|
|
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:WESTINGHOUSE NON-PROPREITARY CLASS 3 Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Division of Fuel Management Direct tel: 803-331-9425 Office of Nuclear Material Safety and Safeguards e-mail: malekem@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref: | | {{#Wiki_filter:WESTINGHOUSE NON-PROPREITARY CLASS 3 |
| Rockville, Maryland 20852-2738 Our ref: LTR-RAC-21-57 Security-Related Information Notice Enclosure 2 to this letter contains security related information September 20, 2021 which is to be whithheld from public disclosure in accordance with RIS 2005-31. The balance of this letter may be considered public upon removal of Enclosure 2 | | |
| | Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA |
| | |
| | Division of Fuel Management Direct tel: 803-331-9425 Office of Nuclear Material Safety and Safeguards e-mail: malekem@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref: |
| | Rockville, Maryland 20852-2738 Our ref: LTR -RAC 57 |
| | |
| | Security-Related Information Notice Enclosure 2 to this letter contains security related information September 20, 2021 which is to be whithheld from public disclosure in accordance with RIS 2005-31. The balance of this letter may be considered public upon removal of Enclosure 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| WESTINGHOUSE REVISED SNM-1107 LICENSE RENEWAL APPLICATION Westinghouse Electric Company LLC (Westinghouse) is pleased to provide the enclosed revised SNM-1107 License Renewal Application. The revision provides updates to the following information in the SNM-1107 License Renewal Application: | | WESTINGHOUSE REVISED SNM-1107 LICENSE RENEWAL APPLICATION |
| | |
| | Westinghouse Electric Company LLC (Westinghouse) is pleased to provide the enclosed revised SNM - |
| | 1107 License Renewal Application. The revision provides updates to the following information in the SNM-1107 License Renewal Application: |
| * Updated data on existing well monitoring network | | * Updated data on existing well monitoring network |
| * Addition of environmental risk reduction commitments | | * Addition of environmental risk reduction commitments |
| * Addition of exemption approved in Amendment 27 of SNM-1107 | | * Addition of exemption approved in Amendment 27 of SNM-1107 |
| * Minor editorial corrections and clarifications This page change revision does not result in a degradation of any safety commitments in the License Application, does not impair Westinghouses ability to meet applicable Federal Regulations, and does not conflict with any condition specifically stated in the License. A public version of the revised SNM-1107 license renewal application is included as Enclosure 1. A copy of the Security-Related page 11 is included as Enclosure 2. | | * Minor editorial corrections and clarifications |
| | |
| | This page change revision does not result in a degradation of any safety commitments in the License Application, does not impair Westinghouses ability to meet applicable Federal Regulations, and does not conflict with any condition specifically stated in the License. A public version of the revised SNM -1107 license renewal application is included as Enclosure 1. A copy of the Security-Related page 11 is included as Enclosure 2. |
| | |
| If you have any questions, please contact me at (803) 331-9425. | | If you have any questions, please contact me at (803) 331-9425. |
| Elise Malek Elise Malek (Sep 20, 2021 14:22 EDT) | | Elise Malek Elise Malek (Sep 20, 2021 14:22 EDT) |
| Elise Malek Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM-1107 : SNM-1107 License Renewal Application (Non-Proprietary Class 3, 114 pages) : SNM-1107 License Renewal Application Page 11 (Security Related Information, 2 pages) cc: | | Elise Malek Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM -1107 |
| | : SNM-1107 License Renewal Application (Non-Proprietary Class 3, 114 pages) : SNM-1107 License Renewal Application Page 11 (Security Related Information, 2 pages) cc: |
| Mr. Thomas Vukovinsky Mr. David Tiktinsky | | Mr. Thomas Vukovinsky Mr. David Tiktinsky |
| © 2021 Westinghouse Electric Company LLC All Rights Reserved}}
| | |
| | © 2021 Westinghouse Electric Company LLC All Rights Reserved}} |
Letter Sequence Other |
---|
EPID:L-2017-RNW-0016, Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility (Open) |
|
MONTHYEARML20202A6782020-07-20020 July 2020 Westinghouse Response to Schedule Update for the License Renewal Review Project stage: Other ML20259A1792020-07-30030 July 2020 Final Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility Project stage: Request ML20294A0562020-07-30030 July 2020 Westinghouse Columbia Fuel Fabrication Facility Hf Spiking Station 1 Assessment Report Project stage: Request ML20259A2212020-07-30030 July 2020 Fuel Fabrication Facility Technetium (Tc-99) Source Investigation Report Project stage: Request ML20275A2512020-11-0303 November 2020 Letter to Westinghouse with RAIs Regarding Environmental Review for Proposed Renewal of Cfff License Project stage: RAI ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan Project stage: Response to RAI ML21026A0622021-01-28028 January 2021 Letter: Revised EIS Schedule to WEC-January 2021 Project stage: Other ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments Project stage: Other ML21138A9262021-05-28028 May 2021 Westinghouse EIS Schedule Letter Project stage: Other ML21263A2182021-09-20020 September 2021 SNM-1107 License Renewal Application Project stage: Other ML21263A0742021-09-20020 September 2021 Flyer Announcing Reopening of Public Comment Period for the Draft EIS for Westinghouse Columbia Fuel Fabrication Facility Project stage: Request ML21263A2172021-09-20020 September 2021 Submittal of Westinghouse Revised SNM-1107 License Renewal Application Project stage: Other ML22033A0712022-02-18018 February 2022 Westinghouse License Renewal RAIs (Environmental) Memo (Public) Project stage: RAI ML22033A0702022-02-18018 February 2022 Westinghouse License Renewal RAIs (Environmental) Project stage: Request ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement Project stage: Response to RAI ML22074A1292022-03-15015 March 2022 Westinghouse - Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement Project stage: Response to RAI ML22080A2822022-03-21021 March 2022 Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement Project stage: Response to RAI ML22094A0972022-04-19019 April 2022 Westinghouse Schedule Extension Letter Project stage: Other ML22157A3482022-09-12012 September 2022 Westinghouse License Renewal Project stage: Request ML22157A3492022-09-12012 September 2022 Westinghouse Electric Company, LLC - Renewal of Materials License SNM-1107 (Enterprise Project Identifier: L-2017-RNW-0016) Project stage: Other 2021-05-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23055A3022023-03-0808 March 2023 Letter - Westinghouse License Transfer Interim Threshold Determination ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan 2024-09-18
[Table view] |
Text
WESTINGHOUSE NON-PROPREITARY CLASS 3
Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA
Division of Fuel Management Direct tel: 803-331-9425 Office of Nuclear Material Safety and Safeguards e-mail: malekem@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref:
Rockville, Maryland 20852-2738 Our ref: LTR -RAC 57
Security-Related Information Notice Enclosure 2 to this letter contains security related information September 20, 2021 which is to be whithheld from public disclosure in accordance with RIS 2005-31. The balance of this letter may be considered public upon removal of Enclosure 2
SUBJECT:
WESTINGHOUSE REVISED SNM-1107 LICENSE RENEWAL APPLICATION
Westinghouse Electric Company LLC (Westinghouse) is pleased to provide the enclosed revised SNM -
1107 License Renewal Application. The revision provides updates to the following information in the SNM-1107 License Renewal Application:
- Updated data on existing well monitoring network
- Addition of environmental risk reduction commitments
- Addition of exemption approved in Amendment 27 of SNM-1107
- Minor editorial corrections and clarifications
This page change revision does not result in a degradation of any safety commitments in the License Application, does not impair Westinghouses ability to meet applicable Federal Regulations, and does not conflict with any condition specifically stated in the License. A public version of the revised SNM -1107 license renewal application is included as Enclosure 1. A copy of the Security-Related page 11 is included as Enclosure 2.
If you have any questions, please contact me at (803) 331-9425.
Elise Malek Elise Malek (Sep 20, 2021 14:22 EDT)
Elise Malek Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM -1107
- SNM-1107 License Renewal Application (Non-Proprietary Class 3, 114 pages) : SNM-1107 License Renewal Application Page 11 (Security Related Information, 2 pages) cc:
Mr. Thomas Vukovinsky Mr. David Tiktinsky
© 2021 Westinghouse Electric Company LLC All Rights Reserved