Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting
ML22159A333
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 06/09/2022
From:
Region 3 Branch 3
To:
Shared Package
ML21362A653, ML21362A654 List:
References
Download: ML22159A333 (21)


Text

Nuclear Regulatory Commission Region III, Lisle, IL.

2021 End of Cycle Annual Assessment Webinar Braidwood and Byron

During the presentation, microphones will be muted, and cameras turned off.

2021 Annual Assessment Webinar Braidwood and Byron

During the presentation, microphones will be muted, and cameras turned off.

2021 Annual Assessment Webinar Braidwood and Byron For the Q&A Session:

Raise your hand under Reaction on the Teams app Email your questions after the Webinar to the PAOs

NRC DRP Branch 3 Staff 4

Hironori Peterson Branch Chief Nirodh Shah Senior Project Engineer Ashley Demeter Project Engineer Daniel Kimble Senior Resident Inspector Phillip Smagacz Resident Inspector Diana Betancourt Senior Resident Inspector Jamie Weigandt Resident Inspector Cammie Hernandez Administrative Assistant Both Sites Braidwood Resident Office Byron Resident Office

Agenda

  • Presentation

-NRC Mission

-Reactor Oversight Process (ROP)

-NRC COVID-19 Actions

-2021 Safety Performance Overview

  • Braidwood
  • Byron
  • Question-and-Answer Session 5

To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.

OUR MISSION Region III Office, Lisle, IL 6

How do we meet our Mission?

Licensing Oversight (Inspections)

Enforcement Incident Response 7

Muzammil at Braidwood Ashley at Byron NRC Emergency Operations Center

Reactor Oversight Process www.nrc.gov/reactors/operating/oversight.html 8

Action Matrix Columns Increasing:

Safety Significance Inspection Management Involvement Regulatory Action Licensee

Response

Regulatory

Response

Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance www.nrc.gov/reactors/operating/oversight.html 9

NRC Response to COVID-19 Senior Resident Inspector Diana Betancourt at Byron Senior Resident Inspector Dan Kimble at Braidwood Resident Inspector Phil Smagacz at Braidwood Resident Inspector Jamie Weigandt at Byron More detailed information on NRC actions can be found on the NRC webpage: https://www.nrc.gov/about-nrc/covid-19/reactors/

10

So how did the sites do?

Byron Braidwood

Braidwood Resident Inspectors Daniel Kimble Senior Resident Inspector Phillip Smagacz Resident Inspector 12

Operated safely and in a manner that preserved the public health and safety and protected the environment Licensee Response Column 2480 hours0.0287 days <br />0.689 hours <br />0.0041 weeks <br />9.4364e-4 months <br /> of direct inspection All Green Performance Indicators One Green finding with an associated non-cited violation for operating Braidwood Unit 1 with both source range neutron flux channels manually bypassed.

One Green finding with an associated non-cited violation for having the 1A auxiliary feedwater pump and its associated suction pressure instrumentation inoperable for longer than the allowed outage time in the Technical Specifications.

https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html Braidwood 2021 Assessment Summary 13

Byron Resident Inspectors Diana Betancourt Senior Resident Inspector Jamie Weigandt Resident Inspector 14

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 2999 hours0.0347 days <br />0.833 hours <br />0.00496 weeks <br />0.00114 months <br /> of direct inspection
  • All Green Performance Indicators
  • No findings or violations were identified in 2021.

https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html Byron 2021 Assessment Summary 15

For more information Inspection Reports

- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html Reactor Oversight Process

- https://www.nrc.gov/reactors/operating/oversight.html Fact Sheets and Brochures

- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/

NRC Information Digest

- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/

Regulations

- https://www.nrc.gov/reading-rm/doc-collections/cfr/

16

NRC Social Media Channels Facebook: https://www.facebook.com/nrcgov/

Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/

Flickr: https://www.flickr.com/photos/nrcgov/

Meeting Feedback On Any Device or Computer:

Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)

Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link.

Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting.

Region III Public Affairs Officers Viktoria Mitlyng Office: 630-829-9662 Cell: 630-201-1345 Viktoria.mitlyng@nrc.gov Prema Chandrathil Office: 630-829-9663 Cell: 630-515-6145 Prema.chandrathil@nrc.gov 19

Questions If you have a question, please raise your hand. On Teams, use the raise hand button.

Moderator will acknowledge your raised hand and allow you to unmute yourself.

Then on Teams, use the mic button.

Unmute yourself and ask your question.

Please limit question to 1.

Once your question is asked the moderator will mute your mic to allow us to answer your question.

The moderator will unmute you again to see if you have a follow-up question During Question and Answering Raise your Hand to ask a question Once you are acknowledged by the moderator, please unmute yourself to ask your question.

This Concludes the 2021 End of Cycle Annual Assessment Webinar Presentation for Braidwood & Byron Thank You & Goodnight