| | U.S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-1257/93-08 Docket No. 70-1257 License No. SNM-1227 Licensee: |
| | Siemens Power Corporation |
| | ~2101 Horn Rapids Road Richland, Washington 99352-0130 Facility Name: |
| | Siemens Power Corporation 1 |
| | Inspection at: |
| | Richland, Washington Inspection Conducted: June 28 - July 2, 1993 8!L/f_f Inspectors: P. M. Qualls, Reactor Inspector Uatt Signed Approved by: |
| | h 8[Y[f5 R. J. Pate, Chidf, ' Safeguards, Dgte Signed Emergency Preparedness, and Non-Power Reactor Branch Summary: |
| | Areas Inspected: This was a routine inspection of the licensee's Emergency Preparedness program and followup on open items. |
| | Inspection procedures 30703, 88050, and 92701 were addressed. |
| | Results: Within the scope of this inspection, no violations or deviations were identified. |
| | No significant weaknesses were identified during this inspection. The working relationship between the licensee and the offsite agencies and the apparent support by facility staff and management of the Emergency Planning program were observed program strengths. |
| | i l |
| | 9308250279 930804 PDR ADDCK 07001257 C |
| | PDR |
| | |
| | i l |
| | DETAILS 1. |
| | Persons Contacted Tte below listed persons were contacted during the course of the inspection. |
| | i Licensee Personnel |
| | *R. E. Vaughan, Manager, Safety, Security and Licensing |
| | *L. J. Maas, Manager, Regulatory Compliance J. B. Edgar, Staff Engineer, Licensing |
| | *T. C. Probasco, Safety Supervisor R. K. Burklin. Health Physicist |
| | *E. J. Hough, Technical Training Specialist i |
| | Other Personnel D. Schrag, Deputy Director for Fire Operations, Richland Fire Department B. Martin, Director, Benton County Emergency Planning G. Pira, DOE Planner, Benton County |
| | *The above individuals denoted with an asterisk were present during the exit meeting on July 2,1993. The inspector also contacted other members of the licensee's emergency preparedness, administrative, and technical staff and management during the course of the inspection. |
| | l |
| | \\ |
| | 2. |
| | Emergency Preparedness (88050) l a. |
| | Offsite Support Agencies The inspector reviewed the agreement letters with the Offsite Support Agencies. The letters were all current with responsibilities clearly defined. The inspector discussed with 1 |
| | Richland Fire Department and Benton County officials the licensee's relationship with their organizations. |
| | Representatives of both organizations stated that the licensee was providing the support and training necessary for their staff to protect the public during an emergency. The inspector noted that the licensee's relationship with the Offsite Agencies was a significant program strength, b. |
| | Emergency Plans. Procedures. Facilities and Equipment The inspector reviewed the licensee's revised Emergency Plan Implementing Procedures which were created to implement the licensee's revised Emergency Plan, EMF-32, Revision 17. The l |
| | inspector reviewed the procedures for plan implementation only. |
| | The inspector did not review the plan to ensure compliance with licensing criteria as that review is being accomplished separately. |
| | The inspector noted no deficiencies in the licensee's implementing procedures. The inspector noted that the licensee's emergency call list is included in the emergency plan and is available to plant personnel in an emergency. |
| | *W 9 |
| | |
| | l |
| | \\ |
| | t b |
| | 2 i |
| | The inspector reviewed the licensee's Pre-Emergency Plans which were l |
| | received in the Region V office on July 22, 1993. This manual provides the information needed by emergency responders to safely j |
| | react to a site emergency. The procedures provide an exterior i |
| | building photograph and a floor plan drawing for each facility building. The procedures also include hazardous materials which may. |
| | i' be present in the room and expected occupancy. The information was presented.in a clear concise manner and should prove to be of l |
| | significant benefit in responding to a severe facility emergency. |
| | The inspector toured the facility and inspected emergency kits, communications equipment, onsite medical kits and the site i |
| | evacuation location. The inspector noted that the emergency response and medical equipment was well maintained, the emergency communications equipment appeared to be in working order. The j |
| | inspector opened several emergency equipment lockers and noted that l |
| | the instrumentation was in calibration, was in good working-condition, and was readily available in sufficient quantities. The i |
| | inspector also noted that air tanks were filled and that the self-contained breathing apparatus and acid suits were available and in |
| | .i good condition. The inspector noted that offsite sampling support i |
| | is provided by Battelle National Laboratory which is a near neighbor l |
| | I of the facility. |
| | c. |
| | Tests and Drills l |
| | l The inspector reviewed the licensee's complet'ed drills. The inspector noted that drills are being conducted in accordance with Emergency Plan requirements. The inspector reviewed the last four i |
| | site accountability. drills. |
| | The time to accomplish accountability-for the. drills averaged 14 minutes. -The inspector reviewed the logs from the March 27, 1993, inadvertent sounding of the criticality alarm and noted that the time to accomplish accountability was 13 minutes. |
| | 1 The inspector reviewed the training records for the Plant Emergency Response Team (PERT). The inspector noted that the licensee maintained an adequate number of trained personnel to respond to emergencies. The inspector reviewed the content of the PERT classes and concluded that it was adequate for the level of response required of PER; members. The inspector noted that licensee employees appeared to be supportive of the emergency response program due to the numbers of assigned members which attend the periodic PERT training. The inspector was told by the licensee, however, that training is provided for each shift one time. No makeup classes are provided or required for personnel who do not attend the training. The licensee also did not have a tracking l |
| | method for non-attenders to ensure that each individual receives i |
| | adequate training. The licensee also provides no-criteria for L |
| | disqualifying an individual for missing some amount of training. |
| | l Subsequent to the onsite inspection the licensee's Safety Supervisor |
| | |
| | l i |
| | .i 3 |
| | informed the inspector that a system to track training: attendance was instituted. |
| | d. |
| | Fire protection i |
| | During discussions with the licensee, the inspector noted that primary responding agency for the licensee is the Richland Fire l |
| | Department. The licensee plans that the initial response by onsite j |
| | i staff be as incipient fire fighters only. |
| | Followup response for 1 |
| | larger fires is accomplished by professional fire fighters in the i |
| | Richland Fire Department. The inspector noted that in place fire fighting equipment located in the licensee's facility appeared well maintained. |
| | l e. |
| | Corrective Action List and Quality Assurance Audit l |
| | l The inspector reviewed the licensee's 1992 and 1993 audit of the l |
| | Emergency Planning Program. The audits were accomplished by the licensee's Quality Assurance organization. The audits were.. |
| | grq comprehensive and well documented. |
| | Items identified by the auditor l |
| | in 1991 had been corrected before the 1992 audit. Many of the= items L |
| | noted during the 1993 audit, which was completed on March 9,1993, had been corrected prior to this inspection. The inspector reviewed the licensee's Corrective Action List being kept by the Safety Supervisor and noted that items were being corrected in a reasonably short time frame and the list was not excessively long. |
| | l 3. |
| | Followup of Previously Identified Open Items (92701) l a. |
| | 91-04-27 (CLOSED) Review of Agreement Letters j |
| | The open item concerned the requirement of the _ Emergency plan to conduct biannual review of the agreement' letters with offsite l |
| | agencies. The guidance is to conduct biennial reviews. Revision 17 of EMF-32 has corrected this administrative error. This item is CLOSED. |
| | b. |
| | 91-04-30 (CLOSED) Reporting Location The licensee's Emergency Plan Implementing Procedures had required their staff to notify the NRC Region V office of an emergency declaration vice the Headquarters Operations Center. The inspector reviewed the applicable procedures and noted that they had been revised to require NRC Operations Office notification of an event. |
| | This item is CLOSED. |
| | c. |
| | 91-04-31 (CLOSED) NRC Region V Telephone Number The licensee's Radiation Safety Manual, ANF-30, contained an |
| | - obsolete telephone number for the NRC Region V Office. A subsequent revision to the manual corrected the telephone number. This item is CLOSED. |
| | |
| | 4 i |
| | I d. |
| | 91-04-33 (CLOSED) Documentation of EP Training The open item concerned the lack of a formal method to document all initial and requalification training. When reviewed by the inspector, as noted in Paragraph 2.c above, the licensee did not have a system to track personnel who did not attend training sessions. |
| | The licensee also had no criteria to specify which sessions could be missed and how often training could be missed and still maintain a qualified status. The licensee has subsequently instituted a system to track training attendance. |
| | Item 91-04-33 is CLOSED. The inspector will review the training attendance tracking and qualification status at a future inspection. (93-08-01) OPEN. |
| | L e. |
| | 91-04-40 (CLOSED) Fire Fighting Responsibilities of the PERT 1 |
| | Revision 15 to the Emergency Plan stated that PERT members could fight fires only when no radioactive materials were involved. The Safety Supervisor had stated that the expectation was that the PERT fight incipient fires with an extinguisher. Revision 17 to the l |
| | Emergency Plan reflects the expectation of the facility management l |
| | that the PERT fight incipient fires. This item is CLOSED. |
| | 4. |
| | Exit Interview l |
| | An exit meeting was held on July 2,1993, with members of the licensee staff identified in Paragraph I of this report. The items identified in this report were discussed at that time. Significant strengths were identified in the areas of working relations with offsite agencies, the support of the Emergency Planning Program by site personnel, and the expeditious completion of site accountability during an inadvertent alarm and routine drills. No significant weaknesses were identified. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during the inspection. |
| | l l |
| | I}} |
|
---|
Category:INSPECTION REPORT
MONTHYEARML24211A0592024-07-29029 July 2024 Framatome Inc. – Physical Security Core Inspection Report 07001257-2024401 Public ML24190A0292024-07-19019 July 2024 Framatome - Richland - Core Inspection Report 07001257/2024002 ML24116A2922024-04-29029 April 2024 Framatome-Richland - Core Inspection Report 07001257/2024001 ML24026A2792024-01-31031 January 2024 Framatome - Richland – Integrated Inspection Report 07001257/2023004 ML23296A0072023-10-25025 October 2023 Framatome-Richland - Core Inspection Report 07001257/2023003 ML23202A2022023-07-24024 July 2023 Framatome Richland Core Inspection Report 07001257/2023002 ML23089A2592023-04-10010 April 2023 2023-001 Framatome-Richland - NRC Integrated Inspection Report 07001257/2023001 ML23030B6172023-01-31031 January 2023 Framatome-Richland - Core Inspection Report 07001257/2022004 ML22291A0342022-10-17017 October 2022 Framatome Inspection Request (2022 Nuclear Criticality and Emergency Preparedness) ML22201A5352022-07-21021 July 2022 Framatome 2022-002 Integrated Quarterly Inspection Report ML22024A2152022-01-25025 January 2022 Framatome, Inc. - Richland, U.S. Nuclear Regulatory Commission Integrated Inspection Report 07001257/2021004 ML21298A2242021-10-25025 October 2021 Framatome-Richland Integrated Inspection Report 07001257/2021003 ML21237A3092021-08-25025 August 2021 Framatome - Material Control and Accounting Program Inspection Report 07001257/2021401 (OUO Removed) ML21221A1852021-08-0606 August 2021 NRC Doc Request Fram OPS-PMA IR 2021-003 ML21189A0042021-07-0707 July 2021 Framatome-Richland Integrated Inspection Report 07001257/2021002 ML21113A2292021-04-23023 April 2021 Framatome - Richland, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1257/2021-001 ML21025A2902021-01-22022 January 2021 Framatome Inc. - U. S. Nuclear Regulatory Commission Integrated Inspection Report 07001257/2020004 ML20303A2512020-10-29029 October 2020 Framatome, Inc. - U.S. Nuclear Regulatory Commission Integrated Inspection Report Number 70-1257/2020-003 ML20302A4312020-10-28028 October 2020 Framatome Inc., U.S. Nuclear Regulatory Commission Inspection Report 2020-401 Public ML20184A2822020-07-0202 July 2020 Framatome Inc., - NRC Integrated Inspection Report 701257/2020001 and 701257/2020-002 ML20030A2612020-01-29029 January 2020 Framatome Quarterly IR 2019-005 ML19301A0762019-10-25025 October 2019 Framatome Inc. - U. S. Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2019-004 ML19214A1162019-08-0202 August 2019 Framatome, Inc., Nuclear Regulatory Commission Integrated Inspection Report 07001257/2019003 ML19109A0022019-04-17017 April 2019 Framatome Quarterly IR 2019-002 ML19025A0172019-01-25025 January 2019 Framatome, Inc. - Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2018-005 ML18297A0902018-10-24024 October 2018 Framatome Quarterly IR 2018-004 ML18200A2402018-07-19019 July 2018 Framatome Inc., - Nuclear Regulatory Integrated Inspection Report 07001257/2018003 ML18110A0232018-04-20020 April 2018 Framatome Inc., - Nuclear Regulatory Commission Integrated Inspection Report 70-1257/2018002 ML18025B2502018-01-25025 January 2018 Framatome Inc., - NRC Integrated Inspection Report 0701257/2017005 ML1100306952010-12-30030 December 2010 IR 70-1257-10-010 & Notice of Violation, on 11/18/10, Areva Np, Inc., Richland ML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20046D7991997-09-0505 September 1997 Non-proprietary Cover Sheet to Insp Rept 70-1257/97-201 on 970804-08.Details of Rept Withheld,Per 10CFR2.790(d) ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering 2024-07-29
[Table view] Category:NRC-GENERATED
MONTHYEARML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20046D7991997-09-0505 September 1997 Non-proprietary Cover Sheet to Insp Rept 70-1257/97-201 on 970804-08.Details of Rept Withheld,Per 10CFR2.790(d) ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering ML20133D0291997-01-0303 January 1997 Insp Rept 70-1257/96-206 on 961202-05.Violations Noted. Major Areas Inspected:Fuel Fabrication Facility in Richland,Wa,Activities Associated W/Planned Startup of New Dry Conversion Facility & Review of Hq Insp Procedure 88015 ML20135D8221996-12-0505 December 1996 Insp Rept 70-1257/96-205 on 961104-07.No Violations Noted. Details Withheld ML20134K8161996-11-12012 November 1996 Insp Rept 70-1257/96-04 on 961021-25.Violations Noted.Major Areas Inspected:Emergency Preparedness,Fp,Followup on Licensee Events & Followup on Open Item from Previous Item ML20149H4771994-11-0202 November 1994 Insp Rept 70-1257/94-06 on 940926-30 & 1012-14.Violations Noted.Major Areas Inspected:Review Circumstances Re 940918 Event,Involving Spill of Approx 41 Kg of Low Enriched U Dioxide Power ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20057C5041993-08-26026 August 1993 Insp Rept 70-1257/93-10 on 930812.No Violations Noted.Major Areas Inspected:Announced Insp to Obtain Info on Licensee Employee Concerns Program ML20046D3401993-08-12012 August 1993 Partially Withheld Insp Rept 70-1257/93-201 on 930712-16. Details Withheld (Ref 10CFR2.790.) ML20056E4111993-08-0808 August 1993 Insp Rept 70-1257/93-09 on 930726-30.Violations Noted But Not Cited.Major Areas Inspected:Maint/Surveillance Testing, Radiation Protection,Criticality Safety/Operations Review, Environ/Waste Mgt & Followup on Open Items ML20056E9041993-08-0404 August 1993 Insp Rept 70-1257/93-08 on 930628-0702.No Violations Noted. Major Areas Inspected:Review Licensee Emergency Preparedness Program & Followup on Open Items ML20056C8711993-07-0707 July 1993 Insp Rept 70-1257/93-07 on 930614-18.No Violations Noted. Major Areas Inspected:Environ Protection,Radwaste Mgt, Onsite Followup of Licensee Events & Followup on Open Items ML20045C6081993-06-0707 June 1993 Insp Rept 70-1257/93-03 on 930412-16.Violations Noted.Major Areas Inspected:Mgt/Organization,Training/Qualification, Transportation of Radioactive Matls & Waste Generator Requirements ML20045C2041993-06-0101 June 1993 Enforcement Conference Rept 70-1257/93-06 on 930517.Major Areas Discussed:Apparent Violations Identified During AIT Insp (NRC Insp Rept 70-1257/93-02) & in-ofc Review of AIT Findings (NRC Insp Rept 70-1257/93-05),dtd 930430 ML20044G1211993-05-19019 May 1993 Insp Rept 70-1257/93-04 on 930226-0409.Violations Noted. Major Areas Inspected:Control Room Operations,Licensee Action on Previous Insp Findings,Criticality Safety Controls Radiological Controls & Special Insp Topics ML20035A0861993-03-10010 March 1993 Insp Rept 70-1257/93-02 on 930209-12.Enforcement Issues Not Addressed.Major Areas Inspected:Circumstances & Cause of 930207 Event Re Inadvertent Accumulation of 124 Kg Low Enriched U Oxide Powder Inside Lexan Encl ML20035B7281993-03-0909 March 1993 Insp Rept 70-1257/93-01 on 930204-11.Violations Noted.Major Areas Inspected:Radiation Protection Program Including Procedures,Instrument & Equipment & Contamination Surveys ML20127B1621992-12-23023 December 1992 Insp Rept 70-1257/92-09 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20126B3451992-12-0404 December 1992 Insp Rept 70-1257/92-08 on 921015-17 & 29.Violations Noted. Major Areas Inspected:Overflow of Low Enriched Uranyl Fluoride to U Hexafluoride Vaporization Chest ML20024H2481991-05-23023 May 1991 Partially Withheld Physical Security Insp Rept 70-1257/91-02 on 910422-0508 (Ref 10CFR2.790(d)).No Violations or Deviations Noted.Major Areas Inspected:Plans,Procedures & Reviews,Safeguards Event Repts & Protection of SNM ML20059H9681990-09-0505 September 1990 Partially Withheld Insp Rept 70-1257/90-201 on 900806-10 (Ref 10CFR2.790(d)).No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Physical Inventory & Measurement Control ML20059G8981990-08-31031 August 1990 Insp Rept 70-1257/90-03 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection, Maint & Surveillance Testing,Transportation of Radioactive Matls & Criticality Safety ML20012B8131990-03-0202 March 1990 Insp Rept 70-1257/90-01 900108-12 & 0205-09.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Mgt & Organization,Operator Training/Retraining, Criticality Safety & Operations Review ML19324C3071989-11-0808 November 1989 Insp Rept 70-1257/89-03 on 890925-29.Violations Noted.Major Areas Inspected:Criticality Safety,Operations Review,Maint & Surveillance Testing,Radwaste Mgt,Environ Protection, Emergency Preparedness & Radwaste Generator Requirements ML20245H0751989-08-0909 August 1989 Matl Control & Accounting Insp Rept 70-1257/89-201 on 890612-21.No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Measurement Sys,Physical Inventory & Records & Repts ML20247H6391989-05-22022 May 1989 Insp Rept 70-1257/89-02 on 890417-21.No Violations Noted. Major Areas Inspected:Followup Actions on Open Items,Mgt Organization,Training & Retraining,Criticality Safety, Operations Review & Radiation Protection ML20247P5161989-04-0505 April 1989 Insp Rept 70-1257/89-200 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Sys Mgt & Assessment,Internal Controls,Measurement Sys,Measurement Controls & Matl Control & Accounting for Exports & Imports ML20195F9841988-11-18018 November 1988 Insp Rept 70-1257/88-08 on 880906-09 & 23.Violations Noted. Major Areas Inspected:Mgt Organization,Training & Retraining,Criticality Safety,Operations Review,Maint & Surveillance Testing ML20154J6151988-05-12012 May 1988 Insp Rept 70-1257/88-04 on 880418-22.No Violations Noted. Major Areas Inspected:Mgt Organization,Criticality Safety, Operations Review,Maint & Surveillance Testing & Radwaste Mgt ML20236C9151987-10-20020 October 1987 Insp Rept 70-1257/87-08 on 870928-1002.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Training,Radiation Protection & Emergency Preparedness & Environ Protection ML20235X1551987-07-20020 July 1987 Insp Rept 70-1257/87-05 on 870606-12 & 0701.No Violations Noted.Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Transportation/Radwaste Mgt & Emergency Preparedness & Environ Protection 1999-08-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions PNO-IV-99-036, on 990813,licensee Notified NRC Operations Ctr That Inaccurate Lab Analysis Method Resulted in Potential for Criticality Safety Limit to Be Exceeded by 23%.Affected Process Was Shut Down & Tagged Out.Region Will Conduct Insp1999-08-18018 August 1999 PNO-IV-99-036:on 990813,licensee Notified NRC Operations Ctr That Inaccurate Lab Analysis Method Resulted in Potential for Criticality Safety Limit to Be Exceeded by 23%.Affected Process Was Shut Down & Tagged Out.Region Will Conduct Insp ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20207B3731999-05-21021 May 1999 Notice of Violation from Insp on 990322-26,0514 & 21. Violations Noted:On 980225,licensee Delivered Licensed Matl to Carrier for Transport Under General License Pursuant to 10CFR71.12 & Did Not Comply with Terms & Conditions PNO-III-99-005, on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries1999-02-0303 February 1999 PNO-III-99-005:on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20198B4191998-12-14014 December 1998 Notice of Violation from Insp on 981109-13.Violation Noted: Failure to Control Decommissioning Operations So That Operators Would Verify That Disassembled Equipment Was Free from Visible U Deposits Before Staging with Other Equipment PNO-IV-98-043, on 980922,NRC Operation Ctr Notified That Criticality Safety Specialist Noted Visible Accumulations of Solids in Disassembled Sections of Ductwork.Training Planned for Disassembly Crew in Aspects of Safety Requirements1998-09-23023 September 1998 PNO-IV-98-043:on 980922,NRC Operation Ctr Notified That Criticality Safety Specialist Noted Visible Accumulations of Solids in Disassembled Sections of Ductwork.Training Planned for Disassembly Crew in Aspects of Safety Requirements ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2741998-07-17017 July 1998 Notice of Violation from Insp on 980615-19.Violation Noted: Operational Safety Activities Not Implemented Iaw/Documented Standard Operating Procedures Appropriate to Circumstances in Listed Examples ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage PNO-IV-98-022, on 980605,notified Nrc,Region IV That Mfg Sciences Corp Had Returned Shipment of Zirconium Cladding After Discovery of Two Unirradiated Fuel Pellets within Cladding.Nrc Region IV Will Perform follow-up Review1998-06-0505 June 1998 PNO-IV-98-022:on 980605,notified Nrc,Region IV That Mfg Sciences Corp Had Returned Shipment of Zirconium Cladding After Discovery of Two Unirradiated Fuel Pellets within Cladding.Nrc Region IV Will Perform follow-up Review ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection PNO-IV-98-017A, on 980415,licensee Conducted Conducted Briefing of Region IV & Headquarters Staff on Details of Fire.Location & Matls Involved in Fire,Described in Original Preliminary Notification of Event or Unusual Occurrence1998-04-16016 April 1998 PNO-IV-98-017A:on 980415,licensee Conducted Conducted Briefing of Region IV & Headquarters Staff on Details of Fire.Location & Matls Involved in Fire,Described in Original Preliminary Notification of Event or Unusual Occurrence PNO-IV-98-017, on 980415,licensee Reported to NRC Operations Ctr That Fire Had Occurred in Handling Area of UO2 Bldg.Fire Initially Quelled w/CO2 & Then Extinguished W/Small Amount of Water.Licensee Scheduled to Conduct Briefing W/Nrc1998-04-15015 April 1998 PNO-IV-98-017:on 980415,licensee Reported to NRC Operations Ctr That Fire Had Occurred in Handling Area of UO2 Bldg.Fire Initially Quelled w/CO2 & Then Extinguished W/Small Amount of Water.Licensee Scheduled to Conduct Briefing W/Nrc ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S4961998-01-16016 January 1998 Notice of Violation from Insp on 971215-19 & 971222-24. Violation Noted:On 971218,licensee Discovered That U Compounds Other than Oxide Pellets Were Being Stored in Temporary Storage Locations ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20199B9341997-11-0707 November 1997 Notice of Violation from Insp on 971006-10.Violation Noted: April 1977 Loss of Moisture Control Incident at Dry Conversion Pilot Plant Was Not Adequately Reviewed & Appropriate Corrective Actions Were Not Taken ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection PNO-IV-97-053, on 970917,Siemens Nuclear Corp Reported Discovery of Damp U Dioxide Matl in Transfer Line in Dry Conversion Pilot Facility Sample Analyses of Pyrohyrolysis Vessel.Licensee Rept Made,Per NRC Bulletin 91-0011997-09-18018 September 1997 PNO-IV-97-053:on 970917,Siemens Nuclear Corp Reported Discovery of Damp U Dioxide Matl in Transfer Line in Dry Conversion Pilot Facility Sample Analyses of Pyrohyrolysis Vessel.Licensee Rept Made,Per NRC Bulletin 91-001 ML20216J0851997-09-12012 September 1997 Notice of Violation from Insp on 970731.Violation Noted: on 970413,RL Rumley,Lead Operator,Defeated Breathing Zone Air Sampler by Placing Rubber Glove Over Air Sampler at Respective Work Station ML20046D7991997-09-0505 September 1997 Non-proprietary Cover Sheet to Insp Rept 70-1257/97-201 on 970804-08.Details of Rept Withheld,Per 10CFR2.790(d) ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20141K5781997-05-23023 May 1997 Notice of Violation from Insp on 970414-18,23,24 & 0501. Violation Noted:On 960603,licensee Shipped 405 NT-IX Shipping Packages Containing Fissile Matl W/O Installing Cushioning Matl ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering ML20134C7241997-01-30030 January 1997 Notice of Violation from Insp on 970106-10.Violation Noted: Field Change Made Under Open ECN (No.5533L) & Not Documented or Included W/Ecn Package Prior to Startup Approval on 960806 PNO-III-97-004, on 970124,truck Carrying Four U Hexafluoride Cylinders in Accident Occurred.Truck Transporting Cylinders from Portsmouth Gaseous Diffusion Plant to Siemens Power Corp in Richland,Washington1997-01-24024 January 1997 PNO-III-97-004:on 970124,truck Carrying Four U Hexafluoride Cylinders in Accident Occurred.Truck Transporting Cylinders from Portsmouth Gaseous Diffusion Plant to Siemens Power Corp in Richland,Washington ML20133D0231997-01-0303 January 1997 Notice of Violation from Insp on 961202-05.Violation Noted: Licensee Failed to Update Posted Criticality Safety Limit Card for UF6 Cylinder Wash Operation to Reflect Change in CCS Limit ML20133D0291997-01-0303 January 1997 Insp Rept 70-1257/96-206 on 961202-05.Violations Noted. Major Areas Inspected:Fuel Fabrication Facility in Richland,Wa,Activities Associated W/Planned Startup of New Dry Conversion Facility & Review of Hq Insp Procedure 88015 PNO-IV-96-066, on 961211,licensee Notified Nrc,Walnut Creek Field Ofc of Electrical Fire & Partial Loss of Site Power. Licensee Formed Incident Investigation Board to Review Event.State of Wa Will Be Informed1996-12-12012 December 1996 PNO-IV-96-066:on 961211,licensee Notified Nrc,Walnut Creek Field Ofc of Electrical Fire & Partial Loss of Site Power. Licensee Formed Incident Investigation Board to Review Event.State of Wa Will Be Informed ML20135D8221996-12-0505 December 1996 Insp Rept 70-1257/96-205 on 961104-07.No Violations Noted. Details Withheld ML20134K8161996-11-12012 November 1996 Insp Rept 70-1257/96-04 on 961021-25.Violations Noted.Major Areas Inspected:Emergency Preparedness,Fp,Followup on Licensee Events & Followup on Open Item from Previous Item ML20134K7921996-11-12012 November 1996 Notice of Violation from Insp on 961021-25.Violation Noted: as of 961022,licensee Had Not Calibrated Three Sets of direct-reading Dosimeters Maintained for Er Since 950918,for Two Sets & Since 950725,for the Third Set ML20149H4581994-11-10010 November 1994 Notice of Violation from Insp on 940926-30 & 1012-14. Violations Noted:Licensee Did Not Provide Training to Operators Relative to Modification or Evaluate Need to Revise Operating Procedures Prior to Restarting Sys ML20149H4771994-11-0202 November 1994 Insp Rept 70-1257/94-06 on 940926-30 & 1012-14.Violations Noted.Major Areas Inspected:Review Circumstances Re 940918 Event,Involving Spill of Approx 41 Kg of Low Enriched U Dioxide Power ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20057C5041993-08-26026 August 1993 Insp Rept 70-1257/93-10 on 930812.No Violations Noted.Major Areas Inspected:Announced Insp to Obtain Info on Licensee Employee Concerns Program ML20046D3401993-08-12012 August 1993 Partially Withheld Insp Rept 70-1257/93-201 on 930712-16. Details Withheld (Ref 10CFR2.790.) ML20056E4111993-08-0808 August 1993 Insp Rept 70-1257/93-09 on 930726-30.Violations Noted But Not Cited.Major Areas Inspected:Maint/Surveillance Testing, Radiation Protection,Criticality Safety/Operations Review, Environ/Waste Mgt & Followup on Open Items ML20056E9041993-08-0404 August 1993 Insp Rept 70-1257/93-08 on 930628-0702.No Violations Noted. Major Areas Inspected:Review Licensee Emergency Preparedness Program & Followup on Open Items 1999-08-25
[Table view] |
Text
.
U.S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-1257/93-08 Docket No. 70-1257 License No. SNM-1227 Licensee:
Siemens Power Corporation
~2101 Horn Rapids Road Richland, Washington 99352-0130 Facility Name:
Siemens Power Corporation 1
Inspection at:
Richland, Washington Inspection Conducted: June 28 - July 2, 1993 8!L/f_f Inspectors: P. M. Qualls, Reactor Inspector Uatt Signed Approved by:
h 8[Y[f5 R. J. Pate, Chidf, ' Safeguards, Dgte Signed Emergency Preparedness, and Non-Power Reactor Branch Summary:
Areas Inspected: This was a routine inspection of the licensee's Emergency Preparedness program and followup on open items.
Inspection procedures 30703, 88050, and 92701 were addressed.
Results: Within the scope of this inspection, no violations or deviations were identified.
No significant weaknesses were identified during this inspection. The working relationship between the licensee and the offsite agencies and the apparent support by facility staff and management of the Emergency Planning program were observed program strengths.
i l
9308250279 930804 PDR ADDCK 07001257 C
PDR
i l
DETAILS 1.
Persons Contacted Tte below listed persons were contacted during the course of the inspection.
i Licensee Personnel
- R. E. Vaughan, Manager, Safety, Security and Licensing
- L. J. Maas, Manager, Regulatory Compliance J. B. Edgar, Staff Engineer, Licensing
- T. C. Probasco, Safety Supervisor R. K. Burklin. Health Physicist
- E. J. Hough, Technical Training Specialist i
Other Personnel D. Schrag, Deputy Director for Fire Operations, Richland Fire Department B. Martin, Director, Benton County Emergency Planning G. Pira, DOE Planner, Benton County
- The above individuals denoted with an asterisk were present during the exit meeting on July 2,1993. The inspector also contacted other members of the licensee's emergency preparedness, administrative, and technical staff and management during the course of the inspection.
l
\\
2.
Emergency Preparedness (88050) l a.
Offsite Support Agencies The inspector reviewed the agreement letters with the Offsite Support Agencies. The letters were all current with responsibilities clearly defined. The inspector discussed with 1
Richland Fire Department and Benton County officials the licensee's relationship with their organizations.
Representatives of both organizations stated that the licensee was providing the support and training necessary for their staff to protect the public during an emergency. The inspector noted that the licensee's relationship with the Offsite Agencies was a significant program strength, b.
Emergency Plans. Procedures. Facilities and Equipment The inspector reviewed the licensee's revised Emergency Plan Implementing Procedures which were created to implement the licensee's revised Emergency Plan, EMF-32, Revision 17. The l
inspector reviewed the procedures for plan implementation only.
The inspector did not review the plan to ensure compliance with licensing criteria as that review is being accomplished separately.
The inspector noted no deficiencies in the licensee's implementing procedures. The inspector noted that the licensee's emergency call list is included in the emergency plan and is available to plant personnel in an emergency.
l
\\
t b
2 i
The inspector reviewed the licensee's Pre-Emergency Plans which were l
received in the Region V office on July 22, 1993. This manual provides the information needed by emergency responders to safely j
react to a site emergency. The procedures provide an exterior i
building photograph and a floor plan drawing for each facility building. The procedures also include hazardous materials which may.
i' be present in the room and expected occupancy. The information was presented.in a clear concise manner and should prove to be of l
significant benefit in responding to a severe facility emergency.
The inspector toured the facility and inspected emergency kits, communications equipment, onsite medical kits and the site i
evacuation location. The inspector noted that the emergency response and medical equipment was well maintained, the emergency communications equipment appeared to be in working order. The j
inspector opened several emergency equipment lockers and noted that l
the instrumentation was in calibration, was in good working-condition, and was readily available in sufficient quantities. The i
inspector also noted that air tanks were filled and that the self-contained breathing apparatus and acid suits were available and in
.i good condition. The inspector noted that offsite sampling support i
is provided by Battelle National Laboratory which is a near neighbor l
I of the facility.
c.
Tests and Drills l
l The inspector reviewed the licensee's complet'ed drills. The inspector noted that drills are being conducted in accordance with Emergency Plan requirements. The inspector reviewed the last four i
site accountability. drills.
The time to accomplish accountability-for the. drills averaged 14 minutes. -The inspector reviewed the logs from the March 27, 1993, inadvertent sounding of the criticality alarm and noted that the time to accomplish accountability was 13 minutes.
1 The inspector reviewed the training records for the Plant Emergency Response Team (PERT). The inspector noted that the licensee maintained an adequate number of trained personnel to respond to emergencies. The inspector reviewed the content of the PERT classes and concluded that it was adequate for the level of response required of PER; members. The inspector noted that licensee employees appeared to be supportive of the emergency response program due to the numbers of assigned members which attend the periodic PERT training. The inspector was told by the licensee, however, that training is provided for each shift one time. No makeup classes are provided or required for personnel who do not attend the training. The licensee also did not have a tracking l
method for non-attenders to ensure that each individual receives i
adequate training. The licensee also provides no-criteria for L
disqualifying an individual for missing some amount of training.
l Subsequent to the onsite inspection the licensee's Safety Supervisor
l i
.i 3
informed the inspector that a system to track training: attendance was instituted.
d.
Fire protection i
During discussions with the licensee, the inspector noted that primary responding agency for the licensee is the Richland Fire l
Department. The licensee plans that the initial response by onsite j
i staff be as incipient fire fighters only.
Followup response for 1
larger fires is accomplished by professional fire fighters in the i
Richland Fire Department. The inspector noted that in place fire fighting equipment located in the licensee's facility appeared well maintained.
l e.
Corrective Action List and Quality Assurance Audit l
l The inspector reviewed the licensee's 1992 and 1993 audit of the l
Emergency Planning Program. The audits were accomplished by the licensee's Quality Assurance organization. The audits were..
grq comprehensive and well documented.
Items identified by the auditor l
in 1991 had been corrected before the 1992 audit. Many of the= items L
noted during the 1993 audit, which was completed on March 9,1993, had been corrected prior to this inspection. The inspector reviewed the licensee's Corrective Action List being kept by the Safety Supervisor and noted that items were being corrected in a reasonably short time frame and the list was not excessively long.
l 3.
Followup of Previously Identified Open Items (92701) l a.
91-04-27 (CLOSED) Review of Agreement Letters j
The open item concerned the requirement of the _ Emergency plan to conduct biannual review of the agreement' letters with offsite l
agencies. The guidance is to conduct biennial reviews. Revision 17 of EMF-32 has corrected this administrative error. This item is CLOSED.
b.
91-04-30 (CLOSED) Reporting Location The licensee's Emergency Plan Implementing Procedures had required their staff to notify the NRC Region V office of an emergency declaration vice the Headquarters Operations Center. The inspector reviewed the applicable procedures and noted that they had been revised to require NRC Operations Office notification of an event.
This item is CLOSED.
c.
91-04-31 (CLOSED) NRC Region V Telephone Number The licensee's Radiation Safety Manual, ANF-30, contained an
- obsolete telephone number for the NRC Region V Office. A subsequent revision to the manual corrected the telephone number. This item is CLOSED.
4 i
I d.
91-04-33 (CLOSED) Documentation of EP Training The open item concerned the lack of a formal method to document all initial and requalification training. When reviewed by the inspector, as noted in Paragraph 2.c above, the licensee did not have a system to track personnel who did not attend training sessions.
The licensee also had no criteria to specify which sessions could be missed and how often training could be missed and still maintain a qualified status. The licensee has subsequently instituted a system to track training attendance.
Item 91-04-33 is CLOSED. The inspector will review the training attendance tracking and qualification status at a future inspection. (93-08-01) OPEN.
L e.
91-04-40 (CLOSED) Fire Fighting Responsibilities of the PERT 1
Revision 15 to the Emergency Plan stated that PERT members could fight fires only when no radioactive materials were involved. The Safety Supervisor had stated that the expectation was that the PERT fight incipient fires with an extinguisher. Revision 17 to the l
Emergency Plan reflects the expectation of the facility management l
that the PERT fight incipient fires. This item is CLOSED.
4.
Exit Interview l
An exit meeting was held on July 2,1993, with members of the licensee staff identified in Paragraph I of this report. The items identified in this report were discussed at that time. Significant strengths were identified in the areas of working relations with offsite agencies, the support of the Emergency Planning Program by site personnel, and the expeditious completion of site accountability during an inadvertent alarm and routine drills. No significant weaknesses were identified. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during the inspection.
l l