Category:INSPECTION REPORT
MONTHYEARML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering ML20133D0291997-01-0303 January 1997 Insp Rept 70-1257/96-206 on 961202-05.Violations Noted. Major Areas Inspected:Fuel Fabrication Facility in Richland,Wa,Activities Associated W/Planned Startup of New Dry Conversion Facility & Review of Hq Insp Procedure 88015 ML20135D8221996-12-0505 December 1996 Insp Rept 70-1257/96-205 on 961104-07.No Violations Noted. Details Withheld ML20134K8161996-11-12012 November 1996 Insp Rept 70-1257/96-04 on 961021-25.Violations Noted.Major Areas Inspected:Emergency Preparedness,Fp,Followup on Licensee Events & Followup on Open Item from Previous Item ML20149H4771994-11-0202 November 1994 Insp Rept 70-1257/94-06 on 940926-30 & 1012-14.Violations Noted.Major Areas Inspected:Review Circumstances Re 940918 Event,Involving Spill of Approx 41 Kg of Low Enriched U Dioxide Power ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20057C5041993-08-26026 August 1993 Insp Rept 70-1257/93-10 on 930812.No Violations Noted.Major Areas Inspected:Announced Insp to Obtain Info on Licensee Employee Concerns Program ML20056E4111993-08-0808 August 1993 Insp Rept 70-1257/93-09 on 930726-30.Violations Noted But Not Cited.Major Areas Inspected:Maint/Surveillance Testing, Radiation Protection,Criticality Safety/Operations Review, Environ/Waste Mgt & Followup on Open Items ML20056E9041993-08-0404 August 1993 Insp Rept 70-1257/93-08 on 930628-0702.No Violations Noted. Major Areas Inspected:Review Licensee Emergency Preparedness Program & Followup on Open Items ML20056C8711993-07-0707 July 1993 Insp Rept 70-1257/93-07 on 930614-18.No Violations Noted. Major Areas Inspected:Environ Protection,Radwaste Mgt, Onsite Followup of Licensee Events & Followup on Open Items ML20127B1621992-12-23023 December 1992 Insp Rept 70-1257/92-09 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20126B3451992-12-0404 December 1992 Insp Rept 70-1257/92-08 on 921015-17 & 29.Violations Noted. Major Areas Inspected:Overflow of Low Enriched Uranyl Fluoride to U Hexafluoride Vaporization Chest ML20059H9681990-09-0505 September 1990 Partially Withheld Insp Rept 70-1257/90-201 on 900806-10 (Ref 10CFR2.790(d)).No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Physical Inventory & Measurement Control ML20059G8981990-08-31031 August 1990 Insp Rept 70-1257/90-03 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection, Maint & Surveillance Testing,Transportation of Radioactive Matls & Criticality Safety ML20245H0751989-08-0909 August 1989 Matl Control & Accounting Insp Rept 70-1257/89-201 on 890612-21.No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Measurement Sys,Physical Inventory & Records & Repts ML20247H6391989-05-22022 May 1989 Insp Rept 70-1257/89-02 on 890417-21.No Violations Noted. Major Areas Inspected:Followup Actions on Open Items,Mgt Organization,Training & Retraining,Criticality Safety, Operations Review & Radiation Protection ML20247P5161989-04-0505 April 1989 Insp Rept 70-1257/89-200 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Sys Mgt & Assessment,Internal Controls,Measurement Sys,Measurement Controls & Matl Control & Accounting for Exports & Imports ML20195F9841988-11-18018 November 1988 Insp Rept 70-1257/88-08 on 880906-09 & 23.Violations Noted. Major Areas Inspected:Mgt Organization,Training & Retraining,Criticality Safety,Operations Review,Maint & Surveillance Testing ML20154J6151988-05-12012 May 1988 Insp Rept 70-1257/88-04 on 880418-22.No Violations Noted. Major Areas Inspected:Mgt Organization,Criticality Safety, Operations Review,Maint & Surveillance Testing & Radwaste Mgt ML20236C9151987-10-20020 October 1987 Insp Rept 70-1257/87-08 on 870928-1002.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Training,Radiation Protection & Emergency Preparedness & Environ Protection ML20235X1551987-07-20020 July 1987 Insp Rept 70-1257/87-05 on 870606-12 & 0701.No Violations Noted.Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Transportation/Radwaste Mgt & Emergency Preparedness & Environ Protection ML20215C0731986-12-0808 December 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-1257/86-09 on 861117-21 (Ref 10CFR2.790).No Violations or Deviations Identified.Major Areas Inspected:Followup on inspector-identified Problems & Unresolved Items ML20212K8191986-08-14014 August 1986 Insp Rept 70-1257/86-05 on 860721-25.Violation Noted:While Performing Equipment Maint,Electrician Spilled Uncontained Visible UO2 Powder Which Was Not Reported to Hpt ML20199C6741986-06-13013 June 1986 Insp Rept 70-1257/86-03 on 860512-16.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls,Training & Retraining,Criticality Safety,Operations Review,Maint & Surveillance Testing & Radiation Protection ML20198J5571986-05-27027 May 1986 Partially Withheld Insp Rept 70-1257/86-04 on 860505-09 (Ref 10CFR2.790).No Violation or Deviation Noted.Major Areas Inspected:Followup on inspector-identified Problems & Unresolved Items ML20154Q8671986-03-13013 March 1986 Matl Control & Accounting Insp Rept 70-1257/86-01 on 860210-14 & 25.No Violations Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Measurement Sys & Matl Control.Details Withheld (Ref 10CFR2.790) ML20154K2321986-02-26026 February 1986 Insp Rept 70-1257/86-02 on 860203-07 & 20.Violations Noted: Procedure Specified That Valves Be Tested Between 70 & 90 Psig Instead of 100 Psig & Protective Valve Cover on Cylinder Not Used After Removal from Vaporization Chest ML20136J0301986-01-0606 January 1986 Insp Rept 70-1257/85-13 on 851203-06 & 09-20.No Violations or Deviations Noted.Major Areas Inspected:Facility Organization & Mgt Controls & Facility Operations & Internal Control.Details Withheld (Ref 10CFR2.790) ML20138A7671985-12-0606 December 1985 Insp Rept 70-1257/85-12 on 851105-25.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls,Training & Retraining,Criticality Safety,Operations Review & Maint & Surveillance Testing ML20135A3351985-08-21021 August 1985 Insp Rept 70-1257/85-10 on 850729-0802.Violation Noted: Visible Hole Identified on Bottom of Container in Shipment ML20127M3021985-06-20020 June 1985 Matl Control & Accountability Safeguards Insp Rept 70-1257/85-08 on 850528-30 & 0603-07.No Violations Noted. Major Areas Inspected:Facility Operations & Internal Control.Details Withheld (Ref 10CFR2.790) 1999-08-25
[Table view] Category:NRC-GENERATED
MONTHYEARML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering ML20133D0291997-01-0303 January 1997 Insp Rept 70-1257/96-206 on 961202-05.Violations Noted. Major Areas Inspected:Fuel Fabrication Facility in Richland,Wa,Activities Associated W/Planned Startup of New Dry Conversion Facility & Review of Hq Insp Procedure 88015 ML20135D8221996-12-0505 December 1996 Insp Rept 70-1257/96-205 on 961104-07.No Violations Noted. Details Withheld ML20134K8161996-11-12012 November 1996 Insp Rept 70-1257/96-04 on 961021-25.Violations Noted.Major Areas Inspected:Emergency Preparedness,Fp,Followup on Licensee Events & Followup on Open Item from Previous Item ML20149H4771994-11-0202 November 1994 Insp Rept 70-1257/94-06 on 940926-30 & 1012-14.Violations Noted.Major Areas Inspected:Review Circumstances Re 940918 Event,Involving Spill of Approx 41 Kg of Low Enriched U Dioxide Power ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20057C5041993-08-26026 August 1993 Insp Rept 70-1257/93-10 on 930812.No Violations Noted.Major Areas Inspected:Announced Insp to Obtain Info on Licensee Employee Concerns Program ML20056E4111993-08-0808 August 1993 Insp Rept 70-1257/93-09 on 930726-30.Violations Noted But Not Cited.Major Areas Inspected:Maint/Surveillance Testing, Radiation Protection,Criticality Safety/Operations Review, Environ/Waste Mgt & Followup on Open Items ML20056E9041993-08-0404 August 1993 Insp Rept 70-1257/93-08 on 930628-0702.No Violations Noted. Major Areas Inspected:Review Licensee Emergency Preparedness Program & Followup on Open Items ML20056C8711993-07-0707 July 1993 Insp Rept 70-1257/93-07 on 930614-18.No Violations Noted. Major Areas Inspected:Environ Protection,Radwaste Mgt, Onsite Followup of Licensee Events & Followup on Open Items ML20127B1621992-12-23023 December 1992 Insp Rept 70-1257/92-09 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20126B3451992-12-0404 December 1992 Insp Rept 70-1257/92-08 on 921015-17 & 29.Violations Noted. Major Areas Inspected:Overflow of Low Enriched Uranyl Fluoride to U Hexafluoride Vaporization Chest ML20059H9681990-09-0505 September 1990 Partially Withheld Insp Rept 70-1257/90-201 on 900806-10 (Ref 10CFR2.790(d)).No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Physical Inventory & Measurement Control ML20059G8981990-08-31031 August 1990 Insp Rept 70-1257/90-03 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection, Maint & Surveillance Testing,Transportation of Radioactive Matls & Criticality Safety ML20245H0751989-08-0909 August 1989 Matl Control & Accounting Insp Rept 70-1257/89-201 on 890612-21.No Violations,Deviations or Declining Performance Identified.Major Areas Inspected:Measurement Sys,Physical Inventory & Records & Repts ML20247H6391989-05-22022 May 1989 Insp Rept 70-1257/89-02 on 890417-21.No Violations Noted. Major Areas Inspected:Followup Actions on Open Items,Mgt Organization,Training & Retraining,Criticality Safety, Operations Review & Radiation Protection ML20247P5161989-04-0505 April 1989 Insp Rept 70-1257/89-200 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Sys Mgt & Assessment,Internal Controls,Measurement Sys,Measurement Controls & Matl Control & Accounting for Exports & Imports ML20195F9841988-11-18018 November 1988 Insp Rept 70-1257/88-08 on 880906-09 & 23.Violations Noted. Major Areas Inspected:Mgt Organization,Training & Retraining,Criticality Safety,Operations Review,Maint & Surveillance Testing ML20154J6151988-05-12012 May 1988 Insp Rept 70-1257/88-04 on 880418-22.No Violations Noted. Major Areas Inspected:Mgt Organization,Criticality Safety, Operations Review,Maint & Surveillance Testing & Radwaste Mgt ML20236C9151987-10-20020 October 1987 Insp Rept 70-1257/87-08 on 870928-1002.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Training,Radiation Protection & Emergency Preparedness & Environ Protection ML20235X1551987-07-20020 July 1987 Insp Rept 70-1257/87-05 on 870606-12 & 0701.No Violations Noted.Major Areas Inspected:Mgt Organization & Controls, Criticality Safety,Operations Review,Transportation/Radwaste Mgt & Emergency Preparedness & Environ Protection ML20215C0731986-12-0808 December 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-1257/86-09 on 861117-21 (Ref 10CFR2.790).No Violations or Deviations Identified.Major Areas Inspected:Followup on inspector-identified Problems & Unresolved Items ML20212K8191986-08-14014 August 1986 Insp Rept 70-1257/86-05 on 860721-25.Violation Noted:While Performing Equipment Maint,Electrician Spilled Uncontained Visible UO2 Powder Which Was Not Reported to Hpt ML20199C6741986-06-13013 June 1986 Insp Rept 70-1257/86-03 on 860512-16.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls,Training & Retraining,Criticality Safety,Operations Review,Maint & Surveillance Testing & Radiation Protection ML20198J5571986-05-27027 May 1986 Partially Withheld Insp Rept 70-1257/86-04 on 860505-09 (Ref 10CFR2.790).No Violation or Deviation Noted.Major Areas Inspected:Followup on inspector-identified Problems & Unresolved Items ML20154Q8671986-03-13013 March 1986 Matl Control & Accounting Insp Rept 70-1257/86-01 on 860210-14 & 25.No Violations Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Measurement Sys & Matl Control.Details Withheld (Ref 10CFR2.790) ML20154K2321986-02-26026 February 1986 Insp Rept 70-1257/86-02 on 860203-07 & 20.Violations Noted: Procedure Specified That Valves Be Tested Between 70 & 90 Psig Instead of 100 Psig & Protective Valve Cover on Cylinder Not Used After Removal from Vaporization Chest ML20136J0301986-01-0606 January 1986 Insp Rept 70-1257/85-13 on 851203-06 & 09-20.No Violations or Deviations Noted.Major Areas Inspected:Facility Organization & Mgt Controls & Facility Operations & Internal Control.Details Withheld (Ref 10CFR2.790) ML20138A7671985-12-0606 December 1985 Insp Rept 70-1257/85-12 on 851105-25.No Violations Noted. Major Areas Inspected:Mgt Organization & Controls,Training & Retraining,Criticality Safety,Operations Review & Maint & Surveillance Testing ML20135A3351985-08-21021 August 1985 Insp Rept 70-1257/85-10 on 850729-0802.Violation Noted: Visible Hole Identified on Bottom of Container in Shipment ML20127M3021985-06-20020 June 1985 Matl Control & Accountability Safeguards Insp Rept 70-1257/85-08 on 850528-30 & 0603-07.No Violations Noted. Major Areas Inspected:Facility Operations & Internal Control.Details Withheld (Ref 10CFR2.790) 1999-08-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20211G7501999-08-25025 August 1999 Partially Withheld Insp Rept 70-1257/99-201 (Ref 10CFR2.790) on 990802-05.No Violations Noted.Major Areas Inspected:Exams of Core Procedures & Representative Records & Interviews with Personnel.Details Withheld ML20211B9261999-08-19019 August 1999 Insp Rept 70-1257/99-202 on 990802-05.No Violations Noted. Major Areas Inspected:Plant Operations,Criticality Safety Training,Administrative Controls,Internal Audits & Internal Reporting of Nuclear Criticality Safety Infractions PNO-IV-99-036, on 990813,licensee Notified NRC Operations Ctr That Inaccurate Lab Analysis Method Resulted in Potential for Criticality Safety Limit to Be Exceeded by 23%.Affected Process Was Shut Down & Tagged Out.Region Will Conduct Insp1999-08-18018 August 1999 PNO-IV-99-036:on 990813,licensee Notified NRC Operations Ctr That Inaccurate Lab Analysis Method Resulted in Potential for Criticality Safety Limit to Be Exceeded by 23%.Affected Process Was Shut Down & Tagged Out.Region Will Conduct Insp ML20210R9071999-08-12012 August 1999 Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted. Major Areas Inspected:Selected Aspects of Licensee Programs for Operational Safety,Radioactive Effluents,Environ Protection,Waste Mgt Programs & Followup of Open Items ML20207B3781999-05-21021 May 1999 Insp Rept 70-1257/99-01 on 990322-26,0514 & 21.Violations Noted.Major Areas Inspected;Licensee Programs for Radiation Protection,Emergency Preparedness,Operator Training, Transportation & Followup of Open Items from Previous Insps ML20207B3731999-05-21021 May 1999 Notice of Violation from Insp on 990322-26,0514 & 21. Violations Noted:On 980225,licensee Delivered Licensed Matl to Carrier for Transport Under General License Pursuant to 10CFR71.12 & Did Not Comply with Terms & Conditions PNO-III-99-005, on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries1999-02-0303 February 1999 PNO-III-99-005:on 990202,truck with Empty UF6 Cylinders Involved in Traffic Accident.Local Fire & Police Personnel Responded Immediately to Scene of Accident.Driver of tractor-trailer Received Minor Injuries ML20198F6021998-12-15015 December 1998 Insp Rept 70-1257/98-05 on 981026-30.No Violations Noted. Major Areas Inspected:Operations,Operational Event Review Feedback & Mgt Organization ML20198B4361998-12-14014 December 1998 Insp Rept 70-1257/98-204 on 981109-13.Violation Noted. Major Areas Inspected:Open Item Completion,Review of Recent Licensee Criticality Safety Event,Validation & Criticality Safety Analysis ML20198B4191998-12-14014 December 1998 Notice of Violation from Insp on 981109-13.Violation Noted: Failure to Control Decommissioning Operations So That Operators Would Verify That Disassembled Equipment Was Free from Visible U Deposits Before Staging with Other Equipment PNO-IV-98-043, on 980922,NRC Operation Ctr Notified That Criticality Safety Specialist Noted Visible Accumulations of Solids in Disassembled Sections of Ductwork.Training Planned for Disassembly Crew in Aspects of Safety Requirements1998-09-23023 September 1998 PNO-IV-98-043:on 980922,NRC Operation Ctr Notified That Criticality Safety Specialist Noted Visible Accumulations of Solids in Disassembled Sections of Ductwork.Training Planned for Disassembly Crew in Aspects of Safety Requirements ML20151X0721998-09-16016 September 1998 Insp Rept 70-1257/98-04 on 980810-14.No Violations Noted. Major Areas Inspected:Operational Safety,Maint & Surveillance,Transportation & follow-up of Open Items from Previous Insps ML20236R2841998-07-17017 July 1998 Insp Rept 70-1257/98-03 on 980615-19.Violations Noted.Major Areas Inspected:Selected Aspects of Operational Safety, Radiation Protection,Radioactive Waste Handling & Storage ML20236R2741998-07-17017 July 1998 Notice of Violation from Insp on 980615-19.Violation Noted: Operational Safety Activities Not Implemented Iaw/Documented Standard Operating Procedures Appropriate to Circumstances in Listed Examples PNO-IV-98-022, on 980605,notified Nrc,Region IV That Mfg Sciences Corp Had Returned Shipment of Zirconium Cladding After Discovery of Two Unirradiated Fuel Pellets within Cladding.Nrc Region IV Will Perform follow-up Review1998-06-0505 June 1998 PNO-IV-98-022:on 980605,notified Nrc,Region IV That Mfg Sciences Corp Had Returned Shipment of Zirconium Cladding After Discovery of Two Unirradiated Fuel Pellets within Cladding.Nrc Region IV Will Perform follow-up Review ML20248K0011998-06-0202 June 1998 Insp Rept 70-1257/98-02 on 980413-17 & 980504-08.No Violations Noted.Major Areas Inspected:Operational Safety, Radioactive Effluents & Environ Protection PNO-IV-98-017A, on 980415,licensee Conducted Conducted Briefing of Region IV & Headquarters Staff on Details of Fire.Location & Matls Involved in Fire,Described in Original Preliminary Notification of Event or Unusual Occurrence1998-04-16016 April 1998 PNO-IV-98-017A:on 980415,licensee Conducted Conducted Briefing of Region IV & Headquarters Staff on Details of Fire.Location & Matls Involved in Fire,Described in Original Preliminary Notification of Event or Unusual Occurrence PNO-IV-98-017, on 980415,licensee Reported to NRC Operations Ctr That Fire Had Occurred in Handling Area of UO2 Bldg.Fire Initially Quelled w/CO2 & Then Extinguished W/Small Amount of Water.Licensee Scheduled to Conduct Briefing W/Nrc1998-04-15015 April 1998 PNO-IV-98-017:on 980415,licensee Reported to NRC Operations Ctr That Fire Had Occurred in Handling Area of UO2 Bldg.Fire Initially Quelled w/CO2 & Then Extinguished W/Small Amount of Water.Licensee Scheduled to Conduct Briefing W/Nrc ML20217J8671998-04-0101 April 1998 Insp Rept 70-1257/98-201 on 980313-19.Violations Noted.Major Areas Inspected:Open Item Resolution,Configuration Mgt & Flowdown of Analytical Limits & Controls ML20203K3731998-02-24024 February 1998 Insp Rept 70-1257/98-01 on 980126-30.No Violations Noted. Major Areas Inspected:Review of Mgt Organization & Controls, Operational Event Review & Feedback,Operator Training & Qualification & Selected Aspects of Operational Safety ML20198S4961998-01-16016 January 1998 Notice of Violation from Insp on 971215-19 & 971222-24. Violation Noted:On 971218,licensee Discovered That U Compounds Other than Oxide Pellets Were Being Stored in Temporary Storage Locations ML20198S5181998-01-16016 January 1998 Insp Rept 70-1257/97-07 on 971215-19 & 971222-24.Violations Noted.Major Areas Inspected:Ep,Operations & Followup on Open Items from Previous Insps ML20199B9431997-11-0707 November 1997 Insp Rept 70-1257/97-202 on 971006-10.Violation Noted.Major Areas Inspected:Criticality Safety Analyses,Chemical Safety Assessment,Chemical & Criticality Safety Controls,Active Engineering Controls & Administrative Controls Flowdown ML20199B9341997-11-0707 November 1997 Notice of Violation from Insp on 971006-10.Violation Noted: April 1977 Loss of Moisture Control Incident at Dry Conversion Pilot Plant Was Not Adequately Reviewed & Appropriate Corrective Actions Were Not Taken ML20217G9641997-10-0808 October 1997 Insp Rept 70-1257/97-06 on 970915-19.No Violations Noted. Major Areas Inspected:Selected Aspects of Operations & Radiation Protection PNO-IV-97-053, on 970917,Siemens Nuclear Corp Reported Discovery of Damp U Dioxide Matl in Transfer Line in Dry Conversion Pilot Facility Sample Analyses of Pyrohyrolysis Vessel.Licensee Rept Made,Per NRC Bulletin 91-0011997-09-18018 September 1997 PNO-IV-97-053:on 970917,Siemens Nuclear Corp Reported Discovery of Damp U Dioxide Matl in Transfer Line in Dry Conversion Pilot Facility Sample Analyses of Pyrohyrolysis Vessel.Licensee Rept Made,Per NRC Bulletin 91-001 ML20216J0851997-09-12012 September 1997 Notice of Violation from Insp on 970731.Violation Noted: on 970413,RL Rumley,Lead Operator,Defeated Breathing Zone Air Sampler by Placing Rubber Glove Over Air Sampler at Respective Work Station ML20198H4171997-09-0505 September 1997 Insp Rept 70-1257/97-201 on 970804-08.No Violations Noted. Info Re Major Areas Inspected Withheld,Per 10CFR2.790(d) ML20141K5781997-05-23023 May 1997 Notice of Violation from Insp on 970414-18,23,24 & 0501. Violation Noted:On 960603,licensee Shipped 405 NT-IX Shipping Packages Containing Fissile Matl W/O Installing Cushioning Matl ML20141K5791997-05-23023 May 1997 Insp Rept 70-1257/97-04 on 970414-18,23,24 & 0501.Violations Noted.Major Areas Inspected:Operations,Radioactive Effluent Discharges,Environ Protection,Solid Radioactive Waste Mgt & Transportation of Radioactive Matls ML20137P1301997-04-0404 April 1997 Insp Rept 70-1257/97-03 on 970303-07.No Violations Noted. Major Areas Inspected:Aspects of Plant Operations, Engineering,Maint & Surveillance Testing ML20136C1611997-03-0707 March 1997 Insp Rept 70-1257/97-02 on 970210-12.No Violation Noted. Major Areas Inspected:Physical Security Plan,Safeguards Events,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Insp Folloup Item ML20134C7241997-01-30030 January 1997 Notice of Violation from Insp on 970106-10.Violation Noted: Field Change Made Under Open ECN (No.5533L) & Not Documented or Included W/Ecn Package Prior to Startup Approval on 960806 ML20134C7331997-01-30030 January 1997 Insp Rept 70-1257/97-01 on 970106-10.Violation Noted.Major Areas Inspected:Mgt Organization & Controls,Operator Training & Qualification,Plant Operations & Engineering PNO-III-97-004, on 970124,truck Carrying Four U Hexafluoride Cylinders in Accident Occurred.Truck Transporting Cylinders from Portsmouth Gaseous Diffusion Plant to Siemens Power Corp in Richland,Washington1997-01-24024 January 1997 PNO-III-97-004:on 970124,truck Carrying Four U Hexafluoride Cylinders in Accident Occurred.Truck Transporting Cylinders from Portsmouth Gaseous Diffusion Plant to Siemens Power Corp in Richland,Washington ML20133D0231997-01-0303 January 1997 Notice of Violation from Insp on 961202-05.Violation Noted: Licensee Failed to Update Posted Criticality Safety Limit Card for UF6 Cylinder Wash Operation to Reflect Change in CCS Limit ML20133D0291997-01-0303 January 1997 Insp Rept 70-1257/96-206 on 961202-05.Violations Noted. Major Areas Inspected:Fuel Fabrication Facility in Richland,Wa,Activities Associated W/Planned Startup of New Dry Conversion Facility & Review of Hq Insp Procedure 88015 PNO-IV-96-066, on 961211,licensee Notified Nrc,Walnut Creek Field Ofc of Electrical Fire & Partial Loss of Site Power. Licensee Formed Incident Investigation Board to Review Event.State of Wa Will Be Informed1996-12-12012 December 1996 PNO-IV-96-066:on 961211,licensee Notified Nrc,Walnut Creek Field Ofc of Electrical Fire & Partial Loss of Site Power. Licensee Formed Incident Investigation Board to Review Event.State of Wa Will Be Informed ML20135D8221996-12-0505 December 1996 Insp Rept 70-1257/96-205 on 961104-07.No Violations Noted. Details Withheld ML20134K8161996-11-12012 November 1996 Insp Rept 70-1257/96-04 on 961021-25.Violations Noted.Major Areas Inspected:Emergency Preparedness,Fp,Followup on Licensee Events & Followup on Open Item from Previous Item ML20134K7921996-11-12012 November 1996 Notice of Violation from Insp on 961021-25.Violation Noted: as of 961022,licensee Had Not Calibrated Three Sets of direct-reading Dosimeters Maintained for Er Since 950918,for Two Sets & Since 950725,for the Third Set ML20149H4581994-11-10010 November 1994 Notice of Violation from Insp on 940926-30 & 1012-14. Violations Noted:Licensee Did Not Provide Training to Operators Relative to Modification or Evaluate Need to Revise Operating Procedures Prior to Restarting Sys ML20149H4771994-11-0202 November 1994 Insp Rept 70-1257/94-06 on 940926-30 & 1012-14.Violations Noted.Major Areas Inspected:Review Circumstances Re 940918 Event,Involving Spill of Approx 41 Kg of Low Enriched U Dioxide Power ML20058H9321993-11-22022 November 1993 Insp Rept 70-1257/93-12 on 931101-05.No Violations Noted. Major Areas Inspected:Fire Protection & Followup on Items of Noncompliance,Inspector Followup Items & NRC Info Notices ML20058D4261993-10-17017 October 1993 Insp Rept 70-1257/93-11 on 930908 & 0927-1001.No Violations or Deviations Noted.Major Areas Inspected:Criticality Safety,Operations & Followup on Open Items ML20057C5041993-08-26026 August 1993 Insp Rept 70-1257/93-10 on 930812.No Violations Noted.Major Areas Inspected:Announced Insp to Obtain Info on Licensee Employee Concerns Program ML20056E4111993-08-0808 August 1993 Insp Rept 70-1257/93-09 on 930726-30.Violations Noted But Not Cited.Major Areas Inspected:Maint/Surveillance Testing, Radiation Protection,Criticality Safety/Operations Review, Environ/Waste Mgt & Followup on Open Items ML20056E9041993-08-0404 August 1993 Insp Rept 70-1257/93-08 on 930628-0702.No Violations Noted. Major Areas Inspected:Review Licensee Emergency Preparedness Program & Followup on Open Items ML20056C8711993-07-0707 July 1993 Insp Rept 70-1257/93-07 on 930614-18.No Violations Noted. Major Areas Inspected:Environ Protection,Radwaste Mgt, Onsite Followup of Licensee Events & Followup on Open Items ML20056C8411993-07-0202 July 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500.Noncompliance Noted:Ecn Not Used for Mod of Discharge Tube of Feed Hoppers on All Four Blenders by Installing Interlocks for Direct Control of Discharges 1999-08-25
[Table view] |
Text
,
U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket No.: 70-1257 License No.: SNM-1227 !
l Report No.: 70-1257/98-05 Licensee: Siemens Power Corporation Facility: Siemens Power Corporation Location: Richland, Washington Dates: October 26-30,1998 Inspectors: David A. Ayres, Fuel Facility inspector, Region ll Wayne L Britz, Fuel Facility inspector Douglas S. Simpkins, Fuel Facility inspector Approved By: D. Blair Spitzberg, Chief Fuel Cycle / Decommissioning Branch Division of Nuclear Materials Safety
Attachment:
Supplemental Inspection Information 9812280160 981'4 15 PDR ADOCK 07001257 C PDR ,
l
1 l
EXECUTIVE
SUMMARY
. Siemens Power Corporation !
l NRC Inspection Report 70-1257/98-05 l
This routine, announced inspection included a review of selected aspects of operational safety, l operational event review feedback, management / organization, and followup of open items from l previous inspections.
Ooerations Operations involving the processing of special nuclear material were in accordance with established safety requirements (Section 1.1).
Operational Event Review Feedback The review of Event Report 34819 was vicered to headquarters for further investigation i due to the criticality safety issues associated with the event. An unresolved item was I identified relating to the event. This item will be reviewed and documented in NRC Inspection Report 70-1257/98-204 (Section 2.1).
Manaaement/Oraanization The licensee's management and organization met license requirements. The licensee's audit program was being conducted in accordance with the license conditions and appeared effective in identifying deficiencies (Section 3.1).
t l
l l
l
a l'
l L
ReDort Details Summarv of Plant Status
! The plant was operating Unes 1 and 3 of the dry conversion facility (DCF). Uranium recovery activities were also in operation. Fuel pellet production, fuel rod loading and downloading, and fuel bundle assembly operations were also in progress.
i l 1 Operational Safety Review (Tl2600/003) 1.1 Plant Ooerations l
I- a. . Insoection Scope General facility operations were reviewed to verify adherence to safety requirements documented in license conditions, criticality safety specifications, operating procedures, l and area postings.
u
- b. Observatians and Findinas The inspectors reviewed the normal operating procedures for the Dry Conversion
' Facility (DCF), the Criticality Safety Specifications (CSS) for the DCF vaporization and powder production systems, and the CSS for plant-wide moderation control. The inspectors observed operations in the DCF and noted the safety-related process parameters used for monitoring moderation controls at various stages of the DCF 1 process. The inspectors interviewed several operators in various operational areas of !
the DCF and found them to be knowledgeable in their assigned duties. The inspectors !
found no safety-related parameters outside the approved operating ranges for ensuring moderation control. The inspectors also observed area safety postings throughout the facility for criticality and radiological controls. The inspectors found no discrepancies l
between safety postings and observed operating practices. The physical condition of the safety equipment and the housekeeping in the DCF was observed to be adequate.
Work involving respiratory protection equipment was observed in the scrap recovery l areas of the ammonium diuranate (ADU) process area. The inspectors found no f.
discrepancies in the use of safety equipment or the special safety postings in use for the work in the contaminated areas.
- l. The inspectors observed operations in the pelletizing, rod loading, bundle assembly, and p scrap recovery areas. The inspectors interviewed several operators in these areas and L also found them to be knowledgeable in their operations. The inspectors compared the
! ' observed operations with license requirements, safety postings, and established
, criticality controls for moderation, mass, geometry, and ccntainer spacing. The
! inspectors found no significant discrepancies.
o
c. Conclusion
Operations involving the processing of special nuclear material were in accordance with established safety requirements.
2 Operational Event Review Feedback (88002) 2.1 Insoection Scope l'
The inspectors reviewed licensee procedures for reviewing and reporting of off-normal <
operating conditions or events associated with licensed activities. Event Report 34819, !
" Event Description for Bulletin 91-0124-br Report," was investigated for an incident involving a failure to follow a criticality safety requirement to remove visible solids from l ductwork during disassembly and prior to placing the ductwork in an accumulation area.
2.2. Observations and Findinos On September 22,1998, the licensee issued " Event Description for Bulletin 91-0124-hr Report," for an event that occurred on September 21,1998. The report described the disassembly of the plant's ADU Conversion Line 1. During the disassembly, the criticality safety specialist noticed that a stacked section of ductwork had visible accumulations of solids in portions of the ductwork. This was contrary to the plant's
! CSS UO50 i B.2. which requires that the disassembly crew have a process operator remove the visible solids from the ductwork prior to placing it in an accumulation area.
The inspectors reviewed the Shift Supervisor's Abnormal Event Log dated September 21,1998, the incident Investigation Board (118) review of the criticality safety incident dated September 23,1998, and Siemens' 30-day followup report dated October 20,1998.
A review of the event determined that mass and geometry were controlled for this
, operation. The moderator was not designed to be a controlling criticality parameter for this particular plant operation. During disassembly, the geometry was no longer being controlled when the vidble solids were not removed as specified in the applicable CSS.
This left mass as the only criticality parameter being controlled. The inspectors reviewed Standard Operating Procedure P66,917,"Line 1 and 2 Process Offgas l
Ventilation System," which describes a boroscopic inspection through ports in the ductwork. It was not clear in the review of this procedure or in discussion with plant personnel just how effective this process was in determining material accumulations to control mass.
l l The 118 short term corrective actions for ADU Line 1 and 2 included:
(1) training / retraining appropriate Manufacturing Engineering staff and contractors in the applicable criticality safety specifications for the work, (2) retraining Plant Support Operators who perform the inspection / cleaning, (3) conducting pre-job briefings of Plant Support supervisors, operators, and contractors by Manufacturing Engineering personnel and (4) inspecting ADU Line 2 ductwork inspection ports for accumulations of uranium before startup of Line 2. The long term corrective actions included:
(1) evaluation of relocating Line 2 HEPA filters closer to the scrubbers and replacing the l
5 ductwork using favorable geometry, (2) evaluation of a better method for conducting ductwork inspections and (3) a quarterly training program for Manufacturing Engineering personnel working on processes covered by CSS.
The inspectors noted that the llB's corrective actions for the event did not address the mid to senior level management role and responsibilities in this event. The llB's review of the incident and its causes did not include any responsibilities above the project engineer level; i.e., no higher level supervisory responsibilities for the operation. The inspectors noted that management's role should be evaluated during incident investigations.
After further discussion, it was decided that a continuation of NRC's review of this incident would be performed by headquarters with input from the regional inspectors due to the specialized technical nature of the remainder of the investigation. It was also decided that the NRC's conclusions related to this event would be reported in NRC Inspection Report 70-1257/98-204. The determination of whether a violation occurred and, if so, its related significance is considered an unresolved item (URl 70-1257/9805-01).
2.3. Conclusions The review of Event Report 34819 was referred to headquarters for further evaluation due to the criticality safety issues associated with the event. An unresolved item was i
! identified relating to this event. This item will be reviewed and documented in NRC ;
Inspection Report 70-1257/98-204. !
3 Management Organization and Controls (88005) 3.1 Insoection Scope The inspectors reviewed and discussed current organization and staffing with licenseo personnel. Records of the (1) Health and Safety Council monthly meetings, (2) Criticality Safety Management System Appraisals, (3) Al. ARA Committee meetings and (4) internal audits and inspections were reviewed.
3.2. Observations and Findinas
! The inspectors reviewed the licensee's organization, defined responsibilities and staffing. There were no significant changes in management personnel or in the I organization and their responsibilities.
The inspectors reviewed the licensee's Health and Safety Council (H&SC) monthly t
meeting reports for the past 3 months. The inspectors' review included monthly H&SC committee safety inspections of housekeeping and industrial safety, monthly criticality safety audits by the Criticality Safety Component, monthly radiological safety audits, and quarterly inspections of the environmental program. The inspectors found these reports 1
to be adequate in depth. The membership of the H&SC and the scope of review were consistent with Section 2.3.1 of the license conditions.
l l
i L l The inspectors reviewed the Criticality Safety Management System Appraisals required '
L by the licensee's Safety Manual. The inspectors found these reports to be adequate in depth.
'..The inspectors reviewed the ALARA Committee's semi-annual report and the annual l report. The inspectors found these reports to be adequate in depth. The membership of the ALARA Committee and the scope of review were consistent with Section 2.3.2 of ,
the license conditions.
1 L The inspectors reviewed the internal audits and inspections requirement of Section 2.7 !
of the license conditions. The reviews include industrial hygiene / industrial safety, environmental compliance, safeguards, emergency preparednes 5, citicality safnty, health physics / radiation safety and radioactive material shipments ihe audits were found to be adequate and were consistent with Section 2.7 of the license conditions.
Audits defined in Section 2, Part I, of the license were performed in accordance with established procedures and checklists. The audits appeared effective in identifying deficiencies and corrective actions appeared appropriate.
3.3. Conclusions The licensee's management and organization met license requirements. The licensee's l l audit program was being conducted in accordance with the license conditions und I appeared effective in identifying deficiencies.
4 Followup (92701 and 92702) 4.1 (Closed) IFl 70-1257/9802-02: Review of licensee's final assessment, l recommendations and corrective actions for the April 15,1998, waste bin fire. A l followup inspection of the corrective actions taken by the licensee was made and closed out as part of the inspection of VIO 70-1257/9803-01 described in Section 5 below.
l 4.2 (Closed) Violation (VIO) 70-1257/9803-01: Failure to follow procedures for segregation l of hazardous waste and fuel rod downloading. A reply to the Notice of Violation was received on August 17,1998. A followup inspection on the corrective actions taken was made during this inspection. Based on discussions with cognizant licensee representatives, a review of licensee procedural changes, and a physical examination of the hazardous waste and fuel rod downloading equipment and facilities, the inspectors
, verified that the licensee had completed the corrective actions described in the licensee's letter dated August 13,1998.
L 5 Exit Meeting Summary The inspectors presented the inspection results to members of licensee management at the conclusion of the inspection on October 30,1998. The facility staff acknowledged
( the findings presented. The licensee did not identify any of the information discussed at
- the meeting as proprietary. A telephone re-exit was held on November 30,1998, to explain the transfer of the ductwork incident inspection from Region IV to headquarters.
l l
t 4
I I' MTACHMENT p SUPPLEMENTAL INSPECTION INFORMATION PARTIAL LIST OF PERSONS CONTACTED i
_ld.pensee
- B. F. Bentley, Manager, Plant Operations R. K. Burklin, Health Physicist '
- J. B. Edgar, Senior Engineer, Licensing
- B. N. Femreite, Vice President, Manufacturing l- E. L Foster, Supervisor, Radiological Safety l B. G. Haugen, General Supervisor, Bundle / Cage Operations M. A. Hendrickson, Supervisor, Rod Fabrication Operations
- D. J. Hill, Manager, Quality Engineering ' '
- D. C. Kilian, Manager, Manufacturing Engineering '
L - R. B. Logsdon, General Supervisor, Ceramic Operations
- *L J. Maas, Manager, Regulatory Compliance
'G. A. McGehee, Criticality Safety "J. J. Payne, Shift Supervisor, Chemical Operations
- T. C. Probasco, Manager, Safety L G. Stephens, Supervisor, Plant Support Operations
- R. E. Vaughan, Manager, Safety, Security and Licensing l-
- Denotes present at exit meeting October 30,1998 INSPECTION PROCEDURES USED -
Tl 2600/003 Operational Safety Review 88002_ Operational Event Review Feedback 88005 Management / Organization .
92701 Followup IFis -
. 92702 Followup Violations /Dev.
ITEMS OPENED, CLOSED, AND DISCUSSED '
Opened 70-1257/9805 ;. URI Review failure to remove uranium during dismantlement of l ductwork as required by criticality safety requirements i ,
l Closed L
lt 70-1257/9803-01 VIO Failure to follow procedures for 1) segregation of L hazardous waste, and 2) fuel rod downloading
.? 70-1257/9802-02 IFl Review of licensee's final assessment, recommendations j and corrective actions of the April 15,1998, waste bin fire
, investigation l
.. -. . . .-_ - -. . - . . _ . . - . . . . -~ .- . . . - .
l .
? ;. .
LIST OF ACRONYMS USED l ALARA as low as reasonably achievable l ADU- ammonium diuranate CSS criticality safety specification DCF. dry conversion facility -
H&SC Health and Safety Council IFl inspection follow-up item IIB . Incident investigation Board NRC ' Nuclear Regulatory Commission SPC Siemens Power Corporation URI - unresolved item VIO violation k
i l
dW l INSPECTION FOLLOW-UP SYSTEM (IFS) I l
DATA ENTRY FORM NUCLEAR MATERIALS SAFETY AND SAFEGUARDS 1
1 L
1 REGION: N
,B<% u d fh<Mv'bajo NANE:
EXPANDED DOCKETS (Y/H): Y INSTITUTION: ! ! ! L.__
REPORT DOCKET LICENSE LAST -
NUMBER: NUMBER: NUMBER: INSPECTION: CITY: STATE:
4'filolo !E' o l'7!olo! I!2!SM S#h /2 3 7 /0 / ff h /a4
!!!! !!!!! ! ! /
!!!! !!! !! ! ! /
!!! ! !! !!! ! ! /
!!!! !!!!!! ! /
!!!! ! ! ! ! ! !'! /
!!!! !!!!!! ! /
!!! ! !!!!!! ! /
REPORT TRANSMITTAL: /.2f /.rf fg RESPONSIBLE ORG.: 4 !3! F1 d LEAD INSPECTOR: tu!B! 6 i (t:TT In tlets) kr 3 g l l
59I (Y/N): //
LETTER (Y/N): V//
CLEAR (Y/N): /V UPDATE INFORMATION (Y/N): j_
SEQUENCE NUMBER: o!f ITEM TYPE: # 18 !! SEVERITY: SUPPLEMENT: ,
UPDATE PROJECTED ACTUAL STATUS: o INS. REPORT: !!!! CLOSE0UT: C / 31/99 CLOSEOUT: / /
CFR: -
LICENSE CONDITION: TIE DOWN:
UPDATE PROJECTED ACTUAL STATUS: INS. REPORT: !!!! CLOSE0UT: / / CLOSEOUT: / /
CFR: LICENSE CONDITION: TIE DOWN:
TITLE: h&Yt>bAbmina & WaAbeltd & & /
CLOSE00T ORG.: Y! 3 ! P! 6 l CLOSE00T EMP.: kA S ! /3 CONTACT EMP: k>! 3! 6 l
INTEREST CODE: , , CAUSE CODE: ,
EA NUMBER: !!! ! NOV ISSUED: / /
NOV ID: !! ! !
ITEM TEXT: MM /d12s /6 h M deaka dimwMe4 efa W 1l% rA w A hrs iAid 4 1 Cwra/1 &j'Jh Arra2A AA -
p a ,
e o i
()
M) 70 - / 3 F7 / 92 6 C- ol
ADDIT!ONAL ITEMS
- UPDATE INFORMATION (Y/N)
- [
SEQUENCE NUMBER: p_L)_ ITEM TYPE: I/! ! ! d SEVERITY: j_ SUPPLEMENT: _ , _
UPDATE STATUS: C INS. REPORT:
Y PROJECTED ACTUAL 11$10!0 (CLOSE0UT: /il /ff' CLOSE0UT: /ffir, qy CFR:
LICENSE CONDITION: TIE DOWN:
UPDATE PROJECTED STATUS: O ACTUAL INS. REPORT: f!7@ D!3 CLOSE00T: M /W / 47 CLOSE0 TIT:
CFR:
//_
LICENSE CONDITION: TIE DOWN:
TITLE: b%I/jabN U22n otbtf Yk 14Ao Y
A & 1 M ?d 21 $d Un & '
CLOSE0UT ORG.: $ !3 !@ !D CLOSEOUT EMP.: W!3!B CONTACT EMP: 41!3!d INTEREST CODE: , s EA NUMBER: CAUSE CODE:
!!!! NOV ISSUED:
/ /
ITEM TEXT: M/d ~? O * /2 f ~7 !ff 4 3 - c l UPDATE INFORMATION (Y/N): (
SEQUENCE NUMBER: 01 3 ITEM TYPE: _ l ! F-! l SEVERITY: SUPPLEMENT: ,
UPDATE STATUS: O PROJECTED ACTUAL INS. REPORT: h!?!a Ol3 CLOSE00T: 'A/31/ff' CLOSE00T: /d/ 0712 CFR:
LICENSE CONDITION: TIE DOWN:
UPDATE STATUS: O PROJECTED ACTUAL INS. REPORT: ?!8!B(/E CLOSE00T:lA /W /ff CLOSE0UT:
CFR:
LICENSE CONDITION: TIE DOWN:
TITLE:
b M//mz/ h M At 84/bdNP "
CLOSEOUT ORG.:
Gf dA/x If47,42126 & f '
//!3!P!o l
CLOSE00T EMP.: _lu! 3!/J CONTACT EMP: IM 3 Id
! INTEREST CODE: _,
l EA NUMBER: CAUSE CODE: __,
! !!! NOV ISSUED: / /
ITEM TEXT: @/ ~/O -/D f f 74) -o >
_.