| {{#Wiki_filter:March 15, 2023 LICENSEE: Florida Power and Light FACILITIES: St. Lucie Plant, Unit Nos. 1 and 2 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 | | {{#Wiki_filter:March 15, 2023 LICENSEE: |
| | Florida Power and Light FACILITIES: St. Lucie Plant, Unit Nos. 1 and 2 Turkey Point Nuclear Generating, Unit Nos. 3 and 4 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
| ==SUMMARY== | | ==SUMMARY== |
| OF FEBRUARY 9, 2023, MEETING WITH FLORIDA POWER AND LIGHT ON ST. LUCIE AND TURKEY POINT IMPROVED TECHNICAL SPECIFICATIONS CONVERSION LICENSE AMENDMENT REQUESTS (EPID NOS. L-2021-LLI-0000 AND L-2021-LLI-0002) | | OF FEBRUARY 9, 2023, MEETING WITH FLORIDA POWER AND LIGHT ON ST. LUCIE AND TURKEY POINT IMPROVED TECHNICAL SPECIFICATIONS CONVERSION LICENSE AMENDMENT REQUESTS (EPID NOS. L-2021-LLI-0000 AND L-2021-LLI-0002) |
| Line 27: |
Line 27: |
| The following items for the St. Lucie review were discussed during the meeting: | | The following items for the St. Lucie review were discussed during the meeting: |
| NRC and licensee staff provided a current status of the review effort. | | NRC and licensee staff provided a current status of the review effort. |
| o NRC staff engaged in follow up discussion with the licensee in support of the review of Section 3.7 (Plant Systems). The licensee proposed not having a minimum value for a surveillance related the emergency core cooling system (ECCS) area ventilation system. NRC staff expressed plans to request that the licensee provide justification for the proposed deviation. | | o NRC staff engaged in follow up discussion with the licensee in support of the review of Section 3.7 (Plant Systems). The licensee proposed not having a minimum value for a surveillance related the emergency core cooling system (ECCS) area ventilation system. NRC staff expressed plans to request that the licensee provide justification for the proposed deviation. |
| o NRC staff continued discussion with the licensee regarding the licensees proposed freedom of movement test associated with surveillance requirement (SR) 3.1.4.4, which is used to verify control rod operability. | | o NRC staff continued discussion with the licensee regarding the licensees proposed freedom of movement test associated with surveillance requirement (SR) 3.1.4.4, which is used to verify control rod operability. |
| o NRC staff and licensee staff continued discussion regarding the water level value for the Unit 1 facility. This is related to NRC staff concerns pertaining to Section 3.4 (Reactor Coolant System). | | o NRC staff and licensee staff continued discussion regarding the water level value for the Unit 1 facility. This is related to NRC staff concerns pertaining to Section 3.4 (Reactor Coolant System). |
| | |
| The following items for the Turkey Point review effort were also discussed: | | The following items for the Turkey Point review effort were also discussed: |
| Continuing discussion was held between NRC and licensee staff regarding the licensees plan to remove setpoints from the Technical Specifications to the licensee-controlled Technical Requirement Manual. | | Continuing discussion was held between NRC and licensee staff regarding the licensees plan to remove setpoints from the Technical Specifications to the licensee-controlled Technical Requirement Manual. |
| o NRC staff and the licensee discussed using an audit to allow more time to review issue. | | o NRC staff and the licensee discussed using an audit to allow more time to review issue. |
| o The licensee communicated, to NRC staff, the possibility of putting the setpoints back into the Technical Specifications. | | o The licensee communicated, to NRC staff, the possibility of putting the setpoints back into the Technical Specifications. |
| | |
| There were no members of the public in attendance for this meeting. | | There were no members of the public in attendance for this meeting. |
| For questions or comments, please contact me at 301-415-7410, or Natreon.Jordan@nrc.gov. | | For questions or comments, please contact me at 301-415-7410, or Natreon.Jordan@nrc.gov. |
| /RA/
| | /RA/ |
| Natreon J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 | | Natreon J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | List of Attendees cc: Listserv |
|
| |
|
| List of Attendees cc: Listserv
| | Enclosure LIST OF ATTENDEES FEBRUARY 9, 2023, PUBLIC MEETING WITH FPL/NEXTERA ST. LUCIE PLANT, UNIT NOS. 1 AND 2 TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 IMPROVED TECHNICAL SPECIFICATIONS CONVERSION Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC) |
| | | Craig Harbuck NRC Ravi Grover NRC Matthew Hamm NRC Vic Cusumano NRC Josh Wilson NRC Andrea Russell NRC Steve Smith NRC Bill Roggenbrodt NRC John Zhao NRC David Rahn NRC Tony Sierra NRC Tarico Sweat NRC Michael Davis Florida Power and Light Company (FPL) |
| LIST OF ATTENDEES FEBRUARY 9, 2023, PUBLIC MEETING WITH FPL/NEXTERA ST. LUCIE PLANT, UNIT NOS. 1 AND 2 TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 IMPROVED TECHNICAL SPECIFICATIONS CONVERSION Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC) | | Jarrett Mack FPL Fred Pollack FPL Michael Cohen FPL Gregg Ellis Excel Services Corporation (Excel) |
| Craig Harbuck NRC Ravi Grover NRC Matthew Hamm NRC Vic Cusumano NRC Josh Wilson NRC Andrea Russell NRC Steve Smith NRC Bill Roggenbrodt NRC John Zhao NRC David Rahn NRC Tony Sierra NRC Tarico Sweat NRC Michael Davis Florida Power and Light Company (FPL) | | Jerry Riste Excel David Bice Excel Christina Long Excel Phil Ballard Excel |
| Jarrett Mack FPL Fred Pollack FPL Michael Cohen FPL Gregg Ellis Excel Services Corporation (Excel) | |
| Jerry Riste Excel David Bice Excel Christina Long Excel Phil Ballard Excel Enclosure | |
|
| |
|
| Package: ML23066A095 Meeting Notice: ML23026A307 Meeting Summary: ML23066A087 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME NJordan RButler DWrona DATE 03/06/2023 03/14/2023 03/15/2023}} | | Package: ML23066A095 Meeting Notice: ML23026A307 Meeting Summary: ML23066A087 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME NJordan RButler DWrona DATE 03/06/2023 03/14/2023 03/15/2023}} |
Letter Sequence Meeting |
|---|
EPID:L-2021-LLI-0000, TSTF-500, TSTF-505, TSTF-425, TSTF-360, TSTF-422, TSTF-500, TSTF-360, TSTF-500 (Approved, Closed) EPID:L-2021-LLI-0002, (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML21265A2842021-09-15015 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1432, Revision 5 Project stage: Request ML21265A2942021-09-15015 September 2021 Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 Project stage: Request ML21265A2932021-09-15015 September 2021 Enclosure 2 - Volume 8 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.3 Instrumentation, Revision 0 Project stage: Request ML21265A2912021-09-15015 September 2021 Enclosure 2 - Volume 6 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.1 Reactivity Control Systems, Revision 0 Project stage: Request ML21265A2902021-09-15015 September 2021 Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 Project stage: Request ML21265A2962021-09-15015 September 2021 Enclosure 2 - Volume 11 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.6 Containment Systems, Revision 0 Project stage: Request ML21265A2952021-09-15015 September 2021 Enclosure 2 - Volume 10 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 0 Project stage: Request ML21265A2972021-09-15015 September 2021 Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 Project stage: Request ML21265A2882021-09-15015 September 2021 Enclosure 2 - Volume 3 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 1.0 Use and Application, Revision 0 Project stage: Other ML21265A2852021-09-15015 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1432, Revision 5 Project stage: Request L-2021-159, Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal2021-09-15015 September 2021 Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal Project stage: Request ML21265A2982021-09-15015 September 2021 Enclosure 2 - Volume 13 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.8 Electrical Systems, Revision 0 Project stage: Request ML21265A3822021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems Project stage: Request ML21265A3812021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS) Project stage: Request ML21265A3852021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling Operations Project stage: Request L-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal2021-09-22022 September 2021 Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal Project stage: Request ML21265A3842021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems Project stage: Request ML21265A3792021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, Instrumentation Project stage: Request ML21265A3772021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control Systems Project stage: Request ML21265A3802021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS) Project stage: Request ML21265A3712021-09-22022 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request ML21265A3702021-09-22022 September 2021, 23 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request PMNS20211440, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-11-0808 November 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications Project stage: Request ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 Project stage: Acceptance Review ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review L-2022-000, License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG- 1432 Revision 5 - Request for Supplemental Information (Rsi) Response Project stage: Supplement L-2022-010, License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response Project stage: Supplement NUREG-1431, Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 52022-02-0303 February 2022 Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) Project stage: Meeting ML22054A1382022-02-16016 February 2022 February 24, 2022 ITS Public Meeting Material - Florida Power and Light Project stage: Meeting ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensees Responses to ITS Conversion LAR and RAIs Project stage: Meeting NUREG-1432, Acceptance of License Amendment Request for the Technical Specifications Conversion to NUREG-1432, Revision 52022-02-23023 February 2022 Acceptance of License Amendment Request for the Technical Specifications Conversion to NUREG-1432, Revision 5 Project stage: Acceptance Review PMNS20220112, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-02-23023 February 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220139, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-02-23023 February 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220236, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-03-11011 March 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220321, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-0505 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220427, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-27027 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22154A4992022-04-27027 April 2022, 7 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Request ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22154A5182022-06-0909 June 2022 Summary of June 2, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Request PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22228A1982022-06-28028 June 2022, 22 August 2022 Summary of July 14, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22228A2432022-07-14014 July 2022, 23 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Request 2022-03-21
[Table View] |
Text
March 15, 2023 LICENSEE:
Florida Power and Light FACILITIES: St. Lucie Plant, Unit Nos. 1 and 2 Turkey Point Nuclear Generating, Unit Nos. 3 and 4
SUBJECT:
SUMMARY
OF FEBRUARY 9, 2023, MEETING WITH FLORIDA POWER AND LIGHT ON ST. LUCIE AND TURKEY POINT IMPROVED TECHNICAL SPECIFICATIONS CONVERSION LICENSE AMENDMENT REQUESTS (EPID NOS. L-2021-LLI-0000 AND L-2021-LLI-0002)
On February 9, 2023, a virtual observation public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Florida Power and Light (FPL, the licensee). The purpose of the meeting was to discuss the license amendment requests (LARs) for St. Lucie Plant, Unit Nos. 1 and 2 (St. Lucie) to convert to Improved Technical Specifications (ITS) in accordance with NUREG-1432, Standard Technical Specifications - Combustion Engineering Plants, Revision 5 (Improved Standard Technical Specifications (ISTS)) and Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point) to convert to ITS in accordance with NUREG-1431, Standard Technical Specifications - Westinghouse Plants, Revision 5. The meeting notice and agenda, dated January 26, 2023, are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML23026A307. A list of attendees is provided in the Enclosure.
The following items for the St. Lucie review were discussed during the meeting:
NRC and licensee staff provided a current status of the review effort.
o NRC staff engaged in follow up discussion with the licensee in support of the review of Section 3.7 (Plant Systems). The licensee proposed not having a minimum value for a surveillance related the emergency core cooling system (ECCS) area ventilation system. NRC staff expressed plans to request that the licensee provide justification for the proposed deviation.
o NRC staff continued discussion with the licensee regarding the licensees proposed freedom of movement test associated with surveillance requirement (SR) 3.1.4.4, which is used to verify control rod operability.
o NRC staff and licensee staff continued discussion regarding the water level value for the Unit 1 facility. This is related to NRC staff concerns pertaining to Section 3.4 (Reactor Coolant System).
The following items for the Turkey Point review effort were also discussed:
Continuing discussion was held between NRC and licensee staff regarding the licensees plan to remove setpoints from the Technical Specifications to the licensee-controlled Technical Requirement Manual.
o NRC staff and the licensee discussed using an audit to allow more time to review issue.
o The licensee communicated, to NRC staff, the possibility of putting the setpoints back into the Technical Specifications.
There were no members of the public in attendance for this meeting.
For questions or comments, please contact me at 301-415-7410, or Natreon.Jordan@nrc.gov.
/RA/
Natreon J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250, 50-251, 50-335, and 50-389
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES FEBRUARY 9, 2023, PUBLIC MEETING WITH FPL/NEXTERA ST. LUCIE PLANT, UNIT NOS. 1 AND 2 TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 IMPROVED TECHNICAL SPECIFICATIONS CONVERSION Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC)
Craig Harbuck NRC Ravi Grover NRC Matthew Hamm NRC Vic Cusumano NRC Josh Wilson NRC Andrea Russell NRC Steve Smith NRC Bill Roggenbrodt NRC John Zhao NRC David Rahn NRC Tony Sierra NRC Tarico Sweat NRC Michael Davis Florida Power and Light Company (FPL)
Jarrett Mack FPL Fred Pollack FPL Michael Cohen FPL Gregg Ellis Excel Services Corporation (Excel)
Jerry Riste Excel David Bice Excel Christina Long Excel Phil Ballard Excel
Package: ML23066A095 Meeting Notice: ML23026A307 Meeting Summary: ML23066A087 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME NJordan RButler DWrona DATE 03/06/2023 03/14/2023 03/15/2023