IR 05000335/2023420

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000335/2023420 and 05000389/2023420
ML23075A146
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/21/2023
From: Clark J
Security Performance Evaluation Branch
To: Coffey B
Florida Power & Light Co
Shared Package
ML23075A148 List:
References
IR 2023420
Download: ML23075A146 (6)


Text

SUBJECT:

ST. LUCIE PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000335/2023420 AND 05000389/2023420

Dear Bob Coffey:

On February 14, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at St. Lucie Plant Units 1 and 2, and discussed the results of this inspection with Orlando Hernandez and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000335 and 05000389

License Numbers:

DPR-67 and NPF-16

Report Numbers:

05000335/2023420 and 05000389/2023420

Enterprise Identifier:

I-2023-420-0000

Licensee:

Florida Power and Light Company

Facility:

St. Lucie Plant, Units 1 and 2

Location:

Jensen Beach, Florida

Inspection Dates:

January 09, 2023, to February 14, 2023

Inspectors:

D. Bradfield, Team Leader, NSIR

J. Brown, Sr. Physical Security Inspector, RII

P. Negrete, Physical Security Inspector, NSIR

R. Ober, Sr. Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at St. Lucie Plant Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125994.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 14, 2023, the inspectors presented the security baseline inspection results to Orlando Hernandez and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 02445610

AR 02445687

AR 02445689

AR 02445691

AR 02447382

Corrective Action Assignments

2/14/2023

Corrective Action

Documents

Resulting from

Inspection

RWT02445503

(17 subtasks)

Roll-up developed to track enhancements through 2023

Inspection activities

2/14/2023

Florida Power and

Light St. Lucie

St. Lucie Plant Target Sets

Florida Power and

Light St. Lucie

Strategy Brief

04/22/2019

Florida Power and

Light St. Lucie

St. Lucie Table of Security Personnel

10/10/2022

Florida Power and

Light St. Lucie

PSL Adversary Timelines

08/04/20

Florida Power and

Light St. Lucie

Responder Timelines

None Listed

Miscellaneous

Nuclear Fleet

Security Lesson

Plan

Room Clearing

Rev. 02

Florida Power and

Light St. Lucie

Physical Security Plan, Training And Qualification Plan,

Safeguards Contingency Plan And Independent Spent Fuel

Storage Installation Security Program

Revision 23

71130.03

Procedures

Florida Power and

Light St. Lucie

Defensive Strategies

06/29/2022

ML23075A148; ML23075A146

OFFICE

NSIR/DSO/SPEB

/ETC

NSIR/DSO/SPEB

/ETC

R-II/DRS/PSB

NSIR/DSO/SPEB

/ETA

NAME

ROber

DBradfield

JBrown

JClark

DATE

Mar 20, 2023

Mar 21, 2023

Mar 21, 2023

Mar 21, 2023