ML13301A767: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML13301A767 | | number = ML13301A767 | ||
| issue date = 11/05/2013 | | issue date = 11/05/2013 | ||
| title = Virgil C. Summer Nuclear Station, Unit 1 - Relief Request (RR-4-01, RR-4-02, RR-4-03) | | title = Virgil C. Summer Nuclear Station, Unit 1 - Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902) | ||
| author name = Pascarelli R J | | author name = Pascarelli R J | ||
| author affiliation = NRC/NRR/DORL/LPLII-1 | | author affiliation = NRC/NRR/DORL/LPLII-1 |
Revision as of 04:02, 2 March 2018
ML13301A767 | |
Person / Time | |
---|---|
Site: | Summer ![]() |
Issue date: | 11/05/2013 |
From: | Pascarelli R J Plant Licensing Branch II |
To: | Gatlin T D South Carolina Electric & Gas Co |
References | |
TAC MF1900, TAC MF1901, TAC MF1902 | |
Download: ML13301A767 (14) | |
Similar Documents at Summer | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML24026A2802024-01-25025 January 2024
[Table view]Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML19091A0582019-01-10010 January 2019 Draft Application Related to April 4, 2019, Pre-Application Public Meeting for Two Proposed Relief Request ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML15176A3152015-08-12012 August 2015 Alternative Request Regarding Snubbers ML15007A1612015-01-0909 January 2015 Alternative Request During the Fourth Ten-Year Inservice Inspection Interval ML14079A6142014-03-24024 March 2014 Acceptance Review Concerning Alternative Request RR-4-05 Alternative Weld Repair for Reactor Vessel Upper Head Penetrations R-4-04 ML13301A7672013-11-0505 November 2013 Relief Request (RR-4-01, RR-4-02, RR-4-03) for Third and Fourth Ten- Year Inservice Inspection Interval (TAC Nos. MF1900, 1901, 1902) ML13177A0782013-07-0808 July 2013 Acceptance Review Concerning Relief from Limited Pressurizer Surge Nozzle-to-Vessel Examination (TAC No. MF1848)(RC-13-0068) ML13101A3332013-04-19019 April 2013 Alternative RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (TAC No. ME9851) (RC-12-0165) RC-12-0179, Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients2012-11-16016 November 2012 Relief Request RR-III-09 Request for Information Fatigue Crack Growth and Transients RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration2012-10-30030 October 2012 Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration ML12289A0502012-10-17017 October 2012 Alternative RR-III-08 for Third 10-Year Inservice Inspection Interval ML0630705402006-11-21021 November 2006 Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code., RC-06-0117, Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04)2006-06-20020 June 2006 Relief, Request to Use Alternatives to ASME Code Requirements in VCSNS Third Inservice Inspection Interval (RR-III-03, RR-III-04) ML0601004482006-01-20020 January 2006 Relief, Second 10-year Inservice Inspection, Requests for Relief RR-II-9, RR-II-10, & RR-II-12 ML0523006162005-09-0606 September 2005 Relief Request, RI-ISI Program ML0512901982005-05-10010 May 2005 Relief, Relief Request No. RR-III-01 Snubber Visual Examination and Functional Testing RC-04-0148, Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02)2004-09-0808 September 2004 Request to Use Alternatives to ASME Code Requirements in Plant Third Inservice Inspection Interval (RR-111-01, RR-111-02) ML0410503842004-04-0707 April 2004 Request to Use Alternative to ASME Code Requirements in VCSNS Third Inservice Inspection Interval ML0404203862004-02-11011 February 2004 2/11/04, Virgil C. Summer Nuclear Station, Bwn, Relief Request RR-11-16 Regarding Reduced Ultrasonic Testing, TAC No. MC0108 RC-03-0234, Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262)2003-11-13013 November 2003 Submittal of Information Requested by NRC for Evaluation of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RR-II-18 (0-C-03-0262) RC-03-0223, Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262)2003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-15, RR-II-18 (0-C-03-0262) ML0330101602003-10-23023 October 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-11,RR-II-12(0-C-02-3202) RC-03-0196, Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-192003-09-16016 September 2003 Resubmittal of Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI (C-03-0262), RR-II-15, RR-II-16, RR-II-17, RR-II-19 RC-03-0191, Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI2003-09-11011 September 2003 Withdrawal of Request for Relief (0-C-02-3202) (RR-II-09, RR-II-10, RR-II-11, and RR-II-12) Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI RC-03-0142, Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-212003-07-11011 July 2003 Request for Use Alternatives to ASME Boiler & Pressure Vessel Code, Section XI, RR-II-15, RR-11-15, RR-II-17, RR-II-18, RR-II-19, RR-II-20 and RR-II-21 ML0317402382003-06-13013 June 2003 Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR-II-13 (0-C-03-0883) 2024-01-25 Category:Letter MONTHYEARML24038A0322024-02-0707 February 2024
[Table view](Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07 Category:Safety Evaluation MONTHYEARML23250A3112023-09-20020 September 2023
[Table view]Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23062A7292023-03-31031 March 2023 Deferral of Pressurizer and Steam Generator Weld Examinations ML23012A0152023-02-21021 February 2023 Issuance of Amendment No. 224 to Change Nozzle Blockage Testing Requirement for Reactor Building Spray System ML22341A1972022-12-15015 December 2022 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval ML22244A1722022-09-22022 September 2022 Issuance of Amendment No. 223 to Relocate Main Steam Isolation Valve Isolation Times to the Updated Final Safety Analysis Report ML22160A3652022-08-16016 August 2022 Issuance of Amendment No. 222 to Relocate Selected Surveillance Frequencies to a Risk-Informed Licensee Controlled Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21319A2622021-12-28028 December 2021 Issuance of Amendment No. 220 to Relocate Unit Staff Qualifications from Technical Specification to Quality Assurance Program Description ML21188A3322021-08-10010 August 2021 Correction to Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report ML21173A1632021-08-0606 August 2021 Authorization and Safety Evaluation for Alternative Request No. RR-4-25 ML21112A1082021-06-30030 June 2021 Issuance of Amendment No. 219 to Modify Technical Specification 6.9.1.11, Core Operating Limits Report ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20248H3782020-12-0202 December 2020 Alternative Requests RR 4-19 and RR-4-21 Related to the In-Service Testing Program (Epids L-2020-LLR-0077 and L-2020-LLR-0078) ML19361A0702020-01-24024 January 2020 Relief Request Regarding Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography (RR-4-20) ML19276D3772019-12-11011 December 2019 Issuance of Amendment Revise Company Name to Dominion Energy South Carolina, Inc. ML19242E0272019-09-0606 September 2019 Relief Request (RR-4-22) for Use of ASME Code Case N-513-4 ML19140A4732019-06-0404 June 2019 Relief Request (RR-4-23) to Utilize Code Case N-513-4 ML19080A1032019-04-30030 April 2019 Issuance of Amendment No. 215 Technical Specification 3.8.2, D.C. Sources - Operating ML19074A2222019-04-10010 April 2019 Issuance of Amendment No. 214 Removes the Expired One-Time Extension to Surveillance Requirement 4.3.3.6 and Removes the Index from Technical Specifications ML19023A4202019-03-0707 March 2019 Issuance of Amendment Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 ML19035A2992019-02-26026 February 2019 Relief Request (RR-4-18) for Use of NRC Generic Letter 90-05 ML19030B8272019-02-13013 February 2019 Relief Request (RR-4-17) for Use of ASME Code Case N-513-3 ML19003A1882019-01-18018 January 2019 Relief Request (RR-4-16) for Use of ASME Code Case N-513-4 and NRC Generic Letter 90-05 ML18345A0602018-12-17017 December 2018 Relief Request Regarding Use of a Performance Based Testing Frequency for Pressure Isolation Valves (RR-4-14) ML18296A1112018-11-0808 November 2018 Relief Request (RR-4-15) for Use of ASME Code Case N-513-4 ML18253A1152018-10-0505 October 2018 Issuance of Amendment No. 212 Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit ML18260A0272018-09-25025 September 2018 Issuance of Exigent Amendment One Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation ML18255A2562018-09-24024 September 2018 Correction to the Safety Evaluation and the Orders Approving Indirect Transfer of Licenses ML18129A0762018-08-30030 August 2018 Transmittal Letter and Safety Evaluation Related to the Orders Approving Indirect Transfer of Licenses for Units 1, 2, 3 and the Independent Spent Fuel Storage Installation ML18186A5882018-07-19019 July 2018 Relief Request (RR-4-13) for Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds. ML18141A6682018-06-28028 June 2018 Issuance of Amendment No. 210, Revise Technical Specification 6.8.4.g for Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML17206A4122017-10-0404 October 2017 Issuance of Amendment TSTF-411, Revision 1, Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P-A). ML17089A6172017-08-0101 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17011A0502017-03-0909 March 2017 Issuance of Amendment to Revise Completion Date of Implementation Milestone 8 of the Cyber Security Plan ML17031A0152017-02-0909 February 2017 Relief from the Requirements of the ASME Code Regarding Service Water System Piping ML16348A2002017-01-18018 January 2017 Issuance of Amendment to Revise Technical Specification 3.5.4 Limiting Condition for Operation Refueling Water Storage Tank ML16264A4112016-10-26026 October 2016 Issuance of Amendment to Revise Technical Specification 3/4.7.1.2, Emergency Feedwater System ML16161A0452016-07-0101 July 2016 Relief from the Requirements of the ASME Code ML15231A6052016-05-16016 May 2016 Issuance of Amendment to Change Licensing Basis to Incorporate a Supplemental Analysis to the Steam Generator Tube Rupture Accident ML16104A2952016-05-0606 May 2016 Issuance of Amendment to Adopt TSTF-523, Revision 2 ML16124A8972016-05-0606 May 2016 Relief from the Requirements of the ASME Code ML16063A0902016-03-0909 March 2016 Issuance of Exigent Amendment Regarding Technical Specification 3.7.1.2 ML15208A0292015-10-15015 October 2015 Issuance of Amendment ML15222A5422015-09-0101 September 2015 Alternative Request Regarding Root Mean Square Depth Sizing Requirements ML15170A0872015-08-18018 August 2015 Issuance of Amendment to Revise the Radiation Emergency Plan ML15176A3152015-08-12012 August 2015 Alternative Request Regarding Snubbers ML15063A3552015-04-13013 April 2015 Issuance of Amendment to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6 2023-09-20 |
Retrieved from "https://kanterella.com/w/index.php?title=ML13301A767&oldid=433497"