| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 6 | | | page count = 6 |
| | project = TAC:MF0602, TAC:MF0603 | | | project = TAC:MF0602, TAC:MF0602, TAC:MF0603 |
| | | stage = RAI |
| }} | | }} |
|
| |
|
Letter Sequence RAI |
---|
TAC:MF0602, Control Room Habitability (Approved, Closed) TAC:MF0602, Control Room Habitability (Approved, Closed) TAC:MF0603, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML1022200222010-08-0505 August 2010 Fuel Storage Criticality Analysis Project stage: Request ML1105603352011-02-22022 February 2011 Supplement 1 to Fuel Storage Criticality Analysis Project stage: Request L-2011-401, License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 32011-09-22022 September 2011 License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 3 Project stage: Supplement L-2011-390, Supplement 2 to the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements2011-11-0909 November 2011 Supplement 2 to the Extended Power Uprate License Amendment Request No. 205 Regarding New and Spent Fuel Storage Requirements Project stage: Supplement L-2011-541, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 2052011-12-22022 December 2011 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 Project stage: Request L-2012-050, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and New Fuel Storage Requirements2012-02-15015 February 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and New Fuel Storage Requirements Project stage: Request L-2012-081, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Storage Requirements2012-02-23023 February 2012 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Storage Requirements Project stage: Request L-2012-130, Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2012-09-14014 September 2012 Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Request ML13077A0052013-03-15015 March 2013 NRR E-mail Capture - Turkey Point, Units 3 and 4-Acceptance Review Regarding License Amendment Request 217 Regarding Administrative Changes to the Technical Specifications Project stage: Acceptance Review ML13137A4602013-05-23023 May 2013 Request for Additional Information Regarding License Request No. 217 and Changes to Operating License Conditions and Technical Specifications Project stage: RAI L-2013-294, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2013-10-23023 October 2013 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement L-2014-070, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2014-03-11011 March 2014 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement ML13329A0922014-06-13013 June 2014 Issuance of Amendments Regarding Operating License Conditions and Technical Specifications Project stage: Approval L-2015-045, License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2015-02-18018 February 2015 License Amendment Request No. 216 - Transition to 10 CFR 50.48(c) - NFPA 805Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request 2012-02-23
[Table View] |
|
---|
Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 2024-09-06
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 23,2013 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 TURKEY POINT NUCLEAR PLANT, UNITS NOS. 3 AND 4 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE REQUEST NO. 217 AND CHANGES TO OPERATING LICENSE CONDITIONS AND TECHNICAL SPECIFICATIONS (TAC NOS. MF0602 AND MF0603) Dear Mr. Nazar: By letter dated September 14,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12262A290), as supplemented by letter dated January 29, 2013 (ADAMS Accession No. ML 13037A387), Florida Power & Light Company (FPL, the licensee) requested an amendment to the Turkey Point Nuclear Plant, Units 3 and 4, Renewed Facility Operating Licenses. The January 29,2013, supplement replaced the September 14, 2012, request in its entirety. The licensee proposed changes to license conditions and revisions to Technical Specifications for Turkey Point Nuclear Plant, Units 3 and 4. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee in its January 29, 2013, letter and determined that additional information is needed to complete the review. The enclosed document contains the NRC staff's specific request for additional information (RAI). As previously discussed with Ms. Olga Hanek of your staff on May 15, 2013, the NRC is requesting a response to the RAI by May 31, 2013.
M. Nazar -2 Please contact Audrey Klett at 301-415-0489 if you have any questions. Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 Enclosure: Request for Additional Information cc w/enclosure: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST NO. 217 OPERATING LICENSE CONDITIONS AND TECHNICAL SPECIFICATIONS TURKEY POINT NUCLEAR PLANT, UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 and 50-251 By letter dated September 14,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12262A290), as supplemented by letter dated January 29,2013 (ADAMS Accession No. ML13037A387), Florida Power & Light Company (FPL, the licensee) requested an amendment to the Turkey Point Nuclear Plant, Units 3 and 4, Renewed Facility Operating Licenses. The January 29,2013, supplement replaced the September 14, 2012, request in its entirety. The licensee proposed changes to license conditions and revisions to Technical Specifications for Turkey Point Nuclear Plant, Units 3 and 4. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee in its January 29, 2013, letter and determined that additional information is needed to complete the review. Request for Additional Information #1 TS pages 3/4 2-6a, 3/4 2-9a, 3/4 2-10a, 3/4 2-12a, and 3/4 3-40a are not on the pagination list in the application and are not shown as deleted in Attachment 1. Discuss the differences between pages 3/4 2-6 and 3/4 2-6a, 3/42-9 and 3/4 2-9a, 3/42-10 and 3/4 2-10a, 3/42-12 and 3/4 2-12a, and 3/4 3-40 and 3/43-40a. Explain if a page is proposed to be deleted. Include which page is the appropriate page to delete between the two pages, and provide the basis for the deletion. Request for Additional Information #2 Current TS page 3/49-14 is stated to become new page number 3/49-13 in the application enclosure; however, Attachment 2 shows the page as 3/4 9-12. Which page number will TS page 3/4 9-14 become: 3/49-13 or 3/4 9-12? Also provide any further corrections to the page numbers for the TS pages that follow current TS page 3/4 9-14 if needed (Le. current page 3/4 9-15 and 3/4 9-16). Request for Additional Information #3 Current TS page 3/4 9-16 is not on the pagination list in the application, and there is no request in this application for changes to or deletion of this page. Explain what FPL is proposing for TS page 3/49-16. Include the basis for any changes and any changes to the page number? Enclosure
-Request for Additional Information #4 Current TS page 3/4 5-17 contains a requirement that states: 5.6 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.6.1 The components identified in Table 5.6-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.6-1. However, Attachment 1 does not show any requirement on TS page 3/4 5-17; rather, only that it is being deleted. The application does not discuss the deletion of such a requirement, nor does the index reference TS 5.6 or Table 5.6-1. Is FPL proposing to delete TS 5.6? If so, provide a discussion that explains the basis for deletion. If not, reflect current TS 5.6 in this amendment and explain where Table 5.6-1 is located. Request for Additional Information #5 Attachment 1 shows the index listing title for Figure 3.4-2 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS APPLICABLE UP TO 32 EFPY." However, Attachment 2 shows the index listing title for Figure 3.4-2 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS (Heatup Rates of 60 and 1OOOf/Hr) APPLICABLE FOR 48 EFPY (Without margins for instrumentation errors)." This is different from the current approved TS, and the application does not discuss the requested change. Provide a discussion that explains this proposed change, or return the title to what is currently approved. Request for Additional Information #6 Attachment 1 shows the index listing title for Figure 3.4.3 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS (100°F/hr) APPLICABLE UP TO 32 EFPY." However, Attachment 2 shows the index listing title for Figure 3.4-3 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS (Cooldown Rates of 0, 20, 40, 60 and 1 OO°F/hr) APPLICABLE FOR 48 EFPY (Without margins for instrumentation errors)." This is different from the current approved TS and the application does not discuss the requested change. Provide a discussion that explains this proposed change, or return the title to what is currently approved. Request for Additional Information #7 Attachment 1 shows the index listing title for Table 3.7-1 as, "MAXIMUM ALLOWABLE POWER RANGE NEUTRON FLUX LEVEL HIGH SETPOINT WITH INOPERABLE STEAM LINE SAFETY VALVES DURING THREE LOOP OPERATION," with "RANGE NEUTRON FLUX" being deleted and replaced by "LEVEL." However, the title of Table 3.7-1 in the TS is, "MAXIMUM ALLOWABLE POWER LEVEL WITH INOPERABLE STEAM LINE SAFETY VALVES DURING THREE LOOP OPERATION," which does not include "HIGH SETPOINT," and the application does not discuss this requested change. Provide a discussion that explains this proposed change, and correct the title so that it matches the title in the Table 3.7-1.
-3 Request for Additional Information #8 Attachment 1 shows the index listing title as "Standby Steam Generator Feedwater System," with "Steam Generator" being deleted. However, the application does not discuss this proposed change. Provide a discussion that explains this proposed change. Request for Additional Information #9 Attachment 1 shows the index listing title as "Feedwater Line Isolation Valves," with "Line" being deleted. However, the title in the TS is, "Feedwater Isolation," which does not include "Valves," and the application does not discuss this proposed change. Provide a discussion that explains this proposed change and correct the title so that it matches the title in the TS. Request for Additional Information #10 In the application, FPL stated, "The text on 5-4 moved to 5-1, on 6-12 moved to 6-5, on 6-23 moved to 6-22a, and on 6-25 moved to 6-24." However, Attachment 1 shows other TS pages where the text is proposed to be relocated; the page is being deleted, and the pages are not reflected in the application. Provide a discussion that reflects every deleted page that has relocated text. Include the page number, what text is on the page, and the text's relocated position.
M. Nazar -2 Please contact Audrey Klett at 301-415-0489 if you have any Docket Nos. 50-250 and Request for Additional cc w/enclosure: Distribution via LPL2-2 ADAMS Accession No.: ML 13137A460 Sincerely, IRA! Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation