ML24080A507

From kanterella
Jump to navigation Jump to search

Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan
ML24080A507
Person / Time
Site: Westinghouse
Issue date: 03/20/2024
From: Ferguson J
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML24080A506 List:
References
LTR-RAC-24-21
Download: ML24080A507 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Electric Company LLC Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA

© 2024 Westinghouse Electric Company LLC All Rights Reserved Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Direct tel: 803-647-1929 Direct fax:

e-mail: fergusjb@westinghouse.com Your ref:

Our ref: LTR-RAC-24-21 Security Related Information Notice The enclosure to this letter contains security related information which is to be withheld from public disclosure in accordance with 10 CFR 2.390. The balance of this letter may be considered public upon removal of the enclosure.

March 20, 2024

SUBJECT:

Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan

Dear Director,

In accordance with 10 CFR 70.32(i), Westinghouse Electric Company LLC (Westinghouse) is requesting U.S.

Nuclear Regulatory Commission prior approval for one change to the enclosed Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan, Revision 24 (Plan). The remainder of the changes to the Plan do not decrease the effectiveness of the Plan. The revision requiring NRC prior approval is a change to the backup method of communication designated in Section 6.2.1 of the plan. Revision 23 of the CFFF Site Emergency Plan will remain in effect until Westinghouses request is approved by the NRC.

If you have any questions, please contact Steve Carver of my staff at (803) 647-3531.

Sincerely, Jeffery B. Ferguson Manager Regulatory Compliance and Environmental, Health and Safety Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151, License SNM -1107

Enclosure:

Revision 24 to the Site Emergency Plan for The Columbia Fuel Fabrication Facility, cc:

NRC, Ms. Jennifer Tobin NRC, Mr. Thomas Vukovinsky Jeffery Ferguson (Mar 20, 2024 17:34 EDT)

Jeffery Ferguson