ML23031A293: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:IR Report 8 Baseline Inspection Completion with Certification Information By Site Region No: 2                       Site: 07000143 - Nuclear Fuel Services, Inc.           IPC Cycle: 2022 (NFS)
{{#Wiki_filter:IR Report 8 Baseline Inspection Completion with Certification Information By Site
IMC Min Sample       Completion Procedure       IPE Code   Title                                           Frequency   Completed Sample               %   Status             Note   Certify Date / By 96001           SG         NRC FOF Insp CAT I Fuel Cycle                   Triennial           1             0       0%   Complete             C   06/09/2022 - Berry, Joshua K Site Totals:                                                                                                   0 Region Totals:
 
Region No: 2 Site: 07000143 - Nuclear Fuel Services, Inc. IPC Cycle: 2022 (NFS)
IMC Min Sample Completion Procedure IPE Code Title Frequency Completed Sample % Status Note Certify Date / By 96001 SG NRC FOF Insp CAT I Fuel Cycle Triennial 1 0 0% Complete C 06/09/2022 - Berry, Joshua K
 
Site Totals: 0 Region Totals:
Report Totals:
Report Totals:
C: Complete                                                                                 NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the C1: Complete - by reference iaw IMC 0306                                                   total between 2020 and 2022.
 
C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306               *Procedure was marked complete, however not all sub procedures may have been completed. See IMC C4: Complete - in previous year(s)                                                         0306 for appropriate comments.
C: Complete NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the C1: Complete - by reference iaw IMC 0306 total between 2020 and 2022.
C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/26/2023 11:19:28 AM                                                                                                                                                               Page 1 of 1}}
C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 *Procedure was marked complete, however not all sub procedures may have been completed. See IMC C4: Complete - in previous year(s) 0306 for appropriate comments.
C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/26/2023 11:19:28 AM Page 1 of 1}}

Latest revision as of 09:58, 15 November 2024

2022 IP 96001 IR Report 8
ML23031A293
Person / Time
Issue date: 02/02/2023
From:
Security Performance Evaluation Branch
To:
Shared Package
ML23031A294 List:
References
Download: ML23031A293 (1)


Text

IR Report 8 Baseline Inspection Completion with Certification Information By Site

Region No: 2 Site: 07000143 - Nuclear Fuel Services, Inc. IPC Cycle: 2022 (NFS)

IMC Min Sample Completion Procedure IPE Code Title Frequency Completed Sample % Status Note Certify Date / By 96001 SG NRC FOF Insp CAT I Fuel Cycle Triennial 1 0 0% Complete C 06/09/2022 - Berry, Joshua K

Site Totals: 0 Region Totals:

Report Totals:

C: Complete NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the C1: Complete - by reference iaw IMC 0306 total between 2020 and 2022.

C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 *Procedure was marked complete, however not all sub procedures may have been completed. See IMC C4: Complete - in previous year(s) 0306 for appropriate comments.

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle 1/26/2023 11:19:28 AM Page 1 of 1