IR 05000369/2023301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML23206A009
| number = ML23270C017
| issue date = 07/24/2023
| issue date = 09/20/2023
| title = William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301
| title = William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301
| author name = Bacon D
| author name = Bacon D
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Moser S
| addressee name = Pigott E
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000369, 05000370
| docket = 05000369, 05000370
| license number = NPF-009, NPF-017
| license number = NPF-009, NPF-017
| contact person =  
| contact person =  
| document report number = IR 2023301
| case reference number = 50-369/23-301, 50-370/23-301
| document type = Inspection Report, Letter
| document report number = 50-369/OL-23, 50-370/OL-23
| document type = Letter, License-Operator Examination Report
| page count = 1
| page count = 1
}}
}}
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:July 24, 2023
{{#Wiki_filter:September 20, 2023


==SUBJECT:==
==SUBJECT:==
WILLIAM B. MCGUIRE NUCLEAR STATION - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000369/2023301 AND 05000370/2023301
WILLIAM B. MCGUIRE NUCLEAR STATION - NRC EXAMINATION REPORT 05000369/2023301 AND 05000370/2023301


==Dear Mr. Moser:==
==Dear Mr. Pigott:==
The purpose of this letter is to provide U.S. Nuclear Regulatory Commission (NRC) approval of the proposed written examination and operating test under Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(4) and to confirm the final arrangements for the upcoming operator licensing examination at Williams B. McGuire Nuclear Station, Units 1 and 2.
During the period of July 31, 2023, to August 10, 2023, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the William B. McGuire Nuclear Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on August 17, 2023.


The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations, and you may administer the written examination in accordance with Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of August 14, 2023. The NRC staff will administer the operating tests during the weeks of July 31, 2023 and August 7, 2023. The list of the applicants approved to take the examination has been provided to your office.
All applicants passed both the operating test and written examination. There were no post-administration comments submitted by your training staff. A Simulator Fidelity Report is included in this report as Enclosure 2.


The examinations have undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examinations meet the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (404) 997-4703.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12.


Please contact your Chief Examiner, Mark Bates at (404) 997-4612 if you have any questions or identify any errors or changes in license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination or operating test, or both) specified for each applicant approved to take the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4518.


Sincerely,
Sincerely,
/RA/
/RA/
Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9 and NPF-17
Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos: 50-369 and 50-370 License Nos: NPF-9 and NPF-17


SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/OB1 RII/DRS/OB2 RII/DRS/OB1 NAME DEgelstad MBates TStephen DATE 7/24 /2023 7/24/2023 7/ 24 /2023
===Enclosures:===
1. Report Details 2. Simulator Fidelity Report
 
REGION II==
Examination Report Docket No.: 05000369, 05000370 License No.: NPF-9, NPF-17 Report No.: 05000369/2023301 and 05000370/2023301 Enterprise Identifier: L-2023-OLL-0026 Licensee: Duke Energy Carolinas LLC Facility: McGuire Nuclear Station, Units 1 & 2 Location: Huntersville, NC 28078-8985 Dates:  Operating Test - July 31, 2023 - August 10, 2023 Written Examination - August 17, 2023 Examiners: M. Bates, Senior Operations Engineer J. Bundy, Senior Reactor Inspector A. Goldau, Operations Engineer N. Lacy, Operations Engineer V. Furr, Operations Engineer (Trainee)
Approved by: Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Enclosure 1
 
SUMMARY ER 05000369/2023301 and 05000370/2023301; operating test July 31, 2023 - August 10, 2023
& written exam August 17, 2023; William B. McGuire Nuclear Station; Units 1 and 2 Operator License Examinations.
 
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 12, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
 
Members of the McGuire Nuclear Station staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.
 
The NRC administered the operating tests during the period of July 31,2023 - August 10, 2023.
 
Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. All Reactor Operator (RO) and Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.
 
There were no post-examination comments.
 
No findings were identified.
 
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
 
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
 
The NRC performed an audit of license applications during the preparatory site visit in order to confirm that they accurately reflected the subject applicants qualifications in accordance with NUREG-1021.
 
The NRC administered the operating tests during the period of July 31, 2023, to August 10, 2023. The NRC examiners evaluated five Reactor Operator (RO) and 12 Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021.
 
Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the McGuire Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
 
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
 
b. Findings No findings were identified.
 
The NRC developed the written examination sample plan outline. Members of the McGuire Nuclear Station training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 12, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
 
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
 
All applicants passed both the operating test and written examination and were issued licenses.
 
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
 
The licensee submitted no post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than September 24, 2025, in the ADAMS system (ADAMS Accession Number(s)
ML23258A122 and ML23258A148).
 
4OA6 Meetings, Including Exit Exit Meeting Summary On August 10, 2023, the NRC examination team discussed generic issues associated with the operating test with B. Bare, Station Manager, and other members of the McGuire Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
 
KEY POINTS OF CONTACT Licensee personnel B. Bare Station Manager M. Matheny Operations Manager J. Banse Assistance Operations Manager - Shift S. Moser Training Manager C. Vrikkis Superintendent - Nuclear Operations Training W. Killette Superintendent - Nuclear Operations Training J. Thomas Regulatory Affairs Manager C. Bush ILT Lead Instructor - Nuclear Operations Training R. Rowe Assistant Operations Manager - Support
 
SIMULATOR FIDELITY REPORT Facility Licensee: McGuire Nuclear Station Facility Docket No.: 05000369 and 05000370 Operating Test Administered: July 31, 2023 - August 10, 2023.
 
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
 
No simulator fidelity or configuration issues were identified.
 
Enclosure 2
}}
}}

Latest revision as of 23:21, 12 October 2023

William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301
ML23270C017
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/20/2023
From: Daniel Bacon
NRC/RGN-II/DRS/EB2
To: Pigott E
Duke Energy Carolinas
References
50-369/23-301, 50-370/23-301 50-369/OL-23, 50-370/OL-23
Download: ML23270C017 (1)


Text

September 20, 2023

SUBJECT:

WILLIAM B. MCGUIRE NUCLEAR STATION - NRC EXAMINATION REPORT 05000369/2023301 AND 05000370/2023301

Dear Mr. Pigott:

During the period of July 31, 2023, to August 10, 2023, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the William B. McGuire Nuclear Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on August 17, 2023.

All applicants passed both the operating test and written examination. There were no post-administration comments submitted by your training staff. A Simulator Fidelity Report is included in this report as Enclosure 2.

The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4518.

Sincerely,

/RA/

Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos: 50-369 and 50-370 License Nos: NPF-9 and NPF-17

Enclosures:

1. Report Details 2. Simulator Fidelity Report

REGION II==

Examination Report Docket No.: 05000369, 05000370 License No.: NPF-9, NPF-17 Report No.: 05000369/2023301 and 05000370/2023301 Enterprise Identifier: L-2023-OLL-0026 Licensee: Duke Energy Carolinas LLC Facility: McGuire Nuclear Station, Units 1 & 2 Location: Huntersville, NC 28078-8985 Dates: Operating Test - July 31, 2023 - August 10, 2023 Written Examination - August 17, 2023 Examiners: M. Bates, Senior Operations Engineer J. Bundy, Senior Reactor Inspector A. Goldau, Operations Engineer N. Lacy, Operations Engineer V. Furr, Operations Engineer (Trainee)

Approved by: Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Enclosure 1

SUMMARY ER 05000369/2023301 and 05000370/2023301; operating test July 31, 2023 - August 10, 2023

& written exam August 17, 2023; William B. McGuire Nuclear Station; Units 1 and 2 Operator License Examinations.

Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 12, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.

Members of the McGuire Nuclear Station staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.

The NRC administered the operating tests during the period of July 31,2023 - August 10, 2023.

Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. All Reactor Operator (RO) and Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.

There were no post-examination comments.

No findings were identified.

REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.

The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.

The NRC performed an audit of license applications during the preparatory site visit in order to confirm that they accurately reflected the subject applicants qualifications in accordance with NUREG-1021.

The NRC administered the operating tests during the period of July 31, 2023, to August 10, 2023. The NRC examiners evaluated five Reactor Operator (RO) and 12 Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021.

Members of the McGuire Nuclear Station training staff administered the written examination on August 17, 2023. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the McGuire Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.

The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.

b. Findings No findings were identified.

The NRC developed the written examination sample plan outline. Members of the McGuire Nuclear Station training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 12, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.

The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.

All applicants passed both the operating test and written examination and were issued licenses.

Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.

The licensee submitted no post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than September 24, 2025, in the ADAMS system (ADAMS Accession Number(s)

ML23258A122 and ML23258A148).

4OA6 Meetings, Including Exit Exit Meeting Summary On August 10, 2023, the NRC examination team discussed generic issues associated with the operating test with B. Bare, Station Manager, and other members of the McGuire Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.

KEY POINTS OF CONTACT Licensee personnel B. Bare Station Manager M. Matheny Operations Manager J. Banse Assistance Operations Manager - Shift S. Moser Training Manager C. Vrikkis Superintendent - Nuclear Operations Training W. Killette Superintendent - Nuclear Operations Training J. Thomas Regulatory Affairs Manager C. Bush ILT Lead Instructor - Nuclear Operations Training R. Rowe Assistant Operations Manager - Support

SIMULATOR FIDELITY REPORT Facility Licensee: McGuire Nuclear Station Facility Docket No.: 05000369 and 05000370 Operating Test Administered: July 31, 2023 - August 10, 2023.

This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

No simulator fidelity or configuration issues were identified.

Enclosure 2