| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 November 2, 2015 SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST REGARDING REPLACEMENT OF SOURCE RANGE AND INTERMEDIATE RANGE NEUTRON MONITORING SYSTEMS (CAC NOS. MF6065 AND MF6066) Dear Mr. Braun: By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range and intermediate range nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. During this detailed review, the NRC staff identified additional information that is needed to complete its review of the submittals. The specific questions are found in the enclosed request for additional information. The draft questions were sent by electronic transmission on October 6, 2015, to Mr. Paul Duke. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. On October 22, 2015, Mr. Brian Thomas of your staff indicated that the licensee will submit a response within 30 days of the date of this letter. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15068A359. 2 ADAMS Accession No. ML 15153A 193. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 November 2, 2015 |
| R. Braun -2 -If you have any questions, please contact me at 301-415-4037 orThomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311 Enclosure: Request for Additional Information cc w/enclosure: Distribution via Listserv Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION REGARDING PSEG NUCLEAR LLC SALEM NUCLEAR GENERATING STATION. UNITS 1AND2 DOCKET NOS. 50-272 AND 50-311 By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification (TS) 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range (SR) and intermediate range (IR) nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. The NRC staff identified additional information that is needed, as described below, to complete its review of the submittals. The requested information is applicable only to new or replacement items. Instrumentation and Controls Branch (EICB)-Reguest for Additional Information (RAl)-1 In its response to the NRC's request for supplemental information dated June 2, 2015, the licensee explained that the Nuclear Instrumentation System source, intermediate range detectors, and associated cables inside the containment were evaluated for applicability of Title 1 O of the Code of Federal Regulations Part 50.49 criteria and were exempted from the Salem Nuclear Generating Station equipment qualification program requirements. Since the equipment is located inside the containment, it should be qualified for normal and abnormal conditions inside the containment for its qualified life, so that the equipment can continue to meet its safety functions as required by General Design Criterion (GDC) 4. Please provide the qualification documentation that shows how the equipment meets the environmental conditions for its qualified life. If this information is not available, please specify when the information will be available for staff review. If a summary report is provided, it should explain the test requirements based on plant specifications and provide the test results. If the equipment inside the containment has been previously qualified and is not being changed or replaced in the subject amendment request, state that in the response. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15093A291. 2 ADAMS Accession No. ML 15153A 193. Enclosure | | |
| -2 -EICB-RAl-2 Please provide the documentation to confirm that all new and replacement equipment will perform their safety functions during and after an earthquake, as required by GDC 4. The equipment must be qualified to the seismic response spectra based on the location of the equipment and any amplification caused by the test equipment elevation. State the basis (e.g., Institute of Electrical and Electronics Engineers standard) and a summary of the test results. EICB-RAl-3 With regard to the electromagnetic interference/radio frequency interference (EMl/RFI) susceptibility for the equipment in mild environment (the source range (SR) and intermediate range (IR) monitors), the licensee stated in its June 2, 2015, letter that the qualification and analysis were conducted in accordance with Electric Power Research Institute Topical Report-102323, Revision 2, "Guidelines for Electromagnetic Interference Testing in Power Plants." Please provide a summary of the qualification requirements and the tests performed to confirm that the equipment is not susceptible to EMl/RFI. The summary should include sufficient description for the NRC staff to determine the adequacy of the test program and its results. As an alternative, the licensee may provide the test requirements specifications and the test reports. EICB-RAl-4 With respect to the embedded software or embedded electronic components with software, the licensee's June 2, 2015, letter stated, in part: The power to the SDMM [shutdown margin monitor) assembly is via a fuse in the SDMM that provides the isolation between the SDMM and the power source associated with the Source Range (SR) Monitor. The circuit isolation between SDMM and SR is provided by two relays. The SDMM provides +/-12v to LEDs [light emitting diodes) for local indication of the status of the instrument power and does not interface with any other components. The SR signal processor provides a pulse signal to the SDMM through an isolation device in the SR channels .... Please confirm that the fuse supplying power to the SDMM is properly coordinated with the upstream power supply breaker or fuse. Also, describe the type of signals processed through the isolation device. Is the circuit isolation achieved by coil to contact or fiber optic isolation or some form of isolation? Further, describe the type of isolation device used for sending the SR pulse signal to the SDMM.
| | ==SUBJECT:== |
| -3 -EICB-RAl-5 In response to the accident analysis impact, the licensee referenced Section 15.2 of the Updated Final Safety Analysis Report (UFSAR) in its letter dated June 2, 2015, and provided the accident analysis table to go with this section. Item 15.2.4 in this table addresses uncontrolled boron dilution accident and reactor trip initiators. The reactor trip for this event is credited by an operator action based upon audible count rate. A note at the end of table states: *For the uncontrolled boron dilution event, UFSAR Section 15.2.4 notes that the operator has prompt and definite indication of any boron dilution from the audible count rate instrumentation. The Source Range and Intermediate Range upgrades do not affect the audible count rate instrumentation. The UFSAR also states that high count rate is alarmed in the reactor containment and the Control Room. The UFSAR does not provide for a High Count Rate alarm setpoint. Please clarify the source of audible count rate, since it is stated that the audible count rate is not affected by the SR and IR changes. What is the current setpoint for high count rate alarm? Also, provide the rationale for selecting the current setpoint (no calculation is required to be provided). Please confirm that the audible count rate and the high count rate alarm will continue to be provided after the implementation of the license amendment.
| | SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST REGARDING REPLACEMENT OF SOURCE RANGE AND INTERMEDIATE RANGE NEUTRON MONITORING SYSTEMS (CAC NOS. MF6065 AND MF6066) |
| R. Braun -2 -If you have any questions, please contact me at 301-415-4037 or Thomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311 Enclosure: Request for Additional Information cc w/enclosure: Distribution via Listserv DISTRIBUTION: PUBLIC RidsACRS MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDeEicb Resource RidsNrrLALRonewicz Resource RidsNRRLIC109 Resource ADAMS A ccess1on N o.: ML 15287A141 OFFICE LPL 1-2/PM LPL 1-2/LA NAME TWengert LRonewicz DATE 10/23/15 10/15/15 Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPLl-2 R/F RidsNrrPMSalem Resource RidsNrrDorlLpl1-2 Resource GSingh, DE RidsRgn1 MailCenter Resource *b d 1y memoran um DE/EICB/BC* LPL 1-2/BC MWaters DBroaddus 9/18/15 10/30/15 LPL 1-2/PM TWengert 11/02/15 OFFICIAL RECORD COPY | | |
| | ==Dear Mr. Braun:== |
| | By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range and intermediate range nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. During this detailed review, the NRC staff identified additional information that is needed to complete its review of the submittals. The specific questions are found in the enclosed request for additional information. The draft questions were sent by electronic transmission on October 6, 2015, to Mr. Paul Duke. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. On October 22, 2015, Mr. Brian Thomas of your staff indicated that the licensee will submit a response within 30 days of the date of this letter. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15068A359. 2 ADAMS Accession No. ML 15153A 193. |
| | R. Braun If you have any questions, please contact me at 301-415-4037 orThomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311 |
| | |
| | ==Enclosure:== |
| | Request for Additional Information cc w/enclosure: Distribution via Listserv Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION REGARDING PSEG NUCLEAR LLC SALEM NUCLEAR GENERATING STATION. UNITS 1AND2 DOCKET NOS. 50-272 AND 50-311 By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification (TS) 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range (SR) and intermediate range (IR) nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. The NRC staff identified additional information that is needed, as described below, to complete its review of the submittals. The requested information is applicable only to new or replacement items. Instrumentation and Controls Branch (EICB)-Reguest for Additional Information (RAl)-1 In its response to the NRC's request for supplemental information dated June 2, 2015, the licensee explained that the Nuclear Instrumentation System source, intermediate range detectors, and associated cables inside the containment were evaluated for applicability of Title 1 O of the Code of Federal Regulations Part 50.49 criteria and were exempted from the Salem Nuclear Generating Station equipment qualification program requirements. Since the equipment is located inside the containment, it should be qualified for normal and abnormal conditions inside the containment for its qualified life, so that the equipment can continue to meet its safety functions as required by General Design Criterion (GDC) 4. Please provide the qualification documentation that shows how the equipment meets the environmental conditions for its qualified life. If this information is not available, please specify when the information will be available for staff review. If a summary report is provided, it should explain the test requirements based on plant specifications and provide the test results. If the equipment inside the containment has been previously qualified and is not being changed or replaced in the subject amendment request, state that in the response. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15093A291. 2 ADAMS Accession No. ML 15153A 193. Enclosure EICB-RAl-2 Please provide the documentation to confirm that all new and replacement equipment will perform their safety functions during and after an earthquake, as required by GDC 4. The equipment must be qualified to the seismic response spectra based on the location of the equipment and any amplification caused by the test equipment elevation. State the basis (e.g., Institute of Electrical and Electronics Engineers standard) and a summary of the test results. EICB-RAl-3 With regard to the electromagnetic interference/radio frequency interference (EMl/RFI) susceptibility for the equipment in mild environment (the source range (SR) and intermediate range (IR) monitors), the licensee stated in its June 2, 2015, letter that the qualification and analysis were conducted in accordance with Electric Power Research Institute Topical Report-102323, Revision 2, "Guidelines for Electromagnetic Interference Testing in Power Plants." Please provide a summary of the qualification requirements and the tests performed to confirm that the equipment is not susceptible to EMl/RFI. The summary should include sufficient description for the NRC staff to determine the adequacy of the test program and its results. As an alternative, the licensee may provide the test requirements specifications and the test reports. EICB-RAl-4 With respect to the embedded software or embedded electronic components with software, the licensee's June 2, 2015, letter stated, in part: The power to the SDMM [shutdown margin monitor) assembly is via a fuse in the SDMM that provides the isolation between the SDMM and the power source associated with the Source Range (SR) Monitor. The circuit isolation between SDMM and SR is provided by two relays. The SDMM provides +/-12v to LEDs [light emitting diodes) for local indication of the status of the instrument power and does not interface with any other components. The SR signal processor provides a pulse signal to the SDMM through an isolation device in the SR channels .... Please confirm that the fuse supplying power to the SDMM is properly coordinated with the upstream power supply breaker or fuse. Also, describe the type of signals processed through the isolation device. Is the circuit isolation achieved by coil to contact or fiber optic isolation or some form of isolation? Further, describe the type of isolation device used for sending the SR pulse signal to the SDMM. |
| | EICB-RAl-5 In response to the accident analysis impact, the licensee referenced Section 15.2 of the Updated Final Safety Analysis Report (UFSAR) in its letter dated June 2, 2015, and provided the accident analysis table to go with this section. Item 15.2.4 in this table addresses uncontrolled boron dilution accident and reactor trip initiators. The reactor trip for this event is credited by an operator action based upon audible count rate. A note at the end of table states: *For the uncontrolled boron dilution event, UFSAR Section 15.2.4 notes that the operator has prompt and definite indication of any boron dilution from the audible count rate instrumentation. The Source Range and Intermediate Range upgrades do not affect the audible count rate instrumentation. The UFSAR also states that high count rate is alarmed in the reactor containment and the Control Room. The UFSAR does not provide for a High Count Rate alarm setpoint. Please clarify the source of audible count rate, since it is stated that the audible count rate is not affected by the SR and IR changes. What is the current setpoint for high count rate alarm? Also, provide the rationale for selecting the current setpoint (no calculation is required to be provided). Please confirm that the audible count rate and the high count rate alarm will continue to be provided after the implementation of the license amendment. |
| | R. Braun If you have any questions, please contact me at 301-415-4037 or Thomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311 |
| | |
| | ==Enclosure:== |
| | Request for Additional Information cc w/enclosure: Distribution via Listserv DISTRIBUTION: PUBLIC RidsACRS MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDeEicb Resource RidsNrrLALRonewicz Resource RidsNRRLIC109 Resource ADAMS A ccess1on N o.: ML 15287A141 OFFICE LPL 1-2/PM LPL 1-2/LA NAME TWengert LRonewicz DATE 10/23/15 10/15/15 Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPLl-2 R/F RidsNrrPMSalem Resource RidsNrrDorlLpl1-2 Resource GSingh, DE RidsRgn1 MailCenter Resource *b d 1y memoran um DE/EICB/BC* LPL 1-2/BC MWaters DBroaddus 9/18/15 10/30/15 LPL 1-2/PM TWengert 11/02/15 OFFICIAL RECORD COPY |
| }} | | }} |
Letter Sequence RAI |
---|
CAC:MF6066, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) CAC:MF6065, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
|
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22055A0702022-02-22022 February 2022 NRR E-mail Capture - Final RAI - Salem 1-Relief Request Associated with Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2021-LLR-0085) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21068A4142021-03-0909 March 2021 NRR E-mail Capture - Final RAI for Salem Unit 1 LAR to Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21043A1442021-02-11011 February 2021 NRR E-mail Capture - Salem - Final RAI Alternative for Examination of ASME Section XI, Category B-B, Item Number B2.11and B2.12 (L-2020-LRR-0103) ML21021A2592021-01-21021 January 2021 NRR E-mail Capture - Final RAI - Salem 1 - Steam Generator Tube Inspection Report ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection ML18267A1712018-09-21021 September 2018 NRR E-mail Capture - Final RAI from PRA Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18264A0122018-09-20020 September 2018 NRR E-mail Capture - Final RAI from I&C Branch: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18250A3132018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0140) ML18171A3212018-06-20020 June 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Adopt TSTF-411 and 418 (L-2017-LLA-0442) ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17212B1152017-07-31031 July 2017 Request for Additional Information - Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Amendment Request (CACs MF9364 and MF9365) ML17199A1122017-07-18018 July 2017 Request for Additional Information - Salem Units 1 and 2 - Accident Monitoring Instrumentation License Amendment Request (CAC Nos. MF8859 & MF8860) ML17192A1672017-07-11011 July 2017 Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report ML17115A4032017-05-0909 May 2017 Request for Additional Information Regarding Relief Request SC-14R-171 - Use of Code Cases N-695-1 and N-696-1 ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16218A0052016-08-11011 August 2016 Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 ML16195A4492016-07-14014 July 2016 Request for Additional Information Regarding Chilled Water System Modifications ML16188A4152016-07-0707 July 2016 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML16013A1592016-02-17017 February 2016 Request for Additional Information Regarding Chilled Water System Modifications ML15287A1412015-11-0202 November 2015 Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML15287A1052015-11-0202 November 2015 Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) (CAC Nos. MF5831 & MF5832) ML15299A3832015-10-29029 October 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Chilled Water System Modification ML15069A1812015-03-31031 March 2015 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals (TAC Nos. MF5149 and MF5150) ML15075A2602015-03-24024 March 2015 Request for Additional Information Spring 2014 Steam Generator Tube Inspections ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2422014-06-28028 June 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML14135A2912014-06-0202 June 2014 RAI Regarding Request for Relief SC-I4R-140 from American Society of Mechanical Engineers Boiler & Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection ML14086A6362014-04-30030 April 2014 Request for Additional Information Regarding Core Operating Limits Report ML14066A2952014-03-0606 March 2014 Licensed Operator Positive Fitness-For-Duty-Test (FY14) ML13330A5672013-11-22022 November 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13304B9362013-10-29029 October 2013 Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) ML13270A4142013-10-17017 October 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0913 and Mf ML13249A0112013-09-0505 September 2013 Weko Seal Relief Request RAI ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13192A2322013-07-11011 July 2013 Draft Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation. ML13186A1672013-07-11011 July 2013 Request for Additional Information Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13179A3032013-06-28028 June 2013 RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation) ML13137A4882013-06-0505 June 2013 Request for Additional Information Relief Request SC-l4R-133 ML13149A0862013-06-0505 June 2013 Request for Additional Information Decommissioning Funding Status Report ML13102A2752013-04-25025 April 2013 Request for Additional Information Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications 2024-02-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 November 2, 2015
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST REGARDING REPLACEMENT OF SOURCE RANGE AND INTERMEDIATE RANGE NEUTRON MONITORING SYSTEMS (CAC NOS. MF6065 AND MF6066)
Dear Mr. Braun:
By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range and intermediate range nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. During this detailed review, the NRC staff identified additional information that is needed to complete its review of the submittals. The specific questions are found in the enclosed request for additional information. The draft questions were sent by electronic transmission on October 6, 2015, to Mr. Paul Duke. The draft questions were sent to ensure that they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. On October 22, 2015, Mr. Brian Thomas of your staff indicated that the licensee will submit a response within 30 days of the date of this letter. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15068A359. 2 ADAMS Accession No. ML 15153A 193.
R. Braun If you have any questions, please contact me at 301-415-4037 orThomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311
Enclosure:
Request for Additional Information cc w/enclosure: Distribution via Listserv Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION REGARDING PSEG NUCLEAR LLC SALEM NUCLEAR GENERATING STATION. UNITS 1AND2 DOCKET NOS. 50-272 AND 50-311 By letter dated April 3, 2015,1 PSEG Nuclear LLC (the licensee) submitted a license amendment request to revise Technical Specification (TS) 3/4.3.1, "Reactor Trip System Instrumentation," to support planned plant modifications to replace the existing source range (SR) and intermediate range (IR) nuclear instrumentation with the Thermo Scientific Neutron Flux Monitoring Systems. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the application and the June 2, 2015,2 supplemental information submitted by the licensee during the acceptance review. The supplemental information provided the basis for detailed review. The NRC staff identified additional information that is needed, as described below, to complete its review of the submittals. The requested information is applicable only to new or replacement items. Instrumentation and Controls Branch (EICB)-Reguest for Additional Information (RAl)-1 In its response to the NRC's request for supplemental information dated June 2, 2015, the licensee explained that the Nuclear Instrumentation System source, intermediate range detectors, and associated cables inside the containment were evaluated for applicability of Title 1 O of the Code of Federal Regulations Part 50.49 criteria and were exempted from the Salem Nuclear Generating Station equipment qualification program requirements. Since the equipment is located inside the containment, it should be qualified for normal and abnormal conditions inside the containment for its qualified life, so that the equipment can continue to meet its safety functions as required by General Design Criterion (GDC) 4. Please provide the qualification documentation that shows how the equipment meets the environmental conditions for its qualified life. If this information is not available, please specify when the information will be available for staff review. If a summary report is provided, it should explain the test requirements based on plant specifications and provide the test results. If the equipment inside the containment has been previously qualified and is not being changed or replaced in the subject amendment request, state that in the response. 1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15093A291. 2 ADAMS Accession No. ML 15153A 193. Enclosure EICB-RAl-2 Please provide the documentation to confirm that all new and replacement equipment will perform their safety functions during and after an earthquake, as required by GDC 4. The equipment must be qualified to the seismic response spectra based on the location of the equipment and any amplification caused by the test equipment elevation. State the basis (e.g., Institute of Electrical and Electronics Engineers standard) and a summary of the test results. EICB-RAl-3 With regard to the electromagnetic interference/radio frequency interference (EMl/RFI) susceptibility for the equipment in mild environment (the source range (SR) and intermediate range (IR) monitors), the licensee stated in its June 2, 2015, letter that the qualification and analysis were conducted in accordance with Electric Power Research Institute Topical Report-102323, Revision 2, "Guidelines for Electromagnetic Interference Testing in Power Plants." Please provide a summary of the qualification requirements and the tests performed to confirm that the equipment is not susceptible to EMl/RFI. The summary should include sufficient description for the NRC staff to determine the adequacy of the test program and its results. As an alternative, the licensee may provide the test requirements specifications and the test reports. EICB-RAl-4 With respect to the embedded software or embedded electronic components with software, the licensee's June 2, 2015, letter stated, in part: The power to the SDMM [shutdown margin monitor) assembly is via a fuse in the SDMM that provides the isolation between the SDMM and the power source associated with the Source Range (SR) Monitor. The circuit isolation between SDMM and SR is provided by two relays. The SDMM provides +/-12v to LEDs [light emitting diodes) for local indication of the status of the instrument power and does not interface with any other components. The SR signal processor provides a pulse signal to the SDMM through an isolation device in the SR channels .... Please confirm that the fuse supplying power to the SDMM is properly coordinated with the upstream power supply breaker or fuse. Also, describe the type of signals processed through the isolation device. Is the circuit isolation achieved by coil to contact or fiber optic isolation or some form of isolation? Further, describe the type of isolation device used for sending the SR pulse signal to the SDMM.
EICB-RAl-5 In response to the accident analysis impact, the licensee referenced Section 15.2 of the Updated Final Safety Analysis Report (UFSAR) in its letter dated June 2, 2015, and provided the accident analysis table to go with this section. Item 15.2.4 in this table addresses uncontrolled boron dilution accident and reactor trip initiators. The reactor trip for this event is credited by an operator action based upon audible count rate. A note at the end of table states: *For the uncontrolled boron dilution event, UFSAR Section 15.2.4 notes that the operator has prompt and definite indication of any boron dilution from the audible count rate instrumentation. The Source Range and Intermediate Range upgrades do not affect the audible count rate instrumentation. The UFSAR also states that high count rate is alarmed in the reactor containment and the Control Room. The UFSAR does not provide for a High Count Rate alarm setpoint. Please clarify the source of audible count rate, since it is stated that the audible count rate is not affected by the SR and IR changes. What is the current setpoint for high count rate alarm? Also, provide the rationale for selecting the current setpoint (no calculation is required to be provided). Please confirm that the audible count rate and the high count rate alarm will continue to be provided after the implementation of the license amendment.
R. Braun If you have any questions, please contact me at 301-415-4037 or Thomas.Wengert@nrc.gov. Docket Nos. 50-272 and 50-311
Enclosure:
Request for Additional Information cc w/enclosure: Distribution via Listserv DISTRIBUTION: PUBLIC RidsACRS MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDeEicb Resource RidsNrrLALRonewicz Resource RidsNRRLIC109 Resource ADAMS A ccess1on N o.: ML 15287A141 OFFICE LPL 1-2/PM LPL 1-2/LA NAME TWengert LRonewicz DATE 10/23/15 10/15/15 Sincerely, IRA/ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPLl-2 R/F RidsNrrPMSalem Resource RidsNrrDorlLpl1-2 Resource GSingh, DE RidsRgn1 MailCenter Resource *b d 1y memoran um DE/EICB/BC* LPL 1-2/BC MWaters DBroaddus 9/18/15 10/30/15 LPL 1-2/PM TWengert 11/02/15 OFFICIAL RECORD COPY