{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-451 December 9, 2016 Shane M. Marik, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550
ARLINGTON, TX 76011-451 December 9, 2016 Shane M. Marik, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550  


==SUBJECT:==
==SUBJECT:==
UPDATED INSPECTION PLAN FOR FORT CALHOUN STATION
UPDATED INSPECTION PLAN FOR FORT CALHOUN STATION  


==Dear Mr. Marik:==
==Dear Mr. Marik:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2017, for Fort Calhoun Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through June 30, 2017, for Fort Calhoun Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC also plans on performing inspections per Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, Post-Operation Transition Phase, which will be provided under separate cover.
The NRC also plans on performing inspections per Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, Post-Operation Transition Phase, which will be provided under separate cover.
Please contact me at 817-200-1173, with any questions you have regarding this letter.
Please contact me at 817-200-1173, with any questions you have regarding this letter.
Sincerely,
Sincerely,  
                                                /RA/
/RA/
Geoffrey B. Miller, Branch Chief Project Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40
Geoffrey B. Miller, Branch Chief Project Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40  


==Enclosure:==
==Enclosure:==
As stated


As stated
SUNSI Review By: JDixon ADAMS x Yes No x Publicly Available Non-Publicly Available x Non-Sensitive Sensitive Keyword:
 
NRC-002 OFFICE DRP/SPE DRP/PBD/C DRP/D DRS/C/EB1 DRS/C/EB2 DRS/C/PSB2 TL/IPAT NAME JDixon GMiller TPruett TFarnholtz GWerner HGeppord THipschman SIGNATURE  
ML16344A234 SUNSI Review               ADAMS           x Publicly Available         x Non-Sensitive           Keyword:
/RA/  
By: JDixon                    x Yes  No        Non-Publicly                Sensitive              NRC-002 Available OFFICE         DRP/SPE       DRP/PBD/C DRP/D             DRS/C/EB1 DRS/C/EB2 DRS/C/PSB2             TL/IPAT NAME           JDixon       GMiller       TPruett     TFarnholtz     GWerner       HGeppord     THipschman SIGNATURE       /RA/         /RA/                       /RA/           /RA/           /RA/         /RA/
/RA/  
DATE           12/5/16       12/5/16       12/5/16     12/5/16       12/5/16       12/5/16       12/5/16 OFFICE         DRS/C/OB     DNMS/C         DNMS/C DNMS/D               DRS/D NAME           VGaddy       LBrookhart     RKellar     MShaffer       AVegel SIGNATURE       /RA/         /RA           /RA/         /RA            /RA/
/RA/  
R.Browder                  VCampbell for/                       for/
/RA/  
DATE           12/5/16       12/5/16       12/5/16     12/7/16       12/7/16
/RA/  
/RA/
DATE 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 OFFICE DRS/C/OB DNMS/C DNMS/C DNMS/D DRS/D NAME VGaddy LBrookhart RKellar MShaffer AVegel SIGNATURE  
/RA/  
/RA R.Browder for/
/RA/  
/RA VCampbell for/  
/RA/
DATE 12/5/16 12/5/16 12/5/16 12/7/16 12/7/16  


DISTRIBUTION:
DISTRIBUTION:

Latest revision as of 16:20, 9 January 2025

Updated Inspection Plan for Fort Calhoun Station
ML16344A234
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/09/2016
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Marik S
Omaha Public Power District
GEOFF MILLER
References
Download: ML16344A234 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-451 December 9, 2016 Shane M. Marik, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

UPDATED INSPECTION PLAN FOR FORT CALHOUN STATION

Dear Mr. Marik:

The enclosed inspection plan lists the inspections scheduled through June 30, 2017, for Fort Calhoun Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC also plans on performing inspections per Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, Post-Operation Transition Phase, which will be provided under separate cover.

Please contact me at 817-200-1173, with any questions you have regarding this letter.

Sincerely,

/RA/

Geoffrey B. Miller, Branch Chief Project Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40

Enclosure:

As stated

SUNSI Review By: JDixon ADAMS x Yes No x Publicly Available Non-Publicly Available x Non-Sensitive Sensitive Keyword:

NRC-002 OFFICE DRP/SPE DRP/PBD/C DRP/D DRS/C/EB1 DRS/C/EB2 DRS/C/PSB2 TL/IPAT NAME JDixon GMiller TPruett TFarnholtz GWerner HGeppord THipschman SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 12/5/16 OFFICE DRS/C/OB DNMS/C DNMS/C DNMS/D DRS/D NAME VGaddy LBrookhart RKellar MShaffer AVegel SIGNATURE

/RA/

/RA R.Browder for/

/RA/

/RA VCampbell for/

/RA/

DATE 12/5/16 12/5/16 12/5/16 12/7/16 12/7/16

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov Electronic Distribution for Fort Calhoun Station