Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2
ML22080A152
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/21/2022
From: Marshall M
Constellation Energy Generation, Westinghouse
To: V Sreenivas
NRC/NRR/DORL/LPL1
Marshall M, NRR/DORL/LPL1
References
Download: ML22080A152 (55)


Text

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

LimerickGeneratingStation DigitalModernizationProject LAR PresubmittalMeeting NRCPresubmittalMeeting March31,2022

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 2 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) oLicensing DaveHelker,LicensingManager FrankMascitelli,LicensingLead LauraLynch,LGSRegulatoryAssuranceManager GeorgeBudock,LGSRegulatoryAssurance Pareez Golub,DigitalLicensingSME oEngineering JohnConnelly,CentralDesignOrganization(CDO)Manager MarkSamselski,CDO LeadResponsibleEngineer GeorgeBonanni,CDO SeniorStaffEngineer MikeFoote,CDO SeniorStaffEngineer ScottSchumacher,SystemsEngineering Introductions-ConstellationProjectTeam 1

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 3 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) oProjectManagement SteveHesse,ProjectDirector DaveMolteni,SeniorManagerandStationLead JerrySegner,PrincipalProjectManager KaylaMarriner,ProjectManager oOperations PaulKrueger,SeniorOperationsSpecialist MattJones,OperationsShiftSupervisor oNuclearOversight DavePeiffer,PerformanceandAssessmentLead o PRASupport JeffreyStone,Director,CorporateEngineeringPRA SuzanneLoyd,SeniorManager, EngineeringRiskManagement Introductions-ConstellationProjectTeam 2

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 4 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) oProjectManagement
  • DominicMocello,ProjectManager
  • BoyanSetchenski,ProgramManager
  • TomPietryka, ProgramManager oEngineering
  • TerryTuite,PPSLead-Engineering
  • Dan Zenger, DCSLead Engineering
  • WarrenOdessGillett,Lead-Licensing
  • SteveSeaman,SystemIntegrationLead
  • CalTang,BWRTechnicalAdvisor Introductions-WestinghouseProjectTeam 3

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 5 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) oOpen/PublicSession
  • Introductions
  • ProjectUpdate/schedule
  • LicenseAmendmentRequest(LAR)Content
  • TechnicalSpecifications
  • RegulatoryCommitments oClosedSession
  • MethodologyforcalculatingRAWforD3AnalysisPosition4Primary and SecondaryContainmentIsolations
  • DPS/RRCSArchitecture
  • SensorConsolidation
  • ReliabilityAnalysis
  • HumanFactorsEngineering EvaluationDetails
  • LGSPlantPowerDistribution
  • PPSCabinetPowerDistribution
  • RiskInformedCompletion Times(RICT)Update
  • DefenseinDepthandDiversity(D3)Feedback Agenda/OpeningRemarks 4

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 6 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 5 ProjectUpdate/Schedule

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 7 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

ProjectSchedule 6

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 8 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 7 LARContents

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 9 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • Coverletter
  • RequiredinformationperDI&CISG06EnclosureB,Alternate ReviewProcess
  • DescriptionandreasonfortheproposedTSchanges
  • TechnicalSpecificationmarkupsandcleanpages
  • TechnicalSpecificationBasesmarkups(Infoonly)
  • TSDescriptionsofChange(DOCs)
  • OutageInstallationStrategy
  • ConceptualFSARMarkups(InfoOnly)
  • VOPSummary 8

LARSubmittalContents

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 10 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • LicensingTechnicalReport(LTR)ProprietaryandNon proprietaryversions

- RRCSreclassificationper10CFR50.62justification

  • LGSPPSFMEAtosupportTSSReliminations(FMEDAisinWEC WCAP18461PandaddressedinLTR)
  • InitialEquipmentQualificationSummaryReport(EQSR)
  • PPSSystemRequirementsSpecification (SyRS)
  • PPSSystemDesignSpecification(SyDS)
  • CIMDiversityAnalysis
  • HFEPlan(detailsinslidestofollow)
  • D3analysis (alreadysubmittedtoNRC)
  • RegulatoryCommitments 9

LARSubmittalContents

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 11 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • PostLARsubmittalSupplementswillincludethefollowing:

-EquipmentQualificationSummaryReport(EQSR)

-HFENUREG0711Elements(Procedure/Training Impacts, V&V)

-SeparateRiskInformed CompletionTime(RICT)LAR PostLARSupplements/Submittals 10

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 12 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

AvailableforAudit:

  • ProjectManagementPlanfortheLimerickGeneratingStation PlantProtectionSystem
  • PPSSoftwareDevelopmentPlan
  • DigitalModernizationProjectConfigurationManagementPlan
  • PPSReliabilityAnalysis
  • PPSResponseTimeAnalysis
  • PPSPreliminarySoftwareHazardAnalysis
  • Control&InformationSystemEngineeringSystemQuality AssurancePlan 11 DocumentsCompleteatTimeofLARSubmittal

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 13 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 12 TechnicalSpecifications

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 14 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • AttheDecember7,2021presubmittal meeting,westatedthattheLGSTS Section2.2.1,"LimitingSafetySystemSettings,"wouldberetainedbutthat thetableoffunctionswouldbemovedtoinstrumentationsectionofthe TS.

- Afterfurtherreview,wedeterminedthattheSection2.2.1wordingwould requireextensivemodificationtobeconsistentwiththenew requirementsandthebetterpresentationwastoremoveSection2.2.1, consistentwiththeStandardTechnicalSpecifications(NUREG1433).

TechnicalSpecificationsUpdate 13

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 15 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • AttheDecember7,2021presubmittal meeting,westatedthatSpecification 3.3.1,"PlantProtectionSystemInstrumentationChannels,"wouldnothave Actionsbasedontheactuatedsystem.TheNRCstaffquestionedthat approach.

- WeconsideredtheNRCstaffcommentsandagreethatsomeActions basedontheactuatedsystemweredesirable. WemodifiedtheTS3.3.1 tableformattoaccommodatesomeexistingActionsbasedonthe actuatedsystem.

TechnicalSpecificationsUpdate 14

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 16 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • IntheLAR,wewouldliketoqualifythattheretyped,proposedTSare technicallycorrect,butnotpublicationready. Thatmeansthatpage numbers,pagebreaks,insertionofintentionallyblankpages,indenting, tablecolumnspacing,etc.,maychangeinthefinalTS.Inaddition,thereare openLARsthataffectsomeoftheaffectedTSpages.Constellationwill submitfinal,publicationreadypagespriortoLARapproval,consistent withthepracticeofprovidingfinalpagesforotherLARs.
  • WewouldliketousethisapproachbecausethechangestoSection3.3are significant(multiplespecificationsremovedandnewonesinserted)andthe LGSTSusecontinuouspagenumberswithinaSection. Inaddition,theLGS TSusedoublesidedpageswithspecificationsandtablesbeginningonleft facingpages,requiringtheuseofintentionallyblankpages. Therefore,it wouldbemostefficienttomakeanychangesrelatedtoresolutionofNRC RAIsbeforecreatingthefinalTS.

TechnicalSpecificationsUpdate 15

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 17 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • OtherTSchangeswillbeneededtosupporttheinstallation ofthePPS system(outageinstallationstrategy)orinadditiontothePPSdigital modification:

- TheRRCSsystemwillberequiredtoberemovedfromservicetwoto threeweekspriortostartoftheoutagefordemolition

  • Aonetime TSAOTextensionto bothtrainsofRRCSequipmentbeing inoperable

- Implement asectionofTSTF582(ReactorPressureVesselWater InventoryControlEnhancements)that hadnotbeen previouslyadopted forLimerick

  • Allowsforcorealterationsduringoutageconditions
  • Removesautomaticoperationof EmergencyDieselGeneratorsonunit inOPCON5(Refueling)tofacilitateinstrumentation/logicchanges

- OnetimetemporarymodificationtoTStofacilitate ReactorModeSwitch wiring(provide actionstoallow movementof rodswithafullscram insertedwiththeplantinOPCON5duringthemodinstallationworkon RPSandtheReactorModeSwitch)

- SeparateTSLARtoincludeRICTswithapplicablerevisedTSfromthePPS digitalLAR(morediscussion inclosedportion)

OtherTSchanges 16

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 18 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 17 RegulatoryCommitments

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 19 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • RegulatoryCommitmentsfor:

- SiteAcceptanceTest(PerPlantSpecificActionItem#5per WCAP16097,CommonQualifiedPlatformTopicalReport)

  • LicenseConditionforcompletionoftheIntegratedSystem ValidationinaccordancewiththeLicenseAmendment Request(LAR) 18 RegulatoryCommitments

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 20 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 19 ClosedPortion

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 21 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 20 RAWMethodology

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 22 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • RiskAchievement Worth(RAW)wascalculatedbytakingthe riskincreaseratiobetweenthequantificationofthebase modelusingonlyeachPCIVFailedopenandthebasePRA resultsintheFullPowerInternalEvents(FPIE)PRAinbothCore DamageandLargeEarlyReleaseAnalysis.
  • Notallcontainmentpenetrationsorisolationvalvesare modeledforisolationfunction.
  • Forpenetrationsnotscreened,additionalscreeningisapplied tocontainmentisolationvalvesdeterminedtoberisk significantbasedonpipediameter,wheresmallleakfailuresof containmentwereriskinsignificant.

RAWMethodologyforLimerickAnalysis 21

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 23 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 22 DPS/RRCSArchitecture

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 24 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 23 DPS/RRCSArchitecture a,c

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 25 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 24 RRCS/DPSInputsandOutputs a,c

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 26 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

~

Constellation..

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 25 SensorConsolidation

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 27 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

OriginalCrosswalkTable 26 Transmitter DIV Function ReactorVesselHighPressureScram PrimaryContainmentHighPressureScram ReactorLowLevelScram CSReactorVesselLoLoLevel CSDrywellHighPressure CSReactorVesselLowPressurePermissive LPCIReactorVesselLowWaterLevel (LPCILoopSelection&LPCIInitiation)

LPCIDrywellHighPressure(LPCIIniaon)

LPCIReactorVesselLowPressure(ValveOpeningPermissiv LPCIReactorVesselLowPressure(ValveOpeningPermissiv HPCIReactorVesselLowWaterLevel HPCIDrywellHighPressure ADSReactorVesselLowWaterLevelConfirmatory ADSDrywellHighPressure RCICReactorVesselLowWaterLevel RCICReactorVesselhighWaterLevelTurbineTrip NSSSSReactorVesselLowWaterLevel(LVL1)

NSSSSReactorVesselLowWaterLevel(LVL2)

NSSSSDrywellHighPressure RG1.97 Transmitter DIV Function ReactorVesselHighPressureScram PrimaryContainmentHighPressureScram ReactorLowLevelScram CSReactorVesselLoLoLevel CSDrywellHighPressure CSReactorVesselLowPressurePermissive LPCIReactorVesselLowWaterLevel (LPCILoopSelection&LPCIInitiation)

LPCIDrywellHighPressure(LPCIIniaon)

LPCIReactorVesselLowPressure(ValveOpeningPermissiv HPCIReactorVesselhighWaterLevelTurbineTrip HPCIReactorVesselLowWaterLevel HPCIDrywellHighPressure ADSReactorVesselLowWaterLevelConfirmatory ADSDrywellHighPressure RCICReactorVesselLowWaterLevel RCICReactorVesselhighWaterLevelTurbineTrip NSSSSReactorVesselLowWaterLevel(LVL1)

NSSSSReactorVesselLowWaterLevel(LVL2)

NSSSSDrywellHighPressure RG1.97 LT*N080A A1 CHANRWTRLVL A

PT*N090A 1

CHARXVesselPressure A

A LT*N080B B1 CHBNRWTRLVL B

PT*N090E 1

CHERXVesselPressure E

E LT*N080C A2 CHCNRWTRLVL C

PT*N090B 2

CHBRXVesselPressure B

B LT*N080D B2 CHDNRWTRLVL D

PT*N090F 2

CHFRXVesselPressure F

F LT*N081A A1 CHAWRWTRLVL A A PT*N090C 3

CHCRXVesselPressure C

C LT*N081B B1 CHBWRWTRLVL B B PT*N090G 3

CHGRXVesselPressure G

G LT*N081C A2 CHCWRWTRLVL C C PT*N090D 4

CHDRXVesselPressure D

D LT*N081D B2 CHDWRWTRLVL D D PT*N090H 4

CHHRXVesselPressure H

H PT*N078A A1 CHARXVesselPressure A PT*N090J 1

CHJRXVesselPressure J

PT*N078B B1 CHBRXVesselPressure B

PT*N090N 1

CHNRXVesselPressure N

PT*N078C A2 CHCRXVesselPressure C

PT*N090K 2

CHKRXVesselPressure K

PT*N078D B2 CHDRXVesselPressure D PT*N090P 2

CHPRXVesselPressure P

PT*N050A A1 CHADrywellPressure A

A PT*N094A 1

CHADrywellPressure A

A A

PT*N050B B1 CHBDrywellPressure B

B PT*N094E 1

CHEDrywellPressure E

E E

PT*N050C A2 CHCDrywellPressure C

C PT*N094B 2

CHBDrywellPressure B

B B

PT*N050D B2 CHDDrywellPressure D

D PT*N094F 2

CHFDrywellPressure F

F F

LT*N091A 1

CHAWRRxLevel A

A A A PT*N094C 3

CHCDrywellPressure C

C C

LT*N091E 1

CHEWRRxLevel E

E E E PT*N094G 3

CHGDrywellPressure G

G G

LT*N091B 2

CHBWRRxLevel B

B B

B PT*N094D 4

CHDDrywellPressure D

D D

LT*N091F 2

CHFWRRxLevel F

F F

F PT*N094H 4

CHHDrywellPressure H

H H

LT*N091C 3

CHCWRWTRLVL C

C LT*N085A 1

CHAFZLevel A

LT*N091G 3

CHGWRWTRLVL G

G LT*N085B 2

CHBFZLevel B

LT*N091D 4

CHDWRWTRLVL D

D D

LT*15A 1

WRIndication A

LT*N091H 4

CHHWRWTRLVL H

H H

LT*15B 2

WRIndication B

LT*N095A 1

CHANRRxLevel A

PT*03A 3

CHAADSPressure A

LT*N095C 3

CHCNRRxLevel C

PT*03B 4

CHBADSPressure B

LT*N097A 1

CHAWRRxLevel A A LT*N097E 1

CHEWRRxLevel E E

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 28 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

Transmitter DIV Function ReactorVesselHighPressure PrimaryContainmentHighPressure ReactorLowLevelScram CSReactorVesselLoLoLevel CSDrywellHighPressure CSReactorVesselLowPressurePermissive LPCIReactorVesselLowWaterLevel (LPCILoopSelection&LPCIInitiation)

LPCIDrywellHighPressure(LPCIIniaon)

LPCIReactorVesselLowPressure(ValveOpeningPermissive)

LPCIReactorVesselPressurepermissive HPCIReactorVesselhighWaterLevelTurbineTrip HPCIReactorVesselLowWaterLevel HPCIDrywellHighPressure ADSReactorVesselLowWaterLevelConfirmatory ADSDrywellHighPressure RCICReactorVesselLowWaterLevel RCICReactorVesselhighWaterLevelTurbineTrip NSSSSReactorVesselLowWaterLevel(LVL1)

NSSSSReactorVesselLowWaterLevel(LVL2)

NSSSSDrywellHighPressure RG1.97 LT*N080A 1,2,3,4 CHANRWTRLVL A

A LT*N080B 1,2,3,4 CHBNRWTRLVL B

B LT*N080C 1,2,3,4 CHCNRWTRLVL C

C LT*N080D 1,2,3,4 CHDNRWTRLVL D

D LT*N081A 1,2,3,4 CHAWRWTRLVL A

A A A A A A A LT*N081B 1,2,3,4 CHBWRWTRLVL B

B B

B B

B B

B LT*N081C 1,2,3,4 CHCWRWTRLVL C

C C

C C

C C

C LT*N081D 1,2,3,4 CHDWRWTRLVL D

D D D D D D D PT*N078A 1,2,3,4 CHARXVesselPressure A

A A A PT*N078B 1,2,3,4 CHBRXVesselPressure B

B B

B PT*N078C 1,2,3,4 CHCRXVesselPressure C

C C

C PT*N078D 1,2,3,4 CHDRXVesselPressure D

D D D PT*N050A 1,2,3,4 CHADrywellPressure A

A A

A A

A PT*N050B 1,2,3,4 CHBDrywellPressure B

B B

B B

B PT*N050C 1,2,3,4 CHCDrywellPressure C

C C

C C

C PT*N050D 1,2,3,4 CHDDrywellPressure D

D D

D D

D LT*N085A 1

CHAFZLevel A

LT*N085B 2

CHBFZLevel B

LT*15A 1

WRIndication A

LT*15B 2

WRIndication B

PT*03A 3

CHAADSPressure A

PT*03B 4

CHBADSPressure B

ConsolidatedSensorCrosswalkTable 27

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 29 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 28 ReliabilityAnalysis

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 30 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • LimerickUFSARandGE(OEM)designspecificationsdonotcontain explicittargetvalues
  • GENEDO10139providestheexistingsystemsreliabilitygoals

-NEDO10139addressesreliabilityforECCS&NSSSS

  • ECCS thereliabilityofthecontrolsystemiscompatiblewiththe controlledequipmentsothattheoverallsystemreliabilityisnot limitedbycontrolsforcorecoolingsystems
  • NSSSS thereliabilityoftheisolationcontrolsystemis compatiblewithandhigherbyatleastanorderofmagnitude thanthereliabilityoftheactuatedequipment(valves)
  • TechnicalEvaluationReport:AReviewOfReactorTripSystem AvailabilityAnalysisForGenericLetter8328,Item4.5.3,Resolution

-EstablishesReactorTripSystemunavailabilityvalue ReliabilityTarget 29

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 31 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • UsingthereliabilitygoalsasguidancefromNEDO10139alongwiththe dominatereliabilityvaluesforcontrolledequipmentandNSSSSisolationvalves logic
  • UseofGenericComponentFailureDataBaseForLightWaterandLiquidSodium ReactorsPRAs(EGGSSRE8875)wasusedtoprovide

- ECCSdominantfailure pumpandturbinefailures-3E03/demand

- NSSSSdominantfailure solenoidvalvesfailures-3E03/demand

- NEDO10139reliabilitygoalisanorderofmagnitudegreaterforthetarget reliabilityforNSSSS

  • TechnicalEvaluationReport:AReviewOfReactorTripSystemAvailability AnalysisForGenericLetter8328,Item4.5.3,Resolutionprovidedabasefailure frequencyofRPS(RTS)as3E06perdemand ReliabilityTarget 30 PPSUnreliabilityRequirements System FailuresPerDemand RPS 3E06 ECCS 3E04 NSSSS 3E04

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 32 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 31 HumanFactorsEngineering Evaluation

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 33 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

HFEExecutionSummary,StatusatLARSubmittal,and ExpectedFinalDisposition 32 NUREG0711Element CurrentStatus FinalDisposition OperatingExperienceReview Complete ResultsSummaryReport(RSR) forLARSubmittal FunctionalAnalysisandAllocation WorkshopatLimerickSimulator (3/2224/2022)

CombinedRSRforLAR Submittal TaskAnalysis WorkshopatINLHumanSystems SimulationLaboratory(5/25/2022)

Staffing&Quals ImplementationdescriptioninHFE Plan RSRavailablepost LAR Submittal TreatmentofImportantHumanActions ImplementationdescriptioninHFE Plan IPandRSRavailablepost LAR Submittal HSIDesign ImplementationdescriptioninHFE Plan HSIStyleGuide Developmentofinitial Prototype HSIsandControl RoomLayout HSIStatic/Dynamic workshops(at HSSL)

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 34 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

HFEExecutionSummary,StatusatLARSubmittal,and ExpectedFinalDisposition 33 NUREG0711Element CurrentStatus FinalDisposition ImpactstoProcedures ImplementationdescriptioninHFE Plan CombinedRSRavailablepost LARSubmittal ImpactstoTraining ImplementationdescriptioninHFE Plan V&V(TaskSupport,Design Verification &IntegratedSystem Validation)

ImplementationdescriptioninHFE Plan CombinedRSRavailablepost LAR Submittal DesignImplementation PartofConstellationEngineering ChangePackage Installedperthedesignand implementationprocess HumanPerformanceMonitoring ImplementationdescriptioninHFE Plan Itemsareidentified,post installation,inCAPfor evaluationandresolution

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 35 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

HFEProgramHSIdevelopment:

ExecutionandVerification/Validation 34 Activity CurrentStatus/Plan Supports DevelopmentofinitialPrototype HSIsandControlRoomLayout Inprogress. BothtobepresentedinFunction Analysis/AllocationandTaskSupport Workshops EarlyinputintoWestinghouse HSIdesign HSIStatic/Dynamicworkshops(at HSSL)

IterativeHSIdesignincoordinationwith Westinghouse/Constellationusingsimulators.

ImpactsbothHSIsandprocedures Workshopresultscapturedas inputsintoHSIDesign TaskSupportVerification PerformTaskVerificationusingWestinghouse developedHSIsalongwithprocedures V&VRSRpostLAR Submittal. Provideinputfrom TaskVerificationtoHSIDesign DesignVerification PerformDesignVerificationaspartofWEC designprocessassupportedbyINLand ConstellationperVendorOversightPlan V&VRSRpostLAR Submittal. WillsummarizeHFE Designverificationefforts includingStyleGuideuse.

DevelopdetailedISV Implementation Plan ImplementationdescriptioninHFEPlan PlanavailableforNRCReview PerformISVandProduceReport ImplementationdescriptioninHFEPlan V&VRSRpostLARSubmittal

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 36 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • LARcontents:

-ISVOverallStrategyincluding:

  • DescriptionofHSIdevelopment:ExecutionandVerification

/Validation activities

  • DescriptionoftheproposedISVImplementationPlan(IP)

-LicenseConditiontoperformtheISVinaccordancewiththe LAR

  • NotethattheISVIPwillbe availableforauditpriortoISV execution
  • NotethattheV&VRSR willbeavailableforinspectionpriorto systeminstallation
  • PerformtheISV toclosetheLicenseCondition IntegratedSystemIntegration (ISV)Strategy 35

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 37 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 36 LGSPlantPowerDistribution

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 38 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

LGSAC&DCDivisionalSingleLinePower 37 D11SafeguardBus[10A115ZA]

4kVto480VAC E0015 E0028 480VACto120 VAC D12SafeguardBus[10A115ZB]

D13SafeguardBus[10A115ZC]

E0015 E0028 D14SafeguardBus[10A115ZD]

E0015 E0028 E0030 RPS DIVICoreSpray InboardValves RRCS RSP RPS DIVIICoreSpray OutboardValves RRCS Process Instrumentation LeakDetection RPS DIVIIICore Spray DIVIIIRHR RPS DIVIVCore Spray DIVIVRHR E0032SH1 1AY160 Alternate Source DIV 1 125/250V 1FA 250V 1DA RCICMOVs RPSAUPS 125V 1PPA1 10AD102 4kVBreakers RCICLOGIC ADS CS RHR STMFlooddampers RSP 125V 1PPA2 D11DGLogic 125V 1PPA3 RRCS RSP DIV 2 125/250V 1FB 125V 1PPB-1 10BD102 4kVBreakers HPCILogic CS RHR STMFloodDampers RRCS 125V 1PPB-2 D12DGLogic 125V 1PPB-3 250V 1DB-1 HPCIMOVs 250V 1DB-2 HPCIMOVs RPSBUPS DIV 3 125V 1FC 125V 1PPC1 10CD102 4kVBreakers RCICInboardIsolation ADS CS RHR STMFloodDampers 125V 1PPC2 D13DGLogic 125V 1PPC3 RSP DIV 4 125V 1FD 125V 1PPD1 10DD102 4kVBreakers HPCIInboardIsolation CS RHR 125V 1PPD2 D14DGLogic 125V 1PPD3 SteamFloodDampers SafetyDCBusandLoads SafetyACBusandLoads 10Y101 4kVto480VAC 480VACto120 VAC 480VACto120 VAC 480VACto120 VAC 480VACto120 VAC 4kVto480VAC 4kVto480VAC 10Y102 10Y103 10Y104

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 39 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 38 PPSCabinetPower Distribution

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 40 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 39 PPSCabinetPower Distribution

a,c

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 41 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

~

Constellation..

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 40 MCRSafetyDisplay(SD)Power Distribution a,c

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 42 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 41 RiskInformedCompletion Times(RICT)Update

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 43 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • TheDigitalModernizationProjectLARwillnotcontainRiskInformed Completion Times (RICTs).
  • ExistingRICTswillberemovedfromaffectedinstrumentation TechnicalSpecifications(TS).
  • Therearecurrently19existingRICTsthatcoverabout97TS functions.
  • PerformasubsequentseparateRICTsubmittaltoamendTSforRICTs.

-Submitthisafterthe DigitalModernizationProjectLAR Final Designiscompleted(April2023)

-AskforsixtoninemonthNRCreviewperiod(December 2024)due tolimitedscope

-PRAmodelingcanbedonewithmaturedesign,eliminating multipleiterationsofanalysesandwillprovideahighqualityRICT justification RICT 42

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 44 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)
  • FinaldesignisrequiredwhichisforecastedforMarch2023,approximately7months aftertheproposedLARSubmittaldate.
  • TheRICTSubmittalwillbecategorizedasaLinked RLA(RequestedLicensingAction (i.e.,LAR)becauseofdependenceonunapprovedTSinpreviousdigitalLAR submittal.
  • NormallyaRLAshouldnotbeacceptedforNRCreviewandapprovaluntilall prerequisiteRLAshavebeenreviewedandapprovedbytheNRC.
  • RequestingNRCfordiscretionduringAcceptanceReviewoftheLinkedRLAs.
  • AskingPRABranchtostartreviewinearnestafterAcceptanceReviewsothatasix toninemonthreviewtimeisachieved.
  • LimitedscopeLARtoupdateModificationImpactedTSsto includeRICT:

- ListofRevisedRequiredActionstoCorrespondingPRAFunctions

- UpdatedBaselineCDFandLERFduetotheModification

- KeyAssumptionsandSourcesofUncertaintyassociatedwiththeModification

- RiskManagementActionExamples,ifapplicable RICT 43

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 45 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 44 DiversityandDefensein Depth(D3)Feedback

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 46 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 45 Next Presubmittal MeetingTopics

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 47 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 46 Closing Comments

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 48 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

ADS AutomaticDepressurizationSystem FMEDA FailureModes,Diagnoscs,andEectsAnalysis PPS PlantProtectionSystem AER AuxiliaryEquipmentRoom FPGA FieldProgrammableGateArray PSAI PlantSpecificActionItems AOI AdvantOvationInterface FSAR FinalSafetyAnalysisReport QA QualityAssurance ARI AlternateRodInjection HFE HumanFactorsEngineering QMP QualityManagementPlan ARP AlternateReviewProcess HPCI HighPressureCoreInjecon RAI RequestforAdditionalInformation ASAI ApplicationSpecificActionItem HSL HighSpeedLink RCIC ReactorCoreIsolationCooling ATWS AnticipatedTransientWithoutScram IBR IncorporatedbyReference RHR ResidualHeatRemoval BPL BistableProtectionLogic ILP IntegratedLogicProcessor RPS ReactorProtectionSystem BWR BoilingWaterReactor INL IdahoNaonalLabs RPV ReactorPressureVessel CAP CorrectiveActionProgram I/O Input/Output RRCS RedundantReactivityControlSystem CCF CommonCauseFailure ITAAC Inspecon,Test,Analysis,andAcceptanceCriteria RWCU ReactorWaterCleanup CDO CentralDesignOrganization LAR LicenseAmendmentRequest SER SafetyEvaluationReport CRDR ControlRoomDesignReview LCL LocalCoincidenceLogic SFMS SupplierFundamentalManagementSystem CIM ComponentInterfaceModule LGS LimerickGenerangStaon SDC ShutdownCooling CRADA CooperativeResearchandDevelopment Agreement LOOP LossofOsitePower SDV Scramdischargevolume CPU CentralProcessingUnit LPCI LowPressureCoolantInjecon SLCS StandbyLiquidControlSystem CS CoreSpray LRA LicenseeRequiredAction SPDS SafetyParameterDisplaySystem D3 DefenseinDepthandDiversity LTR LicensingTechnicalReport SPM SoftwareProgramManual DCS DistributedControlSystem MCR MainControlRoom SR Safetyrelated DDS DataDisplaySystem MPB ManualPartialBypass SRNC SafetyRemoteNodeController DEHC DigitalElectroHydraulicControl MPT ManualPartialTrip SRV SafetyReliefValve DPS DiverseProtectionSystem MSFIS MainSteamandFeedwaterIsolaonSystem SSE SafeShutdownEarthquake ECCS EmergencyCoreCoolingSystem MSIV MainSteamIsolaonValve SyDS SystemDesignSpecification EDG EmergencyDieselGenerator NSR Nonsafetyrelated SyRS SystemRequirementsSpecification EOP EmergencyOperatingProcedures NSSSS NuclearSteamSupplyShutoffSystem TS TechnicalSpecifications EQSR EquipmentQualificationSummaryReport OBE Operangbasisearthquake TU TripUnit ESFAS EmergencySafetyFunctionActuationSystem PC PersonalComputer UFSAR UpdatedFinalSafetyAnalysisReport FMEA FailureModesandEectsAnalysis PMS ProteconandMonitoringSystem VOP VendorOversightPlan PPC PlantProcessComputer WEC Westinghouse Acronyms

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 49 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation) 48 BackupMCRPictures

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 50 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

CurrentMainControlRoomConfiguration 49

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 51 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

GeneralArrangementforMainControlRoom 50

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 52 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

ReservedforRG1.97 PotentialArrangementwithMonitorVisuals 51

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 53 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

OVATIONDISPLAY PotentialArrangementwithViewfromROConsole 52

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 54 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

ReservedforRG1.97 PotentialArrangementwithViewfromSROStation 53

©2022 Westinghouse Electric Company LLC. All Rights Reserved Page 55 of 55 GLIMM-RPS-PM-LI-000007, Revision 0 Westinghouse Non-Proprietary Class 3

      • This record was final approved on 3/17/2022, 2:28:33 PM. (This statement was added by the PRIME system upon its validation)

GLIMM-RPS-PM-L1-000007 Revision 0 Non-Proprietary Class 3

    • This page was added to the quality record by the PRIME system upon its validation and shall not be considered in the page numbering of this document.**

Approval Information Author Approval Odess Gillett Warren Mar-17-2022 08:09:47 Reviewer Approval Shakun Matthew A Mar-17-2022 14:19:24 Approver Approval Harper Zachary S Mar-17-2022 14:28:33 Files approved on Mar-17-2022