ML17341A651: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Letter, Technical Specification, Bases Change | | document type = Letter, Technical Specification, Bases Change | ||
| page count = 6 | | page count = 6 | ||
}} | }} |
Revision as of 03:10, 26 February 2018
ML17341A651 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 12/06/2017 |
From: | Jarrell J P Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
W3F1-2017-0079 | |
Download: ML17341A651 (6) | |
Similar Documents at Waterford | |
---|---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024
[Table view]Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31 Category:Technical Specification MONTHYEARW3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023
[Table view]Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2022-0054, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability2022-11-0101 November 2022 Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2021-08-20020 August 2021 Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML21148A1042021-05-28028 May 2021 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual2019-09-20020 September 2019 License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. ML11224A0102011-07-20020 July 2011 License Amendment Request, Technical Specification Change Regarding Steam Generator Tube Integrity W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0045, License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers2008-09-18018 September 2008 License Amendment Request Relocation of TS 3.7.8 and Addition of LCO 3.0.8 the Inoperability of Snubbers W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0036, License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements2007-07-0303 July 2007 License Amendment Request NPF-38-270 to Modify Diesel Generator Fuel Oil Testing Surveillance Requirements W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 ML0624201532006-08-29029 August 2006 Amendment Technical Specification Pages, Moderator Temperature Coefficient W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation2006-02-15015 February 2006 License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown2005-10-27027 October 2005 License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown ML0513003032005-05-0909 May 2005 Technical Specifications, Issuance of Amendment No. 200 Modification of TS 5.3.1, Fuel Assemblies; TS 5.6.1, Criticality; TS 6.9.1.11.1, Core Operating Limits Reports & Deletion of TS Index W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate2005-03-17017 March 2005 Supplement to Amendment Request NPF-38-249, Extended Power Uprate W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 2023-07-26 Category:Bases Change MONTHYEARW3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program2023-07-26026 July 2023
[Table view]Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual2021-10-14014 October 2021 Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement W3F1-2021-0038, Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 20212021-05-18018 May 2021 Technical Specification Index and Bases Update to the NRC for the Period June 11, 2019 Through March 3, 2021 W3F1-2021-0004, License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual2021-04-0505 April 2021 License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to the Technical Requirements Manual W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System2019-08-27027 August 2019 Application for Technical Specification Change to Control Room Air Conditioning System W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-02-28028 February 2018 Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. W3F1-2017-0079, Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 20172017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6512017-12-0606 December 2017 Technical Specification Index and Bases Update to the NRC for the Period June 2, 2016 Through November 30, 2017 ML15170A1262015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 5 of 5 ML15170A1252015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 4 of 5 W3F1-2015-0006, Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part2015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 3 of 5 ML15170A1232015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 2 of 5 ML15170A1222015-06-17017 June 2015 Application for Technical Specification Change Regarding Risk-Informed Waterford Steam Electric Station, Unit 3 - Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program. Part 1 of 5 W3F1-2014-0067, Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 20142014-11-0505 November 2014 Technical Specification Index and Bases Update to the NRC for the Period June 30, 2013 Through November 3, 2014 W3F1-2014-0052, License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years2014-08-28028 August 2014 License Amendment Request Technical Specification Change to Extend the Type a Test Frequency to 15 Years W3F1-2013-0040, Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 20132013-07-0909 July 2013 Technical Specification Index and Bases Update to the NRC for the Period May 1, 2012 Through June 30, 2013 W3F1-2011-0080, Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 20112011-11-0909 November 2011 Technical Specification Bases Update to the NRC for the Period January 25, 2011 Through October 31, 2011 W3F1-2011-0067, License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train.2011-10-13013 October 2011 License Amendment Request, Proposed Change to Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train. W3F1-2011-0010, Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 20112011-01-24024 January 2011 Submittal of an Update to All Changes Made to Technical Specification Bases for the Period May 25, 2010 Through January 24, 2011 W3F1-2011-0005, Withdrawal of Technical Specification Change Regarding Steam Generator Program2011-01-19019 January 2011 Withdrawal of Technical Specification Change Regarding Steam Generator Program W3F1-2010-0051, Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 20102010-05-25025 May 2010 Technical Specification Bases Update to the NRC for Period July 2, 2009 Through May 24, 2010 W3F1-2010-0010, . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations2010-02-22022 February 2010 . Technical Specification Change Regarding Containment Building Penetrations During Refueling Operations W3F1-2009-0031, Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 20092009-07-0909 July 2009 Technical Specification Bases Update to the NRC for the Period November 11, 2008 Through July 1, 2009 W3F1-2008-0051, Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 32009-01-0808 January 2009 Entergy'S Response to Nrc'S Request for Additional Information Regarding License Amendment Request to Modify Requirements Regarding Control Room Envelope Habitability, Waterford Unit 3 W3F1-2008-0073, Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 20082008-11-11011 November 2008 Technical Specification Bases Update to the NRC for the Period February 16, 2008 Through November 10, 2008 W3F1-2008-0052, Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration2008-09-17017 September 2008 Transmittal of Waterford Steam Electric Station, Unit 3, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage and Add New Technical Specification 3/4 9.12, Spent Fuel Pool Boron Concentration W3F1-2008-0016, Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 20082008-02-20020 February 2008 Technical Specification Bases Update to the NRC for the Period June 2, 2007 Through February 15, 2008 W3F1-2008-0001, License Amendment Request NPF-38-275, Containment Isolation Valves.2008-01-0202 January 2008 License Amendment Request NPF-38-275, Containment Isolation Valves. W3F1-2007-0031, Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for the Period 07/02/2006 Through 06/01/2007 W3F1-2006-0037, Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 20062006-07-18018 July 2006 Technical Specification Bases Update to the NRC for the Period of November 1, 2005 Through July 1, 2006 W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/042004-10-0707 October 2004 Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04 W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 20042004-02-26026 February 2004 Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004 W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 20032003-07-24024 July 2003 TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003 W3F1-2003-0002, Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 20032003-01-15015 January 2003 Technical Specification Bases Update to the NRC for the Period October 1, 2002 Through January 7, 2003 W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 20022002-10-14014 October 2002 Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002 W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.22002-01-31031 January 2002 Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2 W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 20022002-01-16016 January 2002 Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002 ML18053A6971991-05-0808 May 1991 License Amendment Request Technical Specification Change Request NPF-38-114 2023-07-26 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17341A651&oldid=354176"