/2018 |
---|
From: |
Exelon Generation Co, Exelon Nuclear |
---|
To: |
Purnell B A Plant Licensing Branch III |
---|
Purnell B A, NRR/DORL,/LPLIII, 415-1380 |
References |
---|
Download: ML18054B359 (9) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07201036, 07000650 |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request ML22311A5112022-11-0707 November 2022 Pool Swell License - Amendment Request ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22222A1122022-08-0404 August 2022 NMP1 Torus Corrosion Presentation for August 2022 Final ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System 2024-01-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23080A2972023-03-21021 March 2023 Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22311A5112022-11-0707 November 2022 Pool Swell License - Amendment Request ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22222A1122022-08-0404 August 2022 NMP1 Torus Corrosion Presentation for August 2022 Final ML22195A2172022-07-12012 July 2022 D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project 2024-01-08
[Table view] |
Text
NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate the TS Unit Staff Qualification ANSI Requirements to the Exelon QATR February 27, 2018 Purpose for Discussion*Discuss evolution of current proposed Fleet License Amendment Request (LAR)*Provide overview of current LAR
- Discuss 6-month turnaround request
- Discuss the QATR proposed Mark-ups
Opening Remarks*Executive Sponsor for LAR-Julie Sickle*Chair of the ANS working level committee that developed ANSI/ANS-3.1-2014 3
Evolution*11/14ANSI/ANS-3.1-2014 approved*3/22/16Initial Exelon Pre-submittal meeting
- 4/6/16Pre-Submittal NRC meeting summary
- 3/27/17NRC approves TVA LAR to relocate TS ANSI requirements to TVA QAP*Fall/17Exelon decides to change original LAR scope to: Relocate the TS ANSI requirements to the
Exelon Quality Assurance Topical Report*Feb/18Fleet LAR internally reviewed and approved
- 2/27/18Pre-submittal meeting
- 3/1/18Submit Fleet LAR to NRC 4
LAR Overview
- Current Technical Specification Requirements for TS 5/6.3.1(Unit/Plant/Facility Staff Qualifications):ANS-3.1/N18.1-1971*Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad
Cities ANSI/ANS-3.1-1978*Clinton, Limerick, FitzPatrick, Nine Mile Point Unit 2, Three Mile Island Unit 1
- Proposed Technical Specification Requirements:"Each member of the unit [facility or plant] staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality
Assurance Topical Report" 5
LAR Overview*TS verbatim wording relocated to QATR*Minor exceptions for FitzPatrick
- Oyster Creek not included in Fleet Submittal
- Complies with the requirements of AL 95-06 (Relocation of Technical Specification Administrative Controls Related to
Quality Assurance)*These ANSI Standards are considered quality assurance controls*Consistent with TVA precedence for Browns Ferry and Sequoyah (ML16105A287) 6 6-Month Turnaround*The 6-month turnaround will position Exelon to more efficiently adopt and implement the ANSI-2014 standard upon issuance of
RG 1.8 Rev 4Prevents an additional year delay in Exelon achieving a common fleet standard and alignment for staff qualifications if no LAR is needed at the time RG 1.8 Rev 4 is issued*In 3/22/16 pre-submittal meeting NRC advised not to submit until NRC vetted the ANSI-2014 standard via the RG 1.8 Rev 4 process*In 3/22/16 meeting NRC had anticipated that the draft RG 1.8 Rev 4 would be noticed for public comments by end of May 2016*Draft RG 1.8 Rev 4 was noticed for public comments on 2/12/18
- Exelon has had a project in place for 3 years to adopt the ANSI-2014 standard 7
- TS wording relocated verbatim to QATR*FitzPatrick minor exceptions:Referenced "Entergy" QAP exceptionsTS 5.3.1 is already in most recent QATR revisionTS 5.2.2.f requires STAs at FitzPatrickto comply to the ANSI 1993 standard*Mark-ups throughout QATR Appendix C (Codes, Standards and Guides)*Proposed revisions are consistent with existing format for taking exceptions to RG compliance on a station by station
basis8QATR-Mark-ups RG 1.8 Rev 4 QATR revision*Exelon will implement the approved TS amendments within 60 days*No training standards are changed; only change management is to issue revised TS and revise the QATR
as proposed*After ANSI/ANS-3.1-2014 is endorsed via approved RG 1.8 Rev 4, Exelon will again revise the QATR via 10 CFR 50.54(a) evaluation process to adopt it*NRC exceptions to the ANSI/ANS-3.1-2014 that will be in the approved RG 1.8 Rev 4 will be carefully reviewed*It is expected that the subsequent 10 CFR 50.54(a) evaluation will not be a reduction in commitment 9