ML23031A293
| ML23031A293 | |
| Person / Time | |
|---|---|
| Issue date: | 02/02/2023 |
| From: | Security Performance Evaluation Branch |
| To: | |
| Shared Package | |
| ML23031A294 | List: |
| References | |
| Download: ML23031A293 (1) | |
Text
Baseline Inspection Completion with Certification Information By Site IR Report 8 Region No: 2 Site: 07000143 - Nuclear Fuel Services, Inc.
(NFS)
IPC Cycle: 2022 Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note Certify Date / By 96001 SG NRC FOF Insp CAT I Fuel Cycle Triennial 1
0 0%
Complete C
06/09/2022 - Berry, Joshua K Site Totals:
0 Region Totals:
Report Totals:
Page 1 of 1 1/26/2023 11:19:28 AM C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)
C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the total between 2020 and 2022.
- Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.