Line 28: | Line 28: | ||
No findings or violations of more than minor significance were identified during this inspection. | No findings or violations of more than minor significance were identified during this inspection. | ||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety | Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety | ||
Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF- 85 | Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85 | ||
===Enclosure:=== | ===Enclosure:=== | ||
Line 40: | Line 40: | ||
Docket Numbers: 05000352 and 05000353 | Docket Numbers: 05000352 and 05000353 | ||
License Numbers: NPF-39 and NPF- 85 | License Numbers: NPF-39 and NPF-85 | ||
Report Numbers: 05000352/2024001 and 05000353/2024001 | Report Numbers: 05000352/2024001 and 05000353/2024001 | ||
Line 81: | Line 81: | ||
==INSPECTION SCOPES== | ==INSPECTION SCOPES== | ||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp- manual/inspection-procedure/index.html. | Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | ||
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on -site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on -site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | ||
Line 171: | Line 171: | ||
: (2) Unit 2 for the period of January 1, 2023, through December 31, 2023 | : (2) Unit 2 for the period of January 1, 2023, through December 31, 2023 | ||
MS07: High- Pressure Injection Systems (IP Section 02.06) (2 Samples) | MS07: High-Pressure Injection Systems (IP Section 02.06) (2 Samples) | ||
: (1) Unit 1 for the period of January 1, 2023, through December 31, 2023 | : (1) Unit 1 for the period of January 1, 2023, through December 31, 2023 | ||
: (2) Unit 2 for the period of January 1, 2023, through December 31, 2023 | : (2) Unit 2 for the period of January 1, 2023, through December 31, 2023 |
Latest revision as of 14:36, 4 October 2024
ML24128A083 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 05/07/2024 |
From: | Jon Greives NRC/RGN-I/DORS |
To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
References | |
IR 2024001 | |
Download: ML24128A083 (1) | |
Text
May 7, 2024
SUBJECT:
LIMERICK GENERATING STATION, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000352/2024001 AND 05000353/2024001
Dear David Rhoades:
On March 31, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2. On April 23, 2024, the NRC inspectors discussed the results of this inspection with Michael Gillin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000352 and 05000353
License Numbers: NPF-39 and NPF-85
Report Numbers: 05000352/2024001 and 05000353/2024001
Enterprise Identifier: I-2024-001- 0029
Licensee: Constellation Energy Generation, LLC
Facility: Limerick Generating Station, Units 1 and 2
Location: Sanatoga, PA 19464
Inspection Dates: January 1, 2024, to March 31, 2024
Inspectors: A. Ziedonis, Senior Resident Inspector L. Grimes, Resident Inspector E. Miller, Acting Resident Inspector
Approved By: Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Limerick Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period at rated thermal power.
On January 1, 2024, operators performed a controlled shutdown to replace two leaking safety relief valves (SRV), 'D' and
'L'. The unit was returned to full power on January 6, 2024, and remained at or near rated thermal power for the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power.
On March 2, 2024, operators lowered thermal power to approximately 65 percent for a control rod sequence exchange. The unit was returned to full power on March 3, 2024, and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on -site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk significant systems from impending severe weather during the week of February 12, 2024
71111.04 - Equipment Alignment
Partial Walkdown (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 'A' and 'C' residual heat removal (RHR) system on February 7 and 8, 2024
- (2) Unit 1 reactor core isolation cooling (RCIC) system following testing on February 15, 2024
- (3) Unit 2 RCIC system following testing on February 29, 2024
71111.05 - Fire Protection
Fire Area Walkdown and Inspection (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit common fire area 25 auxiliary equipment room on January 17, 2024
- (2) Unit common fire area 78 refuel floor on January 17, 2024
- (3) Unit 2 fire area 72 reactor vent supply fan area on January 31, 2024
- (4) Unit common fire area 27 control structure fan room, during continuous fire watch, on February 7, 2024
- (5) Unit 2 fire area 57 high-pressure coolant injection (HPCI) pump room on February 29, 2024
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 startup on January 4, 2024
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification training in the simulator on February 12, 2024
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
- (1) Unit 2 reactor enclosure supply fan maintenance effectiveness following 'B' fan failure during the week of February 19, 2024
- (2) Unit 2 reactor enclosure system maintenance effectiveness following loss of system function during the weeks of March 4 and March 11, 2024
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 emergent work to replace 'D' SRV following discovery of base-to-body flange external steam leakage during the week of January 1, 2024
- (2) Unit 2 emergent work in response to the 'B' reactor enclosure supply fan following fan failure during the week of January 29, 2024
- (3) Unit common emergent work in response to the 'B' main control room chiller trip on February 1, 2024
- (4) Unit 2 emergent work in response to the 'C' reactor enclosure supply fan following fan failure during the week of March 4, 2024
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 1 'D' SRV following discovery of base-to-body flange external steam leakage during the week of January 1, 2024
- (2) Unit 1 HPCI system following pre-outage scaffold erection in the pump room during the week of February 12, 2024
- (3) Unit 2 RCIC system division 3 logic following steam supply low pressure trip unit gross fail indication light not illuminating during surveillance testing during the week of February 12, 2024
- (4) Unit 1 'B' train of RHR following discovery of an overdue preventive maintenance activity on the motor-operated injection valve 17B during the week of February 19, 2024
- (5) Unit 1 and 2 emergency diesel generators (EDGs) following the receipt of part 21 notifications associated with event notification 56992 and 56993 during the week of February 26, 2024
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated Unit 1 forced outage (1F60) activities from January 1, 2024, through January 5, 2024
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)
- (1) Unit 2 HPCI system testing following planned maintenance during the week of January 8, 2024
- (2) Unit 2 'D' RHR system testing following planned maintenance on February 9, 2024
- (3) Unit 2 remote shutdown panel suppression pool temperature indication selector switch during the week of February 26, 2024
- (4) Unit 2 reactor enclosure system 'A' exhaust fan inlet damper following replacement of failed solenoid valve during the weeks of March 11 and 18, 2024
Surveillance Testing (IP Section 03.01) (3 Samples)
- (1) Unit 2 ST-6-092-314-2, D24 EDG slow start surveillance test on January 23, 2024
- (2) Unit common ST-4-078-490-2, 'A' control room emergency filtration / 'A' main control room heating, ventilation, air conditioning - control room envelope unfiltered in-leakage test in radiation isolation during the week of February 5, 2024
- (3) Unit 1 ST-6-043-320-1, daily jet pump operability verification for two recirculation loop operation during the week of February 12, 2024
71114.06 - Drill Evaluation
Additional Drill and/or Training Evolution (1 Sample)
The inspectors evaluated:
- (1) The inspectors observed and evaluated a training evolution involving licensed operator requalification, with associated emergency action level entry, in the simulator on February 12,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE03: Unplanned Power Changes per 7000 Critical Hours (IP Section 02.02)===
- (1) Unit 1 for the period of January 1, 2023, through December 31, 2023
- (2) Unit 2 for the period of January 1, 2023, through December 31, 2023
MS07: High-Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 for the period of January 1, 2023, through December 31, 2023
- (2) Unit 2 for the period of January 1, 2023, through December 31, 2023
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 for the period of January 1, 2023, through December 31, 2023
- (2) Unit 2 for the period of January 1, 2023, through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 23, 2024, the inspectors presented the integrated inspection results to Michael Gillin, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.13 Corrective Action IR 4727659 1D SRV Tailpipe temperature prompt jump 01/01/2024
Documents IR 4731070 2B RE supply fan failure 01/15/2024
IR 4740863 B Control Enclosure Chiller trip 02/01/2024
IR 4755684 2C RE supply fan failure 03/05/2024
IR 4755796 EOC for U2 RE HVAC Supply Fan Failures 03/05/2024
IR 4756444 Replace 2C RE Supply Fan Screen and Repair Stationary 03/08/2024
Vanes
IR 4756448 Replace 2B RE Supply Fan Screen and Repair Stationary 03/08/2024
Vanes
IR 4756647 2A(B)-E252 and 20-E270 Coil Cleaning 03/08/2024
IR 4756901 2B RE Supply Fan High Vibrations During PMT 03/09/2024
IR 4758544 Unit 1 Reactor Enclosure HVAC Total Flow Degraded 03/20/2024
IR 4759546 Unit 2 Reactor Enclosure HVAC Total Flow Degraded 03/20/2024
71111.15 Corrective Action IR 4753297 Part 21 EN 56992 (Air start solenoid valves) 02/26/2024
Documents IR 4753300 Part 21 EN 56993 (Woodward signal generators) 02/26/2024
IR 4756589 Part 21: Action to Walkdown LGS EDGs 03/08/2024
71111.24 Corrective Action IR 4757656 NRC leak identified on SV-076-255A(AS) 03/13/2024
Documents
7