{{#Wiki_filter: | {{#Wiki_filter:September 28, 2021 | ||
==SUBJECT:== | |||
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000324/2021401 AND 05000325/2021401 | |||
==Dear Mr. Krakuszeski:== | |||
On September 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
No findings or violations of more than minor significance were identified during this inspection. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71 | |||
===Enclosure:=== | |||
As stated | |||
==Inspection Report== | |||
Docket Numbers: 05000324 and 05000325 License Numbers: DPR-62 and DPR-71 Report Numbers: 05000324/2021401 and 05000325/2021401 Enterprise Identifier: I-2021-401-0039 Licensee: Duke Energy Progress, LLC Facility: Brunswick Steam Electric Plant, Units 1 and 2 Location: Southport, NC Inspection Dates: September 13, 2021 to September 16, 2021 Inspectors: J. Brown, Senior Physical Security Inspector R. Patterson, Physical Security Inspector J. Wallo, Senior Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant, | |||
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
===List of Findings and Violations=== | |||
No findings or violations of more than minor significance were identified. | |||
===Additional Tracking Items=== | |||
None. | |||
=INSPECTION SCOPES= | |||
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: | |||
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | |||
==SAFEGUARDS== | |||
==71130.02 - Access Control== | |||
The inspectors evaluated the access control program through completion of the following | |||
===inspection elements: Access Control=== | |||
{{IP sample|IP=IP 71130.02|count=1}} | |||
(1) | |||
* Tier I: All Requirements | |||
* Tier II: (02.05 a-c, 02.06, 02.07 a-h) | |||
* Tier III: (02.08) | |||
==71130.04 - Equipment Performance, Testing, and Maintenance== | |||
The inspectors evaluated the security equipment testing and maintenance program through | |||
===completion of the following elements: Equipment Performance, Testing, and Maintenance=== | |||
{{IP sample|IP=IP 71130.04|count=1}} | |||
(1) | |||
* Tier I: All Requirements | |||
* Tier II: (02.09 a, b, 02.11 a-c, 02.12 a, 02.13 a) | |||
* Tier III: (02.14, 02.15 a-c) | |||
==71130.07 - Security Training== | |||
The inspectors evaluated the security training program through completion of the following | |||
===procedure elements: Security Training=== | |||
{{IP sample|IP=IP 71130.07|count=1}} | |||
(1) | |||
* Tier I: All Requirements | |||
* Tier II: (02.05 a, - d, 02.06 a -b) | |||
* Tier III: (02.012 a - b, 02.13 a-c) | |||
==71130.09 - Security Plan Changes== | |||
The inspectors evaluated the security plan changes through completion of the following | |||
===procedure elements: Review Security Plan Changes (IP Section 02.01)=== | |||
{{IP sample|IP=IP 71130.09|count=1}} | |||
: (1) Since the last NRC inspection of this program area, Security Plan Revision 15 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. | |||
==OTHER ACTIVITIES - BASELINE== | |||
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | |||
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample) | |||
: (1) Unit 1 (August 2020 through August 2021) | |||
Unit 2 (August 2020 through August 2021) | |||
==INSPECTION RESULTS== | |||
No findings were identified. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
* On September 16, 2021, the inspectors presented the security baseline inspection results to Mr. Sam Santaniello and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
71130.02 Corrective Action 02297862 | |||
Documents 02319416 | |||
2322325 | |||
Procedures AD-SY-ALL-0210 Site Access Controls Revision 6 | |||
AD-SY-ALL-0215 Security Search and Entry Processing Revision 6 | |||
AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures Revision 1 | |||
71130.04 Corrective Action 02298987 | |||
Documents 02306691 | |||
2310718 | |||
2319830 | |||
2350296 | |||
2365219 | |||
2369711 | |||
2370037 | |||
Procedures AD-SY-ALL-0580 Weapons Maintenance, Testing, and Accountability Revision 6 | |||
AD-SY-ALL-0610 Nuclear Security Equipment Maintenance Program Revision 0 | |||
AD-SY-ALL-0620 Testing and Inspection of Perimeter Intrusion Detection Revision 0 | |||
Systems (PIDS) | |||
AD-SY-ALL-0625 Security Owner Controlled Area (SOCA) Surveillance Revision 2 | |||
Systems Maintenance and Testing | |||
AD-SY-ALL-0630 Testing and Maintenance of Security Communications Revision 2 | |||
Equipment | |||
AD-SY-ALL-0640 Testing and Inspection of Security Search Equipment Revision 0 | |||
AD-SY-ALL-0650 Physical Barrier Access Control System Testing and Revision 0 | |||
Inspection | |||
AD-SY-BNP-0600 Testing and Inspection of (BNP) Security Equipment and Revision 1 | |||
Barriers | |||
Self-Assessments 2021-BNP-SEC- Nuclear Oversight-Audit Brunswick Physical Security February 25, | |||
2021 | |||
71130.07 Corrective Action 02299013 | |||
Documents | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
Procedures AD-SY-ALL-0510 Security Program Systematic Approach to Training Revision 5 | |||
AD-SY-ALL-0520 Security Training Revision 6 | |||
AD-SY-ALL-0524 Security On-The-Job Training (OJT) and Task Performance Revision 1 | |||
Evaluation (TPE) | |||
71130.09 Procedures Physical Security Revision 15 | |||
Plan (PSP) | |||
71151 Procedures AD-PI-ALL-0700 Performance Indicators Revision 4 | |||
6 | |||
}} | }} |
Latest revision as of 15:36, 18 January 2022
ML21271A343 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 09/28/2021 |
From: | Jannette Worosilo NRC/RGN-II/DRS/PSB2 |
To: | Krakuszeski J Duke Energy Progress |
References | |
IR 2021401 | |
Download: ML21271A343 (9) | |
Text
September 28, 2021
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000324/2021401 AND 05000325/2021401
Dear Mr. Krakuszeski:
On September 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000324 and 05000325 License Numbers: DPR-62 and DPR-71 Report Numbers: 05000324/2021401 and 05000325/2021401 Enterprise Identifier: I-2021-401-0039 Licensee: Duke Energy Progress, LLC Facility: Brunswick Steam Electric Plant, Units 1 and 2 Location: Southport, NC Inspection Dates: September 13, 2021 to September 16, 2021 Inspectors: J. Brown, Senior Physical Security Inspector R. Patterson, Physical Security Inspector J. Wallo, Senior Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: All Requirements
- Tier II: (02.05 a-c, 02.06, 02.07 a-h)
- Tier III: (02.08)
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program through
completion of the following elements: Equipment Performance, Testing, and Maintenance
(1)
- Tier I: All Requirements
- Tier II: (02.09 a, b, 02.11 a-c, 02.12 a, 02.13 a)
- Tier III: (02.14, 02.15 a-c)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: All Requirements
- Tier II: (02.05 a, - d, 02.06 a -b)
- Tier III: (02.012 a - b, 02.13 a-c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Review Security Plan Changes (IP Section 02.01)
- (1) Since the last NRC inspection of this program area, Security Plan Revision 15 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) Unit 1 (August 2020 through August 2021)
Unit 2 (August 2020 through August 2021)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 16, 2021, the inspectors presented the security baseline inspection results to Mr. Sam Santaniello and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Corrective Action 02297862
Documents 02319416
2322325
Procedures AD-SY-ALL-0210 Site Access Controls Revision 6
AD-SY-ALL-0215 Security Search and Entry Processing Revision 6
AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures Revision 1
71130.04 Corrective Action 02298987
Documents 02306691
2310718
2319830
2350296
2365219
2369711
2370037
Procedures AD-SY-ALL-0580 Weapons Maintenance, Testing, and Accountability Revision 6
AD-SY-ALL-0610 Nuclear Security Equipment Maintenance Program Revision 0
AD-SY-ALL-0620 Testing and Inspection of Perimeter Intrusion Detection Revision 0
Systems (PIDS)
AD-SY-ALL-0625 Security Owner Controlled Area (SOCA) Surveillance Revision 2
Systems Maintenance and Testing
AD-SY-ALL-0630 Testing and Maintenance of Security Communications Revision 2
Equipment
AD-SY-ALL-0640 Testing and Inspection of Security Search Equipment Revision 0
AD-SY-ALL-0650 Physical Barrier Access Control System Testing and Revision 0
Inspection
AD-SY-BNP-0600 Testing and Inspection of (BNP) Security Equipment and Revision 1
Barriers
Self-Assessments 2021-BNP-SEC- Nuclear Oversight-Audit Brunswick Physical Security February 25,
2021
71130.07 Corrective Action 02299013
Documents
Inspection Type Designation Description or Title Revision or
Procedure Date
Procedures AD-SY-ALL-0510 Security Program Systematic Approach to Training Revision 5
AD-SY-ALL-0520 Security Training Revision 6
AD-SY-ALL-0524 Security On-The-Job Training (OJT) and Task Performance Revision 1
Evaluation (TPE)
71130.09 Procedures Physical Security Revision 15
Plan (PSP)
71151 Procedures AD-PI-ALL-0700 Performance Indicators Revision 4
6