SUBJECT:
ST. LUCIE PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000335/2023420 AND 05000389/2023420
Dear Bob Coffey:
On February 14, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at St. Lucie Plant Units 1 and 2, and discussed the results of this inspection with Orlando Hernandez and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000335 and 05000389
License Numbers:
Report Numbers:
05000335/2023420 and 05000389/2023420
Enterprise Identifier:
I-2023-420-0000
Licensee:
Florida Power and Light Company
Facility:
St. Lucie Plant, Units 1 and 2
Location:
Jensen Beach, Florida
Inspection Dates:
January 09, 2023, to February 14, 2023
Inspectors:
D. Bradfield, Team Leader, NSIR
J. Brown, Sr. Physical Security Inspector, RII
P. Negrete, Physical Security Inspector, NSIR
R. Ober, Sr. Physical Security Inspector, NSIR
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
Office of Nuclear Security and Incident Response
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at St. Lucie Plant Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125994.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 14, 2023, the inspectors presented the security baseline inspection results to Orlando Hernandez and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AR 02445687
AR 02445691
Corrective Action Assignments
2/14/2023
Corrective Action
Documents
Resulting from
Inspection
RWT02445503
(17 subtasks)
Roll-up developed to track enhancements through 2023
Inspection activities
2/14/2023
Florida Power and
Light St. Lucie
St. Lucie Plant Target Sets
Florida Power and
Light St. Lucie
Strategy Brief
04/22/2019
Florida Power and
Light St. Lucie
St. Lucie Table of Security Personnel
10/10/2022
Florida Power and
Light St. Lucie
PSL Adversary Timelines
08/04/20
Florida Power and
Light St. Lucie
Responder Timelines
None Listed
Miscellaneous
Nuclear Fleet
Security Lesson
Plan
Room Clearing
Rev. 02
Florida Power and
Light St. Lucie
Physical Security Plan, Training And Qualification Plan,
Safeguards Contingency Plan And Independent Spent Fuel
Storage Installation Security Program
Revision 23
Procedures
Florida Power and
Light St. Lucie
Defensive Strategies
06/29/2022
OFFICE
NSIR/DSO/SPEB
/ETC
NSIR/DSO/SPEB
/ETC
R-II/DRS/PSB
NSIR/DSO/SPEB
/ETA
NAME
ROber
DBradfield
JBrown
JClark
DATE
Mar 20, 2023
Mar 21, 2023
Mar 21, 2023
Mar 21, 2023