ML23031A291

From kanterella
Jump to navigation Jump to search
2022 IP 92707 IR Report 8
ML23031A291
Person / Time
Issue date: 02/02/2023
From:
Security Performance Evaluation Branch
To:
Shared Package
ML23031A294 List:
References
Download: ML23031A291 (1)


Text

Baseline Inspection Completion with Certification Information By Site IR Report 8 Region No: 2 Site: Catawba (CAT)

IPC Cycle: 2022 Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note Certify Date / By 92707 SG Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited When required 1

0 0%

Complete C

05/03/2022 - Berry, Joshua K Site Totals:

0 Region Totals:

Page 1 of 2 1/26/2023 11:16:34 AM C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

Baseline Inspection Completion with Certification Information By Site IR Report 8 Region No: 4 Site: Diablo Canyon (DIAB)

IPC Cycle: 2022 Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note Certify Date / By 92707 SG Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited When required 1

0 0%

Complete C

05/03/2022 - Berry, Joshua K Site Totals:

0 Region Totals:

Report Totals:

Page 2 of 2 1/26/2023 11:16:34 AM C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle NOTE: Biennial samples completed are the total of 2022 and 2023. Triennial samples completed are the total between 2020 and 2022.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.