ML16214A291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16214A291
| number = ML16214A291
| issue date = 08/26/2016
| issue date = 08/26/2016
| title = South Texas Project, Unit 1 - Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies (CAC MF7577)
| title = South Texas Project, Unit 1 - Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, Md, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies (C
| author name = Regner L M
| author name = Regner L M
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
Line 13: Line 13:
| document type = Audit Report, Letter, Request for Additional Information (RAI)
| document type = Audit Report, Letter, Request for Additional Information (RAI)
| page count = 10
| page count = 10
| revision = 0
}}
}}

Revision as of 16:25, 25 February 2018

South Texas Project, Unit 1 - Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, Md, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies (C
ML16214A291
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 08/26/2016
Revision: 0
From: Regner L M
Plant Licensing Branch IV
To: Powell G T
South Texas
Regner L M
References
CAC MF7577
Download: ML16214A291 (10)